Category Archives: Environment Agency

Scampi Shardlow. 20th January

Willowbrook Farm Moorings to Derwent Mouth Lock

1.21m down 11cm from yesterday

Ice again this morning. Whilst I attended a zoom production meeting for #unit21 Mick went for a walk along the canal towards Shardlow Lock to assess the ice situation. My meeting went well and Mick’s verdict was that after lunch we should be fine to move as the sun was out melting the ice. He’d phoned Tracy at the farm to arrange a meter reading and a settling up as we’d be moving on today.

Zooming

Just before midday we unplugged ourselves and walked up to the stables. Here we could say goodbye to our noisy neighbours, two donkeys who were rescues from Blackpool quite a few years ago. In three weeks we’d used 150 units of electric, we’d not run our engine other than to check the alternator and once to warm the engine bay up. The occasional blast of electric heating in the morning, washing machine and dishwasher along with the electric kettle, sewing machine and iron. Yes we have an iron but it comes out very rarely and mostly for work. We thanked Tracy for helping us out at new year and allowing us to stay for three weeks.

Lunch, another C&RT notice! Stoke Lock was still not operational by boaters so needs to be booked 24hrs in advance. A phone call was made straight away, when would we be there? Monday morning. The lady rang back confirming that a volunteer would be at the lock waiting for us.

Pushing off for the first time this year

Time to roll up the covers for the first time this year. The new version of our trip computer spluttered into life, an old phone placed in a window, this will run Nebo and track our route and miles. I turned Nebo on on my phone too to record locks as we go through them. We untied and I walked ahead to open the lock whilst Mick reversed Oleanna back to meet me.

A patch of thicker ice slowed his progress just as he arrived at the three widebeams. A chap on the last boat stuck his head out and complimented Mick for his reversing skills. He also warned him of thick ice below Derwent Mouth Lock.

The top gates needed a couple of attempts to get them open, the ice behind holding firm on the first go.

Reversing in ice seemed to be quite good. Blasts of forwards every now and then sent water backwards breaking up the ice in front of the blunt end of the boat. The odd blast from the bow thruster also helped to steer the stern towards the lock.

Look at that sun

Down gently in the lock, the ice there breaking up as the water lowered. The aroma of scampi coming from the pub was soon followed by slightly burnt garlic.

The Clockwarehouse

I left Mick to wind whilst I popped to the post box.

Maybe we’d have to moor up

Cat ice was about, easy enough to push your way through. Then at the pub bend we came across thicker ice. Would our escape from the Trent and Mersey be thwarted on this bend? It is quite hard to steer in ice. Narrowboats pivot in the middle and sideways force on ice isn’t very productive. Right on the bend it took several forward and backward manoeuvres to help get into a good position to start carving our way through the ice again. We wouldn’t have to moor there over night. Scampi here too! Maybe on Fridays Shardlow has a special for fish Friday on Scampi!

Both rivers open

The red traffic lights were both turned off at the EA flood lock, both the rivers Soar and Trent were open to boats.

Constant ice ahead

Now we slowed our pace to pass the line of moored boats by Chapel Farm Marina. Is it better to go slowly? Or does it just eek out the noise of cracking ice? A thick patch by the last line of boats had me at the bow, trying to keep us away from a Dutch barge. My pushing only moved the barge and not us. But eventually we worked our way through.

Cracking

Up ahead was the widebeam that has been waiting for the river for a couple of weeks. More ice in front of them, we’d had enough and wanted to see what the ice was like below Derwent Mouth Lock before venturing any further. We pulled in. A quick cat H&S meeting was held, too much ice, Sorry Tilly! Harumph urumph!!

That’s better

Below the lock the river was in the amber, the lock landing all very visible now. However the chap on the widebeam had been correct the ice below the lock looked thick, snow still sitting on it in the shade. We’d done enough ice breaking for the day, we’d be staying put, after all we’d reached our goal. Hopefully tomorrow the ice would have melted some more to make our journey easier.

Below the lock, thick ice!

We settled down for the remainder of the afternoon to listen to Tilly’s complaints. Then a crack and crackle with music came from the cut. A narrowboat with three chaps at the stern came along, we’d broken the ice for them, would they continue. Sure enough they headed for the lock.

If only we’d known, they could have broken the ice for us!

A little while later Mick popped his head out of the hatch, the widebeam had also gone. Should we follow too? It was too late now to get much further. A check on the weather forecast. We’d both remembered it as getting warmer at the weekend. The forecast didn’t agree, -3C tonight with fog! Oh bum! Would we end up being iced in now away from water and electric?

A rather nice sunset behind tonight

To try to keep the engine bay from getting too cold overnight Mick ran the engine again for an hour, hoping that would help the batteries which don’t like charging at low temperatures.

Nebo Trip recorded from inside Oleanna, lots of back and forth
Nebo Trip recorded in my pocket including a walk to the post box

My Mum’s American Sticky Chicken was made up and sat on the stove to bubble away for 90 minutes before we enjoyed it with some rice noodles. It isn’t the healthiest of recipes, but it’s nice.

1 lock, 1.2 miles, 150 units, 1 reasonable mooring, 2 donkeys, 2 scampi pubs, 2 more overalls, 1 hour breaking ice, 1 challenging bend, 0 red lights, 1 frozen river, 1 ice breaker forging ahead, 1 widebeam, 1 Oleanna who maybe should have followed! 2 sticky chicken thighs, 1 box of rosé!!!

https://goo.gl/maps/Ucc6B8c8Yahk51j5A

2022 Back To Exploring

Time for the annual round, a long post so sit back, put your feet up and enjoy.

The New Year kicked off with winter maintenance in the house. Having two hallways proved time consuming refreshing the woodwork and patching up the worst of the wallpaper. But this was broken up with weekly walks to see the sea. I resumed work on the development showing of #unit21 for Dark Horse and a Christmas present of a cheese making kit proved very tasty in creating my first ever Yorkshire Curd Cheese Cake from scratch. I plan on having a second go at this soon!

In February work progressed in Huddersfield towards opening night, the floor painted, final costume fittings and then the set and lighting added. All while Mick serviced our life jackets and Tilly grew more and more bored of life in the house.

Once the show was opened we had a trip down to London to catch up with the London Leckenbys for a belated Christmas, on our way back we visited Oleanna. When ever we could we visited Blue Water Marina to do jobs and have a pack up lunch. The stove was reblacked, walls washed down and cupboards sorted through.

Then at the end of February, Mick and I left Tilly in charge of the house, we packed enough clothes and food for a couple of days boating and headed to Thorne to move Oleanna through Thorne Lock before a winter stoppage began. Blimey it was chilly out there, but wonderful to be back afloat and moving Oleanna to Goole. Now we were all set to move back onboard and have a few weeks of pootling about in Yorkshire.

Back at the house we made it ready for the first of this years lodgers. Our boat Christmas tree was retired into the back garden where we hoped it would thrive, this of course was before we knew a drought was on it’s way! Tilly said goodbye to the dragon that lives up the chimney, left Seville and Valencia to look after the house before having to endure the car trip back to boat life.

After a few days sorting ourselves, including having one of Joan’s gluten free Chinese takeaways, we unplugged Oleanna and backed out from our mooring at Goole Marina (Boat House). We spent the next three weeks bobbing about between Pollington Lock, Doncaster and Goole. Maintenance jobs were ticked off the list.

Alistair did engine and weedhatch jobs, Frank joined us a couple of times to do carpentry jobs, our galley drawers no longer have a life of their own, the covers had a good scrub and a spray of Wet and Forget to help them keep clean.

In March I’d set myself a charity challenge, to knit as many pairs of socks in the month as I could. Nine pairs knitted for people in return for sponsorship, I also got a very generous donation of yarn from Lisa on NB Summer Wind.

Our plans had had to change as Thorne Lock still hadn’t closed, but was about to! Plans to visit York and West Yorkshire were abandoned, we’d bought ourselves a Gold Licence for the year so wanted to make the most of it. So on March 24th with all the jobs done we turned our backs on Goole and set off into the sunset to see where 2022 would take us, all three of us grinning from ear to ear.

We made our way to Keadby ready for our booked passage on the tidal River Trent, the fast route south. A phone call from a boating friend in need of support meant we’d be doing our best to make use of the spring tide to reach Cromwell in one go despite the weather forecast. We spent a couple of days doing what we could to help in Newark before we needed to be on the move again.

On upstream to The Trent and Mersey keeping up our cruising hours and Tilly hoping we’d stop with enough time for her to explore each day before cat curfew.

Up to Fradley then onto the Coventry Canal, we played leapfrog with NB Free Spirit for a couple of days.

Birmingham and Fazeley Canal, up the Curdworth Flight then a turn left onto a section of the Grand Union we’d not been on before at Star City. Up Garrison Locks, Typhoo Basin and then the Ashted Locks where we now have the measure of that Tunnel! A mooring space at the top of Farmers Bridge had our name on it. This was handy for a road trip to swap lodgers and for visits to the dentist. It also meant we were in shot when a group came to jump the top lock!

Fast forward to 6:15

Our route out of Bumingham saw us through Edgbaston Tunnel, down Lapworth followed by Hatton. A pause was needed for Tilly’s annual visit to a new vet, the one here the closest to the canal we’ve visited so far, also handy for The Cape of Good Hope!

At Napton we joined the Oxford Canal and headed for Braunston, pausing to stock up on goodies from the butcher. On the Grand Union we made our way up over the hill and started our descent down The Long Buckby flight back towards tidal waters.

On the 1st of May we turned left at Gayton Junction onto the Northampton Arm dropping down the flight to the River Nene. We’d only been this way once before and that was when we’d just bought Lillian (NB Lillyanne) back in 2014. We bought ourselves a second Abloy key, showed our Gold Licence to the chap at Northampton Marina and started our journey down stream, time to explore.

A decision was made to head down to Peterborough taking note of places we’d want to visit on our return journey. We worked our way through the guillotine locks, many button operated and others with the wheel of cardiovascular overload.

Tilly loved many of the moorings apart from those in Peterborough where crowds surrounded the boat and meant returning from shore leave was impossible for several hours.

In two weeks we reached the end of the river at the Dog in a Doublet Lock. Here the river becomes tidal, we’d save that trip for another time and turned back upstream to head for the Middle Level.

Here we wanted to explore all the drainage channels, but decided we’d do that on our return too. So we took the direct route and crossed the low lying waters in three days arriving at Salters Lode on Mick’s birthday. The levels out on the tidal stretch of the Great Ouse needing to be just right to get through the lock, turn and head upstream to Denver Sluice.

A lovely GOBA mooring was found on the River Wissey and eventually the sun came out for a birthday barbeque, we’d made it to the Great Ouse.

The remainder of May was spent exploring the River Wissey, Ely and The Little Ouse. Brandon Lock sits at the most easterly point on the connected navigable network for boats Oleanna’s size. Sadly a build up of silt stopped us from getting her bow into the lock, but we did get her as far east as was possible, ticking off the fourth point of the compass.

There was a trip to Hull Truck to meet old friends at a gala evening followed by a meet up with Micks family back in the Fens. At the end of the month we got to know Neil the seal at Ten Mile Bank moorings as he basked in the sun and took sunset dips in the river.

The Jubilee was seen in at Denver, we lit our guiding lights as a Lancaster Bomber flew overhead heading to see the Queen. The Relief Channel gave us a good mooring to be able to have a trip away to celebrate Dawn and Lee’s 50th Birthdays in Scarborough, we went as Wallace and Gromit and won an Oscar!

Another visit to Ely to see the Cathedral, Farmers market and meet up with Heather from NB Bleasdale, the first of many this summer. The River Lark was explored, the end of navigation reached with a handy mooring outside a pub.

We headed for the Cam, our paths crossing for the first time with Ken and Sue from NB Cleddau. Then onwards in to Cambridge where we visited colleges, ate chilled medication and had a day trip to Duxford so that Mick could sit in the pilots seat of a Trident 2, a seat his Dad had sat in on many a flight.

Oleanna squeezed along each of the three Lodes, Wicken, Burwell and Reach. Wicken Lode a magical place and a day visit to Anglesey Abbey with it’s wonderful gardens.

Then we headed onto the Old West a river with a very different feel than the Ely Ouse. A pause was needed when we reached Earith for us to have a tour of Heathers new to her boat GT. Once off the tidal water we were on a different Great Ouse again. Here St Ives, St Neots and Hemingford gave us sunsets, D shaped locks, huge meadows and wonderful towns and villages to explore.

As the temperatures started to rise I needed to do some work. Cruising happened in the mornings, my Panto script and sketches were done in the shade of what trees we could find. White sheets were bought and we hoped for a mooring with shade for the really hot days that were to come. Tilly took to lying on the floor and we took to wearing wet t-shirts to help us to keep cool. Thankfully the hot blast only lasted a couple of days then the temperature dropped and we could continue to head upstream.

July 21st we reached the navigable limit of the River Great Ouse, having to reverse some distance to be able to turn round and return to Bedford for the River Festival.

Here we met up with Ken and Sue, Jennie and Chris from NB Tentatrice and Heather again. Plenty of things to see, do and hear. The boat parades, raft races, vintage cars, all sorts kept us busy for the two days.

Now at the end of July we alternated the days between cruising and my work. More beautiful days cruising and more wonderful sunsets, one day off to visit Cambridge for some more chilled medication and to see the Hockney exhibition.

August saw more hot days. Trips to London to celebrate birthdays, panto meetings, catch up with best friends and travellers over from Australia.

On the 15th August we crossed back from Denver Sluice to the Middle Level having really enjoyed our three months on the Great Ouse. Now water levels were a worry along with having enough time to reach Oxford for me to go to work in October. We made the decision to come back and explore the Middle Level another year, maybe we’ll cross The Wash to get there!

By the end of August our progress up stream on the River Nene slowed to a halt. First one lock broke then another two ahead of us. We’d recently been accepted to join the Reflections Flotilla on the Thames to mark the Queens Jubilee in a few weeks time, now that time was ticking away.

When we did get moving again we had to make up our cruising hours. With the news of the passing of the Queen we didn’t know if the flotilla would still be going ahead, we carried on at pace waiting for news. Back up the River Nene, turning onto the Grand Union, working our way southwards. The news came through that the flotilla would go ahead, but now in remembrance of the Queen.

With a couple of days to spare we squeezed into the Eco-Moorings by Islington Tunnel. Two days of catching up with family and more friends over from Australia before we joined boats heading along the Regents Canal towards Limehouse Basin. An afternoon of activity saw numerous narrowboats festooned with white lights.

On the 24th of September the Thames barrier was closed and we all headed out of Limehouse Lock up stream to Chelsea where we clung onto buoys until the early evening when the flotilla started to muster.

Getting on for 150 boats all displaying white lights got into formation and headed down stream. Crowds stood on the illuminated bridges and Tower Bridge opened up in a royal salute as we passed underneath. What a truly amazing day.

Now we had to head towards Banbury, back round the Regents Canal as a leak in the engine bay needed testing on the calm waters of the canal rather than the tideway. By the time we reached Brentford we were confident with Oleanna’s engine again. On the Thames Tilly got a birthday present of a night on a Cliveden Island. Sadly we got an unexpected present on our arrival in Oxford, a second red line on a covid test! Panto painting couldn’t be put off so we made our way gradually up the Oxford Canal keeping our distance from people at locks and taking maximum doses of paracetamol.

A week of painting in Banbury before I moved to Chipping Norton to stack up the hours over the next four weeks getting the 50th anniversary panto ready. Rendez Vousing with Oleanna at weekends in Banbury and Coventry kept me sane. Mick had to single hand across the summit of the Oxford Canal to avoid the first of the winter stoppages.

All three of us were back onboard by mid November, covid free and vaccinated. We took things slowly now, time to rest up, meet friends, gather family and pootle towards Christmas. Our 20th Anniversary was celebrated with a Chinese takeaway at Alvecote Marina, a planned stop which ended up being extended due to plummeting temperatures. The canal froze, there’d be no moving the outside for Tilly!

Temperatures lifted dramatically and the ice just about vanished in a couple of days, we could now be on our way to Christmas. Alrewas was a good place to spend the festive days, a very good butchers and a village with lots of character and humour.

Bookings in the New Year had been made for passage on the tidal River Trent for us to reach Yorkshire, but this would not be. The Trent had risen before Christmas, Cranfleet Flood Gates were shut ahead of us, so no New Year at Hazelford Lock. Instead our alternator played up and we sought out a mooring to hook up to and see in 2023.

This year we’d been wanting to explore again. This year we cruised miles of new water, made new friends, got too hot, got iced in, got stuck, got to be in the first illuminated flotilla on the Thames for 300 years. What a great year it has been.

So our vital statistics for 2022 according to Canalplan are

Total distance is 1249 miles, 6½ furlong and 555 locks . There were 88 moveable bridges of which 29 are usually left open; 156 small aqueducts or underbridges and 18 tunnels,  a total of 7 miles 2 ¼ furlongs underground and 8 major aqueducts.

This was made up of 227 miles, 1 1/2 furlongs of narrow canals; 363 miles, 2 furlongs of broad canals; 85 miles, 5 furlongs of commercial waterways; 269 miles, 1 furlong of small rivers; 234 miles, 7 1/4 furlongs of large rivers; 69 miles, 6 furlongs of tidal rivers; 176 narrow locks; 232 broad locks; 54 large locks; 2 locks on major waterways.

731.7 engine hours

1156.1 litres diesel, 5 (although we’ve got 1 empty now) gas bottles (used for central heating as well as cooking), 28.5 litres oil, 3 oil filters, 1 fuel filter, 2 air filters, 1 water pump, 2 new belts, 690kg coal, 1 overnight guest twice, 6 packs Dreamies (not enough!), 56 friends, a record breaking 41 Mrs Tilly stamps of approval (4 in one day!), 15 pairs socks, 2 shows designed, 9 lodgers, 2 lots gluten free puff pastry, 9 supermarket deliveries, 30 boxes of wine delivered, 2 lost unicorns.

Thank you all for joining us on our journey. Wonder where we’ll get to in 2023?

The Lady In Grey. 12th January

Shardlow

2.24m up 24cm from yesterday

Hunting round for some envelopes I bought before Christmas I ventured into one of the front cupboards this morning. Here we store Christmas, the white sheets from the summer, spare covid tests and extra wine glasses. I noticed that a corner of the wine glass box was wet. This was on the bottom shelf.

Had the damp trap in the cupboard filled up and over flowed? I’d refilled it with crystals not very long ago and today it was still empty. As I removed things from the cupboard I found a small puddle that had been sucked under a plastic bag on the middle shelf. At the rear of the cupboard it looked like moisture had been getting in at the corner, the holes for the shelf brackets showed signs of damp too.

Getting a good airing

Everything was removed, including the shelves. Dampness mopped up and then we set the heat wave fan blowing at it to help dry it out. Just where was it coming from, or was it condensation collecting in a far corner from the stove? With the recent downpours it could be rain water that had been driven in by the wind. Mick ventured outside to have a look.

Yes I know the roof needs a good wash!

First possible was the starboard nav light, although this was a touch low on the cabin side. It was however half full of water. Mick emptied it, dried it off then reattached it adding a new layer of black tack to the outer edge to help seal it. After he’d tightened the screws he popped a drop or two of Captain Tully’s Creeping Crack on them. The port side nav light was also emptied of water.

Could it be coming from the poppers from the cratch? Some of these are on the overhang, so unlikely to be them. Another couple are quite high up on the cabin side. They also got a drop of the creeping crack. The cupboard was left airing with the fan on or the rest of the day until we needed the space to go back to bed. The contents were edited and then returned to the cupboard, hopefully there will be more air in there this time.

The Lady in Grey

This afternoon I headed out for a walk down to Derwent Mouth Lock to see what the levels looked like today. I took the route by road to start with and walked past The Lady in Grey.

Back in it’s day

The house was built in the 1770’s for the Soresby family who moved to Shardlow when the canal was proposed. Their land spanned the cut giving them two areas for wharfs and warehouses for their canal carrying business (More info on the Soresby family can be found here on the Shardlow Heritage site, which is filled with information on the area).

When it was the hotel and restaurant

The Lodge was transformed into a Hotel The Lady in Grey with it’s restaurant it was highly regarded. The name came from the ghost of a headless young lady said to be hunting for her mothers lost jewels that her wicked sisters had hidden. Then it was a Thai restaurant which closed in 2008, this sadly was when the decline of the building is thought to have started. In 1967 it was awarded Grade 2 listing. In 2012 it is said that planning was sought for the buildings demolition and the site to be used to build three houses, this was refused. 2015 it received listed buildings consent for change of use back to a single dwelling with 5 bedrooms, things were looking up. However permission was refused to build eight dwellings in the grounds alongside the canal. Most probably the proceeds from these new dwellings would have afforded the restoration of The Lady in Grey.

The building is now in a poor state, the council seeking action from the owners, a s215 notice has been served on them requiring them to deal with the poor quality of the building. Such a shame. Most of the windows are smashed, wooden boards cover many of them. Photos from the local facebook page show the interior in such a dilapidated state. Here’s hoping that this once handsome house can be saved before it falls down.

Photos on the left are from yesterday, right today.

The towpath to Derwent Lock is now very muddy, slippy slidy muddy. The lock remains empty, well empty to the level of the river. I guessed about 14 inches lower than the canal today. The lock landing is now under water the edge of the river only noticeable by the tops of the ladders. The red level markers, one now is no longer visible, the other only a few inches away from being submerged.

Flooded fields

The parallel path that runs a little bit lower than the towpath is now submerged for lengths. I walked along it for a while relieved to be off the muddy towpath, only to find another length submerged and having to back track to the towpath. Two new boats sit above the lock awaiting levels to drop and there is one space available in front of the pubs.

Overnight the levels are forecast to rise more. Will the car park by our mooring get flooded? Will the EA flood gates be closed on the canal, if this happens we’ve been told that Shardlow Lock will be padlocked and it’s bywash blocked off too to protect the properties in between.

One day it will stop raining.

0 locks, 0 miles, 1 more leak or is it condensation? 2 drowning nav lights, 1 house with great potential, 1 more lodger booked, 1 hour of numbers for next year, 11 Dreamies, 9 inches, 14 to go, 1 vat of bolognaise.

Two Reds. 30th December

Shardlow

The levels appeared to have peaked this morning and were just starting to come down. We knew we wouldn’t be going anywhere today.

Phone reception is almost none existent inside the boat in Shardlow so it was no surprise when Micks phone received a text message from Adrian at C&RT. He’d tried calling to see if we were still wanting our booking tomorrow to go through Stoke Lock, Cranfleet Flood Gates were still closed. He already knew the answer as did we, Mick texted back confirming that we’d like to cancel our booking. He also asked what would happen from the 3rd of January at Stoke Lock, would we need to book? The answer was that there would be plenty of people about to pen us through when we arrive, hopefully soon afterwards the lock will be back to self operation. Adrian would stand the team down for lunchtime tomorrow.

Wall? What wall!!

Mick spent sometime sat out the back making phone calls to cancel all our Trent lock bookings. We’re hoping we may still be able to make the window of good tides next week, but who knows what the river will do and when Cranfleet Flood Gates will reopen. Cromwell Lock said that they’d be able to get us to Keadby one way or another, maybe missing out on a stop at West Stockwith. One slightly worrying thing was that despite us both remembering Mick having talked to Keadby Lock they didn’t seem to have us in the diary! Glad we hadn’t got to the M180 Bridge and radioed ahead with no-one expecting us! Doesn’t matter now, and we’ll double check when we booked it next.

Mick also called Shardlow Marina. Oleanna was due an oil change, the price of oil was a touch more than he was wanting to pay, maybe it would be cheaper to get the bus and buy some from Halfords? He decided to pay the extra and got on the bike and headed off.

When red lights shows it is not recommended for craft to proceed beyond this point due to flood conditions

Down the towpath at the Shardlow EA flood gates two red lights showed. Both the River Soar and Trent are closed. We’ve stayed this side of the flood gates just in case the river comes up even more!

Hmph!

Tilly did more calculations regarding the wall. She eyed up the wooden signposts again, checked them for claw stability, then decided the call of Dreamies was greater than achieving her goal of getting to the top of the wall.

Inside I took over the dinette table. Foamcor was measured out and cut up to make the base shapes of some giant sugar lumps and milk pods, the sort you get in hotels. I caught up on the Christmas Day radio 4 play which was directed by an acquaintance, The Signalman. All the edges of the shapes were covered in masking tape, this should stop the contact adhesive from eating into the foam when I come to cover them in yoga mats.

Held in place till it’s dry

Whilst the PVA glue was out I made use of it to re-stick some edging strip that was coming off in the bathroom. An off cut of foamcor proved useful to get the glue in behind the veneer. Masking tape used to hold it in position whilst the glue dries.

Mick got on with the oil change in the engine bay. He’s saved doing the filters until tomorrow, we doubt we’ll be on our way for a few days.

This evenings meal made use of the last ham, ham stock which I’d drained off when I roasted the joint. I made it into a stew with a potato, carrot and peas. The stew bubbled away on the stove top for an hour before I made use of the last of the stuffing, making a sort of topping out of it. It then went inside the oven to finish off. Verdict, tasty maybe a little bit salty, but a good invention to use up the last of the leftovers from Christmas.

Yesterday and today we watched Mayflies, a story of a man diagnosed with cancer and his wish to control the end of his life. What a jolly bit of TV to have between Christmas and the New Year! Some very good performances, but a box of tissues was very much required. To jolly things up we’ve watched episodes of Ghosts, Mick has nearly caught me up.

Glad I can’t make the mug to go with them!

0 locks, 0 miles, £60 oil, 4 bookings cancelled, 1 oil change, 6 inch sugar lumps, 1ft milk pods, 1 pot of stew, 2 many tears, 1 near death experience, 1 red lever, 20 catnip Dreamies spilled on the sofa, 2 swirling cats eyes!

Then There Were Two. 11th October

East Street to Kidlington Lock, Oxford Canal

Delivery to the hatch

Shopping arrived bang on 10am. Mick informed the driver that I was isolating. The crates were put by the side hatch and emptied into bags everyone managing to keep their distance. After a bad nights sleep the last thing I wanted to do was stow things away so that was left to Mick.

Extra vitamin C required

Last night the East Street moorings had filled up and this morning they emptied again, apart from those who we suspect know that the Lock Keeper has covid so won’t be coming round for mooring fees. The workmen started dismantling more of the power station opposite at 8.30am. This was not helping my headache so as soon as we’d got ourselves sorted we moved on.

Blue blue blue

In the past we’ve taken the route north up the canal from Isis Lock, today we’d be heading for Duke’s Cut instead, hoping that this route would bring with it fewer people to avoid. With the sun out, blue skies surrounded us as we cruised along Port Meadow. Model planes flew round in circles, cows and horses grazed, what a lovely day, chilly but lovely.

Hotel boat on it’s way

A group of people stood round the control panel at Godstow Lock, I willed them to walk away before I got anywhere near. A Hotel boat was just entering from above, they watched as the gates closed behind it and the crew member walked down to the panel. I kept my distance, at least 6 meters. Thankfully she was far more interested in reading her phone than me.

By the time we got into the lock, ropes sorted and the sluices button pressed we were joined by a Lock Keeper. I stayed very much by the bow rope adjusting it as needed whilst she opened and closed the gates for us.

Godstow Bridge

Traffic lights gave us a green to head under Godstow Bridge where a floating pontoon with skips loitered, diggers either side of the river.

King’s Lock the first of the match stick locks, I made sure I had some hand sanitiser with me so I wouldn’t be leaving anything for the next person. Thankfully no-one was around, apart from the dragon who watched our every move.

Right onto Duke’s Cut. We think we’ve only done this route once on Lillian the first time we did the Thames, so today it was new water to Oleanna. It seems to have grown somewhat from how I remembered it, much longer. Here boats sit on a stretch of water avoiding Navigation Authorities and licences. One end C&RT water the other EA.

Approaching the lock

Faces peeked out from the dark of the boats, I may have covid but I can still say hello to people, even if they didn’t reply. The last stretch of the cut is narrow, boats lined up on both sides, we of course met a boat coming the other way up the lock. Just enough room for us to squeeze past each other.

Only good boats go through my lock!

Someone was waiting for us on the lock beam. Oleanna needed a good checking out!

The full length of roof was checked, then as I was about to lift the paddle I spotted the stow away in the well deck, having a good sniff of a bagged up Tilly deposit. The full length of cat walk was tried out, pauses at each window, especially the bathroom where Tilly quite often begs strangers to set her free!

Cheeky! That’s my Cat Walk!!!!!

Then the black cat was off to do some hunting, leaving us to turn north onto the Oxford Canal and meet a boat just pulling out from the lock.

The last lock of the day, or so we’d planned. I then walked up to the lift bridge which is now windlass operated. Doing this route meant we avoided at least two other lift bridges, are they now windlass operated?

Lifting that took more effort than normal

Our aim today was to reach Kidlington Lock, our normal stop after Oxford. A few boats were already moored up, but thankfully there was space for us before the lock landing. We pulled in, moored up and let Tilly out. She was gone for quite a while, does she recognise these moorings that we’ve stayed at in the past?

Time for a kip for me. Mick had been starting to cough during the day, a test showed as negative. By the end of the day we were both sat on the sofa with a box of tissues between us. The likely hood of Mick not getting covid was minimal, he’d most probably caught it off me before I suspected anything. He’s about a day behind.

The tree stole it!

Tilly came in all very silent during the afternoon. Where had she left her collar? She was quite pleased with herself showing off her white chest and strutting about. It didn’t last long as I pulled out a box with another three collars and cat tags. A blue collar with a boat cat tag was soon back around her neck, the boat doors open again, shore leave could resume.

4 locks, 5.5 miles, 1 lift bridge, 4 boxes wine, 1 box tissues finished, 2 boxes of tissues in the order, 1 straight, 1 right, 1 left, 6 meters minimum, 1 new collar, 1 cat tag, 2 snotty coughing boaters.

https://goo.gl/maps/aQimWWezVQYE57XJ8

Never disappointed. 7th October

Pangbourne Meadow to Lake Field, Day’s Lock

A cuppa in bed before breakfast, followed by a zoom meeting with Amy and Penny from Dark Horse Theatre Company. They have been successful in being awarded funding to take #unit21, the show I worked on last February, on tour next year. Lots to talk about and things to put into motion. There will be two new cast members, so some costume bits to do. New props for Act 2 and an upgrade to the set if we can afford neon lights. All very exciting.

oops!

Not a sight you expect to see on the Thames, a large boat sitting in the middle of the river. I wondered why they’d dropped anchor there, then realised their anchor had not been dropped and was still nestled on the bow. Wild swimmers passed as we approached saying that the boat was grounded, inside silhouettes of passengers could be seen one holding binoculars. Mick considered asking if we could help, but such a big boat and such a small narrowboat!

Whitchurch Lock

At  Whitchurch Lock the Lockie was surprised that the Captain had taken such a line on the river, but The Amazon Queen had been stuck since last night and they were trying to get hold of a tug to get them afloat again. I had a look at their itinerary, last night they should have been at Mapledurham, this morning a hearty breakfast before setting sail to Sonning to enjoy dinner and a show at The Mill, we doubt they’d make it in time now!

Past Shooters Hill and the Seven Deadly Sins. Shooters Hill is supposed to have been named in the C17th after an artillery station was positioned there in the Civil War to guard the Thames crossing, cannon balls were dug up when the Great Western Railway was being built.

It feels like some serious pruning has taken place in front of the Sins as I’m sure one of them used to hide away. They still are wonderful houses, we tried to decide which one we liked the best, maybe the last one.

Goring Weir

The railway moves away for a while as the river passes through Beale Park, only one boat on the moorings there today, a chap just checking the signs £10 for 24hrs, maximum 48hrs pay at the café, same as last year.

Goring Lock

The white board at Goring Lock changed to Blue as we approached, the Lock Keeper was heading off to check out reports of a tree down over the towpath, he’d started to empty the lock for us. Boat hook at hand and bow rope on the roof are now the standard set up on the Thames.

A short distance on was Cleeve Lock also full. Despite its shallow rise the water comes in with quite a force. I was glad that the control panels were not on the other side as  I’d have been bombarded with acorns dropping in the wind which was increasing in strength. Last year we’d watched as people got showered by the new tap at the water point. This year someone has provided a suitable length of hose attached to the tap to avoid such occurrences.

If only the staircase was a helter skelter

Our schedule had us stopping in the next reach of the river. We had a choice, moor below Cleeve Lock, not enough cruising hours. Carry on and try opposite Sheridan Marine, last year the mooring was very awkward with a high uneven bank. Continue to Wallingford and see if there was space for us, or get a day ahead of ourselves and reach Day’s Lock and one of our favourite moorings on the Thames.

Serious stuff

Lunch was had on the move, we slowed down for a big pontoon to be moved and have it’s supports dropped to the river bed to steady it ready for more pile driving on a new stretch of bank.

Hello Fran

Wallingford Bridge, not much spare room for us, maybe one mooring but we wondered if that space was reserved for a trip boat, maybe the African Queen, well she’d not be needing it today! As we passed the last couple of boats we spotted NB Atropos whom we’d spent the really hot days with on the Great Ouse. We beeped the horn and called out to say hello, but Fran was busy exploring the Castle. Maybe next year our paths will cross again.

Benson Lock, quite deep and the start of Lavender at the locks was on self service. Above is one of the bases for the big Le Boat Hire boats. Today they were four deep, not a spare space on the moorings. A couple of boats were being loaded with bags and shopping, one boat just returning from having a test drive with this weeks holiday makers.

Whittham Clumps comes into view, a hill with a clump of trees on the top, one day we’ll take a walk up there, but today we just wanted to moor up before it started to rain. The Lock Keeper saw us up through Day’s Lock, then it was time to find a mooring.

New looking signs and music at the farm on Sundays

New signs along the bank, both here and below the lock there is now a mooring charge. Below the Lock (Thames Path £7) with a very high bank and plenty of friendly cover an awkward mooring. Close to the Lock (Day’s Lock £10) some parts a touch too shallow for us, but a reasonable step off your narrowboat and one or two straight lengths. Then where we were heading (Lake Field £7) in between the trees maybe a touch uneven bank, but a feeling like you are the only one moored on the field. Basically today we would be the only boat here.

Tilly and I had a walk up and down just before the heavens opened. Would this be our first time here without a good sunset? The rain didn’t deter Tilly and she looked round for friends. I put a bolognaise sauce on to cook and Mick waited for the rain to stop so that he could chop up some kindling and light the fire.

Potential

Then as the sun was dipping down towards the horizon the sky cleared. To the west we had a sunset, to the east a rainbow. Day’s Lock never disappoints!

Lovely

5 locks, 15.7 miles, 1 grounded boat, 1 Tilly fan, 7 sins, 2 days into 1, 1 blustery day, 2 hire boats, 1 short hose,1 favourite mooring, 1 downpour, at least 1 friend, 1 bag kindling, £7, 1 sunset plus rainbow.

https://goo.gl/maps/kXgey2PNUBfJuM1M8

Blowing Up The Rats. 3rd October

Marlow Lock Cut

Up, out of bed, breakfasted and walking towards the station this morning for Mick to catch a train into Maidenhead, then one to London, the tube, on to York and the final train of that leg to Scarborough. Our latest lodgers had moved out yesterday, so the house needed checking over and the grass cutting.

Only a bit of space on York to moor today

I meanwhile headed off to Sainsburys to see how much I could carry back to the boat ending up doing an intermediate shop which would keep us going until we reach Tescos in Reading.

Just look at those!

The shop windows in Marlow have tantalising things in them. I SO wish I ate gluten still as one cafe had the most enticing looking bread in their window and trays of wonderous baked goods filling the counters. Oh well I most probably saved myself a fortune.

I behaved and didn’t stock up on yarns

A shop down a side street caught my eye, a crafty shop with fabrics and yarn. My bumbag needs the zip replacing, so I waited outside for the shop to open then purchased what I hope is the correct length zip for the job. Just need to find the time with enough daylight to put it in now.

Alan, still King of the wall in Scarborough

Today I was going to make use of the table whilst Mick was away and do a bit of prep work for panto. The elaborate portals that I’ve designed have quite a few things that repeat themselves, so a quick means of drawing them out is required. I could project them onto the scenery, a method I’ll use elsewhere this year, but as these are so repetitive I’m going to use stencils.

Rats blown up

I gridded up the card I’d bought in London and transferred the designs across, trying to better the originals I’d used for the model. The correct lines were picked out from the mistakes with pen and later on in the day I started to cut them out. After two I’d had enough, the others can happen over the next few days when we moor up.

Around the lock was busy today. Plenty of boats coming and going. At one point I looked up to see a grey widebeam gliding past with no-one at the helm. They were sorting out their centre rope and ran back down the roof before the boat went off course.

EA getting ready for some work somewhere

A work boat and skip came down the lock. We’ve seen a few worky type vessels about the place, presumably getting ready for winter maintenance.

Several of the overstaying boats moved off too. Notices removed from windows. That left us and one other boat that looks like it is quite happy here.

Thankfully no friends were brought home today!

Council workmen arrived and did a bit of pruning in the park we’re moored alongside so whilst the chipper chipped Tilly was kept in. A big vat of carrot and orange soup was made from the remaining cheap carrots we’d bought at M&S, Not bad for 45p, a roast, a cake and soup.

Scarborough Station

Mick’s return journey from Scarborough wasn’t quite so good. The trains to London from York were cancelled so a detour via Leeds was taken. This train ended up stopping everywhere so got into London late. A fast train to Maidenhead got him slightly back on course where he caught up with a train he’d hoped to catch back to Marlow. He was back on board Oleanna just gone 10:30pm. A long day with a lot of trains.

Cats enlarged

0 locks, 0 miles, 9 trains, 2 tubes, 1 tidy house, 1 load washing, 1 catch up with neighbours, 2 bags shopping, 1 zip, 6 hours shore leave, 2 cancelled, 1 busy river out of season, 7 stencils drawn, 2 cut.

No Weather Today. 9th September

Clive’s Retreat FOTRN mooring to Manor Farm FOTRN mooring

Dribbly Oleanna

Alarm was set for an hour later than yesterday. We need to keep our cruising hours up and starting early in the day hopefully means that Tilly will be able to have a few hours shore leave after we’ve moored up each day. We pushed off a little later than planned another day of getting damp feet. Last night the extended news had meant we retired to bed not having seen the weather for today. Maybe there wouldn’t be any weather, maybe it had been cancelled.

The final wheelie gate

Not far ahead was the last of the wheel operated guillotine gates, Mick came to lift the gate then I was left to drop it back in behind Oleanna.

Next was Irthlingborough Lock, a small cruiser was just leaving above. This lock was the first to have a fault recently thankfully today the gates worked. As we rose in the deep lock a boat pulled into the lock landing behind us, shame they hadn’t been five minutes earlier as we’d have been able to share. The bottom gate was leaking so the second top paddle required opening just to get us up the last inch or so and be able to open the gates.

Differing arches

Old Station and New Station Road Bridges were ducked under, the approach to the old bridge a little awkward to get the right line.

Higham Ferrers Lock needed setting the cruiser still ahead of us. We emptied it, opened both gates and awaited for our new locking partners NB Red October to join us.

Ditchford Lock with it’s radial gate

We were sharing with two of the founding members of the FOTRN, the phone number for help on the signs would ring on this boat. We shared tales of trips, how the guillotine locks used to be operated by winding a handle, but then someone broke their nose and the handles were replaced with the wheels. I heard stories of extra weight being added to the guillotine gates to make them move faster, all a complete NO no now!

Each lock we came to the cruiser was just pulling out of. Each lock needing to be reset. At Ditchford Lock we paused once Oleanna and Red October had risen, the radial gate shut behind us, so that Mick could retrieve what was round the prop, thankfully only a load of weed but removing it eased our journey onwards.

Onwards past the jet ski lake where Fran was just opening up her stern doors on NB Atropos, we’d shared the really hot days with her on the Great Ouse. At the Chester House mooring a new bridge over the river has been installed a second one just visible through the fencing which must lead up to the buildings.

Now in towards Wellingborough embankment. I started to count the swans, 48 in the first batch. Have to say I gave up as we rounded the next bend to see the next group. Ladies were feeding them, one lady backing away throwing bread out across the park, she must have had at least 50 following her!

Maybe she’s trying to take them home with her

Upper Wellingborough was the last we shared with Red October as when we arrived at Wollaston Lock the cruiser was waiting with both gates open. Maybe we would be able to fit all three boats in the lock together, but we were a little apprehensive to be tightly packed in with a plastic boat. Our locking partners were on a bit more of a mission than we were, aiming to reach their home mooring up near Northampton today, so we waved them into the lock to share with the cruiser. This of course meant the heavens now opened as the two boats pulled out of the lock, leaving us to reset it and get wet. Todays weather hadn’t been cancelled after all!

Up they go

Our planned mooring was only a little bit further on Manor Farm FOTRN mooring. We pulled in at the nearest end and let Tilly out. Four hours of shore leave with some tufty grass to run around in and find friends. At first she wasn’t too impressed as the door opened to torrential rain, but she soon got over it and headed off.

Chilli for six!

A big vat of chilli was put on the stove late afternoon to gently bubble away. A handy three meals in one pan which will come in handy on long days of cruising. We have decided to keep up our rate of cruising, our next appointment may go ahead or be cancelled, but there is also a rendez vous arranged with family, so it’s important to keep going.

7 locks, 10.62 miles, 3 locks on our own, 4 shared, 6 hours cruising, 4 hours shore leave, 543627 swans, 15:37 model delivered, 1 silent boat, 3 meals 1 pan, 1 plan still in operation.

https://goo.gl/maps/Z2PCJU54dQvN8eCP6

It No Work! 8th September

Oundle Cruising Club to Clive’s Retreat FOTRN mooring

With Waterway Routes suggesting it would take us around 4hrs to reach Islip Lock and Evri suggesting it would be best to drop off my parcel before midday the alarm was set or 6am, a time we only normally do when temperatures outside are due to get high and we can’t just sit still for the day. We were breakfasted and untied by 07:09, winded in the entrance to the marina, waving to NB Cleddau and heading towards Upper Barwell Lock the first of our day.

Birds chirped, Kingfishers darted back and forth, but our sleepy eyes and heads were not capable of counting them let alone see them. Damp under foot, we’d be getting soggy feet this morning. The world gradually waking up around us.

Upper Barwell, Lilford and Wadenhoe locks were all set in our favour. One cruiser moored on the pub moorings and one narrowboat at Peartree Farm. Titchmarsh Lock had been the only lock I’d not operated on our way downstream three months ago, it’s padlock a mensa challenge to relock with only two hands, I got there in the end.

I busied myself with answering panto emails as we went along, what type of backpack, just how big should the mixing bowls be and how would I like the boiled egg ice cream to look?

Collision course!

The river narrows, trees overhang the navigation as you get closer to Islip Lock. Heading upstream the current against us was that bit stronger. Then round a bend we saw our first moving boat, they were going at quite a lick. We saw them before they did us and we slammed on the brakes. Both boats hitting reverse and avoiding a collision. Phew.

At 10:22 we arrived at the Islip Mill Lakeside Moorings, no boats awaiting a broken lock, in fact no boats what-so-ever. We pulled in and I headed off straight away to drop the parcel of panto model bits off at the One Stop shop, then walked over to the Co-op for some eggs.

Yum

Today we were allowed elevenses and whilst I tucked into my toast and peanut butter boats and their movements were texted back to Sue on Cleddau, they were on their way a few hours behind us, hopefully someone would have reset the locks for them.

It was in their favour

I started to walk up to Islip Lock, the first of the locks that has been broken recently. But I soon realised that there was actually no way of reaching the lock without being on a boat, luckily Mick hadn’t set off yet. I was dropped off on the lock landing and walked up to close the top gates. I also had to close both gate paddles as a previous boater had left them up, this had been the cause of this reach draining the day after the lock broke. I went to the panel, no lights. I jigged the gates about, no lights, I wound up and down the paddles, no lights. By now there was a boat heading towards the lock from above. I opened the top gates and waved them in, not that they’d be going anywhere!

Islip Lock last mended on the 6-9-22

As I thought, I knew of this boat. NB Barbarella a Finesse boat with Noni and Peter on board, we follow each other on Instagram so knew we’d pass each other today. They thanked me for holding the lock for them, then I explained, had they jinxed Islip after all they’d been the boat at Whiston when it broke last week. Peter tried everything. Still no lights.

No lights

Noni called the EA emergency number, Mick called the river inspector. After a while we got a call back saying that there was a power outage in the area as work was being carried out on power lines. Ahh it was the chaps opposite the mooring we’d just had elevenses at! The power might be off for half an hour but should certainly be back on by 16:00!

Finesse crews

We were invited onto Barbarella’s ‘super social stern’ for a cuppa and talked all things boats and Finesse. Oleanna was built in Finesse’s early days before they’d got into building electric and hybrid boats, maybe if we’d been two or three years later and had enough money we’d have gone down that route. Maybe if I got a show that goes into the west end the royalties could pay for a retro fit. Noni and Peter certainly seem to be enjoying themselves.

We headed to Oleanna for some lunch. Every now and again one of us would go and check to see if the lights were working on the panel. Behind us Sue and Ken had arrived at the mooring their destination for today. Every now and again we’d get reports on how the chaps up the poles were doing. At around 15:15 a message came through that they thought the chaps were packing up, we all stood round the panel chatting waiting for the lights to come back on.

Twenty minutes later Noni spotted that there was life on the panel. A quick, it’s been really nice to meet you and see you somewhere sometime and she was back on board and I was lifting the gate to drain the water.

Peter and Mick

The two Finesse boats were soon passing each other, waves all round. Oleanna’s turn in the lock, as I closed the bottom gate shouts and waves came from the footbridge below a final final farewell from Sue.

Hooray!!!

All afternoon the water level in the pound above had been over the top of the gates by a good four inches. But as Oleanna rose the level had dropped, maybe having the power back on had lifted some sluices somewhere, sending excess water downstream.

Good sky

Our aim for today was to reach Woodford, through Denford and Woodford locks. We were however following a day boat so every lock was full and both paddles had been left up on the top gates.

St Mary the Virgin

When we arrived at Woodford FOTRN mooring there were already a couple of boats moored there. It looked like there might be space for us but the depth really wasn’t in our favour so after jumping off I had to jump back on again. Thankfully we knew of a new FOTRN mooring up the next lock.

No room for Oleanna

We waved to the moorings where NB Lillyanne came from and then rounded the bend to Lower Ringstead Lock, the hire boat was still in the lock. I walked up to reset it for us.

The water level was coming over the top gates, only a few inches to go. After a minute or two there was still a few inches to go. They started to try to push the gates open, then there was a suggestion to try to help with the boat pushing the gates! It soon became obvious that something wasn’t right.

Not even a thank you!

‘Is the bottom gate closed fully?’ I asked. ‘Yes!’. By this time I was walking back to the panel to open it up and Mick had arrived from below saying there was water flowing from the lock below. No power to the panel, the paddles needed closing for me to be able to use the panel and close the guillotine properly. Just an inch made all the difference. How had they managed to end up in this situation? Even with someone pushing the button on the panel as soon as the paddle on the top gate was lifted the circuit was broken stopping the gate an inch before it was fully closed. I wonder how long they’d been there for with water just running straight through the lock, they’d certainly run out of beers by the number of empty bottles on the roof.

Thankfully there was plenty of water!

We worked our way up and then kept our fingers crossed for a space on the new Clives’s Retreat mooring close to the entrance to Blackthorn Marina. Thankfully it was empty, but much to Tilly’s dismay it was far too late for any shore leave.

Settling in at Clive’s

I put together a Roast chicken leek and feta pie with pastry that had been in the freezer. A glass of wine accompanied our meal and we wondered whether the appointment we were heading for will still go ahead.

8 locks, 13.39 miles, 2 Finesse’s, 3 cuppas, 1 group, 4 hours without power, 1 parcel on it’s way, 1 troublesome day boat, 1 inch, 1 new mooring, 2 flags, 1 long day boating, 70 years, 1 king.

https://goo.gl/maps/d8QyKu9jmkeJ1sHx6

HOORAY!!!! 6th September

Oundle Boat Club

An early start to meet my lift into Peterborough. Ken from NB Cleddau had very kindly offered to give me a lift to the station this morning saving me sitting defending my model box on the bus as well as trains and the tube today. We arrived in plenty of time, I bought my ticket and then had to wait until 8:30 before the barriers would let me through. I was catching the slower Thameslink train to St Pancras, if I’d waited another ten minutes I could have got to London earlier but it would have cost another £90! I was happy enough sat watching Brampton and St Neots go by, only one boat moored on the GOBA mooring where Tilly got stuck behind the double fence weeks ago.

Panto Model on tour

A quick transfer onto the tube and I was soon walking up to Abi’s house in Golders Green. Today the meeting would just be Abi and myself working through the show scene by scene, scene change by scene change. A few notes were taken for small amendments, but generally all was good. When it came to the troublesome scene I had taken three options with me just in case. I set up the latest which thankfully got the thumbs up! Just some minor adjustments to make it even better. Hooray!

We were joined by Gemma the production manager for the last hour to chat through anything that might be problematical, then tucked into a bowl of soup whilst chatting props. A very productive three hours.

The water tower at St Pancras Cruising Club at the end of the road

Meanwhile my phone kept making noises. News was coming through from Oundle. This morning NB Barbarella who have been moored on the lock landing at Whiston Lock were woken by engineers working on the broken lock. At around 10am I got a message from Mick saying that the lock was open again. Hooray!!

I passed the good news onto Cleddau. But so far no news of Islip Lock.

At 12:30 my phone pinged again. The engineers who’d mended Whiston had just completed works at Islip Lock which was now also open. Hooray!!! Our way ahead is now clear, I just need to get things in the post and then we can push off.

The model managed to have a seat to itself on the way back too

Ken met me at the station again and brought me back to Oleanna who had moved. During the afternoon NB Shadow had decided that they would head off and obviously needed their hook up lead they’d lent us back. There was still credit where they had been moored so Mick moved us up to plug in there instead, our old space soon taken over by NB Charlotte May.

Mick had spent the day washing what ever he could find. The chimney was swept, the boat hoovered through, water tank filled, a busy day. Tilly spent much of the afternoon being adamant that NB Charlotte May was actually Oleanna, she had been inside when Mick had moved the outside but sometimes scent is more persuasive to her than looks. Good job she didn’t go for a walk through of their boat as they have two woofers in residence.

Showing the model on zoom

At 7:30 this evening Mick retreated to sit outside under the clubhouse canopy whilst I took over the dinette table. It was time to do my Final model presentation to Producers, the Writer, Production Manager and Technical Manager. To get a reasonable view of the model it was set up on a couple of shoe boxes and moved to about 14 inches away from the laptop, I had to perch on a radiator as I showed everyone through the model. Another good meeting, half a days work to do tomorrow and then we can be off! HOORAY!!!!

0 locks, 55ft reversed, 2 trains, 2 tubes, 1 shower, 5 thumbs up, 2 mended locks, 1 full tank of water, 1 chimney swept, 1 confused cat, 4 faces almost in my model box, 1 very BIG thank you to Ken for the lifts today.