Category Archives: Aire and Calder Navigation

Is That ‘Daisy’ On His Cheek? 2nd March

The last couple of weeks have been busy for us.

Shore leave permitted for another year

Tilly’s annual vaccinations. A years supply of wormer and flea treatment was sought. Sadly a misunderstanding regarding her flea treatment (they don’t know how much of a thug she is!) has meant a delay in obtaining the good strong stuff. But we will be getting a prescription, at some point, to be able to purchase it online, far cheaper than the other options.

Making sure it dies!

Test the new rug out for murderability!

Shiny!

Order spare parts and spare taps for the galley. The mixer tap we have is being discontinued, so we’ve bought two spares and spare cartridges for them, these should out last our boating days.

A slipper for the vac

Make the bag for the handheld vac out of sturdy fabric to go in The Shed cupboard.

The Shed on Oleanna fully sorted. I’ll come back to this in a bit!

See you later in the year Scarborough

Collect new glasses and purchase a protective phone case. Phone case not so good as it inhibits fingerprint recognition, but it is extra strong should I drop my phone. Also not waterproof! *The Power button on side of phone case has now been cut away so fingerprint recognition is possible.

Mick’s medication approved by the GP. An up in dose and a blood test in a few weeks, but nothing to stop us returning to Oleanna thankfully.

Final Sunday walk in Scarborough

My calf muscle to improve. GP surgery still not given me a date for an appointment, been waiting three weeks now. I keep hobbling and am trying to keep up my step count. Here’s hoping the doctor doesn’t want to see me!

Bathroom sink and mirror sorted in the house. Well…. This job had to be abandoned a few weeks ago due to too much plumbing in the way. Then we changed our minds on the solution. Duncan, not THAT Duncan, came round and fitted an extension to the stupid box above the sink instead of removing it all together. Only problem was the backing board didn’t want to stick too well, so had to be left overnight before the clamps could be removed. New flooring was laid. Now Duncan (not THAT Duncan) needs to finish off and then I’ll be needed to touch up the decoration over two days.

Clerk of works inspecting the job

A leaking water pipe into a toilet was fixed, but we now have a noise three minutes after flushing the toilet!

Socks knitted and sent off. I got ahead of myself so have given my sock knitting hands a bit of variety and knitted a few blanket squares for Boaters Blankets. Once back on Oleanna I’ll be back on with socks.

Gardener organised, FAILED yet again. We tried a chap who’d been recommended, but he didn’t call back.

Packing

Builder/roofer to sort leaks, FAILED. We tried a chap who said to call him in a couple of weeks, then he didn’t answer his phone!

Weather to improve for transit on river sections which can’t be avoided. Out of our control sadly.

New stoppages being added to the list. Will we be able to escape Yorkshire before April? Also out of our control. Current stoppages mean we won’t be able to cross the Pennines for a few weeks. A new stoppage at Bank Newton has closed the Leeds Liverpool, Woodnook Lock on the Aire and Calder is closed til mid March cutting off access to both the Rochdale and Huddersfield Canals. But thankfully two locks near Manchester, on the Rochdale which had been suffering from subsidence have reopened. So once we can get through Woodnook we’ll be on our way.

Sparkling!

The house oven got a good clean, we got a man in to do it for us. The oven is only a few years old and wasn’t that bad, but now looks wonderfully sparkly. Mick asked if the chap would travel to Goole to do the one on Oleanna, sadly it was too far. Mick normally cleans the house oven, but he’s never felt the urge to get down on his hands and knees to do the same on Oleanna, neither have I!

Mick made a call to a company in Howden, they were booked up til May. But the chap might be interested in fitting us in so that he could clean an oven on a narrowboat. The lady rang back and if we could be at the boat Saturday morning he’d fit us in. Brilliant! We’d already booked a van for the weekend so moved the pickup to Friday afternoon.

Friday we continued to pack and got down to some serious cleaning in the house. Kitchen sink was resealed had new cartridges and was out of use for 24 hours so we had to eat out, Taj got our custom, their menus a touch tall for a romantic evening.

Up early Saturday. We loaded the van up with various bits and set off to Goole to meet the oven cleaner. On arrival we cleared the work tops, lit the stove, turned on the emersion. Our plan for today was to sort The Shed out so that things could go back where they live. The shelf above the new bully boy battery needed supports, however we’d omitted to bring the flipping drill with us! Oh well we’d not be able to do anything with The Shed whilst the oven cleaner was about anyway.

Nick arrived, took over the hole galley, as expected, and set to on the stove. Well you all know how much I like to cook and the oven has never been cleaned so I’m a touch embarrassed at how horrible it had got. Shelves, stainless steel trays and all the supports from the oven were popped into Nick’s caustic soda tank in his van, heated to 70C it does the job for him. In and out of the boat, his belt maybe needing to be tightened just another notch or two! Three hours later they just needed a spray down with white vinegar to neutralise the soda and they sparkled like new. Much scraping kept him busy with the double oven.

He certainly lived up to his companies name. The ovens look like new, the extractor hood pretty clean and the hob which I thought was pretty good before he started you can now see your reflection in. Well worth the money, we’ll not leave it so long next time.

The boat curtains were put on to wash, once spun they were rehung on their rods to dry in situ, avoiding shrinkage we hoped. The bathroom got a very good clean, some of the sealant could do with being redone but that can wait a little while.

Cutlery tray with obligatory section for handcuff keys and hose adapters

The van was emptied and most things stowed away. The kitchen was put back together the cutlery tray sorted out. New oven glove and saute pan, a treat for the clean cooker.

All very smart now in the galley

Then it was time to find space for all the donated yarn for my Sockathon. I’d just about cleared out the big drawer under my side of the bed a few weeks ago, today I emptied it completely. Full to the brim and a couple of bags of yarn have been found another home. Best get back to knitting socks soon!

Back across the Wolds to a hungry Tilly. Time to finish off bits and bobs of food with some pasta and a glass or two of wine whilst starting to watch the first series of Traitors USA. Yes we’ve been hooked on the English version, watched the Australian first season, now I think we’re going to get annoyed with the USA version.

Bacon, green beans, peas, onion, cabbage, two types of pasta

0 locks, 0 miles, 2 batteries with new owners, 2 sparkling ovens, 2 dripping taps, 1 bathroom sink still to finish off, 60% moved to Oleanna, so much yarn squished into a drawer, 1 clean bathroom, 1 stove backed up for the night.

Sitting Higher And A Friendly Goodbye.

Firstly thank you to Chris and Rufus for helping the blog move earlier this week and to those who commented that they were hearing us loud and clear.

It’s a touch concerning who reads our blog!

Back in 2014 we were getting ready for a life afloat, a year on a boat was calling and work for me was starting to wind down, we’d not yet found NB Lillyanne but had hopes that NB Oleanna (Mark 1) wouldn’t be far away from being completed. Little did we know what was going on back then! But in the summer of 2014 as we were finally packing up the house to move onto NB Lillyanne our friends in Scarborough got together to wish us well on our travels, a nice gathering at a local pizza restaurant and a few pints later, a lovely evening was had.

Nowadays, we get to see our friends every now and again in Scarborough, but not really often or for long enough, so this had to be put right before we left for the spring and summer months. A gathering was organised at our house last Sunday afternoon and it just so happened to be half-term too.

Lamb and veg stew

Catering for a possible twenty was put into operation starting on Friday. The cheapest way to buy lamb was by the leg, this was roasted then chopped up to be added into a stew. A separate veggie stew was made up and potatoes were scrubbed and ready to be baked in the oven. The house was given a dust down and we awaited our friends to arrive.

From left to Right.
Pip, DUNCAN! Gill, Jenny, Jaye, Dawn, Mick, Charlie (down the front) Tucker and Lee just leaning in. Ben and Frank are missing from the photo.

Sadly some friends were too far away to join us, had family visiting or had come down with a lurgy, so the numbers dropped! Never the less we had a lovely afternoon, nibbles, cheese and puddings provided by our guests. Lots of catching up to do especially for Jenny and her son Charlie who live that little bit further afield and hadn’t seen some people for about ten years. A gathering like this simply would not be possible on Oleanna, we have difficulty having two of us in the galley never mind twelve!

Stocked up for the next year

Thank you all for coming and sorry to miss those from further afield or with a lurgy. We also topped up on Yorkshire Rapeseed Oil and Charlie and Ivy‘s goodies for the boat, delivered by Charlie.

Left overs

Because the numbers had dropped our freezer, which we’d been doing a very good job of emptying, has now been filled up again, but we’ll gradually eat our way through them, we’ll just have to vary our diet occasionally!

Tuesday, Mick picked up a hire car and we loaded it with cushions for the dinette and headed over the Wolds to Goole. Time to start putting Oleanna back together again before we move back onboard.

Mick checked the Bully Boy Batteries from his phone whilst I screwed the pan drawer back to the pull out corner cupboard. The old screws had only just managed to last seven years, so new holes and screws were needed, I also added some facing the opposite direction too so hopefully they will last a lot longer.

Now it was time to move things back into cupboards and drawers that had been moved for varnishing. The galley tops also got a very good clean.

Will they all fit?

Before lunch we needed to see if the new dinette cushions fitted. The new foam is a lot firmer so it took a touch more effort to squish them into position.

Hooray!

The one new corner cushion, replacing two, fits well. However the end back cushion now is a little bit too long at the bottom. It’s the same size as the old cushion which was also rectangular, but now it just needs to have a slight angle taken of the bottom for it to fit perfectly. For now this is fine. But if anyone happens to have an electric carving knife as we pass, I may borrow it to trim an inch off it. All cushions are now double sided, which the original ones weren’t, so if they start to look a touch dirty we can flip them over.

Left over cheese by the hatch

We could now sit and use the table again for lunch, in comfort. Much better than the old cushions.

Life Jacket hook position

The afternoon, we checked that the new shelf for The Shed would fit. It does but only goes in one way and still needs blocks to rest on before things can go back in the cupboard. The battery below it also needs some blocks of wood round it to hold it in position for the BSS, Mick is also thinking about shortening the cables to the battery. This all needs doing before the fire extinguisher can we put back on the wall. But I got chance to decide where and how other items would be stored in The Shed rather than just being piled up on top of each other. Our life jackets will happily sit behind the extinguisher on a big hook. Coat hangers on another deep hook above the power socket, this is only for storage as they get used in the pram cover for drying washing not for hanging coats on. The window vac will happily sit in a couple of big hooks on the cabin side, but the hand held vac is too bulky for hooks and there is nowhere to be able to attach a string to hang it from. I’ll make a bag for it which will be fixed to the cabin side also. This should then leave us with little needing to be piled at the bottom of the cupboard in future, just the Brompton bag and took box, Hopefully!

See you soon

It was starting to get late, so we packed up deciding that we’d need another visit before we move back on board to finish off jobs and I also want to give the bathroom a good clean too. As we loaded up the car Alastair came to say hello and handed Mick an invoice for the couple of little jobs he’s done in Oleanna’s engine bay for us this last week.

Hopefully we’ll be back down soon to finish off.

0 locks, 0 miles, 20 down to 12, 1 lovely afternoon with good friends, 5 litres rapeseed oil, 1 car, 7 cushions, 1 a touch too tight, 2 batteries playing nicely, 1 spotless galley, 1 pull out drawer, 1 stove top kettle under the sink, 2 boaters sitting higher, 1 plan for The Shed, 1 more visit, 2 of each back at the house, 1 slightly amended cruising plan.

Happy 8th Baseplate Day! 14th February

Well today marks the 8th anniversary of Oleanna’s baseplate being laid in Tim Tylers workshop in Newcastle under Lyme. It was another year and a bit before we finally moved on board to cruise her down to Crick to meet with Lillian and fully move onboard.

Mick stood at the stern 58ft 6 inches away, 8 years ago

If you want to look back and see Oleanna’s build this is a post from our first visit. Her story starts much earlier so here’s a link to the first Oleanna blog post, 1948 blog posts ago!

Currently we are gradually getting ourselves ready to move back on board, the date still a little bit up in the air.

Sunday in the Park with Mick

Mick went down to check on Oleanna on Monday. A chat with the bully boy batteries went well, the newly oiled floor had cured so the back steps could go back in. I’ve been busy covering new and old dinette cushions and today we should receive new cartridges for our life jackets, which are currently still inflated in a closed room well away from cat claws.

The world of canals and rivers is keeping us on our toes as regards to stoppages at the moment. There is a silt build up on the River Trent which needs dredging between Beeston and Cranfleet locks. The coal boat had serious difficulty passing that way a week ago and was having to wait for levels to rise again before attempting to return to base. Since then the Trent has gone back into flood.

Can we start packing yet?

The Don Doors on the New Junction are having issues with their gearbox so are closed to the canal currently. Even if we got past them Vazon Sliding Bridge is closed to boat traffic until mid March whilst strengthening works are carried out to the north canal wall.

However we’d planned on crossing the Pennines. The Rochdale, Lock 67 is suffering from subsidence which will be worked on next week. Lock 65 is also showing similar signs and will be looked at next week to see what should be done.

Round 1

The Leeds Liverpool has a navigation restriction near Burnley, Embankment 39, so it is still navigable. Works at Wigan have been slowed by the weather so the closure there has been extended by a week so that concrete has more time to go off, the concrete has as yet to be laid. Problems near Foulridge Tunnel seem to have been sorted.

Round 2

Then the Huddersfield Narrow and Broad. There are bridge works and a lock closure on the Broad along with repairs to a wash wall which should be finished mid March. On the Narrow locks on the east side are closed until the end of February, then there is a closure in Stalybridge which should open mid March.

Round 3

So at the moment the Leeds Liverpool is looking the most promising, followed by the Huddersfield canals. Further south there has been a substantial landslip on the North Oxford near Brinklow. We’d planned on heading southwards this way, but we strongly suspect it will take a while for this to be sorted so will have to head southwards through Birmingham. Or do we wait for the Trent to be sorted and out of flood then high tail it south along the Leicester Section?

Who knows! We’ll wait and see what is open when we set off.

Thank you Beth

In Sockathon News I now have sponsors for 29 pairs of socks and have raised £655 for Dementia UK. Pair 7 will soon be finished. I now have a very large box of yarn donations sent in from all over, details of which are on the Yarn Donations page. There are still a few more people who have pledged yarn donations so they will be added as yarn arrives. I think I may be knitting for a few years to use it all up! If you fancy a pair here’s a link to my JustGiving page

  • Thank you Debby for becoming pair 30!
My friend Morag looking across the harbour

0 locks, 0 miles, 8 years old! 4 routes from the north closed, 1 bathroom delayed, 1 best mate visit, 2 lodgers, 1 fair weather cat, 2 opticians appointments, 2 doctors appointments, 1 vets appointment, 1 gathering, 1 leg of lamb, 2 boaters nearly ready.

TLC Day 8. 30th January

Salt and Pepper!

We called into Sainsburys to pick up an order from Ikea, I’d not had confirmation that it had arrived, but it should have been there since Sunday. The lady suggested looking for my delivery on DPD, she needed a QR code to scan before I could have my parcel. Then of course she needed to see some ID for me, which I didn’t have! Thankfully she believed me that I have a driving licence and handed over the order. Thank goodness we’d gone by car, it was a huge box! We chose some soup for lunch and then headed on to Goole, thankfully the sun was out today making for a pleasant drive.

More cupboard sorting, this time the cat proof cupboard. Illustrations for Seperate Doors, bits of panto model, some of these need to stay on board, others need to head for safe keeping at the house. Now we no longer live on board full time some things don’t need to be at hand should we want them. The big box of boat build details was packed along with the folder on Stillwater Narrowboats, that can be filed away somewhere upstairs upstairs, no need to look at that again.

One of my all time favourite illustrations for Seperate Doors

The office cupboard moved from port to starboard. I’d like to have a pull out shelf for the printer at some point, it now being on the starboard side means the power lead will reach a power socket. Whiltling things down is good, but I’m also mindful that we need to compensate for the weight of the new batteries and not end up on a list.

Very tasty

Mick ran the engine. I made a cardboard template for the shelf that will sit above the battery in The Shed. Pea and Ham soup, then a final tidy of various things, The Shed put back together. I could then hoover through and get ready to put a coat of Danish oil on the floor. With the hoovering done, Oleanna was winterised.

Glad you can’t see the diggers on the otherside of the Dutch River

Thankfully the day being bright, Goole looked like the Med today, I had plenty of light to be able to do the oiling. I took my time gradually working my way backwards to the bow. Making sure everywhere got an even coat, no slap dashing today. The last bit is always so hard to do from the bow steps leaning down past your toes to cover the last foot square. Done! The front door was locked, the oil can now cure over several days before anyone will walk on it.

Please dry evenly!

There will need to be another trip so that we can put everything back where it lives and give the bathroom a good clean. The Shed will need it’s new shelf and some hanging rods rather than rails, but we need to see what space we’ll have once the fire extinguisher is back on the wall.

Onion!

Mick will be along sometime soon to explain more about what’s been happening in the engine bay with the new Bully Boy Batteries. I’m now heading off to chain myself to the sewing machine to cover the dinette cushions, oh and a bit of knitting too! Hopefully soon I’ll be able to show you some of the finished socks, once their sponsors have received them.

0 locks, 0 miles, 1 last trip, 1 engine ran, 3 Chippy lanyards, 1 panto car, 2 phone boxes, 1 Petiti tree, 1 hoover, 2 last soups, 1 onion, 1 careful coat of oil, 1 face looking forward to not wearing a mask again, 1 boys blood pressure creaping down each day.

TLC Day 7. 29th January

So much for treat pizza and that fire!

Mick is in the process of changing some medication. For a week he needs to take his blood pressure morning and evening, so on Saturday when we got home he disappeared to do this, returning a while later with a puzzled concerned look on his face. He records his results on an app, this evening his blood pressure was too high, he should seek immediate medical attention. 111 asked him to go to A&E. Should we eat first or should we try to beat the Saturday night influx, we decided on the latter, stupidly!

The long wait begins!

A&E was chocka at 7:50pm, we only just managed to find seats, we’d be a while. The while turned into 8 hours. Mick’s blood pressure was read several times, two ECGs and blood tests done. I’m sure they only did blood pressure readings to get everyone moving once in a while so they didn’t have a room full of freezing cold DVT cases. Eventually a little before 4am Sunday morning he got to see a lovely Dr Frankie. Mick was examined and told to double his dose of drugs, continue to do his blood pressure twice a day and get in touch with his GP Monday morning. We went home, cold, tired, slightly relieved and hungry!

An empty boot apart from some black pudding

So no visit to Oleanna on Sunday, we needed a lazy day, Geraghty zoom, breakfast and those pizzas were finally devoured.

Pairs 2 and 3 in the post

Monday morning Mick contacted his GP. Within half an hour he had a phone call back from a doctor who upped his dose again. The hire car was extended by a couple of days and a plumber postponed his visit, at least this meant we could get to Oleanna earlier than planned. Unfortunatly we came across stand still traffic near Howden, the only cars coming the other way had turned round. I put down my knitting and went into navigator mode.

First thing was to light the stove and open windows. Stove paint once dry needs to cure and to do this it needs to be heated up for around 20 minutes, this always lets off fumes. At least we’d have some heat today.

Still too much stuff

Mick carried on with things in the engine bay whilst I started to go through cupboards. The cupboard under the sink was given a good sort, large night lights, cleaning cloths galore. I would now need to find space in there for our stove top kettle as our battery bank will be good enough to use the electric kettle routinely, but it should stay onboard ‘just in case’.

Spicey Parsnip soup before the galley bottom drawer was sorted, two first aid kits well out of date. We have a new one to bring from the house along with a life time supply for a family of ten of sterile wipes!

Connecting the second bully boy battery

The boat was dusted from top down ready for a good hoover when we got power again. By 3pm Mick moved indoors time to connect the second battery! Very exciting. He turned them on, looked at the computer. Oleanna had power again! The invertor hummed away happily bring electricity into the boat charging up the batteries.

Checking all was as expected

Once second coats of varnish were applied to the remainder of wood it was getting late again. Mick didn’t want to leave Oleanna on her own just yet with the two new bully boy batteries in charge. There was still tidying up to do in the engine bay and The Shed cupboard needed to be put back together. Things were turned off and we headed home.

0 locks, 0 miles, 2 batteries connected, 2 more soups, 2 dead first aid kits, 10mg not 2.5mg! 1 electric kettle, 2nd coats, 1 coat oil under the corner cupboard.

TLC Day 6. 27th January

A lucky dip Helical sock, 5th pair

Back down to Goole today. The temporary battery was disconnected after a blast of the central heating, thankfully it was a warmish day as I wasn’t going to be lighting the stove.

More cableing was going on in the engine bay. The second battery was put into the original battery tray. Blocks of wood have been added so that the battery can’t move more than 10mm in the tray. We’ll need to do something to hold the battery that is in The Shed, blocks of wood or maybe angle brackets.

Mick working with limited room

Mick busied himself hoping to get the instalation complete today, tidying up would be left for tomorrow, maybe even checking things worked as they should do.

A puddle of oil!

The Danish Oil on the floor was still just a touch tacky. I could see where I’d either not been able to see properly in dim light or I’d been a touch slap dash. No shoes inside today, socks only, I managed to find some heat holder socks to attempt to keep my toes from freezing.

Inside I realised that along with the porthole in the bedroom there were the bedside tables and a couple of tops that should also get a varnish to protect them from muddy paws. A space was cleared on the bed so that I could reach the porthole. Everywhere had a sand then some Bar Keepers Friend applied to where there were stains. This was left to dry whilst we had some Spicy Butternut Squash soup for lunch.

Other tops were lightly sanded and then the stove top got some attention. Water has somehow got in during the really heavy rain this winter and had left rusty patches. When lighting the stove recently I’ve made sure the nearest CO alarm has been operational incase we have a dangerous leak. The top was sanded then wiped down with white spirit. Once dry I got the stove paint out and popped my mask on, this stuff stinks! In my younger days a little bit of a whiff was put up with, but now I really hate it as it seems to linger with you for hours!

The BKF was all cleaned off, the porthole required a second coat, most probably a third should have been applied, but I was running out of patience. Everything was cleaned down, followed by a coat of varnish and a second coat elsewhere.

As the day light started to fade so did our enthusiasm. The floor not having gone off fully after two days meant that it would be a bad idea to give it a second coat today, this should be the final thing to be done once everything else was finished tomorrow. Mick was cold from sitting on the engine so we called it a day and headed back over the Wolds to warm up infront of a fire with a cat on my knee, some knitting and pizzas for tea.

0 locks, 0 miles, 1 porthole, 2 bedside tables, 2 more tops, 2nd coats, 1 stove top, 1 stinky boat, 2nd battery and other things, 2 cold and dark, 0 power tonight on Oleanna.

TLC Day 4. 25th January

Not quite as picturesque as Tilly

The tin of Danbolin had been brought inside yesterday so that it could warm up a touch before being used. The battery tray in the engine bay got a coat, this would take the rest of the day and overnight to dry.

Painted and drying

Time to bring a battery inside. The plank was positioned to aid getting the heavy black box onboard and then it was brought down the stern steps. The steps then needed removing so that the cupboard would be more accessible. The steps will now live on the dinette table for a while and access will only be through the bow doors, the stern doors being kept lock from inside so that we don’t forget!

Battery in it’s new cosy home

Everything seemed dry in the cupboard today, so in went the battery onto the floor of the cupboard. A shelf will need to be made and supported above it before items can be organised in The Shed again. The cables will come down from behind the board (at the top of the photo) which covers the hole from the engine bay, the shelf will need to accomodate the cables.

Inside I mixed some Bar Keepers Friend into a paste with a few drops of water, I applied it to the stains on the top of the drawingboard slot. Would this work? I’d see. This was left to dry whilst we had bowls of warming chicken soup for lunch. The dried paste was then scraped off, the residue rubbed away with a green pan scrubber, everywhere was then hoovered. The stains had vanished! A wipe with white spirit and it was left to dry.

Varnishing

I decided to do the same with marks on the window frames and along the wooden trim of the side hatch, this gets wet paws applied frequently to it and was looking quite dark. The BKF certainly bleached down the wood and brought it back to life. A coat of yacht varnish was applied to the hatch, window frames and shelves.

That looks loads better

Possessions were moved to the front of the boat, with the old battery reconnected I could hoover through before applying oil to the floor. This should really be applied, left for ten minutes to soak into the grain, then any excess wiped off with a cloth, giving an even coverage. However, this is next to impossible on a boat. The narrow spans of floor mean you start at one end of the boat and work your way backwards. Yes I could stop every three foot and wait for ten minutes to wipe any excess away, but my knees wouldn’t have appreciated that. Hopefully after a second coat it will even things out.

Danish oil being applied from a trusty Pip pot

Mick sat in the car waiting, not able to do anymore in the engine bay today as the temporary battery was in the way again and it was getting dark. I was glad of being able to have light inside and managed to remember to turn them off as I worked my way to the bow.

Oleanna locked up, the fire dying down. Back across the Wolds to three parcels left with our neighbour, more wonderful yarn. My old collegue Gemma in Leamington Spa had sent me a lot of part used balls of yarn, she works for Wool Warehouse now so I imagine her stash is huge.

The other two parcels were from Vykky at West Green Loft Yarns. One parcel filled with part used balls of yarn, the other a generous handfull of mini skeins. Blimey if I get more generous donations like this we’ll be needing a butty just for the yarn! Thank you!

0 locks, 0 miles, 1 battery in the shed, 1 tray grey, 3 black spots vanished, 1st coat on windows, hatch and 2 shelves, 1 temporary battery, 1st coat oil, 2 aching knees, 1 aching head, 3 parcels of yarn joy.

PS for Tom, this is the reply to your comment a month ago about our batteries.

Tom. Back when Oleanna was being built the builder suggested lithium batteries from a company called RELiON. They seemed good at the time but you may remember we had supply problems. Last summer one of the three 50ah 24v batteries went faulty. Our builder had never used RELiON again after our supply problems so they had no relationship with them. I looked at claiming under the guarantee and it turned out in the small print that the 10 year guarantee worked like this: a failure during years one to three would result in getting a foc replacement. A failure during years four to six would get you a 20% discount off a new battery. A failure from year seven to ten would get you a 10% discount off a new one. Their new prices hadn’t fallen as much as others in the lithium market so a new battery with 10% off would be more expensive than one supplied from elsewhere.
So we decided to limp on with 100Ah for the rest of the summer and decide what to do at our leisure. There is a well renowned facebook group “12 volt boating group” which has a lot of useful info and some recommended suppliers. So I have found a 24v 230Ah battery available for about a third of the price we paid for our 3 original batteries. We could keep the two batteries that are still working and add the new one to the bank but there is no access to the Battery Managment System on the old batteries so that might be problematical. So I am going to ditch the two remaining 8 year old batteries and replace them with two of the new ones giving us redundancy if one fails (thanks Paul Balmer) and a massive increase in capacity which will be very nice. I might do a blog post about it when I come to do the fitting.

Mick

TLC Day 3. 24th January

Alarm went off. Tilly left in charge, note in the window for the Postie, today would be a warmer and dry day for doing jobs on Oleanna.

Last night we’d banked the stove up, it hadn’t lasted but the boat did still feel quite warm. Heating turned on, fire lit but not too big as I planned to create fumes today.

I started to sand the floor concentrating on areas badly marked. Our floor is engineered oak so I know there is plenty of wood that I can sand. Where the pullout corner cupboard is in the galley, bits of grit get under the plinth and scrape the floor, leaving lines. I’d wanted to take the cupboard out totally. I knew how to undo the drawer runner, but to get it actually out and somewhere completely different in the boat would be hard. The handle would need removing and then there might still not have been enough space to get it from under the overhanging worktop, plus it would be heavy in an awkward space. So I’ll just have to make sure there’s no grit in future instead of being able to trim the plinth down by a couple of mm.

Mushroom Soup infront of the stove

Mick disconnected the old battery for ease of access into the engine bay, then cleaned off the Fertan on the battery tray and left it to dry. Oh hang on, I’m a day ahead of myself in the engine bay! The fertan went on today. I know he’s been busy out there in the engine bay, but all the days seem to be melding into one!

The Shed cupboard was cleared out and a damp trap was left inside and the door left open, cupboards take ages to warm up when the cold has settled in.

Mask on for dust and fumes

I carried on sanding the floor, a general sand all over in the main cabin, then just a bit at the bow steps where the leaking water pump had stained the floor slightly last year. Far worse staining had happened inside the hoover cupboard! We also seem to be getting some condensation dribbles under the gunnels from the gas pipe maybe, we might look at lagging the pipe, but you need to be able to see that it’s a continuous pipe for the Boat Safety. Hmm!

There are more towards the galley

Mick had a chat with Alistair and the cables would be ready for us tomorrow, Thursday. Mick tinkered away in the engine bay, sorting cables, labelling them and getting ready.

The Houdini Shelf sanded ready to be varnished and become a skid pan for Tilly

Windows had a sand along with the Houdin shelf and the wooden top to the drawingboard slot, the galley side of this had a few black marks on it. These were most probably caused by drying chopping boards having been left against it and the oak oxidising. Time to try out Bar Keepers Friend, this contains an amount of Oxalic Acid which can be used to remove stains in oak, but this would wait for tomorrow.

The floor got a good sweep and then a wipe down with white spirit, mask worn to avoid the fumes.

Power back on for the night

I now had a decision, should I use Danish Oil on the window frames and shelves? Or should I use an oil based varnish, I had some yacht varnish. When it rains our windows, unless closed, let a certain amount of rain in. The wood around them having lost most of it’s protective layer of laquer or varnish a while ago. I’ve touched them up with Danish Oil, but this hasn’t fared too well. Other places where Tilly sits also have to endure being wet due to her not wiping her paws when she comes in. As I thought about this, all I could hear was Frank saying ‘Danish Oil!’, but my head was saying Yacht varnish. The satin varnish won, the oil would be used on the floor though.

By now the day light was fading, I could do varnishing and oil, but it would be quite late by the time I’d finished and Mick would be trying to work in the dark, so we decided to call it a day and head home.

Bubbles yarn

Today there was one parcel with our neighbour, a wonderful jiffy bag full of part used colourful yarn from my friend Bubbles. Her mum used to knit socks all the time, but dementia has taken that skill amongst other things away from her. I’ll make good use of the yarn in my socks. Thank you Bubbles!

0 locks, 0 miles, 5 windows, 2 shelves, 1 hatch surround, 2 glazed doors sanded and cleaned, 1 floor sanded and cleaned, 1 mask face, 2 soups, 1 parcel, 1 happy cat, about bloomin time you spent some time with me!

TLC Day 2. 23rd January

The alarm was set, a note popped in the window for the Postman, the car was loaded with tools and then those two big cardboard boxes that have been sat in the hallway over the weekend. Blimey they were heavy! Between the two of us we managed to get them out of the house and part way to the steps where it was decided that Mick would take them from there into the boot.

First stop Woods Carpets in town. Woods have provided me with carpets for the house and theatre sets for years. It’s nice to go somewhere where you are known, say what you are wanting, be shown samples, told prices straight off, can we do a join there and there and walk out of the shop with a sample book knowing that the flooring can be fitted on the day I’d like, everything at half the price of the place in York and all in ten minutes!

Next B&Q for some cheap brushes and roller heads, glue and some lint free cloths. Gosh the prices have gone up in there! Then it was across the Wolds, wind and rain keeping us company all the way. My knitting needles clicked away, I just have to arrange my knitting so that I’m not turning a heel whilst travelling in the car!

There she is.

There she was, time to give her some TLC and start work on the battery upgrade.

First things get her warm. Mick turned the heating up whilst I lit the stove. We needed Oleanna to at least feel dry inside before I started to apply oil and varnish, thankfully we’ve chosen a week when the temperatures would be reaching into double figures.

Mick walked over to see if Alastair (the marina engineer) was around to alter the cables we’d bought with the batteries. These arrived as two 6m cables one positive one negative, but we’d ordered 2 3m cables of each. The cables needed chopping in half and connectors crimping on the ends, not worth sending them back. Alastair wasn’t around, but the cables were left in the office for him. Mick also gave notice on our mooring to Laird. Our exact leaving date will depend on Goole caisson opening and changes to some medication Mick is on.

The pull out galley cupboard was emptied. Crockery and glasses were boxed up to return to the house, then the two screws which hold the pan drawer in place were unscrewed. Well I say unscrewed, but it turned out that only one of them was actually only just clinging onto the drawer. When it all gets reattached I’ll be adding more screws, it’s felt a touch wobbly for a while, now I know why. Now I got to see a part of the boat only Tilly normally gets to see, she’d stashed one of her toys there!

I emptied a big drawer under the bed, this will be where I store donated yarn for my Sockathon. I then went through the books on shelves, removing guides we’ve picked up through the years and recipes from magazines I’ve kept. Guides to various waterways were noted, some we’ve been given may well be handy for our planned cruise this year.

Mick headed into the engine bay, with the power turned off on the boat he removed the old batteries and inspected the battery tray. A touch rusty, time to give it a clean and apply some fertan which could work overnight. Mick then set about working out where the new busbar could go, cables from here and there all needed to reach it with ease.

Cream of tomato

After lunch, inside Oleanna the wheels on the pullout cupboard got a good clean, the floor was hoovered and washed very well.

Do NOT start the engine!

Outside the wind and rain were not that conducive to much more work in the engine bay. We’d managed quite a bit of prep work so soon called it a day. One of the old batteries was wired back in and sat on top of the engine so that the fridge would work and things could be charged ready for tomorrow.

Interesting name

Back across the Wolds, time to pick up a couple of parcels that had been left with our neighbour. 3 skeins of yarn from a lady I’ve never met, her yarn stash had been delved into and a donation sent, she’s also sponsored a pair of socks.

Then there was a big box. Blimey! How much yarn was inside!?! I couldn’t believe my eyes. Such a generous donation from The Knitting Shed. 31 mini skeins, quite a few part used cakes and several full skeins of yarn. I had to keep peeking inside the box to check I wasn’t seeing things!

0 locks, 0 miles, 3 batteries disconnected, 1 tray fertanned, 2 batteries taken for a drive, 1 floor washed, 2 screws removed, 3 shelves rationalised, 2 soups, 1 fire, 2kg of yarn, 1 lovely evening in Filey.

3.75 pairs knitted

23 pairs spoken for

48.25 to go

£585 raised

Three Months. 10th January

Viking Marina, Goole

They don’t normally get up in the dark! What’s going on?!

It’s been just over three months since we moved off Oleanna back to the house. Mick has had several visits to check on her, turn the engine over etc, but I’ve not stepped onboard in three months. Northern Railways had a flash sale of train tickets for three days a week ago, some single fares down to £1. So we booked ourselves a trip to Goole, slightly slower than normal, a half hour wait in Hull for a slower train to Goole, but not bad for £12 for the two of us, I think it’s normally around £17 for Mick with his Old Git’s Card.

Tides out on the Humber

The 9:01am train took us to Hull stopping at all the familiar towns, but they always seem to be in the wrong order to me, surely Driffield is nearer to Scarborough than Brid! We had a chilly half hour wait for the slow train to arrive and take us to Goole. We’d brought a Brompton with us incase the puddle of doom near the marina entrance was still there, Mick could ride through get a pair of wellies and return for me. Thankfully the road was just about dry, no puddle of any concern. Apparently a ditch behind the road has been cleared, the puddle had become so deep that even 4 x 4’s were nervous about going through it, far deeper than any wellies would allow!

Hello! It’s been too long!

There she was behind the mesh fence of the marina. More splashes up the cabin side from the nearest puddle in the parking area. Would it be worth washing her down? It’ll only happen again and anyway we’d more important things that needed doing today and a limited time before our train back.

Poor Oleanna

Three months with minimum heating means things tend to stick a little. The front door being the first thing that needed some brute force. The side hatch was the next thing, the swivels that hold the glazed doors closed were very stiff, we may need to add a washer to them until she’s dried out.

She needs a good tidy and clean

I was pleased to see no sign of water coming in through the bathroom mushroom vent, there’s still a coat of paint to go on the outside when the temperature improves. However, somehow water has got in through our double skinned flue! Tracing the faint water marks up the flue brought me to the elbow joint, there were no marks above it and it looks like the joint has moved by maybe a couple of millimeters! Hmm. Mick likes to leave the chimney on for extra ventilation whilst we’re not on board, has this been the cause with all the heavy rain that’s happened in the last month? One thing it does mean is that the top of the stove will want cleaning and a coat of stove paint applying, an extra job before we’re back on board.

Not so good!

Mick lifted the engine boards. I stuck my head in ‘The Shed’ cupboard. This is on the port side, the same side as where the leisure batteries are in the engine bay. Our new batteries will have a bigger footprint than the existing ones, the battery tray was made to fit these and won’t be big enough for the two new ones.

I got the tape measure out to see how much room we had in the bottom of ‘The Shed’. The swim of Oleanna comes round in this cupboard so the bottom is narrower. Only one battery would fit. Above the swim there would be enough space for two side by side. But this would leave us with a funny gap below, only accessible when you take the stern steps out and would eat into the useful space above for life jackets, hats scarves, tool kit and hanging rail that is only actually used to store coat hangers!

Wonder how much they want for it?

A spare cable was passed through from the engine bay into the cupboard, there’s an inch gap behind a panel of wood where I could just feel cables wiggling around. This will be the route in from the engine bay. 3m cables will be required to connect the new batteries.

Curtains down

Decision is to have one battery in the engine bay, the other in the bottom of ‘The Shed’. These would both need battens adding around them so they can’t move more than 10mm to meet BSS requirements. We also need to add a shelf above the one in ‘The Shed’. There will be a gap above the battery so we can fix battens to the sides of the cupboard to rest the shelf on. Then the rest of the cupboard can be used as storage again. We may swap out the full width hanging rail for two hanging rods, meaning we’d be able to hang our life jackets up and have somewhere to store hangers (these only get used to hang washing in the pram cover). We will also need to find means of hanging the handheld and window vacuums, then the tool kit and other bits can sit on the shelf.

Lint rolling time

I got busy removing all the curtains, so that they could be washed. It’s been a few years now since they last came down, having a rod at both top and bottom of them makes them a slightly time consuming job. Last time they were down I relined them. I know the curtain fabric is okay to wash, but was the thermal lining? The place I got it from recommends dry cleaning, but we’re going to risk a hand wash and then rehang them whilst they are wet. Back at the house they have been de spider pooed, de Tilly furred with a lint roller. They’ll head back to the boat for a wash and rehanging.

Tomato!

Time for a bowl of Heinz Tomato and a cuppa. Not in front of the hatch today as the dinette is currently without cushions, so we didn’t have such a good view from the sofa. With the heating on Oleanna, had warmed up quite well. We’d aimed to fill the water tank just enough to do some washing up, but forgot the hose was connected and ended up with a three quarter full tank. I suspect we’ll be able to use much of this for cleaning, so that we can disinfect the water tank before moving back on board.

We plan on a week of visits once we have the batteries. Hopefully with the heating on each day, possibly the stove lit we can get Oleanna warm and dry enough for me to re-oil the floor and window surrounds. This job needs to be done when Tilly isn’t in residence. It’s also quite smelly, so we’d rather not be around either.

Amy our neighbour

I checked to see how the corner galley cupboard had been put together, a couple of screws hold the pull out pan drawer in position and then I believe the cupboard is mounted on a couple of rails which will just need removing from the back of the dinette. I’m wanting to give the wheels of the cupboard a good clean and oil the floor beneath it.

Quite a few jobs to be done on board. Then there’s the dinette cushions to recover too along with a bit of painting in the house before lodgers arrive again!

Ship in bound

With our train due to leave at 15:31, I needed a while to get to the station, I have a hobbly leg at the moment. Thankfully the chap from NB Bruce was just leaving in his car and he offered me a lift into town, Mick would close up Oleanna and cycle to meet me. Mr NB Bruce plans on heading off on his travels soon, he’d checked for stoppages over the Pennines, I mentioned about Goole Caison being closed for works for a few weeks. In my head they’d already started the work, but it doesn’t start until Monday, so I hope his planned departure was going to be this weekend.

Yummy donated yarn arrived in the post, thank you Naomi!

The journey back was uneventful, one ship heading upstream on the Humber to Goole in the fading light. Another change of train in Hull but thankfully not a long wait as it was chilly. The knitting needles came out and I managed to get up to a heel of a sock before we arrived back in Scarborough.

About time too! I’ve been shouting at nobody since I woke up at 3, it’s way past my DingDing!

Hang on, She smells of BOAT!!!

0 locks, 0 miles, 4 trains, 1 bike, 1 hobbly leg, 4m cables, 9 curtains, 2 blinds, 1 shelf measured, 2 bowls Heinz finest, 2 cuppas, 3.5 hours on board.

1.25 Pairs knitted

18 Pairs spoken for

50.75 Pairs to go

£455 raised