Pollington Visitor Moorings to Nearish the Site of No 4 Swing Bridge
Firstly I got something wrong yesterday. The occasion where Oleanna’s engine decided to empty water all over the bilges was actually when we were moored at Eynsham and Mick noticed the large amount of water where it shouldn’t be before the alarm went off. We’ve just had a discussion as whether it matters that I got it wrong, who would notice? Well possibly Paul as on that occasion it was the thermostat. But more importantly when we look back to the blog in years to come to clarify our fading memories things should be correct.
Anyhow.
As soon as breakfast was done we rolled back the covers and pushed off, time to find better internet! With temperatures set to be high today we’d thought of seeking some shade. But on such wide waterways any trees tend to be set back from the waters edge, reducing their shade factor. Mick identified a possible location so we went to have a look.
The trees were tall enough to cast shade on the water but their location was not really one we’d want to be for too long. Between Crowcroft Bridge and Balne Croft Swing Bridge (which is no more) proved to be a touch too close to the Bridge cottage where the St Bernard woofer never runs out of puff! So we decided to aim for some solar power rather than shade and hopefully not too close to the shooting range.
About a quarter of a mile further on, on the north bank a stretch of bank looked quite appealing, we’d have to use spikes to moor as there was no beam to tie to. We pulled in almost halfway between the barking St Bernard and the shooting range, little footfall and plenty of friendly cover to keep Tilly amused for the rest of the day.
Time for jobs. The primer on the stern had dried fine overnight, so this now got a coat of primer filler and everyone was told to avoid the white bits on the stern. Luckily Tilly was too occupied elsewhere so it had more or less dried before she forgot!
The front poppers on the cratch cover were undone and the whole cover pulled back away from the cratch board. I think it was a couple of years ago when I gave the frame a fresh coat of woodskin and recently I’d noticed it getting a touch thin. Time for a freshen up.
If I was doing the cratch board I may as well give the stern locker lids a coat and the shelf above the morse control. Areas were masked off, washed down and then sanded. Another rinse down and they were left to dry whilst we had lunch.
A coat of woodskin was applied to everything in the afternoon, the masking tape removed. The stern was by now very dry so this got a sanding back. The filler hadn’t quite brought everything up to a smooth level so another coat was applied.
Mick took the bowthruster locker lid up so that he could check on the batteries that sit below. The endoscope came out to help check the levels in the cells and all was fine. The bow deck got a clean out, the rope and chain from the anchor stowed and the pins put back to keep the anchor held tight to the front bulk head. This did mean that Mick got to see the state of the rust on the underside of the locker lid. This is already a job on my to do list, but as it and the bow locker lids are sort of inside (under the cratch cover) they can wait for another opportune time, proper outside outside jobs first.
Still rather warm in the evening we sat for as long as we dared with the doors and windows open. But sadly the hand held hoover had to come out and we sat swatting at midges hopefully before they bit us!
0 locks, 1.09 miles, 1 wind, 0 trees of any use, 1 very sunny spot, 2 coats primer filler, 1st coat woodskin, 1 cratch board, 2 locker lids, 7 hours shore leave, 5, 100% internet, 1 shade seeking cat, 1 vat of chilli, 1 boat full of midges again, 2 bowls chilled medication.
Burn Bridge to Gateforth Landing to Selby Swing Bridge
Tilly was allowed out as soon as we were up, no rush to get anywhere today. As she was out I took the opportunity to give the port side windows and frames a really good clean. This job hasn’t been done since we were in Mexborough beginning of last year.
First thing was to check that my phone was safely on a table and nowhere near the towels I would lay the panes of glass on. Last time I gave one of these a shake out of the hatch and lost my phone to the deepest depth of the South Yorkshire Navigations!
It’s a two person job to get the glass out from the frames due to our curtains being tethered at the bottoms. Someone has to pull one side right back to be able to eek the window past, but then I was on my own.
Armed with water, a cloth, an old toothbrush, handheld vac and cotton buds I set about clearing out the debris that collects in the channels of the frame. Yuck! Then washing the dirt and green stuff away before giving the rubber strips a good wash and checking that all the drainage holes were clear. Then each window got a very good clean, sparkling on both sides. I really should do this more often then it wouldn’t be such a big job, but there are other things I’d rather do in life.
Tilly was bemused that all of a sudden there were three one way openings on the side of the boat instead of just one. Of course as soon as the glass was back in the frame she returned to make an inspection. At least they got a Mrs Tilly Stamp of approval! Grrr!
The portholes have a couple of little supports in the bottom of the frame. Some of them work quite well, others have moved over the last few years and you have to jiggle the glass around to make it sit in a good place to be able to lock them. The supports had a thin bit of foam stuck to them. I decided to try replacing this with what we had to hand, a bit of weedhatch tape (sticky on one side and about 5mm of foam the other). The glass now sits a little higher and the lock works much better.
Mick spent some time with the cover of the inverter off. In the last week the cooling fan has been kicking in at odd times. We’re used to it coming on when the washing machine of dishwasher are working it hard. But these recent occasions have been when nothing unusual has been running.
He spent a bit of time watching a video from Victron, then removed the cover revealing all the brains that keep our power needs fulfilled. He’d wondered if an accumulation of dust inside might be causing the fan to run. Nothing obvious, a circuit board was removed to look further inside, gave it a little blow, but no dust. All was put back together, we’ll see if it happens again.
After lunch I moved onto the sliding galley window. I got to know the anatomy of it quite well. The frame being the same as the other windows just with a central bar added. Sliding it this way and that, removing rubber surrounds in the channels. This window was a replacement last year to a normal hopper. It’s not opened quite as far as the one on the other side of the galley, so I trimmed some of the rubber which seems to act as a stopper, making sure it stops short of the handle hitting the other pane of glass. Job done we could make a move.
Tomorrow we have a Sainsburys delivery back in Selby by the waste recycling centre. With no winding holes marked on our map we planned to cruise to West Haddlesey, go through the flood lock wind, drop back onto the canal and return to Selby. Quite a long way to go to turn round.
The duck weed has now been joined by quite a build up of pennywort. Large clumps float around, one such clump caught our bow, visible from the stern on both sides. It took a bit of manoeuvring to shift it, which was a relief as the drag factor could be felt instantly.
Mick had spent a bit of time on Google earth to see if there was anywhere possibly wide enough for us to turn, nothing was obvious. As we reached Gateforth Landing, here there is a mooring by a high wall, the width looked possible and we knew the depth by the wall would be good so Mick gave it a go.
He found a gap in the off side sideways trees and turned the bow into it. A bit of shuffling round, but there was enough space. We winded, just in time before a cruiser came into view, only our second boat we’ve seen moving since we arrived on the canal yesterday. That wind saved us about 3 miles of cruising.
Back in Selby before 5pm we moored up next to the layby to await our delivery in the morning. Tilly a touch disappointed to not be going out again, but she has got views to keep her occupied.
0 locks, 4.98 miles, 1 wind, 4 windows spring cleaned, 1 inverters heart revealed, 5 hours, 1 lamb hotpot thingy.
Maybe one glass of wine too much last night, but thankfully a lie in was all that was needed. A morning of pottering whilst Tilly had an explore then it was time to put on some smartish clothes and head to the pub, our first such outing since seeing the Margees back in early March.
Today we were meeting up with my cousins from my Mum’s side of the family. I’d last seen Julie at my Dad’s funeral eight years ago and last seen John at my brothers wedding fifteen years ago! Julie and I have been in touch over the last few years and it was way past time to meet up. My Aunty Audrey is 92 and now lives in a care home in Farsley, my cousins both live nearby.
We met in the car park of The Owl where Julie had booked a table. We followed the one way system in and were told to choose a table, there was only one other group in the whole pub. This was most probably due to them not having signed up for the Eat Out To Help Out discount.
There was lots to catch up with, both Julie and John are now retired. John has two daughters and Julie a son, all adults when in my mind they are still young kids. We reminisced about our Grandparents whilst we ate and drank. Mick having his first hand pulled pint, an Ossett Blonde.
I refrained from having a starter and saved myself for steak and chips, the chips being the best we’ve had in a long time.
After we’d eaten Mick and I climbed into the back of Johns car and we headed to Calverley to Aunty Audreys old house. They had sold this a couple of years ago to a friend of Julies who has done a lot of work on it, Julie was desperate to show it to us.
I can only just remember visiting a couple of times when I was young and I remembered more about the people than the actual house. A new extension out the back, modern tiled floors, breakfast bar and remote controlled electric fire all new additions to the house Audrey and David bought when it was brand new at the end of the 50’s, John was born in the house.
After a lovely few hours with them they gave us a lift back to the canal. Virtual hugs all round and promises to stay in touch better, which I think is happening with the help of social media anyway.
Tilly was given a second pass for two hours. However we changed our minds and decided that when she came home we’d move through Owl Swing Bridge and moor nearer to Rodley saving ourselves about twenty minutes in the morning, it was going to be an early enough start anyway.
Then it rained, heavy rain, Tilly being Tilly stayed out! Oh well the alarm would have to be set for extra early. Then she came home, it stopped raining. Doors shut, trip computer on a change back into boating clothes and we were off.
We moved through the swing bridge and only just fitted into a gap one boat away from the next bridge, Oleanna kissing fenders both at bow and stern. The towpath was busy and it was getting on for cat curfew so the doors remained shut. As we settled down for the rest of the day, Oleanna dipped. We couldn’t be moored so close to other boats for their movement to affect ours surely. Then a pair of mustard trousered legs swayed past the galley window, maybe they’d swayed on to our stern by accident!
Black Country Museum to Owen Street Bridge, Tipton
After booking ourselves onto the midday tunnel trip we walked back into the Black Country Museum. There were places we’d not looked at yesterday. The first to catch our eye was the Trap Shop.
Here a very knowledgeable chap talked us through the history of trap making. From men sitting hammering shapes, to fly wheel presses churning out parts to a gas powered engine that turned the presses. Sidebotham’s sold animal traps around the world even after they were banned in England. Not the nicest of things they were designed to hold their victim until the hunter came along to release them!
The building was originally ran along the back wall of Sainsburys in Wednesfield, well before the supermarket was there. It was dismantled kept in storage and took four years to build back to how it had been.
We called in at the Pawnbrokers, Tipton in the day had forty such shops, for such a small town this just showed how most of the inhabitants lived from day to day hand to mouth, or not even managing that.
The chap in the Chemist was full of the new street plans further up the hill. The first building to be erected will be a pub from Wolverhampton. Around 30 million has been raised to create the new street and after many years of planning things are starting to happen. The aim is for the new street to be fully open in two years time, sadly our years pass won’t cover that, but maybe there will be something new before the end of the year for us to look at.
Then Mick spotted a trolley bus. Would it get us up the hill and back down in time for our trip into Dudley Tunnel? We walked up to catch it, but with no passengers waiting for it it headed back up the hill. So instead we walked back down to the lime kilns to see if we could work out which of the sunken boats was an Ampton. Below the surface hulls lurked.
Oleanna is 26 paces long and 58ft 6″. So we needed to find a hull that was around 35 paces long. We think we found two, both very well submerged.
Dudley Canal Trust was heaving with young kids who’d all been on a trip into the tunnel. They were full of it. One lad almost gave us a guided tour without being in the tunnel, he said it was quite ‘Bumpy’. Our boat was far quieter, only six of us. We donned hard hats and sat on the benches. The chap at the helm gave us a running commentary and another fella kept an eye on us and untied the boat ready for the tunnel.
Limestone mines in Castle Hill necessitated a tunnel system to help extricate the limestone. Lord Ward had the tunnels and canals built under the hill, work started in 1775 a year before the Act of Parliament was passed for both tunnel and canal. The work was completed in 1778. The tunnel gave access to the other side of the hill, 3 miles underground, the second longest in the country.
Large caverns and various tunnels fill the hill. Today the first two caverns have no roof and are open to the sky, then our boat dipped into the black of the tunnels. Now lined with concrete and areas oversprayed the first section is very round, but this soon becomes more rock like. Opening out into a larger cavern we were shown a film explaining how the limestone was created, then the hills pushed up creating fault lines.
On further and another cavern, more film showing how the limestone was mined and how the Victorians used the tunnels for excursions, coming in by boat and listening to bands, having picnics. Today there is a stage where performances can happen, people get married and concerts are performed.
We backed out through a different tunnel, this one lined with handmade bricks. The original method for boats to come through the tunnel was to be legged. Two volunteers took to a plank in the middle of the boat and they started to leg us along. The tunnel being only one boats width meant one way traffic and boats would queue up at either end to await their turn. One chap could leg three boats joined together on his own, meaning he made more money than the normal pairs of leggers.
Once through the main tunnel the boat would enter the big cavern where numerous tunnels headed off, which one was the right way? A lamp hangs in what would have been dusty air to guide you through. They say this is where the term ‘light at the end of the tunnel’ comes from. However our guide didn’t explain how the leggers got the boats across the wide cavern, presumably the boats were poled across here.
Passage through the hill was much easier through Netherton Tunnel, opened in 1858, which was wide and had a towpath on both sides. So by 1959 Dudley tunnel was more or less disused and British Waterways were going to close it, despite protests it finally closed in 1962. Much work was done by determined enthusiasts and it reopened in 1973. In the late 80’s more work was done to open up links between the caverns. Now visitors can go inside in the electric powered boats to see the sights. No diesel engines are allowed in the tunnel due to lack of ventilation and most modern boats don’t have a low enough profile to manage the journey. A very interesting tour, well worth the drips and getting very cold.
Mick still wanted a ride on the trolleybus so we headed back into the museum, but it seemed that the driver must be at lunch, so we joined the queue for a sneaky bag of chips between us before we left.
Time to head onwards. We winded with the bow under the bridge into the museum then pulled up at the services. Water topped up and yellow water disposed of we pushed off and headed to Tipton.
We pulled in behind a couple of boats moored on the off side by the Medical Centre,walked down into the shuttered town centre to find the Co-op to stock up on a few items.
Back at Oleanna we decided that our second mate should be trusted with some outside time, she most probably wouldn’t like it. Chaperoned for a while she nosed at the people in the doctors waiting room and checked under the friendly cover, but no one was around to play with.
A short whole after 4pm a visitor arrived. Heather, Mrs Bleasdale, was in the area and had spotted we were too, so she called in for a cuppa, a hot cross bun and a very good boaty catch up. NB Bleasdale is currently stuck down on the Great Ouse due to high river levels and delayed maintenance. Last year we had a catch up in Weedon, so there was plenty to talk about. The subject turned to the Irish waterways, this is the second person who’s brought the idea up. Costs need to be looked into, but it’s an idea, I might need to do extra work for us to be able to afford it, but it is an idea!
Heather headed off to catch a train and we headed off to walk through Tipton to Mad O’Roukes Pie Factory. We’ve heard mention of this pub by several bloggers but never been. This being our last night on the Birmingham plateau we decided to treat ourselves and managed to time it with Thursday Pie for a fiver night.
The interior of the pub is very much an old style boozer, no modernisation here, just tables and benches to pack in the masses. We managed to find one of only two free tables, ordered our pies and drinks.
Their gluten free menu had five pies for me to choose from. I was excited, it’s not often I get to enjoy a pie. The only shame was that my puff pastry top was only just browned on top. Gluten free things always take longer than normal and I suspect my pie had been put in the oven at the same time as Mick’s. His crust had bubbled up wonderfully, but mine was doing the chewy under cooked gluten free thing that I now avoid by making my own pastry. Such a shame as I’d been so looking forward to a good pie. The filling was very tasty beef and my gluten free battered chips were tastier than Mick’s.
0 locks, 0.54 miles, 1 wind, 1 straight, 0 trolley bus, 1 trap shop, 2 horses, 1 new street all the talk, 1 year and 1 week, 1 sneaky bag, 76 of each, 6 on a boat, 9 million bricks and counting, 1 text message underground, 2 leggers, 1 lamp, 1 Heather, 1 hour shore leave, 2 boxes wine, 2 pies and chips, 1 pint, 1 glass wine, 2 boaters in need of veg.
https://goo.gl/maps/oEFWY2fRKsq1UJhK8
Day 7.
Things are doing well, I’ll give it a day longer, but start keeping the discard for some pancakes. Fed twice today and bubbling nicely.
Checking our vital statistics for a years worth of cruising takes a while. We have a trip computer which records almost all our journeys, sometimes it counts locks twice, sometimes it doesn’t quite catch where we reached before we wind. Before we used this method of recording our journeys I would use canal plan to work out our distances. This method can also miss out parts of our journey but it does give me more statistics. You know how I like numbers! How many bridges, how many narrow locks and what distances we travelled on different types of waterways. So inputting a years worth of cruising takes some time.
Anyhow, here is our round up of the year.
The New Year was seen in at Crick. From here we decided to head to Sheffield to have the last snagging jobs done on Oleanna, we were fortunate that the route north was open with no winter stoppages in our way until we reached Yorkshire. Once in the top chamber at Foxton it was going to be downhill all the way to Keadby.
Sadly our blog started to loose it’s photos, which is a great shame. It was a problem shared by many bloggers who were all doing their best to get things working again. Have to say we ended up jumping ship from blogger to wordpress, but posts still lacked their photos when moved. We hope gradually to rectify this by replacing the missing photos, I miss them when looking back. But this will be a long job.
During January we cruised down stream on the River Trent, the weather was getting colder the further north we got. Our route was clear but at Keadby the lock off the river was being dredged, so our journey was held up a touch. Then with February came cold nights and the canal at Keadby froze over. So we waited at Cromwell for things to improve.
Daylight hours and tides meant we split our tidal journey at Torksey. The early morning start from Torksey was very cold, so I was very glad I’d knitted us both balaclavas, we remained cosy cheeked for our journey.
Our journey up towards Sheffield meant we coincided with the bicentenary of the opening of the canal and a very unseasonably warm weekend. The chaps at Finesse replaced a leaking window, gave us a new one (our choice), sorted out our gas locker lid amongst other bits and bobs. It had been a good decision going to Sheffield, it saved them time coming out to us and it saved us money on the extras we’d asked for.
Next we headed for Goole, the lure of cheap diesel and a night away to see our friends Bridget and Storm on the otherside of the Humber was a bonus. We then hunkered down to sit out storms and rising river levels. Our original plan had been to go to York, but flooding put paid to that, so instead we went by train.
Towards the end of March we decided to give a trip up the Ouse another go, the rivers were at better levels and we still haven’t taken Oleanna there. But first Bank Dole lock wouldn’t fill due to silt, then when we reached Selby the Lock onto the Ouse had a fault which would take too much time to mend for us to wait. This was a relief for Tilly as this was where she’d discovered the difference between grass and duck weed and ended up learning to swim a couple of years ago.
At the beginning of April we headed to Leeds. From here we had a day trip to Derby Crown Court for the sentencing of our original boat builder (Stillwater) who had finally pleaded guilty for fraud. I also spent a more pleasurable day in London, having a meeting for Puss in Boots.
With panto in mind we planned our cruising for the remainder of the year. The remainder of April we made our way up the Calder and Hebble and onto the Rochdale Canal.
Our friend Frank joined us to do the stretch from Sowerby Bridge to Hebden Bridge, which included the deepest lock n the network, Tuel Lane. He’d not done this stretch back in 2014 when he and I walked from Manchester locking Lillian over the Pennines to get to the Tour de France.
Once over the top we picked up a boat to share the locks down into Manchester. Clare and Graeme were over from New Zealand for a few months and proved to be very good company.
On the 1st of May, with the help of a Canal and River Trust volunteer our passage down into Manchester went well. The following day both boats headed down the Rochdale nine with an extra pair of hands from an old college friend of mine, Doug.
During May we cruised down the Bridgewater and onto the Trent and Mersey Canal gradually heading southwards. A short detour up the Middlewich Branch to look at where the breach had been before we carried on southwards.
A pause in the Cheshire Locks meant we got to meet up with Tom and Jan who were over for a visit. For Micks birthday we moored at Barlaston and had a nosy at the wonderful hall on the hill, our plan still stands if any of our family are interested! https://oleanna.co.uk/2019/05/23/the-plan-20th-may/
We saw the end of May out mooring at Tixall Wide before rejoining the Trent and Mersey and heading onto Fradley Junction where we joined the Coventry Canal. With Atherstone Locks out of the way I spent time below working whilst we cruised familiar waters on the flat, it might have rained too!
A day trip to London from Rugby for us both, me to a seminar for Separate Doors 3 and Mick to catch up with his friend Siobhan who was over from Australia. Continuing down the North Oxford Canal to Braunston where we joined the Grand Union Canal to head to London.
A visit to the Royal Ordnance Depot at Weedon meant I bought some lovely yarn to make a cardie for myself (it’s nearly finished!) and caught up with our friend Heather Bleasdale, who just so happened to be moored there as well.
Our route then up and down the Grand Union meant we managed to get to see both Mikron shows this year as well as teaming up with the cast and NB Tyseley to climb the locks up to the summit.
Tilly was left in charge for a couple of days whilst we headed to Scarborough to check on our house as we had a change of tenants. This meant we got to stay with Jaye and Duncan and catch up on the news from home.
We now pressed on down to London where we booked a mooring in Paddington Basin for a week in early July. This gave us the opportunity to catch with with friends and family before we headed back out west and down the Hanwell flight. I made the front cover of Canal Boat for July.
Mid July we locked out onto the Thames cruising the Tidal section to Teddington. From here we transited to the River Wey, brand new waters for us.
With my final design for panto delivered to Chipping Norton from Guildford we could enjoy our cruising a bit more, despite the soaring temperatures which had us hiding under trees for a couple of days.
On the 26th July we ticked off our third point on the compass, reaching Godalming the furthest south you can get on the connected network. On our way back to the Thames we met up with Adam from NB Briar Rose, both he and Tilly got wet that day.
The original plan had been to cruise the Basingstoke Canal whilst we were there, but sadly the levels were too low and the canal closed before we got there, so we spent a while longer on the Wey.
Onto the Thames where we managed to get a space outside Hampton Court for a couple of days and I discovered the joys of standing in line for some fresh veg. Gradually we made our way up the Thames. Waking early and getting going worked for us as mostly we managed to get moored where we wanted around lunchtime. Three years ago we did from Teddington to Oxford in a week but with a months licence we took our time.
The further upstream we got the quieter the river got, less hustle and bustle. We met up with Paul and Christine (NB Waterway Routes), missed Carol and George (WB Still Rockin), finally got to have a proper conversation with Sue and Vic (WB No Problem XL) as we headed upstream.
As the rivers bends got tighter, the banks were harder to get up. A mooring by Kelmscott Manor required a rope from the post to help us get on and off the boat, but it was worth it to visit the house.
On the 26th August we winded at the furthest point we could reach on the Thames on Oleanna and started to head back eastwards. Tilly gave one of our moorings a double stamp of approval and stayed out well after dark!
An incident with engine coolant nearly stopped us from reaching Oxford to see War Horse. But a nice man from RCR got us going again so we had a narrow lock fix and headed to the show catching up with Matt and Bill for a drink afterwards.
Then at the beginning of September we turned off the Thames onto the Kennet and Avon. For the last five years we’ve been meaning to head this way, but for one reason or another it hadn’t happened.
With tales of lack of mooring we kept to rising early hoping we’d get moorings. This mostly worked and wild moorings were very rarely needed, we did still have to use the gang plank every now and again. We only encountered one pound on our westward journey where even the longest plank wouldn’t have helped which meant we had to carry on up a flight with the clock ticking before locks were locked around us.
At Devizes we met an Instagram friend Frankie who’d been working on the flight over the summer. Despite following another boat down the flight we made good time with the help of the volunteers.
Onwards to Bath and Bristol. Here we moored with HMS GB in the background and met up with two of my old school friends for lunch. A big shame we couldn’t stay longer as there was more we wanted to do and see whilst there, we’ll just have to save up for next time as the mooring fees are quite pricey!
The section between Bath and Bradford upon Avon was our favourite, with the aqueducts and views along with the second deepest lock on the network.
Mick and Tilly got to enjoy it for a week longer than me whilst I headed off to Cornwall to eat gluten free pasties and start painting my panto set for a week.
Once I was back we had two weeks to reach Oxford, but the weather had different ideas. What felt like the monsoon season started. There was rain on most days, luckily not the day we did Devizes. We managed to team up with two couples from Bristol on a hire boat, by the time they reached the top of the flight they could work uphill locks with their eyes closed, we left them to master downhill on their return journey.
Our second low pound struck as we tried to leave Cobblers Lock, Oleanna was sat firmly on the ground and unable to leave the lock until a good flushing of water set her free. The rain actually did me a favour as whilst we sat in Newbury hoping for the Thames to drop I managed to get my model for A Regular Little Houdini finished.
At the end of October I headed off to panto land leaving Mick and Tilly a short distance outside Reading, hoping they would be able to get up the Thames in the following week. Our friend Paul came and helped Mick out onto the Thames reaching Goring on their first day. Here Mick and Tilly got to met Carol and George (WB Still Rockin’) who’d been clinging onto the moorings there before heading downstream.
Paul returned later in the week and despite the engine overheating and having to deploy the anchor they succeeded in getting to Abingdon where Oleanna had her second visit from RCR. Mick battled on against quite a downstream flow and reached Sandford Lock before tying up. Here the levels rose and fell, the engineer came for a second visit and found lots of crud in our cooling system.
With the engine in better fettle, Mick nudged his way up towards Oxford and finally made a dash up Osney Lock and onto the canal despite that section still being on red boards. It turns out he’d chosen his moment well as the river has stayed on red boards since then.
Once I left all the singing dancing and glitter behind and returned to narrowboat life we had to sit out high levels on the Oxford canal and on the River Cherwell. We loitered in Oxford, but as soon as it looked like things were improving we were on our way.
We paused in Banbury for Christmas haircuts and shopping before pulling in for a few days at Cropredy Marina, from where we headed to London for a Sibling get together at my brothers.
Onwards to the top of the Oxford Canal the day the locks reopened and down the other side continuing onwards to Radford Smelly for Christmas.
In Warwick we met up with my family and then picked up crew Mike and Chris to help us up the Hatton and Lapworth flights.
The last few locks were done on New Years Eve bring us up to the Birmingham level for the new year.
Quite a busy year. So our vital statistics for 2019
According to Canalplan
Total distance is 1199 miles, ½ furlong and 886 locks . There are 119 moveable bridges of which 22 are usually left open; 139 small aqueducts or underbridges and 20 tunnels – a total of 8 miles 2 ¼ furlongs underground and 8 major aqueducts.
This is made up of 207 miles, 4 furlongs of narrow canals; 399 miles, 5¾ furlongs of broad canals; 102 miles, 5 ¼ furlongs of commercial waterways; 226 miles, 6 ¼ furlongs of small rivers; 212 miles, 5 furlongs of large rivers; 49 miles, 6 ¼ furlongs of tidal rivers; 150 narrow locks; 626 broad locks; 109 large locks; 1 lock on major waterways.
838.2 engine hours
That is 255 miles and 272 locks more than last year! But 246.4 hours less engine running, just goes to show it’s worth having solar panels.
1336.93 litres diesel, 9 (although we’ve got 2 empty now) gas bottles (used for central heating as well as cooking), 6 overnight guests, 6 packs Dreamies, 1 cover cat, 32 friends, 17 Mrs Tilly stamps of approval, 1 double stamp, 5 pairs socks, 3 pairs gloves, 1 baby blanket, 2 shows designed, 1 cover illustration, 5 lots gluten free puff pastry, 9 supermarket deliveries, 39 boxes of wine delivered, 12 bottles of wine delivered.
The two of us have spent a bit of time trying to hunt out where or how we could get a new ash can. Getting one delivered to a Post Office or Amazon Locker would have been great, except they are too big according to Amazon! So instead we’ve been concentrating on trying to find a hardware shop that might just have one.
This morning we walked down the Farmers Bridge flight. We like this flight but have realised we’ve only ever been down it, never up. The BT Tower sits high above as the locks work their way under buildings, roads and the railway.
Once off the canal we followed a dirty rubbish strewn road to our destination, White’s Ironmongery. Sitting on the corner of Lower Loveday Street and Summer Lane the 1930’s building melded in with it’s background.
The window displays of hinges, brushes, bolts on boards totally filled the windows. We opened the doors and went in.
I was immediately taken back to when I was four, with my Dad going into Stubbs in York for some screws. Shelves lined the walls, each opening once filled with boxes of screws, nuts and bolts, all manner of things. The wooden drawers covered in decades maybe centuries of patina. Labels for many an imperial sized object still in place. As a kid I used to imagine the shop assistants sliding along the shelves on their ladders to reach the top boxes, pushing from one end of the shop to the other.
Today in White’s the shelves were not so full, but still the atmosphere. There were a few displays in the middle of the room, more boards advertising their wares, a few gaps where the last hinge of its type had been removed. Hanging from the ceiling were mop buckets and two galvanised buckets. A lady appeared a touch like Mr Ben bringing with her some warm air.
Unfortunately the suspended buckets were all they had, none with lids. A bucket however would do us for the time being. It would give us somewhere for hot ashes to cool off before being disposed of with our rubbish and mean the ash pan could stay in the stove rather than sit on the towpath. If we were going to get anything else nicked, we’d rather it was a bucket than the ash pan from our corner stove which would be hard to replace without ordering one from Yorkshire.
Whilst here we had a routle through boxes of bolts. Back in the summer Mick had wanted one for our batteries. A good look round and he may have found just the one. When asking of its price the lady said 10p! When our hand written bill was finished she said call it £7, the bolt now 5p.
What a wonderful shop, with just about everything, except an ash can with a lid. How do they stay trading in this modern world? Hopefully local builders and joiners give them plenty of business.
A walk back through town to get some food for this evening. The trams now run into the centre and many of the hoardings we’d got used to seeing 18 months ago have now gone. Old buildings surrounded by new glazed towers.
Then it was time for me to do a touch of work. A script was printed out, read, notes made, photo references added to Pinterest. Then my tickets for my flight to Vienna were printed out. These are all in German, so I spent a while trying to translate them in case there was something I needed to know other than the obvious times and flight numbers. It’s a long long time since I did German at school and only the bare minimum has remained with me.
0 locks, 0 miles, 1 flight walked, 1 bucket, 12, 1 bolt, 1 time warp, 8 page script, 105 images, 4 flights, 22 letters in a word, 2 many consonants!
Whilst the world was still dark outside it remained dry. But once the sun had risen, along with ourselves, it started to rain. We’d been hoping for an hour of dry weather to get us closer to the stoppage, so that we could be poised ready and waiting to go through, but there really isn’t any rush so no need to get wet.
That’s also what I thought when they opened the back doors! Blimey it was wet. So wet it wasn’t even worth stepping past the engine board. A morning snooze was a far better option.
Taking advantage of the situation Mick got to work in the kitchen and rustled up a breakfast. Sadly no tomatoes had been ordered, but beans did the job instead. Very nice it was too.
Later on Tilly returned to her old younger self and ventured out in the rain, only to come back soaked and leaving muddy paw prints over everything including freshly washed trousers. At least she was keeping occupied and hopefully wouldn’t be bored for the rest of the day.
I got on with my knitting whilst watching the recent Elton John interview and Rick Stein eating and cooking his way around France. With the second glove knitted, there’s just the ends to weave in now and then they can go in the post. Next on the list of jobs was Christmas cards, the post version. All are ready for the next post box.
As our macaroni cheese cooked in the oven we could hear the new setting on the inverter. This setting means that if the inverter isn’t being used it will turn itself off, but it wakes up every second to check if it’s needed. Well the fan on the top oven needed it, but maybe not quite enough. We could hear it stopping and starting. A touch annoying.
Originally the inverter would draw 20 watts just by being on. Then when Mick put it into turning off mode it would draw 8 watts whilst not being used and checking if it was needed. A few more adjustments were made today. Now whilst the inverter isn’t needed it goes into a mode with a modified sine wave and draws 12 watts. Hopefully this will stop things like the fan from stopping and starting and not affect anything else.
We stayed up to see the first results of the general election come in. The exit pole at least would mean that we wouldn’t wake up to a surprise result.
0 locks, 0 miles, 1 wet day, 1 soggy moggy, 2nd glove knitted, 25 cards written, addressed and stamped, 2nd day of 2nd attempt of new sour dough starter, 12 watts.
Sainsburys took their time in getting back to me yesterday, but this morning I woke to an email and message from them. The Banbury store had not followed the correct process. Anything with the delivery date or following day as Use by dates should have been flagged up on the paperwork. This would have given us the chance to return anything. As it wasn’t mentioned we got our money back for the ham and some humous. So it’s always worth commenting on such things.
Much of the morning was taken up with A Regular Little Houdini conversations. The production manager rang about something else so I got chance to put forward my new idea, then a lengthy chat with the new director. We came up with a solution that once we get to Vienna we may be able to improve on to get the Wow factor. Another chat with the Production Manager and all was agreed.
Mick in the mean time readied Oleanna for the off. A final load of washing was done, the dirty washing drawer now empty, again. He topped up with water and flattened down the pram cover.
Then it was time to unplug the hook up. He flicked the switch in the electrics cupboard, but the inverter didn’t come on. This should be seemless, no interruption in power, but the inverter wasn’t working!
He tried all sorts, the big breaker switches were turned off and on, the cover came off, he checked for loose connections, the volt meter came out to check for voltage. He unplugged the cable going to the Victron Monitoring system, the inverter started to work. Plugged it back in, it stopped. It was unplugged again.
By now it was the marinas lunch time so we had lunch ourselves, I finished off a new storyboard all about curtain movements, scanned and emailed it to all concerned in Vienna and Wales. At 13:55 we untied and pushed back, only to come forwards again into the next berth which is a service mooring.
A top up of diesel and five bags of coal, then we were finally ready for the off. Our plan was not to go far, the stoppage at Claydon flight is only a couple of miles away and due to reopen at the end of play on Friday. So the first available towpath mooring would do us. These however were all taken, so we rose up Broadmoor Lock and found a space there. With only half an hour before cat curfew time Tilly was allowed out to survey our location.
Mick spent some time on the internet looking for a solution to the inverter problem. He plugged our laptop into it, had a look. The settings seemed fine, so he plugged the monitoring system back in and all was fine. He then altered a setting which means if the inverter is not needed it will turn itself off but will wake up to check if it’s needed at regular intervals, this will save us power.
Tomorrow the forecast is for rain much of the day. But if we wake to favourable conditions then we’ll carry on up the last two locks hopefully before it starts to rain. Fingers crossed.
1 lock, 0.36 miles, £6.30 refund, 1 reverse, 1 left, 1 fault on the monitoring system, 1 last load, 5 bags coal, 55 litres diesel, 1 very helpful dutch chap, 1 inverter set to turn on and off by itself, 1 problem not solved just gone away, 30 minutes!1 sock completed, 8m by 3.1m Taft CS Weinrot.
Brinklow Marina, North Oxford to Lock 7 Long Buckby, Grand Union
Today we’ve had a change of boat. This one currently has a bright blue roof and was built around 1995.
Becca and Sam bought their boat last summer along with her mooring at Three Mills in London. They lived on board hooked up until spring this year when they decided it was time to get some work done to her. Both of them are originally from the Sheffield area and ended up asking Jonathan Wilson (builder of Oleanna’s shell) who they should use to carry out the works in the south of England. His suggestion was Brinklow Boat Services who have spent much of the summer working on her on and off. Becca and Sam have spent most of this time sofa surfing around friends and family, but yesterday they picked their home up and moved back on board.
We’d last seen them in the summer at a wedding in Scarborough, got talking about our boats and discovered that they were planning on cruising her back to their London mooring, having done virtually no boating before. Naturally we offered to lend a hand and show them the ropes if we were still in the area. Reaching Banbury yesterday meant that we could catch an early train over to Rugby with a plan of meeting them at the moorings near Tesco. However they’d been held up leaving, but had managed to make it to near Brinklow Marina in the dark.
Excuse me!
A taxi ride got us to the marina gates where Becca met us, then a short walk down the towpath to their boat and Sam. They’ve had all sorts of work done, new floor as the old one was rotten, the batteries had corroded away the battery tray, the galley and bathroom have had lots done to them and they have a new Squirrel stove with a back boiler. We were slightly jealous of the boiler as we’d wanted one, but it proved problematic with the gas boiler that we’d specked on the same system. The copper pipes look lovely running through the boat to several radiators giving out heat. They’ve matched the galley and bathroom sink taps with the copper pipes and their pull out larder unit at the end of the galley is a great idea. All the cupboards have leather straps rather than knobs or handles. It’s going to be a lovely boat when all the work is finished and they’ve re-varnished and painted the interior. Next summer Becca plans on painting the cabin sides too.
Hello!!
Once we’d had a quick look round it was time to fire up the engine and set off, hoping to get through Braunston Tunnel and down the first lock of the Buckby flight before nightfall. The engine took a bit of stirring, but then kept going all day, grumbling at certain revs. I suspect after they have spent the next ten days cruising they’ll be jealous of our hospital silencer.
Sam took the helm and Mick gave guidance whilst Becca continued to unpack inside. Yesterday Sam’s Dad (Roger) had been on hand at the helm and helped them out of the marina. Today we hoped we’d be able to leave them more confident with cruising and handling locks. Progress was slow to start with, but as Sam grew accustomed to the helm the engine was pushed up a bit and our progress increased. It took over an hour to reach where we’d originally hoped to meet them near to Tescos. Passing through Newbold Tunnel gave us the chance to see what their tunnel light was like, not bad, but a bit of a pain to have to go to the front of the boat to turn it on.
Hello! Remember me!!
Their stocks of gas were low so when we saw NB Callisto we slowed to see if he’d sell them a new bottle. The gas he had was all spoken for so that would have to wait for tomorrow. The new bridge outside Rugby has come on since we came through. A concrete wall stands on one side of the cut and the reinforcement stands waiting on the other. At Clifton Cruisers Sam negotiated his way around the hire boats as we noticed NB No Problem in the shed. In the strong winds a few weeks ago a large tree fell onto NB No Problem and caused a lot of damage, luckily nobody was injured. We could see a welder busy inside the shed and it looked like a lot of work was happening to the cabin sides.
I’m still here, I’m quiet without my collar.
Approaching Hillmorton Locks a Lockie set one of the locks for us and as Sam brought the boat into the lock Becca and I hopped off. These three locks would be the only narrow locks they’d come across on their cruise, quite handy as an introduction being lighter than the broad locks they would live with for the next ten days. A work boat came up the lock next door and the lady was very keen to give us a hand, but when I explained that these were their first locks of many she held back and left us to it. This did give them the chance to get ahead of us.
Hello, my bowl got empty far quicker than normal!
In the next lengthy pound we had some food whilst cruising along. No time to stop we had miles to cover to get to do one down hill lock with them.
Straight on at Braunston Turn but no sign of another boat to share the locks with.
This was quite handy really as at this time of year they are quite likely to have to do the locks on their own and more importantly we could take our time to explain things to them and try to impart as much knowledge as we could whilst doing the flight.
By the time we were three locks up Mick left Sam on his own at the helm and walked ahead to set the next locks. A boat was coming down so the boats had to pass in the next pound, Sam managed to hold his course and hovered without feeling the need to tie up and wait. By the top lock Becca was getting the hang of doing everything in the right order and safely.
The stove went out ages ago!
Tunnel light on, chimney removed, and a handy light the boat yard had left onboard was popped onto the hatch for extra light at the stern. Sam still at the helm was about to do Braunston Tunnel, our least favourite on the network. We had the tunnel to ourselves, no one coming towards us, Sam held his line well, not one bump. By the time they reach Islington Tunnel, which is one way traffic, they will be more confident and hopefully they won’t do too much preparation for repainting the grabrails.
It’s getting past my dingding time.
Becca took over at the helm and cruised us to Norton Junction and then the top of the Buckby Flight. The sun was sinking fast now, we decided it was still worth doing the top lock, so that we’d at least taken them through one downhill. So long as you keep away from the cill and don’t get caught on the bottom gates, going down hill is easier, far less instruction was needed. Sam and I worked the lock in the dark as the light kept flicking on and off at the pub.
We’d reached our aimed mooring, one lock further than they had planned and we’d had three to four miles extra to do too. This was as far as they would be able to go today anyway as the rest of the flight of locks are still being locked overnight to help with water levels. A space quickly showed itself and spikes were hammered into the ground in the dark.
And it is days past morning dingding time!!!
A shame we’d not arrived in day light, it was 7pm and we’d still got to get the train home. Sadly no drinks with them at the end of the day in the pub. They had to go to be able to charge their phones after discovering yesterday that they don’t have an inverter and there isn’t one 12 volt socket anywhere on board! Suspect they’ll enjoy their evenings so long as they find a pub.
We walked down the flight past the locked gates of the next lock and joined the road leading to Long Buckby Station. We arrived just at the right moment as a train was pulling in that would take us as far as Coventry where we’d change to get back to Banbury. A long but enjoyable day. We wish them luck for the rest of their journey to London.
Long!! Long Day!!!! Tell me about it! One very long, cold, boring, hungry day! Tomorrow had better be better than today and yesterday.
10 locks, 18 miles, 1 leftish, 1 rightish, 1 tunnel with 2 mysterons, 4 trains, 1 taxi, 1.5 miles walked by torch light, 2 newbies, 0 inverter, 0 hosepipe, 1 new one on the way with Roger, 3 baskets, 1 slash curtain, 3 cuppas, 9 up, 1 down, hope they can remember how to go up again when they get to do it again, 1 hungry cat who should be more proactive about food.
Saturday morning we had breakfast and then moved Oleanna closer to Wrenbury, not far but past the worst bit of muddy towpath. Whilst Tilly went off to explore her new estate Mick walked into the village for our Saturday newspaper where it was sat waiting for him behind the counter.
Whilst Tilly surveyed her new surroundings I kept the stove top busy, first a pot of Sweet Potato Soup, followed in the afternoon by a pot of Tarragon Chicken which simmered away for five hours. Both were yummy but I think next time I do the soup I’ll try making it with just paprika, not smoked as this was a little over powering. In between chopping and stirring, I made a start to a rug for in front of our stove. Using the fabrics I’d covered the tops of our stools with I came up with a pattern and began to crochet.
Our bilge pump has been a bit active of late. The cause isn’t because the engine bay is full of water (it is as dry as it should be) but it seems that the pump likes the sound of itself, every 2min 30 sec! Quite annoying really. When it started doing this a week a go Mick tried various things finding that when he disconnected it, then reconnected it, it stopped being vocal but still worked. But today this didn’t work. So with Tilly safe inside having a snooze Mick climbed down into the engine bay to see if the pump had got gunged up. I could so help with things down in the box under the boat. I’d be able to reach all those awkward places that Tom can’t and bat things that had been dropped around until he could reach them again. But he doesn’t seem too keen on the idea.
Whilst contorted around the engine he noticed that the fuel gauge had become disconnected, so dealt with that, no wonder the gauge didn’t have a reading. Then he took the bilge pump out of it’s holder and gave it a clean hoping that this would do the job. Sadly the effort had not been worth it as the pump was still being vocal. This may have to be added to the Finesse list when they come with our batteries.
Sunday morning we woke to the sound of a wood pecker giving itself brain damage nearby. This used to be the first sign of Spring that we’d hear from our house in Scarborough. A beautiful morning just right to go for a walk, but first we decided to have a cooked breakfast with Turkey sausages to keep it remotely healthy.
When Tilly eventually returned we quickly got ready to go out ourselves. The aim of our walk was to see what lay ahead where the stoppages are and have been. Not using our common sense, or heeding from Carols experience on the Thames we decided not to put our walking boots on and ventured off wearing trainers! They were old ones. Just after reaching the swing bridge we saw our error as a sea of MUD stretched out in front of us. Back tracking a little we detoured along the road and through the church yard back to the towpath. Here the going was still sticky but passable. The next stone bridge was where a large tree had given up it’s fight against the forces of gravity in a storm blocking the navigation recently. The trunk had been cut and cleared. Much of it must have been put through a chipper, the chips/chunks left on the towpath creating a tree beach.
On we walked, out of the breeze it was really quite warm and hats ended up being removed. Mud occasionally took over and one stretch of sticky sea made us divert to the nearby road again, through a hedge.
The first of the locks came into view, empty. Below the second lock was the boat and butty that had been sold a week or two ago. We wondered if they’d been aware of the next lock being closed when they’d set off from Grindley Brook, but they’d got as far as they could as Lock 3 had only reopened on Friday. A boat was making it’s way down in the chamber, so we went to help close gates, they soon pulled in below as half a mile further on is where the bridge was still closed. We considered walking further, but as our walk had been delayed (nobody said which hour and a half I could be outside for!) we wanted to get back in day light so turned back, knowing that there would be plenty of space for us to moor for a couple of days.
A return along the road made sense, calling in at the Spar shop for a few bits of veg. Next call was at the Cotton Arms to see when they served food until.
But as we stood at the bar the plates of Sunday roast twisted our arms, so we decided to stay and eat instead of coming back later. A quiet pub with quite a few eating or drinking. A good selection of beers too. Only thing was there was no sign of a menu. Mick asked if they were doing a roast today, a choice of four meats. Two beefs, luckily I’d spotted that most plates were swimming in gravy so asked for one with little gravy.
Apart from the food being a little tepid it was very nice. The dessert menu called out to us, well we had walked and waded quite a distance. I had ginger pear and salted caramel sponge whilst Mick had sticky toffee. Both were very nice and warmer than the main course. It had been a good decision to stop. The sun was setting as we returned to Oleanna which didn’t impress Tilly as she wasn’t allowed out again
0 locks, 0.39 miles, 1 bridge lufted, 1 newspaper, 4 bowls of smokey soup, 2 chicken thighs, 6 hours, 1.5 hours a joke! 5.8 mile wade, 1 telepathic pub, 2 roast beefs, 2 sponge puddings, 2 pints, 150 seconds, 2 rows short of a rug.