Bridge 182 to Ballot Box Bridge, Paddington Branch
Yesterday evening we’d had quite a few people stop to chat as we set up the lights on Oleanna. One lady had been concerned that Denham Deep Lock (the next one) may be closed as the bottom gates were open a little bit and in front of the top gates there was a mass of weed, surely we’d not be able to get through! Neither of us were concerned at what she said and when we got to the lock this morning it was nothing compared to the amount of pennywort we’d come across at Wide Water Lock and the bottom gates were just open because that was they way they rested when the lock was empty.
Denham Deep is very deep, but thankfully with fairly new gates it doesn’t leek so it filled in no time compared to the shallower locks we’d recently come through.
Below the lock the floating dry dock was giving a piggyback to another boat.
Onwards to Uxbridge. Here two boats were breasted up on the lock landing and the last people to have gone through the lock had left both bottom gates open with the paddles up! We are now in the land of not giving a monkeys and the number of parakeets way out numbers blackbirds, robins and kingfishers. Thankfully we weren’t a widebeam, as some of the broader boats would have had difficulty getting into the lock and there was space on the off side for me to hop off to set the lock.
We’d arrived shortly after Denham Yacht Station had opened for the day. A top up of diesel was required and Mick had dug out our 5litre can which also got filled. Going out onto the Tideway you want a full tank and we knew we’d not be at St Pancras Cruising Club at the right time to top up there.
At Cowley Lock three volunteers stood awaiting our arrival, we were to be their first boat of the day.
Below someone is building themselves quite a large house boat. New stainless steel tanks sit in the water and a wooden structure is going up above.
Now we were on the level with Paddington. We pootled along passing large building sites, two fellas working their way through a pallet of turf.
Under Murderers Bridge where eight years ago we said a final goodnight to Houdini my old cat.
A plant peeked up out of the hold of a boat, was it what we thought it was? Yes, most probably. Soon we were at Bulls Bridge where the Boat of Fame is currently moored in it’s Mind The Gap coat of paint, very whimsical.
Left onto the Paddington Arm. All sorts of boats. Jolly dogs and grumpy cats. Heftily insulated boats. You see everything down here, some we now recognise each time we’re here.
A sunflower has reached up for light at the edge of the towpath surrounded by new builds. A cormorant took advantage of a high up post.
I ducked below to have a catch up with Jo the props lady for panto leaving Mick to cruise us onwards to near Ballot Box Bridge at the foot of Horsenden Hill. Almost two hours later I finished chatting to Jo and could finally have my lunch. Then it was out with the buckets and cloths, time to give Oleanna a bit of a wash before the flotilla. The starboard side seems to have caught the sun more than the port side, so hopefully a wash might make her look better. Who knows if the starboard side will get washed it depends on time and on how busy our mooring in London will be, at least that side looks a touch smarter.
Mick busied himself attaching the cratch lights. These haven’t been on Oleanna for two years, they are our normal arrangement for Christmas. These will stay on now for Saturday, a little less to do.
3 locks, 12.92 miles, 1 left, 1 tear, 1 tube boat, 3 volunteers, 2 hours talking props, boat 71, 1/10th of lights fitted, 1 clean bow for the first time in years.
Adam’s favourite mooring to above Stoke Hammond Lock
Today I had some work to do, a meeting with the Production Manager for panto via zoom. We could stay put until after my meeting or we could cruise whilst I was on line. The later option was chosen as for most of the day we’d be on the flat going round Milton Keynes, we just needed to get through Cosgrove Lock before 10:00.
We pushed off around 8:15 and cruised our way towards the lock. The hedges at Thurpp Wharf Marina are too high now to have a good nosy so we had to wait to pass the entrance to be able to wave to NB Briar Rose.
Approaching Soloman Bridge we passed a few moored boats, one that we’ve seen before NB Home which has quite a paint job.
Are the houses close to the bridge new? With sand bags shoring up the bank.
As we rounded the bend towards the lock we could see a Black Prince boat heading the same way. They over shot the lock and it looked like they would be winding if they didn’t carry on too far. I hopped off at the narrows and Mick pulled Oleanna back to give them room, another boat was just coming into the lock, good job we’d left half an hour earlier than we’d originally planned.
Everyone seemed to be waiting for everyone else. So I suggested the Black Prince boat got on with winding as the lock finished filling and Mick held back. The lock needed a bottom paddle closing and then everyone could be on their way.
Crossing over the Ouse Aqueduct we glanced downstream, towards Bedford and our time on the Great Ouse this summer.
As we approached Galleon Wharf we could see a strange thing on the bank by the warehouses. Was this a giant slug? All glistening and muddy brown. Two orange boats were in the water and then Mick spotted several dark floating things taking over about two thirds of the canal, no buoys marking them bobbing just at the surface. Were they sucking silt out from the canal bed into the giant slugs? We don’t remember seeing a notice about this, but then C&RT waters have been off our radar for a while. We tried asking a boater if he knew what was going on, it was very hard to hear his reply as mounds of aggregate were being moved around. But something about the warehouses being knocked down and two houses being built. A later hunt round on-line suggests that planning permission had been refused for a scheme of 14 new houses.
Time for me to head below and set up for my meeting. With working drawings at the ready I signed into zoom and Gemma and I worked our way through the model pieces I’d sent and drawings. Most things were self explanatory, but the rostra for the gangplank took some explaining as to how it sat, a bit like trying to brush your hair in a mirror for the very first time! Tomorrow Gemma heads to the builders to hopefully come back with a price for the build.
I was back up on deck after we’d passed Great Linford. Today, when we didn’t want it, there was mooring space. The works around the pond and new footpaths haven’t quite been finished yet, but from Mick’s photos its starting to look smart again.
Every now and then there seemed to be new artworks along the banks of the canal. Had we seen the horse before? A very colourful bench with a waterside theme. Oriental inspired paintings of waterfowl under a bridge.
A Heron stood at the bow of a boat watching the water be pulled along by our approach. It just dabbed it’s head into the water and came out with a fish, which it dually swallowed and we had chance to watch the fish wriggle down it’s neck!
There’s a new pub at Campbell Wharf Marina , still having bits of work done to it. The marina certainly looks full. Three moorings are taken up by widebeams, between them we could just see where the Bedford and Milton Keynes Waterway will be one day. Back in July when we reached the head of navigation on the Great Ouse we were only 11 miles away as the crow flies. Instead we’ve cruised 198.71 miles or there abouts! The link through would have saved us nearly two months.
It took four hours to skirt round Milton Keynes, from the Ouse Aqueduct to Fenny Stratford Lock. Lots of moored boats, new mooring signs limiting stays to 2 days during the summer months. We found these a touch odd as unless marked mooring times during winter change to 14 days, so why bother adding from April to September on these signs? One thing is for sure, C&RT are wanting boats to move around in Milton Keynes. For once we’d have had no difficulty mooring at Campbell Park, but of course we didn’t want to stop today.
Approaching Fenny Stratford we looked out for a figure sat in an arm chair by the window of the first house and waved. There is nearly always someone sat there who will wave back with a big smile on their face.
The bridge needed swinging at the lock and some water emptying out of it’s not so deep chamber. We’d now started our ascent towards Cowroast. We swapped over with a hire boat making sure they knew about the swing bridge, then carried onwards.
A confirmation notice of our appointment came through, we definitely have to keep up the pace south bound now. Three more miles and we were at the lovely Stoke Hammond Lock, the first of the proper uphill locks. Here red roses still in bloom surround the sign, wonderful.
We pootled on almost at our destination for the day, pulling in to a vacant space half a mile on. Here Tilly could head off to explore and we could enjoy a very late lunch. Why oh why does Milton Keynes take soooooo long to cruise through?!
3 locks, 16.76 miles, 1 swing bridge, 1 bottle neck, 1 hour zoom, 11 miles or 198, 12 emails, 1 confirmation, 2.75 hours shore leave, 1 bright red rose, 2 boaters ready for bed early, 20 years of remembering Peter.
Gayton Junction to almost Adam’s favourite mooring Bridge 63
After spending months on the rivers and seeing on average a couple of boats move in a day (apart from at weekends and excluding the river festival) this morning was a reminder of how busy places can be. Before we were even outside rolling up the covers we’d been passed by several boats , one at 06:20. Then as we were ready to go for it we had to hold fast as two Union Canal boats came past heading southwards.
With a suitable gap in traffic we reversed back to the junction, one small blast of the bow thruster and Oleanna herself turned back onto the Northampton arm and pulled into the service block with next to no effort what-so-ever. Water, yellow water, rubbish all were sorted. NB Ivy May pulled up they had a problem which they hoped the boat yard would be able to help with. Hopefully it’s nothing bad and they can be on their way soon.
With our chores complete, life jackets, torch, waterproofs out the back, a quick check of the direction the tunnel light was facing and that it worked, we were ready. Left to London!
Soon we were passing the lovely mill in Blisworth and approaching the tunnel portal. All tunnel preparations were done, tunnel mode engaged. We paused to let a Kate Boat exit before we plunged into the dark ourselves. I hoped Tilly would still be enjoying her morning snooze and not get worked up about the journey underground.
We passed another boat part way to the middle and with 1600m to go we saw a tunnel light enter the far end. Thankfully we passed them after the big pissers coming in through the tunnel wall so I didn’t have to mop up inside.
Out the south portal. We passed only one boat moored towards the tunnel, a hire boat running their engine in reverse gear. Maybe they’d be heading for the locks soon? With water levels still low we decided that we’d wait half an hour for a locking partner or for anyone coming up the locks if they were set against us.
As the top of the locks came into view we could see a boat just entering the top lock, Hooray!! We wouldn’t have to wait. Ooooo! Another boat pulled out to join them! We’d be waiting. We pulled in checked the time and waited.
Mick walked down to see if anyone was coming up, no sign from the bridge. We waited. Still no-one after half an hour. I walked down to the second lock, no-one coming, Mick walked to look back towards the tunnel, no-one coming. We filled the lock.
Just as Oleanna was entering the lock a boat appeared from behind, hooray! Soon followed by a second one. Did we have a situation where they were wanting to share? No, we had a locking partner! With both boats in the lock I walked down to set the next in the flight. This was repeated again. But as I walked to the third lock a Black Prince hire boat was just pulling out. I don’t know you wait half an hour for a lock partner, then all of a sudden three come along!
The lock was ready for when the hire boat arrived, and the same question was asked regarding sharing. I’d already called back to Mick, so we had no problem in swapping partners, we just wanted to get down the locks without wasting water. So we waved goodbye to one boat and joined the next.
With four on board the crew were all experienced, so someone naturally walked down to the next lock to set ahead. Only one pair of boats were met heading up the flight, so a swap over in a pound was needed. The lady on one of the uphill boats asked about the tunnel, ‘Would it be worth one of us walking ahead to see if anyone is coming?’ I let her know that the tunnel was two way and that there was no towpath through it. I did suggest putting waterproofs on as even after the drought it was still very wet in there.
A volunteer greeted us at the second to last lock saying there was a problem gate and it had taken five of them to open it for the last boat. It turned out to be a case of a ground paddle still being open and water flowing over the top gates stopping the levels from equalising. The volunteer managed to open the gate on his own this time.
At the bottom we waved our partners goodbye and headed onwards, maybe we’d pull in once down Cosgrove Lock, this is where we should stop today.
But after an hour and twenty minutes we decided that we’d had enough for the day and Tilly would prefer it here.
We spotted Adam’s favourite mooring, a wide beam sadly taking up the view. A little bit further we pulled in, forced a nappy pin through the plants covering the gaps in the armco and let the cat out.
I spent some of the afternoon working. A few props need sketches doing and sign posts needed making for the model. Now I could have a good tidy up and put my model making things back under the dinette seating. The corner has been filled with my work since we left Bedford in July. After nearly eight weeks it’s nice to have all that room back again! Tilly made sure she reclaimed it by having a good old roll around.
Oundle Cruising Club to Clive’s Retreat FOTRN mooring
With Waterway Routes suggesting it would take us around 4hrs to reach Islip Lock and Evri suggesting it would be best to drop off my parcel before midday the alarm was set or 6am, a time we only normally do when temperatures outside are due to get high and we can’t just sit still for the day. We were breakfasted and untied by 07:09, winded in the entrance to the marina, waving to NB Cleddau and heading towards Upper Barwell Lock the first of our day.
Birds chirped, Kingfishers darted back and forth, but our sleepy eyes and heads were not capable of counting them let alone see them. Damp under foot, we’d be getting soggy feet this morning. The world gradually waking up around us.
Upper Barwell, Lilford and Wadenhoe locks were all set in our favour. One cruiser moored on the pub moorings and one narrowboat at Peartree Farm. Titchmarsh Lock had been the only lock I’d not operated on our way downstream three months ago, it’s padlock a mensa challenge to relock with only two hands, I got there in the end.
I busied myself with answering panto emails as we went along, what type of backpack, just how big should the mixing bowls be and how would I like the boiled egg ice cream to look?
The river narrows, trees overhang the navigation as you get closer to Islip Lock. Heading upstream the current against us was that bit stronger. Then round a bend we saw our first moving boat, they were going at quite a lick. We saw them before they did us and we slammed on the brakes. Both boats hitting reverse and avoiding a collision. Phew.
At 10:22 we arrived at the Islip Mill Lakeside Moorings, no boats awaiting a broken lock, in fact no boats what-so-ever. We pulled in and I headed off straight away to drop the parcel of panto model bits off at the One Stop shop, then walked over to the Co-op for some eggs.
Today we were allowed elevenses and whilst I tucked into my toast and peanut butter boats and their movements were texted back to Sue on Cleddau, they were on their way a few hours behind us, hopefully someone would have reset the locks for them.
I started to walk up to Islip Lock, the first of the locks that has been broken recently. But I soon realised that there was actually no way of reaching the lock without being on a boat, luckily Mick hadn’t set off yet. I was dropped off on the lock landing and walked up to close the top gates. I also had to close both gate paddles as a previous boater had left them up, this had been the cause of this reach draining the day after the lock broke. I went to the panel, no lights. I jigged the gates about, no lights, I wound up and down the paddles, no lights. By now there was a boat heading towards the lock from above. I opened the top gates and waved them in, not that they’d be going anywhere!
As I thought, I knew of this boat. NB Barbarella a Finesse boat with Noni and Peter on board, we follow each other on Instagram so knew we’d pass each other today. They thanked me for holding the lock for them, then I explained, had they jinxed Islip after all they’d been the boat at Whiston when it broke last week. Peter tried everything. Still no lights.
Noni called the EA emergency number, Mick called the river inspector. After a while we got a call back saying that there was a power outage in the area as work was being carried out on power lines. Ahh it was the chaps opposite the mooring we’d just had elevenses at! The power might be off for half an hour but should certainly be back on by 16:00!
We were invited onto Barbarella’s ‘super social stern’ for a cuppa and talked all things boats and Finesse. Oleanna was built in Finesse’s early days before they’d got into building electric and hybrid boats, maybe if we’d been two or three years later and had enough money we’d have gone down that route. Maybe if I got a show that goes into the west end the royalties could pay for a retro fit. Noni and Peter certainly seem to be enjoying themselves.
We headed to Oleanna for some lunch. Every now and again one of us would go and check to see if the lights were working on the panel. Behind us Sue and Ken had arrived at the mooring their destination for today. Every now and again we’d get reports on how the chaps up the poles were doing. At around 15:15 a message came through that they thought the chaps were packing up, we all stood round the panel chatting waiting for the lights to come back on.
Twenty minutes later Noni spotted that there was life on the panel. A quick, it’s been really nice to meet you and see you somewhere sometime and she was back on board and I was lifting the gate to drain the water.
The two Finesse boats were soon passing each other, waves all round. Oleanna’s turn in the lock, as I closed the bottom gate shouts and waves came from the footbridge below a final final farewell from Sue.
All afternoon the water level in the pound above had been over the top of the gates by a good four inches. But as Oleanna rose the level had dropped, maybe having the power back on had lifted some sluices somewhere, sending excess water downstream.
Our aim for today was to reach Woodford, through Denford and Woodford locks. We were however following a day boat so every lock was full and both paddles had been left up on the top gates.
When we arrived at Woodford FOTRN mooring there were already a couple of boats moored there. It looked like there might be space for us but the depth really wasn’t in our favour so after jumping off I had to jump back on again. Thankfully we knew of a new FOTRN mooring up the next lock.
We waved to the moorings where NB Lillyanne came from and then rounded the bend to Lower Ringstead Lock, the hire boat was still in the lock. I walked up to reset it for us.
The water level was coming over the top gates, only a few inches to go. After a minute or two there was still a few inches to go. They started to try to push the gates open, then there was a suggestion to try to help with the boat pushing the gates! It soon became obvious that something wasn’t right.
‘Is the bottom gate closed fully?’ I asked. ‘Yes!’. By this time I was walking back to the panel to open it up and Mick had arrived from below saying there was water flowing from the lock below. No power to the panel, the paddles needed closing for me to be able to use the panel and close the guillotine properly. Just an inch made all the difference. How had they managed to end up in this situation? Even with someone pushing the button on the panel as soon as the paddle on the top gate was lifted the circuit was broken stopping the gate an inch before it was fully closed. I wonder how long they’d been there for with water just running straight through the lock, they’d certainly run out of beers by the number of empty bottles on the roof.
We worked our way up and then kept our fingers crossed for a space on the new Clives’s Retreat mooring close to the entrance to Blackthorn Marina. Thankfully it was empty, but much to Tilly’s dismay it was far too late for any shore leave.
I put together a Roast chicken leek and feta pie with pastry that had been in the freezer. A glass of wine accompanied our meal and we wondered whether the appointment we were heading for will still go ahead.
8 locks, 13.39 miles, 2 Finesse’s, 3 cuppas, 1 group, 4 hours without power, 1 parcel on it’s way, 1 troublesome day boat, 1 inch, 1 new mooring, 2 flags, 1 long day boating, 70 years, 1 king.
My brain was whirring with all the little jobs I needed to do before putting panto things in the post, so much so there was next to no point in lying in bed just thinking about them, I might as well be up doing them. I reckoned half a day would see all the jobs done and a parcel wrapped up, a walk into Oundle Post Office, then all I’d be left with would be emails and the occasional zoom meeting before I start painting the set in five weeks time.
I worked away, altering colours of a few things, cutting away some sky on others. A list of amendments to drawings. Sue came to wave us off, but we wouldn’t be leaving until the afternoon or maybe put it off until tomorrow. A Sainsburys delivery arrived and was stowed away.
After lunch Mick decided that he’d change Oleanna’s oil and a filter, an early service but one that would need doing whilst we were on our mission. Tilly busied herself outside, not sure if she’s ever made it up onto the club roof, I’d seen her doing the calculations the other day!
Drawings amended. Copies amended in triplicate! The right sized shoe box found and some bubble wrap. By now it was getting on for 16:30, I’d just make the Post Office. Then Mick mentioned that Royal Mail would be on strike the next two days!
They apparently would do their best to deliver Tracked 24 parcels. I looked this up on line. Only downside is that they have to collect your parcel, you can’t just drop it off at a Post Office! Well that wouldn’t happen!
Evie was looked up, next day would be the way to go. Nearest parcel shop, Thrapston! Nowhere in Oundle to drop the parcel off at. Thrapston being four hours away and they recommend dropping your parcel off before midday. Should we make a start on the four hours today? It was nearly 17:00, yellow water, water tank to deal with, Tilly busy outside. Decision made, we’d leave extra early tomorrow morning.
In between receiving emails from Jo the panto props maker regarding horse manure we walked across the marina to say our goodbyes to Sue and Ken. If we hadn’t been leaving so early tomorrow we’d have been able to share the first few locks with them. We had a cuppa, chat and then said our final farewell. Hopefully there will be no more delays with broken locks for either of us and once up the Northampton flight we’ll be heading in opposite directions.
Early night for us tonight.
0 locks, 0 post for 2 days, 6 final amendments, 2 shovels of manure, 9 litres oil, 1 filter, 1 full water tank, 1 empty wee tank, 1 food delivery, 1 boat, 2 boaters, 1 cat all ready for the off.
An early start to meet my lift into Peterborough. Ken from NB Cleddau had very kindly offered to give me a lift to the station this morning saving me sitting defending my model box on the bus as well as trains and the tube today. We arrived in plenty of time, I bought my ticket and then had to wait until 8:30 before the barriers would let me through. I was catching the slower Thameslink train to St Pancras, if I’d waited another ten minutes I could have got to London earlier but it would have cost another £90! I was happy enough sat watching Brampton and St Neots go by, only one boat moored on the GOBA mooring where Tilly got stuck behind the double fence weeks ago.
A quick transfer onto the tube and I was soon walking up to Abi’s house in Golders Green. Today the meeting would just be Abi and myself working through the show scene by scene, scene change by scene change. A few notes were taken for small amendments, but generally all was good. When it came to the troublesome scene I had taken three options with me just in case. I set up the latest which thankfully got the thumbs up! Just some minor adjustments to make it even better. Hooray!
We were joined by Gemma the production manager for the last hour to chat through anything that might be problematical, then tucked into a bowl of soup whilst chatting props. A very productive three hours.
Meanwhile my phone kept making noises. News was coming through from Oundle. This morning NB Barbarella who have been moored on the lock landing at Whiston Lock were woken by engineers working on the broken lock. At around 10am I got a message from Mick saying that the lock was open again. Hooray!!
I passed the good news onto Cleddau. But so far no news of Islip Lock.
At 12:30 my phone pinged again. The engineers who’d mended Whiston had just completed works at Islip Lock which was now also open. Hooray!!! Our way ahead is now clear, I just need to get things in the post and then we can push off.
Ken met me at the station again and brought me back to Oleanna who had moved. During the afternoon NB Shadow had decided that they would head off and obviously needed their hook up lead they’d lent us back. There was still credit where they had been moored so Mick moved us up to plug in there instead, our old space soon taken over by NB Charlotte May.
Mick had spent the day washing what ever he could find. The chimney was swept, the boat hoovered through, water tank filled, a busy day. Tilly spent much of the afternoon being adamant that NB Charlotte May was actually Oleanna, she had been inside when Mick had moved the outside but sometimes scent is more persuasive to her than looks. Good job she didn’t go for a walk through of their boat as they have two woofers in residence.
At 7:30 this evening Mick retreated to sit outside under the clubhouse canopy whilst I took over the dinette table. It was time to do my Final model presentation to Producers, the Writer, Production Manager and Technical Manager. To get a reasonable view of the model it was set up on a couple of shoe boxes and moved to about 14 inches away from the laptop, I had to perch on a radiator as I showed everyone through the model. Another good meeting, half a days work to do tomorrow and then we can be off! HOORAY!!!!
0 locks, 55ft reversed, 2 trains, 2 tubes, 1 shower, 5 thumbs up, 2 mended locks, 1 full tank of water, 1 chimney swept, 1 confused cat, 4 faces almost in my model box, 1 very BIG thank you to Ken for the lifts today.
2am, thunder and lightening woke us all. The windows needed closing as the rain hammered down on Oleanna. As we tried to get back to sleep I wondered if our next problem would be too much water!
Monday mornings is when people are about again at the cruising club. Mick went to chat with Fred and get another £3 worth of electric, our hope is that we won’t still be here next Saturday.
What a lovely mooring this is. Now that all the masses of woofers have gone elsewhere Tilly comes and goes to the shed as she likes, the friendly cover towards the marina entrance from the river has also kept her busy today. It’s quiet, no passing foot fall. The benches are nice to sit out at for lunch, very pleasant.
I got on with the final things before my meeting tomorrow. Colemans’s in town could scan my plans so after finding out who would be running the country and having lunch I walked in. It was a surprisingly well stocked stationers, due to the close proximity to Oundle School which seems to surround that part of town.
I had a little wander about before heading back to the boat.
By the end of the day, my model was packed up ready for tomorrow. Drawings scanned and copied. A new storyboard and photos of model pieces in the dropbox folder. Time to enjoy a Monday night roast. Well that was the plan until I got the chicken out of the fridge and it smelt decidedly odd! Mick was sent into town to Tescos for a fresher bird.
0 locks, 0 miles, 73 lightening flashes, £3 more, 24 copies, 12 scans, 1 dropbox filled, 1 model packed and ready to go, 1 chicken in the bin, 1 chicken in our tummies.
The club didn’t stay open that late last night, the only customers were those stranded by the lock closures, so one family from NB Shadow, us and the volunteers who were running it. At some point during the day the volunteers left on their boat with all their woofers, they must moor elsewhere. This meant Tilly had the place almost to herself, taking up watching duty under the shed behind the clubhouse.
The final push for me with finishing touches to the panto model today. The new improved Panto Piccadilly Circus was painted and broken down to make it look a little bit old and worn. Then an hour taking photos of every scene to do a storyboard. A few little jobs to do tomorrow, then fingers crossed that it all gets the thumbs up from the Director and I can have a few weeks that aren’t dominated by panto before I start painting it all full size.
We had lunch sat out on the nearest bench and then Mick spent sometime with Christmas lights. Checking to see if they worked and how many we have. Ken and Sue have kindly lent us their lights that they used on NB Cleddau for the Bedford River Festival. A couple of lengths, one of which is 100 meters long, but sadly Mick couldn’t get them to work. It looks like we’ll have to buy some more.
Why check the fairy lights in September? Why so many? Well you’ll have to wait a little bit longer before I tell you.
This evening we treated ourselves to an Indian Takeaway. It had been planned for last night, but we’d sat out boozing with Ken and Sue until it was too late for Mick to collect one by bike, lack of lights. We got our food from Curry Passion which is close to Waitrose and a ten minute bike ride away. The Lamb Rogan Josh came out on top, followed by the Aloo Paneer, the rear brought up by Chicken Tikka Masala which was mediocre. By no means the worst Indian we’ve had, but not in the top ranking. On the plus side we do have enough rice left over for stir fried rice in the next couple of days.
0 locks, 0 miles, 1 model finished, 1 box to tart up, 1 storyboard to collate, 800 bulbs, 400ish not working, 1 very interesting shed, 1 woofer left, 1 bike delivery, 1 button to press.
Peartree Farm FOTRN mooring to Oundle Cruising Club
Just gone 9:30 it was push back time, the covers were rolled up and mooring spikes soon to be released from the hard ground. The chap who’d been cutting grass yesterday came for a chat. He and his wife arrive on a Friday evening about once a month and over the weekend he strims and trims the grass to keep the mooring looking nice. We chatted all things FOTRN, how rubbish some boaters literally were and how much we certainly appreciated all that the volunteers do with the moorings.
Then we were off backing our way the short distance to the junction with the river, we winded and headed off downstream. Soon followed by NB Sakuma (?) who reversed to the junction and winded to follow us, we’d be sharing the locks back to Oundle today.
Mick soon spotted that we’d got a stow away! A large caterpillar was crawling along our pram hood. I popped it into a tub so that we could release it on dry land at the water point at Wadenhoe. I think it was a Buff Tip Caterpillar at about 70mm long, this will turn into a moth that has fantastic camouflage looking like a twig of a birch tree.
This stretch of river was certainly popular this morning. We counted nine ladies swimming in batches of three, another about to set off from by the Kings Head, throw in a couple of canoes for good measure, it was busy. Fortunately the water point wasn’t so busy, in fact the pub moorings this morning were empty apart from one cruiser. We pulled in and topped up on water and released our stow away into a hedge.
Our locking partners soon arrived and once we were full we swapped with them, we headed for the lock landing to wait. Here the hedgerow was filled with sloes and blackberries. Two tuperwares came out and we started picking. Not being fans of gin the sloes were left for someone else. I know I could make something else with them, but they’d only go to waste as I haven’t the time. A Kingfisher kept an eye on how many we were picking, we did leave plenty for the birds.
An engine could be heard from below. The lock was in our favour, but we were waiting for the other boat. I went to see if I could assist the boat and explain the delay in coming through the lock. Below was Chop Wales on NB Freya, we’d moored alongside each other at Ferry Meadows a couple of weeks ago. He was quite happy to wait as he was going to do a bit of pruning to the willows at the end of the lock landing below.
Chop by name, Chop by nature he got out his big choppers and from the stern of his boat he lopped away at the tree which was making the lock landing hard to reach. As we came out of the lock we chatted with him. He’ll be waiting in the queue for Islip Lock to reopen too, so we’ll see him again. He informed us that he’d been at Oundle Cruising club last night, we already knew this as we had spies keeping an eye out for vacant spots there. If no-one grabbed the space Chop had just left we’d have a mooring for a few days.
Down through Lilford Lock and then Upper Barnwell Lock, each boat taking it in turns to set the lock and work it. We glanced in to Lilford Marina, the pooh sucky machine backed to a pontoon. Today Saturday is the only day when you can get a pump out on this stretch of the river, no sign of NB Otter, maybe they’d already had their tank emptied.
Below Upper Barnwell Lock we wished our locking partners farewell, they were carrying on further downstream today. We nudged under the low bridge and there was NB Otter, NB Shadow and an Oleanna sized gap that Chop Wales had left this morning. We had a mooring!
A very warm welcome greeted us, credit put onto a hook up for our use. We had to daisy chain a couple of leads together to reach, and only just, picnic benches moved to cover any possible trip hazards.
With there being some friendly cover about Tilly was allowed some shore leave, but warned that there were a lot of woofers about. This kept her on her toes about the place, at least 7 woofers about.
Mick bobbed into town for a Saturday newspaper and bumped into Ken and Sue, an invite was issued for them to join us for an evening drink at ‘our club’.
I did some work, amending the adverts in Piccadilly Circus and trimming things down to be neat. Then at 6pm we headed to the club house for drinks. A couple of hours of convivial conversation, the temperature dropped, it was getting dark and we all needed some food to help soak up the wine and beer. We headed back to our respective boats, sadly it was too dark for Mick to head into town for a takeaway so we made do with a pasta salad. Another very pleasant evening with the Cleddau crew.
3 locks, 4.47 miles, 1 full water tank, 67 blackberries, 1 big chopper, 10 swimmers, 4 longhaired Dachshunds, 3 Jack Russells, 6 glasses wine, 2 Bombardiers.
Job 1. Encourage the cat to use shore based facilities. Failed!
Job 2. Eat breakfast. Yum.
Job 3. Do a colour call for panto paints. Tick
This takes quite a bit of time, working out which colours are needed, then reducing them to an affordable quantity. I’ll also need to check what there already is at the theatre.
Looking through my old Flints Hire and Supply catalogue I came across an entry for Owatrol. Life changing experience apparently. I tend to use a bit of it in with paint when touching up Oleanna, but never used it on a theatre set. I’m not sure I’m going to get time to repaint the gunnels before going of to panto. Then there’s the grab rail too!
Job 4. Try to spruce up the model box. Partly achieved.
A length of wood was glued to the inside of the proscenium arch, but I’m not sure the glue is suitable for sticking wood to foam cor. We’ll see tomorrow when the tape is removed.
Job 5. Tack glue the floor into the model box. Tick.
Small blobs of glue used to hold the floor in position, stop the edges from curling up, so that it looks good. But so that it is also easily removable for when I come to paint the floor. Encouraging the glue to stick required clearing some of the galley work top and using Hemsley and Hemsley along with the River Cottage GF recipe book and the largest jar of bay leaves in the world to weight it down. Thank you Frank.
Job 6. Other small painting jobs. Tick.
Job 7. Sort out when to show the model to everyone else and be included in a budget meeting. Half Tick.
Job 8. Everything else. That can wait for tomorrow.
Boats have come today. Boats have left.
The grass has been cut, edges stimmed.
Fires lit, conversations had.
0 locks, 0 miles, 4 arrivals, 1 departure, 1 more woofer, 2 jobs left to do, 1 model so nearly there, 3 days since I last stepped of the boat!