Tag Archives: Friday

Windy Passage. 4th July

Selby Basin to Stubbs Bridge, Aire and Calder Navigation

A boat headed to the water point first thing, once it was done and it had reversed to behind us, we set about winding, and then heading back to a mooring ourselves. Time for breakfast, then we’d be ready for the off. Today we were lucky as it was a training day at the lock so there were five CRT staff about, so plenty to help us through the swing bridge.

Swing Bridge Swung

Two chaps came to help us. We’d not seen them before, apparently, they do a refresher course on the tidal locks every couple of years and today was that day. One chap pressed the buttons on the panel for the bridge, the other stood by the little hut on the off side, where presumably they can operate it by hand if needs be. The bridge seemed to behave well and as soon as we were through a couple of narrowboats came into the basin with passages booked up to York today. There’d be six boats heading out onto the river.

Look at those creepers!

So far this year I’ve only walked the Selby Canal, so today I opted to stay on the boat and not get my brisk walking minutes in. After my panto meeting I need to get back to walking every day, I’m quite missing it.

If I had walked I think I’d have beaten Oleanna to the other end. We’ve been on the Selby when it’s been covered in duck weed, but today it was blanket weed which needed avoiding as much as possible, it’s horrible when it’s round your prop. Certainly no 7mph along here, very slow going!

Out onto the river

I sounded our horns as we came through West Haddlesey Flood lock where we turned onto the River Aire. Here it was windy, very windy and with all the twists and turns you didn’t know which side of your hat to keep hold of.

The boat that had been on the bank is now sunk!

At one steep bend a wide beam came past, he shouted to us that he’d had difficulty at Beal Lock with the gates. This is where we’d had difficulty a few weeks ago and had had to use the boat to help open a gate to get the lock equalised. But as we approached it was obvious that CRT were there checking things over. They opened the gates for us.

Beal Lock with assistance

This was the same two chaps who’d helped us through the bridge, we wondered what time we’d be meeting them at Bank Dole Lock later? They’d been called out but hadn’t found anything wrong with the lock as yet. They worked us through and opened the top gates, one of them only partially opening, maybe that had been the problem?

A Whooper swan?

There were two boats on the pontoon above, we tucked ourselves in at the far end and had a lunch break before carrying onwards, todays aim to get off the river and catch up with where we should have cruised to yesterday.

A windlass lock

It was now very VERY windy out there. I left my hat inside as I’d not want to loose it when I needed both hands to work Bank Dole Lock. The chamber was full, a couple were magnet fishing above. Mick and I emptied the lock and opened the gates. Oleanna was just coming in as a cruiser arrived above. There was plenty of time to chat to the crew who had borrowed their son’s boat for the day and they’d already been through this lock, only one top paddle working. We swapped over with them and headed back to the main Aire and Calder Navigation.

Coming up slowly!

Gosh that wind was strong! We just wanted to get that bit further, to Stubbs Bridge where we seem to moor nowadays. Oleanna was held into the side by the wind as we tied to our chains and retired inside. Tilly was given an hour or so, we thought she’d not like it out there, but she was kept occupied sitting in the shelter of the boat and then pouncing into the grass.

Fenders

I put together the first draft of a props list for panto. I’m really hoping we don’t need quite so much fake food, but we’ll see what John thinks when he’s seen the list.

Sheltered hunting today

The evening was a very VERY blustery one. With one side of the pram cover missing things had a tendancy to be moving around out the back. Our bedroom porthole needed closing and a bung bunging in it to stop it from rattling all night long. Here’s hoping we manage to get some sleep.

1 flood lock, 2 locks, 1 left, 1 right, 13.3 miles, 1 wind, 2 much wind, 2 helpful CRT staff, 1 pouncing cat, 1 props list, 1 very blustery night.

Getting Away For The Weekend. 27th 28th June

New Walk to Naburn, River Ouse

Arrrrghhhh! Frog in it’s throat.

A Friday and Saturday night would most likely be as noisy as last night, maybe even noisier! We decided to make a move away from the city centre after purchasing a fresh pint of milk.

Looking towards Stonegate rather than the Minster

We winded and headed down stream, a bin required, our food waste caddy now just overflowing. There are bins at Linton Lock, but not much mooring so it was back to Naburn for us. Mick was at the helm whilst I busied myself painting more bits of model and inventing things.

Inventing the inventions

Nothing seemed different on the river, but in the early hours of this morning there had been a rescue operation launched as two people had entered the water. By 8:30 the body of a man had been found and a 19 year old woman has been arrested on suspicion of assault.

Spikey and stingy things

Down in Naburn we had the whole stretch of moorings in the lock cut to choose from. We pulled into the space we’d been in last where we knew shade would appear later in the day. As the day progressed several cruisers joined us and sat themselves up on the bank. Tilly headed out, and once she’d remembered where she was, she headed over to the field to see who was about.

I went out for a bit of a walk, but my shorts meant I turned round on the path up to Naburn, too many nettles!

Himalayan Balsam

Saturday morning, I wanted to post my 100th pair of Sockathon socks. So with long trousers on I took to the riverside footpath. Last time I walked this route was maybe six weeks ago and the going was easy. Today however the Himalayan Balsam has totally taken over, very few flowers as yet but the plants were approaching shoulder height and making the path very narrow. I was glad of my trousers to protect from nettles and thistles.

No one out sailing today

I passed a couple walking the same way as me, they were taking it far slower, I’d see them on my way back. Round the fields and onto the main road, into Naburn to find the post box. Boats sat on the sailing club slipway, the pub was quiet.

Cottage

The village has all the cottages you could imagine, Fishermans, Rosehips, River, Blacksmiths. The Village shop seemed to be closed, a shame as I’d have liked a look round. The socks went in the post box, headed to Sally, this is her third pair of socks and this time she also donated her own yarn that she’d wanted to have a go at knittng socks, but had chickened out. Thank you Sally for your continued support.

Pair 100!

Mick had headed off to buy a newspaper, a bus ride away. I got on with my model painting then checked in with my brother who’s birthday it was today.

Moo!

More boats arrived, were they just out for the weekend. A cruiser pulled in behind us, they’d come from Boroughbridge today and it looked like they were packing up to head home. The chap was very chatty and had tales of pies at the pub in the village that were a touch on the soupy side.

Too bold?

Another quiet evening. The noisiest neighbours being the geese and Kenny’s cockeril, thankfully no sign of Orchid.

0 locks, 4.9 miles, 1 far quieter mooring, 100th pair of dementia socks posted, 101 to be thought about, 2 more days model making, 1 happier cat, 1 bus for a newspaper, 6.13 miles walked, 80 briskly, over 2 days, 1 pair of trousers essential.

https://what3words.com/export.inversion.solid

In Search Of Shade. 20th June

Naburn Visitor Moorings to New Walk, York

Early morning Naburn

Up early for us and on the move backwards before breakfast. Time to top up the water tank, check if Kenny’s hens had laid then make a move before it got too hot, plus I had a meeting to attend at 11.

Roses fading on the gateway now

Water tank full, still no eggs. We waved NB Poppy goodbye, they are heading up to Ripon where they have permission to ascend Oxclose Lock on Monday morning to reach their home mooring. They were determined to make it to at least Linton today, a shame as a stop off in York wouldn’t have held them up that much.

A serious bow rope!

Off we set, with the aim of finding a shady mooring in towards town. We passed all the familiar sights. Someone was watering the grass just before Archbishops Palace, wonder how long they’ll be allowed to keep their grass green, he was being extremely generous with the hose pipe. No-one in the garden at the Palace, no-one swimming in the river, the sewage works particularly stinky today.

The river level was too low to see the roof of my old family home today, but the house behind it was still there. We spotted Philli heading off to work in her bright orange trousers. Under Millenium bridge about to celebrate it’s 25th anniversary. Now we looked for shade.

Ice cream boats not headed off to sell yet

New Walk has overhanging trees. For the next few days the shade would most definitely be required, mooring at Museum Gardens would be unbearable, Oleanna would become an oven. Now knowing where the chain eyes are of a wider diameter helped in our choice of mooring. Under a tree that wouldn’t waft onto the roof, perfect.

We got moored up, sent some messages, had breakfast, then I settled down ready for my zoom meeting with the production manager for panto. Lots to catch up on and discuss. I hope Gemma understood my points of view on finding a happy medium on the painting side of the show this year.

Mick headed into town to try to find me a very thin blue pen. Black ones are easy to come by at 0.05mm, but blue is more problematical. This is to outline parts of my model and a more standard 0.5mm pen would end up being a touch too wide for what I want once blown up by 25 times. He didn;t have any luck so I’ve ordered one which we can pick up at the house on the next turn around.

Terry’s

I painted up numerous roses on my portals. Jus when I thought I’d nearly finished I remembered there was another piece of scenery with more of them on it. Hopefully I’ve got them all painted now!

Time to check my calf out. I’ve been doing no brisk walking, and very little walking over the last few days, hoping that the rest would help. A parcel had arrived at a locker for me so an ideal opportunity to see if the rest had worked.

Lovely clock face

I took it easy at first, then increased my speed a touch. Down the riverbank over Millenium Bridge and onto Bishopthorpe Road. Onwards to a new Co-op amongst the new apartments that have been built up around the old Terry’s Chocolate Works. My parcel was there, but more importantly I was now not that far away from the art deco factory with it’s clock tower. I don’t think I’ve ever been quite so close, so it was worth a nosy around.

The chocolate works

The development seems nice and airy, retaining some of the original buildings. A restaurant/cafe/bar/deli sits close to the clock tower, gents sat out in white shirts and dicky bow ties. I wouldn’t stop for a drink. Long avenues all seem to lead up to the clock. When I was a kid, during winter months I could just make out the shape of the tower from my bedroom window. Back along a stretch of the riverbank I’ve never walked before.

Calf verdict, much improved only a slight suggestion that if I’d pushed it more then I’d have hobbled. So complete rest seems to be what I should do when it happens again.

What?!?

Back at Oleanna I opened up my parcel. What on earth?! Beauty Equipment?! I opened up the box, phew, it was an airbrush. They must sell more to the beauty market than to artists. Here’s hoping it can cope with acrylic paints, and not just acrylic nail varnish!

0 locks, 4.9 miles, 1 full water tank, 0 eggs still, 0 house, 1 shady mooring, 37 roses, 0 pen, 1 beauty accessory, 1 walk, 2.01 miles, 31 brisk minutes, 1 disappointed cat.

https://what3words.com/milk.launch.power

He’s Home! 6th June

Aire and Calder Navigation

I woke early, but closed my eyes, next time I opened them it was far later than I’d planned, at least an hour later than normal, oh well, I’ve been working hard!

Moving from one box to the other

Time to get cracking with the technical drawings. These are still only sketch drawings, but should enable the Production Manager to get prices for the set build. After the white card model meeting, decisions will have been made, somethings altered, so I’ll adjust the drawings accordingly. Once the model is finished I’ll do more detailed plans for the set to be built from.

Over in Scarborough Mick got bored of waiting for the roofer to arrive and at 3pm I got a message saying he’d given up and would be on the next train. Heyho, here’s hoping the roofer doesn’t startle our next lodgers when he eventually turns up! Thankfully where he’ll be working is by The Shed window, so he won’t just appear outside someone’s bedroom. But here’s some photos of the lean to now it’s finished, I’ve a bit of painting to do when I’m next there long enough.

Robin Hood joined by some other blue boats today

A walk around the watery block via the bins after refreshing Tilly’s pooh box. I think I heard what would have been Mick’s train pulling out from Woodlesford Station just as I got back. Sadly I ended up having to do a quick crossing of the road which pulled my calf muscle again, so the hobble that was starting to fade has returned.

Feline assistant taking it easy today

Mick brought gifts, my smelly tea, Lipsyl and a new tube of Eurax. The other night I must have been a tasty treat for some insect as I now have five very itchy bites on my forhead and cheek.

A fair few bits of model had moved boxes today

I decided to finish work a touch early, not quite reaching the end of Act 1 scenery. Burgers and chips with a glass or two of wine a treat meal marking Mick’s return to the boat and me almost having finished work ready for my meeting next week. I even managed to pick up a pair of socks and finish weaving the ends in. That is pairs 98 and 99, I’ve changed the numbering of my socks to reflect how many I’ve knitted in aid of Dementia UK in total over the last three years.

Good job CRT don’t mind sharing bollards when mooring up

Next pair 100! Will I get the yarn sorted in time for my long train journey next week?

0 locks, 0 miles, 3 trains back home, 2.81 miles walked, 43 minutes briskly, 3 blue boats at the lock, 1 boat with it’s full complement of crew again, 98, 99 finished, 5 itches, 1 lie in.

Lock Stuff. 29th, 30th, 31st May

Aire and Calder Navigation

Thursday I spent working on the storyboard for Panto again. Editing out options, adding in the basic set to all the drawings and working on the one scene that’s still not quite right took most of the day.

The Christmas present felt catnip balls have been requested recently

I walked down one side of the river passing one bridge and crossing the next, opting to take the path inside RSPB St Aidens. The path occasionally gives you a view across the lakes that once were an open cast mine, the river lurks behind many trees on the other side.

Lakes everywhere

Soon I came across what looked very much like a disused lock. A gate recess first giving it away, then curved walls at what had been the entrance to the lock. A mooring bollard and a couple of now bent lock ladders peeked out from the earth that now fills the chamber. I checked Waterway Routes, locations of old locks are marked and we quite often try to imagine what places would have been like.

Lock stuff

In 1988 the river bank near the Lemonroyd Lock collapsed into St Aiden’s open cast mine which then of course flooded, lower seams of coal that had been mined collapsed in too, to a depth of 230 ft! An Act of Parliament was obtained in 1992 to create a new 1.9 mile waterway. Kipax and Lemonroyd Locks were replaced with one big lock, the new Lemonroyd Lock. It took ten years before mining could continue at St Aiden’s after the site had been pumped out. The coal reserves are now exhausted and the land is once again flooded and is an RSPB reserve covering 740 acres.

Stretching off into the grass

I tried to find where the top gates had been, but had no luck as the land levels out and covers any evidence.

Inventing for inventions sake

Friday. I forwarded the new storyboard to John at Chippy. There had been a staff read through of the latest draft during the week, footage posted on social media, my storyboard sat in the middle of the table. Time to crack on with the model, lots of propy set pieces this year, so my bead tray is coming in handy. I spent much of the day inventing things panto style.

Late afternoon a familiar voice saying Hello could be heard, Mick had returned from Scarborough having picked up a hire car. Well it was meant to have been a van, £20 a day rather than £60 for a car, but the only van they had was a transit which would be an inch taller than the car park Mick would be heading to in the morning, so he got an upgrade to a car. An evening off work for me and a vat of Yaxni made, which will last us for a couple of meals.

Saturday. A very early start for Mick, off the boat by 6am. He was heading to park in the centre of Liverpool and to then meet up with Marion and John for a trip on the Waverley out to Angelsey and back. A van, petrol and parking were far cheaper than a hotel for the night. If you are lucky he might come along and tell you about his voyage. If I’m lucky I might be able to upload a photo from the trip, but the internet here seems to be getting worse!

Only an empty plate to show

There was one egg left that needed eating so the start of my working day was delayed by some blueberry pancakes, well Mick was going off for a treat so I could have one too! Then Tilly and I got on with what is now just a normal day for us. She sites on the roof hatch whilst I work. Then she gets ushered indoors for me to go out for a walk, just around the block today including a trip to the bins. Just gone 11pm, I’d just tidied upmy work when Mick stepped onboard, he’d had a good day if a bit breezy and I’d managed to finish of the model for Act 1.

Metallic green critters

0 locks, 0 miles by narrowboat, 1 Paddle Steamer to Angelsey and back, 1 car not van, 3 days model making, 1 storyboard finished and sent, 1 gafforing read through, 1 Queen of Oleanna, I wonder if we could trust Tilly to lie on her bed as we cruise? Nope, she’d be off hunting as soon as the oportunity arrived!

Closing Down. 16th May

Aire and Calder Navigation

6:45 Oleanna bumped the side, Off Roader was on it’s way. I peeked out the front windows and could see the light at the lock was red, as the big boat came past it turned to green. The bumping continued for about half an hour until calm waters returned. We seem to go bump a while before any boat is seen, either the lock above emptying or the one below filling. I made sure I tightened our ropes this morning, they had stretched a touch since we tied up.

Shaded in design for story board

I shaded in my ideas for the front cloth for panto. In past years I’ve hand drawn the basic design on all the sketches, but I think this year I may just scan the design and then stick it onto my sketches. Yes I could do all of this on the computer, but that would actually take me far longer and I’d be more concerned with how to do it than what I’d be using it for, designing panto. So I’ll use it as a short cut my way.

I checked in with Frank after his operation earlier this week. He was on pretty good form this morning, Great British Bake Off Black Forest Gateaux setting his gastric juices going. By the end of the day his mood had changed as he’d had news of his next medical journey. My PA duties will continue for a while. I’m beginnning to think I talk to Frank more now than I did when we worked together at the SJT.

The hedgrow being trimmed back

The roofers had said they’d be working all day today, but their van was booked in to be mended so they just turned up to check things were water tight and vanished again! Later on the scaffolders arrived to take the towers down. Mick told them that the roof wasn’t finished, infact it was hardly started! They didn’t believe him so wanted to see for themselves, maybe Mick hadn’t noticed them finishing! Their reaction was as expected, we don’t know who’d told them to take it down, maybe they’d got the wrong site and they should have been dismanteling the scaffoldng where our roofers had actually been working this week!

Sketch for a scene

More scenes of panto were worked through during the day until Mick arrived back. I had a walk up the towpath to stretch my legs and then we tucked into a Sainsbury’s curry with a glass or two of wine. Stocks are pretty low onboard at the moment, so a shopping trip will be required over the weekend.

The blue sky is back

The dry weather is affecting canal and river levels around the country. Last week there was advance notice from C&RT that the Leeds & Liverpool Canal was likely to be put on restricted hours or even be closed to navigation. Today notice was given that the lock flights between Skipton and the bottom of Wigan will be closing at the end of 22nd May, not quite a weeks time. Then the locks towards Leeds including Bingley will be open between Thursday and Monday with reduced opening hours to help support water conservation. Thankfully we’d not planned on crossing the Pennines this year as all routes will soon be closed. The Caldon Canal has also been closed from Hazelhurst Junction down to Froghall, therefore the water feeding into the canal can still head down to the Trent and Mersey.

Mum taking her ducklings for a swim in a rare puddle

Research into our planned main destination for the year, Beverley from the River Hull is bringing up obsticles too. More info on this on another post, but it’s looking like we’ll be postponing our plans to another year sadly.

0 locks, 0 miles, 12 sketches, 2 basic portal designs, 3 scenes still to do, 0 roofing done! 1 set of scaff still erected, 1 Nadia going to win, 1 stern washed down, 2 trains, 1 Mick, 2 beers, 4 glasses of wine.

Freda’s Garden. 9th May

Stubbs Bridge to Castleford Moorings

Blue skies return

I opted to walk ahead again today, covering the same route up to Bank Dole Junction that I’d walked a few days ago. Then onwards crossing over Trundles Lane Bridge turning left to walk along the towpath towards Ferrybridge. A lady walked her three dogs, all pretty strong. Other dogs made a beeline for them, smaller dogs barking and straining on their leads for blood! Just what was it about these woofers to cause such a fuss?

Freda’s garden is an immaculate length of the towpath. Roses, Lilies, shrubs all very pretty and cared for by the community in Freda’s memory Freda used to live in a cottage by the canal and she treated the stretch of towpath between Cow Lane Bridge and Shepherds Bridge as if it were her own garden, it is now tended by volunteers in her memory.

Hello!

As I approached the flour mill Oleanna was catching me up, Mick knocked back the revs to accompany my pace. Boats were moored by the amphitheatre, rope added to old mooring ring fixings to make this possible.

The path up high

The path then moves to on top of the bank, a narrow strip of land separating the canal from the River Aire with it’s weir. The flood lock would be open today, so I’d arranged to be picked up just before it, my brisk minutes done for the day.

Ferry Bridge

Out onto the River Aire, under Ferry Bridge designed by John Carr in 1797. This reach of the river used to be interesting, but since the cooling towers of Ferrybridge Power Station were demolished it’s just another river with willow trees exploding their seeds everywhere, the air thick with them.

Someone has tried to add a bit of interest by building a wooden structure, possibly for a tree house or just a good place to launch oneself into the river. Under the A1M, the railway bridge. Then Bulholme Railway Bridge came into view, the lock off the river just beyond it.

Key of Power in hand I emptied the lock, a cruiser was getting ready to come down, so the lady pressed the buttons at the top end for us. Now to find a mooring.

The bank is high here

We didn’t want to be too far along and be near the permanent moorings as the boats there tend to run their gennies late, very late at night. So we were pleased to see plenty of space nearer the lock to tie up to. Tilly got to have an explore, her second outside of the day, before we headed out to do a bit of shopping in Cas (Castleford).

The nearby Premier shop didn’t have anything for my lunches, todays special had been a foot long hot dog, so we had to carry on into town to the supermarkets. Morrisons did it’s best for us and a red onion was purchased off a green grocer. We made sure we crossed the river on the curvy bridge so we’d get some respite from the cars.

Curvy

On our way back to the boat we called in at what we’ve always thought was a garden centre. They had a Thyme plant, my old one bought from a boat had finally died last year. There was also a big bag of kindling which Mick picked up. They also sell a LOT of booze, kegs of beer and bottles of all sorts of flavoured spirits.

This afternoon I went through CV’s of potential props makers and put the top six in order of preference. Then I started to collect reference pictures for Panto. Set in 1890’s France I had a lot to look through on Pinterest and set up a board to look at later.

Just by the dry dock a pretty car

2 locks, 1 open, 8.2 miles, 1 left, 0 cooling towers, 1 lovely garden, 2 outsides, 1 pooped cat, 1 sunny day again, 1 thyme plant, £6 bag of kindling, 1 heat wave now guaranteed to continue, 1 PA catch up, 6 possibles, 6.43 miles walked, 53 minutes briskly, 1 warm chicken salad.

https://what3words.com/paints.double.pile

Empty Waiting Rooms. 1st/2nd May

New Walk, York

Alarms set both in York and Scarborough. When I woke up I wondered if I’d survive the day! My cold now a touch chesty, should I really be beathing in peoples faces at the hospital? I tried ringing for advice, but when I’d only moved one place in the queue I decided I should head for the hospital before ran out of time, if I was turned away so be it.

Bluebell workshop

In Scarborough Mick greeted a chap who’d come to clean the oven, it’s now all sparkling and gleaming for our next lodgers. We’ve decided to get someone in to do this every year rather than Mick spending a whole day doing it. There was also a chap who came to replace the glazing in one of our recently double glazed windows. We’d noticed it was going cloudy when the sun hit it on very cold days. He made himself a workshop in amongst the bluebells of the front garden, I suspect his touch up paint went off quickly. The lean too out the back also needed clearing out, Tilly’s tree and our barbeque were moved and Mick worked his way through washing the towels and bed linen from our last lot of lodgers, an hour on the line and they were dry.

An empty waiting room

At the hospital I wore a mask and awaited my turn in the Ophthalmology Department. Area B, to A, to C, then back to B for a very long wait. In fact I was the last person sat in the waiting room before lunch. The doctor looked deep into my eyes, then added stinging yellow drops. Her comments were that I had no signs of glaucoma and maybe it’s just the way my eyes are that things aren’t totally visible. But my vision is good, very good, even though I know I miss quite a lot on the periphery vision test. I’ve not been discharged, but will have a recall in ten to twelve months, so I’m happy with that.

A Japanese tourist posing in front of the Minster with hat and glasses on she could have been anyone.

In Scarborough today it’s polling day for our new Town Council. Mick went to put crosses in boxes for the both of us. We must remember to reapply for our postal votes next time.

The river was busy with day boats pootling up and down in the sunshine. Tilly was chased by a couple of woofers, one who wanted to follow her onto the boat, so they got short shrift from me.

An hour of engine to charge the batteries up, I suspect if we’d been sat in direct sunlight all day the solar would have done it for us, but I’d rather have a cool boat.

Sunny tree gobos on the New Walk

Thursday. An earlier start for me to beat Frank to the hospital where he had another appointment today, I really didn’t want to miss this one and arrived before most of the staff. My cold was still loitering so it was another morning wearing a mask. There was lots to absorb and questions to ask, then lots to talk about over a cuppa afterwards. We then walked into town where Frank headed off to peruse the vinyl in HMV and I managed to tick off the start to some secret shopping, it’s May and there’s quite a lot of birthdays coming up.

He’s out sailing again

I returned to Oleanna. My PA role for Frank needed to be handed over to the Scarborough PA. Then some knitting in front of a film which kept on being interrupted by the amount of traffic on the river, you could tell it was a Friday of a Bank Holiday weekend, lots of cruisers heading into town.

I think I’ve had enough of this outside now

In Scarborough today our lean to was dismantled (it would have done it itself before too long), and the now exterior walls have all been covered in black plastic to protect them from the elements for a while. It doesn’t half make the back of the house dark! Mick was back a little after 6pm, so tomorrow we can make a move again.

In flotilla news, all the boats are now in London. Those that hadn’t made it through Maida Tunnel are settling themselves in at Little Venice for Cavalcade this weekend. This did mean they had to get the bus round to St Pancras Cruising Club for a Fund Britain’s Waterways do. Two boats had already made it there, the tunnel is still closed, so they may stay there until they head down to Limehouse to muster for the cruise to the Houses of Parliament next week. Other boats will be heading to Brentford to cruise down the Thames, through the barrier then back to Limehouse when the tide suites. Link to petition, please sign it if you haven’t already.

Blue Bridge over the entrance to the River Foss

0 locks, 0 miles, 1 sparkling oven, 1 newly glazed window, 1 clear lean to, 2 appointments, 2 yellow eyes, 10 months, 2 annoying woofers, 37 day boats, 1 M&S sandwich for lunch, 1 dismantled lean to, 6 loads washing dried, 2 PAs, 1 afternoon knitting, 9.31 miles walk over 2 days, 96 minutes briskly over 2 days, 128 pages, 2 boaters ready to move on.

Where we travelled in April

All Nice And Spicy. 18th April

West Haddlesey to Burn Bridge

Showers. Tilly was offered some shore leave, which she took up for a while before retreating inside. I’m a fair weather cat and I like it like that in my older years. Thankfully the showers petered off, not that they’d been very soggy.

We’d toyed with staying put for the day, but our options for shopping were just about none existent and if we left it too long before heading into Selby then it would be Easter Sunday with just about all shops closed. Mick spotted a Tesco Express near to Burn Bridge so that was our aim for today.

Pushing off at West Haddlesey

I opted to walk, at about 3 miles it would be a good way of ticking off the brisk minutes. We both suspected that I’d beat Oleanna as the Selby Canal is really quite shallow, so slow cruising. It also gave me chance to check out the footpath along the first stretch.

Footpaths and towpaths

A big sign showed lots of local walks and that the towpath continued to Tankards Bridge, information already passed on to Paul at Waterway Routes. The footpath was good and obviously well used. I kept my pace up and kept just in front of Oleanna with enough time to pause to take photos.

Paperhouse Bridge with the tunnels/culverts/aqueducts either side

Yesterday I’d crossed Paperhouse Bridge where two round areas sit alongside the canal. Our maps suggest that the canal passes over these on aqueducts, even though they look just a bit like fancy side ponds. But information from the big notice says they have a tunnel, culvert between the two of them. These were designed by William Jessop to collect water and help stop the canal from getting flooded. There were originally four such tunnels/culverts/aqueducts, one has since been filled in.

They won’t budge!

I paused by the high wall mooring. Mick rang. As it was available, should we stop here for the day? Plan changed, he reversed Oleanna back to attempt to moor. There seemed to be quite a few branches in the way. He got the stern in and then with the boat hook managed to pick a branch out. However there were more branches and these were stubborn to shift. Back onboard to try from there, it wasn’t easy. I helped by staring at the branches. But that didn’t even help. After quite a bit of revving we decided to give up and continue to our original mooring.

On we plodded to Burn Bridge. Mick pulled in at the end furthest away from the busy road, under the willow tree. We’ve been here before several times and despite the road it’s a nice mooring. Had something changed? There seemed to be more grass on the bank. The stern came in, but when trying to pull Oleanna in she stopped just that little bit too far out to be able to comfortably step across. The bottom was far too close to the top! We tried again, nope! Not wanting to go any further, or to try mooring nearer the bridge we opted to bring the stern in and have the bow sticking out, after all we’ve not seen a moving boat for a couple of days and we’d still not be blocking the navigation.

Burn Bridge Willow tree

Some mixing and stirring was required by Tilly, some festive baking needed despite watching what is eaten at the moment. This was left to rise whilst we walked to Tescos for a few essentials, we’ll do a bigger shop in Selby tomorrow.

Whilst I added spices and fruit to the mix, Mick chaperoned Tilly’s shore leave. We knew she’d be far more interested in the friendly cover at our end of the mooring, but every now and again she’ll do something unexpected, if that involved the road that would be very bad indeed. I took over once the buns were proving again.

Tree!!!

Mick checked the stoppage notices. The moorings at Burn Bridge have been closed since June last year.

Please be advised that some moorings at Burn are currently unavailable due to ongoing safety renovations. The original footboards, planks, and structure had deteriorated beyond repair and are being replaced along the original banking. Alternative moorings are available at Haddlesey, and Gateforth landing. The notice stopped on 14th April.

The mooring is a quarter of what it used to be

Looking back at old photos, it looks as if they have removed and not replaced the original footboards. This extra few feet may have meant having enough water to get into the side and now it is far too shallow. We’ll have a go at pulling in further along in the morning to see if it’s all too shallow for us.

Hot paw buns with their marzipan prints

All was baked and ready to be a pudding after our main course this evening. We can’t have Easter without Hot Paw Buns! The boat smells all nice and spicy now.

The real thing

The flotilla to London has had quite a few problems today, failing hydraulics on one boat and a second morse control cable has broken. RCR are on their way to fix it tomorrow. Petition Link.

More socks

0 locks, 2.8 miles, 3 tunnels, 1 towpath, 2 attempts to moor, 2 many branches, 1 willow tree trimmed, 1 very jaunty angle, 5 bananas, 1 pot humous, 130 grams cranberries, 12 Hot Paw Buns, 1 willow climbed three times, 2 pairs of socks wrapped and ready to send.

https://what3words.com/backyards.comical.grazes

Crime Scene. 11th April

Near Godnow Swing Bridge to Staniland Marina

Shore leave was granted whilst we had breakfast. Just outside our hatch and along this stretch of bank were these plants, a little like asparagus. My plant app suggested that they are Common Horsetail.

Common Horsetail?

A boat that had been moored on the off side yesterday came past, a cruiser with an outboard motor. Would we catch them up to play leap frog at the swing bridges? In the distance was Medge Hall Swing Bridge I could just about make out that the cruiser worked it’s way through and then vanished round a rare bend. We pushed off to follow and I walked the bank to get the bridge ready for us.

Medge Hall Swing Bridge

I caught a lift to Mauds Swing Bridge where we caught the boat ahead up. I hopped off to walk to the next bridge and offered to work the road barrier on my side for the chap, but he wanted the practice so I walked on.

The Oleanna crew back in Yorkshire

Another sunny day, no need for coats or thermals by midday. I pushed the buttons at Moores Swing Bridge after waiting for the cruiser to catch us up, then walked on again. He arrived at Wykewell Lift Bridge first, but was mooring miles away from the bridge, which can be quite a busy one, so I offered to press the buttons again, holding up 5 as the two boats came through.

There are a few of these along the railway, does anyone know what they are?

Mick suggested I got back onboard and not to walk to Princess Royals Bridge, it would have helped me clock up a few more brisk minutes, but I hopped back on board, knowing I’d be needed at the bridge.

The cruiser chap pulled in on the wrong side to operate it, we pointed out where the bridge landing was, he moved up as I hopped off to get the process of elimination going on getting the bridge to work for us.

That’s a touch too fast chaps!

I turned the key, an audible click! Blimey someone had actually closed the bridge fully. Three barriers clicked into their closed position, the nearest was reluctant, but after some wiggling from cruiser chap and myself it eventually made a noise. Sat watching were three men and a lady in a wheel chair. I asked if this was their usual Friday afternoon entertainment, it seemed it was. I pressed the open bridge button, the siren started woopee! It then takes what feels like a few minutes for anything obvious to happen, Cruiser chap was about to wiggle gates again, I persuaded him to just be patient and actually it would be good to go and get his boat.

Through THAT bridge

He was after services, I pointed out where they were, it looked quite busy at the finger pontoons. He said he’d carry on to Bramwith for the next services and off he went ahead of Oleanna. Mick pulled us in against a narrowboat at Thorne Marine. Mooring up a little tricksy around the shorter boat. He’d estimated we’d need about 80 litres of diesel, the pump clicked off at 79.5, but then a top up from there added 14 more litres.

With the temperatures due to fall in a few days we wanted some more coal. They sold Newheat so we got a couple of bags to keep us going, maybe until the autumn. Then we asked if they might have a grub screw. We’d lost one from the front door handle and the catch seemed to be playing up a touch. The chap brought out a box and Mick and he rummaged through to find the right size (M6 for future reference), this was free with our purchase of coal and diesel £1 for domestic today.

Pulled in at Thorne Marine

The finger pontoons were full. The cruiser that had moored up when we were topping up with water two weeks ago was still there. The boat that had caused a lot of bother winding etc. We carried on, our preferred mooring above Thorne Lock. Here volunteers were on duty. The chap who doesn’t say much was on duty, he very gently fills the lock and another fella seemed to be on barrier duty for the swing bridge.

Helping with the barriers and bridge I chatted to this chap. The cruiser from the services was heading towards the lock now. Apparently they had been called to the boat a couple of days ago as someone was in difficulty, they performed CPR but sadly had no luck in reviving them whilst the emergency services arrived. A chap who’d been on the boat legged it when he heard that the ambulance and police were on their way. Later on this chaps body was found on the boat, the cruiser had become a crime scene. The volunteers had been asked if they could move it for the police, the chap I was with refused, not wanting to go back on the boat.

Thorne Lock

Reports in the local papers a few days later suggest the first person had collapsed in the street, their death unrelated to the death later in the day. So some of what the volunteer told me was speculation. However the second death is being treated as murder and two people have been arrested, but released on bail pending further investigation.

Mick pootled Oleanna up to a free space opposite Staniland Marina, this would do for all of us. Tilly vanished off to play in the woods for quite sometime, another stamp of approval awarded. We needed a few things for breakfast so I headed up to Lidl, the rest of the shopping will be done another time. We also looked at the bow door handle to replace the grub screw. The bar inside the handle was too far one way, so required a bit of adjustment so that it wouldn’t keep slipping.

1 lock, 6 bridges, 7 held up plus numerous pedestrians, 1 boat leap frogged, 5638 trees to climb, 94 litres diesel, 40kg coal, 1 grub screw, 1 door handle fixed, 4.92 miles, 44 minutes briskly, 400grams blueberries, 1 Mrs Tilly stamp of approval.

https://what3words.com/icon.furniture.thorax