Category Archives: North Stratford Canal

2018 Round Up. 2nd January

HOORAY!!! Proper signal again, sorry for the delay. Here at last is a round up of 2018 and our vital statistics, who they are vital to I don’t know!

THAT Aqueduct!

We started off the year up on the Llangollen having spent Christmas up in the basin, if it hadn’t been for me getting some work I think we’d have headed back there this year as we enjoyed it so much. On our return journey we dropped down onto the Montgomery Canal for a few days. Then we gradually worked our way along the canal stoppage hopping, the last bridge holding us up by a few days whilst work over ran, but we were first through and soon back down on the Shroppie  at the end of January.

Ellesmere Port

A pootle up to Chester and then Ellesmere Port where we spent several days looking round the museum, mooring on site made this very easy.

Shuffling with Brian on NB HarnserDry bottom

Oleanna had a day in the dry dock at Chester to check out why our bowthruster had stopped working and gave me chance to do a quick touch up of the blacking.

Jaq from NB Valerie

We then made our way back to Nantwich where we sat out the Beast from the East and at last got chance to meet and spend a bit of time with Jaq from NB Valerie.

The magical Shroppie

Then we climbed the Shroppie to Autherley Junction turned right onto the Staffordshire and Worcester Canal and made our way down to Stourport where the river rose on us over night and left us stranded for far too long. This did mean that Tilly had her annual jabs gaining shore leave for another year. A hire car gave us a few days away from the flashing lights of Stourport, a trip to Beverley and to catch up with the John Godber Company in Bromsgrove along with a recky trip to Droitwich.

Long routeShort routeIn the end we got bored of waiting for the river to drop and decided on going the long way round to Droitwich. Of course about two or three days into ‘the long way round’ the levels dropped and we could have done a quick journey down the River Severn.

TardebiggeLock 40

Oh well we enjoyed all the locks having good weather for the Tardebigge Flight.

Once in Worcester we turned onto the river and made our way down to the Gloucester Sharpness Canal where we pootled down to the end with all the swing bridges being worked for us, met up with Jaye and Duncan (I’d have got into big trouble if I didn’t mention them!), saw the hulks, all sorts of flamingos and got to watch tall ship Kaskelot pass us.

Duncan, Jaye, Mick and meTall Ship

Back up the Severn for Micks 60th birthday weekend where all our siblings joined us to celebrate. We watched cricket at New Road in Worcester, ate in Droitwich, caught steam trains in Kidderminster and ate some more in Bridgenorth, a very good weekend.

Family at the cricketBirthday Boy

About time there was a picture of meYummy

By now the summer had already started with wall to wall sunshine and our Sunday roasts became Sunday barbeques. We made our way back to Worcester and turned back down stream to Tewkesbury (I do like a good Tewkesbury!) and the river Avon. The last rain storm for a while slowed our progress upstream, but we stayed safe.

A lovely Avon mooringThe Avon was a picturesque cruise and we met up with friends from Australia and old work friends of mine in Stratford, taking advantage to see as much theatre as we could.

The Swan, Stratford

Whilst in Stratford I heard that I’d got the job designing Panto in Chipping Norton this year. This would now affect the remainder of the year slowing us down somewhat. We headed back into Birmingham up the Lapworth flight (meeting NB Chuffed) to rendez vous with NB Blackbird and crew.

One last kiss with NB BlackbirdPerry BarHere we planned to explore all the back waters of the BCN, but the sun was now on permanently and the thought of spending weeks surrounded by brick work and concrete reflecting heat at us was not attractive. So we chose a route out of the city that we’d not done before (via Ryders Green and Perry Barr) and headed for the shade of trees.

Sheltering on the Ashby

Work and heat were the feature of the next few months. On days we wanted to cruise we tried to be up early to make the most of the cool hours before the sun got too high in the sky to avoid. We hopped from mooring to mooring hunting out good places with maximum tree cover, not so good for the solar panels but it meant we didn’t cook inside.

Loads of cars in CoventryCoventry BasinWe gradually cruised the Coventry Canal,  the Ashby Canal for the first and second times, all the way into Coventry, down the North Oxford onto the Grand Union and on up to the Leicester Section. All our favourite moorings on the summit pound were visited and the London Leckenbys visited us at Foxton. All this slow cruising was interspersed with Panto meetings in London and Chippy, necessitating being near to stations, but this worked out well with a bit of planning.

The finished model for Aladin

Leamington Spa was a handy station back on the Grand Union for my final  model meeting in mid September, freeing us up until rehearsals started a month later.

Well worth a visitLeamington Spa StationWe made use of the Heritage weekend visiting places in both Warwick and Leamington. Oleanna got to visit the Saltisford Arm where we worked our way through the dirty washing drawer before heading back towards the Oxford Canal crossing bows with NB Tentatrice on the way.

Lift bridges on the Oxford keep Oleanna smilingStunning sunsetsThe South Oxford Canal then became our home for the next three months.

Lunch at the Turf Tavern

First we cruised all the way to Oxford taking our time to return to Banbury. I then spent four weeks working my socks off in Chippy enjoying being creative again on Panto, returning each weekend to wherever Oleanna was with my head full of song lyrics and dance moves.

Final dress rehearsal

Once Aladdin was open and hoards of kids were shouting ‘He’s behind you!’ I could return to my normal life at 3mph, the boat, Tilly’s friends and Mick’s breakfasts.

What a way to spend Christmas Eve

Due to winter stoppages leaving the south Oxford couldn’t happen until near Christmas so we slowly made our way northwards breaking off to have a pre-Christmas in London and then once Napton Lock 9 was open we headed into the middle of nowhere for Christmas. The year ended with us returning to Crick and sadly missing out on the festivities at The Red Lion with friends.

We’ve had a great year travelling, meeting up with old friends and new. We’re looking forward to where 2019 will take us and who we shall meet along the way.

Us

So our final statistics for the year are.

Total distance is 944 miles, 1 ¼ furlongs and 614 locks. There were 170 moveable bridges of which 77 are usually left open (although three of those weren’t); 131 small aqueducts or underbridges; 39 tunnels and 2 major aqueducts.

This is made up of 669 miles, 1 ¼ furlongs of narrow canals; 118 miles of broad canals; 35 miles, 5 furlongs of commercial waterways; 42miles, 7¼ furlongs of small rivers; 78 miles, 3 ¾ furlongs of large rivers; 476 narrow locks; 129 broad locks 9 large locks.

1084.6 engine hours, 7 hire cars, 1,383.63 litres diesel, 10 gas bottles (we do have gas central heating), 54 bags of coal, 2 waterway museums, 3 big houses, 3 versions of tuperware, 60th birthday, 2nd solar panel fitted, 7 overnight guests, 6 packs of Dreamies, 26 friends, 1 snake, 9 Mrs Tilly stamp of approval moorings, 7 pairs socks,  6 pairs gloves, 11 supermarket deliveries, 56 boxes wine delivered!