Mick set off this morning to see if he could catch up with a parcel that had been diverted to Bethnal Green sorting office. With card in hand he arrived and joined the queue where news reached his part of the line that the sorting office was closed due to strike action. His trip out though did mean he bought some stand in presents for his sisters as the parcel containing those also hadn’t arrived despite several attempts at delivery.
Quality control in operation
Meanwhile back at the house preparations were underway for the first Leckenby Geraghty family get together since the pandemic. Whilst Andrew and Josh worked on work things Jac and I made salads, prepared a fish pie laid the table and tidied up, all under the watchful supervision of quality controller Finn, he’s very particular about his fish pie!
Kath, Marion, Andrew and Christine
Kath was first to arrive out of the cold, soon followed by Christine and Paul. John and Marion had changed their plans and driven up from the south coast, sadly they wouldn’t be staying as Marion was full of cold. An exchange of presents was done accompanied by some festive fizz before they headed off back home with a welfare package of fish pie. Anne, Mick’s fourth sister joined us briefly via video link from Scotland, which was lovely to have everyone together for a short while.
What a lovely afternoon and early evening, drinking, eating and chatting away. The fish pie was very tasty along with the salad. Then pudding came out decorated with some of the candied orange slices I’d made the other day. Sitting in the tuperware they had got very sticky again. One orange seemed to have candied better than the other. The cheesecake was very rich, which went down well.
It really was great to get people back together for an early Christmas, just a shame not everyone could stay or be there. There were a couple of plans talked about for next year, where we hope to be able to get the next generation and the one below that together too.
Snow starting to settle
Around 6pm Josh came down and said it had started to snow. By 7:30 this was more obvious looking out of the window as it was starting to build up. A taxi was called to get people home and as we waved goodbye there must have been at least an inch and a half of snow.
Settling out the front
Poor Marion and John had left us most probably around 3pm and had got stuck on route home by snow. A pause in a pub for a few hours before they altered their route back to the south coast, arriving home as we were all heading to bed.
A snow blanket
0 locks, 0 miles, 1 canal not frozen (Hertford Union) yet, 3 sisters, 1 videoed in, 11 bottles, 1 welfare package, 0 left overs of fish pie, 0.25 left of cheese cake, 1st get together since 2019, 4 stand in presents, 1 still to be caught up with, 1 happy Finn, 10C on Oleanna!And don’t I know it!!!
If people would like me to post how I candied the oranges I’ll add it to the recipes, let me know.
With Tilly left staring into the corner of the boat, ‘in charge’, we headed off with overnight bags to meet a taxi which took us to Tamworth Station. Today we’d not be heading northwards but south to London. For this we needed the platform opposite the entrance. Getting there you really need to read the signs, as just getting the lift up to the higher platform doesn’t actually work! You need to take the second lift, hidden round the corner under the viaduct to be on the right side of the higher tracks to then be able to take another lift down to the correct platform. Tamworth Station may be handy for access to different parts of the country, it however is quite confusing.
Jahn Court
We were lucky to get seats as the train very quickly filled right up. An hour and a half later we arrived into Euston. A 30 bus took us the short distance to Kings Cross where we alighted and walked round the corner onto York Way. We were looking for a recessed courtyard at Jahn Court and the Supermodel exhibition.
Glowing next door
Architects Piercy & Company have put together an exhibition of architectural models based on buildings they have designed, some built, some not. All the models have a life given to them, some with sound, all with light and several with moving elements.
Awaiting a new life
They were made over a period of five years between projects. Jahn Court building is part of Endurance Land’s ten-year plan to revitalise the Regent Quarter to the east of Kings Cross. The building is currently in a stripped out state awaiting redevelopment and gives an interesting background to the exhibition.
Each model had either a motion sensor or a button to press which would set things in motion. Projected people moving about staircases and landings. How passing daylight affects a building, revealing different things as the day progresses including a giant balloon dog.
A camera on a track through and around a model, the footage projected onto a screen close by. A choir singing as light directs your eye around a modern church.
Cantilevered
By far the best was Two Villas. Two Georgian villas open up like a cantilevered metal tool box to display the rooms inside.
This was closely followed by Steel House. This was the first model of the collection, it is modeled on a steel framed house that had to be craned onto its site. The buildings slide or rise upwards, a bird flies over the roof, a puff of smoke comes from the chimney. Apparently there was an aroma of cinnamon, but we didn’t notice it.
Footage of the models being made and the rather nice benchesto sit on.
A very good way to spend an hour, thank you Heather Bleasdale for sending me the link to the Ian Visits article about it.
Falling off the bone
Back on the 30 bus and out to Hackney and the London Leckenby’s where a warm welcome awaited us. Plenty to catch up on as we tucked into a wonderful beef stew. Josh headed out to meet some friends to watch the England game whilst Mick, Jac and Andrew settled in the living room to also watch.
Meanwhile I busied myself in the kitchen, blitzing digestive biscuits, beating cream cheese and sugar together, melting chocolate and grating the zest off oranges. I managed to occupy myself for just about all of the match aided by my assistant Finn. By the time we’d had another glass or two of wine, pudding for tomorrow was baked and cooling on a rack.
Finn who comments all the time as you cook
0 locks, 0 miles, 1 very frosty Tamworth, 1 taxi, 3 lifts, 1 train, 30 bus twice, 8 models, 1 beef stew, 1 chocolate orange baked cheesecake, many glasses of wine.
As we laid in bed having our morning cuppa we had a quandary. With the weather set to take a turn to the colder end should we head onwards and stock up with coal and diesel? Our natural boaters instinct was to stock up and be prepared. Micks cold and my calf muscle made us want to stay put, after all we are plugged in and have a water tap close to hand in the marina.
Different sort of ideas
We plan on being in the marina for a few days, trips away needed and the boat being plugged in handy as the Alde boiler can work on electric to keep any major chill at bay. The marina office is closed on Sundays so we couldn’t check in today, hence our arrival yesterday. Maybe we should have checked in, been pointed to our mooring, but then continued onwards to Glascote and Fazeley to be able to stock up at Fazeley Marina where the diesel ten days ago was around 22p cheaper than here at Alvecote! Diesel prices depend on who had the cheapest delivery recently.
What to do? One minute we were gearing ourselves up to move Oleanna, the next a quiet day with cooked breakfast appealed more. The breakfast won. Here’s hoping we don’t regret our decision when the temperature plummets.
This seems to becoming very regular
The Geraghty zoom subjects consisted of Eastern European sofas, pigeon scarers and pass the parcel etiquette. This was followed by breakfast.
How many windows open?!
Time for me to do some work and order in some materials to make some props. Being in one place for a few days means I can get things delivered to a nearby shop for collection. The actual building of the props will wait til after Christmas so that we can actually live in the boat for the next few weeks. Calculations were done, working out how many yoga mats would be needed, a lot of πD maths to get the most out of them.
More in depth calculations
Christmas shopping was also started on-line. Somehow the day had vanished, not that we’d seen much of it being slotted into our mooring, a boat 18inches away on both sides.
The day ended with a roast chicken and arrangements being made with the London Leckenbys for the start of the family festivities.
0 locks, 0 miles, 4 siblings, 4 bags of coal, 5 yoga mats, 2 sheets corex, 70cm long spoon, 1 watch list chocka, 1 float waited for, 1.714kg chicken, 1 cosy bored cat.
A lie in and then tea with the newspapers and handing over of Advent calenders. Mick has a Science Museum one and I have one with Reese’s peanut butter cups. The Geraghty zoom covered parkin, leaf mould and the World Cup.
Advent
Then even though it was Sunday I needed to do some work. Time to read the latest version of #unit21 the show I designed for Dark Horse in Huddersfield. They have been successful in being awarded funding to tour the full show next year in February. For the showing last February we produced Act 1, Act 2 was to follow.
Runny Sunday
Script read, notes taken. Then a spread sheet for the budget. I spent much of the day hunting round the Internet for materials to make giant mugs, finding extra small overalls and working out how the budget should be spent. Mick and Tilly pottered away the day, keeping quiet when needed.
Reminiscent of the array of velcro at Nottingham hospital seven years ago
Advent Sunday dinner was popped in the oven then it was time to catch up with my brother who’d had an overnight stay in hospital a few days ago. Thankfully he seems to be on the mend after an operation. There was lots to catch up on and festive plans to be made.
Advent Lamb
Our joint of roast lamb was very tasty indeed. Not a patch on the Advent Sunday meals my Mum used to make. These would have huge joints of beef and big proper Yorkshire Puddings as starters. But the most important part of the day was spending it with my God Mother Betty. Today I made sure I sent her an email, hope she was having something nice to eat too.
Betty and Me
0 locks, 0 miles, 2 calendars, 2 acts read, 1 page of notes, 1 joint lamb, 1 BP email, 1 brother in one piece.
A lie in with Tilly in the way, it’s good to be home. After a lengthy cuppa in bed with Saturdays newspaper to read, Mick set to in the kitchen preparing breakfast, extra rations today. There was so much food that we continued to eat as we joined the Geraghty zoom. A trip to Bruges, panto and flowering cacti were discussed.
Breakfast whilst waiting for family to arrive
Another two loads of washing were required before moving away from the handy tap and a couple of items were still needed from Tescos. So Mick popped down the hill and dealt with washing whilst I rested myself.
Several boats came past, some stopping in spaces, others pausing to top up and empty.
Topping up
Oleanna had her yellow water tank emptied and her fresh water tank filled, then we were ready to make a move.
The last time I was on a moving boat was five weeks ago, cruising from near Kings Sutton Lock to the Tramway moorings in Banbury, all pre-panto. Then the ground was dry, today the towpath and boat were muddy.
Stepping off the boat was done carefully, yet my calf twinged. More rest required for it. I managed to push the bow out and off we went. The sun was trying it’s best, but that really didn’t matter, just being on the move at a leisurely pace was all that counted.
Waiting for the bow to come out
Not far today, just somewhere where we’d be happier for Tilly to head off and explore. Well it didn’t get a very good review from her. Well what do expect! There’s a great big mesh fence in the way of the good bits!
The afternoon was spent pottering and watching another episode of Morse and the final part of Inside Man, we wonder if there was enough plot left dangling for there to be a second series. Later on we enjoyed a roast chicken.
Panto reviews have started to come in, so far everyone has enjoyed themselves.
Bridge 68, North Oxford Canal to Coventry Basin, Coventry Canal
Another long week in Panto land and some more cruising for Mick and Tilly.
Monday I arrived in the theatre to find sliders being cut down to size and lots of magnetic catches and door handles having been attached, all good news. But then I soon heard that Abi the Director had tested positive for covid over the weekend whilst at home in London. The cast were given various options, the one they chose was that John the Artistic Director of Chippy Theatre and the writer of panto would stand in for Abi until she returned and Abi would join when she could via zoom. Our Production Manager Gemma was also unwell so she stayed at home an extra day.
Counter getting close to completion
I got on with painting what ever I could without being in the actors way. A list of scenes required for the following days rehearsals is sent out so it takes a little bit of working out what I might be able to paint and when. The wings of the stage were sorted by Stage Management to hopefully help make the technical rehearsals easier.
In the evening we were joined by a couple of chaps to help with setting up the sound equipment and drilling holes in trees for fairy lights. By the end of the evening two out of the four trees had lights and a lot of the sound system was up and running.
The River Avon in Rugby
In Rugby, Mick and Tilly stayed put on the boat. Mick did venture out for his covid booster jab, four weeks after we’d tested positive.
Painting ovens and doors in the wings
Tuesday. More setting up of sound with Matt the Sound Designer about for one day. The aim was for levels to be set for the songs and cues to be programmed into the desk so that only minor adjustments would hopefully be needed. Songs were sung by the company accompanied by the two man band.
Dicks solo being sung in front of the Pippins and Becky the composer
Gemma joined us for a few hours but she was obviously still not well. She did her best to keep her distance, helped get sliders rehung and sorted a few bits out, but mid afternoon she headed to her digs to hopefully get some sleep.
Mark the Lighting Designer had a lighting session in the evening, meaning I was either painting by torch light or had a lot of light. This gave me the chance to get some black lining done to the sliders for Piccadilly Circus. There’s still plenty more to do on them, but at least I made a very good start.
Newbold Tunnel
In Rugby, Mick moved Oleanna up nearer to Tescos, did a good shop. Topped up with water and headed onwards through Newbold Tunnel. Over the weekend we’d discussed where might be easiest for me to get back to the boat next weekend, Rugby was a little bit problematical and quite a bit of a walk to reach the boat. We’d decided that Coventry would be better.
Wednesday. Gemma tested positive for covid this morning. Hopefully she hadn’t passed it on to anyone whilst she’d been in the building, but more importantly she could head home to recover.
Signage
Conversations were had about outstanding jobs. I can lend my hand to quite a few things, but it would all take time. Better to have someone who knew what was needed and free me up to carry on painting and helping where needed.
The Technical rehearsals begin
In the afternoon we started to Tech. This is where all the elements come together on stage. Sound, lighting, costumes, props, actors, musicians and set. Due to many reasons there were gaps in costumes, props and set pieces. Not ideal, but unavoidable. Everyone did as well as they could, one thing became obvious was that we still needed someone to help program the sound.
Loads of room!
Mick carried onwards. In winter months moorings that are normally chocka block can be empty, this was the case at All Oaks Wood. I think we’ve managed to pause there before for lunch once, but today he had a choice of where to pull in. Tilly made the most of a good outside!
Thursday. A long day of technical rehearsals. Days like today I spend mostly sitting in the dark, taking notes, attending to things as they arise. I decided to try to do small jobs whilst sat in the dark like signs, sorting out the new song sheet.
It was not me who emptied the chilled medication fridge leaving only vanilla!
Then when the actors have a break there is some time to get a bit of painting done. Wet things need to be dry before costumes are back on stage, so timing jobs can be a touch tricksy. Following rehearsals there are a couple of hours to get more jobs done. Jo the prop maker was about, so conversations turned to treasure chests and snakes.
Mick carried on moving. The journey from Rugby to Coventry can be done in under eight hours, but with a week to do it in he was pacing himself. Today he moved a touch further than he’d originally planned, through the new swing bridge at Rose Narrowboats, stopping a short distance before Hawksbury Junction, meaning there was space before other boats for Tilly to explore.
The Greyhound busy on a Friday morning
Friday. Mick decided to stay put, having a walk up to the bins at the junction a highlight of the day. The Greyhound was busy even quite early in the morning.
The tight turn at the junction. To head north use the left canal, south the right turning under the bridge.
Another early start to do some jobs before rehearsals started again. My lunch tends to be eaten in the next technical session, making use of as much stage time for jobs as possible. Abi is now very much in the room, joining by zoom, sending messages by Whatsap.
Laptop in the centre of the auditorium so Abi can join us
Today after rehearsals, Dan who’d helped set up the sound equipment and has been helping with programming stayed around to help with various jobs on stage. Some black tabs were not quite in the right place so needed adjusting. A tree needed extending, it’s track moving higher. But the most important job was to get a cloth rigged so that it could be lowered in to view and pulled out of view, it’s been out of view for three weeks.
A Curlywurly in the dark whilst taking notes
Chippy Theatre has a bit of a fly tower, but it is nowhere near tall enough to be able to fly cloths fully in and out. So the cloth has to work like a very big Roman Blind, pulling itself up on itself. We got all the cords in place, but lacked somewhere to tie it off to. So that we don’t now see too much of the cloth it’s been tied off to a cleat for other scenery, a better solution needs to be found.
Nice to see the cloth again after three weeks.
Saturday. A morning of technical rehearsals. There is still more to do on Monday sadly.
Last year I did one of these every day during panto
Also sadly today we were missing Becky, the composer, another case of covid. I am so hoping that I still have some natural immunity left as I spent much of yesterday sat next to Becky. This morning I did a test after spending time with Gemma, I’ll be doing a test before returning to work on Monday.
A nearly finished scene
All the trees were up and fairy lights working giving Mark the opportunity to light the next scene. We mostly worked our way through the scenes that have the Pippins in so as to make the most of their time in the theatre. Having three teams of Pippins means doing everything three times, one team are in costume the others not. We now just have to finish teching the rest of the show on Monday.
Mick moved on again in the morning, turning left at Hawksbury Junction and heading under the bridge decorated with swans. We last came this way about five years ago and today Mick saw a big difference. New houses and just generally better kept, possibly assisted by the City of Culture. Tilly however wasn’t that impressed!
Coventry Basin
After rehearsals I became unpopular asking for the trees that had only just gone up to be taken down. My aim for the day was to get the last two remaining trees painted, having them flat this would take about half the time. It didn’t take too much to get them down thankfully.
Trees finished. Well I might add some glitter if I get chance.
The last couple of hours I was on my own and was glad to not have to climb a ladder. By 18:10 the trees were painted, brushes washed up. By 18:25 the theatre alarm was set and I was heading for the bus stop and Banbury.
Goodbye Chippy, see you Monday
A train then another bus to save me walking across Coventry where Mick met me and we walked up the hill and over the ring road to Oleanna in the basin. Time for head nudges with Tilly, something to eat and slump in front of the tv.
He’s here!
Sunday. A Sainsburys delivery was early, I left Mick to deal with it as it was early early, but it did mean we could have a nice breakfast.
Yumm!
This was followed by the Geraghty zoom where we were all relieved to be joined by Anne who has just had a spell in hospital.
Work in progress
A slow day, much needed, but sadly I still had some work to do. A new song sheet needed designing and the best time to do it was today. Thankfully it didn’t take too long. The day will end with a roast chicken and packing my bags to head back to Chippy tomorrow. Hopefully no more cases of covid this week, fingers crossed.
Monday morning I was on the 488 bus which dropped me off at the end of Over Norton Road, a short distance away from my Chippy home for the next few weeks. There was time to say hello to Suzanne and pick up a front door key before heading in to the theatre where Ade and Lou (the set builders) were already stood waiting for the building to open to load the set in.
John Terry welcoming everyone to the 50th Chippy panto
I collected my model pieces together and laid the model out ready to be shown at the read through, then set to work. This year the set has a lot of what are called profiled flats. Ade and Lou had built the flats to the correct overall size, but the profiled edges needed drawing out before someone could jigsaw them in to shape. I managed a few simple shapes before having to dash off to join in with the meet and greet for the company. A very good breakfast spread had been laid on for everyone, parish notices and a quick once round the room of introductions.
Paul, Imogen and Chris busy on stage
Normally I would stay for the readthrough, but this year my time would be better spent drawing things out. So I got to do the model showing to the company before heading of to put my dungarees on.
Jo the prop maker arrived with a van full of goodies.
In the past I’ve used an overhead projector to speed up drawing complicated pieces of set. I’d been offered a digital projector to help, with all the set pieces scanned this should have been easy. But no matter what myself and Louisa (the Assistant Technician) did things just didn’t want to line up and propping the projector up at the right angle proved so frustrating! In the end I gridded everything up and drew up in the old fashioned way.
Back in Banbury, Mick and Tilly headed out of town and moored between the lift bridges so that some shore leave could be taken and enjoyed again. Bumbury really is rather boring!
A tired and out of focus photo. Ade, Lou, Gemma, Chris and fish and chips
By the end of the day, sliders were in position, over half of the profiled flats were cut out, quite a lot of set pieces were primed. Time for a drink at the Blue Bore and some food. Sadly the pub were reluctant to serve us food as they were short staffed, Chris went for a walk to find food and we all ended up sitting in The Fox. Five portions of fish and chips went down very well!
Nadia
Tuesday, Ade and Lou headed home leaving Gemma and Chris to carry on with the fit up. Make up was tried out for Whittington the cat and photos taken so that I can recreate their face in part of the design.
Louisa and Andy adding fittings to sliders
More drawing out of flats and the constant noise from jigsaws filled the theatre, when they were quiet we got to hear the cast learning the songs up in the gallery. Tracks were put up by Paul, Louisa and Andy. By the end of the day we’d achieved a lot, having the main set go up on Sunday had helped a great deal.
Healthy option tonight
Tonight the Blue Bore was considerably quieter and food could be ordered. A squash and beetroot stew with broccoli was very tasty accompanied by a glass of wine, only one mind as my head is still recovering from covid.
Something’s missing from that cill
Wednesday. Mick needed to turn Oleanna. The next winding hole was at Twyford Wharf down Grants Lock. He winded and returned to the lock where he could see several protruding bolts on the top cill. Keeping Oleanna away from the bolts was important so as not to snag the bow fender. He made it safely back up and returned to the mooring he’d left an hour and a quarter earlier, Tilly got to spend the rest of the day out and about.
Such an autumnal front door
In Chippy things needed checking over, magnetic catches adding to cupboards and wheels adding to set pieces to aid their movement both on and off stage. We worked our way through the scene changes marking positions and deciding on positions for things in the wings.
Eros based in with the model for reference
I spent much of the day priming bits of scenery. Imogen who’s on work placement with me started to base in Eros, it was very nice to see some colour going onto some scenery.
Front cloth in position
Late afternoon the actors and Pippins (local children who make up the chorus) joined us in the theatre for a health and safety briefing. For the first time we were able to show the company all the different settings, each piece of scenery being put in position, the swirling front cloth whisked off stage to reveal them. We were in a good place with everything, it just all needs painting now!
Just what’s needed after a busy day
Once the stage was clear of actors I started to mark up the Piccadilly Circus sliders. If ever a projector would have been useful it was now with sooo much lettering to draw up. To celebrate getting started with the sliders I treated myself to chicken and chips from the burger van. This is most definitely a treat best eaten on the bench under the tree by the book shop. Only thing is a small portion could just about feed a family of four!
Thursday. Mick made his way back in towards the Tramway to moor. Then in the afternoon he walked over to Enterprise to pick up a hire car. He’d hired the cheapest vehicle available a people carrier, but thankfully he was given the option of a small car instead. Loading up two buckets of compost he set of and drove up to our house in Scarborough to reset the insurance clock and check things over, leaving Tilly in charge on Oleanna with two pouches of food to keep her going overnight.
Eros just about finished
At the theatre I now have to work on things around the actors rehearsing on stage. The Piccadilly sliders are fixed on stage, so I am one of the first people in the building each day and one of the last out, taking advantage of a hour before rehearsals, lunchtime and after they have finished for the day. Today I got the sliders drawn up and started to paint them.
Being around the theatre is handy when props are needed, questions asked can be answered pretty swiftly. Possible alterations to things can be noted, today we found out that a door needs to be rehung, opening onto a scene has more comedic value than the way I’d had it built, but hopefully the alteration won’t be too difficult to do.
A very refreshing shandy
In the evening the theatre staff had a club night in the bar, Bingo. As much as it would have been nice to join in there is too much work to get done. Paul set up the sound system whilst I started to add colour to the sliders. A drink was brought through for us towards the end of the evening, a nice refreshing shandy which I enjoyed once I was off the top of a ladder.
Cakes cakes and sweeties
Friday. Every morning the treats stash seems to get replenished in the green room. With lots of dancing sugar levels need to be kept up, well that’s the excuse everyone is sticking to!
Mick returned to Banbury, returning the hire car after popping to the Gateway Shopping Centre for a flu jab. He’s compiled a list of jobs that need doing at the house, some small, others quite big and costly!
I started work on the backing flat for Piccadilly Circus. Drawn out and windows shaded in quite quickly, followed by a bit of colour. Traditional panto sets have what is known as black lining, over the last three pantos I’ve designed for Chippy I’ve avoided black lines, using shading instead. But this year having based much of my designs on Victorian etchings I could not avoid them. In fact there are far more black lines than I’ve come across before!
Saturday, Mick did a shop for the weekend at Morrisons then was just about to push off when a boat came into view, too close to push out in front of. As it came closer he noticed that it was pulling in behind Oleanna and had skeletons hung by the front doors, it was Frankie Fango an Instagram friend of mine. The two of them had quite a chat and Mick gleamed a bit of information that may come in handy next week.
He then moved on up to top up with water and timed his arrival at the lock perfectly as a lady from the trip boat happened to be there and was willing to work both the lock and lift bridge for him, that’s one lock he’d not have to single hand. He pootled onwards past the bakery and found a space alongside Spiceball Park where Tilly would be able to go out. It’s the weekend, too many woofers about to have a really good time! Pah Bumbury!!
Black line crazy
The actors were on stage this morning along with the Pippins, learning the opening song. I continued with black lines, still some more to do on the backing flat, but it will be fine for a photo shoot next week and the final lines can wait for other things to get painted first. The final rats for the portals were painted in, the last of the pillars primed and by the end of the afternoon the Piccadilly sliders were all painted in, just in need of black lining now!
That black border needs to go up a touch
There was time to have a tidy up before heading to catch the last bus back to Banbury. A quick service with only two passengers on board, it didn’t need to stop for anyone so we were in Banbury very swiftly. As I climbed onboard Oleanna I could smell jacket potatoes, we’d be having pie tonight and a lot of cuddles from Tilly!
Curled up happy Tilly
Sunday. The day started with tea in bed, followed by a cooked breakfast. Very yummy.
Being near Morrisons means gf black pudding too
The Geraghty zoom, subjects included exploding boats, hedgehog fascists, and the Queen Elizabeth Line. We seem to have coincided with a canoe race day on the canal. We’ve been around for one before, it gets very choppy, we may have to go out for a while.
A quiet moment in the canoe racing
Today I will spend mostly sitting down and not doing much, we’ll round the day off with a joint of pork. Hopefully we’ll both be rested up in time for numerous hours painting scenery and Mick single handing his way up and over the summit of the Oxford Canal before the winter stoppages start.
4 locks, 2 twice, 5.74 miles, 2 buses, 1 lovely landlady, 1 forgotten bag, 5 lots of fish and chips, 1 chicken and chips, 4 trees, 1 snake, 1 gorilla,1 stand down, 6 days of busyness, 2 sit down tea breaks, 1 Eros, 1 backing flat, 2 sliders painted, 1 cosy cat, 1 cooked breakfast, 32567 canoes!
A slow start this morning so that we could join the Geraghty zoom. Subjects today acorns, anti-virals and loft insulation.
Goodbye Abingdon
Another sunny day meant the river was busy. A canoe stopped a wide beam from pulling out across the way, they were wanting to wind so waited patiently then waved us on before they started their manoeuvre.
A tall affair
Abingdon Lock was set for us and we rose up with plenty of people watching, then pulled along onto the water point. It seems that some of the water points are being changed, the other day at Cleeve Lock I’d noticed the new short hose already attached to the tap, here the water point is long and tall with a yellow surround to it.
Backflow protection
The pressure wasn’t too great and the hose just managed to reach our water filler on the off side of the bow. Water seems to be pumped up high to a small tank and then it flows through the hose to your boat. This is all to do with not wanting to have river water flowing back into the water mains, which is understandable with the amount of sewage that is allowed into the rivers. But it all takes time. We were patient and made use of the big skips to dispose of our rubbish and recycling. Talking of which, if you are a boater, have you filled in the C&RT survey regarding services and distances between them? It’s anonymous so no reason not to have your say in what C&RT will see as the national standard for services. Survey Link
The next river reach goes on and on. Not as bad as when Mick did it a few years ago with an overheating engine with a large amount of fresh coming the other way. The sunk boat is still mid channel, then numerous rowing boats and plenty of cruisers out for a Sunday pootle.
Sandford being emptied
There was a blue board at Sandford Lock, but someone had set it to empty. I walked up with the boat hook and opened the gate. The Lock Keeper arrived, he’d been just about to go for lunch as we arrived, could he help with ropes? We got ourselves sorted and then waited for a cruiser to join us. They had no idea! A rope from the bow was put round a bollard as their boat continued into the lock. The rope was moved along, then again and again. The Lock Keeper went to help, pulling them back in the lock and making sure they had two ropes round the bollards. This lock fills from the sides as well as from the end, so you need to keep hold of your rope.
Just about full
We led the way, coming across numerous rowers all at bends which made positioning ourselves very awkward! I don’t think we’ve ever come into Oxford on a sunny Sunday in term time before. I think we’ll do our best to avoid it in future!
Iffley!
Iffley Lock, the Lavender Lock was on Self Service, it always feels like we’ve arrived in Oxford when we go through here . I headed up to see what needed doing. A small day boat was just entering the lock above to be followed by an eight, the lock just wide enough for them. A chap asked if I could open the gates for them so they could get back on board, of course I could. But this all took time as they hadn’t got a rope round a bollard, the boat tipping from side to side as people got on and off.
All that Lavender
Then a Lock Keeper appeared and requested that they put a rope around a bollard and then actually hold on to it! A request came from the boat, could he help with the rope. ‘No, I’ve got covid’ he then retreated to the other side of his garden.
Our turn next with the cruiser. We let them leave first as they’d be quicker than us, all we both had to do was negotiate our way around the waiting rowing boats and those also heading towards the lock.
Someone with a different style has been decorating the walls under bridges. An Arthurian subject, with knights on horse back jousting and a unicorn.
Trip boat 1 out of the way
Towards Folly Bridge there was a log jam. The cruiser we’d been sharing with had pulled over to the side, two eights were sat waiting for a big trip boat to wind and head down stream. The eights then had to wind themselves, another trip boat was about to back away from it’s moorings, but we got in first only to meet four canoes coming under the arch of the bridge. Hopefully now the river would calm down.
Canoes next
No! The cruiser suddenly appeared having come round the island of the bridge the other way. They headed off and we soon passed them trying to moor. Hopefully NOW the river would be quieter.
Demolition works
Osney Lock had a boat coming in from above. A lady closed the gates behind the boat the chap held onto his centre line. I suggested that I could work the bottom gates and sluice allowing the lady to get on board. She was happy with this and just carried on walking away from the lock, I suspect a helpful passerby rather than crew.
Here we were on our own, no Lock Keeper. A fella walked past and informed us that the Lockie here also had covid. There was space on East Street, maybe because the old Power Station is being demolished opposite.
On upstream under the bridge to Sheepwash Channel where we turned right. The old railway swing bridge that last year was shrouded in covers has been restored, sleepers and track, the workings all shiny black and yellow. Not that there is anywhere for it to connect to as houses stand where the line once used to be.
Isis
Isis Lock. Time to dig out the windlass again. This lock means Panto, Autumn leaves, Inspector Morse watching, Christmas shopping, fish and waiting for the River Cherwell to come out of flood. It’s nice to be back.
Going up
We pulled into the first space. Tilly was given 2.5 hours, Yeh yeh, I know where I am! It’s that isthmus outside! You always tie this one up! Still no new complex opposite. Time to put a Sunday roast on and have a catch up with my brother.
5 locks, 1 narrow one, 9.58 miles, 1 right, 1 left, 2 many boats, 1 tall waterpoint, 2 poorly Lockies, 2 boats with no idea, 1 near miss, 2.5 hours, 1 roast chicken, 1 sore throat!
Sadly we could only stay one night on Tilly’s birthday island, we need to keep moving, admittedly not far today.
Sunday morning
But first there was time for Mick to rustle up a breakfast and for us to join the Geraghty zoom. The Basingstoke Canal, flights from Barra and the general state of the country were topics today.
We pushed away the island around 11am, passing our nearest neighbours soon afterwards. I wondered who might be staying in Spring Cottage at the moment (ÂŁ2,750 a night) an extra ÂŁ50 a night to include breakfast. Or at the cheaper NT run cottages ÂŁ896 for three nights, no option of breakfast being included there.
You brought it with you, it’s now lighter, so much easier to take home!
We followed a big hire boat up to Cookham Lock where a volunteer saw both boats in and pressed the buttons for us. Mick had picked up a bag of rubbish on the island so we paused to drop it off at the bins above the lock. Why would you parcel up your rubbish and then hide it behind a tree on an island?! We topped up the water tank as a load of washing spun round in the machine and then carried onwards.
Bourne End can be so sunny, it almost feels like a resort as you glide along the wide water.
Sailing dinghy’s raced back and forth, the wind being in the perfect direction for their course today.
Click photo for details
Another house for sale, with a good length of mooring, only ÂŁ2,750,000.
We paused at a familiar boat, bipped our horn, but only the wagging tail of a dog greeted us today. Next time we’ll make sure we send a message in advance.
Terraced garden
All the big houses climbing up the cliff and pretty boats moored below.
Round the big bend in the river, we spied space on the EA moorings below Marlow Lock and pulled in. We then nudged along in front of one of several boats with overstay notices on their windows. The route to walk up to the lock takes you round the houses a touch, but does give a great view across to Marlow.
Marlow
Only a volunteer on duty as it was lunchtime. Mick ventured back later in the afternoon to check in with the Lockie and see if it was possible for us to stay for two nights instead of just the one. As it was out of season he gave us permission.
Tilly got busy, bringing a friend inside to the warmth! Luckily it turned out to be easy to catch, but when released in the hedgerow it scarpered so quickly it didn’t see which way it was going and ended up in the river. It did swim, so I’m hoping it found somewhere to climb out.
I put together some photos and words for the Panto programme. They wanted a two page spread about the set design process. Lots of photos and a sentence with each one, I suspect I’ve given them too much.
What a lovely mooring it is here, we’ve only stayed by the park above the lock before which is quite busy, just a shame there is constant nose from the road bridge!
1 lock, 5.16 miles, 1 bag of rubbish, 1 tank of water, 1 load washing drying on the whirligig, 2 nights okay, 4 hours shore leave, 0 island, 7 photos, 7 sentences.
Coming round Desborough Island we came across a huge boat, Magna Carte a luxury hotel boat, prices are stated in US dollars a more stable currency at the moment. They must have just come through Shepperton Lock, the bottom gates wide open. Next year we hope to be turning left here to head to the Basingstoke Canal, water levels permitting.
Kath and Sean to the left, Chippy straight on
I was just getting ready to step off and work the lock when a chap appeared from the Lock cottage, more like house on the Thames. He waved us in and worked the lock for us.
More houses for sale today, small properties which no doubt will be bought and knocked down to build something more modern. The house on the end of Pharoah’s Island that was for sale a few years ago is having extensive work done to it, several boats moored alongside used to bring building materials over to the island.
Chertsey and Penton Hook Locks were both manned, a helpful reminder from a Lock Keeper about the side filling locks coming up today. We passed two chaps in a canoe who are working their way from Bristol to London, we wondered which way into London they’d go. A friend of mine once canoed downstream of Tower Bridge on an organised event!
The trees are still very well clipped in Staines-on-Thames. Was that a platform for a duck disco? We pulled in at the first lower mooring and Mick bobbed off to pick up a prescription and some fruit. As soon as he was back we were on our way again, hoping to reach a good mooring before the storm arrived mid afternoon.
Mick spotted a familiar flag on the bow of a cruiser, a fellow Reflection Flotilla boat. I spotted a polar bear.
Then we were going under the M25, we were now without! Bell Weir Lock is the first of the side fillers, an extra turn around a bollard helps a great deal at these locks. But our position made it impossible to get the bow rope round twice without intervention from the Lock Keeper, who just walked on by to open the sluices. I clung on as best I could, dodgy grip in one hand and cranky shoulder complaining. Must try harder at the next side filler!
The little backwater
Harry Roberts had a little holiday caravan and a rowing boat that Mick and friends used to row down a little back water, far too small for Oleanna to fit down. Runnymede and all it’s history remains on the ‘next time’ list. Maybe we should get a gold Licence again next year!
All the trip boats were tucked up as were the Bugsy Malone cars under the posh house on stilts!
Old Windsor Lock was on self service. The first time we’d done this one without a Lockie, blimey there’s a load of steps here! I forgot about holding the button for ten seconds on the control panel, so it took a while to fill, giving me time to adjust the bow line and chat to a couple who’d just moved to the area from Lincoln. The lock had a big sign beside it requiring you to close the top gates and leave it emptying.
Albert Bridge, the start of the Royal park land. Today a black car with two chaps followed us on the bank, perimeter security maybe?
Shallow was an understatement!
By now the wind was starting to strengthen, it was time to pull in somewhere and batten down the hatches before the storm really got going. The public mooring just after Kris hire boats had one boat moored on it, would we fit in there too? Two chaps sat on a bench said it was shallow, as did signs on the low wall. We soon discovered how shallow it was as we ran aground several meters out. It took a bit of umph to get us back afloat, next possible stop Eton above Romney Lock.
He’ll get soggy later
A dad and young lad stood at the control panel as I approached with our boat hook in hand. He was closing the bottom gate sluices with the intention of filling the lock. They were from one of the big Le Boat hire boats and it was most probably their first self service lock. It took a while for me to get through to him that it would be really good if we could use the water he’d be filling the lock with as it was in our favour.
Filling up
In we came, I hooked up the bow line that had been left resting on the cratch board and tied the bow to a bollard securely. Mick passed his rope round a bollard at the stern a couple of times, this was a side filler. Only one push of the button was required for it to start the process of filling and the sluices continued to rise at intervals. We were soon up and on our way to find a mooring.
The first time we came through Windsor people moored in the lock cut, but that is not allowed anymore. We pootled along thinking we’d end up mooring on the Brocas infront of my Aunt and Uncles old flat. But we quickly spied that the free mooring just before Windsor Road Bridge was empty, we headed straight for it.
Really?
Here there are several signs, EA signs saying not to run your engine/generator/ play loud music, 24 hour mooring. Others from Eton Riverside Management Ltd saying to only tie to the rings not the railings as it’s a public right of way. Then two new looking signs saying Private Land, they didn’t say ‘No Mooring’. Hmmmm! The official signs out numbered the other signs and a storm was just starting to take hold and we’d be quiet anyway. We stayed put suspecting the new signs were from a boat hating flat owner, hoping to put boats off mooring.
Tilly was disgruntled not to be let out as we battened down the hatches and bang on 3pm it started to rain. It rained, then rained some more, the sound on the front panel of the pram cover suggesting it was very heavy. If anyone did have a problem with us mooring here, they certainly weren’t going to come out to tell us so!
Our view of Windsor Castle
On checking our trip computer at the end of todays cruise I noticed that the total mileage for this year so far had just passed 1000 miles. We’re actually likely to have exceeded 1000 miles as the trip computer tends to cut corners. Add to this the miles yet to come returning to Yorkshire, so around another 300 miles, I don’t think we’ll have C&RT on our backs for not moving enough!
Our trip computer works using Water Explorer, which come the end of the year will no longer exist. It’s been handy knowing how many locks and miles we’ve done each day. Sometimes it gets things wrong, you very often go through Beeston Lock twice and omits others. But as a general tally of where we’ve been and what what miles we’ve covered it’s been good, I will miss it. We just need to sort out what we’ll use instead, not many GPS programs will count the number of locks you go through.
6 locks, 2 self service, 13.68 miles, 6 nights 8 people $40,500! 1 pause for pills, 1 duck disco, 2 shallow, 3pm rain, 0 shore leave, 1 wet night, 1000.55 miles this year.