Category Archives: Huddersfield Narrow Canal

Going For Gold! 27th to 29th December

Betwixmas Breakfast

A bit of a tradition for us (when in Scarborough with a car) is to visit Thornton-le-Dale to see the Christmas lights. In days gone by we used to drive back from my Dad’s in York via one of the scenic routes so that we could see them.

Thornton-le-Dale

They are not a huge spectacle like Regents Street and pretty much remain the same year in year out but they are still very pretty to us. Multi-coloured festoons swag up the street and along Thornton Beck, which runs along side Maltongate. I especially like the group of swans, one all puffed up and head down.

Whilst in the village we also popped along to have a look at the old cars at Mathewsons Auctions, made famous in Bangers and Cash. The showroom is now full of merchandise and the cars out of the forecourt weren’t anything special. We did however bump into Derek Mathewson, as well as running the vintage garage and museum Derek owns The Moorcock Inn, Langdale End where Mick used to drink. The next vintage car auction is in February and there are several very pretty cars going under the hammer LINK

We then headed back to the coast to see more lights. Scarborough Harbour for the last year or so has put on a display of it’s own. The boats bobbing on the low turning tide are festooned with lights up their masts and rigging.

The wonderful Lighthouse

There were plenty of people out taking photos despite the chilly breeze. Centre stage is the lighthouse, one of my favourite buildings. Big pea bulbs decorate the building which glows in the dark. Wonderful.

Christmas Cheese selection, Smoked Brie, Harrogate Blue, Kit Calvert Wensleydale and Keens Traditional Cheddar

Last week we’d been considering moving Oleanna to Huddersfield, making use of the break in the winter maintenance over Christmas and the New Year, so that I could have her to stay on whilst working for Dark Horse. We are now quite glad that we didn’t set out on the trip as with all the recent rainfall the flood locks on the Aire and Calder have been shut, Doncaster lock (not that we’d have been going that way) is closed due to high water and the Don Doors are closed protecting the New Junction Canal from rising waters on the River Don. Oleanna can stay put and I’ll stay in a hotel instead.

Janet, what a fab costume. Photo Tony Bartholomew

The last couple of evenings we’ve been to the theatre whilst sitting on our sofa. We had booked tickets to see Jack and the Beanstalk at the SJT, but sadly the night we were going coincided with some of the company having positive covid tests. Instead we decided to watch the show from home. Adapted by Nick Lane we knew we’d be in for a silly time and it was designed by Helen Coyston (costume designer for panto at Chippy). We really enjoyed it especially Janet and The Paella of love, from heaven above.

The Railway Children, Hull Truck

Last night we sat down to watch Hull Truck’s production of The Railway Children. This was originally filmed for a live stream so it included 15 minutes of nothing before it actually started, a full interval break and no credits which we thought was a big shame. The show has been getting great reviews, although we really enjoyed it I think quite a lot was lost in the filming. Well live theatre is magical and not being in the room with an audience let it down somewhat. The camera angles at times, although capturing the full set meant that the actors were smaller than they would have been even if we’d sat on the back row of the theatre. Have to say I felt a little bit short changed even if Sian Thomas’s costumes were lovely.

Tilly preferred Paddington 2

Back to the title of the blog. Going for Gold!

This isn’t that I’ve beaten Tim Larmour to the top of a mountain (Fulford School joke) therefore depriving him of Gold! No we actually got round to making a decision, we’ve bought Oleanna a Gold license for the coming year. Mick had looked on line, found where to buy a Gold License on the C&RT site but not where you could apply for a refund on a standard license.

They’re not as fancy as they used to be. Just a black G not a gold one!

Our license ran till the end of May, but a Gold License runs from January to the end of December, so to make the most of it we needed to trade in our old license this month to get a maximum refund. Mick rang C&RT and was assisted by a very helpful lady. Within minutes we had an email confirming our purchase, then a little while later another saying that they had refunded us £300 plus from our old license. Really easy.

For those readers who don’t know what the difference is. The Environment Agency is the navigation authority for the River Thames, Anglian Waterways plus a few more. With a standard C&RT license you need to pay for a visitors license to cruise EA waters. We’ve done this several times on the Thames. A Gold license however means you are covered for both C&RT and Environment Agency waters, it costs around about £300 more than our previous license but now we can come and go as we like onto the Thames or on the River Nene.

Will it be the Thames again?

Our cruising plans for next year are still dependant on a few things, but we thought it best to invest in a Gold license now as they only run from January to December and we could get a refund for what remained of our existing one.

Who knows we may spend a couple of months exploring the Thames in greater detail than we did a few years ago along with other rivers in the south. Or we may head eastwards to the Nene, Great Ouse etc. Time and commitments will tell.

Red napkins in a hot wash, Paddington!

0 locks, 0 miles, 2 Christmas shows, 2 Christmas lights, 3 red napkins, 4 pink t-towels,1 painting, 1 of several rivers closed due to flooding, £338.04 refund, 1 Gold license, access all areas, 1 cat licensed to kill!

Green Mystery 12th October

Aspley Basin

Today was a day off boating.

A mini view of Huddersfield

This morning I packed up my model for #unit21 and walked up to Queen Street in town to the offices of Dark Horse for a production meeting. The show doesn’t happen for another four months but there was much to discuss.

The budget was the main thing. Next February will be a showing of the show, six scenes to wet the appetite for funders, possible tour venues. The original brief I’d been given was that the set and costumes should have full production values. Normally this would be a tight squeeze on their budget, but right now I was needing more than a shoe horn and magic fairy dust to sprinkle on everything to try to keep the costs down, materials have rocketed in price. When I’d last talked to Amy the director I’d planted some seeds, thankfully they had started to take root.

Just to check

With Penny the Lighting Designer/digital editor joining us via zoom we had a very productive meeting fuelled by gf Chocolate Hobnobs. Lynda was recovering from the cold that is doing the rounds, I kept my distance and hope that she’s past the stage of passing it on as I’ve got five weeks of hard work coming up.

Several things had arrived for me, UV fabric paint, which I need to try out on off cuts of costume. A very large box which contained two 1inch brushes that I’ve treated myself to for panto. I just needed to walk to B&Q now to pick up some neon green paint for the set, then after doing a couple of samples I can forget about the show for a while.

The Lawrence Batley Theatre

Meanwhile back on board, Mick topped up the diesel tank, our stern being moored right next to the pump it made sense. Topped up to the top. There is a small chandlers here where he managed to get a few more poppers for our cratch cover as spares. £10 a night including electric was paid so that we’d be ready to go in the morning. The washing machine has been working hard.

Then it was time for him to climb back into the engine bay. A service was needed, but first it was time to trace and reconnect all the wires that had got chewed up when the belt went.

Red, a voltage sensitive relay, which provided power from the ignition to the bow thruster battery.

Dark Horse Rehearsal space

Orange, the engine temperature gauge.

Green. Green! What is the green one for? There had been a length of green cable wrapped round the pulley that Mick had dug out, but what had it been connecting? And to what? He’s had no luck finding any other green cabling in the engine bay. So far it can’t have been anything critical, but it would be nice to know what it was.

Next followed the oil change. One less job to do today was changing the alternator fan belt! Just after Mick had pumped all the old oil out I got a message from Kim on NB Idleness saying they were about to come down Lock 3 and Lock 1 was going to be unlocked for them.

Tucked in next to each other

We would be breasting up with Yan and Kim and because of their old dog we’d suggested that we should pull out to let them have the bank side mooring to help with his arthritic legs. Of course shortly before they arrived another boat pulled up onto the water point opposite and when they were just pushing off NB Idleness was just pulling through the bridge slowly. Instead of a two way do-si-do it was to be a three way one. Idleness through first, then the blue boat into the bridge hole (pausing to remove their bikes), we pulled out, Idleness pulled in and we tied up on the outside, job done.

Paints and new lovely brushes

I walked the mile to B&Q a very large one on Leeds Road. Mick had also made a request for a new fuse for the bowthruster. So that was another 0.75 of a mile to Halfords for one, then back to the boat via Sainsburys picking up a bag of cat litter and some pizzas for tonight. The rest of the shopping we did on line to collect in the morning before we pushed off. So despite doing no locks today I still walked 5 miles, but I have pretty things to show for it.

0 locks, 0 miles, 5 miles walked, 1 meeting, 2 alterations, 1 budget to be fine tuned, 2 wires reconnected, 1 green mystery, 9 litres oil, 1 filter, 1 fuse, 1 bow thruster able to charge again, 3 boat do-ci-do, 1 full tank of diesel, 2 pots UV, 2 pots Neon, 2 x 1″brushes, 1 key to be left, 1 producer, 2 pizzas.

Charging Down.11th October

Lock 9E to Aspley Basin, Huddersfield

Last nights mooring, not so rural

Mick wanted another go in the engine bay this morning to see if he could free what remained of the cable around the pulley on the alternator. I in the mean time sat down to hand write the post you read yesterday so as not to forget things. I’ve discovered that hand writing is actually a touch quicker than tapping the words out on a keyboard, I tend not to re-read everything several times. If only the words would now leap onto the computer for me, I’m going to try dictating them into Word when we have power restored and see how that goes.

Hand written

Mick beavered away at the back. First the remaining cable was prised out from the pulley, Hooray!!! Then he fitted the new belt to the alternator. On Saturday morning he’d been a touch cautious about this, RCR could have done it if the cable hadn’t been a problem. But having spent quite a bit of time up close with the beating heart of Oleanna over the last couple of days he felt that he was more than capable. By 11 am the engine was started, things checked over in the engine bay. Inverter was turned on along with the fridge, everything sprang back into life. We had POWER again!

POWER!!!!

With plenty of time to make it down to Lock 1E for 3pm it had been a morning well spent. Once the batteries had had a little boost the dish washer was turned on, now very full. The covers were rolled back and I set off to walk most of the rest of the way down into Huddersfield.

The character of the Huddersfield Narrow Canal now changes, far less leafy, more old mills, roads and the railway. Industry the reason for the canal existing in the first place. Businesses were proud of themselves when mills and factories were built, carving their names in stone, building their names into the brickwork, established dates forever.

At 8E there was at last a walkway over the top gates. I soon worked out that this was because there was no other way to get to the offside, despite there being a bridge just below the lock there was no means of getting to the gate that side. Time to walk round the lock the other way time and time again. The beams overhang the bridge below, the beams having been shaped round it. This does mean that the final push closed of the gates can be done from the road, saving one trip all the way round the lock, no walkway to jump from one gate to the other here on the Narrow.

A boat! I was so surprised I didn’t manage to get it in focus!

Between 6E and 5E the level was down, was this to be the start of our water worries? I walked on ahead, safer that way so as not to have to launch oneself off the boat if you can’t get into the side. Up ahead I could see a boat coming towards us, they must have come up 1E at 9am. They loitered for Mick to come through a bridge and there was time to chat. The level between 1 and 2 had been very low, they’d only just made it. I warned them about Lock 1W and how much of a b**rd it was.

NB Bridge Street was one of the boats we saw a lot of in Nantwich last year during lockdown 1. We also saw them somewhere near Fradley earlier this year. I said they’d recognise the boat when they passed. They did and asked Mick how Tilly was.

Just a touch low

The bywash certainly wasn’t flowing at lock 5E, the lock needed just a touch more water to level out, a C&RT key was required for the locks on the paddles, that of course was onboard.

Towering over Oleanna

Down under the very tall viaduct which helps connect Huddersfield to Sheffield, the trains too high up to get in a picture as they cross.

Gong along the old tunnel

Down 4E and then the long narrow channel past new University buildings. The position of Lock 3E has been moved twice. Factories had been built upstream of the lock and Lock 2E after the canal had been abandoned, they were built on the line of the canal and thus blocked it. The solution was to relocate the lock upstream of the factories and have a tunnel built under the factory. Eleven years later Sellers Engineering relocated to a new site, enabling Lock 3E to move a second time, nearer to the original Lock 3E. The section that had been the tunnel was now brought to the surface and is the narrow channel leading to the new lock. Link

Dropping down 3E you have to get back on your boat as there is no land access to Lock 2E. This is where we met NB Jubilee six years ago. They were just arriving at the empty Lock 2E and it was in their favour. We pulled in on the lock landing awaiting our turn. As the lock filled and NB Jubilee rose the rapid level drop above the lock caused Lillian to go on such an alarming list we dropped the paddles very quickly!

Today we had no problem as no-one was coming up the lock. We dropped down, Mick picking me up again and headed on down to Lock 1E through another tunnel and the old Lock 2E. I remembered Frank and myself having to go to the front of Lillian to help raise the stern on this pound, it also made it easier to get off the bow as the stern would not get into the side.

A touch low towards Lock 1E

Today the pound looked a touch low so I replicated what I’d done six years earlier, hopping off the bow to tie Oleanna up. Lunch was had at a jaunty angle whilst we waited for 3pm and the chaps from C&RT to come and open the lock for us.

As close to the side as we could manage

Discussions on various forums have been that the University alongside the canal here was able to use water from the canal to cool things, the warm water then being put into the river, thus explaining why the pound above Lock 1E is quite often so low. Mick spotted someone wearing blue outside so popped out to see if it was C&RT. It wasn’t, but was a chap who knew about the water at the University. No water is taken from the canal, there wouldn’t be enough for their needs in that pound as the level is always so low!

At just gone 3pm a van arrived with two C&RT employees. One chap told Mick how to move Oleanna into the centre of the canal, he knew everything, apart from how our boat reacted. Mick however did get Oleanna lined up with her bow close to the top gates so that the lock could be filled. Then he nudged backwards so we could open the gates and bring her into her last lock of the Huddersfield Narrow Canal. Another tick off the list of waterways for Oleanna.

We’d started at Bridge 111 and Lock 1W, we were now coming off the Narrow at Lock 1E and Bridge 18! The bridge numbers continue onto the Huddersfield Broad Canal to where it meets the Calder and Hebble. Under Wakefield Road Bridge, slowly, we popped out at Aspley Basin.

A familiar place

First thing was to top up on water, dispose of rubbish at the C&RT services. Then we pushed over to the diesel point at the marina to wait for the chap who would be with us after 4pm. When he arrived we were given the option to stay on the diesel point and be able to plug in or move up to where there would be no hook up, but it would be free for 72 hours, there after it would be £8 a night. We wanted to be plugged in so as to make use of the washing machine and at £10 a night including power we could run the machine as much as wanted and gorge ourselves with light, charging everything within sight.

The lights of Huddersfield

To celebrate our arrival and power being restored, we headed over to the okay Aspley Table Table for some reasonably priced food. If I hadn’t just spent the last three days walking all the way down from Marsden, then we’d have headed into town to the Chilli Lounge for a curry, but my legs really didn’t want to do any more steps.

8 locks, 83ft 6″ descended, 2.54 miles, 1 last tuft of wire, 1 belt, 1 alternator working again, 1 boat with POWER! 1 jaunty lunch break, £10 incl, 3 loads washing, 2 loads dishwasher, 1 gammon, 1 chicken breast, 0.5 rack of pork ribs, 2 glasses of wine, 1 narrow canal completed and I got to work every lock this time, well apart from the guillotine bit! 0 shore leave!

https://goo.gl/maps/nNvmeo8VP8LCw4LL8

Rangerless. 10th October

Lock 31E to Lock 8E

Beautiful

What a beautiful mooring, even if we were on a list and in a winding hole. We woke up this morning quite late considering we’d gone to bed early last night. After a cuppa in bed Mick pulled us forward onto the lock landing to take advantage of the morning sunshine hitting our solar panels.

Lovely, who needs electric!

This morning the battery bank was down to 34% so any solar we could gain today would help this evening, thank goodness for Lithium. We do have lots of night lights, but we’re too old for candle lit dinners!

Out comes some more

After breakfast, sausage sarnies to help use up the defrosting freezer, Mick decided to have a go at removing more of the cable from the alternator pulley with the aid of a hacksaw. He allowed himself fifteen minutes and came back with a handful of copper wire. There is still more around the pulley!

Time to get moving, think it was about 10:30, hard to know exactly with no trip computer to refer to. We hoped to make up for yesterday and get a good distance in towards Huddersfield and a good number of locks lower. Richard yesterday said he’d send round a message to other volunteers to see if anyone could help, but sadly we’d not heard from anyone, we’d be on our own.

The sun made the day another stunner. Bright blue skies, views just about everywhere you looked. There were plenty of people out for a walk, some sauntering, others far more serious about it. I was out for a walk to get locks filled ahead and then back to let Oleanna free from the locks above. This of course means walking three times the distance. I kept this up going through the closer locks but stopped when they became a touch too far apart, I was going to walk far enough as it was!

Look at that blue!

The bywashes were flowing yet we still managed to have one low pound. Between 28E and 27E there is a line of moorings, the paddles on the lock above have stops on them so you can’t flood the pound below. Mick wound the off side paddle up as I walked back from below, then I lifted the other. When it came to lowering the paddles again this proved almost impossible on the off side, as there wasn’t enough space for me to be able to lift the mechanism to release it from the pawl. I tried everything including hitting it with my windlass, in the end I somehow managed to get it moved and lower the paddle.

Shhh sneeking past

We’d been warned of a vocal local moored above Lock 26E. I’d already set the lock for us in advance so hoped we wouldn’t get abuse. Anyhow I was hoping to cut him off with what a glorious day it was before he got started. His genny was running and washing hung around the trees. Mick brought Oleanna into the lock, lining her up meant being very close to shouty mans boat. But we did okay and didn’t hear a bean from him, I was slightly disappointed!

Shuttle Lock 24E is a guillotine lock, the top gates are operated as normal but the bottom one has a large metal rising door. Within this is a fairly standard paddle, wound by a windlass. The guillotine gate is also windlass operated, the spindle kept safe from nare do wells by a cover opened with a handcuff key. Six years ago the lock was operated by C&RT as there were safety issues with it. Today try as I might I just couldn’t get the handcuff key to open the cover, it had been over tightened. Mick and I swapped over, in the end the mallet was called for to get it shifted.

Mick worked the lock and I descended into the dark chilly lock with numerous gongoozlers peering down at me. The guillotine raised and below I could see a pipe across the top of the opening at an angle restricting the height somewhat. Our fresh bucket from the toilet only just fitted below it.

The pound below seemed slow going to me and sadly there was nowhere for us to pull in by The Handmade Bakery, a must if you visit Slawit. I got to walk back to lock the guillotine, but had no mask or money to buy Mick a lovely loaf of bread and wish I still could eat their wares, they used to do homemade baked beans on toast!

We still waved

At Darmouth Lock we missed the jolly waves from Pete’s (Mikron Producer) Mum and Dad who used to live there, earlier this year they moved away. So all we got today was the silhouette of someone sat at a computer screen.

Now in a new channel the canal is low and very narrow, thankfully our bucket fitted here too. Below Pickle Lock 22E there was the Hippie Boat, they were busy and we’d only stopped for a quick lunch, szechuan pork on toast another defrosting thing eaten up. Salmon came out for our evening meal, not much worth saving now.

At 21E Waterside Lock there is a local celebrity, Tinker. Tinker has taken a fancy to sitting around the lock, C&RT have put up signs saying he lives nearby so not to worry, he’s not lost. I thought Tilly could spare a couple of her Dreamies. Well blow me down, Tinker is the first cat I’ve ever met who turned his nose up at them! Well I hadn’t come home had I, I was still out!

Blackberries past their best now

The narrow channel beyond reminded me of last time, Frank had joined us to help crew and he’d spotted the bank of Blackberries, he and Mick became mountain goats collecting that nights pudding whilst I stood at the next lock all wrong handed.

I gained two very keen crew a few locks on, they both demanded to help with the gates, then ran down to tell their Dad all about it. The next lock I then had six extra crew, their brothers and sisters and Dad now helping. I hardly had to lift a finger. A close eye was needed to keep everyone safe, Mum and the youngest stood and watched. I asked how it was at home with eight of them. She asked if she could run away with us and pleaded with me to take her with us.

Titanic Mill

The big Titanic Mill built in 1911 has been converted into 130 apartments and sits proudly at the bottom of the valley. What a lovely place it would be to moor with such a great view, but I seem to remember it being shallow, we still had quite a way to go

.

Narrow locks, both paddles up to fill locks, overhanging stones locks through Linthwaite.

The pumps have stopped pumping from the river to the canal, the levels are too low

Did you know that in 1931, Bank Bottom Mill in Marsden set a record of 2 hours 10 minutes for making a suit of clothes, direct from sheep to wearer? The cloth industry was big round here.

Dappled sunlight

Back into the woods, my step counter clicking away. There is one pound longer than the others on the eastern side, I could have got a lift, but I’d walked all the way from Marsden so I might as well carry on. This did mean I got to walk over Golcar Aqueduct and see the horseshoe falls on the River Colne.

Horseshoe falls at Golcar

The final three locks of the day, I was pooped and found bottom paddles left up and gates open, not a welcome sight. But they were soon sorted and we were on our way down. Last time empty pounds had held us up here, today the levels were good.

Nearly there

Last lock of the day Isis Lock 9E, one of the locks on the network with poetry on it’s beams.

We pulled in onto the bollards below, almost into the side. This would do us for the day. The sun had boosted our batteries to 49%, so phones could be charged again. Laptop still off and showers on hold until things improved again.

9E last of the day

Salmon pasta and wine tonight, Mick is now 3/4 of the way through the book on the Standedge Tunnels, the most of a book he’s read in years! I wanted to do some crochet, but with Tilly sat on my knee a large blanket would have been too warm for us both.

https://goo.gl/maps/K4WoHm3n8TGpZwAy7

22 locks, 229ft 10″ descended, 4.3 miles (?), 9+ miles walked, 1 more handful of freed wire, 0 rangers, 1 constant stream of walkers, 2nd blog handwritten, 1 more stunning day on the HNC, 1 guillotine, 1 Hippie Boat, 1 Tinker, 3 wasted Dreamies! 2 aching knees, 1 aching back, 1 big sense of achievement, only 8 more locks to go.

Leaks Big Leaks, Leeds Liverpool Breach 2, 14th October

Over the last few days there has been plenty going on at the Leeds Liverpool Canal breach. A dam has been put across one bridge hole and I think stop planks have gone in on the other side of the breach. There is a lot of footage available on Youtube. Here’s a link to some drone footage.

A group of lads also went down to where the dam has been put in. Their theory, before they got there, was that the water was going down into a disused coal mine. Bare with the swearing, they get quite a bit of information about the collapsed wooden culvert that has caused the breach. They then go to explore the breach site and below it. I do not condone their actions, but it is quite interesting to see below the canal.

Several boats have been affected including NB Mr Blue Sky, the boat we shared locks into Manchester with a couple of years ago. I so hope the boat is safe along with others that have been caught up. Sections of the canal are now getting water back in them and boats are being re-floated. Other sections will take a while longer as water needs to be pumped round the breach site to reach them. is now cut off. Refloating those boats will take longer.

The Leeds Liverpool isn’t the only canal with problems.

Down on the Grand Union Canal the levels dropped between Copper Mill Lock and Cowley, a C&RT notice was put out yesterday with an emergency navigation restriction. On Tuesday night Widewater and Denham Deep Locks were closed due to low water levels. Several boats have sunk because of this in the marina there.

15W ten days ago

Then on the Huddersfield Narrow Canal yesterday a significant leak had been discovered between locks 14W and 15W, where we had been moored last Tuesday. Today a method of repair has been established and repair works will happen over the weekend.

On this side of the Narrow someone has left a paddle up at Lock 14E. This doesn’t sound too bad, half emptying a the pound above. The eastern side of the Huddersfield Narrow has limited water resources and the refilling of this pound will have a knock effect to the lower end of the canal.

Not a good time on the canals at the moment.

Going Down Hill! 9th October

Marsden to Lock 31 via Lock 40/39

The alarm was set to make sure we were up and about in time for the arrival of our CRT Ranger this morning. Richard arrived just before 9 with his wife, sorry we didn’t get your name, she’d come for the walk up and down the locks. Today we’d start our descent from the highest pound on the network.

Leaving the highest point

Richard set the top lock, and we all had a brief chat about how to work the locks. Basically to save as much water as possible the lock below should be set to fill before the one above emptied. This is what we tend to do on a flight anyway.

Filling up with a view

Mick and I had both imagined that either Richard or I would walk ahead lifting paddles on the lower lock and opening them up. However it didn’t quite start off that way. After lifting paddles I was sent down to open the gates on the next lock. But at that lock both bottom paddles were up, the pound below looking like it needed a refill. I lifted a top paddle to aid the refill, quite a lot of water was already going round the bywash. But how long should I leave it for? I tried phoning back uphill, ‘Yep close it and fill it’.

The pound looked to be improved but was still shallow. As we dropped the next lock Kim arrived walking their dog, could I let her know of any problems down the flight when they come to it on Monday, the next pound was an obvious one!

Richard running back to let more water down

Mick brought Oleanna across the low pound, when he reached lock 40 the depth simply wasn’t enough to get Oleanna over the cill. Richard ran back to let water down and Mick put Oleanna into reverse to get her away from the cill and aid the level in the lock to rise.

Just floating back in

As Oleanna reversed there was a sudden screaming coming from the engine bay. A fan belt had gone! Mick lifted the engine board, Yep a belt had gone and taken some cabling with it. The influx of water from above was pushing Oleanna now into the lock, Richards wife and I took the centrelines and pulled her into the lock.

Both centre lines

We dropped the lock keeping an eye on her position. Mick checked below, he felt he could start the engine and run it for a short time. This next pound looked to be a better level and we managed to get Oleanna into the side, just putting spikes in was a problem but we got there in the end.

Time to investigate

Mick inspected the engine bay further. The Domestic alternator belt had gone and as it did so it had taken out quite a lot of cables. We have spare belts and in fact at the next service Mick was going to change them. A call to RCR was made to see if they could help. It took a while before they rang back suggesting it might be 3 or 4 this afternoon before someone could get to us.

Dates inside the locks

This wasn’t going to be a quick fix, so we thanked Richard and his wife for their help, he gave us his notes on the locks, so we’d know where we might have problems. Richard is normally a ranger for the Broad Canal, he very kindly offered to return should we get moving again, or maybe be able to help us tomorrow.

Off to enjoy the Jazz

Our mooring was okay for Tilly to go out and we got to hear several of the stages placed around Marsden for the Jazz Festival taking place this weekend. I dropped in to say hello on the Geraghty zoom as I couldn’t be much help in the engine bay or hunting for friends.

Ends of cables

Mick got down in the engine bay to clear the wires. Orange, Red and Green has been severed, but what did they all do? That didn’t matter really as one of the cables had managed to wrap itself around the alternator in such a way that he couldn’t get it off.

That lot shouldn’t be there!

Time for lunch, well that’s what Tilly thought as she returned on board with a friend. She and her friend were very quickly lifted back outside where she and I discovered that her friend had been playing dead, it scurried off ending up in our well deck! I hunted round for it, Tilly did too with her head down between the boat and the bank, right in the crush zone. After she was put inside I found the mouse which ended up running back the way it had come. This could mean it was either back on the bank, in the canal or in the starboard side locker, possibly having gone down the vent pipe to get cosy around the water tank. Here’s hoping it wasn’t the latter.

Ooo dear!

Kim and Yan came to see if they could help, then the chap from RCR arrived, a local mechanic from the other side of the tunnel. Mick and he descended into the engine bay. Phone calls were made, discussions had, it wasn’t sounding good.

In the end the chap couldn’t help, the alternator would need to be removed then the pulley as the cable had got itself round and under it. This needed a puller to remove it which the chap didn’t have. The good news was that we could move just our domestic batteries wouldn’t charge without the belt. The engineer suggested getting to Aspley Basin where assistance should be easier to get. Because we were able to move we wouldn’t be covered by our RCR membership. If there was a mooring available in Huddersfield we’d at least be able to plug in and charge the batteries.

On the move again

The boat was put into serious energy conservation. The freezer was turned off. Hopefully the contents, which I’d been depleting anyway, would last us a couple of days as they defrosted. All sockets were switched off, leaving just the one USB socket powered from the batteries so that we could charge our phones. Phones would only be used for essential use and the laptop would remain off unless needed for work.

We decided to move down 8 locks to get closer to Huddersfield today. There wouldn’t be enough daylight left to reach Slaithwaite but hopefully we’d be able to pull in above Lock 31.

We worked our way down the pretty flight, plenty of walkers making comments. The lock below was filling before we emptied the one above, well apart from at 33 where I wound a paddle up and was on my way back quickly, quite a long walk, to let Oleanna out of 34. When we returned 33 was still empty. Grrr! I’d found a none working hydraulic paddle and had walked tall that way three times for nothing!

Sparth Reservoir

Wild swimmers were getting ready for a dip in Sparth Reservoir above the canal, below the canal the other reservoir sat empty, the mud drying out well.

We tried pulling in near another boat but only got stuck on a submerged object almost mid channel. Onwards we continued ending up where we’d had lunch six years ago. Normally we’d not moor in a winding hole, but here the only downhill boat would be NB Idleness and they wouldn’t be coming for a couple of days, uphill boats were unlikely as there were no tunnel passages until Monday, we doubted we’d see another moving boat, if we were in anyone’s way we’d happily move.

Very picturesque

Tilly was given an hour and a half which she took once there was a big enough gap between walkers and woofers to dash to the nearby trees and friendly cover. Inside the fridge was now turned off, we’d rather survive with the water pump working and light than have chilled milk and wine!

Come on Woofers! Don’t you know the clock is ticking!

Tonight we had sticky American Chicken cooked on the hob and stove top, followed by melting Soleros from the freezer, spoons were required. Some sausages were brought out to finish defrosting for a sarnie in the morning.

Couldn’t see chilled medication go to waste

I darned a hole in one of Mick’s jumpers, he read Trevor’s book on the tunnels and we were ready for bed by 10pm, no news for us tonight. Hopefully tomorrow will be sunny to get us as close to Huddersfield as we can. Sadly Richard can’t help, he sent out messages to other volunteers, but nobody has been back in touch. So it looks like we’ll be on our own, 22 locks shouldn’t be too much of a problem, should it?

Hopefully the solar will give us enough reserves for light and water for another day.

Have to say it’s a very beautiful spot to be moored in, which we’d have missed on our original schedule.

11 locks, 1 and a bit miles, 1 trip computer switched off, 1 very helpful Richard, -1 belt, 3 cables, 1 unknown green one, 44% to 42% before bedtime, 2 top outsides, 1 lost friend, 1 hand written blog post, 8 pages, 1 jazz festival, 1 early night, 2 Mrs Tilly stamps.

https://goo.gl/maps/tL8dgu4f6EAi4SCm9

No One Can Hear You Scream! 8th October

….. to Marsden Pipe Bridge

On our way in

Straight away we had a request from Trevor at the helm to adjust our tunnel lamp, to point it straight ahead. Mick did so, then we didn’t hear another word from Trevor for almost two hours.

Differing bricks and arches

Last time we’d both been on the back, our volunteer/guide gave us a fascinating running commentary as well as guidance to Mick at the helm. So much history and interesting facts was passed onto us. Sitting at the stern meant there was a limited amount you could see though. My photos were pants!

Sooty brickwork from the days of steam trains

This time sat in the bow I had my camera on handheld intelligent night auto mode along with the camera on my phone, both fully charged. Our volunteer Trevor, had turned out to be the author of a book all about The Standedge Tunnels (available from here), he’d become a member of the Huddersfield Canal Society in 1976 so if anyone knew their stuff about the tunnels he did. Just a big big shame there was about 50ft between us all. We did however buy a copy off him which he signed for us before entering the tunnel.

Rocky

There are four tunnels in all through the hill, the canal being the first to be built and it was then used to remove the spoil from the construction of the railway tunnels, two of which are now disused. Each tunnel is connected, walkways cross above the canal, and the support van drives through another alongside.

Rocky and misty

The railway tunnel crosses over the canal twice through the hill and when a train passes mist collects in front of you which then gets dragged away with the motion of the train, quite eerie!

At the western end the tunnel was extended when the last railway tunnel was built, so you start off in a brick arch, then a flat roofed section.

Reflections

All the way through different surfaces surround you, it’s like being in a 1970’s DR Who set at times, except this isn’t made from polystyrene!

Curves

Brick arches.

Bare rock that was blasted away, the drill holes for the dynamite quite visible towards the eastern end.

Arch meets rock

A mixture of rock and brick, sometimes brick above, sometimes below.

Spraycrete and rock

Then the creepier sections where concrete has been sprayed onto the bare rock to help stabilise it. This is very Dr Who or Star Trek, Captain Kirk would have set his phaser to stun! The spraycrete was done during the restoration of the canal.

At times the tunnel twisted in front of us, dug out from the ends and from the bottom of shafts the tunnel went off course several times. There are now several S bends

Rock bolts on the ceiling

Other places big bolts have been drilled into the rock face to hold it all back. The ends painted yellow so you can see them better, or know when one of them is going to scrape down your cabin side! There are numerous places where the sides of the tunnel look to jut out further then the gunnels of your boat!

I believe there are four wide sections, passing places. These tend to have wider brick arches helping to support the roof line. When boats were originally legged through the tunnel, it took four hours, this is where the boats going in different directions could pass. But the boatmen meeting elsewhere in the tunnels would refuse to go backwards to the next passing place, so two way traffic was abandoned. Official leggers were employed with traffic going in one direction for four hours before the direction changed. This then led to queues to get down locks at either end of the tunnel.

NO exit

Numerous gaps go off to the sides, some marked as exits, others marked with no exit.

As you approach each of the four adits a security light can be seen on the tunnel roof. Motion activated, the lights come on, a ticking noise can be heard as we passed. Apparently Tunnel Control would be able to tell that we’d passed each adit because of this. However not calling in would mean we didn’t know if there was a problem up ahead.

Walkways from the old rail tunnel to the new

The tunnel was built with quite a few air shafts. None of these can be seen now, well some are around 500ft deep! But you certainly know when you pass under most of them as this is where the water tends to get in. The further east we got the more water cascaded in. Waterproof coats did a good job, but when a flood hits the locker you are sitting on you also need waterproof trousers or better still a swimming costume! I got soaked twice and stood up for the last one, but still I was soaked through to my knickers!

Changes in height

But how was Tilly faring? I was glad we’d kept her confined to our end of the boat. I could see her most of the time and she could see us too.

But?!

Well who stole the sun?!

I’m kind of used to bridges stealing it, although I do tend to duck when that happens. Tunnels are worse as they usually time their theft of the sun with me requiring to use shore based facilities, very inconsiderate! Yes I know I can see in the dark but I’d rather not have to when visiting my box.

Rock and arches

Apparently Tom moved this tunnel once, before I came to be second mate. He bumped into it two times, She is quite proud of that. But today they were not where they should have been, I could see them, slacking at the front! They’d left it to Hard Head Tom to move the outside today.

BUMP, scrape, BANG!!! I sat on the floor not wanting to see what Hard Head Tom was doing to the outside, well lets face it I was really the only one who could see everything properly. BANG!!! How many more times!

Can anybody hear me!!!

I screamed at She and Tom to go and sort it all out, but they couldn’t hear me. Maybe I could do something? But black stuff was over the emergency bathroom gap, how was I meant to escape if I needed to!

Brick profile changing

BANG BIFF Scrrrrrrapppe!

In the end I decided that there was nothing I could do but to curl up on the bed and pretend everything was okay. Maybe this was going to be it for the rest of our lives! I certainly didn’t sleep. Who’d be able to sleep with no sun to warm your back and all that noise!

Light at the end? Or the trip boat?

As we approached the last adit I could see the lights from the trip boat ahead, quite a distance off.

Hi John

A torch light was flashed from the adit. John, the volunteer who’d driven through in a van was waiting for us. He informed us that the trip boat was in the tunnel, but we should just keep going.

After at least a year of my life Tom came through the bedroom, he had a hard head to put on too. Gradually the sun fought it’s way back into the cabin pushing away the tunnel. I could tell Tom was back moving everything, it got quieter and lighter.

Handing the equipment over

Mick had walked through for the very last part of the tunnel. This was so that the boat could be stopped at the tunnel portal to hand all the safety equipment to shore with ease. A plastic crate of first aid, life jackets and a large fire extinguisher were handed ashore. Just a case of retrieving the light from the bow.

Back in the sunlight

We pulled in to where the little shuttle boat moors, it had just headed to the top of the locks to drop people off near the station.

Trevor

Time to thank Trevor who admitted he’d bumped Oleanna a couple of times! There was nothing to see on the port side, but then he did favour starboard side in the tunnel.

No smile just yet

As we pushed off past the visitor centre a train sped past and into the rail tunnel, the sun shone brightly, as much as the tunnel is fascinating it was good to be back in the light.

We pulled in at the top of the locks, the first stretch a touch shallow for us so we hoped that further towards the lock would be better for NB Idleness. A quick check up and down the starboard cabin side of Oleanna, a couple of lines which when rubbed vanished. Our passage may have been a touch noisy at times, but other than a couple of new scrapes on the gunnels there was not one scratch. Thank you Trevor for looking after Oleanna, maybe I should have repainted the grab rails earlier in the year after all.

Soggy bum!

Time to check on Tilly, get changed and have lunch. All was fine with our little thug, who within half an hour of arriving used her on board facilities. Well I couldn’t hold on any longer and you weren’t letting me out!

This way out!

What a great day. Thank you to all the volunteers who make the passage through the longest, highest, deepest tunnel on the network possible.

0 locks, 3.76 miles, 1 tunnel, 3 miles underground, 1hour 48 minutes, 1 more wonder of the waterways for Oleanna and Tilly, 3 boats, 3 volunteers, 2 crew in the front, 2 soaked boaters, 17 years, 1 screaming cat, 2 nav lights in tact, 2 more scrapes on the gunnels added to the 5678 which were already there.

https://goo.gl/maps/qbzszmzTKAy1D1p9A

Heading Into The Dark. 8th October

Diggle to …..

The alarm was set and we were up and about having breakfast ready to push off in plenty of time. It seemed like it was going to be a rather nice day, not that we’d notice it in the tunnel!

The gates were already open

We moved up to the west or south portal of the tunnel at 9am, the gates already open and waiting. Time to fill the water tank to help Oleanna sit as low as possible in the water for her trip through. Once she was full we pulled her back from the water point (much better pressure than at the slow tap at Wool Road).

Covers removed

This morning there was one boat heading east to west, they most probably set off at 8:30, so there was still plenty of time to get Oleanna ready for her trip, the first boat at our end wouldn’t set off until 11:30.

All naked again

Yesterday evening the boat that has been following us arrived, this morning they had called Tunnel Control and managed to change their passage booking for Monday morning. The rush to return to their mooring is due to a relative being very poorly, they were hoping that the chaps at the tunnel today would be able to add them to todays passages. However no body was here but us. The volunteers wouldn’t turn up until nearer 10:30, so they headed back for breakfast.

Here comes NB Idleness

Yan and Kim soon joined us on NB Idleness pulling in behind.

The cratch cover was removed and stowed inside. Then the pram cover and frame came off and slotted in behind the dinette table. Tilly’s Escape Pod was zipped together ready should it be required. The gap at the bottom of the bathroom door into the main cabin was taped up with gaffa, meaning we’d be able to contain Tilly to one end of the boat. I hoped this would be enough as on the tunnel guidance it suggests all pets should be restrained inside your boat, if they won’t be able to handle the tunnel someone should take them over the top. Tilly’s Escape Pod is a favourite place for her, until the door gets closed! This would freak her out more, so I hoped we’d done enough.

Not so smiley today!

Brushes and hooks were laid in the gutters on the roof. All but the strawberry plants from the well deck were moved inside into the shower to give us more space at the front. Mick decided to wait to see what the volunteers thought before removing our nav lights, not wanting to break the seal between them and the cabin side, helping to keep rust at bay.

The men in blue arrive

At around 10:30 a C&RT van arrived, the chaps from NB Faggle Three went up to chat with them and explain their situation. They then headed off to get their boat to be measured. If it fitted then the volunteers would accommodate them.

What a high cratch board, we’d be fine

Soon a tunnel light appeared at the portal the west bound boat with a well deck full of people, a volunteer and helms person at the stern. They all looked a tad wet!

How high?!

Out came the official measuring stick, a large aluminium L shape. Oleanna had her vital statistics taken. To the top of the bags of coal she was 5ft 10″, across the cabin top 4ft 11″ and draught 2ft 4″. She passed! Mick asked about the nav lights. It was suggested that it was best he removed them rather than the tunnel! NB Idleness was measured, she passed. By now NB Fraggle Three had pulled up. Her vital statistics measured and passed too.

Fraggle Three coming to the front

Yan, Kim, Mick and I had conferred, if the extra boat fitted then we would let them go first as they were hoping to make it as far as Slaithwaite today, this would give them at least another hour and a half, we would be stopping in Marsden for the night.

Off they go

The chaps rushed to take the pram cover off their boat and pulled up to the water point where their volunteer loaded all the safety equipment on board, handed out high vis and hard hats and they were off, into the tunnel.

Byee!

Next a discussion as to who would be at the helm of Oleanna for the trip. Last year the volunteers were not working and only one boat could go through the tunnel in each direction a day, helmed by a C&RT employee, all crew on board had to be sat at the bow. This year the volunteers are back, two boats in each direction, three times a week. It is up to the volunteer whether they can socially distance themselves on your boat. 2m distance had been reduced to 1m in September. If there wasn’t the space they drive. For NB Idleness with it’s trad stern there was no question, but Oleanna being a semi trad?

The volunteer said he would drive her through, but he also quite fancied Mick doing it too. Mick had been quite looking forward to being able to sit in the bow and actually see things rather than concentrating all the way and not getting chance to look round.

Extra light at the front

Decision was made Trevor would be at the helm. This however meant that we wouldn’t be able to do the usual stops at the safety adits to call through to tunnel control. John another volunteer would have shadowed NB Fraggle Three through by van in an old railway tunnel, he would wait for us at the last adit to check on us.

Here we go (thank you Yan for the photos)

Tunnel control were consulted and we were given a time to enter the tunnel. Kim and Yan had another cuppa and a bacon butty, they would have to wait for at least 3/4 of an hour after we’d gone in, maybe more as their volunteer had taken the first boat through and needed to returned by van for them.

Trevor at the helm

Our gas was turned off at the bottles. Extra lights were put on the hatch and gas locker. Mick was given a hard hat and high vis just in case he needed to take over at the helm. We popped our life jackets over our waterproof coats, untied and at 12:20 we pushed off into the dark.

Here we go!

Five Foot Three By Five Foot. 6th October

Roach Lock to Wool Road Winding Hole

The chaps on the other boat were out and about this morning as we pushed off. One chap was measuring their cabin, he wasn’t sure they’d fit through Standedge Tunnel. There are strict maximum dimensions that your boat must fit due to the dimensions of the tunnel, yes it does get tight in places. Maximum height above the water 6ft 2″, maximum draught 3ft 3″, width 6ft 10″, length 70ft.

Roach Lock moorings

Then there is the height of your cabin corners above the water compared with the width across the top. There is a handy chart here. When we were on the River Wey we measured Oleanna at a bridge where we knew the height. Oleanna measured 1.87m or there abouts to the top of her horns, so just under the maximum height for Standedge, we can always remove the horns if we need to.

Blue skies and hills!

The chap with the tape measure said they had discovered that their booking wasn’t until a week on Friday, not this Friday. They are heading back to their mooring and with the Rochdale and Leeds Liverpool both closed it was the Narrow or the Trent to get home and there is a matter of flying away on holiday in a couple of weeks time too.

We left them to it and turned to face the hills ahead.

What a sky

What a stunning day!

Beautiful

I could just leave it at that, because it really was glorious. The sun shone, bright blue skies, views across the valley, trees on the cusp of autumn. Yesterdays dampness just evaporated away. Wonderful.

Bridge 85 is called Division Bridge. This used to mark the boundary between Yorkshire and Lancashire, the name suggesting the counties rivalry with each other in times gone by. Oleanna crossed the old boundary, the next lock in Old Yorkshire was the first to not have locks on the paddle gear! This of course didn’t last long as they were reintroduced at the next lock.

And breath

Views through the trees across the valley, the peaty water and the sunshine. I soon had to make a change to my leg attire and layers came off from walking and paddle winding.

Royal George Mills sits by Lock 19W which shares it’s name. Built in 1786, by 1870 it specialised in the production of felt and the manufacture of flags. During the 20th C they specialised in two forms of felt, Technical felt used in machinery and Taper Hammer Felt used on the hammers on pianos, the mill was renowned for it throughout the world.

A couple of community raised beds sit alongside the lock, it looks like strawberries, tomatoes and mint were the main crops. Only green tomatoes today, all the strawberries long gone.

Spire and mast

The spire of Christchurch Friezland reminded Mick of a wedding he’d once attended there.

Frenches Wharf

Next Frenches Wharf Marina. Here six years ago we’d wondered if the grey box was a pump out machine, it turned out not to be. We also wanted a Saturday newspaper so paused to head to Tescos behind, there being no rings handy Mick was left holding Lillian whilst the shopping was done.

Hmm! No chimneys

Beside the marina there is a big new development, houses and flats all built/clad with stone that has been given a black tint presumably to meld in with other buildings in the area. I wonder whether this coating weathers in time and will be self cleaning returning to a natural stone look rather than the grimy mill look?

We now started to get gongoozlers, the area around Uppermill and Dobcross a magnet for tourists. Oleanna ducked under the new High Street Bridge and I walked up to open the lock, the off side gate windlass operated as there’s not enough space for a full length beam.

Only one boat on the visitor moorings here which was a bit of a surprise, but then the road is close by and there is a lot of tree coverage for solar to be any good. One day we will stop and have a bit more of an explore, the Saddleworth Museum going on the ‘next time’ list.

A couple sat with their two dogs and watched us come up Dungebooth Lock. As Oleanna started to appear from below the side of the lock one of the dogs was not happy! He barked and barked at this growing thing from the deep. When the chap decided to tap Oleanna’s gunnel I suggested he should watch out as Tilly might make an appearance!

Saddleworth Viaduct

Then Lime Kiln Lock, the sun being out gave me plenty of photo opportunities. Saddleworth Viaduct towers high above the canal. The arch that spans the cut adjusted to make everything work. The pillars are all square on until you get to the canal, here the down hill face is narrower and angles towards the lock, the curved arch above set on a skew.

15th August 2015

This is where I took my favourite photo of our last trip up here with Kath (Mick’s sister) and Sean walking up to the lock. Mick says he’s glad we don’t have a 70ft boat as it was hard enough to line Oleanna up to get in the lock.

Think this is my favourite photo from today

Here I met my first angled paddle gear, there is most probably a better name for them but angled will do for me. Normally paddles are lifted straight up. The deeper the water the more pressure on them. These paddles lift at an angle. This increases the water pressure on them, making them that bit harder to lift (my theory). Repositioning the windlass was needed to get more purchase, but with patience you can avoid getting a hernia.

Will the tunnel be able to stop this tag?

Gongoozlers stood and watched, asked questions, but no-one had that glint in their eye wanting to open the gate for me. Ah well! A chap warned us that a boat was coming down the locks above. Time to claim a mooring.

There was one boat moored by the car park opposite Wool Road Service Block, we pulled in behind doing our best not to annoy a fisherman. This would do us for the day, the last nine locks reserved for tomorrow. Sadly being almost part of a car park Tilly had to just sit and look at the sideways trees.

A downhill boat

As we had lunch the downhill boat came past, the only boat through the tunnel, east to west today and Shire Cruiser Hire boat, the first on coming boat we’ve seen since being on the narrow. After lunch we headed off for a walk, well we couldn’t waste the sunshine! We walked up Standedge Road then veered off onto Huddersfield Road taking the lower route through Diggle. Diggle Chippy looked inviting, but as there was no mention of gluten free fish we refrained.

Warth Mill was built in 1919 and in 1929 it started to produce tyre fabric for the growing automotive industry. In it’s heyday it was producing nearly 50 tons a week. Thankfully when production ceased the Mill was made available for a collection of small businesses which still use it today.

We walked up to the tunnel entrance where the railway thunders alongside. All calm on our side of the fence.

Mick peeked through the gate and said ‘Hello!’ Either nobody was at the other end to respond or we didn’t wait long enough for their greeting to come back to us.

Space in front for us

Returning to the boat we followed the canal and locks downhill. Plenty of room for us to moor up away from the tunnel entrance. Then Grandpa Greens Chilled Medication Emporium, we’ll be visiting there tomorrow!

Summit pound

We took note of any low pounds, the same as they were six years ago between 27W and 26W. Maybe overnight the levels would improve, maybe they’d get worse, we’ll see. A quick measure of our cabin corners from the water level just incase. 5ft 3″ then 5ft across the cabin top, well within the limits. Phew!

What a day

9 locks, 97ft 3″ climbed, 2.66 miles, 1 downhill boat, 1 shadow boat, 0 shore leave, 1 glorious day boating, now you don’t get views like that on the Ashby

https://goo.gl/maps/vJDXUCxVU9oWJz8G8

Proper Pennine Precipitation. 5th October

Tesco’s Stalybridge to Roaches Winding Hole

Not much of a view here!

It’s not often we push off in the rain, but with a tunnel booked we want to keep moving, anyway the forecast had been for rain in the afternoon not morning!

7W with all the railings around it

Up 7W already a little bit damp at the seams. This is surrounded by apartment’s that were built after the reopening of the canal in 2001, good views over the canal. Photos of the lock being built. The new stretch through town could really do with someone adopting it and giving it a good weed, maybe the council used to do this but it’s been cut back on financially.

Narrowing

The canal now follows the River Tame. Power lines head off in all directions from a substation. When the canal was being restored one pylon had been built over the cut. Instead of going round it the canal narrows to the width of a narrow lock and goes right underneath it.

Pylon selfie, yes that’s my hood

Up 8W and we pulled in at the service block. Here there is water, toilets, elsan, shower and bins with what must be a C&RT yard behind it. Not the most romantic of locations with the razor wire along the top of the walls!

Service block

We topped up on water, put a load of washing on, Tilly got a fresh pooh box, the yellow water was disposed off and we got damper.

Canal, Bywash, River

Constant rain turned into proper Pennine Autumn Half Term rain, the sort where your Mum says ‘It’s character building’! No it’s just WET. All we wished was that Tilly was busy inside relighting the stove that had gone out during the night, the heat ripple from the chimney would have given us something to look forward to. Oh well!

9W

Not willing to jump to the bank from the stern, it was better to access the towpath from the bow as the canal wasn’t really built for stopping, so the sides can be rather shallow. Locks 9W and 10W are close together. In the past leaking gates and not enough water in the pound between have caused problems with boats getting stuck on the cill with water lowering in the lock. Today filling 9W certainly stopped the bywash and dropped the level in the pound, I dropped the water from 10W, that along with a flow of water from elsewhere kept Oleanna off the cill and safe.

The bridge at Lock 10W

I’m sure there used to be a levels board at one of the locks here that warned you if the levels were too low, but today it wasn’t to be found. The problems must have been solved.

Next Scout Tunnel, or Dave’s Tunnel to us. Remedial work was needed here, much of it similar to that done in Standedge. Parts of the tunnel are lined in brick others are bare rock where rock bolts were used to stabilize it. There is a towpath that runs through the 188m tunnel, if you walk you need to take care not to bump your head.

A Mandarin Spring Roll Duck

Ducks were hanging out enjoying the rain. We’d already spotted a drenched Mandarin Spring Roll Duck, but the one here looked all preened and ready to impress. They are such tarts of ducks!

At Lock 13 we could see up the hillsides a spire poking up into the sky. Not sure which church this is as I can’t find one on the map with a suitable spire.

Woodend Lock 14W sits round a slight bend, alongside Woodend Mill. The mill was built around 1830-40 and was an integrated cotton mill, meaning that weaving and spinning processes both took place here. Now it looks like the mill is used by different people for different things, workshops, upholstery, a dog stood gazing out across the valley. Up on the top floor someone has installed what looks like white French windows with railings across them.

Woodend Mill

Not far now. Below Roaches Lock is where we moored six years ago. We had a feeling it was hard to get into the side then and fairly soon we were reminded of it. There was one boat already moored up, the gap ahead of them had something big below the water. Then a stretch of stone bank has fallen in, but in the end we got close enough to the side to be happy. With plenty of friendly cover before the river Tilly was allowed shore leave, although she spent a lot of time coming and going making the most of ‘Thank you for coming home’ Dreamies!

Another soggy boat

The stove was lit and we dried out during the afternoon as wind and rain came down outside. A couple of hours after we’d settled another boat arrived, it was the same boat that had turned up yesterday afternoon in Stalybridge. Mick had chatted with them yesterday, they are also booked for the tunnel on Friday but had been hoping to get through tomorrow! We suspect they are not totally aware of Standedge Tunnel and how much it differs from Harecastle or Blisworth and that C&RT are quite unlikely to be able to add you to the list of boats who’d already booked. Their rush however towards the summit has slowed as they stayed put for the night.

8 locks, 83ft 9″ climbed, 3.28 miles, 1 moving boat behind us, 1 full water tank, 1 empty wee tank, 0 rubbish, 1 parsley plant sent to heaven, 1 thoroughly wet day, 1 frustrated designer, 0 pubs visited, 1 stove lit , 7 pancakes, 4 savoury, 3 sweet.

https://goo.gl/maps/HW8ySNT5U58HqBT49