Category Archives: Cats on the Cut

Panto Postcard 3, 2021

61.25 hours

My planned escape back to Oleanna was very nearly thwarted. I left the theatre with ten minutes to reach the bus stop I have used on a Saturday night to get to Banbury in the past. I glanced at the time table only to discover that the last bus to Banbury did not stop at my bus stop, it was a fast bus. Two minutes later I saw it pass the end of the street! I called the taxi company that had ferried me back and forth last week and pleaded with them to help me. Thankfully they had one driver who wasn’t booked up all evening and he’d just returned from a break. I was soon back on track but £25 worse off.

What a journey!

The first train to Birmingham New Street was very pleasant and roomy, however the next train was packed with singing shouting Barnsley football fans. Luckily I had a reserved seat, well three in all for my journey up to Doncaster as I’d bought split tickets. I sat wincing every time the next round of songs was shouted around the carriage. I wore my mask hoping it would keep any possible virus at bay, not just for me but also the whole panto cast on my return. Eventually the carriage emptied out and things became quieter.

Mick was at Doncaster station to pick me up in a hire car and whisk me back to Goole so that I could surprise Tilly. She was so pleased to see me that I wasn’t allowed to stop stroking her until it was time for bed.

Sunday. What a horrible morning! We’d been hoping to move Oleanna today, the alarm had been set, but the sideways rain was so not conducive to seven hours or so out side to get her along the New Junction Canal. So instead Tilly got to come and go, using the hire car as shelter and we had a cooked breakfast. Hooray!

I actually needed a quiet day as I was really rather pooped. Mick headed off to buy some Puppy Training Pads whilst I did very very little. It was so nice to be back at home with my two favourites cosy in front of the stove.

Hello Martin and Wendy!

Yesterday Mick had discovered that the boat moored behind us was Martin and Wendy’s Lullabelle, we’d escaped Goole with them back in May. Lullabelle is part way through having a repaint, Martin had spotted Oleanna though. They have spent the summer months pootling about on the Ouse, up to Oxclose Lock which was closed and down to Naburn. They then headed back to Selby, had a trip round Trent Falls on Sea Maiden ( another Escapee) and Lullabelle was one of the first boats to get through Selby Swing Bridge when it was finally removed to be mended.

Monday. Time to pack things, the main one being Tilly. Our original plan had been to return to the house on Sunday, have a day for Tilly to settle down with me being around before I headed back to pantoland. But there had been a misunderstanding with one of our lodgers who’d decided that she was not leaving until today, she’d also said no to Mick dropping in to pick up Tilly’s Cat Caravan. Her show was moving on to Newcastle so she wanted to avoid any unnecessary contact, we respected that but were a touch miffed that she’d been confused at us wanting to return to the house on the Sunday when that is when she’d booked the house til!

I don’t see why I couldn’t have stayed here!

Anyhow, we packed the hire car. Fleur the Company Stage Manager in Scarborough had lent Tilly a Cat Caravan, which she wasn’t too pleased about. Also what was it with those Puppy Training Pads! I’m not a puppy and I certainly don’t need training! Our drive back to Scarborough involved two stops to refresh the puppy pads and after about half an hour Tilly seemed to be calming down a touch, maybe helped by the Pet Remedy, or just that she was getting more queasy. Poor poor Tilly! It was a relief for us all to reach the house.

Once Tilly had been cleaned up I didn’t bother restricting her to a room at a time, so we both checked round the house, Tilly more vocally than me! She definitely knew where she was, Yes, Scarboreugh! Our lodgers through the summer have ranged from being awarded 11 to 5 out of 10 for how they have left the house. A spare clean sheet for our bed would have been nice, but that was soon sorted.

Shoes from down the road has been making himself known to our lodgers and came peering in through the kitchen window only to find that Tilly had returned and that we would not be a push over. Stupid Cross Eyed Cat!

Having people live in your house means you get left with things, the garlic will get used, but I think we now have a touch too much malt vinegar! The rest of the day was spent doing washing, unpacking and making lists. Followed by fish and chips from Cappleman’s.

Sunny day

Tuesday morning and it was time for me to pack my bag again. Mick gave me a lift to the station, Scarborough was wonderful and sunny, such a shame to spend the day on a train. Mick headed back to Oleanna to pick up more things and check in with Martin and Wendy who would be keeping an eye on her for us for a few days.

My first train was to York where the River Ouse was in flood, right up to the level of the Museum Gardens, so no boats were moored there. I changed trains to a direct one to Banbury which followed parts of the canal network and rivers, the Soar looked really quite full. Back to Chippy on the 488 I stocked up with some food and went straight into the theatre.

The town square almost finished

Final preparations were taking place for publicity photos so we tweaked a few things whilst the Dame tweaked her padding. Lights were focused onto stage and then scenes were run for the photographer. Meanwhile I carried on painting behind the backdrop.

Final adjustments

During the afternoon news came through that one of the Pippins had tested positive on a lateral flow test today. The Pippins had all been in yesterday after school for a couple of hours rehearsing with the adult company. PCR tests were arranged for the company and anyone who’d been in close contact, it looks like I’d chosen a good day to have off!

Things getting nearer to being finished

Wednesday. The theatre was a touch quiet today with the majority of people having gone to Banbury for a test. The test centre where they had been booked into via the NHS had closed three weeks ago! Luckily their appointments were honoured at a drive through test centre not too far away. Doors and windows were kept open and everyone wore a mask all day long.

Socially distanced production meeting

More painting, nearly everything has a coat of paint on it now. Despite rehearsals going on on stage I can beaver away behind the backcloth quite happily. We had a production meeting at lunchtime. We collected in the bar and were joined by other members of the team via zoom. A laptop was pushed around the bar for people to give updates on their progress and bring up any problems. The main problem we have is that The Chipping Norton Theatre sweet chest, which has been in every panto that people can remember has gone missing! If you happen to know of it’s where abouts please let me know in confidence.

Thursday. Back in Scarborough we finally had scaffolders arrive. This is so that a roofer can sort out the roof where we have developed a roof garden which is letting a lot of water into the house and is possibly the reason the kitchen sockets have been tripping for the last few months.

That looks like a good climbing frame!

Mick added two containers worth of our solid deposits into the compost bin in the garden. The garden waste and our deposits from earlier in the year had almost totally composted down, this will be left until next year before it is used somewhere in our garden.

A pouch of plenty!

In Chippy rehearsals continued, the Pippins joined via zoom this evening, Dash (the Director) showing them where he wanted them to be in certain scenes. They also got to meet the Musical Director who joined us, Barney. Some singing was done over zoom too. It’s great that such things can happen keeping everyone involved with the show. By the end of the day everyone’s PCR results were in, only the one Pippin having tested positive, thankfully she hadn’t passed it on to anyone else. We all continue to do daily lateral flow tests.

Second coat of emulsion before the arty stuff goes on

I was called over by Dash for something important, he needed to give me plenty of chocolate to keep me going through the evening. Working for him is a touch like having a fulltime Dame in the room, and today I got most of the sweeties! A fresh coat of paint was added to the floor before we all left for the night.

First frost

Friday. Blimey it was chilly this morning, fitting for it being Bonfire night. Rehearsals continued, eleven out of twelve Pippins returning to the theatre.

I started putting finishing touches to several pieces of scenery and ended up the day drawing out the floor in paint in preparation for painting it over Saturday night into Sunday morning.

In Scarborough the roofer arrived and Mick got chance to see the roof where the problem was. The roofer wanted us to replace the slates with concrete tiles, but that wouldn’t be right for the house. He also wanted to redo the whole of the roof over that part of the house. Mick declined his kind offer, we just needed the roof to be good again and the rest of it seems to still be in good order. Thankfully the timber is just wet and not rotten. The chap will return next week to sort out gutters and reroute down pipes with the hope that the problem will not recur so that everything can dry out. We now need to find a plasterer to redo the kitchen wall, I’m not sure my dabble with plaster last winter makes me qualified enough for the job.

0 locks, 0 miles, 2 windy, 2 wet, 2 nights on board, 1 cat transported to the house, 4 trains, 1 hire car, 0 clean sheets, 5 out of 10, 1 tart, 1 Tilly tree climbed, 3 bottles Sarsons, 1 positive, 2 known neighbours, 1 not too lonely Oleanna.

Panto Postcard 2. 2021

70.75 hours

Cheese and Ham Muffins

Sunday. What a lovely day. Time for a cuppa in bed for me. I didn’t really plan on doing that much as I’d had a busy week and knew that the following week would be even busier! Not having my breakfast chef on hand I put together a treat breakfast. Two toasted muffins with cheese and ham. Very tasty, but not a patch on one of Mick’s breakfasts. I then spent most of the morning trying to catch up with The Great British Bake Off, played on the laptop whilst crocheting and most importantly keeping my legs up.

Crochet and baking

During the last week my knees have taken a battering, an old war wound on my left knee used to be sorted with a good rub. But sadly now the effect only lasts a few minutes. So keeping my feet up was a very important job today, also having the opportunity to do some crochet was good. My blanket is now of a size that Tilly and it cannot live comfortably on my knee at the same time.

Gluten free fish and chips

In the evening I joined Gemma (Production Manager), Chris (Production Carpenter), Ade and Lou (Set Builders) for a drink and some food at the Blue Boar where we could get a table. It was good to see the team again, have a drink and of course have fish and chips (gluten free version available).

Meanwhile in Yorkshire, Mick had been up early to move Oleanna for her rendezvous in the morning in Goole. Thank goodness it wasn’t further! His first hop before Oleanna was over heating got him about half way from Rawcliffe Bridge. Time to let the engine cool down before the next hop just to inside Goole caisson.

The lift mooring

Then the final hop was into Viking Marina, to the boat lift. Oleanna wouldn’t need to come out of the water, but this was a space that was available. Our mooring from last winter now has a boy racer cruiser tied up to it, but we could still claim to be neighbours with Lisa and Al’s boat. The trip of 2.5 miles had taken Mick and Oleanna 6.5 hours.

Meet and greet

Monday. A very busy day for me at Chippy, read through and fit up all rolled into one along with meeting a sixth form work placement student (Imogen) who’d be joining me several times this week. I collected all my model pieces together and using blue tack put it back together as best I could in the time I had before being asked questions by the builders, showing my face at the meet and greet. Blimey that was odd, everyone being masked, trying to talk to each other and be heard, whilst at least 20 other people were trying to do the same thing!

Busy busy busy

I did the model showing, followed by Helen showing the costume designs, then it was the read through, so much better read by the actors than read in my head. Plenty of ‘Chill out Hilda!’

Ade and Lou concentrated on building a platform for Rapunzel to get to her tower, whilst Gemma and Chris busied themselves rigging portals and cloths. I managed to get quite a few things drawn out so that they could all be jigsawed out to the correct shape. Jo (Prop maker) arrived with many goodies in her van, including the giant strawberry.

In Goole Mick and Alastair were being busy. First the antifreeze in the cooling system was drained off. Then pipes and the gear box oil cooler were removed. Lots of rusty crud was blocking these. A pressure washer was then fitted to the system and the whole thing was given a good wash through.

The system was put back together filled with water the engine started up. After about ten, fifteen minutes it became clear that the crud was not the only problem as Oleanna’s temperature started to rise again. Alastair decided that a pressure test would be needed to check if the head gasket had gone! This could only be done when the engine was cool, so it was decided to do that the following morning as it was already late in the afternoon.

Chocolate fuelled drawing out

Tuesday. More drawing up for me today and with the help of Imogen lots of furniture had a base colour applied, Imogen could well be a useful find. Ade and Lou headed home leaving a box of their fresh pressed apple juice for us all to enjoy. Chris and Gemma carried on rigging pieces of scenery with the help from Ash and Gav the two in house technicians.

Base colours on the town flats

By the end of the day I’d managed to get some paint on more pieces of scenery and solutions for the cinema screen to be able to fly in and out had been found. One tower has a hinged door in it the other has a section that can be removed with care, hopefully this won’t need to happen too many times. A good day in Chippy.

Heading back to Viking before she over heats

However in Goole investigations continued. Alistair set about doing a pressure test at 8am. This had to be done first thing as the boat lift was needed today. Thankfully Oleanna passed the test and so the head gasket is good, phew! He was sent over to the visitor moorings whilst the lift was being used. Mick headed off to do some shopping and once the mooring was free again he moved back over for more investigations.

The water pump

The water pump was removed and then taken to bits. Ah Ha! This was the problem, Mick had thought it might be. For those unfamiliar with what the inside of a pump should look like, there should be 6 fins that pump the water through the cooling system, Oleanna’s for some reason only had 1.5, the rest having disappeared into the rusty crud.

It should not look like this!

A phone call was made to RCR as the job could now be passed back onto our breakdown cover. A new water pump was placed on order, but no-one was sure when it would arrive. Oleanna certainly wouldn’t be going anywhere, she was hooked up so Mick and Tilly could have power again. The marina sadly isn’t a suitable place for Tilly to explore so cabin fever was soon to set it.

Wednesday. Covid policy at Chippy Theatre is to do two lateral flow tests a week which have to be photographed and sent in to Annette the Company Stage Manager. There is also a thermometer by the pass door into back stage. Tuesday morning I’d offered up my forehead at which point the unit flashed red, displaying a large L. I tried again, the same thing happened. I removed myself from the building whilst the thermometer instructions were checked. As I thought, my temperature was too low, thankfully that meant I was allowed to enter the building and get on with work. The same happened again today, six times before my icy heart warmed up enough!

This was a delivery to the pub next door, honest!

The theatre has arranged for the theatre bar to be open on an evening for the company to drink in, hopefully reducing the chance of someone picking up Covid by mixing with the general public in a pub. I’d already decided that a bottle of wine back at my digs was preferable to going to the pub, plus I’m unlikely to be doing that anyway as I’ll be at work till late most evenings anyway.

The backdrop was flown out, red bands added to the portals, they still need to go gold, some of them were trimmed to fit better. As I’d designed the tower last January/February I knew getting in and out of it might be quite a tight fit, so I was the one who had to try it for size first. Thankfully I fitted meaning Rapunzel would have quite a bit of spare room as she is half my size.

I spotted a problem with part of the set. A tent that needed to be on wheels. A discussion was had about it. One side saying if they’d have known it was to be a truck (on wheels) then it would have been built completely differently. The other side said it had always been a truck and that the drawings most probably said as much. In fact the drawings had sketches explaining what would happen to the tent truck. A carpenter would be found to amend the tent.

Green wires!

Mick busied himself on Oleanna. There was the green wire to solve from the alternator belt incident. He also took apart our original domestic water pump and gave it a good clean as suggested by Alastair. This worked a treat, so it was put back to work. The new faulty one was also taken to bits and the switch was found to be faulty. Mick managed to mend this whilst Tilly climbed on the ‘Feed me’ shelf at regular intervals throughout the day. Well I had to occupy myself with something if there was no shore leave! Tom got himself a gate key and blatantly chatted to Toms outside, coming and going at will, leaving me to snooze in front of the stove!

My bowl is empty. Feed me!

Thursday. Test day for me and another day of being cold hearted!

Mine is a bit brighter

Today the actors moved into the theatre to rehearse. I moved into the auditorium and spent the day painting the groundrow, which I thought I’d based on a David Hockney painting of the Yorkshire Wolds. However on visiting the Co-op it appears I’ve been influenced by the mural there!

Dash (Director) had quite a few questions and found it quite novel that they could be answered by me within minutes, it’s not often a Designer is in the rehearsal room all day every day. It’s nice for me to hear where ideas are coming from rather than just getting the request on an email at the end of the day.

In Goole Mick waited for the new water pump to arrive. We’d been hoping to have Oleanna back along the New Junction Canal by now, maybe at Bramwith Junction. Extra crew, Bridget and Storm had been enlisted to work the lift bridges for Mick, but by now they had been stood down several times. The pump would be coming from Beta and should be delivered by midday on Friday.

Fusedale alongside the new dry dock at Viking Marina

Fusedale turned up for refuelling at Viking Marina, Laird was expecting it to require 850 to 1000 litres!

Friday. Chris returned for the day, a few hours of his work saved the technicians several days worth and I know things will work now including the tent truck, Hooray! Scenes were rehearsed, a lot of long hair climbing in and out of windows. How to support your long hair and a witch at the same time became a bit of a theme for the day.

The Pippins joined

Then in the late afternoon the Pippins joined the actors. The Pippins are local school kids, in three teams who add to the chorus of panto. Two hours with lots of singing and dancing on stage whilst I hid behind the backdrop working away.

All but the blooms done

By the end of the day the town flats were complete apart from some purple blooms.

Around 11am a delivery arrived in Goole, a water pump! You can now see what damage the old one had very clearly. Alastair fitted the pump, the system was filled with antifreeze mix and the engine started up. Everything seemed fine.

A working gauge to show the water pump working!

The new green wire also did it’s job, the temperature gauge showed a constant 80, this hadn’t shown a reading since the belt incident. Hooray! on two counts. By 2:30pm everything was deemed good to go, only thing was it was far too windy to move Oleanna. Mick would most probably have got her as far as Lisa’s boat and ended up being blown alongside and pinned there. Laird from the marina was fine with Mick staying for another night.

Peeking through the set

Saturday, a slightly later start for me today, just as well as the covid policy at the theatre has changed. Every morning before going into the theatre we all now have to do a lateral flow test. This is so that during rehearsals the actors can all be unmasked, but whilst moving around the theatre masks are to be worn. As I spend my life going from here to there and back again, I wear my mask pretty much all the time. I won’t be changing this even if everyone is testing daily, even though the back of my ears are red roar! I so feel for those who’ve been wearing masks all day every day for the last 18 months.

Gav down the trap

Time to draw up the tents and when the acting company had left for the day the scaffolding tower was erected so that I could reach Rapunzels tower to touch up the paintwork and finish bits that couldn’t be done before. The technicians dug out old equipment to see if it worked from under the stage and then Gav did a very good job of being ballast at the bottom of a ladder for me whilst I painted a coat of gold on the arches. At 6:15 an alarm went off on my phone, time to wash up, pack up, get changed and run away for the weekend!

In the afternoon Mick returned the key fob for the gates to Laird, thanked him and then moved Oleanna out from the marina. The doors were opened up and Tilly was set free to explore once more.

0 locks, 3.1miles ish, 1 new water pump, 2 mended domestic waters pumps, 1 big flush through, 1 pressure test passed, 0 blown head gasket, 34 litres antifreeze mix, 3 lateral flows, 1 theatre with doors open, 19 cast, 3 carpenters, 5 long days, 1 normal day, 2 soups, 1 brolly, 3.5 meters of hair, 1 new leaking roof, 1 tent on wheels, 4 panto masks,12 hours a day, 1 weekend off, WOOHOOO!

Panto Postcard 1. 2021

59.5 hours

Monday morning I was in the theatre early. Time to hunt out my paint orders and old paint I would be needing this week. The dressing room that we normally use for a props office (until the Dame takes it over) was piled high with Panto Post. I found most of my things tucked under a pram in the wings of the stage.

I then met up with the new Producer Suzette who gave me a lift out of town to Alfred Groves and Sons in Milton-in-Wychwood where I would be working this week. A while later Gemma arrived with the advance pieces of set for me to paint. These are the pieces that will be needed early on in the fit up or will end up being high up.

Ready to prime

We collected more things from the theatre, like a table chair and ladder. All pieces of scenery were laid out and by the end of the day everything had a prime coat of paint on them. Taxis were booked for the rest of the week to get me back and forth.

Meanwhile up in Yorkshire. Mick did a few things whilst still having use of the car, he’d hoped to be able to buy a new part for the kitchen tap which is dripping again, but one will have to be ordered on line. Once he’d returned the car he and Tilly made ready for the off. Because Bulholme Lock was still being operated by a Lockie he wanted to take advantage of not having to single hand it. He was beaten to it by the gravel barge Farndale, heading back to Hull sitting high in the water. With big beasts of boats now using the waterway it’s wise to find secure moorings as mooring spikes are unlikely to withstand the movement.

Being dismantled

Mick descended the lock and headed downstream towards Ferrybridge. More buildings have been demolished around the power station and the old coal wharf is gradually being dismantled. I’m kind of glad I wasn’t there to see it, although jealous at the same time.

Oak assisted drawing

Tuesday. My taxi arrived and whisked me out to Groves, the driver I would see several more times this week. Despite it being unseasonably warm I had paint that wasn’t drying! So I spent the day drawing everything out. To aid this I hunted around some skips in the yard outside, nearby carpentry workshops supplied me with offcuts I could use as a yard stick. Fixing a pencil to the end means you can draw from a distance and supposedly get better curves. The only sticks I could find had been oak, a touch heavier than I’m used to, along with the lack of practice my curves were not so good, but that could be sorted with paint.

1 kettle and a glass of wine

A short day today as I had a ticket to see The Strange Case of Dr Jekyll and Mr Hyde at the theatre. Blackeyed Theatre are touring the production for which I have several connections. It was adapted and directed by Nick Lane, the Company Stage Manager Jay and one of the actors Zack are all people I have worked with, they are part of my Hull Truck family. It was great to see the show, but better to see Jay and Zack. We headed to the pub where they were staying for a couple of drinks after the show. I of course took a kettle with me, now I could have hot drinks at the paint shop.

Only three towers left at Ferrybridge

Back in Yorkshire. Mick had moored overnight in Knottingley allowing Tilly to have a bit of shore leave. The river level had risen and the flood lock was closed behind him. Good job he’d come through the day before as it’s a very long lock to single hand in.

Next stop was just below Whitley Lock. He’d arrived as someone else had below, the lock got a touch confused so even though it was almost in his favour it was emptied to bring the other boat up which seemed to sort the problem out. The crew from the other boat helped Mick down. He then pulled up on the visitor moorings and let Tilly out.

Wednesday. At last I had dry paint! I could start to add more. I spent a lot of the day either bending over or on my knees laying in and blending the yellow stonework on Rapunzels tower, both inside and out. It took forever and my knees were not my friend by the end of the day. I did treat myself by starting to add some colour to the Cotswold Thunderbolt pieces. Being able to stand up to do this was a joy, I needed to move the other pieces up off the floor and also get some heat as it was starting to get chilly. The weather had been fooling me and I’d not even thought about heating until then.

Gravel barge in Whitley Lock

It was raining at Whitley. Mick decided that he would leave when they moved up to Tilly, so she got busy outside. Just as well he’d managed to tie up to rings as Farndale came past with a full load of gravel. One of our fender hooks broke and sadly a rope fender dropped into the deep Yorkshire water.

A full Fusedale

Half an hour later Fusedale the other gravel barge came past fully laden. I suspect Mick knew they were on their way as he’ll have had the VHF radio on. The gravel barges don’t have to drop crew off with the key of power, there are Lock Keepers on duty for them.

Around about midday Mick and Tilly pushed off although they didn’t go very far, just to Heck Bridge as it started to rain. A strange noise from the domestic water pump made him investigate, it had sprung a small leak. He called Laird at Viking Marine to see if they had a 24 volt one in stock and he did. So later in the afternoon they pushed off again mooring above Pollington Lock.

Up against the walls

Thursday. A chilly start, I was glad I’d taken my thermals with me to work today. I thought I’d be getting a work placement to help me for a couple of days this week and had planned on standing all the set pieces up with their assistance, but because of all the paperwork and regulations they won’t join me until next week.

Cafes, carpenters, bakeries, chilled medication, all sorts at Groves

The big gas heater above my head sadly doesn’t work, so I put in a request back to the theatre for assistance moving things and some heat. The flats are not that heavy and maybe I could have done them on my own, but one wrong twist and I’d be out of action, so not worth it. John the Artistic Director arrived to help move things about, so much easier with two and now my knees could take a break. Another two colours were added to Rapunzel’s tower and I started to base in one of the houses for the town square.

Below Pollington Lock

Mick single handed down Pollington Lock. There is still no mooring along this stretch of water following the breach last December.

Slipping banks

Lengths of the piling holding the bank up slipped when the water level was low and parts of the bank have followed the piling splitting away from the bank.

Buoys on the way to Drax

Buoys mark the areas to give a wide berth of up to the New Junction Canal and around the bend where Drax Power Station comes into view (the only power station in the area still with all it’s cooling towers).

Breach site

Then the right hand bend and past the breach site.

All new

New piling over the big culvert and concrete now have a big rubber strip along the top edge. Two small manholes sit where there were ones before the breach.

Rubber edging

A new wooden fence is in place and grass seed is just starting to take hold around the area.

All the big machines, pipes, generators have long since gone.

New roof for a new life

Past New Bridge 21 you can moor again and further on the almost ruin of a house is in the process of getting a new roof. It’ll be watertight before they remove the bricks and breeze blocks in the windows. Mick carried on past Rawcliffe and through Goole caisson. Both diesel points in Goole had boats moored on them so he winded and returned to moor at the far end. He walked back to Viking Marina to get a water pump. Laird had quite a few and was selling them at a discount price, without a guarantee as several of them had proved to be faulty. If they didn’t work at all he’d either replace it or give you your money back. Mick bought two in case and soon found one didn’t work. Maybe they were a batch lot that dropped off the back of Del Boy’s cruiser!

Not a bad view when I looked up from my work

Friday. A heater was meant to have been left for me to pick up at the theatre this morning, but was annoyingly absent. John would sort it later in the morning. I based in more of the town flat and then started to add extra bits to the ship.

John visited me twice, once with a heater that didn’t work, then with one that did, Hooray!

I then spent the remainder of the day lining in the tower pieces. By the end of the day I had finished several pieces of set, a few just need a few finishing touches which would be better done when they are upright.

I’ll do anything for your kebab!

I requested to the taxi driver to take me to Sainsburys, I’ve been to most supermarkets this week, so that I could get something in stock for tomorrow. But Sainsburys seriously let me down with very few things I could eat without buying a mass of veg, I tried the Co-Op too and gave up, rewarding myself for a good days work with a chicken doner and chips. These I find are best eaten on a bench, they taste better in the open air! The aroma attracted some company from a local beggar who just missed me putting the box in the bin. Even a very big head nudge didn’t work.

Exol Pride’s new home?

Mick returned the none working water pump, got another, but doesn’t hold out much hope. He stocked up with food spotting that Exol Pride seems to have a new mooring near the coal tipper. We wonder if this is because it was all getting a touch too busy with the gravel barges also using the same moorings. He topped up with diesel at Goole Boat House and headed back out of Goole to just before New Bridge. Tilly prefers it out there. The unfortunate thing is that just as he was about to pull in he noticed that the engine temperature was rising, it kept on rising. Mick moored up.

The skin tank wasn’t hot, there was little hot water, but the engine was most certainly hot. Was this a recurrence of what happened on the Thames two years ago? Or had the water pump on the engine gone? A phone call to RCR in the morning when he might be able to get a touch closer to a road.

Finished, Rapunzel’s window when it’s cut out

Saturday. Somehow my taxi this morning had been cancelled, I got it sorted and got out to Groves for a bit after 10. I managed to join the Geraghty zoom for a short time whilst I opened up tins of paint. Lovely to see everyone even if briefly.

Going a bit gingerbread

Time today was precious as it was my last day here and the set pieces would be collected tomorrow. I ended up finishing several other pieces but by the end of the day I had no idea if the roofs for the towers were right or not as I had to leave then drying. Paint was all packed away, my possessions collected together and hopefully I left the place in a reasonable state as I ran hobbled to catch my taxi. My left knee is very much looking forward to doing next to nothing tomorrow.

I could do no more, before my taxi turns up

Mick decided to move to Rawcliffe this morning where there are bollards to moor to and an easier place for an engineer to get to the boat. Oleanna managed to hobble the distance but was getting very hot and bothered as she arrived.

A nice local engineer came out, listened to Oleanna’s woes and history. He doesn’t think it is the pump on the engine, but thinks the system is gunked up again as it did on the Thames. He feels that the system needs a good flush through with a power hose. He thinks that maybe the level of anti-freeze wasn’t correct in Oleanna’s early days and that a flushing out means that we can start from scratch again. We’ll see, Oleanna now has an appointment with a jet wash on Monday, if she can get there!

3 locks, 27.65miles, 1 straight on, 4 winds, 3 water pumps, 1 too hot engine, 11 taxis, 1/3 of the set, 3 heaters, 1 working, 1 lovely space to work in, 3 supermarkets visited, 0 digs cat, 1 scrounging cat, 1 friendly landlady, 2 ex truckers, 1 show, 31 pots of paint, 1 fat knee!

Panto Home. 17th October

Castleford

My last Sunday morning on board before panto, so I had requested a cooked breakfast. Very yummy it was too.

A few last things to pack and then I was ready. Time to push off to load the car.

Could it be?

Late yesterday afternoon I’d heard a boat pulling in a boat behind us. This morning as we started to untie a chap on the narrowboat was doing the same. Without assistance he was taking his time, so we waited patiently before undoing our ropes.

NB Honky Tonk and Oleanna one boat apart

I looked at his boat. Hang on! Could this be a boat I’d been keeping my eyes open for since we reached Wakefield? It had the right configuration at the bow, but I just couldn’t see it’s name. The chap reversed out from the mooring and proceeded to wind, heading back towards the flood lock. As he did so we both spotted each others boat names at the same time. NB Honky Tonk is another Finesse boat, we follow each other on Instagram. We waved and had chance for a little bit of a chat, but the distance between us was a touch too much for him to hear properly, he at least got the jist that we wouldn’t be following him to Lemonroyd Lock, a shame really as we could have met properly.

Red and green at the lock

Once he’d cleared we followed suit, pushing out and winding. We headed up towards the flood lock, all of 0.4 of a mile. The lock landing was full of fishermen, so we couldn’t pull in there and get the car alongside to load it.

Just look at her smile!

Instead we pulled up behind the boat moored on the water point and whilst I popped the last few things into bags Mick ferried things to the car.

Bye

Once I was off loaded we winded again and returned to where we’d come from, mooring up well in case any of the gravel barges were on the move. Now it was time to say goodbye.

Well I knew what was happening, but a little unsure to what extent. She’d been putting things in bags, lots of them! Last time She did this we all moved to Scarboreugh, to a house! But this time it didn’t look like I was going anywhere. She gave me a big head nudge and asked me to look after the boat and Tom, I also got some Webbox too! Then they were gone, leaving me in charge. Thankfully She’d left me my evening dingding and extra biscuits!

Normally it takes 50 minutes to reach Chippy by bus, today it would take about three hours by car. The last stretch gave us great views over the Cotswolds. We dipped down through Over Norton and into Chipping Norton.

I’m staying with Suzanne again where I’ve been for the previous pantos. She was away for the weekend so had left me a key. We off loaded the car and had a cuppa, then it was time for Mick to head back to Oleanna. He could have stayed the night, but would have been under time pressure to get back with the hire car. Heading back today meant he could do a few chores in the morning, return the car and then hopefully get down the broken lock whilst it is being manned, the day after it will be closed for divers to hopefully fix the problem.

Cotswolds

So I am now in Chipping Norton for the next few weeks, working hard, doing my best to avoid catching any lurgy. Mick and Tilly will still be cruising and taking photos for me. For the next few weeks it will be Panto Postcard Posts only on the blog. See you at the weekend.

0 locks, 0.8 miles, 2 winds, 2 Finesse boats, 2 many bags, 1 full car, 1 very early dingding, at least we remembered this time, 3 hours there, 3 hours back, 1 Chippy home again, 0 Pepper the cat :(, 1 post a week for a while.

How Much Stuff?! 16th October

Castleford

After the Geraghty zoom this morning Mick headed off to pick up a hire car. He’d shopped around to find the cheapest option. Enterprise just pipped Thrifty to the post as Thrifty have a maximum mileage after which you are charged quite a bit per mile.

Butter, light muscovado sugar and golden syrup

Whilst Mick was out Tilly got to come and go as she liked whilst I first wrote a long list and then started collecting items together. Next week I start work on this years Chippy Panto. On the two previous times we have been on the South Oxford Canal, an easy weekly commute for me to get back to the boat for weekends. This time being a lot further north, I will only be getting one trip back to see Mick and Tilly, plus I’ll be there for five weeks. So my packing needed to be more comprehensive than in the past.

Bramley apple and raisins

Living on a boat means things are beavered away all over the place. The steps at the stern had to be removed to access the lower cupboard where I keep my Scenic paint brush bag. Then the winter bag of clothes needed to come out from under the bed. This has normally already happened to get our warmer clothing out of storage, but so far this year we’ve not felt the need for thermals. But I strongly suspect I’ll be needing my long johns before too long.

Porridge oats and cinnamon

As everything was gathered together and packed into bags I was staring to run out of places to put everything. The bed became piled high. The sewing machine came out from under the dinette seats and sat on top of them in the corner. It really is amazing just how much stuff can be tucked away.

Stew bubbling away, jackets in the stove

A pork stew was put on the stove to have with jacket potatoes later in the day. I carried on packing. The Bourbon tin came out, still full with drawing tools from two years ago. The big pencils got a good sharpen whilst I watched boats arriving to be penned down the broken lock. Mick had a walk up to chat the lock keeper as he was hoping to be able to get the car a touch closer to the boat to load all my stuff. The road to the lock has a barrier and if it’s not open you have to reverse for quite a distance before you can turn round. The lockie suggested returning to the flood lock where you can get a car right by the north bank. We’d leave moving until tomorrow.

Sharpened and ready to draw

A batch of apple crumble flapjack was made and once cool it was cut up and shared between two tuperwares. One to stay on Oleanna, the other added to yet another bag to head to Chippy.

Baked until golden

When it came time to go to bed everything was lifted off the bed and put on the floor under the flap of our cross bed, at least now it wasn’t in the way anymore.

One zonked Tilly

The generator has been chuntering away again tonight, still going as we turned the light off at gone midnight!

0 locks, 0 miles, 1 car for 2 days, 0 space nearby, 3 sharp pencils, 9 hours, 2 ikea bags, 1 large hold all (obviously it didn’t hold everything), 1 paint brush rucksack, 1 rucksack, 1 food bag, 2 crochet blanket to finish, 1 food bag, 1 sewing machine, 1 pooped cat, 1 designer all packed up, 1am!

Sad Estate. 15th October

Stanley Ferry to Castleford Cut

Stanley Ferry

No need to rush today, we are on schedule and having pushed on a touch yesterday to get somewhere suitable for Tilly, we were a touch ahead of ourselves.

New gates for somewhere

As we had breakfast a tug came past pushing a skip piled high with brand new lock gates. Stanley Ferry is one of two places in the UK where lock gates are manufactured and refurbished. In an average year around 100 gates are made here, that is a lot of oak! Between November and the end of March sections of the network will close for maintenance, an extensive stoppage list is put together every year with chance to make comments before it is finally published in August. Cruising in winter can take some planning.

Crane too

Soon followed a crane boat, most probably heading to the same site to off load the gates. We pondered where they were heading and if the skip boat was short enough with the tug to go up the Calder Hebble Locks together, we suspected not, there’ll be some bow hauling out of locks.

The sun was out, clear blue skies and plenty of them now that we are out of the hills. We pushed off pausing for me to work Ramsdens Swing Bridge, I only managed to hold up one cyclist! A chimney sweep sat having a fag break on a roof sunning himself.

Stanley Ferry Aqueduct, one of them

Then on over Stanley Ferry Aqueduct and past the workshop.

The big doors were open so we could see inside. Hoists were about to move more gates about inside. Out side piles of gates lay on the concrete, one pile had a constant stream of water running over it, the oak all dark. Presumably this is to keep gates from shrinking as during their working life they will hold back tonnes of water on a daily basis. New baulks of oak sat close by.

No squeezing into locks today, no need for handcuff keys or windlasses. The Aire and Calder requires the Key of Power. Birkwood Lock however never looks like it should be key operated as it’s gate beams of oak have relaxed through the years, it looks like they’d need a good old shove, but no the Key works wonders.

Written in blood!

On the lock landing below there were pots of flowers that were past their best, then hand scrawled signs that could have been painted in blood were a big contrast.

How blue can one world get?

Sky sky sky. 180 degrees of it. Chilly but so very sunny.

It’ll cut across those fields

A short distance above Kings Road Lock is where the proposed route of HS2 crosses on our map, I’m no longer sure if the northern sections of HS2 will happen. Thankfully today there were no huge mounds of earth to spoil the views.

Out for the weekend

We pulled into the lock landing to empty the yellow water into a container for disposal later. This meant the lock was emptied by a wide beam heading up. We were ready before the lady moved to the top gates to start filling the lock, so I offered to use my key at that end, the console traps your key until the gates are closed. She was quite happy for me to press the button for two seconds to commence the filling, so was I!

Down we dropped in the huge lock, it’s as if those short locks were a figment of our imagination now!

Pink Panther keeps an eye on where Foxholes Lock used to drop down onto the River Calder. Ahead we could see that traffic on the M62 was stationary on the eastbound carriage way, we however were cruising along quite happily in the deep wide water.

Last lock for me

A top up of water above Woodnook Lock before we pulled in to descend. This was to be my last lock for a while, the last before I head off to Panto land.

Now back on the river we passed familiar sights Woodnook Viaduct, Fairies Hill Lock, no yellow wide beam moored below it today. At Methley Bridge Boat Yard the boats were still three deep. Welding going on and a great named tug, Chugger-lugs-the-tug.

Just how sad do they look

Towards Castleford Junction, where the Aire and Calder Wakefield Branch meets the Aire and Calder from Leeds and Goole, there is a housing estate going up. I’m fairly sure we’ve been past and seen the Marvin the paranoid android houses before, but now there are even more going up.

Each and everyone of them has the sad furrowed brow, what a sad estate. Did the architect never see how sad they looked?

Left to Leeds, Right to a weir, or straight on to Castleford and Goole.

Straight on for us and through the flood lock. Now where to moor? We need to be here for three days, so longer than the 48hr moorings. We carried on towards Bulholme Lock and pulled in on the south bank just before the edge becomes high.

A red light?

Was that a ‘Red’ light at the lock? A cruiser pottered about in front of the light. Yes it looked red. Normally the lights on the Aire and Calder are on Amber, self operation. Maybe a gravel barge was on it’s way up? Once we’d moored up the reason arrived in our Inbox.

One of the lower sluices has an object jammed in the gate preventing the sluice paddle from fully closing.  This impacts lower lock operation. The upper lock is operational but only operates via the desk in the lock tower and not via the lock side customer operated pedestals which only operate the lower lock.

Actions to investigate and make repairs are in hand but the lock will not be operational via the customer operated lock side pedestals until these are undertaken and completed. To facilitate lockage’s and until repairs have been completed the lock will be operated by a lock keeper on the following dates and during the time periods indicated below.  Outside these times the lock will be closed:

Saturday 16th, Sunday 17th and Monday 18th October 2021: lock open from 10am, last lockage 3pm

The lock will be closed on Tuesday 19th October to allow access for divers to investigate and undertake repairs.

Bulholme Lock is big, but it also has, like many others around here, an extra section to make it even longer. These stem back to when Tom Puddings transported coal around the area. So even though the bottom gates of the lock cannot be made water tight, the middle gates (in normal operation the top gates) are, so they can be used as the bottom gates instead. The extra gates which are rarely used can only be operated by a lock keeper in the tower, hence reduced working hours.

Tilly was given four hours! There was a bit of coming and going at first, but then she vanished out of sight for a couple of hours. That’s more like it!

Sunset

As the sunset, planes flew over and boats lit their stoves, sending up plumes of smoke. Just a shame someone had got their genny going. Even more so when it didn’t stop until around midnight!

3 locks, 1 flood lock, 6.21 miles, 1 straight on, 1 swing bridge, 1 cyclist, 1 boat helped up, M62 stationary, 14 day mooring, 0.5 half broken lock, 2 many sad houses, 1 happy cat, 1 annoying boater somewhere over the other side who needs new batteries!

https://goo.gl/maps/auWZtgb7zUWRd2qb8

Bridge Bingo. 14th October

Wheatley Bridge to Stanley Ferry Water Point, Aire and Calder, Wakefield Section

Today we needed to be moored up in time for me to join a zoom Production Meeting for panto, Tilly’s hope was that we’d be somewhere she could go out for the rest of the afternoon. We already knew that wouldn’t be possible. The travel time on our maps didn’t really give us a suitably cat friendly mooring for 2, 2:30pm, we’d see how we did.

4000 hours as the engine was started up

So no time to sit around in bed, we’d got more short locks to descend and some miles to cover. This must be the first time on passing through Mirfield that there have been no visiting boats moored up, we could have carried on just that bit further yesterday, but Tilly wouldn’t have had any bracken or friendly cover to seek out friends in as the link fencing is right on the towpath here.

The boat that is being worked on is still covered in a tarpaulin by the water point and it looked like the charity boats were gearing up for a day of visitors. Just by the lock, no I’ll rephrase that, on the lock landing was a cruiser! Big signs say that it is the lock landing but the owner must be blind. Any single hander would have had to reverse past the permanent moorings to be able to tie up to use Shepley Bridge Lock. I however went through Oleanna to the bow (I don’t walk the gunnels due to my bad grip) and hopped off the front, luckily the lock was just about full.

Ground paddles that devour spikes

No need to get the Calder Hebble spike out and risk dropping it into the hole below the ground paddle gear. The hard wood that the spikes are made from does not float! I’ve seen one disappear here before and on the same day met a second crew who’d lost theirs at a lower lock.

Down the bottom

The paddle gear seems to be getting stiffer with every lock we work, at least it means you can’t whip up a paddle in the short locks too quickly. Once down the lock Mick turned left and pulled into the lock landing we were now on the River Calder, deep, wide, so different from the bottom end of the Huddersfield Narrow. With water under Oleanna she smiled a broader smile than she’s smiled before, nothing to do with a slight reposition of her twin horns after the tunnel. She also sounds more confident too!

Just a small proportion of the masses

Swans and geese blocked our way into Greenwood Cut, but luckily they all moved out of the way leaving just one cygnet to our port side. It didn’t complain too much at it’s enforced separation.

Greenwood Lock gave us plenty of room to breath in, the stern doors needed closing to avoid the torrent of water coming from under the top gates. Then Thornhill Flood Lock took us back onto a cut, a long cut. This is where we started to play Bridge Bingo.

Bridge Bingo

Some bridges just have names, others numbers as well. However the numbers seem to be mixed up as if two waterways have been melded into one. 31, 8, 33, 34, 35, 22, 39, a few with names and then 26!

Back in the world of moving boats

A moving boat came towards us, NB Little One, an Aintree Beetle, below the high up Railway Bridge 35. Great the Double Locks should be with us.

Thornhill Double Locks

This is where Lillian had an incident the pound between the two locks which knocked her tiller out of it’s cut, meaning we had no steering. Since then we do our best to be very careful at these two locks. The top one was full, but the bottom empty, I went down to lift a paddle as Mick brought Oleanna in to the top.

With no means of crossing the bottom gates of these locks I started to walk back up to the top lock on the off side, but Mick had stepped off Oleanna on that side as the gate had opened. This meant running back down and around to get to the towpath side to close that gate, oh well my steps for the day had a boost!

Damn!

These two locks are the last of the shortest locks, so we took care and nudged our way past the closed bottom gate. The intermediate pound was still at a good level, I’d opened the off side gate on the lower lock for Mick to be able to go straight in. However the two locks are on a bend and Oleanna really wanted to go through the other gate. Mick did his best to manoeuvre her round, but she clipped the port side bow on the walkway, smudging off some paint I’d touched up from a previous moment!

Dewsbury off to the right

One day we will go down the Dewsbury Arm just to have a look, ‘Next Time’.

Approaching Millbank Lock I could see movements, another boat just leaving below. I filled the lock only using the gate paddles, getting the spike into use wasn’t necessary. As I went to lift the first bottom paddle another boat was pulling up below. The first paddle was just about impossible to lift so I moved over to the other side where I hoped that one would be easier. Have to say I’d rather be stood over the bow of the boat in a short lock to keep an eye on it catching on stonework.

A none Magenta Elektra

A lady came up to help, I asked her to wait until we knew we were past the cill as we were over long. She understood and waited until Mick was happy with our position. We nudged past the closed gate and were set free onto the river again.

Mick lending a hand with the paddles

Next the Figure of Three Locks. Two locks very close together, the lower one was seriously damaged by flood water, the bywash being more or less totally washed away. I posted about it earlier this year as it was being rebuilt.

Today the locks are reopen, reconnecting the Rochdale and Huddersfield Canals to the eastern side of the network. Both Locks look pretty much as they would have before the flood damage. A new area of stonework on the towpath connects the two where the flood water pushed through from the river. Now sunflowers fill where the gap had been. Here’s a link to what it looked like after the flood and during the work to put it back together.

A deep narrow bywash

The lower of the two locks has a new bywash. The sides of it very high and built of sturdy stone, this had all but been washed away. The off side bank looks to have been replanted and today a farmer was out in his tractor. A very fine job done.

I wonder if the one new solitary stone below the lock will have something carved on it, it’s shouting out for it.

On past Horbury where we visited St Peter’s and St Leonard’s Church a couple of years ago. This is a John Carr Church and is where the architect is buried.

More moving boats and then moored boats below Broad Cut Top Lock, the locks were getting quite roomy now. Time was ticking on. We knew we wouldn’t make it to Stanley Ferry in time for my meeting so decided to pull in after the next river stretch through Thornes Flood Lock. Just as well we’d given ourselves a bit of leeway as Broad Cut Low lock took forever to fill and then with only one paddle working at the bottom end it took forever to empty!

Thornes Flood Lock

We pulled up into the lock cut with half an hour before my meeting and had a late lunch listening to Tilly demanding to be let out. Too close to the railway for comfort she could protest all she liked, but we’d be moving on for her after my meeting anyway.

It might look good to you Tilly, but not to me!

A couple of new faces at the meeting today. Late last week a site was found for me to do a weeks painting near Chippy and set pieces will arrive for me next Monday. I have a clean bare space to take over for a week, I just need a chair, a table and a ladder and I’ll be painting away for hours. Every department was checked on, lists drawn up and the first day of rehearsals discussed, along with the obvious Covid protocol. I’m hoping my panto face masks are waiting for me when I get to Chippy as I think I’ll be wearing them a lot.

The last shortie

With the meeting over we’d pushed off within five minutes to reach a Tilly friendly mooring. Thornes Lock was our last short lock of the Calder and Hebble.

Bow hauling into the lock

This required a hand spike to empty it as the other paddles were out of order. We squeezed in and dropped down. A chap walked up saying they couldn’t get through the lock without a Hebble Spike. I thought he was about to ask me to lock them through. But now the lock was empty they’d be able to fill it just using a windlass as I had. They took their time to move off the lock landing, the reason soon becoming obvious as they’d lost steering and were wanting to tie up above the lock to fix things.

On we pootled back on the river now, passing Double Two where I used to paint sets for the John Godber Theatre Company before I started living on a boat. Straight ahead the dangling sculptural man above the moorings near the Hepworth Museum still dangles. We turned right through Wakefield Flood Lock.

How tall ?!

No visitors to Wakefield on the moorings today, but we did spot a very very tall telephone pole.

Sooo much room!

At Fall Ing Lock we could now breath out, we were leaving the Calder and Hebble, all the short locks behind us now and big Yorkshire locks ahead. It takes quite a bit of filling, longer when it’s a touch breezy and Mick had decided to hover and wait.

Two paddles together

Eventually the lock was full and we could descend onto the Aire and Calder, each hydraulic paddle taking over thirty turns to lift. My arms were tired before I started!

Nearly there Tilly!

Not long now Tilly! We sped down the river and through Broadreach Flood Lock and on towards Stanley Ferry. We’d made it with an hour before cat curfew!

11 locks, 4 flood locks all open, 11.94 miles, 0 short locks left, 0 manual locks left, 1 windlass back in the locker, 4000 engine hours, 1 hour, 11 panto zoomers, 1 painter starting on Monday, 5 chum zoomers, 24th October Tankards Bridge on the Selby Canal open to all craft after 13 months.

https://goo.gl/maps/hxQK6iE8fpJPvhJ5A

Breathing In. 13th October

Aspley Basin to Wheatley Bridge 20, Calder and Hebble Navigation

Not the quietest of moorings

Up early for us, breakfasted whilst the final load of washing was making the most of the electric hookup, then we pushed over to the service block. Someone already had a hose linked up to the tap, but that didn’t matter we could wait. Our main reason for being there was to make it easier to pick up our Click and Collect from Sainsburys. Mick headed off with the bike to collect it across the car park and was back very quickly.

That way please!

The tap was now free so we topped up with water, disposed of any rubbish as the shopping was stowed away. Time to push off and say Goodbye to Huddersfield the largest Town in the country. I’ll be back in February, but sadly not by boat.

Chains and wheels

The Turnbridge Loco Lift Bridge was opened in 1865 replacing a swing bridge. A combination of chains, wheels and counter weights lifts the bridge deck vertically. Originally it was operated with a windlass, but since 2002 it has been electrically powered. I got my Key of Power out and waited for a gap in the traffic before turning it to release the barriers. Once they had been moved I pressed the button to lift the bridge. What look like big counter weights actually house all the chain required for the bridge to rise and fall. Today I managed to stop 8 vehicles.

The pootle out of Huddersfield isn’t the most picturesque, light and not so light industry sit alongside the canal. Gas Street Bridge always has a strong aroma around it. Then we passed my second choice hotel in Huddersfield the Travelodge. From here you get good views of the railway viaduct before the recycling plant, I prefer the view of boats from the Premier Inn at Aspley.

Red Doles Lock 9

Then the first lock of the Huddersfield Broad Canal. Opened in 1776 it linked the Calder Hebble to the centre of Huddersfield and later to the Narrow in 1811 creating a trans-pennine route. The long narrowboats that could climb over the Pennines could not use the shorter locks of the Broad canal. Goods were transhipped at Aspley Basin but the canal was overshadowed by the Rochdale Canal, which had broad locks that could hold two narrowboats.

Mind that cill

Today the Broad canal is listed as being 57ft 6″ long by 14ft 2″ wide, but C&RT also say that narrowboats of 60ft can navigate it by going diagonally. Six years ago we managed the trip in Lillian (NB Lillyanne). Going downhill in an over long boat you have to take great care to position your boat in the right spot. Last time lock 8 proved to be a touch tight for Lillian and we had difficulty positioning her so as to be able to get her bow past the closed bottom gate and out. This is why we had Oleanna built a foot shorter and with the aid of a bow thruster to help her clear the bottom gate without use of a rope or pole. So today we knew we’d be alright, yet we still had to take care.

For each lock we did the same. Oleanna was brought in, her bow brought as far forward as the small walkway allows and she tucks into a corner. Then the stern is taken over to the other side, this works on Oleanna. With Lillian ( a foot longer) we had to have her stern more towards the centre of the lock this giving a few more inches as the cill is curved.

On a diagonal

I then stand above the bow and gradually lift the paddle whilst Mick keeps an eye on the stern and the cill. With Lillian we took this very slowly as any chance of the stern sitting on the cill could mean she would sink. As the boat lowers you can move her forward under the walkway a touch. Then once Oleanna’s stern had safely passed the cill I walk round to the other side and lift the paddle there.

Nudging her way past the bottom gate

Once the water is level with below I then open this gate. Now Mick moves Oleanna’s bow past the still closed gate and can escape. Just to do it all over again at the next lock.

No visible brake on the gear

The paddle gear is different to most as there is no visible brake on them. You wind the paddle up and just stop where you want to. Then when you want to lower it you just need to give it a little bit of extra umph to get it moving and the brake comes off.

The gate paddles can be fierce and send a jet of water down the lock. But then several of the locks had quite a few leaky top gates, so much so Mick had to shelter behind the back doors to keep himself dry.

Getting ready to jet wash

Two chaps from C&RT were getting ready to jet wash around some of the locks, they said they were slippy and with winter maintenance happening soon they were giving the stone work a good clean.

Poorly lock

The next lock is currently closed to widebeams as the off side gate has been damaged. The face of it now covered with a sheet of timber and the gate is tied with a cable to prevent anyone from opening it.

Colne Bridge Lock dropped us down into the final pound of the Broad Canal. This is the pound that has been loosing water over the last few weeks. We’ve seen photographs of it just about empty, but thankfully today there was water, it was still low but enough for us to head to Lock 1.

The last of the Huddersfield locks, Cooper Bridge Lock 1

Here we would leave the Huddersfield Canals behind. Lock 1 and Bridge 1.Time to join the river, checking the level board first.

We came from the right through 180 degrees

After a hand brake turn onto the Calder Hebble we pulled in for lunch, then got ready for another short lock, a second Cooper Bridge Lock, this one number 16 not 1.

Give me a lever ….

Time to use our Hebble Spike to help fill the lock. The spike is made from hard wood and is used to gradually wind up the paddles. There are windlass operated paddles too, but more water was needed to help level the lock to open it.

Now we had stretches of river followed by lock cuts. The next lock being Battye Ford Lock, here we knew we’d be able to breath and have a four course meal and still fit.

Through Ledgard Flood Lock it was time to find somewhere suitable to stop, hopefully where Tilly could go out. The first mooring by Lidl has a road running alongside. We carried on to just after an old railway bridge and pulled in, we almost go into the side.

Here there was bracken and some friendly cover before three layers of fencing designed to keep animals out. Well Tilly was soon seen on the other side, it was hardly taxing!

A few angles needed checking for the panto set builders then it was time to put the Wednesday roast in the oven, a medium chicken which turned out to a large in disguise. We’ll be eating a lot of chicken for the next few days.

11 locks, 3 flood locks, 6.32 miles, 1 click and collect, 1 lift bridge, 8 held up, 10 skimpy locks, 1 hand brake turn, 1 giant lock, 3 fences, 1.75kg chicken, 2 fat contended boaters.

https://goo.gl/maps/jGM7BY6PbXbR1Uiv7

Rangerless. 10th October

Lock 31E to Lock 8E

Beautiful

What a beautiful mooring, even if we were on a list and in a winding hole. We woke up this morning quite late considering we’d gone to bed early last night. After a cuppa in bed Mick pulled us forward onto the lock landing to take advantage of the morning sunshine hitting our solar panels.

Lovely, who needs electric!

This morning the battery bank was down to 34% so any solar we could gain today would help this evening, thank goodness for Lithium. We do have lots of night lights, but we’re too old for candle lit dinners!

Out comes some more

After breakfast, sausage sarnies to help use up the defrosting freezer, Mick decided to have a go at removing more of the cable from the alternator pulley with the aid of a hacksaw. He allowed himself fifteen minutes and came back with a handful of copper wire. There is still more around the pulley!

Time to get moving, think it was about 10:30, hard to know exactly with no trip computer to refer to. We hoped to make up for yesterday and get a good distance in towards Huddersfield and a good number of locks lower. Richard yesterday said he’d send round a message to other volunteers to see if anyone could help, but sadly we’d not heard from anyone, we’d be on our own.

The sun made the day another stunner. Bright blue skies, views just about everywhere you looked. There were plenty of people out for a walk, some sauntering, others far more serious about it. I was out for a walk to get locks filled ahead and then back to let Oleanna free from the locks above. This of course means walking three times the distance. I kept this up going through the closer locks but stopped when they became a touch too far apart, I was going to walk far enough as it was!

Look at that blue!

The bywashes were flowing yet we still managed to have one low pound. Between 28E and 27E there is a line of moorings, the paddles on the lock above have stops on them so you can’t flood the pound below. Mick wound the off side paddle up as I walked back from below, then I lifted the other. When it came to lowering the paddles again this proved almost impossible on the off side, as there wasn’t enough space for me to be able to lift the mechanism to release it from the pawl. I tried everything including hitting it with my windlass, in the end I somehow managed to get it moved and lower the paddle.

Shhh sneeking past

We’d been warned of a vocal local moored above Lock 26E. I’d already set the lock for us in advance so hoped we wouldn’t get abuse. Anyhow I was hoping to cut him off with what a glorious day it was before he got started. His genny was running and washing hung around the trees. Mick brought Oleanna into the lock, lining her up meant being very close to shouty mans boat. But we did okay and didn’t hear a bean from him, I was slightly disappointed!

Shuttle Lock 24E is a guillotine lock, the top gates are operated as normal but the bottom one has a large metal rising door. Within this is a fairly standard paddle, wound by a windlass. The guillotine gate is also windlass operated, the spindle kept safe from nare do wells by a cover opened with a handcuff key. Six years ago the lock was operated by C&RT as there were safety issues with it. Today try as I might I just couldn’t get the handcuff key to open the cover, it had been over tightened. Mick and I swapped over, in the end the mallet was called for to get it shifted.

Mick worked the lock and I descended into the dark chilly lock with numerous gongoozlers peering down at me. The guillotine raised and below I could see a pipe across the top of the opening at an angle restricting the height somewhat. Our fresh bucket from the toilet only just fitted below it.

The pound below seemed slow going to me and sadly there was nowhere for us to pull in by The Handmade Bakery, a must if you visit Slawit. I got to walk back to lock the guillotine, but had no mask or money to buy Mick a lovely loaf of bread and wish I still could eat their wares, they used to do homemade baked beans on toast!

We still waved

At Darmouth Lock we missed the jolly waves from Pete’s (Mikron Producer) Mum and Dad who used to live there, earlier this year they moved away. So all we got today was the silhouette of someone sat at a computer screen.

Now in a new channel the canal is low and very narrow, thankfully our bucket fitted here too. Below Pickle Lock 22E there was the Hippie Boat, they were busy and we’d only stopped for a quick lunch, szechuan pork on toast another defrosting thing eaten up. Salmon came out for our evening meal, not much worth saving now.

At 21E Waterside Lock there is a local celebrity, Tinker. Tinker has taken a fancy to sitting around the lock, C&RT have put up signs saying he lives nearby so not to worry, he’s not lost. I thought Tilly could spare a couple of her Dreamies. Well blow me down, Tinker is the first cat I’ve ever met who turned his nose up at them! Well I hadn’t come home had I, I was still out!

Blackberries past their best now

The narrow channel beyond reminded me of last time, Frank had joined us to help crew and he’d spotted the bank of Blackberries, he and Mick became mountain goats collecting that nights pudding whilst I stood at the next lock all wrong handed.

I gained two very keen crew a few locks on, they both demanded to help with the gates, then ran down to tell their Dad all about it. The next lock I then had six extra crew, their brothers and sisters and Dad now helping. I hardly had to lift a finger. A close eye was needed to keep everyone safe, Mum and the youngest stood and watched. I asked how it was at home with eight of them. She asked if she could run away with us and pleaded with me to take her with us.

Titanic Mill

The big Titanic Mill built in 1911 has been converted into 130 apartments and sits proudly at the bottom of the valley. What a lovely place it would be to moor with such a great view, but I seem to remember it being shallow, we still had quite a way to go

.

Narrow locks, both paddles up to fill locks, overhanging stones locks through Linthwaite.

The pumps have stopped pumping from the river to the canal, the levels are too low

Did you know that in 1931, Bank Bottom Mill in Marsden set a record of 2 hours 10 minutes for making a suit of clothes, direct from sheep to wearer? The cloth industry was big round here.

Dappled sunlight

Back into the woods, my step counter clicking away. There is one pound longer than the others on the eastern side, I could have got a lift, but I’d walked all the way from Marsden so I might as well carry on. This did mean I got to walk over Golcar Aqueduct and see the horseshoe falls on the River Colne.

Horseshoe falls at Golcar

The final three locks of the day, I was pooped and found bottom paddles left up and gates open, not a welcome sight. But they were soon sorted and we were on our way down. Last time empty pounds had held us up here, today the levels were good.

Nearly there

Last lock of the day Isis Lock 9E, one of the locks on the network with poetry on it’s beams.

We pulled in onto the bollards below, almost into the side. This would do us for the day. The sun had boosted our batteries to 49%, so phones could be charged again. Laptop still off and showers on hold until things improved again.

9E last of the day

Salmon pasta and wine tonight, Mick is now 3/4 of the way through the book on the Standedge Tunnels, the most of a book he’s read in years! I wanted to do some crochet, but with Tilly sat on my knee a large blanket would have been too warm for us both.

https://goo.gl/maps/K4WoHm3n8TGpZwAy7

22 locks, 229ft 10″ descended, 4.3 miles (?), 9+ miles walked, 1 more handful of freed wire, 0 rangers, 1 constant stream of walkers, 2nd blog handwritten, 1 more stunning day on the HNC, 1 guillotine, 1 Hippie Boat, 1 Tinker, 3 wasted Dreamies! 2 aching knees, 1 aching back, 1 big sense of achievement, only 8 more locks to go.

Going Down Hill! 9th October

Marsden to Lock 31 via Lock 40/39

The alarm was set to make sure we were up and about in time for the arrival of our CRT Ranger this morning. Richard arrived just before 9 with his wife, sorry we didn’t get your name, she’d come for the walk up and down the locks. Today we’d start our descent from the highest pound on the network.

Leaving the highest point

Richard set the top lock, and we all had a brief chat about how to work the locks. Basically to save as much water as possible the lock below should be set to fill before the one above emptied. This is what we tend to do on a flight anyway.

Filling up with a view

Mick and I had both imagined that either Richard or I would walk ahead lifting paddles on the lower lock and opening them up. However it didn’t quite start off that way. After lifting paddles I was sent down to open the gates on the next lock. But at that lock both bottom paddles were up, the pound below looking like it needed a refill. I lifted a top paddle to aid the refill, quite a lot of water was already going round the bywash. But how long should I leave it for? I tried phoning back uphill, ‘Yep close it and fill it’.

The pound looked to be improved but was still shallow. As we dropped the next lock Kim arrived walking their dog, could I let her know of any problems down the flight when they come to it on Monday, the next pound was an obvious one!

Richard running back to let more water down

Mick brought Oleanna across the low pound, when he reached lock 40 the depth simply wasn’t enough to get Oleanna over the cill. Richard ran back to let water down and Mick put Oleanna into reverse to get her away from the cill and aid the level in the lock to rise.

Just floating back in

As Oleanna reversed there was a sudden screaming coming from the engine bay. A fan belt had gone! Mick lifted the engine board, Yep a belt had gone and taken some cabling with it. The influx of water from above was pushing Oleanna now into the lock, Richards wife and I took the centrelines and pulled her into the lock.

Both centre lines

We dropped the lock keeping an eye on her position. Mick checked below, he felt he could start the engine and run it for a short time. This next pound looked to be a better level and we managed to get Oleanna into the side, just putting spikes in was a problem but we got there in the end.

Time to investigate

Mick inspected the engine bay further. The Domestic alternator belt had gone and as it did so it had taken out quite a lot of cables. We have spare belts and in fact at the next service Mick was going to change them. A call to RCR was made to see if they could help. It took a while before they rang back suggesting it might be 3 or 4 this afternoon before someone could get to us.

Dates inside the locks

This wasn’t going to be a quick fix, so we thanked Richard and his wife for their help, he gave us his notes on the locks, so we’d know where we might have problems. Richard is normally a ranger for the Broad Canal, he very kindly offered to return should we get moving again, or maybe be able to help us tomorrow.

Off to enjoy the Jazz

Our mooring was okay for Tilly to go out and we got to hear several of the stages placed around Marsden for the Jazz Festival taking place this weekend. I dropped in to say hello on the Geraghty zoom as I couldn’t be much help in the engine bay or hunting for friends.

Ends of cables

Mick got down in the engine bay to clear the wires. Orange, Red and Green has been severed, but what did they all do? That didn’t matter really as one of the cables had managed to wrap itself around the alternator in such a way that he couldn’t get it off.

That lot shouldn’t be there!

Time for lunch, well that’s what Tilly thought as she returned on board with a friend. She and her friend were very quickly lifted back outside where she and I discovered that her friend had been playing dead, it scurried off ending up in our well deck! I hunted round for it, Tilly did too with her head down between the boat and the bank, right in the crush zone. After she was put inside I found the mouse which ended up running back the way it had come. This could mean it was either back on the bank, in the canal or in the starboard side locker, possibly having gone down the vent pipe to get cosy around the water tank. Here’s hoping it wasn’t the latter.

Ooo dear!

Kim and Yan came to see if they could help, then the chap from RCR arrived, a local mechanic from the other side of the tunnel. Mick and he descended into the engine bay. Phone calls were made, discussions had, it wasn’t sounding good.

In the end the chap couldn’t help, the alternator would need to be removed then the pulley as the cable had got itself round and under it. This needed a puller to remove it which the chap didn’t have. The good news was that we could move just our domestic batteries wouldn’t charge without the belt. The engineer suggested getting to Aspley Basin where assistance should be easier to get. Because we were able to move we wouldn’t be covered by our RCR membership. If there was a mooring available in Huddersfield we’d at least be able to plug in and charge the batteries.

On the move again

The boat was put into serious energy conservation. The freezer was turned off. Hopefully the contents, which I’d been depleting anyway, would last us a couple of days as they defrosted. All sockets were switched off, leaving just the one USB socket powered from the batteries so that we could charge our phones. Phones would only be used for essential use and the laptop would remain off unless needed for work.

We decided to move down 8 locks to get closer to Huddersfield today. There wouldn’t be enough daylight left to reach Slaithwaite but hopefully we’d be able to pull in above Lock 31.

We worked our way down the pretty flight, plenty of walkers making comments. The lock below was filling before we emptied the one above, well apart from at 33 where I wound a paddle up and was on my way back quickly, quite a long walk, to let Oleanna out of 34. When we returned 33 was still empty. Grrr! I’d found a none working hydraulic paddle and had walked tall that way three times for nothing!

Sparth Reservoir

Wild swimmers were getting ready for a dip in Sparth Reservoir above the canal, below the canal the other reservoir sat empty, the mud drying out well.

We tried pulling in near another boat but only got stuck on a submerged object almost mid channel. Onwards we continued ending up where we’d had lunch six years ago. Normally we’d not moor in a winding hole, but here the only downhill boat would be NB Idleness and they wouldn’t be coming for a couple of days, uphill boats were unlikely as there were no tunnel passages until Monday, we doubted we’d see another moving boat, if we were in anyone’s way we’d happily move.

Very picturesque

Tilly was given an hour and a half which she took once there was a big enough gap between walkers and woofers to dash to the nearby trees and friendly cover. Inside the fridge was now turned off, we’d rather survive with the water pump working and light than have chilled milk and wine!

Come on Woofers! Don’t you know the clock is ticking!

Tonight we had sticky American Chicken cooked on the hob and stove top, followed by melting Soleros from the freezer, spoons were required. Some sausages were brought out to finish defrosting for a sarnie in the morning.

Couldn’t see chilled medication go to waste

I darned a hole in one of Mick’s jumpers, he read Trevor’s book on the tunnels and we were ready for bed by 10pm, no news for us tonight. Hopefully tomorrow will be sunny to get us as close to Huddersfield as we can. Sadly Richard can’t help, he sent out messages to other volunteers, but nobody has been back in touch. So it looks like we’ll be on our own, 22 locks shouldn’t be too much of a problem, should it?

Hopefully the solar will give us enough reserves for light and water for another day.

Have to say it’s a very beautiful spot to be moored in, which we’d have missed on our original schedule.

11 locks, 1 and a bit miles, 1 trip computer switched off, 1 very helpful Richard, -1 belt, 3 cables, 1 unknown green one, 44% to 42% before bedtime, 2 top outsides, 1 lost friend, 1 hand written blog post, 8 pages, 1 jazz festival, 1 early night, 2 Mrs Tilly stamps.

https://goo.gl/maps/tL8dgu4f6EAi4SCm9