Category Archives: Narrowboat Maintenance

Mushrooms and Ashley. 20th October

Castleford

Well the generators here at Castleford are a touch quieter than they’ve been in the past. The last one finally went off at 12:30, that’s at night!

Breakfast

We’re in finishing things off mode on board at the moment and with quite a few eggs left that meant we had to have them scrambled for breakfast, this also helped use up some of my nice bread in the freezer.

The Geraghty zoom followed, thankfully no-one caught our colds last weekend, maybe that’s why we still have them! Subjects covered included West Wittering, Corkmen, Tory auras, rotating apples and My First Wedding cards!

There were a few boats on the move today, but were they heading to the lock and on to Ferrybridge? One boat came from the lock, had they come from Ferrybridge or just behind us somewhere? We are seriously thinking that the lock is user operable, but what is the health and safety issue?

It was a touch windy and wet this morning, but nothing spectacular. Was that Ashley over and done with? We were likely to be on the periphery of the storm when it came.

Autumnness

A walk up to the lock to check on the level and just how many leaves were left on the trees. One of the boats that had come past us this morning was moored by it’s centre line in the extension to the lock. We suspected it was a single hander waiting for someone to share locks with rather than have to climb ladders and look after ropes in these big locks. The river level below the lock was just in the amber. Should we move? Or should we stay? We opted to stay and run the risk of the river coming back up overnight.

Back at Oleanna my thoughts turned to jobs that we should have been doing. The sun was out and we could now put the mushroom vent back on the roof. First we needed to find the black tack which seals the join between vent and roof. This took quite some finding, and as always with such things ended up being in the last place we looked, the cat proof cupboard. Then the old black tack needed removing from the vent along with the layer of rusty paint. The vent was then given a clean.

Back when Oleanna was built we’d opted for Chrome fittings so we’d not need to polish any brass. No idea what happened to the chrome but it tarnished pretty quickly on the mushrooms. I think within a year I was trying to find a way to clean them and bring a glint back to them. But this wasn’t to be, as they seem to have had the chrome stripped or stained/worn away somehow. Possibly something to do with the stove as the tarnished sides face the flue, but who knows? I gave up worrying about them ages ago.

Checking it fits

Last year we’d removed another mushroom vent and at dusk tried to fix it back on the roof. We learnt one thing from last year and that was the holes in the base of the vent are not drilled equally. So before adding a layer of black tack it was worth seeing which way round the base should be. Then mark the face that faces the bow with some tape. Maybe if we do more of these we’ll add a permanent mark to the insides so not only we’ll know which way they face for next time, but also which one goes where on the roof, before they are removed!

Better than last time!

Black tack reapplied, fixings pushed through the tack. Tilly agreed we’d managed to do it better than last time, but there was still room for improvement. She wasn’t wrong, as when it came to put the top back on, Mick had just started to tighten the nut from the underside when I realised that it was no longer attached to the top! The two part epoxy glue was needed and a good 24 hours for it to fully cure before we tried again. The big pan would be staying upside down on the roof for another night!

Here’s hoping it’s strong enough!

A big pot of chilli was put together and left to bubble away whilst I designed the next pair of socks. I’m quite happy with the design, I just hope I’ve some suitable colours for it. Yarn selection would have to wait a day or two as I’ve still got the last pair to finish off. At least I’m almost a pair in hand at the moment.

This pair may take a little bit longer

0 locks, 0 miles, 1 storm almost nothing, 1 cat bored of this outside, 1 mushroom base back on, 1 mushroom top broken, 1 threaded bar sticking, 3 meals of chilli ready, 44th pair designed, 0 bags packed, 0 drive south, 1 storm arrived later in the day.

Stirring Up The Red. 10th October

Handmade Bakery, Slaithwaite

Sunshine. It was guaranteed to be good weather today as we’d not be working any locks. But the sunshine could be used for other things, painting!

It’s sunny out. Can I go out?

Mick headed off to visit the Co-op and Aldi to see what miracle drugs he could find to help us both with our colds. We’d really like to not be spluttering and sneezing this weekend, but it looks like we’ll have no choice.

Stirring up the red

I dug out the cream and red paints from one of the bow lockers. Masking tape and fine sandpaper from the painting cupboard inside. The pan was lifted off the mushroom vent and dried off, moisture having collected around the rim of the pan. Then sections of the grab rail were taped up that needed top coat. My aim this year had been to repaint the grabrails, but I’ve run out of time to do a proper job. This also seems to be my aim most years! We just get too busy boating.

Once the sections were taped off I gave them all a sand down. The undercoat needed flattening out and the surrounding paint needed to have a key to aid adhesion.

May not look pretty, but it’s got a coat of paint on it!

An old envelope was stuck under the hole of the mushroom vent inside the cabin, to catch any stray blobs of paint. Then a coat of cream was painted. I’d not bothered to mask off an area here, I just tried to keep the area within the size of our biggest pan so it could be covered up again later.

Several shades of red

Then areas on the grab rail had a coat of red. Red no matter what you do fades in sunlight, it’s a fact and you have to live with it. For me to have a boat with no red on it wouldn’t be right as it’s my favourite colour. I’ve touched up the starboard side before with the red that had been noted in our boat bible from Finesse when Oleanna was built. However the number was out by 1 digit so the colour had been quite a bit darker. Now the grabrail looks a bit of a patchwork, one day it will all be the same bright red again.

Second coat of red and blue needed

One area of rust had spread across from the red grabrail onto the blue cabin side, I’ll hopefully follow up with the blue on the next possible day. The red also will require a second coat at some point. I made sure I removed the masking tape after a short while, leaving it on too long means it’s a nightmare to remove.

An exciting five minutes for Tilly

Next job was to dig out my sewing machine from under the dinette. I’d bought myself some red cords which had been sent to the house. They were in the sale and I could only get my size with a longer leg than required. So they needed turning up by 3 inches. Ironed and sewn, job’s a good un.

Sewing

Attention turned to a painting I did recently. This needed trimming and a backing making for it. I’ll hopefully be able to show you what it was and for after the weekend.

Ready to hand over

Next and final job, give Mick a hair cut. It’s not that long since it was last done, but a tidy up would be good. He’s all smart now, we’re ready for the weekend. Just have to hope my nose stops glowing red from being blown so much!

My photo of tonight’s Northern Lights!

0 locks, 0 miles, 1 bottle of cough medicine, 1 box tissues, 2 boxes cold capsules, 1 roof touched up, 1st coat on grabrail, grade 3, 3 inches up, pair 41 finished, 8 more pairs on waiting list! 0 northern lights visible, 2 sniffly coughing boaters, 🙁

Apple Bobbing. 6th October

Above Lock 41E

Mick has developed a cold over the last couple of days. I’m doing my best to avoid it, so I’m trying to avoid touching things he’s touched, sharing the same air won’t be helping, but I’m hoping to fend off getting it for a week if possible as I have a hospital appointment amongst other things.

A month old!

So this morning I was on tea and Lemsip duty. This is normally Micks job as he’s on that side of the bed and he hands me my tea. This morning I was scrabbling my way back to my side of the bed ( we have a cross bed) trying my best not to spill any tea when the alarm above our heads sounded. A red flashing light and three beeps. This meant there was a fire. Not that we were aware of. I pressed the button to silence the alarm. We took it off it’s base and Mick tried to reset it. It did nothing! Was this a dud detector? Only a month old! Mick spent some of the day checking things on line and it turns out the detector was fine, it just turns itself off when not on it’s base on the ceiling. Why had it sounded? Steam from my tea!

Subjects included Radio Caroline, sausage casserole, cousins in Gravesend and tying Aunts in armchairs! Everyone was present this morning for zoom, even if our internet kept dropping out in a somewhat annoying manor, so we only got part of the story from John about the PS Waverley passing Radio Caroline a few days ago.

This morning seemed to be dry enough to add another coat onto the mushroom vent. Mixing, brushing followed, the starboard side grabrail bits got another coat too. If my knees hadn’t been playing up so much I’d have done the port side as well, but balancing on a gunnel with nowhere to step back to at the moment is not on the cards, my knees are burning whilst doing nothing, so that side of the boat will have to wait.

Current location!

Just about as soon as I’d finished it started to spit! Oh well, I’m trying my best considering my phone currently thinks I’m just to the west of Moscow! Mick seems to have this happen to his phone too at the moment. Are the Russians checking up on us? Anyone else get the weather in Russia rather then West Yorkshire? They are expecting thunder storms tomorrow.

Marsden Mechanics standing out from the crowd

This afternoon I headed off down the Marsden flight of locks to see what I could see at lock 37E, the lock which has closed the flight has a dangerous bridge. Despite it being a grey day the flight is still pretty with the occasional glimpse across the valley.

Apples ready to bob

Below lock 39E there were numerous apples bobbing about waiting for Halloween, none of them had toffee coatings though!

The Blue Peter Lock or Smudgees Lock 37E

Lock 37E is the Blue Peter lock with a shield on both bottom gates. Orange fencing was draped around the tail bridge. On the far side I could see what looked like rotten wood on one of the uprights to the handrail. With a suitably sized baulk of timber and carpentry tools and skills it didn’t look like it would be a long job to mend. Hopefully it will be sorted tomorrow.

I didn’t want to do anymore down hill so headed back up. There are a new cabins that have been built alongside the canal, A Place in the Pennines. The office looks like it is in a blue narrowboat next to the care takers cabin. They look nice and I suspect they have good views from their terraces across the valley.

Views

I walked up the hill, hoping I’d stay on the level more to return to the boat. Past houses all with great views over the top of one another and along to the station. Steep stairs lead down to the platforms, I’ll enjoy those tomorrow!

Socks!

Back on Oleanna, Mick was snoozing by the stove. I got out my box of socks to weave ends in. Three pairs in total. I had a sponsorship for four pairs so have been waiting for them all to be finished along with the next pair and then take more photos. My box is now full. By the end of the evening and the ninth episode of Traitors NZ I’d finished off pair 40, ends weaved in too. 40 weeks 40 pairs! Yarn has already been selected for the next pair, they’ll get started on the train tomorrow.

Hopefully this is an easy fix

0 locks, 0 miles, 1 broken handrail, 2nd coat, 1 very bored cat, 5 siblings, 1 dodgy alarm mended? 6 pairs of socks waiting to be posted.

Seconds Away. 3rd October

Uppermill to Diggle moorings

Just the last eleven locks up to the summit today, that’s all. They shouldn’t take us long to do. We already knew we might have trouble with one pound being low, it’s been low the last two times we’ve come this way. Our map suggested it would be about 2.5 hours, we added a bit more for good measure but we should still be moored up in time for lunch and to give Tilly some shore leave.

Escape pod!

Before we pushed off I got Tilly’s Escape Pod out of the cupboard and zipped it together, she was straight in it before I’d even got the top on. Should anything go wrong in the tunnel tomorrow we’d need the pod at the ready, so best to get it ready today and let Tilly move back into one of her favourite places, only when the doors not closed!

Mick walking up to the lock

The first two locks were the same as the one’s we’d come up. Although Lime Kiln Lock can’t quite be classed as just a HNC lock. It has Saddleworth Railway Viaduct right across the bottom of it. Then there is Mytholm Bridge just below the lock too. The approach is slightly skewed and I half expected to mess it up, with a bywash coming towards me at the same time, but no it was pretty easy. Up Oleanna rose in possibly the most picturesque lock on the west side of the canal.

Another fender to add to our collection!

We pulled in at the services, topped up on water, the washing machine running, emptied yellow water and refreshed Tilly’s toilet. The weed hatch was also checked. No weed but a fairly new looking rope fender! Mick walked up to set the next lock.

The Diggle flight have single big bottom gates, similar to those south of Banbury on the South Oxford. All the paddles are on the lock beam side of each lock. The bottom paddles are geared and have a pawl to keep them in place. The top paddles wind up as normal but the pawl on these is a flat bar that you need to angle in to slot into place to hold everything up.

Views

We worked our way up the first two locks without too much bother. Then there was the expected low pound. It was VERY low. Mick lifted the paddles to fill the lock, no chance of getting over the cill without more water. He walked up to the next lock and ran water down through the lock. He also called C&RT to check it would be okay for us to do this, they were fine about it. The next pound looking pretty healthy, it wouldn’t stay that way as the one we were trying to raise was really quite big. Mick phoned me, would I prefer him to be at the helm through a low pound, so for us to revert to the A team. I did, so he returned and helped me climb off the boat with the aid of the stern lockers. We needed so much water to fill the pound enough to get over the cill. I walked up ahead and once Oleanna was over the cill and in the pound I closed the top paddles on the lock, let it finish emptying and opened the bottom gate, hoping the pound was deep enough to get across. Thankfully it was. Once Oleanna was in 27W I returned to close the gate at 26W.

More views including a low pound

The same process was now required to rise up the next lock 27W, the pound above very depleted of water. I walked up to 28W and ran water down, Once over the cill Mick managed to encourage the gate to close behind him, the flow of water into the pound helping and saving me the walk back down to do the job myself.

That’ll need a bit more water!
Coming across

Same process at 28W, each pound above was lowered just enough to get Oleanna from one lock to the next. Each time, each pound above looked that bit higher than the one below.

All the stone work

Getting across from 28W to 29W was a little bit more tricksy, getting over the bottom cill took more effort. All the way up the flight we’d had walkers stopping for a chat, saying how they’d never seen the pounds look so low, it must happen especially for us! A chap possibly with a dog had walked up, not chatted then sat down on the bench to admire the view.

Lock 29W we will never forget you!

I stayed to see how we’d do. Opened the top gate when it was level. A guestimate on how deep the water was over the cill had been met. I closed the top paddles and waited to close the gate. We now should be fine.

Mick gently brought Oleanna forward to the cill. Her bow crossed it, but then she came to a sudden stop. Possibly the cill or was there something under the water stopping her. We’d need more water to get her over whatever was stopping her. I started to walk up to the next lock, Mick put Oleanna in reverse to get away from the cill.

Mick shouted. ‘QUICK, really QUICKLY!‘ He’d not been able to get Oleanna to reverse. She was sitting on the top cill. The bottom of the lock was doing it’s best to empty itself!!

I ran. I ran. The towpath curved around the pound, a small bridge to cross over the bywash, up the side of the lock was steep. Which paddles to lift first? I have no idea if there was any water in the lock or not. One bottom paddle was raised, followed by both top paddles, then the second bottom paddle. Now all I could do was gasp for air and watch through the camera 100 meters away.

Mick had climbed off Oleanna, he wound the top paddles up as Oleanna was stopping water from getting past and into the lock chamber. The first paddle dropped and needed lifting again. He was wondering should he get Tilly off, would she be nice and comfortable in her escape pod, easy to pick up. But adding weight to Oleanna would be a really bad thing.

S**T!!!!

All we could do now was watch, hope there was enough water getting into the lock. Mick walked to the bottom gates, checked the paddles were down, they were, but there was still a big leak. From 100 meters away the angle Oleanna had reached was alarming, I suspect it was more alarming close to. Had we done everything in time? Would she rise back up? Or had she reached the point of no return.

I could make out cabin sides again

What felt like a good ten minutes actually it was only one. Oleanna’s stern seemed to be coming back up. Taking a photo to check whilst out of breath and with shaky hands was hard to get in focus. Thankfully down at lock 29W Oleanna was floating again and Mick had to get back onboard to stop her from hitting the bottom gates.

Floated back into the lock behind the cill mark

Mick rang, ‘She’s floating!’ ‘I’m going to lift the engine board to check if any water got into the engine bay’. He disappeared from view, then reappeared, waited a while then gently brought her out of the lock. THANK F**K for that!! The gate closed behind and Oleanna made her way across the pound to 30W.

Over the cill away from danger

The only witness to her very near sinking was a dog who’s owner had sat admiring the view all the time a major drama had been happening behind him. As the lock gate closed, the man stood up and walked away with his dog, totally oblivious.

Up 30W, we had a moment as the lock levelled out. It had possibly only been a matter of a few seconds between saving the situation or sinking. If Oleanna’s stern had got any lower and water got in through the engine vent that would have been it!

The next pound was a touch low. We made sure the top paddles were left open until Oleanna was well clear of the cill.

I walked on to 31W. My phone rang. It was a jolly chap from Standedge Tunnel control checking to see if we’d made it up to Diggle yet and were we still on for our booked passage tomorrow morning. Two more locks to go. I asked if I should report our incident to him or was it the west side of the HNC we should contact. West side, he was the East.

Last lock of a the day

Grandpa Greens looked attractive as we came up the next lock, but we refrained from indulging. I have to say I was extremly relieved when I opened the top gate on lock 32W and Oleanna easily passed over the cill and onto the top pound of the HNC.

Now, which tree first?

We moored up. The only thing out of place inside was a galley drawer. Tilly was checked on. What’s all this with the big hug! Yuck!! It looks great here, just get on and let me out!

Pan off, attachment of doom on

The flight had taken us 4.5 hours, it was time for a late lunch. The sun was out. Time to carry on with prep work for the grabrails. The attachment of doom was attached to the drill and I ground back the fertaned rust patches to bright steel. Then another coat of fertan which could work it’s magic overnight.

Our new roof light

11 locks, 1.6 miles, 1 extremely close call, 2 boaters who will never close top paddles on a low pound again! 100 meters personal best, 1 canine witness, 1 horrible day, 29W reported, 1 grab rail prepped, 4 hours, 2 many pesky woofers!

https://maps.app.goo.gl/mGQ9fhhbRB2zsthi9

A Rounder O. 28th September

Hyde Bank Tunnel to Dukinfield Railway Bridge

Quarter of an hour earlier than of late we managed to push off, a small achievement but at least it was in the right direction.

Trees trees trees

Once down the Marple flight the Peak Forest Canal is just flat, there are two tunnels and a lift bridge for a bit of interest, but no locks. We pootled along, tunnel mode engaged for Hyde Bank Tunnel all 308 yards of it. I then bobbed below to give Tilly’s pooh box a refresh as I could tell she was desperate to go, wanted to use shore based facilities, wouldn’t be allowed onto the outside, her pooh box smelt! I can tell these things easier now I spend half an hour every day at her level on the floor!

A touch of autumnal knitting at the stern as we made our way along the tree lined canal. At Woodley Tunnel a Dad was cycling with his two kids along the towpath which goes through the tunnel. His daughter wasn’t peddling, just pushing herself along with both feet, making her Dad’s progress behind quite difficult. As soon as we passed there was no light in the tunnel and the daughter really wasn’t happy! I’m not sure how Dad coped with it all, I suspect the easiest way would have been to reverse out of the tunnel, but his son was way ahead. I hope next time they’ll equip their bikes with lights!

A rounder O would have helped

Past Joseph Adamson and Co, Est 1885. I wonder if originally they had planned for a rounder O than was used Or was the company actually Jo Seph Adamson and Co?

Under a couple of roving bridges. One with metal sides. Going under this it looked like the bridge has been expanded several times, I think we counted five different archways

Under the M67

The next bridge was under the M67, I think this is just about as close as we can get to Fallowfield where my nephew Josh is currently living at Manchester University. 5.3 miles as the crow flies.

Lifted just enough to get under

Who would wind up the lift bridge? I remember doing so on a hire boat, this I’m pretty sure would have been the first lift bridge I ever worked, unless I got the job on the Llangollen way back when! First thing was to remember what would be needed to unlock it, a handcuff key, not a Key of Power! I remember making the same mistake last time. 31 turns up and 21 down, it was hard work, maybe I’m loosing all my windlass lasspower.

I suppose it’ll do!

We pulled in a short distance on, enough outside before the drop down to the River Tame for Tilly to have some shore leave and not too close to the railway bridge. Before sitting down for lunch I gave the nettles along the bank a trim, intentions to do more to the grabrail.

Over lunch it decided to rain, this along with the bank not being right alongside Oleanna put me off getting the attachment of doom out to grind back the rusty bits. I just hope that I get a suitable mooring and suitable weather to get more done to them and the mushroom vent before too long.

Ashton Old Baths

A walk up to Lidl then Asda to do a ‘just in case’ Sunday roast shop and to buy a newspaper in the wet kept us busy. Three buildings caught our attention. The first not very architecturally significant, Ashton Primary Care Centre. This is where nine years ago a lovely nurse practitioner redressed my missing finger despite them not being allowed to do such things.

What lies inside the old baths

Next was Ashton Old Baths. Opened in the 1870s, Ashton Old Baths is one of the finest example of a former public swimming baths in the North of England. The building has housed concerts, held tennis matches and closed in 1975, the building remained derelict for 40 years until Tameside Council and Oxford Innovation decided to reinvent the space for the digital age. It’s a grand Victorian building from the outside, inside it holds a wooden pod. More info can be found here.

Cavendish Mill

The other building is Cavendish Mill a former cotton spinning mill. It was built between 1884 and 1885 to a fireproof design and was the first mill in Ashton to be built with concrete floors and a flat roof. What stands out though is it’s octagonal staircase around the base of the chimney. The mill ceased spinning cotton in 1934, then was used for various purposes until it was converted into housing in 1994.

0 locks, 6.4 miles,1 lift bridge, 2 tunnels, 1 great looking outside, 1 mediocre outside, 2 many woofers, 1 plan postponed, 1 Sunday roast purchased just in case, 1 dormant pizza boat neighbour.

https://maps.app.goo.gl/71R28WmF9pvizJ2d6

Dribbles. 17th September

Bramble Cuttings to Rookery Railway Bridge

Turning my phone on this morning I came across two messages, both about rendez vous. I was expecting one, but not the other. Location and planned route were passed on to one, and current location to the other. No time for a full cuppa in bed this morning, we were about to meet up with NB Cobweb. Last night they were moored only a mile away and Vicki was checking to see if we were still on the Weaver as they were heading that way.

Dribble!

Tilly was allowed some shore leave whilst I washed the Fertan off the grabrail and roof. Fertan does the job, but it can also leave a horrible streaky mess! The dew this morning had done it’s worst! Maybe some Bar Keepers Friend will help.

At last the boats and owners get to meet up

One of our neighbours moved off a short while before NB Cobweb arrived, perfect. Vicki and David have had NB Cobweb for a couple of years now, we passed the boat last year on the Leeds Liverpool, but no-one was on board. Vicki used to work front of house at the SJT in Scarborough, her daughter was also part of the youth group Rounders, she is now a very talented musician. Early last year there had been a comment made about the annoying Princess Ann’s swing bridge in Thorne on Facebook, I noticed a reply from Vicki who was moored in Thorne at the time, they were preparing to move aboard. Well we’ve been trying to meet up since and Vicki had sponsored a pair of socks, which I’ve been hanging onto in case our bows crossed.

Socks handed over

After about an hour of chatting it was time for both of us to move on. They hoped to be on the boat lift this afternoon and we hoped to be through Middlewich. Good to see you Vicki, enjoy the Weaver and yes we’ll meet up for a drink when we’re all back in Scarborough this winter.

Approaching Big Lock

It was nearly midday when we pushed off. Back towards Middlewich, two boats just entering Big Lock. I went up for a chat with Sabrina as the lock finished, at last we’ve met and not just given each other a wave as one of us has passed. Once we’d risen ourselves we pulled in as close to the little Tescos as we could, a few items required and it was time for lunch.

Lots of water coming down

As ever through Middlewich we timed our departure ten minutes late, the bottom lock of the three was over topping as a boat was coming down the lock above and we were in a queue with Baked Onboard the Pizza boat in front of us. At least we’d not been another five minutes later as there were now another two boats behind us.

Up she comes

No volunteers in sight, but the lady from the boat behind came up and helped. I worked the locks, wimping out of turning the corner. We helped the pizza boat up, then she helped us up the first lock. We swapped with another boat coming down at the corner, and then once we were up the three we lifted a paddle for the boat behind.

Reaching the junction

The junction wasn’t as busy as ten days ago and King’s Lock only needed a touch of emptying before we could go in. Our chosen route back to Yorkshire would be back up the Cheshire Locks.

Kings Lock in the sunshine

We soon found we were following a hire boat who were following a single hander, the going was a touch slow. At Lock 67 I went up to set it for us and chatted to the hire boat. They didn’t want to start up the Cheshire Locks today so were looking for a suitable mooring, I suggested where we’d be pulling in and a couple more places before Wheelock.

Following

A young girl was busy asking Mick questions, she came to see how the lock worked, it was scary! But it was still way more interesting than watching her family fishing just above the lock. She also helped with the gates which was great.

Two different fonts and dribbly

One day, when I’ve retired from boating, I would like the job of repainting the numbers on lock beams. It feels as if each canal used to have a style of numbers, but as you can see on the lock at Middlewich that style has now become a dribbly mess. In comparison the faded number at lock 67 is just wonderful.

I love the faded one on the left

We pootled on back to the moorings after Rookery Railway Bridges, the hire boat had already pulled in there. Tilly was miffed as it was already after cat curfew time!

9 locks, 6.8 miles, 1 straight on, pair 33 handed over, 1 hour apart, 20 years ago, 0 volunteers, 0 free pizza for helping, 1 long day, 1 miffed cat.

https://maps.app.goo.gl/Fd2fRgqj6aL9EbTo9

The Spiders From Anderton. 16th September

Baron’s Quay to Bramble Cuttings, Trent and Mersey Canal

Fog! Who ordered FOG!!!

No choice, we needed to move today. Thankfully as we pootled down to the lift waiting mooring the skies started to clear, still grey but not cloud filled. Tied up half an hour before our booking we could see the caissons were on the move, the chap up top could be seen chatting to a boat that had just gone up, it took ages before we saw the hat of a boater moving towards the aqueduct towards the canal.

Boat Lift

A C&RT person walked round to see us. A few instructions to follow when we got into the lift, and they were ready for us. Round and into the caisson, stern rope tied up, engine off. Time to chat whilst two boats came in from above into the other caisson. Today was the lift operators first day going solo. Having just finished three years at University they were hunting for a job, had worked on the trip boat before and now was working part time on the lift. The occasional glance at a sheet of paper to make sure everything was being done in the right order.

I wonder if the spiders prefer the gate being up or down?

This morning the caisson we were in had had a slight problem. The gates that open to let boats in and out have shot bolts that hold them in place when they are open to boats, one set of them hadn’t been working properly.

They are a safety device, so should anything happen to the winches that move the gates the bolts will hold the gate in place. Anyone who’s ever worked back stage at the SJT will understand this problem very well, as the Round stage is a big lift and every now and again the shot bolts would need a good old hit with a hammer!

Once the two boats were in the other caisson, water drained out from the gap between the gates behind us, we were good to go. That slight judder and we were on our way up.

When originally built in 1875, the lift was operated with hydraulics, water from the River Weaver was used in it’s operation. The caisson going up would be drained just slightly to make it lighter than the other one. The heavier caisson would then sink pushing the water into the other side of the hydraulics and push the lighter caisson up. However the water being used was full of salt from the river and the pipes corroded. In 1882 one of the cast iron hydraulic cylinders burst whilst a boat was at canal level, the caisson descended rapidly, but thankfully water escaping the cylinder slowed the descent and the water filled dock at river level softened the impact!

Cogs right at the top

The hydraulics were replaced by winches above the caissons, extra structure was added to the lift to cope with the extra weight. The winches lifted and dropped the caissons powered by electricity. The conversion happened over two years , but the lift was only closed for 49 days, reopening fully in 1908.

The shiny pole is the hydraulic ram that pushes the caisson up

This worked for quite some time, but commercial boat traffic declined and rust set in. In 2000 major refurbishment was carried out, new hydraulics installed and this is how it works today. The caissons can be moved individually, we think that is what happened 13 years ago, but it is actually cheaper to use both caissons whether there are boats in them or not, the counterbalance meaning they use less electricity. To book your boat on the lift it costs £5. It takes three members of staff to work the lift and if it wasn’t for the trip boat the lift would loose hundreds of pounds a day.

Next year is the boat lifts 150th anniversary. After the summer season it will close again for some more restoration, closing it for 12 to 18 months.

As we reached the top, the lift slows down for the last foot or so. The operator at the top greeted us and gave us our instructions. Once the lift had come to a stop, the gap between gates was filled with water, then the gates open, we move onto the aqueduct. Gate close behind.

Then the gate onto the canal can open. A thumbs up from by the bridge meant the way ahead was clear. A turn right, the only way you can turn out from the lift and we were back on the T&M.

Us

Rubbish needed disposing of so we pulled in behind a boat that had just started filling up with water. I said we were only there to use the bins, ‘They’re getting rid of them!’ came the response. Well this was correct and wrong at the same time. The bin compound as we talked was being dismantled, the biffa bins already gone. However the new skip is there and replacing the bins. Once the compound has been dismantled the skip will be positioned where the bins once were.

Compound being dismantled

We got chatting to the C&RT chap who was wielding a hammer and saw dismantling the bin compound. Recently there have been occasions when one bin was full and someone had put their rubbish bags by that bin, another two bins were empty. Other boaters arrived and just assumed the bins were full and left their rubbish on the floor too. This escalated until Biffa refused to empty the bin as they couldn’t get to it. There is also frequent use by non boaters as a lot of the local tips are now either closed or you are limited in your use. The pump out also gets misused, a new end to the sucky pipe costs in the region of £1000 every time. He said that the services here were ‘this close to being closed for good’ due to misuse.

More power station

Onwards, now on the flat, retracing ourselves along the long pound. At the power station progress was obvious from a week ten days ago. A fifth fan had been added to the sci-fi Swiss chalet structure. We counted the cranes, many different sizes, now 12 of them.

Hi Andy, Nichola and Jez

The sun was out, time to take off our precautionary waterproofs. Was that bow who we thought it was? Were those notes on the bow? A quick exchange of hellos with Andy on NB On A Fiddle, Nichola down below as we passed them.

All mine!

Time to hope for a space at Bramble Cuttings. At 2pm would there be space? Yes! we had the whole mooring to ourselves! A perfect shore leave location for Tilly. I stepped inside gave her the rules and opened the doors straight away, 4 hours! Yeh yeh!

A late lunch for us and self catering for Tilly. With the weather due to be fine for the next few days it was time to attend to a leaking mushroom vent and whilst I was at it scrape off all the rust along the port side grabrail and gunnel! Gosh there was plenty! I also spotted a couple more little bits where the grabrail had caught in Froghall Tunnel.

Mick got busy in the engine bay, an oil change. Tilly was just BUSY!

Down the hole!

Soon we got another neighbour who pulled up right at the far end, no woofer visible. Then an hour later a second boat came in to moor. Mick chatted to the chap and I miss heard thinking it was a boat we’d met a few days ago with a woofer, but there was no dog. Tilly could continue with her shore leave in safety much to the dislike of the squirrels.

Fertanned

Once the worst of the rust had been scraped off, a couple of patches on the cabin side too unfortunately, my knee was starting to complain. I’d really have liked to given things a go over with the attachment of doom, but that would take too long and it also felt wrong to do it at Bramble Cuttings. So instead everything got a coat of Fertan rust inhibitor. Hopefully that will stop things from getting worse before I can attack it again. As it was a lovely warm afternoon I dug out a spray bottle and filled it with water so I could keep the Fertan damp, helping it to do it’s job for longer.

Hooray!!!

Tilly had had a very good afternoon. Plenty of trees climbed and lots of pouncing. I’d had to rescue a few friends and then did my best to persuade Tilly to come in for her dingding. I could tell she was tired as she was doing that belligerent toddler thing of I’m not tired! Look I can do this and walk away from you. This tree hasn’t been climbed yet, so I’ll just do that first. She soon gave in, came inside, had a lick of her dingding and flaked out.

One lovely sunset too

0 locks, 1 boat lift, 9.3 miles, 1 right, 2 many patches of rust, 9.5 litres oil, 4 whole hours! 1 big pan on the roof, pair 37 yarn selected, 1 2 Mrs Tilly stamp of approval.

Jiggering And Jolleying. 4th September

Bridge 118 to below Plants Lock 41

Well that new detector! It’s position on the ceiling directly over my head whilst in bed was a problem last night. Around the big test button is a ring of green light which flashes every 30 seconds or so. All detectors tend to flash, but this one was SO BRIGHT that it felt like the aliens were invading. Yes I tried turning over and I did have my eyes closed but the light flashed through my eye lids time after time after time! I’m aware that I was awake trying to ignore it for at least two hours, thankfully then I fell asleep.

Byebye, see you again somewhere sometime

We couldn’t be tardy this morning, we’d something to tick of the ‘Next Time’ list. A quick chat with Mike on NB Alchemy before we pushed off. It was really good to be able to meet up, until next time, happy cruising for the remainder of the year.

As it says, Middleport Pottery

A mile and a half to cruise and we pulled in on the visitor moorings at Middleport Pottery, with a booking for Harecastle Tunnel this afternoon we hoped there’d be enough time for us to enjoy the pottery. You can wonder around the site for free, but if you pay then you get to go inside various rooms and workshops, if you pay more you can get to go round the working Burleigh Pottery Factory. We opted for the Heritage Trail. With green stickers and a key fob we could guide ourselves round the pottery.

What a great model

Middleport Pottery was the first pottery to be designed by an architect, the whole process of the factory taken into account with the products flowing through from one area to the next. In came the clay by boat, off loaded, it was cleaned, made ready for which ever process it was destined for, slip for casting, put through a pug mill for Jiggering, Jolleying and pressing into various shapes and patterns. Drying. Biscuit firing in bottle kilns, patterns applied, glazes painted or dipped on, dried again, then into the Glosting bottle kilns for their final firing, then packed up and loaded back onto boats to head of to be sold.

Dane returning with a hold full of people

Here in Stoke they had both clay and coal, the canal alongside aided the more reliable transportation of the finished goods. Dane normally sits outside the pottery, but today it was on a cruise through Harecastle Tunnel. Those on the trip were on board from 10am, we passed them coming back a little after 2pm.

The last remaining bottle kiln

There’s a wonderful model of the factory how it originally was, made in ceramic (what else!) this shows the seven bottle kilns that used to be in the factory. Three for biscuit firing (the ceramics could be stacked close for firing) then four for glost kilns (the ceramics needed more space once glazed so as not to stick together in the firing). When the clean air act came in in 1956 new methods of firing were found, gas taking over from coal, tunnel kilns were developed to save having to stack everything up around a bottle kiln, blocking the door and then lighting fires to raise the temperature to over 1000 degrees. Six of the original bottle kilns were demolished, the one that remains does so as it was a part of another factory building and not stand alone.

Hi there

We saw the old offices. Phones rang as you walked past, if answered you’d get the story of an office worker. We watched a film about the factory processes making all the pottery, then looked at examples of Japonica tea sets, Churchill Toby Jugs, other fancy items.

Rooms now taken over by independent studios

Round past various independent studios we had the opportunity to look round a quarter of the moulds used which had been stored in roof spaces around the factory.

Commemorative plates, Toby Jugs, vases all sorts, an amazing collection of jelly moulds too. A mould could only be used so many times before a new one had to be made from the master.

Looking upwards between the brick walls of a bottle kiln

The Placing House and Bottle Kiln were next. In the placing house Saggers (rough clay containers used to protect the finer pottery whilst in the bottle kiln) were meticulously packed to make the most of the space, then they were carefully positioned in the bottle kiln, piled high one on top of the other right to the top. More delicate items such as plates would be packed nearer the centre of the kiln. Then once full the door would be bricked up and fires lit around the outside of the inner skin of the kiln, ramping up the temperature to a maximum of 1000 to 1250C, this was maintained for two to three hours before the kiln was allowed to cool down. As soon as it was possible to enter the kiln, the men would start to unpack it dressed in many layers to protect them from the heat. Pay was based on the quality of the goods coming out of the kiln, so if a firing went wrong the wages weren’t paid.

Sinks

The bath house has a wonderful line of sinks, just enough room to stand in front of them, no elbow room. A deep deep bath tub sat in another area. Was there just the one between all the workers, or several? During WW2 the bath house was one of eleven areas earmarked as air raid shelters, it could hold 38 of the 500 employees, thankfully the shelters were never needed.

The Lancashire Boiler produced steam to power the steam engine next door which kept many things moving in the factory.

Cuppas

Time for a break and some lunch. We could have had oatcakes, we could have had some Lobby (a beef stew) but we opted for jacket potatoes and a cuppa each obviously in suitable cups. Very nice and better than the potato wedges we’d had at Shugborough a few weeks ago.

Boots

Next we just had time to look round the Lodgekeeper’s House. A two up two down house with projections of people telling stories of their lives in Stoke. Very interesting, but the rooms lacked a little bit in atmosphere.

It was now 2pm time to push off, we’d the tunnel booked for 3pm. We’d enjoyed the pottery, however it still sits on the ‘Next Time’ list as I’d now like to do a factory tour and have a peruse around the independent studio spaces. The seconds factory shop was still WAY too expensive for anything to be purchased. I’m glad that around 30-40 years ago I visited the factory when it was closed and riffled through skips with a friend, we were students at the time. Items that were not too faulty in our eyes were pulled out and later I was allowed to visit my old school and give them all a clear glaze and fire them. Not the most expert job, but it did give me a set of Burleigh ware bowls and various other items which today would have cost me several hundred pounds.

Following

We pushed off. At Westport Lake a hire boat pushed out in front of us. They went slowly, we followed at tick over, would we make it to the tunnel by 3pm? Thankfully yes. They pulled in ahead of us and a Tunnel Keeper came to talk to them. This took quite a long time as their English wasn’t so good, getting them to shine their head light and sound the horn was testing the keepers patience a touch. As soon as he’d decided that they’d understood everything he came to talk to us.

Can you show me your light and sound the horn? Please?

‘Your lucky!’ Why? We’d booked. ‘Your not in the book’. But we booked. I checked the confirmation email. The Tunnel Keeper and Mick were both correct. We had booked and we weren’t in the book for today because Mick had booked our passage for the 11th! We were lucky as someone else had booked and we could tag along behind them, phew!

More head room than at Froghall

We whizzed through our safety briefing and were let into the tunnel a few minutes after the hire boat. Our normal speed would be reduced by their normal speed, go too slowly in a tunnel and you loose your steering and end up biffing the walls. Once we’d cleared the portal the doors closed behind us and the loud drone of the big fans kicked in to help ventilate the tunnel. It took a few hundred meters for us to be able to hear each other again.

Around 50 minutes later we emerged at the Kidsgrove portal. The tunnel Keeper here doing his best to keep a group of school kids off the CRT boat. The kids then turned their attention to us, the usual ‘Can I have a ride Mr, I’ve never been on one before’ ‘How much did it cost?’ ‘I could run and jump onto your boat from here’ We talked to them, suggested it would be a bad idea, hoping that we knew they’d not try, but you never know. They soon walked up the steps towards the station and forgot about us as we did about them.

At the junction

The hire boat had tried turning long before reaching the junction, but managed to get round after a bit of faffing leaving the way ahead clear for us. We dropped down Plant’s Lock 41, the first from the summit pound, and chose where to moor up, easy as we were the only boat in the pound.

Down Plant’s Lock

A visit to Lidl was required, then Mick headed to Tescos for bits Lidl don’t do and to pick up a prescription whilst I set about preparing cruising sustenance for a busy day tomorrow.

1 lock, 5.5 miles, 1 tunnel, 1 pottery finally visited, 0 shore leave AGAIN! 2 jackets, £15 for a 2nds cup, 11th September, 2 lucky boaters, 1 straight on, 1 batch short crust, 1 tin of oaty apple energy, 1 folded bit of card over the flashing green light!

https://maps.app.goo.gl/JQRSHzqPx19ptvvL7

The Missing End. 30th August

Froghall Basin to The Boat, Cheddleton

There was no point in putting things back on Oleanna’s roof yesterday as we’d be going back through the tunnel today. Well the chimney went on in case it rained overnight. The mooring had been quiet apart from what sounded like a distant dog kennel, one with lots of hounds.

Not CRT bins!

Yesterday we’d wanted to dispose of some rubbish. CRT signs suggested that the bins were theirs, but another sign said there were not and there would be a £600 fine for anyone using them, they belonged to Hetty’s. Mick popped over this morning to check on the situation. Apparently CRT removed the bins a while ago, Hetty’s then took over the contract with Biffa, so they are theirs. The chap at Hetty’s said we’d be okay popping one bag of kitchen waste in them before we left.

A very green lock

Time to make our move. Mick headed off to set the lock, no need to as there was no chance it would have filled up overnight. The chap from the waterpoint yesterday was walking his dog and came for a chat, at least someone other than us had now seen that we’d made it through the tunnel. Blimey the lock was like the Hanging Gardens of Babylon when empty, so much plant life. Up Oleanna rose, we then pulled onto the water point to top up the tank again.

Chatting funding and bins

Not such a powerful tap and I suspect it was connected to Hetty’s as the pressure varied. A CRT fundraiser came over to chat, full of the problems to do with funding. He confirmed the bins were no longer CRT’s, maybe someone should remove the CRT sign.

Nice click photo for details

Opposite the lock is a rather nice building containing several holiday lets. They have their own swimming lake behind them. A lady came out to wave at us as we passed, heading back to the tunnel.

Can we do it in 2 minutes this time?

It took a while to line up with the tunnel again. Then we plunged back into the 75 yards, repeating yesterdays slow progress, only a little bit quicker this time, 7 minutes instead of 10 for Mick’s head to pop back up at the stern.

With all the covers removed it made sense to me to give the roof a much needed wash. Mick wasn’t so keen and busied himself putting nav lights back on and reassembling the horns. I however was determined to finally give Oleanna a wash, sick of the green and grey the cream had become.

Revolting!

With other items removed the roof needed a prewash and rinse to get rid of the worst of the muck. Then followed with a soapy wash and scrubbing brush, rinsed down. Mick ran out of jobs he could get away with, he really hates washing boats, doesn’t see the point in it! So I got him to do the prewash and rinse on the off side. Where the coal lives on the roof both sides got the full works the rest of the offside could wait for us to be moored later on.

So much better

Oh finally the cream was back with us. Unfortunately it did mean that I’d got to see just how bad the grabrail had got close up on the port side. Last year I’d prepped the starboard side for painting, then ran out of time. The port side didn’t get a look in. I’m going to have to find the time this year along with knee stamina to stand on the gunnels to get the job done. Washing the roof was at least a start.

Back under the railway

As we had lunch a boat came past. Where had it come from? It had come from the tunnel, we’d not seen it go past earlier. Mick said he’d spotted it down an arm when he went into Hetty’s. So when we came across a boat heading to Froghall, thankfully not on a narrow section, we could confidently tell the helm that there would be no-one heading towards him as there were no boats behind us. We kept sounding our horn, just in case, but met no other boats.

Just by the water point at Consell Forge there was a For Sale sign. Not much of a river frontage, but hardly surprising as the house was up a track away from the weir and river. If you like a good pint and heritage railways along with a bit of seclusion this is your house.

Back off the river

Back up the river, back onto the canal. No Bob or Rob to help at Wood Lock, but that didn’t matter. We now wanted a mooring. A hire boat and CRT boat occupied the first length. The boat from the water point yesterday sat on the next mooring opposite The Boat pub. We pulled in behind, tucking in as close as we could, with boats moored opposite we didn’t want to be in anyone’s way. It did require some creative mooring, but we got there in the end.

Pheasants? A touch pale though

Time to put Oleanna back together again. I finished off washing the roof, the offside no longer off, whilst Mick put the cratch cover and pram hood back on. Except there was a vital bit missing from the pram hood. An end that connects the end of a piece of frame to attach it to the cabin sides. When we’d taken the frame off it had been stored inside, last night it was put on the roof out of our way, then back inside again today. We hunted high and low, inside and out. Tilly was questioned in case she’d found it interesting and batted it under the sofa for safe keeping. It was not to be found, we needed some means of attaching the frame to the roof.

Boy things kept for what? But that broken thing might just

In amongst the things that have been kept for some reason was a broken bit from the tv aerial pole. A rubber end to it and a broken metal prong. It fitted into the frame leaving the prong which we might be able to clamp into the connector. Mick played around with it for a while, cable ties and for now we have a way to attach the frame when it’s up, it always gets folded down for cruising no matter. A new connector will need ordering next week.

Not the quietest of moorings. Plenty of dog walkers and noisy drinkers at the pub. This was then followed by a lot of cars coming and going. We’d be able to cope with it for a night and before there is any boat traffic in the morning we want to be moving.

4 locks, 4.8 miles, 75 yards of tunnel, £750,000, 0 boats behind us, 1 year of grime, 1 sparkling roof, 2 sides still to do, 15 patches of rust, 1 noisy mooring, 2 dogs to get along, 1 bored cat, 1 missing end, 1 broken bit repurposed.

https://maps.app.goo.gl/WqJVkvPNNTgQgc3X7

Barry, Karen and Sexy Eyes. 4th August

1 lock down from the top of Buckby Flight to past Bridge 88, North Oxford Canal

The Geraghty zoom didn’t go as well as normal. Despite good upload speeds and the internet otherwise seemingly fine, all of Mick’s siblings kept freezing, we reciprocated at their end. The IT department had a go at sorting it out, but failed. We still caught bits of the conversation though, insulation and Bumble Bees, Cherry Pickers Finger and the Chinese falling off things. We ended up leaving early as there was little point in us remaining.

Up the last lock of the Buckby flight, everyone else had moved off long ago, at least we’d missed the rush.

Buckby Top Lock and The New Inn

As Oleanna rose the last few feet Barry Manilow was singing his heart out along the cut. Once he’d stopped for a breather Karen Carpenter started up, followed by Dr Hook. None of the boats on the moorings looked like they had their doors or windows open, so it must have been SO loud inside. As we filled with water and delt with the yellow water it kept my toes tapping.

Norton Junction

Up to Norton Junction. A quiet horn could be heard, we were far enough back for a boat to turn, then nothing. A dog walker had been taking her time along the towpath, I think she’d prompted the boat coming from the Leicester Section to sound their horn again, by now we were just out of their view but at the junction, we sounded our horn in reply and carried on knowing we’d clear the junction and be out of their way quickly.

Approaching Braunston Tunnel

The scenic view moorings were quite busy, but there would have been space for one this morning? Approaching the tunnel we passed at least three boats having just come through from Braunston, the question was, how many would we meet in there?

Passing just after the tunnel

A view straight through to the other end, this meant we’d get past the wiggly bit before we met anyone. If fact we’d reached the far end just as a boat approached turning it’s light on. Behind we were being followed, a locking partner, however it was time for our lunch. Tilly approved of our mooring through the window, that was as close as she was going to get!

Mick looked up from his lunch. ‘Did you lock The Shed and upstairs upstairs at the house? I didn’t!’ Neither had I. New lodgers due today, one of whom we’ve known for decades and would trust, the other a very brand new actress. I’m sure she’d be fine, but you never know. A lodger earlier in the year had asked why the doors were locked and we’d rather be asked that question. A quick think, who could we ask to pop round within the hour and give the house a quick check as Darren was meant to have left this morning. A message sent to Sue who’s Aunt used to own our house and she lives pretty close, instructions given on how to get in.

Going down the locks

We moved up to the lock, a boat appeared behind us. Sue had gained access, I’d warned her that a bed might not have been made up, I’d also had the feeling that Darren might have just left things not as he’d found them. This feeling turned out to be correct. Sue made up the bed, hoovered round, emptied bins, what a star. Then a message came through. ‘There’s a lot of used towels in the bathroom’. I usually do a last minute check round the house before we leave, but due to my knee I’d not wanted to go back up the stairs and had assumed Mick would have dealt with them, a bit like the keys! Oh heck what rubbish landlords leaving their own towels about the place! Sue was still about when our first lodger arrived, jobs just about done, we owe someone a big drink when we next see her. If we hadn’t had the chap in last week as a favour to the theatre, we’d have at least left the bed made, bins emptied, but the towels might still have been there. Mental note made for next turn around, Must do better!

Bread and chilled medication shop at the bottom Braunston lock

Our locking partners were a couple from Tasmania over to see family and spend a week relaxing on a hire boat, they do it every couple of years. I felt a touch bad constantly checking my phone and talking towels for much of the flight. Plenty of boats coming up and at least one behind us, quite hot on our heels where the locks only have ground paddles.

We’d considered stopping for a loaf of bread, word from the up hill boats that there was no room in Braunston. Mick bobbed into the shop at the bottom lock, a treat loaf of bread bought we’d no longer need to stop. Midland Chandlers is closed on a Sunday so no filters could be bought.

We counted at least five spaces as we came through Braunston. Hardly full, apart from in front of the pub. The bridge into the marina was having work done to it, big areas of white paint missing and hessian covering the top stones. Onwards past Braunston Turn, straight onto the North Oxford, still more spaces.

Ooo Hello! NB Rock ‘n’ Roll

Once through bridge 88 we spied a length of armco and pulled in. Tilly was allowed an hour and a half by which time we were surrounded by more boats. Our nearest neighbours a Dutch family saying that Braunston was full. Here was now, maybe we’d just timed our cruising well today.

Bangers!

6 locks, 5.6 miles, 3 golden oldies, 1 full water tank, 1 empty wee tank, £3+ for a loaf of bread, 4 towels left out, 2 keys, 2 new lodgers, 1 disappointing lodger, 1 super star of a Stage Manager, 1 tunnel, 0 boats passed, 2 mysterons, 90 minutes.