Category Archives: Huddersfield Broad Canal

Breathing In. 13th October

Aspley Basin to Wheatley Bridge 20, Calder and Hebble Navigation

Not the quietest of moorings

Up early for us, breakfasted whilst the final load of washing was making the most of the electric hookup, then we pushed over to the service block. Someone already had a hose linked up to the tap, but that didn’t matter we could wait. Our main reason for being there was to make it easier to pick up our Click and Collect from Sainsburys. Mick headed off with the bike to collect it across the car park and was back very quickly.

That way please!

The tap was now free so we topped up with water, disposed of any rubbish as the shopping was stowed away. Time to push off and say Goodbye to Huddersfield the largest Town in the country. I’ll be back in February, but sadly not by boat.

Chains and wheels

The Turnbridge Loco Lift Bridge was opened in 1865 replacing a swing bridge. A combination of chains, wheels and counter weights lifts the bridge deck vertically. Originally it was operated with a windlass, but since 2002 it has been electrically powered. I got my Key of Power out and waited for a gap in the traffic before turning it to release the barriers. Once they had been moved I pressed the button to lift the bridge. What look like big counter weights actually house all the chain required for the bridge to rise and fall. Today I managed to stop 8 vehicles.

The pootle out of Huddersfield isn’t the most picturesque, light and not so light industry sit alongside the canal. Gas Street Bridge always has a strong aroma around it. Then we passed my second choice hotel in Huddersfield the Travelodge. From here you get good views of the railway viaduct before the recycling plant, I prefer the view of boats from the Premier Inn at Aspley.

Red Doles Lock 9

Then the first lock of the Huddersfield Broad Canal. Opened in 1776 it linked the Calder Hebble to the centre of Huddersfield and later to the Narrow in 1811 creating a trans-pennine route. The long narrowboats that could climb over the Pennines could not use the shorter locks of the Broad canal. Goods were transhipped at Aspley Basin but the canal was overshadowed by the Rochdale Canal, which had broad locks that could hold two narrowboats.

Mind that cill

Today the Broad canal is listed as being 57ft 6″ long by 14ft 2″ wide, but C&RT also say that narrowboats of 60ft can navigate it by going diagonally. Six years ago we managed the trip in Lillian (NB Lillyanne). Going downhill in an over long boat you have to take great care to position your boat in the right spot. Last time lock 8 proved to be a touch tight for Lillian and we had difficulty positioning her so as to be able to get her bow past the closed bottom gate and out. This is why we had Oleanna built a foot shorter and with the aid of a bow thruster to help her clear the bottom gate without use of a rope or pole. So today we knew we’d be alright, yet we still had to take care.

For each lock we did the same. Oleanna was brought in, her bow brought as far forward as the small walkway allows and she tucks into a corner. Then the stern is taken over to the other side, this works on Oleanna. With Lillian ( a foot longer) we had to have her stern more towards the centre of the lock this giving a few more inches as the cill is curved.

On a diagonal

I then stand above the bow and gradually lift the paddle whilst Mick keeps an eye on the stern and the cill. With Lillian we took this very slowly as any chance of the stern sitting on the cill could mean she would sink. As the boat lowers you can move her forward under the walkway a touch. Then once Oleanna’s stern had safely passed the cill I walk round to the other side and lift the paddle there.

Nudging her way past the bottom gate

Once the water is level with below I then open this gate. Now Mick moves Oleanna’s bow past the still closed gate and can escape. Just to do it all over again at the next lock.

No visible brake on the gear

The paddle gear is different to most as there is no visible brake on them. You wind the paddle up and just stop where you want to. Then when you want to lower it you just need to give it a little bit of extra umph to get it moving and the brake comes off.

The gate paddles can be fierce and send a jet of water down the lock. But then several of the locks had quite a few leaky top gates, so much so Mick had to shelter behind the back doors to keep himself dry.

Getting ready to jet wash

Two chaps from C&RT were getting ready to jet wash around some of the locks, they said they were slippy and with winter maintenance happening soon they were giving the stone work a good clean.

Poorly lock

The next lock is currently closed to widebeams as the off side gate has been damaged. The face of it now covered with a sheet of timber and the gate is tied with a cable to prevent anyone from opening it.

Colne Bridge Lock dropped us down into the final pound of the Broad Canal. This is the pound that has been loosing water over the last few weeks. We’ve seen photographs of it just about empty, but thankfully today there was water, it was still low but enough for us to head to Lock 1.

The last of the Huddersfield locks, Cooper Bridge Lock 1

Here we would leave the Huddersfield Canals behind. Lock 1 and Bridge 1.Time to join the river, checking the level board first.

We came from the right through 180 degrees

After a hand brake turn onto the Calder Hebble we pulled in for lunch, then got ready for another short lock, a second Cooper Bridge Lock, this one number 16 not 1.

Give me a lever ….

Time to use our Hebble Spike to help fill the lock. The spike is made from hard wood and is used to gradually wind up the paddles. There are windlass operated paddles too, but more water was needed to help level the lock to open it.

Now we had stretches of river followed by lock cuts. The next lock being Battye Ford Lock, here we knew we’d be able to breath and have a four course meal and still fit.

Through Ledgard Flood Lock it was time to find somewhere suitable to stop, hopefully where Tilly could go out. The first mooring by Lidl has a road running alongside. We carried on to just after an old railway bridge and pulled in, we almost go into the side.

Here there was bracken and some friendly cover before three layers of fencing designed to keep animals out. Well Tilly was soon seen on the other side, it was hardly taxing!

A few angles needed checking for the panto set builders then it was time to put the Wednesday roast in the oven, a medium chicken which turned out to a large in disguise. We’ll be eating a lot of chicken for the next few days.

11 locks, 3 flood locks, 6.32 miles, 1 click and collect, 1 lift bridge, 8 held up, 10 skimpy locks, 1 hand brake turn, 1 giant lock, 3 fences, 1.75kg chicken, 2 fat contended boaters.

https://goo.gl/maps/jGM7BY6PbXbR1Uiv7

Green Mystery 12th October

Aspley Basin

Today was a day off boating.

A mini view of Huddersfield

This morning I packed up my model for #unit21 and walked up to Queen Street in town to the offices of Dark Horse for a production meeting. The show doesn’t happen for another four months but there was much to discuss.

The budget was the main thing. Next February will be a showing of the show, six scenes to wet the appetite for funders, possible tour venues. The original brief I’d been given was that the set and costumes should have full production values. Normally this would be a tight squeeze on their budget, but right now I was needing more than a shoe horn and magic fairy dust to sprinkle on everything to try to keep the costs down, materials have rocketed in price. When I’d last talked to Amy the director I’d planted some seeds, thankfully they had started to take root.

Just to check

With Penny the Lighting Designer/digital editor joining us via zoom we had a very productive meeting fuelled by gf Chocolate Hobnobs. Lynda was recovering from the cold that is doing the rounds, I kept my distance and hope that she’s past the stage of passing it on as I’ve got five weeks of hard work coming up.

Several things had arrived for me, UV fabric paint, which I need to try out on off cuts of costume. A very large box which contained two 1inch brushes that I’ve treated myself to for panto. I just needed to walk to B&Q now to pick up some neon green paint for the set, then after doing a couple of samples I can forget about the show for a while.

The Lawrence Batley Theatre

Meanwhile back on board, Mick topped up the diesel tank, our stern being moored right next to the pump it made sense. Topped up to the top. There is a small chandlers here where he managed to get a few more poppers for our cratch cover as spares. £10 a night including electric was paid so that we’d be ready to go in the morning. The washing machine has been working hard.

Then it was time for him to climb back into the engine bay. A service was needed, but first it was time to trace and reconnect all the wires that had got chewed up when the belt went.

Red, a voltage sensitive relay, which provided power from the ignition to the bow thruster battery.

Dark Horse Rehearsal space

Orange, the engine temperature gauge.

Green. Green! What is the green one for? There had been a length of green cable wrapped round the pulley that Mick had dug out, but what had it been connecting? And to what? He’s had no luck finding any other green cabling in the engine bay. So far it can’t have been anything critical, but it would be nice to know what it was.

Next followed the oil change. One less job to do today was changing the alternator fan belt! Just after Mick had pumped all the old oil out I got a message from Kim on NB Idleness saying they were about to come down Lock 3 and Lock 1 was going to be unlocked for them.

Tucked in next to each other

We would be breasting up with Yan and Kim and because of their old dog we’d suggested that we should pull out to let them have the bank side mooring to help with his arthritic legs. Of course shortly before they arrived another boat pulled up onto the water point opposite and when they were just pushing off NB Idleness was just pulling through the bridge slowly. Instead of a two way do-si-do it was to be a three way one. Idleness through first, then the blue boat into the bridge hole (pausing to remove their bikes), we pulled out, Idleness pulled in and we tied up on the outside, job done.

Paints and new lovely brushes

I walked the mile to B&Q a very large one on Leeds Road. Mick had also made a request for a new fuse for the bowthruster. So that was another 0.75 of a mile to Halfords for one, then back to the boat via Sainsburys picking up a bag of cat litter and some pizzas for tonight. The rest of the shopping we did on line to collect in the morning before we pushed off. So despite doing no locks today I still walked 5 miles, but I have pretty things to show for it.

0 locks, 0 miles, 5 miles walked, 1 meeting, 2 alterations, 1 budget to be fine tuned, 2 wires reconnected, 1 green mystery, 9 litres oil, 1 filter, 1 fuse, 1 bow thruster able to charge again, 3 boat do-ci-do, 1 full tank of diesel, 2 pots UV, 2 pots Neon, 2 x 1″brushes, 1 key to be left, 1 producer, 2 pizzas.

Charging Down.11th October

Lock 9E to Aspley Basin, Huddersfield

Last nights mooring, not so rural

Mick wanted another go in the engine bay this morning to see if he could free what remained of the cable around the pulley on the alternator. I in the mean time sat down to hand write the post you read yesterday so as not to forget things. I’ve discovered that hand writing is actually a touch quicker than tapping the words out on a keyboard, I tend not to re-read everything several times. If only the words would now leap onto the computer for me, I’m going to try dictating them into Word when we have power restored and see how that goes.

Hand written

Mick beavered away at the back. First the remaining cable was prised out from the pulley, Hooray!!! Then he fitted the new belt to the alternator. On Saturday morning he’d been a touch cautious about this, RCR could have done it if the cable hadn’t been a problem. But having spent quite a bit of time up close with the beating heart of Oleanna over the last couple of days he felt that he was more than capable. By 11 am the engine was started, things checked over in the engine bay. Inverter was turned on along with the fridge, everything sprang back into life. We had POWER again!

POWER!!!!

With plenty of time to make it down to Lock 1E for 3pm it had been a morning well spent. Once the batteries had had a little boost the dish washer was turned on, now very full. The covers were rolled back and I set off to walk most of the rest of the way down into Huddersfield.

The character of the Huddersfield Narrow Canal now changes, far less leafy, more old mills, roads and the railway. Industry the reason for the canal existing in the first place. Businesses were proud of themselves when mills and factories were built, carving their names in stone, building their names into the brickwork, established dates forever.

At 8E there was at last a walkway over the top gates. I soon worked out that this was because there was no other way to get to the offside, despite there being a bridge just below the lock there was no means of getting to the gate that side. Time to walk round the lock the other way time and time again. The beams overhang the bridge below, the beams having been shaped round it. This does mean that the final push closed of the gates can be done from the road, saving one trip all the way round the lock, no walkway to jump from one gate to the other here on the Narrow.

A boat! I was so surprised I didn’t manage to get it in focus!

Between 6E and 5E the level was down, was this to be the start of our water worries? I walked on ahead, safer that way so as not to have to launch oneself off the boat if you can’t get into the side. Up ahead I could see a boat coming towards us, they must have come up 1E at 9am. They loitered for Mick to come through a bridge and there was time to chat. The level between 1 and 2 had been very low, they’d only just made it. I warned them about Lock 1W and how much of a b**rd it was.

NB Bridge Street was one of the boats we saw a lot of in Nantwich last year during lockdown 1. We also saw them somewhere near Fradley earlier this year. I said they’d recognise the boat when they passed. They did and asked Mick how Tilly was.

Just a touch low

The bywash certainly wasn’t flowing at lock 5E, the lock needed just a touch more water to level out, a C&RT key was required for the locks on the paddles, that of course was onboard.

Towering over Oleanna

Down under the very tall viaduct which helps connect Huddersfield to Sheffield, the trains too high up to get in a picture as they cross.

Gong along the old tunnel

Down 4E and then the long narrow channel past new University buildings. The position of Lock 3E has been moved twice. Factories had been built upstream of the lock and Lock 2E after the canal had been abandoned, they were built on the line of the canal and thus blocked it. The solution was to relocate the lock upstream of the factories and have a tunnel built under the factory. Eleven years later Sellers Engineering relocated to a new site, enabling Lock 3E to move a second time, nearer to the original Lock 3E. The section that had been the tunnel was now brought to the surface and is the narrow channel leading to the new lock. Link

Dropping down 3E you have to get back on your boat as there is no land access to Lock 2E. This is where we met NB Jubilee six years ago. They were just arriving at the empty Lock 2E and it was in their favour. We pulled in on the lock landing awaiting our turn. As the lock filled and NB Jubilee rose the rapid level drop above the lock caused Lillian to go on such an alarming list we dropped the paddles very quickly!

Today we had no problem as no-one was coming up the lock. We dropped down, Mick picking me up again and headed on down to Lock 1E through another tunnel and the old Lock 2E. I remembered Frank and myself having to go to the front of Lillian to help raise the stern on this pound, it also made it easier to get off the bow as the stern would not get into the side.

A touch low towards Lock 1E

Today the pound looked a touch low so I replicated what I’d done six years earlier, hopping off the bow to tie Oleanna up. Lunch was had at a jaunty angle whilst we waited for 3pm and the chaps from C&RT to come and open the lock for us.

As close to the side as we could manage

Discussions on various forums have been that the University alongside the canal here was able to use water from the canal to cool things, the warm water then being put into the river, thus explaining why the pound above Lock 1E is quite often so low. Mick spotted someone wearing blue outside so popped out to see if it was C&RT. It wasn’t, but was a chap who knew about the water at the University. No water is taken from the canal, there wouldn’t be enough for their needs in that pound as the level is always so low!

At just gone 3pm a van arrived with two C&RT employees. One chap told Mick how to move Oleanna into the centre of the canal, he knew everything, apart from how our boat reacted. Mick however did get Oleanna lined up with her bow close to the top gates so that the lock could be filled. Then he nudged backwards so we could open the gates and bring her into her last lock of the Huddersfield Narrow Canal. Another tick off the list of waterways for Oleanna.

We’d started at Bridge 111 and Lock 1W, we were now coming off the Narrow at Lock 1E and Bridge 18! The bridge numbers continue onto the Huddersfield Broad Canal to where it meets the Calder and Hebble. Under Wakefield Road Bridge, slowly, we popped out at Aspley Basin.

A familiar place

First thing was to top up on water, dispose of rubbish at the C&RT services. Then we pushed over to the diesel point at the marina to wait for the chap who would be with us after 4pm. When he arrived we were given the option to stay on the diesel point and be able to plug in or move up to where there would be no hook up, but it would be free for 72 hours, there after it would be £8 a night. We wanted to be plugged in so as to make use of the washing machine and at £10 a night including power we could run the machine as much as wanted and gorge ourselves with light, charging everything within sight.

The lights of Huddersfield

To celebrate our arrival and power being restored, we headed over to the okay Aspley Table Table for some reasonably priced food. If I hadn’t just spent the last three days walking all the way down from Marsden, then we’d have headed into town to the Chilli Lounge for a curry, but my legs really didn’t want to do any more steps.

8 locks, 83ft 6″ descended, 2.54 miles, 1 last tuft of wire, 1 belt, 1 alternator working again, 1 boat with POWER! 1 jaunty lunch break, £10 incl, 3 loads washing, 2 loads dishwasher, 1 gammon, 1 chicken breast, 0.5 rack of pork ribs, 2 glasses of wine, 1 narrow canal completed and I got to work every lock this time, well apart from the guillotine bit! 0 shore leave!

https://goo.gl/maps/nNvmeo8VP8LCw4LL8

Consulting With The Tunnel. 4th October

Murrys Winding Hole to opposite Tescos………

Two years ago we crossed the Pennines from east to west via the Rochdale Canal with Clare and Graeme on NB Mr Blue Sky. Last year we crossed via the Leeds Liverpool visiting friends and family in Skipton and Leeds. Earlier this year we dodged the hills by taking the route south via the River Trent. There is one other route which we have only done once before, six years ago, the Huddersfield Narrow and Broad Canals.

Snake bridge

Recently all routes have had their problems. Lock floors, stuck boats, lack of water etc etc. The Huddersfield Narrow has problems with water levels towards Huddersfield on a good year, but this year those problems have been greater. Then over the last month the bottom end of the Huddersfield Broad Canal has been found to be empty on several occasions.

And another

The C&RT stoppage notices that come from this area are far more informative than you normally get, they explain what has happened and what measures are being taken to rectify the situation. However what we wanted to know was, was the situation going to improve or would Oleanna be stuck in Huddersfield all winter if we went that way.

I think we’re going to see a lot of the chap on the right

The amount of work needed to reach the summit, the tunnel passage and then working down the other side is more for those who like a challenge than those who prefer a life on the flat with a glass of wine in hand. Before we committed to this route we wanted to talk to someone on the ground with local knowledge. For the last week Mick has been trying to call Standedge Tunnel Control to speak to someone, but with no luck. Today however was different he got through.

This year the canal has suffered more from the lack of water as one of the reservoirs has been drawn down for inspection and maintenance (several others on the system have also been lowered). But the rain we are having has been doing a good job of filling the canal up. The chap sounded positive, which is what we wanted to hear. Decision made before we’d even got out of bed this morning. Huddersfield Narrow it is!

We’ll be going right please!

About a month ago we’d booked our passage through Standedge Tunnel and our cruising has been planned for us to reach Diggle portal the day before. We have also booked a ranger to assist for a day on our descent from Marsden, then you also have to book for Lock 1E to be unlocked to let you out the bottom and into Huddersfield.

Time to get moving!

A boat came past, possibly the boat that had followed us down Marple yesterday, at speed. They then met a Black Prince hire boat at the next bridge, we just waited for both boats to pass before untying. The Black Prince boat might just arrive in time to start the flight before midday.

They’ll need warp drive to reach the locks in time!

Soon after pushing off ourselves we were approaching a big bend when the bow of another Black Prince boat came charging round it. Thankfully it seemed that the person at the helm had some experience as we narrowly avoided a collision. If they could keep their speed up we reckoned they would miss the locks by about ten minutes! Not good if you are trying to the Cheshire ring in a week!

We pootled along at a reasonable speed through the long winding wooded valley. A chap was blowing leaves off his astro turf. Maybe it’s best to keep on top of such things, but what a never ending job!

M67

Under the M67. Was this the face of a local graffiti artist on the wall here? Was this going to be the local ‘Ghost’? It was, we were to see plenty more pupilless faces today.

We caught the boat ahead of us up at Duckingfield Lift Bridge. Here you need an anti-vandal key, or handcuff key to get the lock off the mechanism and they hadn’t got one. The chap was tinkering with the lock as the lady knocked on a boat to see if they could help. We pulled in for me to hop off just as they got the lock unlocked. At least it saved me doing all the winding, but I did make sure it was locked back up once it was down again.

Mick asked them which way they were going. ‘To Ancotes’ was the reply. He pointed out that they would need a handcuff key for the locks. But the lady said they wouldn’t be doing the locks today. They’d still need a handcuff key no matter what day they were doing them.

Dukinfield Junction

They turned left at the junction, we turned right onto new waters for Oleanna and Tilly. Under the Asda Tunnel and out passing moored boats and three flying ducks.

Then on towards Bridge 111, the first of the Huddersfield Narrow Canal, just below 1W Ashton Lock, the first lock of the canal.

Broken even with the price tag still on it!

Now six years ago we’d just bought ourselves a long reach aluminium windlass. I was nursing my lack of little finger so was at the helm, off went Mick to set the lock. He soon returned with the brand new windlass in two pieces! The advantage of the longer reach no longer available he struggled with a standard windlass. A while later we replaced the broken aluminium windlass with a long reach one made from steel, now my best friend.

Lock 1W finally open!

Today it would be me working the locks and 1W made itself known quickly. The lock was full so I went to empty it. The towpath side paddle being extremely stiff took some work. A couple of clicks, then adjusting the position of the windlass to give me more umph! Eventually it raised. I then tried the off side, this just slipped every half turn, so I left it closed. The gates were stubborn too, one side with a cranked beam. If this was to be the case at every lock we were going to be working hard for the next few days!

Plantation and Tame Lock were much easier. Hills just in view ahead and old mills alongside the canal.

River Tame

The River Tame aqueduct took me by surprise, I nearly had to do a Giles as I’m not too keen on having nothing on one side of the boat!

Now we cruised through overgrownness on both sides approaching Stalybridge. Railings and lamp posts hide in amongst the sideways trees. At one time someone thought the canal would be a popular place to walk, it is but only on one side, the other left to grow over and collect rubbish.

Salt shaker vent

The canal was built over 17 years, originally opening in 1811 Standedge Tunnel being the last stretch to open. For a while the canal was profitable being a shorter route connecting Manchester to Leeds than the Rochdale, but bottlenecks were created at the tunnel where it took four hours to leg a boat through! In 1845 the canal was bought by the Huddersfield and Manchester Railway Company who’s route was to follow the canal up the Tame and Colne Valleys. Standedge Tunnel was used to remove the spoil when they built the railway tunnel. Once the railway was open there was no need for the canal which fell into decline and ended up closing in 1944.

In 1974 the Huddersfield Canal Society was formed with the aim of re-opening the canal. Whole sections of the cut had been filled in, built over and several bridges had been removed. Volunteers with the support of local councils worked hard and by the 1990’s all sections that had not been filled in were restored. The Huddersfield Canal Company was set up to co-ordinate the reopening of the remaining sections, one of them being a half mile through Stalybridge which had been filled in and partly built over. But in May 2001 the canal was reopened. Plenty photos of the building work here.

4W mossy but new

Lock 4W is more or less where the major works in Stalybridge started. A whole new lock was built with it’s approach under a road. I’d remembered this and the railings which meant dropping crew off to work the lock had to be done at the start of the tunnel/bridge.

The bottom gates were problematical to close. In fact after pushing and bumping the gates there was still a six inch gap between them. We tried adding water pressure to the equation, but all that was going to do was deplete the pound above. The paddles were closed, gates reopened, Mick tried prodding around with a boat hook but the water was too deep. The gates closed a touch better and water pressure did the rest of the job for us, up the 11ft 1″ Oleanna rose, the pound above looking a bit short on water.

Looking back to 4W

I walked ahead and dropped the water from 5W which aided our need to get over the cill. Mick decided to leave the ground paddles open until Oleanna was safely across the cill, this would help water move around her should I have needed to let more water down. Once clear of the gate he then dropped the paddles. As on quite a few of the Huddersfield Canal Locks both ground paddle mechanisms are on the same side as the gate beam, handy as there are no walkways over the top gates.

Stalybridge Civic Hall and hills

We had a similar problem at 5W with the gates closing. An extra nudge and water help again. Now we could see the Civic Hall and the hills behind as we made our way through the new cut to 6W.

Nice trees, a shame about the weeds

Up at lock level there is masses of paving everywhere, a municipal feel to the town centre, all revamped when the canal came back through town. Once exciting I’m sure, but now it feels just a touch soulless. An art installation sits near the lock, Holy Trinity and Christ Church a little behind it. Then once up through Lock 6W Tescos takes over, car park on both sides of the canal. We pulled in where another boat was moored right opposite the checkouts. The chap on NB Texas Star had a very pretty dog and he was trying his best to get a coat of paint on the back of his cabin just as it started to really rain.

Two paddles and Tescos ahead

After a late lunch we put together a big shopping list, enough supplies to get us into Yorkshire. This must be the closest we’ve ever moored to somewhere you can leave your trolley and get your £ coin back. The only problem is the railings between the car park and boat. I passed the shopping through and Mick popped them on the boat. It was then either a walk round for me or a scramble through the railings.

Look what they’ve just bought!

This afternoon we’ve had the following through from C&RT

Huddersfield Narrow Canal – Water management information
Starts At: Lock 1 East, Stanley Dawson Lock
Ends At: Standedge Tunnel

Monday 4 October 2021 14:30 until further notice

With the support of the EA, during the 2021 boating season we installed a temporary river pump at Britannia bridge, in Milnsbridge, abstracting water from the River Colne into the Huddersfield Narrow canal to aid continued navigation on the canal. We have unfortunately been unsuccessful in gaining an extension on this abstraction from the EA which we had hoped would continue until the end of the 2021 boating season, so as of 30th Sept 2021 we have ceased abstraction for this year.

The canal is currently looking healthy and we are relying on supply from our reservoirs, natural feeds and of course wet weather to maintain water supply, with the recent rainfall proving beneficial. The local team will continue to do their best to manage water levels in order to support safe navigation and if we are faced with the need to implement restrictions or closures, we will update the notice accordingly.

At least the rain is doing some good to the east of the Pennines, here it has stopped us from heading out for an explore, instead we stayed by the stove keeping dry and warm. Outside it was someone’s birthday, maybe they were having a car park party! Thankfully they quietened down after a while leaving us with the car park lights and the very raucous Canada Geese!

Today we have learnt something that we’ll never forget. Did you know that a Moorhens skin type is fur ?! No we didn’t either until we were checking what juvenile Moorhens looked like. Check this link if you don’t believe me!

6 locks, 61ft 3″ climbed, 5.89 miles, 1 lift bridge, 1 boat held up, 1 right, 2 canals, 1 Asda tunnel, 6 furry Moorhens, 1 pretty woofer, 6437 giant spiders, 1 car park mooring, 1 box, 2 bottles wine, 1 trolley almost to the boat, 1 very damp evening, 0 shore leave.

So our route today

Murrys Winding Hole to opposite Tescos, Stalybumbridge, Huddersfield Narrow Canal

https://goo.gl/maps/7urH5f7JMhsms2NQA

Obligatory! 21st September

Laches Bridge 73 to Otherton Marina

By the time we’d had a leisurely breakfast we’d been passed by many boats, in fact by the end of the day we’d seen more moving boats than we’ve seen in all the time since turning onto the Grand Union at Napton Junction three weeks ago. We’d taken so much time in getting ready to push off that the next lot of kids had come past in canoes powered by screams.

On closer inspection that might be NB Jubilee behind Bessie Surtees too!

Last night there had been several boats moored along the stretch in front of us, now there was only one. It turned out to be NB Bessie Surtees, fellow Scarborians! We’d last past them at Tyreley in March last year when we had a brief chat and imagined the world would be back to near normal in a matter of a few months. A good gap in passing boats meant we were able to have quite a chat as we trod water. One day I will find out your names! Lovely to have a catch up, hope the weather stays kind for roof painting and see you somewhere next year.

A good Scarborough Smile

At Hatherton Junction we followed the canal to the left.

A right turn one day (hopefully) will take you onto the Hatherton Canal which is proposed for restoration. This will link up with the Wyrley and Essington Canal at Fishley Junction near Pelsall. The canal used to connect with the Cannock Extension via the Churchbridge Branch climbing 16 locks.

Moored boats, fishermen, a bridge and an on coming boat all happen at the same time when the canal is busy as it is. I wonder how much time the fishermen spend moving their lines out of the way at the moment. The two chaps said they’d caught a few, so it must be worth their time.

The ‘No Mooring or Stopping’ signs look to have had a make over alongside the chemical works. Plenty of boats kept on moving, mostly a mixture of hire and share boats. There was space at Gailey for a top up of the water tank, we also pumped out the yellow water for disposal at the elsan here whilst the lock was pretty much in constant use. Our tank finished filling at the same time as a share boat that had pulled up after us, with two more boats coming towards us we both quickly moved up towards the lock.

Gailey Lock

The obligatory photo was taken with the tower, no longer a shop. Two C&RT chaps lifted a manhole and started to turn off what we assumed was the bywash round the lock, it was still flowing at force as we passed below. We pulled in for some lunch before we carried on.

Stop planks in their house

Taking our time was maybe a good idea as we didn’t end up joining the post lunch queue at Brick Kiln Lock, we arrived just in time to help the boat ahead open and close the bottom gates.

Training boat

At Boggs Lock a training boat was coming up, a time to stand back and not help. Their progress was quite slow, but very safe, as the crew worked the lock everything was explained to them.

Just by the M6

With boats coming towards us and one following there always seemed to be crew to help with gates and paddles. A hire boat at Rodbaston Lock were hoping to reach The Anchor pub today but had been told it was too far to reach. I checked my map, suggesting it would be just short of 3 hours, but with this amount of traffic about maybe longer.

Frothy Man!

Along the side of the M6 I walked on to Otherton Lock. This lock is always so frothy! Why this one in particular?

Handy bridges at some locks now

We decided that we’d stop before Penkridge, giving Tilly a while longer to explore, but the number of woofers was a touch off putting so she spent quite a bit of time on the roof instead of in the friendly cover.

A tight squeeze

During the afternoon we regrouped. Our current cruising plan is possibly being thwarted by vandals emptying pounds on the northern waterways which we suspect C&RT are having difficulty refilling due to low water reserves in reservoirs. We consulted canal plan for alternative routes. Some quicker but hard work. Some very familiar. After quite a bit of debate we have decided that for now we will continue with the original plan hoping that things improve ahead of us. Final decision to be made in ten days. We have Plan B, C and D. We also have our fingers and paws crossed.

But if I cross my paws too much I won’t be able to climb trees!

5 locks, 5.72 miles, 2 fellow Scarborians, 1 full water tank, 1 empty wee tank, 2 many boats, M6, 1 frothy lock, 4 possible routes, 1 preferred, 20 fingers and 4 paws crossed.

https://goo.gl/maps/n5vNW4pxmcmqj2ze8

Two Sizes Smaller Than Small. 5th July

To Huddersfield and London

Mental note, the back bedroom needs the curtains lining or a blackout blind! However today it didn’t matter too much as I was awake extra early and Mick got up soon after me.

Today we were heading in different directions. I was off to work in Huddersfield and Mick was returning to London, Oleanna and Tilly. Her magic food bowl would have opened its second compartment last night and all the yellow biscuits will have been picked out leaving only the boring ones!

It felt this early!

I dropped a key through the front door of the theatre for our next lodger Vicky who was arriving later in the day and hopped onto the 07:34 to Leeds. Mick had a few things to finish off in the house before he would be on a train two hours later.

Only one narrowboat at the Museum Gardens today

I’d booked my train so that I would arrive at the rehearsal space in Huddersfield before the actors so I could get myself set up and ready to do costume fittings. But this simply wasn’t to be. Due to multiple track circuit failures along with a points failure my train pulled into Leeds half an hour late, my connecting train cancelled! The next service I tried was also cancelled, so by the time I reached Huddersfield I was an hour late and everyone had arrived.

Dark Horse’s studio

All the way through the pandemic Dark Horse has continued to work with their ensemble and students. For much of the last year their work has happened online, The Garden being one project they produced. Since the restrictions eased they have been back in the studio, the ensemble of nine actors, now split into two bubbles working on different days to help maintain social distancing.

Today I had five actors to fit into their overalls. Everyone would need sleeves and legs shortening. Several would need darts putting in the front and back. Two would require a couple of inches taking out from the body and arms. Then there was Rebekah, her overalls would need major work, they actually needed to be two sizes smaller than the small I had purchased for her. I’d been expecting to wear a visor and mask whilst working, but early on it was discovered that quite a few of the actors lip read, nobody had realised this until instructions were being ignored. So my day was spent behind a plastic visor with a big bottle of hand sanitiser.

Serious alterations

I ran out of safety pins quite quickly trying to shrink everyone’s costumes. Then I set to tacking Rebekah’s so that I could try it on her again before she left for the day. All seemed good thank goodness.

Meanwhile Mick managed to get his train to York, there was congestion due to the problems in Leeds, but he was only delayed by 15 minutes. Tilly was pleased to see him. Well there were no yellow biscuits left!

With all the fittings done I decided to retire to my hotel room to neaten and tack all the alterations as I’d have more room there.

The same boats on the permanent moorings

When booking my hotel I’d looked at both the Travelodge and Premier Inn. Travelodge came in £2 cheaper, it sits by the Huddersfield Broad Canal and is a bit of a walk away from town. So I’d booked into the Premier Inn at Apsley Basin where the Narrow Canal meets the Broad, its closer to where I was working with a handy Sainsburys in between and filled with boats rather than rubbish!

Aspley Basin

The first overall was tacked during an episode of Midsummer Murders, then I headed to Sainsburys for supplies, one of which was a bottle of House Pinot Grigio which I cooled in the bathroom sink.

Wine cooler

All the alterations took time in fact I didn’t finish until gone midnight. I was very glad of that wine.

0 locks, 0 miles, 2 trains both late, 5 actors fitted, 1 overall to be rebuilt, 10 legs, 10 arms, 1 hit and run, 1 wine cooler sink.