Category Archives: Breach

Panto Postcard 1. 2021

59.5 hours

Monday morning I was in the theatre early. Time to hunt out my paint orders and old paint I would be needing this week. The dressing room that we normally use for a props office (until the Dame takes it over) was piled high with Panto Post. I found most of my things tucked under a pram in the wings of the stage.

I then met up with the new Producer Suzette who gave me a lift out of town to Alfred Groves and Sons in Milton-in-Wychwood where I would be working this week. A while later Gemma arrived with the advance pieces of set for me to paint. These are the pieces that will be needed early on in the fit up or will end up being high up.

Ready to prime

We collected more things from the theatre, like a table chair and ladder. All pieces of scenery were laid out and by the end of the day everything had a prime coat of paint on them. Taxis were booked for the rest of the week to get me back and forth.

Meanwhile up in Yorkshire. Mick did a few things whilst still having use of the car, he’d hoped to be able to buy a new part for the kitchen tap which is dripping again, but one will have to be ordered on line. Once he’d returned the car he and Tilly made ready for the off. Because Bulholme Lock was still being operated by a Lockie he wanted to take advantage of not having to single hand it. He was beaten to it by the gravel barge Farndale, heading back to Hull sitting high in the water. With big beasts of boats now using the waterway it’s wise to find secure moorings as mooring spikes are unlikely to withstand the movement.

Being dismantled

Mick descended the lock and headed downstream towards Ferrybridge. More buildings have been demolished around the power station and the old coal wharf is gradually being dismantled. I’m kind of glad I wasn’t there to see it, although jealous at the same time.

Oak assisted drawing

Tuesday. My taxi arrived and whisked me out to Groves, the driver I would see several more times this week. Despite it being unseasonably warm I had paint that wasn’t drying! So I spent the day drawing everything out. To aid this I hunted around some skips in the yard outside, nearby carpentry workshops supplied me with offcuts I could use as a yard stick. Fixing a pencil to the end means you can draw from a distance and supposedly get better curves. The only sticks I could find had been oak, a touch heavier than I’m used to, along with the lack of practice my curves were not so good, but that could be sorted with paint.

1 kettle and a glass of wine

A short day today as I had a ticket to see The Strange Case of Dr Jekyll and Mr Hyde at the theatre. Blackeyed Theatre are touring the production for which I have several connections. It was adapted and directed by Nick Lane, the Company Stage Manager Jay and one of the actors Zack are all people I have worked with, they are part of my Hull Truck family. It was great to see the show, but better to see Jay and Zack. We headed to the pub where they were staying for a couple of drinks after the show. I of course took a kettle with me, now I could have hot drinks at the paint shop.

Only three towers left at Ferrybridge

Back in Yorkshire. Mick had moored overnight in Knottingley allowing Tilly to have a bit of shore leave. The river level had risen and the flood lock was closed behind him. Good job he’d come through the day before as it’s a very long lock to single hand in.

Next stop was just below Whitley Lock. He’d arrived as someone else had below, the lock got a touch confused so even though it was almost in his favour it was emptied to bring the other boat up which seemed to sort the problem out. The crew from the other boat helped Mick down. He then pulled up on the visitor moorings and let Tilly out.

Wednesday. At last I had dry paint! I could start to add more. I spent a lot of the day either bending over or on my knees laying in and blending the yellow stonework on Rapunzels tower, both inside and out. It took forever and my knees were not my friend by the end of the day. I did treat myself by starting to add some colour to the Cotswold Thunderbolt pieces. Being able to stand up to do this was a joy, I needed to move the other pieces up off the floor and also get some heat as it was starting to get chilly. The weather had been fooling me and I’d not even thought about heating until then.

Gravel barge in Whitley Lock

It was raining at Whitley. Mick decided that he would leave when they moved up to Tilly, so she got busy outside. Just as well he’d managed to tie up to rings as Farndale came past with a full load of gravel. One of our fender hooks broke and sadly a rope fender dropped into the deep Yorkshire water.

A full Fusedale

Half an hour later Fusedale the other gravel barge came past fully laden. I suspect Mick knew they were on their way as he’ll have had the VHF radio on. The gravel barges don’t have to drop crew off with the key of power, there are Lock Keepers on duty for them.

Around about midday Mick and Tilly pushed off although they didn’t go very far, just to Heck Bridge as it started to rain. A strange noise from the domestic water pump made him investigate, it had sprung a small leak. He called Laird at Viking Marine to see if they had a 24 volt one in stock and he did. So later in the afternoon they pushed off again mooring above Pollington Lock.

Up against the walls

Thursday. A chilly start, I was glad I’d taken my thermals with me to work today. I thought I’d be getting a work placement to help me for a couple of days this week and had planned on standing all the set pieces up with their assistance, but because of all the paperwork and regulations they won’t join me until next week.

Cafes, carpenters, bakeries, chilled medication, all sorts at Groves

The big gas heater above my head sadly doesn’t work, so I put in a request back to the theatre for assistance moving things and some heat. The flats are not that heavy and maybe I could have done them on my own, but one wrong twist and I’d be out of action, so not worth it. John the Artistic Director arrived to help move things about, so much easier with two and now my knees could take a break. Another two colours were added to Rapunzel’s tower and I started to base in one of the houses for the town square.

Below Pollington Lock

Mick single handed down Pollington Lock. There is still no mooring along this stretch of water following the breach last December.

Slipping banks

Lengths of the piling holding the bank up slipped when the water level was low and parts of the bank have followed the piling splitting away from the bank.

Buoys on the way to Drax

Buoys mark the areas to give a wide berth of up to the New Junction Canal and around the bend where Drax Power Station comes into view (the only power station in the area still with all it’s cooling towers).

Breach site

Then the right hand bend and past the breach site.

All new

New piling over the big culvert and concrete now have a big rubber strip along the top edge. Two small manholes sit where there were ones before the breach.

Rubber edging

A new wooden fence is in place and grass seed is just starting to take hold around the area.

All the big machines, pipes, generators have long since gone.

New roof for a new life

Past New Bridge 21 you can moor again and further on the almost ruin of a house is in the process of getting a new roof. It’ll be watertight before they remove the bricks and breeze blocks in the windows. Mick carried on past Rawcliffe and through Goole caisson. Both diesel points in Goole had boats moored on them so he winded and returned to moor at the far end. He walked back to Viking Marina to get a water pump. Laird had quite a few and was selling them at a discount price, without a guarantee as several of them had proved to be faulty. If they didn’t work at all he’d either replace it or give you your money back. Mick bought two in case and soon found one didn’t work. Maybe they were a batch lot that dropped off the back of Del Boy’s cruiser!

Not a bad view when I looked up from my work

Friday. A heater was meant to have been left for me to pick up at the theatre this morning, but was annoyingly absent. John would sort it later in the morning. I based in more of the town flat and then started to add extra bits to the ship.

John visited me twice, once with a heater that didn’t work, then with one that did, Hooray!

I then spent the remainder of the day lining in the tower pieces. By the end of the day I had finished several pieces of set, a few just need a few finishing touches which would be better done when they are upright.

I’ll do anything for your kebab!

I requested to the taxi driver to take me to Sainsburys, I’ve been to most supermarkets this week, so that I could get something in stock for tomorrow. But Sainsburys seriously let me down with very few things I could eat without buying a mass of veg, I tried the Co-Op too and gave up, rewarding myself for a good days work with a chicken doner and chips. These I find are best eaten on a bench, they taste better in the open air! The aroma attracted some company from a local beggar who just missed me putting the box in the bin. Even a very big head nudge didn’t work.

Exol Pride’s new home?

Mick returned the none working water pump, got another, but doesn’t hold out much hope. He stocked up with food spotting that Exol Pride seems to have a new mooring near the coal tipper. We wonder if this is because it was all getting a touch too busy with the gravel barges also using the same moorings. He topped up with diesel at Goole Boat House and headed back out of Goole to just before New Bridge. Tilly prefers it out there. The unfortunate thing is that just as he was about to pull in he noticed that the engine temperature was rising, it kept on rising. Mick moored up.

The skin tank wasn’t hot, there was little hot water, but the engine was most certainly hot. Was this a recurrence of what happened on the Thames two years ago? Or had the water pump on the engine gone? A phone call to RCR in the morning when he might be able to get a touch closer to a road.

Finished, Rapunzel’s window when it’s cut out

Saturday. Somehow my taxi this morning had been cancelled, I got it sorted and got out to Groves for a bit after 10. I managed to join the Geraghty zoom for a short time whilst I opened up tins of paint. Lovely to see everyone even if briefly.

Going a bit gingerbread

Time today was precious as it was my last day here and the set pieces would be collected tomorrow. I ended up finishing several other pieces but by the end of the day I had no idea if the roofs for the towers were right or not as I had to leave then drying. Paint was all packed away, my possessions collected together and hopefully I left the place in a reasonable state as I ran hobbled to catch my taxi. My left knee is very much looking forward to doing next to nothing tomorrow.

I could do no more, before my taxi turns up

Mick decided to move to Rawcliffe this morning where there are bollards to moor to and an easier place for an engineer to get to the boat. Oleanna managed to hobble the distance but was getting very hot and bothered as she arrived.

A nice local engineer came out, listened to Oleanna’s woes and history. He doesn’t think it is the pump on the engine, but thinks the system is gunked up again as it did on the Thames. He feels that the system needs a good flush through with a power hose. He thinks that maybe the level of anti-freeze wasn’t correct in Oleanna’s early days and that a flushing out means that we can start from scratch again. We’ll see, Oleanna now has an appointment with a jet wash on Monday, if she can get there!

3 locks, 27.65miles, 1 straight on, 4 winds, 3 water pumps, 1 too hot engine, 11 taxis, 1/3 of the set, 3 heaters, 1 working, 1 lovely space to work in, 3 supermarkets visited, 0 digs cat, 1 scrounging cat, 1 friendly landlady, 2 ex truckers, 1 show, 31 pots of paint, 1 fat knee!

Leaks Big Leaks, Leeds Liverpool Breach 2, 14th October

Over the last few days there has been plenty going on at the Leeds Liverpool Canal breach. A dam has been put across one bridge hole and I think stop planks have gone in on the other side of the breach. There is a lot of footage available on Youtube. Here’s a link to some drone footage.

A group of lads also went down to where the dam has been put in. Their theory, before they got there, was that the water was going down into a disused coal mine. Bare with the swearing, they get quite a bit of information about the collapsed wooden culvert that has caused the breach. They then go to explore the breach site and below it. I do not condone their actions, but it is quite interesting to see below the canal.

Several boats have been affected including NB Mr Blue Sky, the boat we shared locks into Manchester with a couple of years ago. I so hope the boat is safe along with others that have been caught up. Sections of the canal are now getting water back in them and boats are being re-floated. Other sections will take a while longer as water needs to be pumped round the breach site to reach them. is now cut off. Refloating those boats will take longer.

The Leeds Liverpool isn’t the only canal with problems.

Down on the Grand Union Canal the levels dropped between Copper Mill Lock and Cowley, a C&RT notice was put out yesterday with an emergency navigation restriction. On Tuesday night Widewater and Denham Deep Locks were closed due to low water levels. Several boats have sunk because of this in the marina there.

15W ten days ago

Then on the Huddersfield Narrow Canal yesterday a significant leak had been discovered between locks 14W and 15W, where we had been moored last Tuesday. Today a method of repair has been established and repair works will happen over the weekend.

On this side of the Narrow someone has left a paddle up at Lock 14E. This doesn’t sound too bad, half emptying a the pound above. The eastern side of the Huddersfield Narrow has limited water resources and the refilling of this pound will have a knock effect to the lower end of the canal.

Not a good time on the canals at the moment.

POWER! Leeds Liverpool Breach 11th October

Over the last couple of mornings Mick has been in the engine bay trying to solve our power problem. This morning he succeeded in getting things working again. Hooray!!! The lap top now has 100% power.

We’ve been able to keep moving so there is plenty to write about, well most of it is written in long hand so I didn’t forget it. Plus there are hundreds of photos to sort through so it will take some time to catch up with ourselves whilst still moving!

In other news however there has been a breach on the Leeds Liverpool Canal. Yesterday afternoon the following C&RT notice came through

A closure to navigation and towpath is required between Bridges 109 (New Barn Bridge) and 110 (Aspen Bridge) on the Leeds & Liverpool Canal in Rishton, while our engineers investigate significant leakage through the bed of the canal.

Due to the volume of water loss, please be advised that water levels between Barrowford Bottom Lock (No.51) and Blackburn Top Lock (No.52) may be affected and lower than normal.  We advise against unneccesary travel through this area until repairs have been completed.

Then this morning it was followed with this

Our teams have been working throughout the night to try and stabilise the significant leak between Bridge 109, New Barn Bridge and Bridge 110, Aspen Bridge, Rishton on the Leeds & Liverpool Canal, unfortunately, during the early hours of this morning the canal bank has breached.

Dams are currently being installed onsite and our teams are organising a method of repair, including pumps to be able to pump water over the affected area to maintain a feed to the lower section of the canal.

To help conserve water in the surrounding areas, the following Lock Flights are closed:

  • Barrowford Locks
  • Blackburn Locks
  • Johnsons Hillocks
  • Wigan Flight

Another update will be put out tomorrow. This all seems very familiar to us. We obviously really feel for those affected and hope there is a speedier solution than there was on the Aire and Calder. We’re also glad we decided against going that way just over a week ago.

Not A Breach Update 4th October

This morning at 09:59 the following notice dropped into our inbox from C&RT, not much notice of the start of works!

Aire & Calder Navigation Main Line
Location: Low water levels at Goole

Starts At: New Goole Caisson
Ends At: New Goole Caisson

Monday 4 October 2021 10:00 until Wednesday 6 October 2021 09:00

Type: Advice
Reason: Information


Original message:

British Ports are undertaking emergency repair works to their lock gates.

We will have a reduced water level of 300mm for today and potentially tomorrow as the levels need to be dropped to allow the repair works to be carried out.

You can view this notice and its map online here:
https://canalrivertrust.org.uk/notice/20747/low-water-levels-at-goole

Last year there were rumours that the lock gates out onto the River Ouse leaked quite badly, which didn’t help retain levels in the docks when the Caisson was closed. Well they leaked too until stop planks were put in behind them.

Presumably the stop planks have been dropped back in as the caisson gates open the wrong way to maintain levels upstream on the canal, or has the whole pound back to Pollington and Sykehouse Locks been dropped?

I’m hoping that people living on their boats in the marinas at Goole have had prior warning as the levels dropping by 300mm might feel a little bit like deja vu!

Updated Update

Update on 04/10/2021 at 15:30:

Associated British Ports have advised us that they have completed the emergency repair works and water levels are returning to normal.

Further works will be required in the future and we will advise of these works when we have more information.

A Spot Of Gardening. 20th August

Thrupp Canal Cruising Club to not quite Muddy Slipper

With the news of the Aire and Calder opening this morning I kind of wished we were up in Yorkshire to go through the breach site, reclaiming it for boats from the pile drivers and diggers. But we are miles away and will leave the reclaiming to others in Goole at Rawcliffe. Enjoy your cruise Lisa and Al and anyone else heading out this weekend. Will it be a mass exodus?

There she is again

It was time for us to get moving again, thank you Thrupp CCC for giving us a base for the last week whilst we’ve been busy with other things. Today it was back to boating!

There used to be a bridge there!

The bridge landings either side of Shipton Lift Bridge were filled with moored boats, this didn’t really matter as the bridge has been removed so no need to stop. We wondered how busy the canal was going to be after hearing stories of queues at locks further north.

I liked Thrupp outside!! Please don’t move it!

Shipton Weir Lock had a Black Prince hire boat just leaving and another boat was about to pull in and come down. We had chance to have a little chat with the crew who were heading out onto the Thames to Lechlade. Then it was our turn into the diamond shaped lock, designed this way to allow enough water to be sent down into the canal for the next lock whilst only a small drop in level was required to get off the river onto the canal.

Shipton Weir Lock

Last weekend we’d considered taking the London Leckenbys for a little pootle for a barbecue, here just out on the river had been a possible location. Reversing down towards the weir and mooring up would have given us a good amount of space to spread out. Today a small tent sat where our bbq would have been.

Having spent most of October and November on the Oxford for a couple of years everywhere is obviously so much greener than we’re used to, views are different, some gone with the amount of foliage. There are quite a lot of reeds that we don’t remember.

We rounded the bend to Barkers Lock and pulled in behind the Black Prince boat. Above the lock sat several other boats waiting to come down. In the lock was a C&RT work boat doing some gardening. Gardening isn’t really quite the right description for it. Two people were scrapping the chamber walls clearing it of growth, weeding on a big scale. I zoomed in with my camera and realised I knew one of the people in blue, Frankie an Instagram friend.

Frankie at the helm

They soon finished, pulling out of the lock leaving it free for the hire boat to go up. Frankie and I had chance to say a quick hello, maybe we’ll get more chance to chat if we come across each other further north. It was good to she her working on her much loved Oxford Canal, helping to maintain it.

Waiting our turn

There was chance to chat to hire boaters heading back to Oxford at the lock whilst we waited our turn, we were soon up and on our way again. The pub at Gibraltar looked pretty much as it did a couple of years back, building work seems to have halted during the pandemic.

Next came Pigeon’s Lock, no queue but a full lock. Whenever I talk to the Director for Panto he goes on and on about meeting his sister and her boat at Pigeons Lock, I think he really enjoyed those days. The big house at the end of the lane here was having a lot of building work done, this now is completed. The new roof looks very fine with it’s stone flags.

Jane’s Enchanted Tea Garden was set up to receive visitors this weekend, menus and sugar jars out on the tables. One day we’ll manage to time this part of the canal with it being open. Review here Apparently you need to book quite a long way in advance or follow their facebook page hoping that someone cancels as you are about to arrive.

Have gazebo, will cruise

The quarry moorings were pretty full, someone’s brought their own gazebo. Space for one at the end if you could get a mooring spike in.

Pulling out twigs

Northbrook Lock had another queue. Two C&RT chaps were fishing around by the bottom gate with a keb. Up to Banbury the locks on the Oxford Canal have a single bottom gate which means that should anything get stuck behind it it may not open sufficiently to get your boat through.

The first boat above had been waiting for over a couple of hours and seemed keen to get going again, I know we would have been. Their boat was brought into the lock all six fenders hanging down the side of their boat. One vague attempt was made to lift one of them, but it just fell back down waiting for a lock to grab it.

At last on the move

The chap went to lower the paddle on the offside. It looked like he’d tripped and knocked it as it dropped on the relatively new gate. Yet he wasn’t bothered by this in the slightest, he was more interested in a very wet mouse that was sitting on the lock side. He pointed this out to his wife, who couldn’t hear him. Eventually he crossed back over the bottom gate, I started to open it when I realised he’d stopped on the wrong side of the gate to lower the paddle, not the safest of places to be! He tried time and time to tell his wife about the mouse, convinced it was a water vole, then finally walked down below the lock to get on his boat, still pointing out to his wife about the mouse! With no power engaged they drifted out of the lock, still trying to see the mouse. Mick and I by now were both saying ‘GET ON WITH IT and get OUT OF THE WAY!’ under our breath, I have no idea what those who’d been waiting for at least an hour behind him were saying under theirs!

There were two possible moorings we’d be aiming for today as where we needed to get to was right alongside the railway. A few extra hours would have us mooring at Somerton Meadow, but arriving late in the day would almost certainly mean there’d be no space left. Then at Muddy Slipper mooring someone was already tied to the armco, we reversed back a touch and pulled up a short distance behind, just enough depth for us.

They’re on Muddy Slipper!

A late lunch was followed by an hour or so working out how to deal with the cinema screen during the run of panto. I came up with a solution which I hope won’t be too much extra work and emailed it through to everyone. Fingers crossed they all think it’s a good idea, or come up with a better solution.

A slot

Then as this weekends stag do hire boats came past, ten on each boat, sailors hats and some fancy dress with sea shanties being sung at the top of their voices, clinking bottles of beer I turned my attention to #unit21 and the samples of black canvas I’d received. This was far far tamer than the outfit a groom was wearing as the last boat passed by.

4 locks, 2 with queues, 5.52 miles, 1 Frankie, 1 trimmed and scraped lock, 6 fenders down, 1 mouse not vole, 1 twonk head, 5 hours shore leave, 1 (maybe more) friend, 3 stag dos, 1 solution, 1 email lost, 4 green shades of felt, 2 slots, 1.83 wide black canvas, 5 weeks digs, 1 cauliflower cheese with extras.

https://goo.gl/maps/M9uS1L9bcbvFmuFGA

Open! Breach 59, 20th August

At 9:31 this morning a C&RT notice dropped into our inbox. Exactly 8 months after the original notice regarding the breach was published the canal has now reopened!

Notice Alert

Location: Aire & Calder Main Line & New Junction Canal

Intersection of:

Lock 13, Pollington Lock to New Bridge on Aire & Calder Navigation Main Line

and

Went End Aqueduct to Went End Aqueduct on New Junction Canal

Friday 20 August 2021 09:30 until further notice

Type: Advice
Reason: Information


Original message:

We are pleased to report that the Aire & Calder Navigation is open and operational Friday 20th August from 09:30hrs. There will be no need for leisure boaters to pre-book passage between Skyehouse and Pollington Locks. Through passage to and from Rawcliffe and Goole will restored.

For a short while after this date, contractors will be using work boats to install fenders and so care should be taken when travelling along this section past the breach site at New Bridge.

Navigation Restriction

Please be aware lengths of bank above and below the breach site at New Bridge have suffered extensive damage due to the breach.  Repairs are programmed to take place during 2022 and 2023.  Until the repairs are undertaken and completed, please note the following information and adhere to instructions regarding mooring:

No mooring or overnight staying in the section from:

  • 200m west of New Bridge (Grid Reference SE67608 20410) to

Went Aqueduct (SE 65002 18441) and

Pollington Lock (SE 61644 19194)

Note:

  • – hidden underwater obstructions that could pose a danger to navigation are to be found within this area along the bank edges on both sides.
  • – when navigating keep to the centre line where possible.  When passing other craft keep a minimum of 4m from the bank edge where possible.

Towpath Closure

For your safety due to bank damage and instability the towpath is closed from:

– Southside – Pollington No.4 Swing South Dyke Bridge to Went End Aqueduct

– Southside – Beevers’ Bridge to New Bridge

You can view this notice and its map online here:
https://canalrivertrust.org.uk/notice/20476/aire-and-calder-main-line-and-new-junction-canal

Another notice was sent out about an hour later which was a little bit more straight forward

Sunday 20 December 2020 14:30 until Friday 20 August 2021 09:30

We are pleased to report that the Aire & Calder Navigation is open and operational with effect from 09:30hrs on Friday 20th August. Please see separate notice for ongoing restrictions.

I wonder if the first boat through played a fanfare!

Could This Be The Penultimate Update? 18th August Breach 58

This evening Mark Penn has been out with a new drone to have a look and see how they are progressing at the breach site removing the cofferdam.

18-08-2021

Well as you can see the dam has gone. There is water in the cut once again. What a lovely sight.

18-08-2021

The pumps are still in the cut, but the pipework from where water was being pumped round the cofferdam is in the process of being removed.

18-08-2021

The pontoon that was used to remove the cofferdam is just positioned through the bridge, the boom that was across the cut has been removed.

18-08-2021

It looks like there might still be a bit of work to do on the towpath, earth doesn’t look to be fully flattened out up to the piling where the water wooshed round the piling back in December. The level in the drain below looks the lowest it’s been for a long time, covered in duck weed.

18-08-2021

There are still railings around the top of the concrete structure over the drain below. There was a hole maybe an access hatch in the old concrete, maybe this is the new one. The water level looks to be back up to normal levels now. How wonderful it is to see water and no silt.

There is obviously some tidying up to do and maybe bits left to sort on the towpath, but all looks good for the 23rd when the navigation is set to reopen. Booking to pass through Sykehouse and Pollington Lock will no longer be required from the 21st.

Dredging is happening up near Lemonroyd. A sunk vessle is being removed up that way too.

18-08-2021

I so hope that when I next post about the breach it will be to celebrate it’s reopening after 8 long months.

Thank you Mark once again for your photographs.

Nearly There! Breach 57.

On Friday there was a section in the fortnightly Boaters Update from C&RT about the breach on the Aire and Calder. In it they give the 23rd August as a date for reopening the navigation. I can almost hear the engines in Goole starting up!

Update on major maintenance work in Yorkshire & the North East

Over the past six months we’ve had to deal with unexpected failures of waterway components as well as some pretty horrendous stormy weather in the north of the country. We appreciate the adverse impact this has on boaters in the region and have been working tirelessly to get things back to normal as soon as we can.

Ariel shot of repair works on river

Repairs to the breach at New Bridge on the Aire & Calder Navigation are almost complete. The navigation will re-open on 23 August. A silver lining of this big project has been that we were able to take the opportunity to do other work on the navigation, which will minimise future disruption, during the stoppage:

  • Lemonroyd Sluices – Work to repair the sluices is still underway but the lock will be operational for the re-opening of the navigation. A further 1-day stoppage in September will be required to complete the work. This will be planned around freight movements.
  • Ferrybridge Lock – Gate replacement work finishes today (13 August).  
  • Dredging – Hydrographic surveys and sampling are complete and dredging is planned to commence next week from 16 Aug at Lemonroyd. Dredging at Ferrybridge will not commence until October to comply with environmental conditions. It is difficult to say exactly when the dredging will be complete as we, much like the rest of industry, are facing a shortage of lorry drivers which will impact dredging disposal. When the navigation opens all freight passage will remain on a reduced draft. Given the long period with no freight activity we would not recommend loading deeper than 2.0m (6’ 6”) with some ballast for the first few trips.
  • Dredging (South Sheffield & Yorkshire Navigations) – Survey work has been completed and potential areas for dredging identified.  A couple of the locations identified will be picked up as part of the spot dredging works. 
  • Edge Piles – Our engineers will continue to monitor the piles until remedial work can be undertaken. At this stage we do not anticipate any disruption to freight barge movements.

Gravy And Stewed Cabbage. 6th August

Desborough Island to Boveney Lock Landing

Last nights mooring this morning

A saunter around the island, of course we noticed that there were spaces at the next mooring where we’d have let Tilly go ashore. That mooring is added to the ‘next time’ list. As we’re in transit we won’t be touching on the ‘next time’ list, we’ll just be adding to it.

A metal warrior stood guard over a garden, whilst a severe fencing kept people off off a lawn. A rather lovely roof line caught our eye, the room at the top of that fire escape would have fitted my teenage dream.

Joining back onto the main channel there was a sign in the middle, the river would be closed for a regatta today, good job there’s the alternate route. We arrived at Shepperton Lock before any Lock Keeper would be on duty, the blue Self Service sign displayed. No need for a Key of Power on the Thames, just patience as they can be slow to fill and empty.

Extra fencing has been added around locks to dissuade people from gathering too close. Signs ask for crew to stay on their boats and if a lock is on self service then only one crew member should go to operate it.

Pharaoh Island

At Pharaoh Island the house on the end looks to have new owners, it was on the market two years ago. A boat is moored round the back and a kids trampoline stands in the garden so that you can gongoozle at the passing boats whilst bouncing.

Chertsey Lock

At Chertsey Lock we were joined by a cruiser, the strong wind making it hard for them to manoeuvre. Oleanna has weight to her so she hunkers down on windy river days, so long as her speed has purpose she is fine. By now we’d remembered how to do the ropes on the Thames if I was acting as Lock Keeper. Positioning the bow rope on the roof and taking the boat hook with me I could then wrap the rope round a bollard to keep the bow in whilst heading away to press buttons, popping back to adjust it if needs be as the lock filled.

Today we spotted a couple of cruisers that have a different line from the usual. They have a hint of a barge to them, quite a pleasing shape and with colour to the cabin sides we decided we quite liked them.

More shapes and sizes as we cruised along.

Approaching Staines on Thames there are new static caravans being built with a difference. Some have roof terraces, others extensions that take them away from the standard oblong design, however the cheapest one will set you back £499,999! We preferred the older more characterful houses. Does anyone know what this tree is please, with fleshy leaves and large white flowers?

Just before Bell Weir Lock we ducked under the M25 for the last time.

Runnymede is already on our list for next time so no need to add it. Today we’d have found a nice mooring, although the road would be a touch too close for Tilly to go off exploring. Only one of the French Brothers trip boats was cruising today. Banners boasted of a refurbishment to Pink Champagne, but the pandemic looks to have put paid to that happening and the fake steamer sat below trees filled with chairs collecting tree sap and bird droppings.

Day boats increased in number the closer we got to Datchet as we skirted round Windsor Royal Park all immaculate as normal. The Queen won’t be short of mistletoe this Christmas, they just need a big cherry picker. Just through Victoria Bridge there are ground works going on. Big boulders and a crane was being put together. Maybe this will be a new rock garden for the Queen!

A side filler

At Romney Lock we were joined by a trip boat as we waited for the lock to empty. Two Lock Keepers attended to the button pushing whilst we inhaled the smell of gravy and stewed cabbage that was to be lunch on the trip boat for the OAPs. We wondered at what age does stewed cabbage become appealing?

I failed to throw my rope over a bollard and a Lockie came to assist. I requested he passed it round a second time which he didn’t seem too keen to do, but as it was a side filling lock he relented after I’d mentioned my failing grip. A second turn means less clinging on for dear life even in the gentler filling locks.

Out of the cut we popped out the view of Windsor Bridge where Eton meets Windsor and where as a child staying with my Aunt and Uncle we used to stand to hear Concord fly overhead, I’m sure we never heard the sonic boom but Uncle Peter swore he did!

Just how many swans! A fayre was set up on the Brocas, we decided we’d carry on, hoping the mooring we’d stayed at above Boveney Lock would be available. Liz wasn’t at home anyway for a cuppa, I suspect she doesn’t want visitors whilst the builders are about!

Only part of the queue

Blimey was that the queue for Boveney Lock ahead?! The full length of lock landing filled with boats. People were stood about, although not quite enough for it to be a queue. Two more things didn’t seem right. NB Zenith was one of the moored boats, the other thing was the narrowboat in front of them was just hanging up their washing on a whirligig. We pulled up closer and heard the news, the lock was broken!

That gate shouldn’t be at that angle!

The story goes that yesterday the Lock Keeper had reported one of the top gates was making an awful noise. By the end of the day the collar had broken and the gate sat at an odd angle. No-one would be going anywhere today other than in the opposite direction.

During the afternoon more boats arrived. The lock island already had boats moored on the other side and by the end of the day they were four abreast behind us.

It’s broken

The Lock Keepers came down to keep us informed. A crane was being brought in by road tomorrow morning, hopefully it was just a case of lifting the gate back into position and replacing the collar, which shouldn’t take too long. If they couldn’t mend it on Saturday it would be Monday. Fingers crossed for the morning.

The choice for what to have to eat this evening was somewhat taken out of my hands as a camembert cheese was starting to plot world domination from the fridge, it needed stopping.

This evenings mooring

PS Selby Swing Bridge is now open to boat traffic and through a Facebook fishing page on the Aire and Calder I have heard reports that the Eastern side of the cofferdam at the breach site has just about been removed. Fingers crossed for everyone still in Goole.

6 locks, 15.43 miles, 1 regatta, 2 self service locks, 0 Liz at home, 1 rock garden, M25, 10 portions stewed cabbage and gravy, 15 waiting below, 10 above, 1 part time boat cat, 1 smoked salmon and camembert quinoa crust quiche, 1 world saved by our tea.

https://goo.gl/maps/VH4KWM7NgBRxoFLg8

Breach 56. 3rd August

This afternoon C&RT have issued the following notice

Notice Alert

Aire & Calder Navigation Main Line
Location: Rawcliffe to Goole Docks Aire & Calder Navigation

Tuesday 3 August 2021 16:45 until Friday 20 August 2021 18:00

Type: Advice
Reason: Information


Original message:

Work to extract the cofferdam piles at the New Bridge breach will commence 5th August this will require a reduction in water level from the breach at Rawcliffe to Goole Docks and all connecting marinas.

The reduction in water level will commence on the 4th August and extend until the 18th August. During this period water level may be up to 200mm below normal level.

Skippers of all craft are advised to check mooring lines and allow for a 200mm reduction in water level

You can view this notice and its map online here:
https://canalrivertrust.org.uk/notice/20340/rawcliffe-to-goole-docks-aire-and-calder-navigation

Hopefully this will mean the navigation will open soon after the 18th maybe by 18:00 on the 20th water levels will have returned to normal. Fingers crossed that this is the case.