Category Archives: Baking

The Week That Turned Into A Day. Catch up 10/10 to 2/11

Scarborough/Goole

Downstairs Toilet

Kitchen ✔

Utility Room ✔

Downstairs Toilet ✔

Front Doors ✔

Kitchen windows ✔

Sadly the list of things still to do is still long, but there is plenty of time.

All shiny again

Frank has been visiting a few times a week to work his way through various jobs for us. A thumped bedroom door is now back how it should be. The front door lock has been changed back to an old one, rejigged for new keys and I can now open the front door with ease. One window sill has been replaced, the others will be worked on in fine weather, lockdown permitting. Various items of furniture have had the top layer of stains, paint and glitter removed and are now looking much better with a few coats of Danish Oil on them.

Fabric for new curtains was ordered along with lining. Sadly Boyes in Scarborough has reduced it’s stock so this had to be ordered on line. Getting new curtains made was going to be at least another £250, so I’m just hoping my sewing machine is up to the job along with me!

Weekly veg boxes arrive on Wednesdays to keep me being creative on the cooking side and fill our tummies. Sainsburys delivers once a week and we’ve had a second delivery from Dulux with more paint to keep me going. I hopefully now have all I need to get the remainder of one side of the house finished, then we can clear one side of my work room for access to the end wall which needs some attention from builders. It’s still all go.

An early mast

Sundays we head out for a walk each week. We’ve headed inland, climbing up the hills behind Falsgrave. At Irton Moor we tip toed past the GCHQ listening station, making sure we didn’t stray from the path.

Then veered up to Seamer Beacon where we enjoyed 360 degree views, out to sea, inland towards Pickering and Malton and along the coast with Bempton Cliffs leading towards Flamborough Head. Our return route brought us down off the hills along a very muddy autumnal bridleway, past schools that have changed their names and along streets with very posh houses.

Scarbados

Another weekend saw us walking along the ridge above the A64 with fantastic views over Scarborough to the sea. It has always amazed me how certain landmarks in this town have a life of their own. The Castle and windmill move around at will whilst your back is turned always to appear in the wrong places.

We then dropped down into the valley and walked round the Mere, getting a fix of water, ducks and swans. It appears there are unwelcome otters here as fences have been erected to keep them out away from the fish.

Clerk of works keeping an eye on things

With the country looking like every area would gradually creep into Tier 3 we planned on having a trip to Oleanna, before we couldn’t. Scarborough is in Tier 1, Goole and the East Riding had just made it to Tier 2. With all none tidal routes from Goole leading to Tier 3 areas we decided that we’d have a pootle about staying within Tier 2. A week afloat for the three of us would be great, a deserved rest for Mick and myself and some towpath respite away from the urban felines for Tilly.

Have another one

On Friday hire cars and train tickets were booked along with a food shop to be delivered to Oleanna on Tuesday morning. With everything sorted we’d then head off towards the New Junction Canal, Pollington Lock and Great Heck. Not far but far enough.

Friday evening I started to remove the ripped lining from the boat curtains ready to replace it, planning to sit at the sewing machine over the weekend so that we could have some privacy again.

Before that we had tickets booked to see the brand new John Godber play at the SJT with Bridget and Storm on the Saturday. Sadly I woke up in the morning not feeling quite myself, instead of improving during the morning I went downhill requiring to be near to shore based facilities. It was not a good idea to head to a theatre feeling unwell, even though I know where all the toilets are. So Mick headed off to watch the show leaving me with Tilly as nurse maid, a duvet and the TV. Fred Astaire entertained me more than The Trump Show!

Mick Bridget and Storm enjoyed the show very much, I hope I’ll get chance to see it sometime next year when theatres can reopen again.

News had filtered through that it was looking very likely that the country would be entering another lockdown in a few days. We waited patiently and not so patiently for Boris Johnson to announce his plans. These of course were not in line with our plans which now would have to change.

Unfinished curtains

So instead of a week on board we headed to Goole on Monday in the first hire car, just Mick and myself, leaving Tilly very disappointed holding the fort at the house. She had tried to sneak into a vacuum bag of clean bedding, but had been spotted before I sucked the air out.

Living in an upside down world

The Wolds are greener than they were when we moved to the house. The stubble in the fields has gone and the earth has been turned over, new crops are starting to show their heads.

Sat patiently waiting for us

We let ourselves into the marina and pulled up close to Oleanna. There she was still tied up well to the pontoon, maybe a little bit dustier than when we’d left her, but that’s only to be expected close to the docks.

A day of boat jobs.

Eergh!

I chose to attack the shower sealant, the corners long gone black. This is a job I really do not like doing. Baths and showers in the house have been my nemesis through the years. But I was determined to get the job done, especially as Tilly wasn’t around and we wouldn’t be using the shower today.

I’d brought various tools with me. A window scraper, craft knife and a piece of wood with a blunt point to it. These all gradually worked to clear out the mangy sealant from the corners.

Meanwhile Mick did a firmware upgrade to the inverter. Hopefully he’ll still be able to remotely turn the inverter on and off. Time will tell.

Masked up

After some lunch I then set to masking off the areas that needed sealant. Originally the corners of the walls and where the shower screen met the tray had been sealed with translucent and the shower tray to the walls with white. I decided to change the tray to screen to white as even though the sealant had been okay here it had started to turn orange. White would be better.

I started with the translucent and that went on nicely. The white however had a slightly different quality to it, so it splurged a bit. I smoothed everything off doing my best to avoid making a mess then removed the masking tape.

All done

The sealant behind the galley sink had also seen better days so I’d dug this out, masked it and then applied sealant. This went on better and once the masking tape was removed I decided to smooth it off with my finger, so that it matched the rest of the galley. This worked a treat so I returned to the bathroom to smooth everything off there too. A skin had already started to form, but it was still suitably squidgy to get an okay finish to it. Infact this is possibly the best sealant job I’ve ever achieved, looks wise, time will tell if I’ve sealed it well enough.

Mick had attached a remote heat sensor to the boiler so that the thermostat wasn’t in the electrics cupboard. Our Aldi boiler can work off both gas and electric. Whilst we are hooked up it will work off the electric and Mick has set the thermostat to 9 C.

A second coat of Danish oil was applied to all the window frames, another job to do whilst Tilly isn’t about. One more left to do and that is a much bigger one, re-oiling the wooden floor. This may require an overnight stay, getting everything clean one day and oiled the next, leaving as I finish.

Everything left airing, including the sofa

Oleanna was given a quick check over. Everything winterised. All moisture traps were checked, cupboards and drawers left open, mattress and cushions left so that air can circulate and the sofa bad was opened up and left on it’s back. We don’t know when we’ll be back next due to lockdown, but if we happen to come back with Tilly she will have a field day!

Bye bye, hope to see you soon

It had long gone dark when we locked Oleanna’s back doors and climbed back into the car. A big shame not to be staying longer as originally planned, but we are glad we’ve been able to visit to check on her, run the engine and do some more jobs. She’ll be sat waiting for us to return when we can, hopefully in four weeks time, but we’ll wait and see how things go. It does mean I don’t have to rush to reline her curtains.

0 locks, 0 miles, 2 hire cars, 1 cancelled, 2 train tickets un-cancellable, 5 doors, 3 rooms, 1 thermostat, 1 cat preferring the front, 2 bedside tables, 1 computer desk, 1 bored cat, 0 friends, 1 show missed, 1 week, 1 day, 2 sealants, 1 upgrade, 1 winter ready boat, 2 resigned disappointed boaters, 1 boat cat without her boat.

Where were we

2019 On the flooded River Thames to Isis Lock South Oxford Canal and Chippy Panto. LINK

2018 On the South Oxford Canal, Thrupp and Chippy Panto. LINK

2017 On the Trent and Mersey at Church Lawton, a day trip to Bowness. LINK

2016 On the Trent and Mersey, Marston Bridge to Billinge Green Flash. LINK

2015 On the River Trent, moored at Kings Marina. LINK

2014 On the Grand Union Leicester Section, Crick. LINK

Are They All Going To The Races? 9th September

Bramwith Junction to Sprotbrough Visitor Moorings, Sheffield and South Yorkshire Navigation

Blue skies and blue canal

A slow sunny start to the day, we pushed off a little after 11 and headed for Barnby Dun. The canal rippled silver as we made our way. Only one boat moored here, it’s always been busy. We pulled in to deal with rubbish, empty the yellow water tank and fill with water. Our chosen mooring today would hopefully have a recycling bin so we kept hold of such things for later.

Looking back at Barnby Dun Lift Bridge

Chores done we untied and I headed to work the lift bridge. This is a busy bridge with traffic coming from two roads on the panel side and the road bending round on the other. I waited for there to be no one in sight or within hearing distance before I turned the key and pressed the button. A second after the button was pressed (and held) a black car sped up towards the bridge, was it going to screech to a halt? The thought passed through the drivers mind, but even though the wigwag lights were flashing the car sped up. I released the button straight away. The barriers here are made up of two parts one for each carriageway, the enter barrier drops first followed by the exit. Maybe the car would have cleared the barrier in time, but I didn’t want to risk it.

A calm round of golf for this chap

Once the car was clear, along with one following! I applied pressure again to the button and the bridge did it’s thing. Around 16 patient car and van drivers were held up. This is the nearest I’ve been to someone zooming through barriers.

At Kirk Sandall the housing estate that has been planned for years is going up. The rubble across the way from St Oswald’s Church is now housing. The once lonely church seems to be being surrounded. The church is only open a few days a year but is well worth a look round as we did back in 2016, the next open days are the 19th and 20th September.

I suppose you don’t have to wait for plastic to grow!

Several of the new houses over look the canal an original stone wall being the limit to their gardens and big wooden fences give privacy to one another. The end house seems to wanted the view but then planted plastic ivy up their railings for modesty purposes!

Lock ahead

Another mile on and we could just see the lights at Long Sandall Lock. Red. Then red and green. A volunteer Lockie had spotted us and was setting the lock for us. With the centre line round a bollard we rose up gradually to the Doncaster level.

This was where we were wanting to moor for the next couple of nights, but unless we got the two boats to really nudge up tight and then overhang the moorings a touch there wasn’t space for us. A change of plan was needed and we’d be hanging onto our recycling for a few days longer.

Doncaster was our next option, not so good for Tilly, but she’d have to cope. Approaching Strawberry Island there were big earth works going on opposite. A large pontoon floated a welfare hut and diggers trundled back and forth. Up by the next bridge a very large full skip boat was being pushed past an empty one. We slowed our pace to below tickover as they winded and returned.

Dark photo of the skip being winded

The Environment Agency are bolstering up the river bank here as it very nearly got washed away in the November floods last year. £1.6 million is being spent here to repair a 40 meter slip of the flood defence embankment. Over 100 individual repairs were identified on the flood defences in South Yorkshire and £12.8 million is being spent to help protect around 6000 properties.

The visitor moorings came into view. They were full too! How come everyone wants to be in Doncaster all of a sudden?! Removing git gaps here would have only created about 35 to 40 foot, so nowhere near enough for Oleanna. Stocking up from the wonderful Doncaster deli would have to wait and we’d have to carry on upstream to find a mooring.

Big locks now, all key operated and no gongoozlers standing watching over your shoulder as access to these big locks is restricted. These all automatically refill, which is great coming down stream, but it takes time to empty them. No real hardship as all it takes is a two second push on a button and then time. Mick pulled Oleanna away from the lock and waited mid stream as the East Coast Main Line trains rumbled over my head.

Don’t go that way

Now out onto the River Don. More flood defence works could be seen and several groups of high-vis clad men stood pointing at the timbers at the entrance to the weir.

Doncaster railway bridge

Trees and high bridges brought us up to Sprotbrough Lock. A fisherman was just packing up on the pontoon, just as well as there would have been no avoiding him. An old chap stood and watched and then chatted to Mick as I walked up opened the gate to the lock and proceeded to empty it. This old fella walks ten miles a day with the aid of his walking stick, a stretch of the river from one bridge to the next and back again. Winter months he doesn’t venture quite so far.

Setting off for the lock

Up the lock we hoped for a space, it was way past lunchtime now and both of us were feeling peckish. Only two boats to be seen, plenty of space for us and a much nicer place to be than Doncaster, phew!

Tilly set off to explore the island whilst we had our lunch. Then we tuned in to listen to see what Mr Johnson had to say. Covid-19 cases have been rising so the ‘rule of 6’ is going to be enforced by law. Local restrictions may now include curfews should they be needed. They want to ramp up testing (haven’t they always!) and hope to have a test which will give results in 20 minutes, which would allow those with a negative result to lead a more normal life, which might just include visits to theatres! Well we’ll see if this world beating ‘moonshot’ will come off or end up failing.

Little boat in big lock

Trials at sport events will be cancelled for the time being. Today one such event was at Doncaster races, tomorrow there will be no spectators. Maybe that’s why all the visitor moorings were full?!

3 locks, 1 lift bridge, 16 held up, 1 boy racer, 9.04 miles, 2 moorings full, 3rd time lucky, 1 batch garlic mustard and cheese crackers, 10, 1 quinoa quiche base, 1 macaroni cheese with extras, 0 visit to Scicluna, 0 tapioca starch, 0 treat cheese, 7 flies still, 1 spider.

&w=600&h=450]
https://goo.gl/maps/LrYW1jyNEHrrvg2B8

Patience Tilly Patience. 30th August

Naburn Water Point Pontoon to Naburn Visitor Moorings

Levels were certainly dropping this morning, but would they get low enough for us to head downstream tomorrow? Our main hope for the day was that the levels would come down enough, early enough for us to play do-ci-do and reverse back to the 48 hour moorings and let Tilly out. We all had our fingers crossed.

Just as we were about to tuck into breakfast we heard an engine and movements from outside. Had someone else arrived? Or was someone leaving?

It was the latter. The Abandoned boat was on the move. Kenny, the Lock Keeper had managed to track down the owner the other day, the chap hadn’t been pleased when he was told his boat had been moved. He apparently changed his mind when he heard that his boat would have sunk if no action had been taken. A couple of days ago smoke was seen coming from the abandoned boats chimney, but nobody saw him until this morning. He asked the hybrid boat to move out as he wanted to be off, so they did as requested. His manoeuvring meant that he ended up across the sterns of everyone else and required a push and then his bow pulling round so that he didn’t remain pinned to us for the rest of the day. He said nothing, headed off upstream, Kenny said he was headed to Linton Lock. Each to their own!

Tom decided to study the charts and lots of words about the Ooose. He obviously needed some assistance so I lent him some, sitting on the book to keep it warm. Very helpful I thought.

Waiting

The lady from NB Gandja came to say hello, we’d been wondering where abouts of the river they’d got to. They had enjoyed their trip up to Ripon and on their way back they had moored at Boroughbridge when the river started to come up. Someone from the homemade vessel, No 9, had knocked on their roof at about midnight and suggested that they should move to the floating pontoon above Milby Lock. The following morning some C&RT staff told them not to move until the level dropped. When it did they had called Kenny at Naburn, but he told them there was no space, so they headed into York Marina as the river was due to rise again. She was hoping for a discount as they weren’t using any of the facilities, just electric and water, at £27.50 a night! Glad we’d headed to the lock! They plan on heading to Selby on Tuesday, so we may see them again down the way.

To while away some of the afternoon we tagged along at the very back of an heritage tour around the lock. These were taking place over the weekend with a volunteer talking about the history of the Ouse and Naburn Lock. We missed about a third of it, but did find out that the lock island had once been home to a corn/flint mill and workers cottages. The mill and lock were serviced by a blacksmith in one of the buildings which still stands.

Up to the yale lock

The chap showed photos of the floods on Boxing Day 2012 when the lock island was under water, right up to the yale lock on the office door, quite impressive. Neither Mick or myself remember that flood, November 2000 was the highest recorded, the gate across the bottom of the lane by my dad’s house had only one bar left above the water on that occasion, I suspect in 2012 there were at least two bars visible.

1.3 the moorings should be visible

Back at the boats the level was getting more and more promising. Tilly did her best to be patient, waiting for her shore leave to return. We waited for a view to come back to each side of Oleanna. Being hemmed in without a view was getting to all of us. At least you got to go outside!!

So nearly there!

The afternoon wore on, Jo had headed out to the park with her kids and a friend, maybe we should have done the boat shuffle before she went out. Mick chatted to Kenny and Richard, both of us heading down the lock in the morning, we’d be joined by a couple of cruisers heading to Goole. We waited and waited. Was that Tiger Storm we could hear? We waited. That had to be them! I baked a loaf of bread for Mick and then got a fish crumble ready for the oven.

At half an hour past my dingding the back of Oleanna dipped. Tom went to chat with Jo She, She needed to settle the kids then could move her outside and give us some back. This all took way too long, a Tiger Tom should understand my needs and hopes, but they just slid away.

About to be set free

As Jo pulled back we could just see the edge of the moorings glinting in the evening sun, any earlier and we’d have been paddling. Everyone was out and ready to move round. Jo winded and headed off up the cut to wind again and return to the visitor moorings so her kids could have easy access to the bank.

Then it was our turn. Mick reversed Oleanna back to the nearest end of the moorings. A blast of reverse then an adjustment with forwards meant he flooded the moorings, luckily my end stayed dry, well drier as there was a layer of sticky silt that the ducks had been paddling about in.

Reversing

Doofer moved outwards, the hybrid boat pulled back and Richard reversed NB Isabella back towards the moorings. Doofer and the hybrid moving back in, both against the pontoon. They will be following us down the lock in a few days time.

As we finished tying up, the beeper went announcing that the crumble was ready. It also meant that it was way past cat curfew. Should we risk letting Tilly out for the first time in days. Our decision was no. Should she get carried away and stay out overnight the tide would not wait for us. She would have to make do with a view tonight.

BUT!!!!!!!!

0 locks, 0.06 miles in reverse, 1 boat gone, £27.50! 5 boats shuffled round, 0 milk at the shop, 7pm land visible, 1 balloon, 1 so so bored cat, 2/3rds of a tour, 1 loaf, 1 crumble, 6 days without a view, 2 sun setting vistas revealed, 1 early night.

YoYo River. 28th August

Narburn Lock Water Point Pontoon

Overnight the river had continued to fall. Here in Naburn when we woke the mooring bollards were above water again, a good sign, but it was raining and due to continue raining for most of the day. A look at the Viking recorder level and the forecast levels showed that in York the river had just started to level out before it would rise again. We’d guessed as much, but the predicted levels were high again.

The levels recorded below Naburn Lock were starting to show the influence of the tides again, would there be enough fresh going downstream to make it possible to escape during the afternoon and not have to wait for the tide? This was a question to ask the Lockie when we saw him next.

Bollards!

A look at the weir was needed, it was more audible than it’s been in the last few days. The difference of levels on the tidal and none tidal river were visible again, hence the weir making a lot more noise. The downstream pontoon no longer level with the island, still a lot of water crashing around though.

A height difference

The Lock Keeper was hanging around when we returned. We asked what the possibilities were of heading downstream this afternoon a bit earlier than with the tide before the next rise in water really got going. He wasn’t keen on the idea, fare enough.

Rafted boats at the lock

He did say that if the levels remained more or less as they were now then he’d be on duty for the morning tide and be able to pen us down at 6:30am in return for a bacon butty. Well we already knew that the levels would rise again, a carrot dangled then drowned again!

Moreby Hall visible downstream

A wet day followed as the levels gradually rose again.

Tilly is finding it hard here. Being cabin bound is one thing, she kind of copes when in places like Paddington or BUMingham. But here there is nothing to watch through the windows, being hemmed in on both sides isn’t helping her deal with things. Her incessant pleading at the back doors is not helping our mental health either!

Mick popped back to see the Lockie later on. He’d still pen us down if we wanted in the morning, however he wouldn’t recommend it. We already knew this. If we were to go boats would have to move round. Jo is on the outside of us all and is waiting for a friend to help her on the Tidal Ouse. It would be her first time and on a new to her widebeam, so totally understandable. No need to play do-ci-do then.

Watching the film

Mick lit the stove as it was getting chilly. I made a round of mustard and cheddar crackers and then we all settled down to watch The Sence of Ending, a gentle English mystery. Jim Broadbent plays Tony, who receives a letter from the estate of the mother of his 1960’s university girlfriend. He has been left some money and a diary. Who’s diary was it and why won’t his ex-girlfriend, Charlotte Rampling, hand it over to him. What happened after they split up and where have their lives taken them since. An enjoyable wet days viewing.

A lock lampost

The weather forecast is looking up and hopefully we will have several dry days. Fingers crossed the levels start to go down and stay down long enough for us to get to Selby and maybe across the River Aire to Knottingley.

0 locks, 0 miles, 1 wet day, 1 missing boater found, 1 stern gland tightened, 1 greaser filled, 1 red dot boring now, 1 cat climbing the walls, 1 bacon butty passage, 2 boaters staying put, 1.22m minimum, 1.54m at midnight, 1 river on the rise, 2 boaters using shore based facilities, 2 boaters hoping to still have a cat in the days to come, wonder what feline steak tastes like, at least she’d be quiet and we’d have a varied diet.

Half Way Up The 48 Hours. 21st August

Museum Gardens

The voice of Houdini woke us this morning, Mick was to be on the 8:57 train to Scarborough to visit the dentist, so there was no lounging around in bed with a cuppa for him. A peek out of the window revealed that the level had risen again overnight, only what looked like a couple of inches, we’d still have at least another foot before we’d be getting wet feet on the moorings here. Gaugemap was checked along all the tributaries up stream before Mick committed to his journey eastwards. I’d not be too keen on moving Oleanna on my own should the level rise!

Yurck

Today was to be windy, very windy. Tilly and I got on with the normal morning routine, keeping an eye on the other side of the river for the level and being buffeted about somewhat.

On the other side of Lendal Bridge is where all the trip boats get moored overnight, at the tail end all the little red hire boats are huddled up together. I was quite surprised when these had been moved mid morning, then at intervals of 10 to 15 minutes one would pass by. The strong winds which we’d not consider moving in didn’t seem to be a problem for them. Then the trip boats started to do their rounds, adding to the swell on the river.

Rising levels

It was a bumpy morning, a little unsettling so I needed to keep myself occupied. As I was expecting visitors I decided to give Oleanna a tidy and sweep through, not that anyone would be coming onboard, but it did the job of keeping my eyes away from checking the level constantly. A batch of biscuits were popped in the oven and had just cooled off when there were voices outside.

Halfway up

Jaye and Duncan had come for a cuppa and a catch up, other than briefly last night it’s just over a year since we last saw them. If the weather had been more conducive I’d have made refreshments for us to enjoy on the river bank watching the world go by. This was still a vague hope, but was soon replaced with heading into town to find a cafe.

Duncan suggested Spring Espresso on Lendal, a small cafe. They couldn’t move two tables together for us, but we could use two tables which was just fine helping us all to keep our distance.

Yum!

Eggs Benedict with spinach and mushrooms, the poached eggs cooked perfectly, yummy!

There was lots to catch up on, theatre, friends, tenants, our travels etc. which meant trying to eat got in the way a touch.

As we were nearly finished another Scarborough face appeared at the door. Georgie used to work at the SJT and is now a Producer for York Mediale an International Media Arts Festival that is held every year. She spotted Jaye and Duncan and then did a second take when she saw me. It was lovely to see her even if it was very brief as she was meeting with an artist.

Duncan and Jaye

A lovely lunchtime meeting and catch up with good friends. Back at Oleanna the level still looked pretty much the same. More checks on Gaugemap and the Governments river and sea levels site. Looking at the Viking Recorder levels there is a forecast level, this was due to remain steady for a while but later today to rise by half a meter. Because of this when Mick had seen his dentist he cycled to the house, picked up post and cancelled an appointment with a plumber so that he could be back sooner, just in case we needed to move.

The ‘Yay’ train

At 14:24 I got a text message. Mick was on the ‘Yay!’ train. When he worked in York, pre-boating days, he commuted from Scarborough by train, there was a ‘Yay’ train and a late train. Today trains were two hours apart, they may have more carriages but his return journey was quite busy.

We had a walk around the block so that I could see the new footbridge. Built with social distancing in mind it is wonderfully wide. Built from steel and fashionable rusted metal it does the job well. Mick reckons the bridge would have saved him at least five minutes each way on his commute, so he’d have managed the ‘Yay’ train more often.

Leeman Road sorting office

Some post had arrived at the house for our old tenant, so this needed returning. Handily Leeman Road sorting office still has a late collection even if it’s clock is wonky. As a child it was exciting to climb in the car with Dad and come to post a letter late at night, imagining there to be someone just behind the post box who would stamp it with a postmark, sort it and send it on it’s way to arrive before 8am somewhere.

The bar walls are all one way, I pity the person who lost their coat during their circular perambulation, would they have to walk ALL the way back round to pick up their coat?

As the streets seemed that bit emptier we decided to go a touch further. A patch of unkempt riverbank behind Coney Street needed investigating. Could this be where York City Council could install some pontoons for boaters?

Coney Street used to be THE shopping street in York, now the number of empty shops is scary. A chap disappeared down a slope between WH Smith and Boots, this was where we needed to be. A steep narrow concrete ramp led down to the river, the walls on either side showing grooves from many deliveries.

At the end mesh fencing stopped us from checking out a set of steps down into the river and caged delivery bays now host bicycle racks. The chap came out with his bike, ‘There’s nothing down here!’ Well actually he was wrong. Should anyone ever decide to provide flood safe moorings for visitors in York here would be an ideal spot. Unused river frontage, steps (that would need replacing) and access up to Coney Street along with a very old WH Smith logo.

Waterstones has moved, the public toilets in Parliament Street have been demolished and replaced with portacabins, just as ugly as their predecessors. The pavement along this stretch was surprisingly uneven, up and down. I wonder if there are plans to try to level this out, maybe loose the trees that were planted in the 70’s 80’s, the fountain from then has gone.

Betty’s World Famous Fat Rascals

A glance in at Betty’s tearoom is always a must. They looked busy but could have coped with two more. When we got back to Oleanna the level looked to have dropped just a touch more, ‘max’ on the mooring sign, was now just about above water. We’ll see what happens overnight.

Minstergate and the Minster

0 locks, 0 miles, 2 trains, 1 filling, 2 visitors, 3 more mentions, 2 photos, 1 rising river, 1 dropping river, 1 very blowy day, 2 poached eggs, 1 surprise meeting, 2 lovely hours, 1 wide bridge, 1 top hat with covid visor, 1 solution for York mooring if only the council gave 2 hoots!

Lepers. 17th August

Ripon Basin

Rain overnight, at 2am it was beating down on the roof so hard that we were both woken up. But luckily it dried up during the morning.

The trip boat from the end of the basin started to do runs past us, a little bit quickly or maybe our ropes just needed tightening. We could hear him saying something about 5.30 yesterday and if we’re lucky we’ll see it today. He must have been mentioning the otter, but going at his speed I think the otter would be staying well away!

Ripon Basin

We still require a plumber to replace a boiler in the house, as the quote we got through seems a touch too pricey and one lead on someone to clear the gutters for us hasn’t come off. So sometime was spent this morning on housey things. Then it was time to have a wonder around.

We walked up to the end of the basin and then past a fish and chip shop who boasted that they do gluten free every day. A touch of a shame we were eating out tonight, maybe another time though.

Ripon Cathedral

The Cathedral sits up a hill, currently there is an exhibition in the nave where 10,000 origami angles have been suspended from a large net. These were all made during lockdown by volunteers in the community, each angle represents a dedication made during the pandemic to keyworkers and loved ones. We thought we’d have a look on our way back out of the city, but our ambling route took us another way.

How did that happen, a Pie Shop!

Our route somehow managed to pass a pie shop, Mick simply had to taste their produce, so a pound pork pie was purchased to be eaten over the next few days. I ventured into Holland and Barrett to stock up on brown rice flour to make crackers with, then a couple of puzzle books were required from WH Smiths. A wander around the Yorkshire Trading Company, but we couldn’t remember what we’d said they would have that we wanted, so it can’t have been that important!

The market square today had something missing, the Cabman’s Shelter a grade 2, once movable hut where the drivers of horse drawn cabs would wait for their next fare. A hunt around on the internet suggests the council maybe have managed to get permission from Historic England for it to be taken for much needed restoration work. Here’s hoping so, sadly I didn’t take a photo of it 6 years ago, so here is one from the Historic England website.

The Workhouse now a museum

We then meandered down Allhallowgate. Here the impressive building of the Workhouse sits, not open on Mondays so we could only look at the exterior.

The Jolly Fryer further down the hill has a yellow bike above it’s door, it’s rider seems to have been waiting quite sometime for his fish and chips. Yellow bicycles are a common sight around parts of Yorkshire since the Tour de Yorkshire was started, I think we spotted a couple more today, one perched on the ridge of a roof.

A sign pointed us away from the city centre and towards the Leper Church, St Mary Magdelenes. The original building dates from the 12th century, the Norman doorway on the south side dates from this period. Many modifications have been made to the building through the centuries. A low narrow window on the north wall is where the lepers could receive the sacrament. There is a 15th Century oak screen and a mosaic set in the floor before the alter, but sadly due to extra cleaning that would be required during the pandemic the church was firmly shut to visitors.

Now those are chimneys

Lepers and blind priests were looked after here and in 1544 the hospital became alms-houses and survived the religious upheavals that followed. New alms-houses were built across the road with their own chapel in 1820, these buildings have wonderful chimneys.

We retraced our steps and walked round the back of the cathedral, passing High Saint Agnesgate and finding our way to a foot bridge across the River Skell with a lovely view back to the cathedral.

River Skell

Tilly had been on lookout for the otter, but there had been no sightings. A trial batch of crackers, cheese mustard and garlic were made as the trip boat came back and forth, we were now part of the commentary and recieved numerous waves.

Highly recommended

Late afternoon we walked back into the city to Prima to meet up with Robert and Margie whom we’d met in Skipton a few weeks ago. Ripon being only an hours drive for them we’d made plans to meet up again. Prima is their favourite restaurant in Ripon and with an earlybird menu it was going to be reasonably priced, even more so with the Chancellor chipping in a third of the final bill (alcohol not included in the Eat out to help out scheme).

Affogato con Ameretto faces

A lovely evening with them both, two meetings in a month. We all enjoyed our food, garlic mushrooms and a goats cheese and spinach pizza each for Mick and myself, one with gluten the other without. We were too full for pudding, but the Halls had paced themselves better and both opted for Affogato con Ameretto, I know one master carpenter who’d have been chomping at the bit for one of these.

Kirkgate

0 locks, 0 miles, 2 bags flour, 1lb pie, 2 puzzle books, 1 leper church, 1 cathedral, 2 octogenarians, 2 pizzas, 2 melting chilled medications, 4 glasses of wine, 0 otter sightings, 1 tray of crackers, 1 highlight on the tour, 1 green flagged canal.

Port Side. 8th August

Woodlesford Lock to Oil Terminal Arm

Mick was off straight after breakfast for our Saturday newspaper, heading up into Woodlesford, returning just in time for 10am and the Geraghty Zoom. Todays topics, dragons, being tongue tied and art patrons. Tilly had been refused shore leave as we intended leaving soon after seeing the family, so to stop her incessant winging at the back doors she and I had an extended game of pen at the dinette. This seemed to do the trick.

A crow at Woodlesford Lock

Before pushing off we emptied the yellow water tank and then pushed over to the water point to fill up. Rubbish was disposed of and Tilly got a fresh litter box whilst we waited for the tank to fill. NB Barley came past leap frogging us. At the time we thought we might catch them up, but then our plans changed.

Bye bye Barley

To reach Selby for our passage up the Tidal Ouse to York we need to do a couple of hours or there abouts a day. Quite a few of the moorings will mean that Tilly will be deprived of shore leave, so we decided to only go a short way today. Our chosen mooring would have all she would want, shady trees for us and the possibility of a barbecue. But this would mean a longer day tomorrow to catch up, not really a problem.

Lock control panel

A chap stood at the downstream panel for Woodlesford Lock pressing buttons. He was there for ages without the gates opening, so I went to see what was happening. He said that Barley had left the paddles up when they left. I assumed he’d meant the paddles at the downstream end. He stood and pressed the gate button, nothing happening, kept pressing the paddle button, nothing. I looked below the lock, there were signs that the level in the lock was higher than below, suggesting that the lock had started to fill itself after being used. A full lock is a safer lock should anyone fall into it and rivers tend to have sufficient water to cope with this.

Us going down

I suggested he tried turning the panel off, removing his key and starting all over again. This worked and the lock emptied. I suggested to use my key on the top panel so that hand over would be easier, the chap agreed. Once in the lock he gave a thumbs up, just after I’d pushed the button to fill the lock the chap at the helm disappeared inside. Through the front doors I could see two of them were making a snack and drinks, they only came back up on deck when the lock was nearly full, admittedly their boat had only wandered about a bit in the lock as it was a gentle filler, but still.

Flowers and weeds

Lots of people have been making comments about the state of the canals since lockdown, towpath cutting, reeds taking over, weed. But today here was the biggest thing I’ve noticed. Woodlesford Lock normally has the grass kept neat as my Grandfather would have liked to see it and the flower beds immaculate. Any dead heads removed and not a weed in sight. But today the grass is long, some flowers are in bloom but all around them is filled with weeds. One can only assume the volunteers who normally look after the area have been shielding.

Tilly preparing to cross the towpath

Below the lock we cruised about a mile to join another boat in our chosen mooring. We winded so as to have the port side to the towpath and tried to get in. A few tries didn’t work, in the end we reversed back behind the other boat and tucked in nicely.

Here the towpath is actually a little bit away from the edge, giving us a grassy area next to us without so much footfall. Tilly got straight to work, rolled in the dust and then headed off into the friendly cover.

I mixed up some sourdough cracker dough and experimented with the flavouring. The last two batches I’d made were rosemary and thyme with parmesan. Today I went for paprika, mustard, garlic and pumpkin seeds. They were okay, but I’d forgotten to sprinkle on some seasalt before baking them. They could have done with a touch more flavour.

Not quite uniform

Then a batch of gluten free rolls were mixed up and left to rise whilst I got on with clearing the roof and preparing to wash the port side whilst Mick listened to the cricket.

Bloomin rusty bits

Under where the plank and poles sit the red bar on the roof has developed some rust spots. So these got some attention before the roof was washed. On finishing the roof the batch of rolls had risen enough to be shaped and left to prove. This was all timed very well with washing down the cabin side which had got extreamly dusty in Calverley.

The barbecue came out and Mick chopped away at the big chunks of charcoal with an axe, they were soon glowing away and ready to cook on. Halloumi and veg kebabs and some pork and apple burgers tonight, all whilst Tilly had extended shore leave. Todays temperatures hadn’t been quite as high as we thought they’d be and by the time we’d finished eating it was decidedly chilly out, no sitting out to watch the sunset tonight.

1 lock, 1 mile, 1 wind, 10am zoom,1 newspaper, 1 empty wee tank, 1 full water tank, 0 rubbish, 1 unkempt lock, 1 twonk head, 0.5 roof clean, 1 cabin side clean, 1 big puddle of oil, 6 more patches of rust, 1 coat fertan, 4 kebabs, 4 burgers, 4 rolls, 4 glasses of wine, 1 chilly evening.

https://goo.gl/maps/bt57uWPLg44rcpaK8