Category Archives: Tunnels

2021 An Adventurous Year

Time for the annual round up. Put the kettle on or pour yourself a glass of something stonger, put your feet up, this is a long post.

Looking out into a cold world!

As midnight turned from 2020 to 2021 we saw the old year out and new one in at the house in Scarborough, a quiet affair with just the three of us.

January and February brought ups and downs with them. Oleanna rose and fell with the water level at Viking Marina due to the breach at New Bridge whilst the country locked down. Despite the restrictions on travelling we made use of having a hire car for a few days at the beginning of the year to keep an eye on Oleanna.

Jobs around the house continued, our bedroom was redecorated and reclaimed from troublesome tenants. Tilly and I ventured out into the nearby park for the occasional walk, dependant on the number of woofers and the weather of course.

We walked, we ate, we drank, did our best to stay well and I started on the design for Chipping Norton’s panto in my reclaimed work room.

The spare living room was used as a workshop doing some work for Animated Objects, scrimming giant sci-fi guns and then painting model buildings all for The Odyssey. Beetroot burgers were made and pancakes consumed.

Then March came along and some easing of restrictions. Colour came back in nature with the daffodils popping up and my panto model started to get coloured in. A design for some origami paper arrived ready to be folded up to be part of 1000 ships display that would happen a couple of months later along the Yorkshire coast.

With new freedoms we had a couple of trips to Goole to check on Oleanna. First one was to swing her round and finally put fire extinguishers on walls all ready for her Boat Safety Inspection which she passed with flying colours and a comment that we seemed to like CO and smoke detectors, well I’d rather have too many than not enough!

The cofferdam at the breach site was completed and an access ramp created. My posts about the breach put us in touch with several people in Goole and at the beginning of April The Goole Escape Facebook group was formed. Due to the breach and lack of water in Goole Docks no leisure boats were allowed to use Ocean Lock out onto the Tidal Ouse. A joint calm voice was needed to try to find a way out for those boats wanting to leave, including us.

Of course March was also when Mick and I got our first vaccinations. Who’d have thought having a jab would put a smile on peoples faces! Not that you could really see them behind all the masks. A bathroom got a make over and we discovered parts of Scarborough we’d never been to before.

April was a very busy month. With lodgers on the horizon house jobs needed finishing. The roof needed attention along with a wall in my work room, both jobs were for the professionals. Pictures went up on walls, finally. The bathroom needed finishing with Frank fitting us a new bath surround.

Mid month out attention moved back to Oleanna. Way back when, we’d booked her in at Goole Boathouse to be blacked. We had a night on board before moving her from one marina to the other to come out of the water. She was jet washed down and the chaps began applying layers of 2 pack to her hull. We visited most days with jobs to do ourselves. Mick busied himself inside whilst I ground back rusty bits on the gunnels, repainted them and the tunnel bands. Inside the oak floor had a good clean and then was treated to two coats of oil. The weather had been perfect for it and she went back in the water a week after she’d come out, enough time for the 2 pack to cure. She looked smart again, well the cabin sides still needed a good wash!

Whilst in Goole we met up with David, Karl, Wendy and Martin, four members of The Goole Escape group. David had managed to negotiate with ABP passage for leisure boats through Ocean Lock at Goole Docks, this was limited to specific times of the tide. So escape was now possible but everything would have to come together to make a sensible plan. We wouldn’t be ready for a few weeks and hoped that there wouldn’t be a mass exodus before we could join people.

As I carried on trying to finish my panto model Mick made good use of his time doing a VHF radio course, we’d need to be able to use the radio to meet the criteria for going through Goole Docks and out onto the Tidal Ouse. Tilly visited the vet and got a years worth of flea and wormer treatments, we were all set to move back on board.

The first of May was that day. We’d hoped that Tilly would remember the boat after seven months on shore, within about two seconds of being back it was obvious she knew where she was. News that Goole caisson gates were now open and cruising up towards the breach site was possible we headed off to give Oleanna a good run and so that Tilly could venture back onto dry land. It was very good to be back on the move again. On our second such trip Tilly remembered how to swim!

Whilst in Goole Mick took his Short Range VHF Radio exam and passed. I carried on painting my panto model. We both had our second vaccinations. Heather Bleasdale came to visit joining us for an outdoor lunch. We got to know the Goole Escape Committee and discussed plans. We watched work going on at the breach site. Mick had a birthday and Joan’s Home Kitchen provided us with a celebratory meal a couple of days before we hoped to escape.

On 21st May an escape committee meeting was had early on, the weather looked hopeful for the tide in the afternoon, we were booked in at Ocean Lock. Our escape was to be via Selby, the Lock keeper was called there and our plan confirmed. At lunchtime we moved up to fill the diesel tank and await the other escapees, Sea Maiden and Lullabelle. Given the go ahead by the docks to proceed we were soon passing through to Ocean Lock where there was plenty of space for the three of us. At around 14:30 the large lock gates opened to reveal our way out of Goole onto the Tidal Ouse.

All three boats arrived safe and sound

We headed upstream following Sea Maiden being pushed along with the tide. Would we make it to Selby before the tide turned. Each boat arrived individually and was locked up into Selby Basin. We’d made it, now all we had to do was escape Selby as the swing bridge out of the basin there was broken.

We waited. Tides, times, weather and the amount of fresh coming down stream all had to fit together. Bridget and Storm came to visit. We twiddled our thumbs. The Environment Agency came and closed the flood barrier. We twiddled our thumbs. Daily escape committee meetings were held. By the 27th everything was looking to fit together apart from one thing, Keadby Lock would not be manned at a suitable time for us to get off the river. Sea Maiden and Lullabelle decided to stay put in Selby. Heather Bleasdale was joining us for the trip but Oleanna would be out on the river on her own heading to Trent Falls.

What a day that was! David’s advice was spot on. Leaving Selby just before 10am Oleanna zoomed downstream with the out going tide. We followed our charts keeping to the channel. At the Apex light Mick swung Oleanna round to head upstream onto the Trent our progress slowing instantly.

We then crawled our way to find where we should wait for the tide to turn. Two hours of very little, drifting on our anchor. We’d picked the day well, it was wonderful out there.

When Oleanna started to move round a touch more we managed to pull the anchor up and found our way back into the main channel to head upstream with the incoming tide. One plan had been to moor up in Gainsborough, but we decided to carry on and arrived at Torksey just as the last light was fading at just gone 22:00, 64 miles in a day, I doubt we’ll ever beat that.

Over the next few days we made our way up the Trent, dug out our windlasses to work locks in Nottingham. Once we rose up Derwent Mouth Lock onto the Trent and Mersey we had completed our escape. The going would now be much slower along shallow canals and plenty more moored boats to slow down past.

Now we should make our booked mooring at Rembrandt Gardens, every day would be a boating day unless the weather was either too hot or far too wet to cruise. Along the Trent and Mersey, pausing to stock up in Alrewas. At Fradley we turned onto the Coventry Canal to head southwards. We gave a tow to NB Burghley Girl to the bottom of Atherstone.

At Hawkesbury Junction we did the 180 degree turn onto the North Oxford Canal, through Rugby and up Hillmorton. NB Kamili with Andy and Irene passed as we arrived in Braunston where we paused for another butchers, then up the flight and through the tunnel.

Straight on along the Grand Union. On route we stopped for a drink with Lizzie at Bugbrooke. Paused for a hot day under some trees near Milton Keynes. Had a diversion along the Wendover Arm for a night. Picked up extra crew, my old college friend Jen, for a day through Hemel Hempstead. Came across our first sightings of HS2 cutting it’s way across the landscape.

At Bulls Bridge we turned left onto the Paddington Arm. On our trip into London we came across our friends Pete and Clare on NB Billy, it turned out we’d be neighbours at Rembrandt Gardens for a few days. We arrived on time and the next day headed across London by bus to Hackney to see the London Leckenbys for the first time since Christmas 2019.

Plenty more family to catch up with. Kath came for lunch, we had a trip to Eastbourne to see Marion and John, a lovely lunch with Christine and Paul. So good to see everyone again and not just on a computer screen every Saturday.

Happy Birthday Big Brother

Andrew’s 60th Birthday was celebrated, nothing fancy just good to be able to be together for it, we’d achieved our second goal of the year.

We heard there was a space at St Pancras Cruising Club for a long boat like Oleanna, so we took advantage of a more secure mooring close to Kings Cross whilst we had a visit back to Scarborough. Checking on the house, lodgers changing over and seeing the latest Ayckbourn play with Bridget and Storm, it all made for a good weekend away. I then headed off to Huddersfield for a couple of days work with Dark Horse, fitting costumes for a photo shoot.

There was to be a Tideway cruise from St Pancras Cruising Club and with one space left we jumped at the opportunity. Ten boats made their way to Limehouse, we breasted up with NB Misty Blue, Graham turned out to be another Goole Escapee. Three lock-fulls of boats headed out onto the Tideway on the morning of 10th July, special permission had been sought to go under Hammersmith Bridge which was closed to all forms of traffic at the time.

Tilly thought we were mad taking her onto such rough water, I was a little perplexed too! Very glad that I was the official photographer, clinging on as we did more than bob up and down! Tower Bridge, The National Theatre, Christine, Adam, The Houses of Parliament, Battersea Power Station. So many sights, what an experience!

The further west we got the calmer the water got. We were glad when Hammersmith Bridge was passed as there had always been a chance that it might close to boat traffic at anytime due to safety reasons. We turned off at Brentford along with several other boats and continued up to Hanwell where we had a very sociable evening at The Fox with everyone. Thank you Simon for mentioning the cruise to us.

Sadly our washing machine hadn’t liked the lumpy water so for the next month we cruised meeting up with engineers on route hoping it could be mended. Back through London, pausing at St Pancras again. Then down to the Herford Union to cut across to the Lee and Stort. We had another mooring booked on the Lee awaiting our arrival, alongside NB Billy.

Then up the Lee and onto the River Stort. We’d only ventured so far up the Stort during our first winter on Lillian, this time we headed all the way to Bishop Stortford. Our return journey was held up slightly due to the river going into flood overnight so we had to wait for it to lower to get under the bridge at Roydon.

Back through London we made use of the new Eco-moorings near Islington Tunnel, a handy stop off with electricity. Here we met up with Nick an old friend from York and Adam called in for a catch up after working the breakfast shift at Radio 2.

Goodbye Christine!

At the end of July we pushed on and left London behind us, returning to Bulls Bridge.

We headed up to Uxbridge for cheap diesel and finally got our washing machine mended. We turned around and headed back to the Hanwell flight, stowed the garden back in the shower and headed out onto the Thames again where we turned right towards Oxford.

With a weeks license we couldn’t dawdle, although a broken lock gate at Boveney Lock did hold us up overnight so our license would be extended. A space was spotted below Cliveden so we treated ourselves to a night moored in the grounds of the big house. We paused for a socially distanced chat with Sue on No Problem XL, good to see her looking so well. Henley Regatta was almost ready as we passed through and our favourite mooring above Days Lock did not disappoint. All too soon we turned up Sheepwash Channel and ascended Isis Lock back onto the Oxford Canal.

Whilst in Oxford I managed an actual face to face meeting with Dash the Director for Chippy Panto. He seemed happy! Then we made our way up to Thrupp where we’d booked ourselves in at the cruising club for a few days whilst the London Leckenbys came to visit and we had a trip back to Scarborough and we got to see the show at Esk Valley for the first time since we’ve been living afloat.

I had a day trip to Chippy where I did a final model meeting over zoom from a dressing room, but also had chance to measure things up. Then we were off up the Oxford Canal, mooring in our favourite spots, it was a touch busier than it normally is in the winter.

A pause to visit Village Meats in Braunston and we spotted our old share boat NB Winding Down so we stopped to say hello. On up the flight sharing with a boat full of actors, then left up to Crick for the first time in ages.

A prearranged boaters meeting at Houdini’s Field worked brilliantly, NB Panda and NB Kamili convened and we all enjoyed each others company over a fantastic barbeque outside so everyone could feel safe and Tilly could roam about. Oleanna was treated to a very good wash and brush up before we were on our way again. We now needed to get her north before I started on Panto.

News came through that the breach on the Aire and Calder had been mended and nine months after the canal had sprung a leek it was mended and open again. Boats could now move through the area, mooring however is still restricted.

Following the Grand Union we headed down the Stockton Flight to Leamington Spa. Tilly and I had a few hot days on our own moored at Radford Smelly then we were on our way again. An obligatory burger at The Cape of Good Hope the night before we teamed up with NB Mad Hatter to ascend the Hatton flight. One day my old college friend Emma will not have an excuse to helping us up the flight, this time we met for a cuppa and a catch up the following day.

On up Knowle to Catherine de Barnes, then Camp Hill Locks, the Ashted flight and Tunnel (!) followed by Farmers Bridge into Birmingham. The city centre is still full of building and tram works but with the sun out it looked stunning. We also caught up with Paul Balmer from Waterway Routes before carrying on with our journey.

A night at Hawne Basin filled the diesel tank up. A night at Dudley Port Basin got the cupboards filled. A pause at Urban Moorings meant we could donate our deposits and the next day we descended from the Birmingham plateau down the Wolverhampton 21.

Along the Staffordshire and Worcester we managed to have a mid stream catch up with Barbara from NB Bessie Surtees. At Great Haywood I managed a catch up with Kay from NB Pea Green as she set up to trade for the day and Mick filled Oleanna’s water tank.

Heading north on the Trent and Mersey we pulled in for lunch and a surprise hello to Barry and Sandra from NB AreandAre whom we’d got to know last year in the first lockdown. In the afternoon we were joined by Bill and Lisa for a trip through Harecastle Tunnel. Now we swung off the Trent and Mersey and onto the Macclesfield with it’s wonderful bridges.

It would have been nice to take our time but we had a rendez vous to make. The end mooring at Marple was free and from here we headed into Manchester by train to join the London Leckenbys for a meal of big red fish. The following day my old school friend Morag joined us for a night on board with some serious catching up to be done.

Our next deadline loomed, Standedge Tunnel. We dropped down the Marple flight, crossed the aqueduct and turned right at Dukinfield Junction onto the Huddersfield Narrow Canal. We knew we were in for some hard work to climb our way over the Pennines, last time we’d enlisted crew to help as I was one handed. This time we’d be going solo. Apart from the very first lock it wasn’t too troublesome. The work is rewarded with stunning views.

Standedge Tunnel did not disappoint. Because of social distancing Mick got ride ride up front in the cratch leaving the helm to a C&RT volunteer. Bumps and scrapes made Oleanna wince along with us, but we all got through in one piece with no damage. Tilly wasn’t too happy about the trip, but at least I can now boast to the local cats in Scarboreugh that I’ve been through the longest deepest highest tunnel on the canal network whilst they just lazed around on their shed roofs!

On our way down the other side Oleanna had a belt that went taking out quite a few wires in the engine bay. RCR were sent for, the engineer suggested we’d need to remove a pulley on the alternator to be able to remove trapped wires, this could not happen where we were. We could move but the batteries would not charge. The only way to top up our electric was with the solar panels. Emergency power conservation went into operation, blogs were hand written, the freezer turned off and we gradually ate our way through our defrosting supplies. Every day Mick managed to pull more wire from the alternator and soon there was no need for an engineer again, just a new belt needed fitting.

We made our way down to Huddersfield and arrived the day before I had a production meeting at Dark Horse. After walking to my meeting I handed over the model and we stocked up on supplies before heading off east along the Huddersfield Broad Canal.

The Board locks are just that, but they are short. On Lillian we’d nearly got stuck here, but Oleanna was built a foot shorter so we knew we were fine, we still had to take great care in descending the locks diagonally. This continued on to the Calder and Hebble, taking our time and using our Hebble spike. The rebuilding work done at the Figure of Three locks, after flooding washed huge parts of the structure away, are only noticeable due to the new stonework.

Bigger locks were welcome, using the key of power once past Wakefield. The sun shone wonderfully for my last full days boating this year as we made our way to Castleford. Here we hired a car to get me down to Chipping Norton to start work on Panto whilst Mick and Tilly stayed on board with the plan to move Oleanna to a winter mooring in Thorne.

Whilst I painted the set working all the hours I could, Mick and Tilly gradually made their way eastwards. They passed through the breach site and headed to Goole to top up on diesel. On their way back towards the New Junction Canal the engine started to over heat, a problem that had happened a couple of years ago on the Thames.

The following day he winded and slowly made his way to Rawcliffe Bridge for easier access for RCR. Little could be done there and then, so Mick and Alastair (engineer) arranged to meet at Viking Marina in Goole. Oleanna managed the two and a half miles in three stages. After her cooling system had been flushed through the problem hadn’t gone away. The water pump was removed and was obviously the problem. A week later with a new pump Mick moved back out onto the cut and joined Lullabelle (a fellow Goole Escapee).

Taking a long weekend off panto, I headed up to join Mick and Tilly to help move them back to Scarborough. Wendy and Martin kept an eye on Oleanna for us whilst we settled Tilly back into the house, I knew where I was! Pah!!

Several days later with the weather on his side, Mick returned as early as he could, pushed off and single handed Oleanna back along the Aire and Calder to Sykehouse Junction where he turned onto the New Junction Canal. With swing and lift bridges to work he was glad of the assistance of a volunteer at Sykehouse Lock. Then the sharp turn at Bramwith onto the Sheffield and South Yorkshire Navigations. A few more bridges and two more locks before he arrived at Blue Water Marina, Oleanna’s winter mooring.

Tucked up for a rest

On our way back from Chippy a week or so later we called in to check on her. A boat in winter isn’t too friendly without the stove lit. We’ll have visits every now and then to check on her and do the odd job. The weeks are already flying by before we move back on board.

For a year that we’d decided would purely be about seeing our family and friends we ended up having quite an adventurous time. Trent Falls, the Tideway through London and Standedge Tunnel made it quite a year.

So our vital statistics for the year 2021 according to canal plan are

Total distance was 932 miles, ½ furlong and 627 locks . There were 42 moveable bridges of which 16 are usually left open; 169 small aqueducts or underbridges and 30 tunnels – a total of 19 miles 3 ¼ furlongs underground and 3 major aqueducts.

This was made up of 277 miles, 1 ¾ furlongs of narrow canals; 270 miles, 4 furlongs of broad canals; 89 miles, 4 ¼ furlongs of commercial waterways; 59 miles, 7 ¼ furlongs of small rivers; 121 miles, 5 furlongs of large rivers; 105 miles, 2 ¼ furlongs of tidal rivers; 8 miles of seaways; 263 narrow locks; 302 broad locks; 61 large locks; 1 lock on major waterways.

Sadly with Oleanna’s log book where it should be, onboard, I’m not able to offer up the engine hours, litres of diesel, gas bottle or bags of coal. Maybe I’ll update this once we are back on board.

The Thames, 2021

This year we’ve done more miles than last, not bad considering we were on land for so much of it. We’ve done far more tidal miles than ever before and for the first time we’ve been on a Seaway! If someone can tell me what the difference is between Tidal waters and Seaways please do. Maybe it was around Trent Falls, or was it downstream of Tower Bridge?

As last year I hope the pandemic doesn’t throw a spanner in the works for us or anyone else. We need the theatrical world to still function with an income for me designing shows and lodgers paying to stay in our house.

I want to say ‘Keep well friends’, but I feel I need to add, ‘Get well soon friends’, as so many have tested positive recently. Thank you for following us and hope to see you soon x

No One Can Hear You Scream! 8th October

….. to Marsden Pipe Bridge

On our way in

Straight away we had a request from Trevor at the helm to adjust our tunnel lamp, to point it straight ahead. Mick did so, then we didn’t hear another word from Trevor for almost two hours.

Differing bricks and arches

Last time we’d both been on the back, our volunteer/guide gave us a fascinating running commentary as well as guidance to Mick at the helm. So much history and interesting facts was passed onto us. Sitting at the stern meant there was a limited amount you could see though. My photos were pants!

Sooty brickwork from the days of steam trains

This time sat in the bow I had my camera on handheld intelligent night auto mode along with the camera on my phone, both fully charged. Our volunteer Trevor, had turned out to be the author of a book all about The Standedge Tunnels (available from here), he’d become a member of the Huddersfield Canal Society in 1976 so if anyone knew their stuff about the tunnels he did. Just a big big shame there was about 50ft between us all. We did however buy a copy off him which he signed for us before entering the tunnel.

Rocky

There are four tunnels in all through the hill, the canal being the first to be built and it was then used to remove the spoil from the construction of the railway tunnels, two of which are now disused. Each tunnel is connected, walkways cross above the canal, and the support van drives through another alongside.

Rocky and misty

The railway tunnel crosses over the canal twice through the hill and when a train passes mist collects in front of you which then gets dragged away with the motion of the train, quite eerie!

At the western end the tunnel was extended when the last railway tunnel was built, so you start off in a brick arch, then a flat roofed section.

Reflections

All the way through different surfaces surround you, it’s like being in a 1970’s DR Who set at times, except this isn’t made from polystyrene!

Curves

Brick arches.

Bare rock that was blasted away, the drill holes for the dynamite quite visible towards the eastern end.

Arch meets rock

A mixture of rock and brick, sometimes brick above, sometimes below.

Spraycrete and rock

Then the creepier sections where concrete has been sprayed onto the bare rock to help stabilise it. This is very Dr Who or Star Trek, Captain Kirk would have set his phaser to stun! The spraycrete was done during the restoration of the canal.

At times the tunnel twisted in front of us, dug out from the ends and from the bottom of shafts the tunnel went off course several times. There are now several S bends

Rock bolts on the ceiling

Other places big bolts have been drilled into the rock face to hold it all back. The ends painted yellow so you can see them better, or know when one of them is going to scrape down your cabin side! There are numerous places where the sides of the tunnel look to jut out further then the gunnels of your boat!

I believe there are four wide sections, passing places. These tend to have wider brick arches helping to support the roof line. When boats were originally legged through the tunnel, it took four hours, this is where the boats going in different directions could pass. But the boatmen meeting elsewhere in the tunnels would refuse to go backwards to the next passing place, so two way traffic was abandoned. Official leggers were employed with traffic going in one direction for four hours before the direction changed. This then led to queues to get down locks at either end of the tunnel.

NO exit

Numerous gaps go off to the sides, some marked as exits, others marked with no exit.

As you approach each of the four adits a security light can be seen on the tunnel roof. Motion activated, the lights come on, a ticking noise can be heard as we passed. Apparently Tunnel Control would be able to tell that we’d passed each adit because of this. However not calling in would mean we didn’t know if there was a problem up ahead.

Walkways from the old rail tunnel to the new

The tunnel was built with quite a few air shafts. None of these can be seen now, well some are around 500ft deep! But you certainly know when you pass under most of them as this is where the water tends to get in. The further east we got the more water cascaded in. Waterproof coats did a good job, but when a flood hits the locker you are sitting on you also need waterproof trousers or better still a swimming costume! I got soaked twice and stood up for the last one, but still I was soaked through to my knickers!

Changes in height

But how was Tilly faring? I was glad we’d kept her confined to our end of the boat. I could see her most of the time and she could see us too.

But?!

Well who stole the sun?!

I’m kind of used to bridges stealing it, although I do tend to duck when that happens. Tunnels are worse as they usually time their theft of the sun with me requiring to use shore based facilities, very inconsiderate! Yes I know I can see in the dark but I’d rather not have to when visiting my box.

Rock and arches

Apparently Tom moved this tunnel once, before I came to be second mate. He bumped into it two times, She is quite proud of that. But today they were not where they should have been, I could see them, slacking at the front! They’d left it to Hard Head Tom to move the outside today.

BUMP, scrape, BANG!!! I sat on the floor not wanting to see what Hard Head Tom was doing to the outside, well lets face it I was really the only one who could see everything properly. BANG!!! How many more times!

Can anybody hear me!!!

I screamed at She and Tom to go and sort it all out, but they couldn’t hear me. Maybe I could do something? But black stuff was over the emergency bathroom gap, how was I meant to escape if I needed to!

Brick profile changing

BANG BIFF Scrrrrrrapppe!

In the end I decided that there was nothing I could do but to curl up on the bed and pretend everything was okay. Maybe this was going to be it for the rest of our lives! I certainly didn’t sleep. Who’d be able to sleep with no sun to warm your back and all that noise!

Light at the end? Or the trip boat?

As we approached the last adit I could see the lights from the trip boat ahead, quite a distance off.

Hi John

A torch light was flashed from the adit. John, the volunteer who’d driven through in a van was waiting for us. He informed us that the trip boat was in the tunnel, but we should just keep going.

After at least a year of my life Tom came through the bedroom, he had a hard head to put on too. Gradually the sun fought it’s way back into the cabin pushing away the tunnel. I could tell Tom was back moving everything, it got quieter and lighter.

Handing the equipment over

Mick had walked through for the very last part of the tunnel. This was so that the boat could be stopped at the tunnel portal to hand all the safety equipment to shore with ease. A plastic crate of first aid, life jackets and a large fire extinguisher were handed ashore. Just a case of retrieving the light from the bow.

Back in the sunlight

We pulled in to where the little shuttle boat moors, it had just headed to the top of the locks to drop people off near the station.

Trevor

Time to thank Trevor who admitted he’d bumped Oleanna a couple of times! There was nothing to see on the port side, but then he did favour starboard side in the tunnel.

No smile just yet

As we pushed off past the visitor centre a train sped past and into the rail tunnel, the sun shone brightly, as much as the tunnel is fascinating it was good to be back in the light.

We pulled in at the top of the locks, the first stretch a touch shallow for us so we hoped that further towards the lock would be better for NB Idleness. A quick check up and down the starboard cabin side of Oleanna, a couple of lines which when rubbed vanished. Our passage may have been a touch noisy at times, but other than a couple of new scrapes on the gunnels there was not one scratch. Thank you Trevor for looking after Oleanna, maybe I should have repainted the grab rails earlier in the year after all.

Soggy bum!

Time to check on Tilly, get changed and have lunch. All was fine with our little thug, who within half an hour of arriving used her on board facilities. Well I couldn’t hold on any longer and you weren’t letting me out!

This way out!

What a great day. Thank you to all the volunteers who make the passage through the longest, highest, deepest tunnel on the network possible.

0 locks, 3.76 miles, 1 tunnel, 3 miles underground, 1hour 48 minutes, 1 more wonder of the waterways for Oleanna and Tilly, 3 boats, 3 volunteers, 2 crew in the front, 2 soaked boaters, 17 years, 1 screaming cat, 2 nav lights in tact, 2 more scrapes on the gunnels added to the 5678 which were already there.

https://goo.gl/maps/qbzszmzTKAy1D1p9A

Heading Into The Dark. 8th October

Diggle to …..

The alarm was set and we were up and about having breakfast ready to push off in plenty of time. It seemed like it was going to be a rather nice day, not that we’d notice it in the tunnel!

The gates were already open

We moved up to the west or south portal of the tunnel at 9am, the gates already open and waiting. Time to fill the water tank to help Oleanna sit as low as possible in the water for her trip through. Once she was full we pulled her back from the water point (much better pressure than at the slow tap at Wool Road).

Covers removed

This morning there was one boat heading east to west, they most probably set off at 8:30, so there was still plenty of time to get Oleanna ready for her trip, the first boat at our end wouldn’t set off until 11:30.

All naked again

Yesterday evening the boat that has been following us arrived, this morning they had called Tunnel Control and managed to change their passage booking for Monday morning. The rush to return to their mooring is due to a relative being very poorly, they were hoping that the chaps at the tunnel today would be able to add them to todays passages. However no body was here but us. The volunteers wouldn’t turn up until nearer 10:30, so they headed back for breakfast.

Here comes NB Idleness

Yan and Kim soon joined us on NB Idleness pulling in behind.

The cratch cover was removed and stowed inside. Then the pram cover and frame came off and slotted in behind the dinette table. Tilly’s Escape Pod was zipped together ready should it be required. The gap at the bottom of the bathroom door into the main cabin was taped up with gaffa, meaning we’d be able to contain Tilly to one end of the boat. I hoped this would be enough as on the tunnel guidance it suggests all pets should be restrained inside your boat, if they won’t be able to handle the tunnel someone should take them over the top. Tilly’s Escape Pod is a favourite place for her, until the door gets closed! This would freak her out more, so I hoped we’d done enough.

Not so smiley today!

Brushes and hooks were laid in the gutters on the roof. All but the strawberry plants from the well deck were moved inside into the shower to give us more space at the front. Mick decided to wait to see what the volunteers thought before removing our nav lights, not wanting to break the seal between them and the cabin side, helping to keep rust at bay.

The men in blue arrive

At around 10:30 a C&RT van arrived, the chaps from NB Faggle Three went up to chat with them and explain their situation. They then headed off to get their boat to be measured. If it fitted then the volunteers would accommodate them.

What a high cratch board, we’d be fine

Soon a tunnel light appeared at the portal the west bound boat with a well deck full of people, a volunteer and helms person at the stern. They all looked a tad wet!

How high?!

Out came the official measuring stick, a large aluminium L shape. Oleanna had her vital statistics taken. To the top of the bags of coal she was 5ft 10″, across the cabin top 4ft 11″ and draught 2ft 4″. She passed! Mick asked about the nav lights. It was suggested that it was best he removed them rather than the tunnel! NB Idleness was measured, she passed. By now NB Fraggle Three had pulled up. Her vital statistics measured and passed too.

Fraggle Three coming to the front

Yan, Kim, Mick and I had conferred, if the extra boat fitted then we would let them go first as they were hoping to make it as far as Slaithwaite today, this would give them at least another hour and a half, we would be stopping in Marsden for the night.

Off they go

The chaps rushed to take the pram cover off their boat and pulled up to the water point where their volunteer loaded all the safety equipment on board, handed out high vis and hard hats and they were off, into the tunnel.

Byee!

Next a discussion as to who would be at the helm of Oleanna for the trip. Last year the volunteers were not working and only one boat could go through the tunnel in each direction a day, helmed by a C&RT employee, all crew on board had to be sat at the bow. This year the volunteers are back, two boats in each direction, three times a week. It is up to the volunteer whether they can socially distance themselves on your boat. 2m distance had been reduced to 1m in September. If there wasn’t the space they drive. For NB Idleness with it’s trad stern there was no question, but Oleanna being a semi trad?

The volunteer said he would drive her through, but he also quite fancied Mick doing it too. Mick had been quite looking forward to being able to sit in the bow and actually see things rather than concentrating all the way and not getting chance to look round.

Extra light at the front

Decision was made Trevor would be at the helm. This however meant that we wouldn’t be able to do the usual stops at the safety adits to call through to tunnel control. John another volunteer would have shadowed NB Fraggle Three through by van in an old railway tunnel, he would wait for us at the last adit to check on us.

Here we go (thank you Yan for the photos)

Tunnel control were consulted and we were given a time to enter the tunnel. Kim and Yan had another cuppa and a bacon butty, they would have to wait for at least 3/4 of an hour after we’d gone in, maybe more as their volunteer had taken the first boat through and needed to returned by van for them.

Trevor at the helm

Our gas was turned off at the bottles. Extra lights were put on the hatch and gas locker. Mick was given a hard hat and high vis just in case he needed to take over at the helm. We popped our life jackets over our waterproof coats, untied and at 12:20 we pushed off into the dark.

Here we go!

Consulting With The Tunnel. 4th October

Murrys Winding Hole to opposite Tescos………

Two years ago we crossed the Pennines from east to west via the Rochdale Canal with Clare and Graeme on NB Mr Blue Sky. Last year we crossed via the Leeds Liverpool visiting friends and family in Skipton and Leeds. Earlier this year we dodged the hills by taking the route south via the River Trent. There is one other route which we have only done once before, six years ago, the Huddersfield Narrow and Broad Canals.

Snake bridge

Recently all routes have had their problems. Lock floors, stuck boats, lack of water etc etc. The Huddersfield Narrow has problems with water levels towards Huddersfield on a good year, but this year those problems have been greater. Then over the last month the bottom end of the Huddersfield Broad Canal has been found to be empty on several occasions.

And another

The C&RT stoppage notices that come from this area are far more informative than you normally get, they explain what has happened and what measures are being taken to rectify the situation. However what we wanted to know was, was the situation going to improve or would Oleanna be stuck in Huddersfield all winter if we went that way.

I think we’re going to see a lot of the chap on the right

The amount of work needed to reach the summit, the tunnel passage and then working down the other side is more for those who like a challenge than those who prefer a life on the flat with a glass of wine in hand. Before we committed to this route we wanted to talk to someone on the ground with local knowledge. For the last week Mick has been trying to call Standedge Tunnel Control to speak to someone, but with no luck. Today however was different he got through.

This year the canal has suffered more from the lack of water as one of the reservoirs has been drawn down for inspection and maintenance (several others on the system have also been lowered). But the rain we are having has been doing a good job of filling the canal up. The chap sounded positive, which is what we wanted to hear. Decision made before we’d even got out of bed this morning. Huddersfield Narrow it is!

We’ll be going right please!

About a month ago we’d booked our passage through Standedge Tunnel and our cruising has been planned for us to reach Diggle portal the day before. We have also booked a ranger to assist for a day on our descent from Marsden, then you also have to book for Lock 1E to be unlocked to let you out the bottom and into Huddersfield.

Time to get moving!

A boat came past, possibly the boat that had followed us down Marple yesterday, at speed. They then met a Black Prince hire boat at the next bridge, we just waited for both boats to pass before untying. The Black Prince boat might just arrive in time to start the flight before midday.

They’ll need warp drive to reach the locks in time!

Soon after pushing off ourselves we were approaching a big bend when the bow of another Black Prince boat came charging round it. Thankfully it seemed that the person at the helm had some experience as we narrowly avoided a collision. If they could keep their speed up we reckoned they would miss the locks by about ten minutes! Not good if you are trying to the Cheshire ring in a week!

We pootled along at a reasonable speed through the long winding wooded valley. A chap was blowing leaves off his astro turf. Maybe it’s best to keep on top of such things, but what a never ending job!

M67

Under the M67. Was this the face of a local graffiti artist on the wall here? Was this going to be the local ‘Ghost’? It was, we were to see plenty more pupilless faces today.

We caught the boat ahead of us up at Duckingfield Lift Bridge. Here you need an anti-vandal key, or handcuff key to get the lock off the mechanism and they hadn’t got one. The chap was tinkering with the lock as the lady knocked on a boat to see if they could help. We pulled in for me to hop off just as they got the lock unlocked. At least it saved me doing all the winding, but I did make sure it was locked back up once it was down again.

Mick asked them which way they were going. ‘To Ancotes’ was the reply. He pointed out that they would need a handcuff key for the locks. But the lady said they wouldn’t be doing the locks today. They’d still need a handcuff key no matter what day they were doing them.

Dukinfield Junction

They turned left at the junction, we turned right onto new waters for Oleanna and Tilly. Under the Asda Tunnel and out passing moored boats and three flying ducks.

Then on towards Bridge 111, the first of the Huddersfield Narrow Canal, just below 1W Ashton Lock, the first lock of the canal.

Broken even with the price tag still on it!

Now six years ago we’d just bought ourselves a long reach aluminium windlass. I was nursing my lack of little finger so was at the helm, off went Mick to set the lock. He soon returned with the brand new windlass in two pieces! The advantage of the longer reach no longer available he struggled with a standard windlass. A while later we replaced the broken aluminium windlass with a long reach one made from steel, now my best friend.

Lock 1W finally open!

Today it would be me working the locks and 1W made itself known quickly. The lock was full so I went to empty it. The towpath side paddle being extremely stiff took some work. A couple of clicks, then adjusting the position of the windlass to give me more umph! Eventually it raised. I then tried the off side, this just slipped every half turn, so I left it closed. The gates were stubborn too, one side with a cranked beam. If this was to be the case at every lock we were going to be working hard for the next few days!

Plantation and Tame Lock were much easier. Hills just in view ahead and old mills alongside the canal.

River Tame

The River Tame aqueduct took me by surprise, I nearly had to do a Giles as I’m not too keen on having nothing on one side of the boat!

Now we cruised through overgrownness on both sides approaching Stalybridge. Railings and lamp posts hide in amongst the sideways trees. At one time someone thought the canal would be a popular place to walk, it is but only on one side, the other left to grow over and collect rubbish.

Salt shaker vent

The canal was built over 17 years, originally opening in 1811 Standedge Tunnel being the last stretch to open. For a while the canal was profitable being a shorter route connecting Manchester to Leeds than the Rochdale, but bottlenecks were created at the tunnel where it took four hours to leg a boat through! In 1845 the canal was bought by the Huddersfield and Manchester Railway Company who’s route was to follow the canal up the Tame and Colne Valleys. Standedge Tunnel was used to remove the spoil when they built the railway tunnel. Once the railway was open there was no need for the canal which fell into decline and ended up closing in 1944.

In 1974 the Huddersfield Canal Society was formed with the aim of re-opening the canal. Whole sections of the cut had been filled in, built over and several bridges had been removed. Volunteers with the support of local councils worked hard and by the 1990’s all sections that had not been filled in were restored. The Huddersfield Canal Company was set up to co-ordinate the reopening of the remaining sections, one of them being a half mile through Stalybridge which had been filled in and partly built over. But in May 2001 the canal was reopened. Plenty photos of the building work here.

4W mossy but new

Lock 4W is more or less where the major works in Stalybridge started. A whole new lock was built with it’s approach under a road. I’d remembered this and the railings which meant dropping crew off to work the lock had to be done at the start of the tunnel/bridge.

The bottom gates were problematical to close. In fact after pushing and bumping the gates there was still a six inch gap between them. We tried adding water pressure to the equation, but all that was going to do was deplete the pound above. The paddles were closed, gates reopened, Mick tried prodding around with a boat hook but the water was too deep. The gates closed a touch better and water pressure did the rest of the job for us, up the 11ft 1″ Oleanna rose, the pound above looking a bit short on water.

Looking back to 4W

I walked ahead and dropped the water from 5W which aided our need to get over the cill. Mick decided to leave the ground paddles open until Oleanna was safely across the cill, this would help water move around her should I have needed to let more water down. Once clear of the gate he then dropped the paddles. As on quite a few of the Huddersfield Canal Locks both ground paddle mechanisms are on the same side as the gate beam, handy as there are no walkways over the top gates.

Stalybridge Civic Hall and hills

We had a similar problem at 5W with the gates closing. An extra nudge and water help again. Now we could see the Civic Hall and the hills behind as we made our way through the new cut to 6W.

Nice trees, a shame about the weeds

Up at lock level there is masses of paving everywhere, a municipal feel to the town centre, all revamped when the canal came back through town. Once exciting I’m sure, but now it feels just a touch soulless. An art installation sits near the lock, Holy Trinity and Christ Church a little behind it. Then once up through Lock 6W Tescos takes over, car park on both sides of the canal. We pulled in where another boat was moored right opposite the checkouts. The chap on NB Texas Star had a very pretty dog and he was trying his best to get a coat of paint on the back of his cabin just as it started to really rain.

Two paddles and Tescos ahead

After a late lunch we put together a big shopping list, enough supplies to get us into Yorkshire. This must be the closest we’ve ever moored to somewhere you can leave your trolley and get your £ coin back. The only problem is the railings between the car park and boat. I passed the shopping through and Mick popped them on the boat. It was then either a walk round for me or a scramble through the railings.

Look what they’ve just bought!

This afternoon we’ve had the following through from C&RT

Huddersfield Narrow Canal – Water management information
Starts At: Lock 1 East, Stanley Dawson Lock
Ends At: Standedge Tunnel

Monday 4 October 2021 14:30 until further notice

With the support of the EA, during the 2021 boating season we installed a temporary river pump at Britannia bridge, in Milnsbridge, abstracting water from the River Colne into the Huddersfield Narrow canal to aid continued navigation on the canal. We have unfortunately been unsuccessful in gaining an extension on this abstraction from the EA which we had hoped would continue until the end of the 2021 boating season, so as of 30th Sept 2021 we have ceased abstraction for this year.

The canal is currently looking healthy and we are relying on supply from our reservoirs, natural feeds and of course wet weather to maintain water supply, with the recent rainfall proving beneficial. The local team will continue to do their best to manage water levels in order to support safe navigation and if we are faced with the need to implement restrictions or closures, we will update the notice accordingly.

At least the rain is doing some good to the east of the Pennines, here it has stopped us from heading out for an explore, instead we stayed by the stove keeping dry and warm. Outside it was someone’s birthday, maybe they were having a car park party! Thankfully they quietened down after a while leaving us with the car park lights and the very raucous Canada Geese!

Today we have learnt something that we’ll never forget. Did you know that a Moorhens skin type is fur ?! No we didn’t either until we were checking what juvenile Moorhens looked like. Check this link if you don’t believe me!

6 locks, 61ft 3″ climbed, 5.89 miles, 1 lift bridge, 1 boat held up, 1 right, 2 canals, 1 Asda tunnel, 6 furry Moorhens, 1 pretty woofer, 6437 giant spiders, 1 car park mooring, 1 box, 2 bottles wine, 1 trolley almost to the boat, 1 very damp evening, 0 shore leave.

So our route today

Murrys Winding Hole to opposite Tescos, Stalybumbridge, Huddersfield Narrow Canal

https://goo.gl/maps/7urH5f7JMhsms2NQA

Staring Down The Barrel Of A Gun. 19th September

Dudley Port Basin to Wolverhampton Tunnel

Last nights mooring

It was just starting to stop raining when the Sainsburys van arrived, the young chap brought our order over to the boat where it was loaded in through the side hatch. Once everything was stowed we finished off breakfast then made ready to push off, timing it perfectly with the sun coming out.

Hello!

We’d just turned to face the entrance when a new shiny red Bickerstaff boat cruised past, there were waves all round. No-one was coming so we were straight out of the basin and heading north west.

With the sun out and the water being so clear the bottom of the canal looked like the back drop for a Disney film, all aqua blue lily pads waving at us from the depths. Just how long would it stay like this for? We’ve been hearing of masses of weed towards Wolverhampton and boats having to stop every hundred yards to clear their prop, but for now we enjoyed being able to see the bottom.

Soon to be a new bridge

Coneygree Rail Bridge has been removed, it looks like the Wednesbury to Brierley Hill extension of the Metro will be using the crossing with a purpose built structure.

On the off side a duck sits on top of a cannon defending it’s landing and swing seat. Tipton Junction and we turned right, not able to see how many boats were nestled by the Black Country Museum. No boats at John The Locks Moorings, maybe we’d already seen the only boat we’d see today.

Nobody coming up Factory Locks, another route up from the Birmingham level. There’s a large area of building rubble on the off side. Was this here early last year? Or is it new? We couldn’t remember.

Coseley Tunnel next, not long at 329m, a towpath on each side, three cyclists to our starboard and a waterfall to our port side. Straight on at Deepfields Junction, the Bradley Arm still to be ticked off the BCN list.

Don’t stray from path

Now we started to meet the weed, a distinct channel has been cut through by boats, stick to it and you may be okay, venture off it and you’ll be down the weedhatch guaranteed!

Beep beep! Anyone home?

Round a few more bends, another boat come into view. Straight away we knew who it was and what they were likely to be doing. Mike and Christine on NB Alchemy have been enjoying the Curley Wurley over the last few days, we’d not been sure where our paths would cross, but now we knew. We bipped our horn. No sign of movement. Another two bipps, still nothing. The front door was open, gang plank deployed, hopefully they’d not been kidnapped!

Hopefully our paths will cross again next year, somewhere, sometime

Then Mike’s head appeared from the stern, he’d of course been down the weedhatch, not only weed but a long length of plastic had wrapped itself around the drive shaft. We loitered to have a chat. No wind blowing us off course today and no passing boats so we managed quite a lengthy conversation, which was disturbed by a hire boat coming round the bend. We moved over to let the boat come past meaning we ended up towards the off side, Mick indicated which side to pass us on and hand signals came back.

As they passed us one chap asked when they’d get back out into the open, we think he meant the countryside, Mick said well you’re headed for Birmingham. The chap seemed to be puzzled by that, just about any countryside from here would be a days cruise away, we wondered if they had a map?

Conspiracy graffiti

We waved goodbye to Mike and Christine, then discovered we’d got stuck in the shallow off side. Boat pole was retrieved from the roof and Mick tried to push Oleanna off, but the silt below was so deep the pole just kept going into it. A bit of rocking, reversing and eventually we managed to get moving again, only to be stopped by something around our propeller just around the bend. Where we drifted to seemed to be a popular place to dump thick weed from propellers.

I love this structure

Back on the move we soon arrived at Horsely Fields Junction, here we turned right onto the Wyrley and Essington Canal and into the narrow channel with buddleia and other bushes growing across it. Up ahead two chaps came into view staring straight towards us. They were nestled amongst cars piled high in a scrap yard. One chap sat on the wall, in front of him a white plastic container, resting on this was a rifle!

Who’d have guessed there’d be a rifle pointing at us

Hang on! Hang on!! That rifle was pointing towards us! I was stood at the bow so would be first in the line of fire! I smiled and said hello, keeping calm. As we got closer the chaps kept staring, thankfully past me and just to the right of Mick. Phew! ‘What have you got in your sights?’ I asked. ‘Rats!’

As it says Urban Moorings

Just past the gunmen is Urban Moorings. We pulled up alongside the first moored boat. Early last year we had a night here on their visitor mooring, currently occupied, and had a full guided tour of the moorings. Lots has changed since then, there are more wooden buildings and more planned, lots and lots of plants growing everywhere. As last year we had a very warm welcome.

Fred in with the flowers

A few days ago we’d called ahead to see if we could off load the solids from our separating toilet, adding them to their now established compost bins. They can accommodate those who pass by, but not every boater in the West Midlands turning up in cars! They now have four bins built out of railway sleepers which seem to have enough insulation that the contents are always warm, therefore the composting process is speeded up somewhat. The first bin from a year ago is being used in flower beds, the compost is so rich that they are having to mix it with top soil, their flower beds look very happy on it.

Michaelmas Daisies

We left them with a cash donation towards their future plans and twelve babies from our wild strawberry plants that I’d just pruned from the second trough this morning. With permission and guidance we were allowed to wind at the end of the island. This isn’t marked as a winding hole as the end of the island used to be pointed, jutting out quite a way, it now hides below the surface for the unsuspecting. Directions were to turn as if we were heading down past the boats in the arm and not to drift towards the submerged point. Mick took his time, churning up black from the depths and slowly got us round. Thank you ladies, maybe see you next year.

There’s a pointy bit lurking beneath the water

Back to the junction we turned right towards Wolverhampton. Here the towpath has been closed for the last week due to an unstable wall. Well I say closed, but you’d never know it was, cyclists and walkers quite happily getting past the fencing at both ends. The fence nearer Wolverhampton sticks out across the cut and looked really quite unstable.

Right please

We pulled in on the offside mooring, not needing to go anywhere tonight here would be fine for us. The ivy clad wall did however mean that Tilly would spend the next few hours complaining at not being allowed shore leave. We ignored her, preferring her complaints to worrying as she climbed up towards the ring road!

That looks safe!

Tonight we enjoyed a leg of lamb with all the accompaniments. We’ll still be enjoying it for a few more days as there is plenty left.

It’s rubbish this! LET ME OUT!!!!

0 locks, 6.9 miles, 3 lefts, 2 rights, 1 straight on, 1 wind, 1 tunnel, 1 blogging boat, 1 clogged prop, 6ft of silt, 2 buckets, 4 hot bins, 107 babies, 12 given to a good home, 0.5 leg of lamb, 1 off side mooring, 1 mardy cat.

https://goo.gl/maps/rGUUVc4jPgPukAAh6

The Right Left. 17th September

Sheepcote Street Bridge to Coombeswood Canal Trust, Dudley No 2

Goodbye BUMingham

An early start, well almost, slightly delayed by an incident whilst moving a bucket off our roof. All I can say is that the contents were a lot easier to clear up than those from any other type of boat toilet and as it was a secondary bucket there was no smell whatsoever.

Cloaked in cloud

Time to say goodbye to Birmingham, the tops of the buildings hiding in the morning cloud. We decided to make a slight detour on our way out of the city. Mick had once taken Lillian around the Soho Loop whilst I had been out show shopping so it was only right for Oleanna to follow the old line around the loop.

Soho Loop

The first stretch was as urban as I’d imagined, a building sight on the island and a graffiti wall alongside the towpath. Then things started to green up a touch. Then the tone of Oleanna’s engine changed. Mick tried a blast of reverse, but no this wasn’t going to get rid of what ever we’d just caught on the prop. Oleanna drifted towards the towpath, but then bumped into something under the water a couple of times, then she found herself listing on what ever it was. No chance of getting into the side now. Engine off and the propmate was put to work clearing black sacking.

We continued round missing going up to Hockley Port, after all we’d made an early start for a reason, that little jaunt can wait for another time to fill with water. As we approached Winson Green Junction a chap with white head phones walked over the bridge closely followed by an excited ginger and white cat. Dad’s home!!!! We turned back onto the Main Line and continued to head North West.

Hello Ghost! this years tag

Junctions old and not so old went past. The older ones left over from 1827 when Thomas Telford straightened out the Old Main Line reducing travel times. Lots of the loops were left to service existing factories and wharfs, others over time have been blocked off and built over.

Over flowing from above

At Smethwick Junction you can head up three locks to stay on the Old Main Line at the Wolverhampton Level or continue along the New Main Line the two canals sitting quite close together before the Old Line crosses over the New under the M5 and wanders off south westerly. Today the level on the Old Main Line must have been good, we don’t remember water cascading down what must be an overspill.

Now the canal stretches out straight ahead, Gauging stations (speed bumps) slowing passage down splitting the canal in two. Long reaching bridges span across the water and towpath. In the cuttings high up bridges tower above, one of them being platforms for Smethwick Station.

The water on board would now be hot so I left Mick to cruise the straight line and headed below for a shower. He was left with instructions to find the right left, not the left right. Navigation around the BCN can be so confusing!

A Blackberry jungle up above

I was back up top in time to make sure he made the correct turn at Dudley Port Junction down towards Netherton Tunnel. Long straddling tendrils hung over the opening of the north portal, bet there are some good blackberries above!

Despite Netherton Tunnel being 2776m long you can easily see right through. Today we could just make out the shape of a boat ahead of us, the first moving boat we’d seen. It took us half an hour to reach day light at the other end. Our second moving boat came into view now, just making the turn left at Windmill End, the way we were going.

A boat!

The Dudley No 2 can be shallow in parts, some bridge holes awkward as your boat becomes unresponsive to the tiller. We followed NB Jasper at a reasonable distance, were they heading this way for the same reason as us? Or do they moor down here?

Toll Man Was Ere

Luke Perry’s informative sculptures keep you amused, my favourites are the Toll Man spraying his mark on his dilapidated office and keep your eyes open for coots about the place on walls and in bridge holes.

Two boats!

When we reached Gosty Hill Tunnel the boat we’d followed through Netherton were mooring up alongside the busy road and the boat that was directly in front of us was now gradually making progress through the tight fitting tunnel. We pulled up still in day light our bow just about inside the portal and waited. Not being able to see the stern of the boat in front we wanted to give them plenty of space, so we waited a good five minutes to make sure they were well on their way.

Waiting

Gosty Hill Tunnel starts off reasonably high, but then there is a big step down in the roof. This is why we’d taken the bucket off the roof and the top off the chimney, however there was still plenty of inches above the grabrails and horns.

Time to duck

Out on the far side we pulled up just before the Coombeswood Canal Trust permanent moorings for some lunch. This would hopefully give the boat ahead time to fill with diesel or get back on their mooring. However NB Mr Bojangles came past, soon followed by another boat. Only one boat came back past us, so all we could assume was that the others were returning to their moorings.

A tight turn that many have missed

We pootled up and turned through the tight bridge, a couple of moored boats sticking out across our path, but Mick expertly got past them. NB Mr Bojangles was on the diesel point but we were invited to pull alongside. They were making full use of the facilities before returning back to their mooring in the morning. They lent us heir hose so we could fill with water and the diesel was easy, but emptying our yellow water would be a touch problematic breasted up.

The very helpful lady from the basin suggested we could pull up on a vacant mooring just outside the basin to pump into our container and then use the elsan. Then as Mick paid for the diesel she asked if we’d like to stay the night on the mooring too.

To encourage boaters to use the canal down to Hawne Basin the trust not only has the cheapest diesel on the network (currently 65p a litre) but if they have space available you can moor there for free for a week, any longer then it’s £4 a night.

What’s down here?

We pulled back out of the basin and pulled as far in onto the available mooring as we could, the lady coming to help us. A very friendly reception and somewhere suitable to let Tilly out.

What’s under here?

Rules were read then the front door was left open for her to come and go. She went this way then that, then checked over the bridge. This outside is SO much better than the last two! Can we keep this one?

Just going over there

0 locks, 12.17 miles, 6 straights, 2 lefts, 3 rights, 2 tunnels, 8 mysterons, 3 moving boats, 6 herons, 118 litres, 1 full water tank, 1 empty wee tank, 1 free mooring, 3 hours, 1 Mrs Tilly stamp of approval.

https://goo.gl/maps/WKiL67Lt1SSEcqbH7

‘I Thought I Was Going To Drown!’ 13th September

Damson Parkway Bridge 78A to Cast Iron Roving Bridge, Birmingham

Now yesterday I said we’d be starting our ascent into Birmingham this morning, well before we could start the climb there was a matter of cruising almost 6.5 miles before we actually dropped down 12.92 m, then we could start our ascent.

Birdies

An alarm was set and there were no cuppas in bed this morning, tea was had with breakfast. Surprisingly a boat came past a little before 8am, but it was a C&RT tug parting the water as it went, hopefully it wouldn’t be going as far as Camp Hill Locks.

Back in 2015 this route out of Birmingham seemed to take forever, we’d come down and up the locks and then cruised for what felt like an absolute age before we reached Catherine De Barnes all the time wondering if there’d be any space for us. Heading the other way still took time but today there was plenty to look at as C&RT work boats numbered many.

Diddy paddle power

On a floating pontoon sat a generator and attached to it were some little paddle motors. We thought that maybe these could be used where the depth is very shallow on the off side, they almost looked like they were a new section for Mouse Trap. A tug was moving more of these along to a new site.

Dredging was happening at two sites, well one chap was engrossed with his phone, another had a tug with it that had to be moved out of the way to let us pass. All very busy.

Two bridges becoming one

Soon we started to see red gates and panels on the bridges, these are so that the fire brigade can drop their hoses into the canal should they need to. At Bridge 82 there are actually two Bridge 82s. Once they have crossed the canal they join together. One the far side of the bridge someone has painted Kingfishers and Herons.

I’d just been remarking about graffiti artists and what a shame it was that they didn’t start off with their masterpieces and had to practice their tag so many times. Back in February 2019 we got to see the evolution of Ghost from scrawled tag to multicoloured art work around the northern parts of the BCN, then there was one of his, an intermediate tag quite close to Top Cat.

Tyseley Waste Bridge 88A

Passing through Tyseley all you can see is the large incineration plant and the bridge that leads to it. Once the area was known for it’s tube works which attracted numerous bicycle and motorcycle manufacturers. I used to have a Dawes Bicycle which was made here.

Camp Hill Service block

Up ahead modern tall buildings appeared as we passed old factories and warehouses, all showing blocked up windows and archways from decades of change and decline. Then our first lock came into view, the top of the Camp Hill flight. Alongside the top lock is a service block with all facilities, we pulled in to top up on water, empty the yellow water, dispose of rubbish and give Tilly’s pooh box a refresh as she’s likely to be using it more than she has been recently.

Camp Hill Lock 1

With a handcuff key in my back pocket and windlasses at the ready we could start on the locks. The top lock was empty which meant unless top gates leaked most of the flight would be empty too. I lifted a paddle and then walked down to lift a paddle at the next lock so that it could be filling as we made our way down. We soon got into our stride, me setting the next lock ahead as Mick lifted a paddle on the lock with Oleanna. I then walked back to open and close gates. Most locks had handrails on the bottom gates enabling me to kick them open, then Mick helped to close the offside gate with a pole, saving a lot of walking round.

No escape from scrawl

Walking ahead at Lock 3 there is a big pool as the canal curves round under road bridges. There was the bow of a boat ahead, was it moving or just moored up? It was moving, an Aqua Hire boat, so I walked back to set Mick free the next three locks now in our favour.

Big chunks of steel sit alongside gates on these locks and boast their age, still going since 1891.

Around Lock 6 is surrounded by graffiti. Some good, some not so. Having time to read some of it I realised a lot was in memory of Jason. Was Jason a graffiti writer or a local lad who died at the locks?

Straight on

Straight on for us at Bordesley Junction.

Looking back, to the left still uncharted water to us

The canal to our right, the continuation of the Grand Union Canal, is still one to tick off the list on the BCN. We cruised on to Digbeth Junction now on the GU Digbeth Branch.

By Warwick Bar there is building work ongoing. Most of the area is listed, so buildings are being refurbished for new uses. Residential and food outlets will dominate, the area being transformed due to the proximity of HS2. Through the bar itself with double gates at each end, then a right at Digbeth Junction leaving the Typoo Basin behind us and now on the Birmingham and Fazeley Digbeth Branch.

All of a sudden we were greeted with floating rubbish, earlier in the morning we’d seen a lady litter picking whilst feeding the ducks, it looks like the entrance to Curzon Street Tunnel could do with several like minded people.

HS2 works going on behind
Old and new infront

Building work surrounds you as you come out of the other side of the tunnel. Six years ago it was Birmingham City University buildings going up, now added into the mix is HS2 which will cross the canal over the bottom lock of the Ashted Flight.

Mid flight

The locks were all full, so now we started with our uphill routine, the locks however were mostly close enough together for me to come back and close the top gate instead of Mick stopping to close it. The bottom gates are now also single gates, so no kicking to open them or walking round required, just a little bit more umph!

Between Locks 1 and 2 there is a tunnel, a renowned tunnel! Six years ago Lillian lost a nav light here having come down the lock and being a touch too close to the offside, it really was a horrible grating crunching noise. Today I wished Mick luck and left him to close up at Lock 2 as I walked through the tunnel to lock 1 to empty it and then sit and wait.

Waiting

Below Mick had a passing thought, maybe he should drop the level of the pound a bit to increase the air draught in the tunnel. The top of the chimney was removed and a bucket of toilet solids was moved into the well deck, just in case! The tunnel light went on along with the nav lights, from the far end I could at last see Oleanna making slow progress through the tunnel.

Mind the bump

The handrail along the towpath is beefy wood and mentally pushes you towards the offside wall. But today Mick blocked that out. I could hear the bowthruster nudging the bow away from the wall, from my position it almost looked as if Oleanna was crabbing her way through the tunnel, there isn’t enough width for this to have happened. Slowly they made progress a bulge in the wall very obvious to me towards the northern end. Out came Oleanna’s bow, both nav lights still in tact, hooray!

A scuff or two

Up she rose in the lock, Mick giving the pram cover a checking over. Had the tunnel struck again and damaged the fabric? As Oleanna came up to the top the damage could be seen more clearly. The fabric had a few scuffs from the tunnel wall/roof, but more to the point was a scratch along the grab rail. Then we noticed another and another, some of them right down to bare steel! Mick should have listened to that little voice in his head and dropped the level of the pound. Ashted Tunnel had struck again!

Bu**er!

A pause for lunch on the bollards just through the next bridge was finished with a slice of chocolate banana loaf to help us up the last flight of the day, Farmers Bridge.

At Ashton Junction we turned left onto the Birmingham and Fazeley Canal, a right would have us descending locks again heading towards Spaghetti Junction. Left however meant thirteen locks and arriving into the heart of the canal system of Birmingham at Cambrian Wharf and Old Turn Junction.

Farmers Bridge Bottom lock

The bottom two locks are slightly set apart from the others, so I wouldn’t be returning to close gates behind Oleanna. Just after I’d lifted the paddles on Lock 12 we could see a volunteer walking towards us, he’d come to tell us to leave the gates open as a boat was heading down. We swapped with them in the next pound and the volunteer continued on downhill.

Beam on the off side

Lock 11 has it’s bottom gate beam on the off side and as I stood there waiting for Mick to bring Oleanna into the lock a man walked up, climbed over a low wall on the off side and then walked down the steps below the lock. It was fairly obvious that he was looking for somewhere a touch out of view, he reached into his pocket and pulled out a rizla packet. I closed the gate to the lock and was about to walk up to the top paddles to fill it when the chap came back up the steps.

Bywash at Lock 11

‘Are you going to fill down there?’ he said in a slightly alarmed voice pointing to the pound below the lock. ‘No just where my boat is’. I could see the relief on his face ‘I thought I was going to drown!’ He returned down the steps now knowing he’d stay dry to smoke his spliff in peace.

Now we were in the thick of the flight and the locks ahead empty or just about. So it was easy to start filling a lock and walk up to open the gate on the one above, then return to close the gate behind Mick. The volunteer walked back up the flight, not stopping to help us directly, but instead he opened up the locks ahead of us as he climbed back up the hill, a great help. Thank you.

Gate open and waiting

We were on a roll now up the flight, each lock waiting for us.

The locks under buildings are quite atmospheric, modern architecture meeting old transport. The lock under a bridge even more so. Above here masses of scaffolding engulfs the buildings, cladding work going on. Extra supports over the canal have had to be fixed to pillars on the existing building to hold the scaffolding up. In a weeks time the towpath down the flight will be shut for even more scaffolding to be erected.

At lock 6 we were greeted with the bottom gate shut. Maybe the volunteer didn’t want to set too far ahead of us. But as I emptied it the reason became clear quite quickly, the top gates leaked a lot, so in the time we’d take to get there the pound above would have emptied itself. The lock above was also full for a similar reason.

A touch of a leak

Then I spied a downhill boat coming out of lock 2. We could now leave gates open for them, we rose up lock 4 and waited for them. Plenty of crew on hand to work NB Kew down the flight, but it being a full length boat time was taken to position her in the lock, the tiller pulled right across and tied in position the arm removed so as not to snag on the lock walls. We wondered how far they would get before dark and which way they were heading.

Up the last of todays locks, we’d reached Birmingham, now we had to find a space. Back in February 2020 this had not really been a problem, but today spaces were few. One space in the corner of Cambrian Wharf, it can be shallow in that corner and awkward to get into.

Top of Farmers Bridge Locks

Oozells Street Loop was chocka. There was one space left towards Sheepcote Bridge, but would it be big enough for us.

One space left

We pulled in, a chap from NB Chyandour came out to take our centre rope. We touched both at the bow and stern, slightly overlapping to be truthful, but neither of our neighbours minded.

Oh Blimey! BUMingham again! At least the small sideways trees have a touch more cover to them this time!

BUMingham bricks!

Time to dig out the sand paper and primer, get something on the grab rails before the rain brings with it rust and makes the job a bigger one. I chipped off loose paint, sanded back the gouges and applied a coat of primer. I’d intended repainting the grabrails this year, but time is now running out both weather wise and before panto starts. So a patch up will have to suffice for this winter. Hopefully in the next few days there won’t be constant rain so I can get undercoat and top coat on it too.

Tweaked in

25 Locks, 9.73 miles, 1 straight, 1 right, 2 lefts, 2 tunnels, 12.92m down, 35.9m up, 4 paddle boats, 2 dredgers, 2 tugs, 1 full water tank, 1 empty wee tank, 1 clean pooh box, 3 boats met, 2 slices cake, 1 volunteer, 1 weed smoking survivor, 6 inches too long, 1 cosy mooring, 1 disappointed cat.

https://goo.gl/maps/SShBALoBLemZ2d7X9

Then There Was One. 30th August

Houdini’s Field to Norton Junction

Tilly was still pooped from her freedom yesterday so we had a quiet breakfast without being pestered for some shore leave. Only a couple of boats had come past us before we pushed off, but as always one appeared just as we were about to untie. We waited for them to pass, two chaps who asked where the nearest shops were. Their speech was very loud yet a touch incoherent. Lizzie said thank goodness we’d be behind them as they engaged their dilithium crystals.

See you soon!

Time to say our farewells and leave Lizzie to the last of her Bank Holiday boat chores before she herself would be returning to Crick Marina. It’s been a lovely weekend and so nice to have a catch up at ease on the boats. Hopefully we’ll be seeing Lizzie later this week as some things for panto were being delivered to her work for me.

Conkers means schools about to start

We pushed off with the aim of reaching the top of Long Buckby and finding a space to moor there for our Sainsburys delivery. Fingers crossed there would be space for us and that we’d have an easy time at Watford with not too much queuing. Our maps suggested it would take us around five hours, plus a bit if we had to wait at the staircase, so we should arrive for a late lunch.

There they go managing to avoid collision with the bridge

However. The blue boat had exhausted the boost of power and now just seemed to be working on Guinness and Stellar! They zigzagged across the cut, one of them trying to do something with their chimney, it’s suspected that it got a big whack going through a bridge hole. Several times it looked like they might be pulling in to let us go past, but this was only so that they could ricochet off the towpath to back into the deeper water before passing into the shallows on the off side. Would we actually reach Watford before the locks would be locked up for the day (thankfully extended hours still in place after Crick show)?

See you sometime Cracks Hill

Then thankfully after about three quarters of an hour following them they managed to pull over just after Bridge 24, just after a moored boat, shortly before a winding hole and bend where of course a boat was just coming round! Mick engaged our lithium crystals and managed to pass them before there would be an awkward moment with the other boat. Back to normal cruising speed.

We think it’s the first time we’ve been through Crick without stopping for anything carrying on straight to the tunnel. Water proof coats and life jackets on we had the tunnel all to ourselves. The first 400ms are the wettest, I hoped my lovely clean roof would survive having an extra rinse. As we reached the southern portal the air grew misty, our lights creating search light beams onto the tunnel roof.

Could have been tenth not third

On to the top of Watford where we joined onto the back of a queue of 2 boats just nudging up to the top lock behind one going down. I hopped off to go and sign in with the Lockie. With a queue of boats below the flight we would have to wait, the two in front of us would go down, then boats would come up. Time for an early lunch.

Down the top lock

Once the first uphill boat had risen up the last single lock we were locked down to wait in the pound above the staircase, therefore using a lock full of water and getting the downhill queue one lock ahead.

to wait in the pound above the staircase

The next boat up the staircase didn’t sit well with the engine noise we could hear. A 57ft modern boat which would normally have a beta 43 sounded like an old work boat. This was because in the next chamber downhill there was a boat with a heart pounding thump, in fact it was a National DA2 built in 1949, only one of two thought to be in the UK. This was NB Hadar all 70ft of her, Keith at the helm and Jo working the paddles.

Hadar coming up

Mick helped with gates and chatted to Keith about Hadarford, the model railway in their hold, whilst I helped with the bottom gates of the top lock, closing them and emptying the lock ready for the next uphill boat.

Passing by

Six in all came up, then it was our turn to head down. Plenty of Lock Keepers were on hand to assist and we made it down the staircase and the final two locks in no time. There was a boat in each pound below and a queue of hopeful boats was forming beyond them.

We’d been glad of helping with the locks it had kept the days chill off, but now stood at the back of Oleanna it crept back in. At Norton Junction we turned left towards the top of the locks, but it was soon evident that there was no space for us.

Reversing to a mooring

We’d just passed a big gap by the water point before the junction so into reverse we went and backed ourselves around the corner. Tomorrow morning one of us will go and await our order with bags and a bike, so no need to cancel the order again.

They never let me out in Watford outside, the trees always look so good too!

7 locks, 4 a staircase, 9.88 miles, 1 tunnel, 0 mysterons, 3 to 2 to 1 boat left, 1 pissed boat, 2 fleeces, 4th in line, 6 coming up, 5 Lock Keepers, 1 left, 1 reversed left (or is that right?), 3 hours shore leave, 1 stove lit on a Bank Holiday weekend.

https://goo.gl/maps/tMT5U4dgkrK7FETdA

Star Jumps, WD And Thespians. 26th August

The hedge Flecknoe Road Bridge to the view before Norton Junction

Quite a good view from the kitchen sink

Last night we’d had this stretch of armoc to ourselves, but just around the corner there were seven boats nose to tail, we preferred the view we’d had. As we made our way towards Braunston Turn we kept our eyes open for any gaps in the hedge to the north of the canal so that we could drop a pin on our map to remember it, only one and not much of a gap.

How many glasses in one of these?

As we cruised along I tried to drink several glasses of water. A few weeks ago I got an invite from the Zoe covid app to do an antibody blood test, this would show if I’ve had Covid without knowing. I’d arranged for a test kit to be sent to Scarborough and then have been waiting for a suitable time to do the test. On the instruction video it suggests drinking 6 to 8 glasses of water the day before, so yesterday I spent a lot of time filling up the yellow water tank! Today 2 to 3 glasses had to be drunk at least half an hour before doing the test, I also needed to be near to an NHS Priority Post box, Braunston.

Bangers!
Braunston Turn

At Braunston Turn we turned right following a hire boat who quite quickly pulled in. Would Braunston be full of boats or would we be fine finding a space? There was so much space available we easily slotted in at Butchers Bridge our preferred mooring.

All laid out

Now to do the test. I laid everything out and had to discourage Tilly from watching too closely. Then I had to get my blood pumping by doing some exercise before submerging my left hand in a bowl of warm water for a couple of minutes. Far more complicated than sticking a cotton bud up your nose!

Star jumps are a little bit hard to do inside a boat, but I decided to stay indoors rather than amuse those having their bacon butties at the Gongoozlers Rest. Then self inflicted pain! A lancet pushed hard into a finger tip, followed by massaging my hand and finger to fill a little bottle up to a line. One thing they should add to the instructions is that if you have long finger nails then most of your blood will collect on your nail, a trim before hand would have worked better. With my sample done, labelled and packed up we set off to the Post Office.

Is that? Could it be?

As we crossed Butchers Bridge we glanced up towards the bottom lock, was that boat NB Winding Down? It was green, the sign writing wasn’t visible. We walked down to have a look, yep it was, but would we know the people on board?

Hello WD!

Mick called out to the occupants, ‘Hello, do we know you? We used to have a share in Winding Down’. Well we did know them, Paul and Aileen , some of the original syndicate members. Our paths crossed several times in Waitrose at Sandbach on hand over days. A lovely catch up with them and news of other members we knew, the last AGM on zoom and most importantly that NB Winding Down will be moving further north for next years cruising season, so we’ll have to keep our eyes open near Stone in future.

Priority

Up the hill we climbed to the Post Office first popping my sample into the post box, then across the road to the butchers.

Bangers! but none for me 🙁

Well, since first noticing a sign saying they do gluten free sausages a few years ago, we’ve asked every time we’ve come in and only once have we had any. Quite a disappointment! Maybe the church spire no longer means Bangers! Yes I could buy some of their normal sausages for Mick, but what would I have!?! We bought bacon, a pork pie, some pork, eggs and some strawberries. Have to say their fruit and veg looked better than it used to, maybe they have a bigger turn over after the lockdowns when I suspect the locals shopped with them more. A few more bits from the shop across the way and we were done.

Braunston Bottom

After lunch we pushed off to climb the locks. A lady waved to Mick from the bridge after opening the bottom gate, she thought he was her husband! With no boat following and two boats coming down the next lock we headed up on our own.

In the pound below The Admiral Nelson people sat out side their boat, turns out they were waiting for a boat to share with. Marvellous!

The Admiral Nelson

Nick Wolfe stood at the stern of Aldgate, he turned to me and said ‘Hire Boat!’ One was pulling into the lock landing below the lock, doing their best to get out of our way whilst being berated for mooring up. Oh blimey! Poor holiday makers! The poor ladies at the bow had steam coming out of their ears as they tried to pull their boat out of the way. They assumed I’d have the same reaction and angrily said they weren’t staying. As we worked the two boats up the lock I could still hear ‘You can’t moor there!’ from below. No wonder some people think boaters are down right rude, I think they already knew what was being rammed down their throats!

New locking partners NB Celtic Girl

Calmly we worked our way up the remaining locks. Three generations of one family out on a friends boat for the day. The lady said they lived on a boat for ten years in the 70’s, it must have been so different then. Then she said that her husband was an actor, so they used to go where the work was. Obviously that started a whole different conversation.

New brick work finished

Meanwhile Mick at the stern was chatting away, acting had been mentioned and the chap said ‘Oleanna’ sounded familiar. The world got smaller over the next couple of locks. Graham Padden had been working at The New Vic in Stoke in 1998 when the Stephen Joseph Theatre visited with their 10 x 10 season. 10 new plays with a company of 10 actors. Comic Potential, Perfect Pitch and Love Songs For Shopkeepers were the main house shows with seven more in the studio, I designed eight out of the ten. He then mentioned that he’d been in Shadowlands with Janie Dee in the West End. His wife and son were also actors. They’d all toured into Chipping Norton too!

Braunston Top

At the top of the locks we led the way to the tunnel. Life jackets and torch at the stern. We soon saw a light coming towards us, this was followed by another three in quite quick succession. Thankfully no-one else entered the tunnel so we got to the kink on our own.

Braunston Tunnel

3:30pm. Would we get to the Watford flight in time to go up the locks before they closed? We’d get there, but if anyone was waiting then we’d not get up the locks today. We carried on up to Norton Junction where there was space for a couple of boats with the lovely view. It would have been rude not to moor up, so we tied the outside up and let Tilly out. She was given a strict time to be home. She obliged.

That bow looks familiar

A little while later the bow of a very new Cowpar appeared at the bridge ahead of us. This was the new Finesse boat that had been shown at Crick Boat Show last weekend. Excuse the looks on their faces as it is a 70ft boat turning at a junction with a bridge hole to contend with. A very nice looking boat with electric drive, there’s a boat test by Adam about it in last months Canal Boat magazine.

NB Grà

6 locks, 6.98 miles, 1 right, 3 glasses, 1 prick, 500 whatevers, 10 turns, 2 syndicate members, 1 share for sale, 0 bangers, 6 rashers bacon, 3 pork loin steaks, 0.5kg beef mince, 1 small pork pie, 1 punnet strawberries, 3 actors on a boat, 1 tunnel, 2 mysterons, 4 passing boats, 1 prime view mooring, 1 bruised finger.

https://goo.gl/maps/1qq4YepPW6DonSeZ6

Waving Goodbye, 31st July

Eco-Moorings to Ballot Box Bridge, Paddington Arm

Mick was off with a shopping list to keep us going for the next few days until we can get a click and collect somewhere. Then it was time to sit down with the Geraghtys. Todays topics, Olympics, Toddler stage school and Trampolines.

Time for us to head off. We unplugged (once the dishwasher had finished), turned on our tunnel light and followed the trip boats through Islington Tunnel. On the other side a boat was showing off it’s tyre sculptures. A curvy lady and a lizard, all very clever, have to say I preferred the lizard.

Below St Pancras Lock

Many of the same boats were moored up in the same spots as when we first came past a month ago, tyre fenders touching the water an ideal place for a moorhen or coot to build a nest. Have to say one boat almost certainly had done a diy nest on their back deck, the predominance of organic material a sheer give away, London coots and moorhens like a bit of plastic bling added to their nests!

Back up at St Pancras

St Pancras Lock sat full, full of duck weed, in the last two weeks the bloom has taken over.

NB Chance

As we worked our way up Richard and Victoria from NB Chance stopped for a bit of a chat, they are currently staying at the Cruising Club before heading onwards, we also spotted NB Misty Blue pulled in against NB Flora Dora. Today we wouldn’t be stopping, not even for water as planned, someone else had got to the tap before us.

Under the railway tracks

We waved goodbye to the gas holders as we ducked under the railway bridges and carried on our way westwards.

Safe behind the railings

Below Kentish Town Lock Christine was waiting behind the railings to watch our ascent up the three locks, the last on the Regents Canal. She stayed a good distance away from the waters edge at all times, just as well as she still had her shopping to do.

Moondance and Oleanna swap

The pretty NB Moondance was coming down in the middle lock, so we swapped over in the pound below and carried on upwards. The boat that had been on the water point at St Pancras appeared below the locks, but we were well on our way up and there was plenty of water coming down.

Keeping the tourists happy

Hampstead Road Lock was full and needed the gates closing so we had a pause whilst I set the lock, no volunteers on duty today, although Mick said an off duty lockie stopped to say hello.

Hampstead Road Lock, gongoozler central

Now which gate was the b**ger to close? I called Mick to see if he could remember, he couldn’t, don’t know why I asked really! Foolishly I chose to open the gate on the island which opens over the steps, this was the wrong gate and did take quite a lot of effort to close. A lady appeared at the other gate and said as much, wound down a paddle then stood keeping an eye on the bottom gate. I half expected the lock to immediately be emptied as soon as I closed the top gate, but it wasn’t.

Bye bye Christine

Christine had headed up onto the bridge above for one final wave goodbye. It’s been lovely to be able to catch up with family whilst we’ve been in London, spending some quality time with them. There were plenty more people we could have seen, but family were the most important for this visit.

Now back into the mayhem that is trip boats, paddle boarders and Goboats. The paddle boarders held back as we passed following NB Black Pearl who stayed in tick over for most of the way through Regents Park.

Piling going on

Big piling has been going in where we’d seen the sunken workboats two weeks ago. All boats now above water, a busy site.

By the time we reached Park Road Bridge we had another trip boat behind us, three Goboats at least coming through the not quite tunnel ahead. Then came another trip boat. With three boats waiting to go through, Goboats dawdling, some having pulled in right where the new trip boat had to go as there was nowhere else for it, it slammed into reverse! Quite surprised there wasn’t an incident!

Once through Maida Hill Tunnel we were away from any possible collisions. Rembrandt Garden moorings were awaiting it’s next lot of moorers and luckily for us the water point through Westbourne Terrace Bridge was empty, we pulled in, hooked up the hose and started to fill up. The tap being slow we knew we’d have chance to have something to eat before carrying on.

Blimey those fish down there blow big bubbles! I waited to see if one would surface in amongst the grass but it didn’t.

Slowly we cruised out west, we passed the widebeam we’d rescued a few weeks ago. Where scaffolding has been used to tie up to forever the hording boards have been removed, maybe the scaff will follow and people will have to drive mooring spikes in again. A wall we’d seen being cleaned of graffit tags as we came in last time already has a collection forming again.

Just where we’d rescued the widebeam a couple of weeks ago

Our progress slowed to the point where we needed to stop to clear the prop. Urban Jellyfish, as Tom used to call them, had been caught on our prop.

In Alperton we noticed a mural under a bridge. Had this been here before? A plaque at the end mentioned the artists name Gianpaolo Buccheri and that the piece was a commission from C&RT. It turns out it was created only a couple of weeks ago.

I also like the cat and sofa that must have been there longer.

Might have to start carrying a container with me soon

Soon we arrived at our destination, now our usual stop in and out of London, Ballot Box Bridge. We pulled in where there was plenty of space and despite it being very nearly Tilly’s dingding time she was given an hour of shore leave. I put a chicken in the oven to roast and Mick cleared the prop again.

4 locks, 1 tunnel, 11.63 miles, 1 right, 1 full water tank, 1 dry Christine, 1 empty wee tank, 2 trips down the weed hatch, 1 near miss, 2 many Goboats, 2 boaters and 1 cat waving goodbye to London.

https://goo.gl/maps/3JnRLqCfLrfnHpBM7