Redhill Marina / Scarboreugh!
Another week.

Monday we sent a message asking when it might be possible to start moving things back on board, would this be the week it would happen?
Don’t be daft!!!

The roof was anti slipped, all the mushroom vents masked off, edges taped and the gritty paint applied.
Tom wasn’t 100% happy with how the blue on the bow and stern bulkheads had dried, the hot weather having speeded up the drying process, so it had gone a touch matt. When we were there a little while ago, I’d mentioned that the blue on the bow bulkhead didn’t look as shiny as that on the bow, at least Tom agreed. There was a choice between cut and polishing the blue, or give it a sand back and respray. The latter was chosen for a better use of time and to stop the top coats becoming thin.


Tuesday the masking on the roof had been removed and Matt the solar chap must have visited as on Wednesday morning we were sent photos of the solar panels installed on the roof. Cables held down by magnets.


The boat was then masked off again to respray the bulkheads and by 5:30pm we had photos through from Tom showing how much shinier they were.
Thursday morning all the masking was removed, including the brown paper that has been keeping the blacking black. The first sight of Oleanna in her new livery. Very nice. The tiller was also painted in the three colours.


Zooming in on the photos I could see that the cratch board is still to be sanded and varnished and there was no sign of any anti slip on the gunnels yet.
We sent a message asking if there was a plan for the remaining jobs including a time scale for which they’d be happening. Would we be able to move things back on board, stay over and be there for her to go back in the water?
Friday came and we nudged Tom for an answer. It was his son’s birthday, so he’d rightly been busy with celebrations. There was a list of some of the remaining jobs, we checked he’d got repainting the lockers on his list. He could see us climbing back on board mid to late next week with Oleanna being launched after the bank holiday weekend. He’d give us a call tomorrow as he’d be down at the paint shed.

An invoice arrived from Matt for the solar. Of course we can’t check if it works until we’re out in daylight! The fuse for the panels has been added on the roof as there is no space for it in the electrics cupboard.
So we started to make plans around next week, adding in a trip to the south, which had been another destination we’d aimed to go to by boat. Canal time eh! I went for a walk to think about the logistics of hiring a car/van, when should we get it from and for how long? We’d need it before the weekend and after, but not during. The hire car we’d arranged from East Midlands Airport would now need cancelling, or should we keep it as it could be returned on Saturday afternoon? This would not be possible if we hired anything from Scarborough.

We had several possible plans, but would need confirmation from Tom before we went ahead and booked anything.
Saturday morning we decided which plan we preferred and relayed it to Tom. This would involve us moving things onto the boat one day, staying overnight and then heading south from Redhill, returning the following week for the launch with more of our possessions, then a third trip to return our second mate back to her floating home.

Unfortunately, the day we’d planned is also a day when the base plate is likely to be sprayed. So the paint will be gassing overnight, so it wouldn’t be possible for us to stay overnight. However, we could drop things off at the boat that day. We’ll book ourselves a Travelodge somewhere nearby, which will be cheaper than the fuel to return to Scarborough only to drive southwards again the following day.
Pete the joiner has done the locker lids and the inspection hatch, although we’ve not had photos, but they are more jobs off the list.

So we gradually inch closer. We’d rather it was quicker, and we’d rather know which day Oleanna will go back in the water as there are hire cars and Tilly to think about. The only fortunate thing about not going back in the water until after the Bank Holiday is that our new licence will start close to the start of a month rather than having to pay for the full month of August and only achieving a few days afloat.

In panto news, new prices have come in for the printing of cloths, 2/3rds the previous quote. A new version of part of the set will come in cheaper. We’ve given the go ahead to Jamie to build the show before he got offered another job.

I’ve had a full day of props meetings with Helen who is the main props person this year and then Min who has lots of things to make at home for one very busy scene. Hopefully soon I will know if we’re on budget. Late on Friday, draft four of the script arrived, just as I thought I was ticking off the last few jobs I needed to do. Well at least I’ll be able to find the time to read it now.
There has been more walking and catching up with friends. Mick planned to visit Headingley on Saturday for the fourth day of the test match with Pakistan. Unfortunately play ended on Friday, fortunately England won and Mick will get a refund on his ticket.

So we continue to wait. The boxes I’d packed a month ago, have now been raided and will need repacking. At least we’ll be here to reset one side of the house after Alex leaves.
0 locks, 0 miles, 2 more friends seen, 1 more supporter sorted, 1 hire car cancelled, 1 hire car booked, 2 hotels booked, 3rd destination not reached by boat, 1 HMRC webinar, 1st decent rain in ages, 1 waterproof at the house, 1 waterproof in Redhill, 1 painting started, 4th draft, 6 hours props meetings, 1 list of jobs, £139 saved, 7 years old, 1 bank holiday, I remember when things were going to start happening after Easter!