Category Archives: BCN

A Productive Day. 14th September

Cast Iron Roving Bridge

Rain. Well it had been forecast.

Just about all our neighbours moved off all sporting their wet weather gear. We on the other hand sat indoors to stay dry. We’d most certainly chosen the best day to ascend the locks into Birmingham.

Tilly ventured outside when the rain dulled a little, but still nothing had changed to alter her opinion of BUMingham.

Into reverse

During the morning we heard a low deep engine coming. Was it a trip boat or could it be a coal boat. The bow came into sight, it was NB Roach. I waved to the chap on board as Mick made his way out of the pram cover, we were after a new gas bottle and he had some on board.

NB Roach with quite a load on

With quite a few boats moving about he wasn’t able to stop straight away. Another boat hailed him too for some coal. He gradually reversed back into the space behind us and tied up. £35.50 so not bad and we’d rather stock up now as there are still rumours of shortages further north. He’s heading for Worcester then onto Stourport for next Monday, back up to Stourton Junction hoping that the lock in Kidderminster is operational after a big fire and subsequent pollution in the canal there.

I spent the day working. All of a sudden emails were flooding in regarding Panto. These needed attention and the props list needed up dating and forwarding to Jo who is already working on the show.

Our super powerful torch comes in handy at times

Then it was time to put the finishing touches to my #unit21 model. Adjustments of lines on the floor a bit off here and there to make the overall proportions look better. Then it was time to take some photos to update Amy on the model.

I updated the technical drawings ready to scan and send to Graham for a new price. Different covering materials were sought out and samples requested so that projection can be tried out. A very productive day for me.

Soggy woofer on the roof

Mick spent his time lighting the stove and generally keeping warm, he also walked to Sainsburys for a few bits.

Tilly, after a couple of checks on the outside, retired to bed for just about all of the rest of the day. A very productive day asleep I think you’ll find!

0 locks, 0 miles, 2 boats left, £35.50 gas, 1 day behind already, 1 soggy day, 1 model finished, 1 big torch, 1 happy director, 4 new samples, 1 panto set builder, 0 production manager, 1 updated props list, 1 bored cat, 1 cosy boat.

‘I Thought I Was Going To Drown!’ 13th September

Damson Parkway Bridge 78A to Cast Iron Roving Bridge, Birmingham

Now yesterday I said we’d be starting our ascent into Birmingham this morning, well before we could start the climb there was a matter of cruising almost 6.5 miles before we actually dropped down 12.92 m, then we could start our ascent.

Birdies

An alarm was set and there were no cuppas in bed this morning, tea was had with breakfast. Surprisingly a boat came past a little before 8am, but it was a C&RT tug parting the water as it went, hopefully it wouldn’t be going as far as Camp Hill Locks.

Back in 2015 this route out of Birmingham seemed to take forever, we’d come down and up the locks and then cruised for what felt like an absolute age before we reached Catherine De Barnes all the time wondering if there’d be any space for us. Heading the other way still took time but today there was plenty to look at as C&RT work boats numbered many.

Diddy paddle power

On a floating pontoon sat a generator and attached to it were some little paddle motors. We thought that maybe these could be used where the depth is very shallow on the off side, they almost looked like they were a new section for Mouse Trap. A tug was moving more of these along to a new site.

Dredging was happening at two sites, well one chap was engrossed with his phone, another had a tug with it that had to be moved out of the way to let us pass. All very busy.

Two bridges becoming one

Soon we started to see red gates and panels on the bridges, these are so that the fire brigade can drop their hoses into the canal should they need to. At Bridge 82 there are actually two Bridge 82s. Once they have crossed the canal they join together. One the far side of the bridge someone has painted Kingfishers and Herons.

I’d just been remarking about graffiti artists and what a shame it was that they didn’t start off with their masterpieces and had to practice their tag so many times. Back in February 2019 we got to see the evolution of Ghost from scrawled tag to multicoloured art work around the northern parts of the BCN, then there was one of his, an intermediate tag quite close to Top Cat.

Tyseley Waste Bridge 88A

Passing through Tyseley all you can see is the large incineration plant and the bridge that leads to it. Once the area was known for it’s tube works which attracted numerous bicycle and motorcycle manufacturers. I used to have a Dawes Bicycle which was made here.

Camp Hill Service block

Up ahead modern tall buildings appeared as we passed old factories and warehouses, all showing blocked up windows and archways from decades of change and decline. Then our first lock came into view, the top of the Camp Hill flight. Alongside the top lock is a service block with all facilities, we pulled in to top up on water, empty the yellow water, dispose of rubbish and give Tilly’s pooh box a refresh as she’s likely to be using it more than she has been recently.

Camp Hill Lock 1

With a handcuff key in my back pocket and windlasses at the ready we could start on the locks. The top lock was empty which meant unless top gates leaked most of the flight would be empty too. I lifted a paddle and then walked down to lift a paddle at the next lock so that it could be filling as we made our way down. We soon got into our stride, me setting the next lock ahead as Mick lifted a paddle on the lock with Oleanna. I then walked back to open and close gates. Most locks had handrails on the bottom gates enabling me to kick them open, then Mick helped to close the offside gate with a pole, saving a lot of walking round.

No escape from scrawl

Walking ahead at Lock 3 there is a big pool as the canal curves round under road bridges. There was the bow of a boat ahead, was it moving or just moored up? It was moving, an Aqua Hire boat, so I walked back to set Mick free the next three locks now in our favour.

Big chunks of steel sit alongside gates on these locks and boast their age, still going since 1891.

Around Lock 6 is surrounded by graffiti. Some good, some not so. Having time to read some of it I realised a lot was in memory of Jason. Was Jason a graffiti writer or a local lad who died at the locks?

Straight on

Straight on for us at Bordesley Junction.

Looking back, to the left still uncharted water to us

The canal to our right, the continuation of the Grand Union Canal, is still one to tick off the list on the BCN. We cruised on to Digbeth Junction now on the GU Digbeth Branch.

By Warwick Bar there is building work ongoing. Most of the area is listed, so buildings are being refurbished for new uses. Residential and food outlets will dominate, the area being transformed due to the proximity of HS2. Through the bar itself with double gates at each end, then a right at Digbeth Junction leaving the Typoo Basin behind us and now on the Birmingham and Fazeley Digbeth Branch.

All of a sudden we were greeted with floating rubbish, earlier in the morning we’d seen a lady litter picking whilst feeding the ducks, it looks like the entrance to Curzon Street Tunnel could do with several like minded people.

HS2 works going on behind
Old and new infront

Building work surrounds you as you come out of the other side of the tunnel. Six years ago it was Birmingham City University buildings going up, now added into the mix is HS2 which will cross the canal over the bottom lock of the Ashted Flight.

Mid flight

The locks were all full, so now we started with our uphill routine, the locks however were mostly close enough together for me to come back and close the top gate instead of Mick stopping to close it. The bottom gates are now also single gates, so no kicking to open them or walking round required, just a little bit more umph!

Between Locks 1 and 2 there is a tunnel, a renowned tunnel! Six years ago Lillian lost a nav light here having come down the lock and being a touch too close to the offside, it really was a horrible grating crunching noise. Today I wished Mick luck and left him to close up at Lock 2 as I walked through the tunnel to lock 1 to empty it and then sit and wait.

Waiting

Below Mick had a passing thought, maybe he should drop the level of the pound a bit to increase the air draught in the tunnel. The top of the chimney was removed and a bucket of toilet solids was moved into the well deck, just in case! The tunnel light went on along with the nav lights, from the far end I could at last see Oleanna making slow progress through the tunnel.

Mind the bump

The handrail along the towpath is beefy wood and mentally pushes you towards the offside wall. But today Mick blocked that out. I could hear the bowthruster nudging the bow away from the wall, from my position it almost looked as if Oleanna was crabbing her way through the tunnel, there isn’t enough width for this to have happened. Slowly they made progress a bulge in the wall very obvious to me towards the northern end. Out came Oleanna’s bow, both nav lights still in tact, hooray!

A scuff or two

Up she rose in the lock, Mick giving the pram cover a checking over. Had the tunnel struck again and damaged the fabric? As Oleanna came up to the top the damage could be seen more clearly. The fabric had a few scuffs from the tunnel wall/roof, but more to the point was a scratch along the grab rail. Then we noticed another and another, some of them right down to bare steel! Mick should have listened to that little voice in his head and dropped the level of the pound. Ashted Tunnel had struck again!

Bu**er!

A pause for lunch on the bollards just through the next bridge was finished with a slice of chocolate banana loaf to help us up the last flight of the day, Farmers Bridge.

At Ashton Junction we turned left onto the Birmingham and Fazeley Canal, a right would have us descending locks again heading towards Spaghetti Junction. Left however meant thirteen locks and arriving into the heart of the canal system of Birmingham at Cambrian Wharf and Old Turn Junction.

Farmers Bridge Bottom lock

The bottom two locks are slightly set apart from the others, so I wouldn’t be returning to close gates behind Oleanna. Just after I’d lifted the paddles on Lock 12 we could see a volunteer walking towards us, he’d come to tell us to leave the gates open as a boat was heading down. We swapped with them in the next pound and the volunteer continued on downhill.

Beam on the off side

Lock 11 has it’s bottom gate beam on the off side and as I stood there waiting for Mick to bring Oleanna into the lock a man walked up, climbed over a low wall on the off side and then walked down the steps below the lock. It was fairly obvious that he was looking for somewhere a touch out of view, he reached into his pocket and pulled out a rizla packet. I closed the gate to the lock and was about to walk up to the top paddles to fill it when the chap came back up the steps.

Bywash at Lock 11

‘Are you going to fill down there?’ he said in a slightly alarmed voice pointing to the pound below the lock. ‘No just where my boat is’. I could see the relief on his face ‘I thought I was going to drown!’ He returned down the steps now knowing he’d stay dry to smoke his spliff in peace.

Now we were in the thick of the flight and the locks ahead empty or just about. So it was easy to start filling a lock and walk up to open the gate on the one above, then return to close the gate behind Mick. The volunteer walked back up the flight, not stopping to help us directly, but instead he opened up the locks ahead of us as he climbed back up the hill, a great help. Thank you.

Gate open and waiting

We were on a roll now up the flight, each lock waiting for us.

The locks under buildings are quite atmospheric, modern architecture meeting old transport. The lock under a bridge even more so. Above here masses of scaffolding engulfs the buildings, cladding work going on. Extra supports over the canal have had to be fixed to pillars on the existing building to hold the scaffolding up. In a weeks time the towpath down the flight will be shut for even more scaffolding to be erected.

At lock 6 we were greeted with the bottom gate shut. Maybe the volunteer didn’t want to set too far ahead of us. But as I emptied it the reason became clear quite quickly, the top gates leaked a lot, so in the time we’d take to get there the pound above would have emptied itself. The lock above was also full for a similar reason.

A touch of a leak

Then I spied a downhill boat coming out of lock 2. We could now leave gates open for them, we rose up lock 4 and waited for them. Plenty of crew on hand to work NB Kew down the flight, but it being a full length boat time was taken to position her in the lock, the tiller pulled right across and tied in position the arm removed so as not to snag on the lock walls. We wondered how far they would get before dark and which way they were heading.

Up the last of todays locks, we’d reached Birmingham, now we had to find a space. Back in February 2020 this had not really been a problem, but today spaces were few. One space in the corner of Cambrian Wharf, it can be shallow in that corner and awkward to get into.

Top of Farmers Bridge Locks

Oozells Street Loop was chocka. There was one space left towards Sheepcote Bridge, but would it be big enough for us.

One space left

We pulled in, a chap from NB Chyandour came out to take our centre rope. We touched both at the bow and stern, slightly overlapping to be truthful, but neither of our neighbours minded.

Oh Blimey! BUMingham again! At least the small sideways trees have a touch more cover to them this time!

BUMingham bricks!

Time to dig out the sand paper and primer, get something on the grab rails before the rain brings with it rust and makes the job a bigger one. I chipped off loose paint, sanded back the gouges and applied a coat of primer. I’d intended repainting the grabrails this year, but time is now running out both weather wise and before panto starts. So a patch up will have to suffice for this winter. Hopefully in the next few days there won’t be constant rain so I can get undercoat and top coat on it too.

Tweaked in

25 Locks, 9.73 miles, 1 straight, 1 right, 2 lefts, 2 tunnels, 12.92m down, 35.9m up, 4 paddle boats, 2 dredgers, 2 tugs, 1 full water tank, 1 empty wee tank, 1 clean pooh box, 3 boats met, 2 slices cake, 1 volunteer, 1 weed smoking survivor, 6 inches too long, 1 cosy mooring, 1 disappointed cat.

https://goo.gl/maps/SShBALoBLemZ2d7X9

Walking Uphill. Catch Up. 7th February

There she is

Lisa sent through a photo of Oleanna this morning. The level at the docks is just about normal and Oleanna was sitting there in the rain. Yesterday it must have been sunny at the marina as the solar panels were doing a good job of keeping the batteries topped up and the engine bay got up to 8 C. It’s handy being able to check on her from afar, keeps our minds at rest.

Paper stretched and ready

Here in Scarborough I’ve been busy with work. A new, to me, art shop is proving very handy. I’ve not had chance to go into The Art Room yet and I can’t see what art materials they normally stock, Delia responds to emails swiftly and is very helpful. This week I was after a pad of thick cartridge paper and a wooden board so that I can stretch the paper properly. If water colour paper isn’t stretched, when you start to paint the paper cockles and will never lie flat again. In the past I’ve half heartedly taped paper to a plastic board, but this never really worked that well. So I have invested in a board that will take A3 paper comfortably. This will first get used for my boat origami paper design. Then I hope to use it for paintings of the waterways, which I’ve been planning on doing for some time now. I have the equipment, the reference, all I need now is the time!

This week I’ve started work in earnest on Panto for Chipping Norton. Sketch technical drawings enable me to make pieces of model, then do adjustments. Yesterday I finished working my way through the show, there is still lots to alter and work out, but I have solutions for most things. I’m quite happy with my galleon set, but the smugglers inn isn’t right yet! Hopefully this coming week things will get sorted before my next work arrives on the doorstep!

Cotton top measuring up

I’ve finally finished knitting a top for my sister-in-law which is now measured out and blocking on some new foam mats I’ve treated myself to. These will be handy to take back to the boat as they breakdown into foot squares, but once clipped together they give me 3ft square to pin items onto. They will save me pinning things out onto the back of our mattress on the boat and hoping things will be dry before bedtime!

Cricket on the TV, who’d have thought

Mick, whilst not watching the cricket, has been working on the blog. Two years ago we moved to WordPress and our current deal is nearly up. There are things we’d like to try to improve, but unless we spend more money they are proving hard to sort. Paul (Waterway Routes) suggested sometime ago we tried WordPress.org, this is free but we’d need to pay to have the blog hosted, which is all working out at a similar price to if we stayed put. We could go back to Blogger and Open Live Writer, but photos had been problematic, Mick is still working his way through the blog inserting them and I like the way wordpress works.

Tomorrow Tilly it’s too dark to go for a walk now!

However we miss having a blog roll that moves with peoples posts and a forwards and back button. Mick has found the relevant code, we may need to enlist my nephew Josh into giving us some guidance with this. We’ll see what happens.

Mick is taking his time reading the book he selected from our Christmas stash. The chap has left Kate Saffin and Alarum, headed to the Exeter Canal and is now somewhere on the Bridgewater Canal.

I on the other hand have finished mine, which I’ve really enjoyed. When we first moved on board I read a lot, but in the last couple of years I’d got out of the habit. With so many books to choose from I was spoilt for choice. So when Sam from NB Red Wharf said that Canal Pushers was really good and Debby from NB Chuffed asked for a review I thought I’d best start there.

I like a good crime story and with it being set on the canals it started off on a good footing. Andy Griffee has taken the theory of a serial killer, pushing people into the waterways around Manchester and set a similar story on the Stratford, Worcester and Birmingham Canals.

Jack has just picked up a narrowboat to see if a life afloat will suit him after recently being divorced. Let down by a friend who was going to help him learn the ropes he is soon rescued by a lady walking the towpath, Nina. A friendship is formed between the two of them, Nina keeping herself a bit of a mystery.

Look at those whiskers

Knowing the stretch of canal where the book is set is quite warming to a sole that misses being on the cut right now. Jack’s experience of The Navigation Inn at Wooten Wawen made me smile as it was very similar to ours when we hired our last boat from there seven years ago. Stratford with the tourists and theatre, Wedges, Packwood House, all the time Jack learning how to handle the boat as the mystery of the death of a young homeless lad unfolds.

Not breakfast, but a beetroot and feta burger in homemade gf buns with lockdown chips

Several plots intertwine, gradually unravelling themselves at a narrowboat pace. There are several moments where the pace speeds up which has lead to a couple of nights where I’ve kept the light on whilst Mick has snored away. I don’t want to say too much as I don’t want to give the plot away, as it is well worth a read. My only criticism, I’ve always walked down hill to the shops in Alvechurch, not up hill.

Verdict, a good read especially for those with a canal interest, but this is not required and it certainly doesn’t turn into a manual for narrowboat handling. I’m looking forward to the next book in the series River Rats which takes place in Bath. I may read my way down towards the Kennet and Avon via Murder on the Oxford Canal by Faith Martin. I wonder if there are enough novels to cover the whole network?

Also not breakfast, but turnip curry, beetroot and carrot curry with homemade gf nan breads

This weekends walk will prove to be a rosy cheeked one as it is currently trying it’s best to snow, although I doubt it will settle. An east wind will be whipping up the sea and will chill us to the bone, thermals needed today.

Last week we braved the climb up onto Oliver’s Mount. Down into the valley to then climb back up the other side and then further all up hill. We chose to go cross country avoiding felled trees up to the top.

Up the top

Here on the summit a telecommunications mast stands. Back in the early 1990’s this was the only place in Scarborough to get mobile phone signal when the telephone exchange had a serious fire knocking out all landlines in the town. The other high point here is the war memorial that marks a view point.

We took our time looking for family names. None from the Geraghty side, but quite a few Capplemans. I shall have to dig out the family tree I was sent after my Dad passed away and see if any of them are mentioned.

The view right up the coast

Oliver’s Mount makes for a great view point. Looking down all the usual landmarks have found new positions around town (as they do!) and the South Bay looks more like a smugglers cove. Views right into the North Bay and up the coast, we took our time spotting friends houses.

The South Bay

The way back down we followed the roads which make up the Oliver’s Mount race track, stopping to say hello to the beach donkeys who are on their winter holiday, sadly they were just a touch too far away for a good photo.

Us last week

0 locks, 0 miles, 1 level back up, 1 glimpse, A3 sketch board, 20 sheets, 0 cow gum, 1 new proscenium, 1 white card sketch model complete, 409 pages, 1 cotton top, 67 pins, 2 t-towels, 6 capplemans, 5 miles up and down, 1 bored cat in need of a hobby, 1 windswept short walk, 0 cobwebs.

Us today!

Where Were We

2020. Sheepcote Street Bridge, Birmingham.

2019. Thorne Lock, Stainforth and Keadby Canal. LINK

2018. Chester, Shropshire Union Canal. LINK

2017. Lime Kiln Lock, Trent and Mersey Canal. LINK

2016. Newark Show Ground. LINK

2015. Hemel Hempstead, Grand Union Canal. LINK

2010. Bramble Cuttings, Trent and Mersey. LINK

2020 A Long And Winding Year.

Get yourself a cuppa and put your feet up, this is a long post.

Into BUMingham

Having seen New Year in on the North Stratford Canal we commenced the new year by cruising in to Birmingham or as Tilly would have it know, BUMingham, she’s not too keen!

What a stripy world!

A meeting with Amy from Dark Horse Theatre Company about a project in the summer set out our years cruising as I’d need to be in Huddersfield then York for the show. Then it was time to pack and get myself ready for ten days in Vienna. This would be the longest I’ve been away from boat life since we set out in 2014. Half of my clothes were packed up along with a basic scene painting kit and I jetted off to what was a mixed experience. Despite the problems I had a wonderful time working with a great team in the theatre, I hope one day to return.

Whilst I marvelled at the wonderful scenes in Vienna and pulled my hair out at work, trying to keep a calm exterior, Mick and Tilly headed back out into the countryside towards Tardebigge on the Worcester and Birmingham. Here they met up with a friend Chris who was planning a boat build.

Hello!

Mick and Tilly came back into Birmingham to pick me up and then we set about exploring the BCN. There is plenty to explore and we didn’t quite manage to go everywhere, but we did our best.

Smethwick Locks

We headed up Smethwick New Locks onto the Old Main line. Stopped at Dudley Port Basin, coconuts accompanied us down Brades Staircase, then through Netherton Tunnel where we’d planned on visiting Hawne Basin, but thick ice thwarted our first attempt. The following day we succeeded and had a bumpy ride along the Dudley No 2 to fill our diesel tank.

Emma and Ted

Factory Locks brought us back onto the Old Main Line, we visited Wolverhampton, turned onto the Wyrley and Essington Canal and wiggled our way through the rubbish to Pelsall Junction. Here we had a wonderful get together with my bestestest friend and her son Ted (my Godson) who were over from Sydney, an all but too short lunch with them before they headed onwards on their whistlestop tour of England.

The Cannock Extension and Anglesey Branch were ticked off followed by the Daw End Branch, The Rushall Canal, Tame Valley Canal and up the Ryders Green Locks back into the centre of BUMingham early February.

The Jewellery Quarter kept us busy with visits to Smith and Pepper a time warp jewellery manufacturers, The Back to Backs, The Coffin Works. We watched the film 1917.

The Garden white card scale model

I designed costumes and made the white card model for The Garden for Dark Horse whilst we sat out storm Ciara which was to wipe out the Figure of Three Locks on the Calder Hebble. The damage to the locks looked great and not fixable quickly, a rethink to our cruising route was needed for me to get to work in the summer.

We went to the Symphony Hall and listened to Schubert and Berg spurred on by Dimitrios from NB Galene. Storm Dennis kept us from cruising to our next evening of entertainment at Titford Pump House, a bus replacement did the job so that we could see Alarum Theatre Company’s Acts of Abandonment. Little did we know at the time that this was to be our last live theatre until December.

A night out in the countryside for Tilly and a last night in the city to fill our bellies with curry. Then we were off again, up Smethwick Locks under the M5 where the scaffolding was being taken down. We turned up the Oldbury Locks following a boat that turned out to be NB Sola Gratia. A spin round the Titford Pools was in order before we returned for another diesel top up at Hawne Basin.

The Walsall Canal now beckoned us, that was a bumpy ride over trolleys, trees and all sorts! A fantastic fabric shop, the New Art Gallery right by our mooring and The Leather Museum kept our interest for a couple of days before we climbed up the Walsall Locks back up to Wyrley and Essington Canal.

The garden at Urban Moorings

The ladies at Urban Moorings welcomed us for an overnight visit, time to work the washing machine hard as we plugged into the electric. Then we kept our fingers crossed for a mooring at The Black Country Museum, which thankfully worked.

Marion and John came to meet us for an afternoon at the museum and we all enjoyed fish and chips with plenty of salt and vinegar in between visiting shops and watching chain links being made. The following day we took a boat trip into the Dudley Tunnel, had a second visit to the museum along with a portion of chips before heading out to moor in Tipton and have a visit from Heather from NB Bleasdale, followed by a pie at Mad O’Roukes Pie Factory.

The 7th of March saw us descend the Wolverhampton 21, leaving the Birmingham plateau behind us. Blimey we managed to pack a lot into the first ten weeks of the year! Just as well really. Onto the Shroppie where I had my first successes with gluten free sour dough bread, Tilly got to remember life in the countryside and we were treated to Shroppie Sunsets again.

Burgers with the Margees

The recent storms had brought down numerous trees and caused landslips so our progress was a touch slow heading northwards. We had a lovely lunch with Alison and Laura the Margees at Norbury Junction, they were to be our last visitors on board Oleanna for quite sometime.

Passing NB Bessie Surtees on the Tyrley Locks we actually got chance to chat for the first time. A stop to stock up in Market Drayton, we saw our first homemade mask (a pair of y fronts repurposed) and the start of empty shelves in supermarkets with people gleeful to have a twelve pack of toilet roll under their coat.

The Audlem flight was busy with plenty going down and NB Mountbatten coming up, delivering coal as they went. Theatres closed that day and we started to put into practice new ways of working locks hoping to keep ourselves safe. As we socially distanced around the shops in Nantwich people were joking about the virus. We shopped, adapting what we bought to what was available and then got ready for our first Zoom with family on the 21st March.

We stocked up with NB Halsall at Calverley then made our way onto the Middlewich Branch and down Cholmondeston Lock. The following morning (23rd March) we listened to our gut instincts. If lockdown was to happen we’d rather not have to negotiate locks to get to shops or services, so we winded and headed back up Cholmondeston Lock onto the Nantwich pound. Our gut instinct was correct.

Adam and Adrian on NB Briar Rose

The next few days we saw plenty of boats moving, finding places they wanted to spend the coming weeks, heading for home or temporary ones like NB Briar Rose. Jac my sister in law eventually managed to get a flight back from Melbourne where she’d been to celebrate her Mum’s birthday, at last everyone was where they should be.

We tried different moorings out for size as the need to fill with water or get shopping arose. It was also good to keep Tilly moving, both to stop her from getting bored and to help the local wildlife survive.

Our decision to be on the Nantwich pound turned out to be a good one, we ended up mooring at the bottom of Hurleston on the visitor moorings most, this became ‘Home’ for us where we watched spring turn into summer.

Watching the field behind the hedge be ploughed, planted and start to grow. Listening to the Lapwings enjoying the bounty in the potato fields. Getting to know our neighbours at a distance. The wheelie shoppers. The huskies out for their morning walk. The egg farm at the top of the locks. Weekly veg boxes from Nantwich Veg Boxes which we collected for ourselves and NB AreandAre. Supermarket deliveries were sought each week, sometimes only managing click and collect. The sun shone and Tilly had freedom. The coal boats kept us stocked up with fuel and our waterless (composting) toilet took one need to move out of the equation.

By mid-April my design for The Garden had been reimagined into an illustrated audio play. I was to do the illustrations, then they would have audio and some animation added to be available online. Chippy panto started to gear up with the hope that all would be back to normal-ish by the end of November for the show to be mounted.

We winded, went for walks, watched plays on the internet, winded, ate cheese scones, winded again! Tilly ventured further afield, across her field. We had barbeques, brownies and watched the reservoir banks get mown by remote control.

By Mid-May we were allowed to travel, so we hired a car for a day trip to Scarborough to see how our house was after the tenants had lost it during lockdown. In need of some tlc we now made plans for the rest of the year. We would be returning to life on land for a while, but planned on cruising as much as we could before then.

On the 23rd of May the suspension of the 14 day rule was lifted, our ‘home’ mooring was now 48 hours only so it was time to start moving again. Some boats around Hurleston headed off straight away, others remained a full 14 days before pushing off. We spent the next two weeks pootling to the far ends of the pound, Hack Green and Calvereley, the gunnels got a repaint and we said farewell to NB AreandAre who were heading up onto the Llangollen.

Cholmondeston Lock

With a full boat of veg and fruit from Nantwich Veg boxes, a Sainsburys shop and a visit from NB Halsall we were ready and on the 10th June we pushed our ‘home’ mooring away for the last time this year, Calverely was visited for a top up of water a toilet refresh and then we were off, turning onto the Middlewich Branch and descending Cholmondeston Lock, our first lock in 80 days. New gardening gloves became my boaters PPE and worked well, better than sanitising every five minutes.

Across onto the Trent and Mersey where we headed for Bramble Cuttings for a couple of nights. We’d been hoping to be able to drop down onto the Weaver but the Anderton Boat lift was still closed. So instead we winded at Whatcroft flash and headed up the Cheshire Locks hoping to catch Bosley Locks being open for a day to make our way onto the summit pound of the Macclesfield.

Nice Lock

It was nice being back on familiar ground again, although it took a little while to be able to do the Trent and Mersey hurdles over the lockgate beams with ease after sitting still for so long.

Our chairs were brought out onto the towpath to watch the setting sun at Tilly Railings and a barbeque was enjoyed on the Dane Aqueduct as we waited in line for Bosley Locks to open.

Bosley Locks and The Cloud in the background

With a single hander in front and one behind everyone helped out where we could making our passage up the locks a very jolly if hot one that only took 2.5 hours. Over the next ten days or so we pootled our way along the Macclesfield Canal, such a lovely stretch of water and oh those bridges! Still our favourites.

Calling in at Bollington Wharf we had our gas locker lid mended and had a top up of diesel. Foxgloves filled the canal banks and woods, we stopped at favourite spots along the way turning under the snake bridge at Marple onto the Peak Forest Canal at the end of June, heading for Whaley Bridge and Bugsworth Basin.

Saturday 4th July the pubs could re-open, we however went for a walk and waited for our delivery from Sainsburys along with a diesel top up from NB Alton. A batch of cheese scones were made to help us down the Marple flight on the 7th, we were the second boat down and it felt like we were pioneering boats going where no one had gone for months.

A couple of nights at Droylesden Marina saw to the washing pile and to recharge our batteries before we descended into Manchester. Our last narrow lock of the year was to be Ancotes Bottom Lock 1 on the Ashton Flight where we paused for a night at Telford Basin before tackling the Rochdale 9 on our own the following day. Patience and sheer determination got us out of Lock 92 at the bottom and was rewarded with a cheese scone as we made our way out to the Bridgewater Canal and Worsely.

The 14th July saw us rising up the Wigan Flight. We’d made arrangements to share the locks with NB Billy but it was decided by the volunteer lock keepers that they might be over long to share with, so instead we teamed up with John and Lindsey on NB Merganser. With the help of the Wigan Flight crew setting ahead we made good time up the flight, we then slowed down leaving the others to head off ahead of us.

The next few days we found ourselves leapfrogging NB Billy, or should that be hopfrogging? But we finally caught them up at Blackburn to share the locks. Another spectacular sunset was enjoyed by all near Foster Swing Bridge.

We’d planned to take our time along this stretch, but with local lockdowns looking possible in the area we decided to push on. The Burnley Embankment was busy with walkers and not a place to stop so we continued on to the bottom of Barrowford Locks. The following day we were caught up again by NB Billy so we shared the final flight up to the summit with Clare and Pete.

Our sixth anniversary of being fulltime boaters happened to coincide with pulling up at our favourite mooring on the network, the curley wurlys above Bank Newton. The following day the clouds lifted and we got to see the view. A barbecue was just managed before it started to rain.

It wasn’t quite plain sailing down into Skipton as the skipper of NB Amelie ended up in the cut at the bottom of Bank Newton and then we had problems with lock gates and swing bridges. Mick and I had an overnight in Scarborough leaving Tilly in charge and with the magic food bowl primed. On our return to Skipton we were met by two octogenarians leaning out of the upstairs windows of their house waving. We joined Margaret and Robert for a lovely meal, good to see them even if we were a bit nervy being in their company inside.

Sunny weather accompanied us onwards and finally I managed to take the photo I’ve been after for four years, Oleanna coming towards me under Parson’s Bridge. Now we have the matching pair, Lillian going away from us, Oleanna towards.

At Bingley five rise we teamed up with NB Barley to descend with the help of Lock Keeper Clare, carrying on to Saltaire in the sunshine.

A pause in Rodley meant we could meet up with friends Graham and Tracy in their new garden room, very nice to have a good catch up with them. The following day we took the opportunity to have lunch with my cousins Julie and John, our first pub in months.

Meeting up with Jenny and Andy on NB Barley again we shared the locks down into Leeds with them early the next day. A lack of water meant it took an hour to do one pound as water was let down from above, but we made it in the end to Granary Wharf. Shame the lack of water followed us, in fact the basin did a good job of emptying itself overnight. It took quite a few hours before boats had enough water to be afloat again, we all made a hasty exit as soon as we could.

Back into the big locks of the Aire and Calder we motored on to Ferrybridge where now only three of the power station cooling towers remain, a very sad sight.

Down Bank Dole Lock, the slow filler and we headed to Selby. Our trip up the Tidal Ouse was an interesting one a there were SO many trees floating about, we had to try our best to loose them before passing through what few bridges there were. Kingfishers escorted us just about all the way to Naburn which was a real treat. Instead of pulling up in York we decided to head on up to Ripon, we’d spend time in York on our way back, or so we thought!

Above Boroughbridge a familiar boat came into view, NB Billy. This was the last time our bows would cross this year. At Oxclose Lock we had some time for Tilly to explore before heading up into Ripon Basin to meet up with Robert and Margaret again and for Tilly to show off her ability to spot otters.

I’d get it in the neck if I didn’t include a photo!

On our way downstream the river was rising, we stopped off for a meal at The Dawney Arms making the most of the Eat out to Help out deal. Wonderful food and chance to meet up with Kerry the Landlady and hoped that the river level would ease overnight. Fortunately it did and we made our way in to York. We had hoped to meet up with old friends whilst we were in the area, it turned out the only people I got to see where Jaye and Duncan for lunch. Social distancing, rising rivers sadly put paid to seeing other people.

Over the next ten days the river rose twice. On one fall we made it back into York to pick up a supermarket delivery but very quickly headed back to Naburn where we ended up breasting up in a line of four boats tied to the floating pontoon by the water point. Levels didn’t rise so much as to necessitate wellies or waders, but it did put paid to the London Leckenbys joining us for a few days at the nearby campsite. A big disappointment all round.

But on the 31st August levels had dropped sufficiently for us to head back to Selby accompanied by Richard and Heather on NB Isabella, new boat owners. Naburn was their very first lock, Selby was to be their second! It was such a beautiful morning, we led the way but then let them go first when we reached Selby, we were likely to be able to stem the tide better, but they managed the lock with ease.

Lovely to see Bridget and Storm

At West Haddelsey we had a visit from Bridget and Storm, so lovely to see them. We’d planned on being good and sitting out, they’d even brought their own chairs and the camper van for their own toilet. But as it started to rain we bent the rules taking shelter inside Oleanna. This was the day I gave a second phone to the god of the cut.

For a replacement we headed down to Goole, calling in at Viking Marina to check we would have a mooring later in the month. After filling up with cheap diesel we then headed off up toward Doncaster and Sprotbrough where we caught up with Mick’s niece Fran, before returning back onto the Aire and Calder to do maintenance jobs and enjoy our last days onboard.

On the 18th September we pulled into our berth at the marina, finished off the contents of the freezer and started to pack. Two trips in a hire car to Scarborough and we were moved, Tilly joining us the second time.

Back then we imagined we’d be down to Oleanna doing jobs on day trips and by now we’d have had a couple of weeks out on the cut, but this simply wasn’t to be.

Living Room reclaimed

Jobs in the house keep me busy, along with starting work on the postponed Chippy panto. Mick for a while applied for supermarket jobs, hoping to be a delivery driver. The only job he was offered was as a meet and greeter just before Novembers lockdown. We both decided that maybe we’d cope without the money.

Not as low as she got after the breach

Then before Christmas came the news of the Aire and Calder breach. Fortunately plenty of people are keeping an eye on all the boats including Oleanna.

Blimey what a year!

So our vital statistics for the year 2020 according to canal plan are

Total distance is 792 miles, 2 ½ furlong and 339 locks . There are 82 moveable bridges of which 5 are usually left open; 233 small aqueducts or underbridges and 41 tunnels – a total of 19 miles 6 ¾ furlongs underground and 8 major aqueducts.

This is made up of 365 miles, ¼ furlongs of narrow canals; 242 miles, 4 ¾ furlongs of broad canals; 81 miles, 3 ¾ furlongs of commercial waterways; 76 miles, 1 ¾ furlongs of small rivers; 0 miles of large rivers; 27 miles of tidal rivers; 202 narrow locks; 118 broad locks; 18 large locks; 1 lock on major waterways.

Sadly with Oleanna’s log book where it should be, onboard, I’m not able to offer up the engine hours, litres of diesel, gas bottle or bags of coal. This year I can’t even work out how many boxes of wine we’ve gone through!

However I can tell you that from one page of journeys on our trip computer, missing out all the journeys in between the start of the page and the end, the total distance travelled would have been 2.25 furlongs. Instead it actually amounted to 56 miles 7.5 furlongs with 19 winds (turning around). This was of course in Lockdown 1. Grand total number of winds this year, 67.

Christmas Day 2020, Scarborough Spa

Here’s hoping that the pandemic calms down, we all get vaccinated and the breach on the Aire and Calder gets sorted so that we can go boating again. After all we didn’t plan to move back on land permanently!

Not a bad view

Extra Measurements, Breach 10. 3rd January 2021

Goole

Firstly thank you to Dave Scouts and Kevin Too for suggesting Bingmaps. The National Library of Scotland map images alongside the satellite image is very interesting. I’ve sneakily put an extract here that shows the railway line. We’ve come across this before but had forgotten about it. Have to say though these maps make it very easy to see where an old railway used to be, I quite like trying to work it out for myself from the satellite images, but can then confirm my suspicions using this and OS maps.

Side by side

The actual bank slip along this stretch is about 400ft east of where the railway bridge was. Paul (Waterway Routes) pointed this out from examining my photos, Marks photos and the flag on a map I’d put up the other day. Mick had also spotted this when we’d first seen the comment on Facebook. All interesting stuff to keep you busy on a winter Sunday afternoon.

Rays over the Wolds

Today we kept ourselves busy too. The hire car keys will be handed back tomorrow so one last trip to check on Oleanna before it gets a little bit harder to do so, or impossible when a new lockdown is imposed. So after breakfast we hopped in the car to cross the Wolds and wish Oleanna a Happy New Year.

Todays view

Stepping down onto the stern was a touch easier again. Measurements were taken 34 inches to the top of the pontoon from the water level, this started off at 48 inches, when I first thought of measuring it. Up some more, which is good news despite the breach leaking and some ships coming and going from the port again.

Today I remembered to take the freshly washed blinds for the front door back. Measurements were taken as I’ve not made new ones yet and one of the poppers which has needed replacing for a while definitely needs attention before we sleep on board again.

But I’ll need a die set and spare poppers to do this, hopefully someone in Scarborough might be able to lend me the die set. My next problem will be what size the poppers are, 10mm, 12mm, 11mm heavy duty. I measured everything except the flipping popper size!

Porthole bungs were put back in their covers and hung back on doors, ready to be deployed on those Spring mornings when the sun beats in through the bathroom windows long before anyone wants to be awake.

Brrrr!!

Mick turned Oleanna’s key and started her up. She was a little bit surprised at being woken up from her long sleep, but soon relished her engine whirring, warming up the engine bay.

Icey

Over our packed lunch we had the same discussion as before, whether to tighten the ropes or not. The marina is quite frozen at the moment, certainly between us and our nearest neighbours. Down the side of Oleanna there was a gap, she’s obviously been moving about quite a bit in the wind, carving herself a patch of water. We decided to tighten the ropes a touch, but not fully should the level drop a bit.

Mick chatted with Geoff. Apparently the level has been higher, but dropped again. The caisson gates are still closed and the pumps are still running, even though at one point Geoff thought the level out on the canal was higher than in the docks. We’re glad we’ve left some slack.

Local MP Andrew Percy has commented on the breach today on facebook.

‘I’ve been popping up to check the breach in the canal near East Cowick regularly and did so again this afternoon. I happened to bump into the Canal and Rivers Trust guy who was out doing one of the daily inspections. Whilst water has continued to come out of the breach, the temporary works have held steady and there are no concerns at the moment. He also confirmed that the CRT and their engineers and contractors are due back on site tomorrow all being well to start considering next steps. The future works will also involve works to the damaged banks further along the canal which have been caused by the fluctuating canal levels. Just thought people might like the update. When I hear more I’ll let folks know!’

Before we left I decided to take an educated estimate of where the level normally is, by using the rusted and green marks on the pilling around the marina as a gauge. This was measured to the top of the pontoon. 16.5 inches. So currently the level is 17.5 inches down on the norm. Oleanna’s gunnel at the stern must have been just above the pontoon when we first arrived as that sits 20 inches above the water.

Bum

According to the C&RT notice the navigation was to remain closed until January 4th as a precaution, tomorrow. Exol Pride I’m sure is just chomping at the bit to get her next load up to Rotherham.

We said our farewells to Oleanna, we hope to be able to visit every couple of weeks to check on her, but who knows if this will be possible.

Hope to see you soon.

As we drove back to Scarborough, along the extra scenic route via Wetwang, we remembered our first trip back when the fields were all golden having recently been harvested. Then they went brown with white flecks of chalk as the fields were ploughed over. Now shoots of green are pushing up to find sunlight. I wonder what Tilly’s field is doing at our lockdown ‘Home’ mooring at the bottom of Hurleston?

0 locks, 0 miles, 1 last day of having a car, 17.5 inches to go, 2 blinds, 1 not so blind, 10/ 11/12/15mm? 3 ropes slightly tightened, 1 icy marina, 2 ships, 2 weeks hopefully!

Where were we

2020, The Giraffe, Birmingham City Centre LINK

2019 Crick, Leicester Line Grand Union Canal LINK

2018 Maesbury Marsh, Llangollen Canal LINK

2017 Marple, Macclesfield Canal LINK

2016 Kings Marina, Newark, River Trent LINK

2015 Hunsdon Mill Lock, River Stort LINK

Twenty One Down. 7th March

Top of Wolverhampton to Hunting Bridge No 7, Shropshire Union Canal

Lock 1 Wolverhampton Flight

The chaps at Oxley Marine had warned Mick of a pound a few locks down the Wolverhampton flight that empties itself overnight. They suggested after locking down the top lock to leave a paddle cracked open at both ends of the lock to send water down. We however didn’t like the idea of leaving water coming down the flight.

Star t Wars

So whilst I popped to Sainsburys for some milk, a newspaper and to see how their stocks of loo roll were doing, Mick sent some water down the flight. The first pound had been a couple of inches low, so that was topped up and another couple of locks worth of water flowed down and around the bywashes of the flight. Hopefully this would be enough.

Sharing the work

We entered the top lock at around 9:45am and started to work our way down. We’ve been up three times, the last time Mick single handing as I’d broken my ankle, but today was to be our first time going down the flight.

Rubble and Industrial past

The second lock was a touch too far to walk ahead to set to then return to let Mick and Oleanna out, after all I’d be doing that on the majority of the flight so I saved my energy.

Date stones

We made steady progress downhill dropping into our routine quickly. Each and every lock was empty so required filling. Back and forth I walked, Mick closed top gates and lifted a bottom paddle.

Giving the M a clean

There were several gongoozlers. A man of very few English words watched and tried to express how interesting it all was. Then a young chap with a can of cider started to ask questions. He offered to open and close gates, lending a hand. Even though I explained how things worked he didn’t get it. He asked if I wanted any more help, ‘Only if you want to’. Was I going to have an assistant all the way down the flight? No, as I walked ahead to set the next lock he wandered off down a path, at least he’d saved me walking round to open gates on a lock.

Handrails!

All bar one of the flight have double bottom gates and only three have handrails on them. At these I could kick the bottom gates open, but the ones without a handrail I walked round.

A couple walking up the flight (about halfway) stopped and chatted, on their way back down they opened and closed some gates for me. They asked how many locks there were, 21. Over what distance are they, at the time I didn’t know this, but I know I’d already walked 4.5 miles!

Viaduct. The towpath has improved since we first came up, no wading through mud

Some biscuits and water kept us going. Under the viaduct, where trains head to Birmingham from Shrewsbury. The sun was now out making it quite a pleasant day.

Then the aroma of horses, loads of horses. Looking through the hedge on the offside I could see horse boxes parked up at Wolverhampton Racecourse. A Mum and young boy walked past, he was trying to stand and watch, but Mum kept pushing him along, the same at the next lock. Sadly I didn’t get the opportunity to ask if he’d like to push a gate. However Tilly stopped them dead in their tracks, wooing them sat in a window.

Get on with it!!!!

Never mind them! Will you two please hurry up and stop moving the outside. This one has plenty of trees , will you tie it up now! Yes NOW!!!

At lock 18 a muscle in my left arm decided it had had enough. Blimey it hurt. Mick suggested that I drove, all well and good but as I couldn’t lower my arm without it hurting I wouldn’t have been able to operate the throttle. I continued winding paddles and keeping my left arm raised. Thankfully it wore off and was as if nothing had happened.

Just look at all those trees!

Really, this outside fitted the bill. She’s been singing Saturday, Saturday, Saturday is Tillys day, for days now, but it didn’t seem to be my day. She’d been and got a newspaper so I knew it was Saturday! No matter how much I pleaded from every window and door they just kept on going.

21!

At 1:15pm we pulled out of the bottom lock, biped the horn to announce our imminent arrival at Aldersley Junction. But which way would we turn?

Right please.

Right please

There was a gap in the moored boats so we pulled in and had some well earnt lunch. A couple of Norbury Junction hire boats came out from Autherely Junction each in turn headed north. This meant the stop lock, all of four inches would be in our favour.

Blossom

Whilst descending, Mick disposed of rubbish at the bins, then we moved up to the water point and topped up the tank. Just gone 3pm we pushed off again to reach our chosen mooring for the day between Bridges 7 and 8 of the Shropie about an hours cruise ahead.

There it is and only one boat

This was a very strong contender for a Mrs Tilly stamp of approval two years ago, except Mrs Tilly stamps hadn’t come about at that point. Would the mooring meet Tilly’s exacting standards?

Can I come out now?

A touch too blowy to find out properly. Tom had to remove things from the top because it was so blowy. She stayed inside and mixed floury things together and put a chicken in the oven. Today wasn’t Saturday after all it was going to be Sunday.

That way or…
that way?

22 locks, 5.52 miles, 1 newspaper, 4 rolls not 100, 21 empty locks, 84 paddles working, 1.8 miles, 2 helpers, 1 can cider, 1 can beer, 1 right, 1 left, 1 full water tank, 1 clean pooh box, 0 rubbish, 1.5 hours shore leave, 0.5 taken, 2 much fresh air, 1 loaf started, 2 much discard, 1 Tilly fan email, Hello Guy! 1 roast chicken, 2 pooped boaters, 68 days on the BCN, 1 Oleanna has left the plateau.

https://goo.gl/maps/XZGyYUaN5DZREHaFA

Day 9.

Starter fed in morning and evening.

Flours, oil, seeds and water mixed and left overnight ready for tomorrow.

Skating

Tipton Medical Centre to Off Side mooring Wolverhampton

Ice!!! That hadn’t been factored into the plan for today!

Figure Skating

The alarm had been set, a full days cruise ahead of us, but we woke to Coots ice skating outside the boat. After breakfast Mick went to see how thick it was with a boat hook, too thick. Oh well, stand down everyone.

Filters ready for the next service

One job today was buying filters for the next engine service. So instead of picking them up as we cruised past Oxley Marine, Mick caught a train then a bus down to Autherley Junction just in case the boatyard there is closed tomorrow. The chaps said that they were always there and furnished Mick with all he wanted before returning back up to the Wolverhampton Level.

Bye bye Tipton

Not only did he return with filters but with news that at 132ft lower there was no ice, there was also no ice in Wolverhampton. By now the sun had worked it’s magic and melted the ice in Tipton too.

Next time

So after lunch we pushed off to get ourselves to the top of the locks ready for the morning. With a bit more time on our hands than originally planned we were disappointed that it was too late on a Friday to turn down the Bradley Arm. The C&RT Bradley Workshops are at the end there and needs to be open to provide enough room to wind, Fridays they knock off at 3pm, we wouldn’t get there in time. So that is one thing left on the list for next time.

The sun was out, warming everything. Bright blue skies, such a shame not to make the most of it going down the locks, but that’s boating for you.

The waterfall in Coseley Tunnel

Coseley Tunnel dripped at the northern end, buildings were being built. We tried to remember what this stretch was like when we first did it on NB Winding Down. Far more derelict factories and warehouses then.

It would make a fantastic set, not sure what for though

At Horseley Fields Junction we looked out for the old entrance to what is now Urban Moorings, a bricked up archway must have been where it was. The service mooring visible as we came past the junction, no need to do any washing today so we would cope with the ringroad noise for a night.

Was that the way in, now all bricked up

0 locks, 5.31 miles, 2lefts, 1 straight, 2 ice skaters, 2 oil filters, 1 fuel filter, 1 air filter, 2 buses, 2 trains, 1 sunny day, 1 pumpout tank taking root, 2 dabchicks, 1 sour dough starter ready for use, 1 more night on the plateau.

A slightly better photo
https://goo.gl/maps/VxaePMcfotKbP7a1A

Day 8.

One starter bubbling away waiting to be fed. The discard jar is now full. Bread and pancakes this weekend me thinks.

Traps, Tunnels, Terra Firma And Tara. 5th March

Black Country Museum to Owen Street Bridge, Tipton

After booking ourselves onto the midday tunnel trip we walked back into the Black Country Museum. There were places we’d not looked at yesterday. The first to catch our eye was the Trap Shop.

Open today

Here a very knowledgeable chap talked us through the history of trap making. From men sitting hammering shapes, to fly wheel presses churning out parts to a gas powered engine that turned the presses. Sidebotham’s sold animal traps around the world even after they were banned in England. Not the nicest of things they were designed to hold their victim until the hunter came along to release them!

Inside the trap shop

The building was originally ran along the back wall of Sainsburys in Wednesfield, well before the supermarket was there. It was dismantled kept in storage and took four years to build back to how it had been.

The Pawnbrokers

We called in at the Pawnbrokers, Tipton in the day had forty such shops, for such a small town this just showed how most of the inhabitants lived from day to day hand to mouth, or not even managing that.

Bottles of stuff, whether they did you any good was a different matter they just looked the business

The chap in the Chemist was full of the new street plans further up the hill. The first building to be erected will be a pub from Wolverhampton. Around 30 million has been raised to create the new street and after many years of planning things are starting to happen. The aim is for the new street to be fully open in two years time, sadly our years pass won’t cover that, but maybe there will be something new before the end of the year for us to look at.

Helter Skelter being dismantled
Trolleybus!!!!

Then Mick spotted a trolley bus. Would it get us up the hill and back down in time for our trip into Dudley Tunnel? We walked up to catch it, but with no passengers waiting for it it headed back up the hill. So instead we walked back down to the lime kilns to see if we could work out which of the sunken boats was an Ampton. Below the surface hulls lurked.

There’s an Ampton down there somewhere!

Oleanna is 26 paces long and 58ft 6″. So we needed to find a hull that was around 35 paces long. We think we found two, both very well submerged.

Dudley Canal Trust was heaving with young kids who’d all been on a trip into the tunnel. They were full of it. One lad almost gave us a guided tour without being in the tunnel, he said it was quite ‘Bumpy’. Our boat was far quieter, only six of us. We donned hard hats and sat on the benches. The chap at the helm gave us a running commentary and another fella kept an eye on us and untied the boat ready for the tunnel.

Hard hatted and ready

Limestone mines in Castle Hill necessitated a tunnel system to help extricate the limestone. Lord Ward had the tunnels and canals built under the hill, work started in 1775 a year before the Act of Parliament was passed for both tunnel and canal. The work was completed in 1778. The tunnel gave access to the other side of the hill, 3 miles underground, the second longest in the country.

One of the caverns without it’s roof and two tunnels ahead

Large caverns and various tunnels fill the hill. Today the first two caverns have no roof and are open to the sky, then our boat dipped into the black of the tunnels. Now lined with concrete and areas oversprayed the first section is very round, but this soon becomes more rock like. Opening out into a larger cavern we were shown a film explaining how the limestone was created, then the hills pushed up creating fault lines.

Pixel par illuminations

On further and another cavern, more film showing how the limestone was mined and how the Victorians used the tunnels for excursions, coming in by boat and listening to bands, having picnics. Today there is a stage where performances can happen, people get married and concerts are performed.

Formations

We backed out through a different tunnel, this one lined with handmade bricks. The original method for boats to come through the tunnel was to be legged. Two volunteers took to a plank in the middle of the boat and they started to leg us along. The tunnel being only one boats width meant one way traffic and boats would queue up at either end to await their turn. One chap could leg three boats joined together on his own, meaning he made more money than the normal pairs of leggers.

Once through the main tunnel the boat would enter the big cavern where numerous tunnels headed off, which one was the right way? A lamp hangs in what would have been dusty air to guide you through. They say this is where the term ‘light at the end of the tunnel’ comes from. However our guide didn’t explain how the leggers got the boats across the wide cavern, presumably the boats were poled across here.

The light at the end

Passage through the hill was much easier through Netherton Tunnel, opened in 1858, which was wide and had a towpath on both sides. So by 1959 Dudley tunnel was more or less disused and British Waterways were going to close it, despite protests it finally closed in 1962. Much work was done by determined enthusiasts and it reopened in 1973. In the late 80’s more work was done to open up links between the caverns. Now visitors can go inside in the electric powered boats to see the sights. No diesel engines are allowed in the tunnel due to lack of ventilation and most modern boats don’t have a low enough profile to manage the journey. A very interesting tour, well worth the drips and getting very cold.

No bread to buy other than in a pudding

Mick still wanted a ride on the trolleybus so we headed back into the museum, but it seemed that the driver must be at lunch, so we joined the queue for a sneaky bag of chips between us before we left.

Tara for now

Time to head onwards. We winded with the bow under the bridge into the museum then pulled up at the services. Water topped up and yellow water disposed of we pushed off and headed to Tipton.

We pulled in behind a couple of boats moored on the off side by the Medical Centre,walked down into the shuttered town centre to find the Co-op to stock up on a few items.

Back at Oleanna we decided that our second mate should be trusted with some outside time, she most probably wouldn’t like it. Chaperoned for a while she nosed at the people in the doctors waiting room and checked under the friendly cover, but no one was around to play with.

At bloomin last!!!

A short whole after 4pm a visitor arrived. Heather, Mrs Bleasdale, was in the area and had spotted we were too, so she called in for a cuppa, a hot cross bun and a very good boaty catch up. NB Bleasdale is currently stuck down on the Great Ouse due to high river levels and delayed maintenance. Last year we had a catch up in Weedon, so there was plenty to talk about. The subject turned to the Irish waterways, this is the second person who’s brought the idea up. Costs need to be looked into, but it’s an idea, I might need to do extra work for us to be able to afford it, but it is an idea!

Mad O’Roukes Pie Factory

Heather headed off to catch a train and we headed off to walk through Tipton to Mad O’Roukes Pie Factory. We’ve heard mention of this pub by several bloggers but never been. This being our last night on the Birmingham plateau we decided to treat ourselves and managed to time it with Thursday Pie for a fiver night.

The interior of the pub is very much an old style boozer, no modernisation here, just tables and benches to pack in the masses. We managed to find one of only two free tables, ordered our pies and drinks.

Pies and more chips!

Their gluten free menu had five pies for me to choose from. I was excited, it’s not often I get to enjoy a pie. The only shame was that my puff pastry top was only just browned on top. Gluten free things always take longer than normal and I suspect my pie had been put in the oven at the same time as Mick’s. His crust had bubbled up wonderfully, but mine was doing the chewy under cooked gluten free thing that I now avoid by making my own pastry. Such a shame as I’d been so looking forward to a good pie. The filling was very tasty beef and my gluten free battered chips were tastier than Mick’s.

All gone despite the crust

0 locks, 0.54 miles, 1 wind, 1 straight, 0 trolley bus, 1 trap shop, 2 horses, 1 new street all the talk, 1 year and 1 week, 1 sneaky bag, 76 of each, 6 on a boat, 9 million bricks and counting, 1 text message underground, 2 leggers, 1 lamp, 1 Heather, 1 hour shore leave, 2 boxes wine, 2 pies and chips, 1 pint, 1 glass wine, 2 boaters in need of veg.

https://goo.gl/maps/oEFWY2fRKsq1UJhK8

Day 7.

Things are doing well, I’ll give it a day longer, but start keeping the discard for some pancakes. Fed twice today and bubbling nicely.

Elbow Bumps. 3rd March

Urban Moorings to The Black Country Museum, Dudley No 1 Canal

Everyone talks about how slow water points are around the network, Hillmorton and Cambrian Wharf being especially known for it. Well we now know where the slowest one is. The ladies at Urban Moorings had warned us yesterday, there is a leak in the supply, luckily on the other side of their water meter, but this reduces the pressure, a lot.

Mick set the hose up whilst we had breakfast, the tank carried on filling whilst we did various chores. We handed over spare oil containers for reuse and added our recycling to theirs. Not quite a full tank of water but it would do us.

Recycled pots

Time to say thank you and be on our way. Elbow nudges all round, no-one is shaking hands or hugging at the moment. We left them to continue work on their pumpkin patch and a bench with a glass bottle base. Photos on their facebook page.

Left please

Just a short distance to Horseley Fields Junction where we turned southwards and meandered our way. From out of nowhere came this rather odd noise, I remembered hearing it around this area before. Was it an alarm or a bird call? Looking in the overgrown offside vegetation, Friendly cover! I spotted two birds swimming around. Not Coots or Moorhens, they had orangey brown cheeks and were a touch smaller than other waterbirds. Hunting through Google I came to the conclusion that they were Dabchicks. I’ll keep an eye open when we pass later in the week and try to get a better photo.

They are in there somewhere

By a new housing estate a damn has been erected with buoys around it’s edge. We feel the wrong sign has been put up. Also beware as the white tarpaulin looks like it is quite happily floating around almost mid cut, just waiting to get entangled around an unsuspecting prop.

Don’t go between the buoys!
The white tarp extends out to the buoys

As we had sneaked an extra load of washing in this morning we decided that the Bradley Arm/ Wednesbury Oak Loop would have to wait for the next time we’re up this way, so we sailed on past at Deepfields Junction, through Coseley Tunnel. I was fine inside even though She has put my Escape Pod away! Then at Factory Junction we turned right missing out on the locks.

Factory Locks, we’ll get enough locks in a day or two

Through Tipton we made note of moorings, all free at the moment and continued onwards. At Tipton Junction we stayed straight, onto the Dudley No 1 Canal, what there is that you can navigate on your own boat before reaching Dudley Tunnel. Not far till we reached our destination joining a couple of other boats on the moorings outside The Black Country Museum.

Another misleading instruction

A black corrugated fence surrounds the museum, not much for Tilly. A quick check on the situation deemed it sadly unsuitable. The trees that she would naturally be drawn to are far too close to the busy road, no shore leave again.

Moored up at the back gate, almost

Taking a walk down to the back gate of the museum we planned on crossing over the new swing bridge (well new to us along with the new visitor centre since we were last here on NB Lillyanne) to make use of the boaters facilities on the other side. Except the bridge was swung open to boat traffic, the old route over the top of the tunnel entrance was blocked off, so we’d have to walk all the way round. Through the gate with our key of power, up over the bridge, along the road to the main entrance to the Dudley Canal Trust. All just to go for a pee! We then tried to come back via the swing bridge but were told it was closed now so we’d have to walk round. Good job they weren’t too keen on closing the gates at 4pm!

Bridge closed to boats when we arrived

There is most probably a reason for them closing the bridge to pedestrians, but it didn’t make sense to us. Out of hours it means that to reach the service block we would have to go by boat as the bridge is padlocked. We walked all the way back round!

Up and over this bridge tomorrow

I have perseveared with what I thought was a lost cause of my sour dough starter today, adding in an extra feed to try to pep it back up. I think I have sussed what was wrong. The instructions say to drain off any liquid that forms on the surface, hooch. This I’ve been doing, but because of this it has all become quite thick. So this morning I just stirred it back in, an option given on the full youtube instructions. I then spooned off some to discard and fed it. By late lunchtime it was bubbly again, another feed and things are definitely not dead.

0 locks, 5.47 miles, 1 load washing, 4 elbow bumps, 1 slooooow tap, 1 left, 2 straights, 1 right, 1 tunnel, 0 mysterons, 1 tarp lurking, 1 bridge closed, 0 shore leave, 1 thinner starter rising again, 1 possible solution for Vienna, 2 boaters waiting for the museum to open.

https://goo.gl/maps/BvwnPCNEtCkn4Skk6

Day 5. Morning

Houch mixed in, 10 dessert spoons discarded then fed

Lunchtime.

Extra feed showing signs of bubbles again

Evening.

Bubbles! Visible bubbling. Some discarded and fed

Urban Oasis. 2nd March

Lane Head Bridge to Urban Moorings, Lycetts Basin Bridge

A day full of sunshine. We soon passed where Vernon (Production Manager in Vienna) used to play as a child on the Short Heath Branch. His grandmothers cottage apparently was demolished and replaced by the current houses in the 1930’s and she moved to a council house. His Grandfather was night watchman on the arm and his uncles were day boat men delivering coal to Wolverhampton till the early 1960s.

Short Heath Branch

Today NB Senior Moment was occupied both by humans and several Pekineses. Maybe they’d just come back from a cruise or were preparing for one.

Mini Woofers and woofer gang plank

We pootled onwards, the canal seeming far cleaner than it had done a month ago. In the bottom of someones garden I spied a curled up mass of fur, could it be alive? It opened it’s eyes to check us out as we passed. A couple of hundred yards later another battered and torn fox walked along the canal edge. They both looked like they’d been in a fight and had seen better days.

Foxy fox

Approaching Rockery Bridge I got ready to hop off and see if this Sainsburys might have some arrowroot. I wizzed round the store and found some with baking powder and baking soda, I just hope my starter perks itself up in the next day or two!

Stop for a cuppa

Mick carried on and moored up on the first set of bollards, lunchtime. As we ate a boat came past, the first boat we’ve seen moving since we left Brindley Place! yes we did see some heads on Tividale Aqueduct, but not the actual boat.

Boat!!!!

Onwards, picking up a big branch which necessitated reversing and changing course before we continued much further. Our original plan had been to head for the offside moorings in Wolverhampton, hopefully stopping at Urban Moorings for some coal on the way.

Urban Moorings

As we came under Swan Garden Bridge we could see the end of the arm where Urban Moorings sits. A bench looks down the canal with Fender Fred watching for boats.

Fred with his cuppa and pipe

Could we see anyone? We slowed and crept our way along. Towards the end was a mooring, by some new looking sheds. A lady was stood by a door and said hello. We asked if they had any coal and if so, what variety. ‘Excell 20kg bags, £10 a bag’. Yes please. We pulled in as more and more people appeared from the sheds all wearing high-vis.

What a welcome, help to moor up too. Conversations about where we were heading turned to them saying that they had a visitors mooring £8 including electric a night. Mick and I were having a similar conversation at different ends of the boat, him saying we’d have a chat about it, me saying ‘We’ll be staying the night then’ images of the washing machine going round round in both our heads.

The gardens made from anything and everything that floats on by

Once tied up we were given guided tours of the moorings. Neither of us had realised just how big the site was. Originally Commercial Wharf the arm and land around it, there were Lime Kilns a wharf and slipway where boats were maintained. The boats, Ampton boats, were used for transporting coal along the flat Wolverhampton level and Wyrely and Essington Canal, no need to descend any locks so they were built longer and a touch wider, their holds could carry 45 to 50 tons of coal.

The site was used as a boat yard until 1992 when the last boat left the dock. Several boats had been restored here including NB Tench.

Miss Scotland had been down to help with the weeding today

Urban Moorings CIC are a group of boaters who are wanting to create mooring sites that boaters actually want, integrating history, ecology, art and volunteering. They redevelop moorings very slowly ‘Slow Regeneration’ without having to spend millions of pounds doing so. The moorers live on site, their aim is to turn derelict and unprofitable sites owned by C&RT into self managed boater run moorings.

These very friendly ladies have been here for three years, built moorings, brought electric and water onto site, made gardens for nature to inhabit where lime kilns used to be. They must have spent years clearing away buddleia and now sheds seem to be taking over. An office, a workshop, a bits and bobs exchange, more moorings planned. Recently they advertised on facebook that they were now selling coal and gas. Today they received 100 bags of Excell and moved their gas cage into position. There had also been a volunteer day to kick start the creation of a community garden. What an Oasis.

Four/five dogs inhabit the area, but they offered to put them all away if Tilly wanted some shore leave. We both looked around. She would absolutely love it here if the scent of woofers wasn’t too much for her. But we decided that the look of underneath the decking on our mooring would be far too interesting and it would be a very soggy and painful extrication for both her and us. Another day kept inside, Saturday isn’t that far off!

Work in progress, coal cage and recycling next to one of the sheds

After all the chatting, oh Kate Saffin was also here having volunteered for the day, we eventually managed to get hooked up, washing machine on, yellow water disposed of. If our solids container had been more advanced it could have been emptied here too. That is something we’ll think about, if we can store our solids during the first stage of composting and deposit it when next we pass then we’ll be using our toilet as fully intended.

They do seem to have thought of everything one could want and have plans for even more here. All profits go back into the project, so any support either through volunteering or purchases will be used to improve what they have to offer. Good luck to them, we’ll certainly be putting them on our map as a good stopping place. More information here Urban Moorings CIC

0 locks, 4.44 miles, 90grams arrowroot, 2 foxes, 5 footballs, 2 coconuts, 1 moving boat, 1 unexpected mooring, 4 bags coal, 3 loads washing, 1 Kate, 0 shore leave, 1 Miss Scotland, 2 possible openings, 1 offer, 1 oasis in Wolverhampton.

https://goo.gl/maps/KzNwExACThyfKR6q7

Day 4.

Not much to show today, two feeds and no bubbles, no rise. I’ll keep going for a few more days to see if it comes back. 🙁