Category Archives: Scarborough

Panto Postcard 5, 2021

72 hours

Sunday, a day of rest all round. After spending nine hours leaning over painting the floor I needed to check I could still walk. After a bit of a lie in and breakfast I headed out for a walk to get some food. I walked up to Marks and Spencers Food Hall buying a pie and some stir fry vegetables, along with some other bits and bobs to keep me going.

Which one did I buy?

This coming week I would more than likely be trying to paint things with the lights going on and off so I popped into Mountain Warehouse to buy myself a head torch. In past years I’ve ended up borrowing someone’s, but that wouldn’t be possible with covid around. I had quite a choice, narrowed it down to two, then one.

Feet up, baking and crochet

Much of the rest of the day was spent lying on my bed with my feet up. A couple of colours were added to my crochet blanket and two episodes of Great British Bake Off were caught up on. Once I’d watched Dr Who it was very much time to go to bed.

Cinnamon buns

Monday. Ed the sound designer joined us, checking the system and making sure the actors on stage would be able to hear Barney the Musical Director as well as him being able to hear them. Will the Lighting Designer focused lights leaving me with just my head torch behind the backdrop.

Most of the scenery would pass by now, still finishing touches needed, but most of that could now happen in breaks when the lights were on. So I turned to smaller things, the bunch of parsley. The Designer arrived and had changed her mind how this should look! She doesn’t always get in the way, but today she insisted that I start again!

The other major thing that required painting was a portrait of Gothel the witch. I’d been hoping to catch Amy in costume at some stage before now, but had missed her on Saturday. Luckily she had taken some dressing room selfies of herself so I was able to use one of those. I’d been wanting to do a version of the Mona Lisa, it took a while to get her arms not looking stumpy.

Back in Scarborough the roofer returned. The old gutters were replaced and the mass of down pipes moved to nearer the ridge of the roof, hopefully meaning that the water will spread across the roof and not just be a torrent down the corner of the house. The bill for the work turned out to be more than the chap had said, we thought his quote had included scaffolding, but now that was an extra £300!

Still a lot of detail to add

Tuesday. Sound check day, I wondered if Gavin could actually count past two. Barney was moved onto stage. Trying to give him enough space for all his kit, keyboard, headphones, peddles, squeeze box, microphones, cameras, monitors as well as be able to change the scenery in front of him all took time.

Fairy lights going up

Gemma returned and set about adding the fairy lights to the portals, I’d hoped someone would take this on. Due to a lot of previous layers on the portals we wouldn’t be able to push the lights through from the back, this is by far the neatest way. Instead they were cable clipped onto the front, it was quite fortunate that I wanted to cover the surface with thousands of leaves. Once the lights were up Gemma started sticking the greenery up.

Just about finished

Out in the garden Jo was busy with the big cannons. She’d had a brain wave overnight and done some research, I could assist with my boaters knowledge of amp hours and batteries. I got on with the final pieces of scenery, the cucumber sandwich slidders, all the time gradually adding more paint to Gothels portrait.

Wednesday. Mick caught trains down to Thorne, not as easy to get to as Goole was. On Saturday he’d not been able to meet up with any of the marina staff and by the time he arrived it was getting too late to winterise Oleanna. So he introduced himself to Sarah, received the marina rules and handed over some money. The mooring here is a touch more expensive than it was last winter in Goole, but it does include an amount of electricity in the price.

Diddy damp trap

Mick emptied the damp traps, refilled them with new crystals and positioned them around the boat. The water was turned off, the system drained and the shower head laid in the shower. Cupboards were opened up to help with air circulation and the Alde boiler was set to come on when the temperature drops to 3C, a few degrees lower than last winter.

A panto must at Chippy

Time for the technical rehearsals to start in Chippy. The sweet chest had been tracked down, it had been sold off at the last Panto sale by mistake! The new owner will have it replaced with a chest that isn’t so important to panto.

Waiting to start

Last night lighting states and sound levels had been programmed into the boards for the first part of the show, today we’d add the actors, costumes, scenery and props. Teching can be a slow process especially when there is SO much going on. Visual gags and luminous lettuce kept us all amused.

Lettuce!

Thursday, more technical rehearsals. These days I spend watching, taking notes, helping solve any problems. But I’d also decided that baby Rapunzel needed to have a crocheted blanket! Yes we could have gone out and bought one, but it would have been hard to find a good one to match the show. Instead Jo supplied me with some green yarn with gold flecks and I borrowed a lamp so that I could see to crochet in row G whilst I wasn’t needed. In breaks more leaves were added to the portals and Gavin’s feet! He seemed to have a homing instinct to them whilst the latex glue was drying.

Friday. The Cotswold Thunderbolt was erected on stage and we had chance to add the rigging. A chap called Tim joined us to help Jo work on props whilst we continued with the technical. We worked our way through Act 2 until the actors ran out of hours. Then it was time to dry tech the ending of the show.

Wide ribbons had been made up by Valerie a local volunteer, Jo had fibre glassed the giant strawberry which was flown out. With big clamps to temporarily hold ribbons to the balcony fronts we tried out the ribbons and raised the strawberry. This all worked. We then dry teched the end sequence (without actors), it all slotted together as planned! High fives all round.

Saturday. Today we should have been doing the first of three dress rehearsals. Each team of Pippins get to have a dress, but we still hadn’t teched the end of the show with everyone, the five minutes was likely to take about two hours! So in the morning we did a dress rehearsal of Act 1. Imogen my work experience joined us and did her best to cut leaves to decorate the pram whilst sitting in the dark. We then positioned ourselves in the balcony to release the ribbons several times as we finished the technical.

The strawberry, Gemma and Dash

Then followed a busy afternoon, trying to tick jobs off the list, painty jobs that could dry before actors returned in costume. I’d set myself an alarm and at 5:30pm it went off, time to wash brushes, get changed and head to the correct bus stop and leave Chippy for a night away.

Gothel green

This time I was heading to Hackney to see the London Leckenbys. Google suggested a route, S3 bus to Oxford, grab something to eat at the station, a train into Paddington, Bakerloo line then Central line followed by the 388 bus to Hackney Wick. A busy journey but not as alarming as the one to Doncaster had been two weeks ago. Unfortunately I got off the bus a little bit early so arrived about five minutes after I should have, but still before 9:30. Cheese and wine on my arrival with a guided tour of their new improved house, before sinking into bed in what used to be Josh’s room.

0 miles, 0 locks, 5 trains, 2 buses, 2 tubes, 7 tech sessions, 0.5 dress, 6 lateral flow tests, 1 head torch bought, 1 head torch misplaced after 3 hours! 1 boat winterised, 1 portrait, 1 pram, 1 MD squeezed in, 1 backing flat squeezes out, 1 asm, 1 blanket to make, 1 more long week to go.

Panto Postcard 4, 2021

Apologies, as this will be a short postcard this week, so I’ll stick to last Saturday as that was a very busy day both here and up North.

Mick was up seriously early and on a train at 5 something silly o’clock, he was heading to Goole to try to make the most of what hours of daylight there were. I on the other hand had a little bit of a lie in, well it was going to be a long day for me. Between the two of us we spanned 23 hours.

The curtain going sideways on Act 2

At Chippy Theatre it was time for us to be joined by Will Burgher the Lighting Designer who came in to watch a run of the show. The Pippins were also in and the three teams took it in turns to do scenes. Minimum scene changes happened so it was a little bit hard for me to make notes on what I still needed to work on, but it was good to see the show from start to finish.

I think it was Thursday that I’d received a message from Ann Marie and Dave from NB Legend, they had pulled up in front of Oleanna. We’d hoped our paths would cross earlier this year around Trent Lock, but we were just a bit too quick in passing on our way down to London. Legend has been down the Trent visiting all the off shoots, Boston, up the Chesterfield and when they came off the river at Keadby they had headed on up to Sheffield. We actually thought our paths might have crossed at Bramwith Junction a week or so ago, but due to Oleanna being poorly that hadn’t happened. Instead the boats met in Goole and they helped to keep an eye on Oleanna from the bow whilst Wendy and Martin kept an eye on the stern.

Mick arrived in Goole at 8am and cycled the mile to Oleanna, there was time for a cuppa and a catch up with Ann Marie and Dave before he needed to be on his way.

Heading west

By 9:30 the pram hood had been dropped and Oleanna was winded to face west. Mick waved goodbye to Goole, NB Legend and WB Lullabelle most probably for the last time this year and headed out through the caisson.

The breach site

He motored on along the long straight passing the breach site and on to Sykehouse Junction where we turned left onto the New Junction Canal. This had been planned to happen three weeks earlier and Bridget and Storm had kindly offered to come and operate the bridges for Mick, but today he was going to single hand them.

Some are lift bridges

Now when I operate lift or swing bridges I keep a tally of how many vehicles I hold up. Admittedly I’m not single handing, trying to work the bridges as quickly as possible to hold up as few vehicles as possible, but I was a touch disappointed when Mick told me he held up ‘a few, not many, but a few’! That’s no good for the numbers!

Approaching Sykehouse Lock, is that a green light?

He worked his way along through the first lift bridge. As he approached the second bridge Kirk Lane Road Swing Bridge he thought he could see a green light at Sykehouse Lock. But at distances the lights can be a touch confusing and once he got that bit closer it was most definitely amber, self operation. I’d passed on my knowledge of this lock to him as there is a swing bridge over the centre of it and to be able to operate the panels at either end you need to insert your Key of Power into the panel by the swing bridge and open the bridge to the canal before either of the gate panels will work. However as he approached the amber light turned to green, there is an enthusiastic volunteer who can quite often be found at this lock and today it was Mick’s lucky day. The lock was set and waiting for him, he didn’t have to step off the boat once. Thank you.

By 1pm Oleanna had passed through the last of the six moveable bridges. Ahead lay the Don Doors, two guillotine gates that can be dropped when the River Don goes into flood stopping the river from backing up along the canal from the aqueduct. Earlier in the week I’d seen the River Ouse in flood so there was a possibility that the Don was high, but thankfully not high enough for the doors to be closed.

Don Doors in the distance

In Chippy by now we’d finished the run. The show was running at a half hour too long, some trimming would be needed, there is nothing worse than an over long panto, yet Rapunzel hadn’t felt too long. Dash headed home to work out what could be cut over the weekend.

Notes after the run

Reaching Bramwith Junction Mick battled a touch with the wind to turn the sharp left to Bramwith Lock. Sadly no help on hand here so the ladders were used to get on the boat once she had descended. By 2:30 he’d passed through Bramwith Swing Bridge and was on his way to Thorne.

This left Thorne Lock with it’s swing bridge to do, all operated by the Key of Power, well apart from the road barriers that are manually swung into position. Then it was the renowned Princess Royal Swing Footbridge.

Don’t Look!

Mick moored up and went to operate the bridge, he followed the instructions to the T, but the very particular barriers on the far side got the better of him! Two barriers pull out and lock into position, you then cross back over the bridge and pull out the barriers on the control panel side. This means that unless you are as skinny as a heron you cannot get back across the bridge to wiggle the far side barriers to encourage them to locate properly. Fortunately a local came along and knew what to do. The bridge opened, Mick brought Oleanna through and another local closed the bridge and returned the key to Mick, handy as the bridge landing on that side has deteriorated so much it would have been just about impossible to get off Oleanna safely and tie up.

Oleanna’s home for a few months.

Not much further on they had reached their destination shortly before it got dark. Mick turned Oleanna into Blue Water Marina, her winter home this year. We’d hoped to be able to return to Viking Marina in Goole, but Laird had no room for us, our mooring from last winter now occupied by a go faster cruiser. Mick secured Oleanna to the short pontoon that we’d been allocated, closed her up and headed to the station. Today’s mission was accomplished, winterisation will happen on another visit.

Back on stage the technicians spent the afternoon adding more lights, they were meant to be focusing the lights on stage and then moving to the front of house bars handing over the stage to me to paint. I got myself ready with pots of paint, brushes on sticks and the model to follow. We were all in a position for me to start painting a little later than originally planned, they carried on working in the auditorium until I’d painted too much of the stage for Will to be able to play Hopscotch anymore.

The stage flooring was recently resurfaced which should have made for a nice floor, but somehow the boards were laid rough side up, this made the painting of washes quite a bit harder than it should have been. When Ash left at 11pm I thought it might take me another four hours to finish painting the floor and get two coats of glaze on it, but time just evaporated.

Once the washes were complete I stopped for something to eat, then thankfully enough of it was dry for me to add green hedges, the heating in the auditorium having been put onto it’s highest setting to aid the drying. Next came white and purple for a touch of floweriness. Gavin hunted round for several fans to help with the drying and by 3am I was applying the first coat of glaze. This should have had two hours before the second coat was applied, but by the time I’d finished getting into all the nooks and crannies it felt dry enough to walk on. The second coat went on in 18 minutes, the roller sleeve was left in a bucket of water to be cleaned out properly on Monday and I was out of the door just before 4:30am.

Floor finished

A long day for both of us.

3 locks, 17.6 miles, 9 bridges, ? held up, 3 lefts, 1 lockie, 2 helpful locals, 1 winter mooring reached, 2 weeks late, 1 run, 30 minutes too long, 1 hour late starting, 9 hours of floor painting, 2 coats glaze, 4:30am, 1 pooped Pip.

Panto Postcard 3, 2021

61.25 hours

My planned escape back to Oleanna was very nearly thwarted. I left the theatre with ten minutes to reach the bus stop I have used on a Saturday night to get to Banbury in the past. I glanced at the time table only to discover that the last bus to Banbury did not stop at my bus stop, it was a fast bus. Two minutes later I saw it pass the end of the street! I called the taxi company that had ferried me back and forth last week and pleaded with them to help me. Thankfully they had one driver who wasn’t booked up all evening and he’d just returned from a break. I was soon back on track but £25 worse off.

What a journey!

The first train to Birmingham New Street was very pleasant and roomy, however the next train was packed with singing shouting Barnsley football fans. Luckily I had a reserved seat, well three in all for my journey up to Doncaster as I’d bought split tickets. I sat wincing every time the next round of songs was shouted around the carriage. I wore my mask hoping it would keep any possible virus at bay, not just for me but also the whole panto cast on my return. Eventually the carriage emptied out and things became quieter.

Mick was at Doncaster station to pick me up in a hire car and whisk me back to Goole so that I could surprise Tilly. She was so pleased to see me that I wasn’t allowed to stop stroking her until it was time for bed.

Sunday. What a horrible morning! We’d been hoping to move Oleanna today, the alarm had been set, but the sideways rain was so not conducive to seven hours or so out side to get her along the New Junction Canal. So instead Tilly got to come and go, using the hire car as shelter and we had a cooked breakfast. Hooray!

I actually needed a quiet day as I was really rather pooped. Mick headed off to buy some Puppy Training Pads whilst I did very very little. It was so nice to be back at home with my two favourites cosy in front of the stove.

Hello Martin and Wendy!

Yesterday Mick had discovered that the boat moored behind us was Martin and Wendy’s Lullabelle, we’d escaped Goole with them back in May. Lullabelle is part way through having a repaint, Martin had spotted Oleanna though. They have spent the summer months pootling about on the Ouse, up to Oxclose Lock which was closed and down to Naburn. They then headed back to Selby, had a trip round Trent Falls on Sea Maiden ( another Escapee) and Lullabelle was one of the first boats to get through Selby Swing Bridge when it was finally removed to be mended.

Monday. Time to pack things, the main one being Tilly. Our original plan had been to return to the house on Sunday, have a day for Tilly to settle down with me being around before I headed back to pantoland. But there had been a misunderstanding with one of our lodgers who’d decided that she was not leaving until today, she’d also said no to Mick dropping in to pick up Tilly’s Cat Caravan. Her show was moving on to Newcastle so she wanted to avoid any unnecessary contact, we respected that but were a touch miffed that she’d been confused at us wanting to return to the house on the Sunday when that is when she’d booked the house til!

I don’t see why I couldn’t have stayed here!

Anyhow, we packed the hire car. Fleur the Company Stage Manager in Scarborough had lent Tilly a Cat Caravan, which she wasn’t too pleased about. Also what was it with those Puppy Training Pads! I’m not a puppy and I certainly don’t need training! Our drive back to Scarborough involved two stops to refresh the puppy pads and after about half an hour Tilly seemed to be calming down a touch, maybe helped by the Pet Remedy, or just that she was getting more queasy. Poor poor Tilly! It was a relief for us all to reach the house.

Once Tilly had been cleaned up I didn’t bother restricting her to a room at a time, so we both checked round the house, Tilly more vocally than me! She definitely knew where she was, Yes, Scarboreugh! Our lodgers through the summer have ranged from being awarded 11 to 5 out of 10 for how they have left the house. A spare clean sheet for our bed would have been nice, but that was soon sorted.

Shoes from down the road has been making himself known to our lodgers and came peering in through the kitchen window only to find that Tilly had returned and that we would not be a push over. Stupid Cross Eyed Cat!

Having people live in your house means you get left with things, the garlic will get used, but I think we now have a touch too much malt vinegar! The rest of the day was spent doing washing, unpacking and making lists. Followed by fish and chips from Cappleman’s.

Sunny day

Tuesday morning and it was time for me to pack my bag again. Mick gave me a lift to the station, Scarborough was wonderful and sunny, such a shame to spend the day on a train. Mick headed back to Oleanna to pick up more things and check in with Martin and Wendy who would be keeping an eye on her for us for a few days.

My first train was to York where the River Ouse was in flood, right up to the level of the Museum Gardens, so no boats were moored there. I changed trains to a direct one to Banbury which followed parts of the canal network and rivers, the Soar looked really quite full. Back to Chippy on the 488 I stocked up with some food and went straight into the theatre.

The town square almost finished

Final preparations were taking place for publicity photos so we tweaked a few things whilst the Dame tweaked her padding. Lights were focused onto stage and then scenes were run for the photographer. Meanwhile I carried on painting behind the backdrop.

Final adjustments

During the afternoon news came through that one of the Pippins had tested positive on a lateral flow test today. The Pippins had all been in yesterday after school for a couple of hours rehearsing with the adult company. PCR tests were arranged for the company and anyone who’d been in close contact, it looks like I’d chosen a good day to have off!

Things getting nearer to being finished

Wednesday. The theatre was a touch quiet today with the majority of people having gone to Banbury for a test. The test centre where they had been booked into via the NHS had closed three weeks ago! Luckily their appointments were honoured at a drive through test centre not too far away. Doors and windows were kept open and everyone wore a mask all day long.

Socially distanced production meeting

More painting, nearly everything has a coat of paint on it now. Despite rehearsals going on on stage I can beaver away behind the backcloth quite happily. We had a production meeting at lunchtime. We collected in the bar and were joined by other members of the team via zoom. A laptop was pushed around the bar for people to give updates on their progress and bring up any problems. The main problem we have is that The Chipping Norton Theatre sweet chest, which has been in every panto that people can remember has gone missing! If you happen to know of it’s where abouts please let me know in confidence.

Thursday. Back in Scarborough we finally had scaffolders arrive. This is so that a roofer can sort out the roof where we have developed a roof garden which is letting a lot of water into the house and is possibly the reason the kitchen sockets have been tripping for the last few months.

That looks like a good climbing frame!

Mick added two containers worth of our solid deposits into the compost bin in the garden. The garden waste and our deposits from earlier in the year had almost totally composted down, this will be left until next year before it is used somewhere in our garden.

A pouch of plenty!

In Chippy rehearsals continued, the Pippins joined via zoom this evening, Dash (the Director) showing them where he wanted them to be in certain scenes. They also got to meet the Musical Director who joined us, Barney. Some singing was done over zoom too. It’s great that such things can happen keeping everyone involved with the show. By the end of the day everyone’s PCR results were in, only the one Pippin having tested positive, thankfully she hadn’t passed it on to anyone else. We all continue to do daily lateral flow tests.

Second coat of emulsion before the arty stuff goes on

I was called over by Dash for something important, he needed to give me plenty of chocolate to keep me going through the evening. Working for him is a touch like having a fulltime Dame in the room, and today I got most of the sweeties! A fresh coat of paint was added to the floor before we all left for the night.

First frost

Friday. Blimey it was chilly this morning, fitting for it being Bonfire night. Rehearsals continued, eleven out of twelve Pippins returning to the theatre.

I started putting finishing touches to several pieces of scenery and ended up the day drawing out the floor in paint in preparation for painting it over Saturday night into Sunday morning.

In Scarborough the roofer arrived and Mick got chance to see the roof where the problem was. The roofer wanted us to replace the slates with concrete tiles, but that wouldn’t be right for the house. He also wanted to redo the whole of the roof over that part of the house. Mick declined his kind offer, we just needed the roof to be good again and the rest of it seems to still be in good order. Thankfully the timber is just wet and not rotten. The chap will return next week to sort out gutters and reroute down pipes with the hope that the problem will not recur so that everything can dry out. We now need to find a plasterer to redo the kitchen wall, I’m not sure my dabble with plaster last winter makes me qualified enough for the job.

0 locks, 0 miles, 2 windy, 2 wet, 2 nights on board, 1 cat transported to the house, 4 trains, 1 hire car, 0 clean sheets, 5 out of 10, 1 tart, 1 Tilly tree climbed, 3 bottles Sarsons, 1 positive, 2 known neighbours, 1 not too lonely Oleanna.

Summit Of Summits. 7th October

Wool Road Winding Hole to Diggle, the summit of the Huddersfield Narrow Canal

It looks good over there!

As we got ready to leave this morning the chap from the boat in front appeared with a billy can full of coal which he proceeded to give to me. He’d taken his stove out several months ago, so had no need of it.

Good Luck with Gypsy

He bought his boat in May as a project boat and was due to have a new stove fitted before now, but for one reason or another it hasn’t happened. I suggested he might want to hold onto the coal to help keep warm, but he still wanted to give it to us. I suspect it was in his way. He grew up around Tunnel End in Marsden, before the tunnel was reopened he and his mates used to play in it, he says there is graffiti from the original navies who cut the tunnel. We wished him good luck with the work on his boat, his next aim is to get to Marsden, then who knows!

Time to climb the last few locks. The last nine locks to the summit are all relatively close together, infact today we only moved a mile horizontally but 94ft 6″ vertically.

Lifting the paddles

The angled paddle gear wasn’t as bad as I thought it would be, several of them having had hydraulic mechanisms added to them. Six years ago we had enlisted crew to assist due to me not being able to use my right hand at the time. Using a windlass wrong handed was a challenge as I tried to do my bit. Today my long reach windlass was only needed some of the time.

Will that be enough water?

Our main problem today would be the low pound between locks 26W and 27W. As I arrived to open the gates into 26W above looked really rather low, would there be sufficient water left after filling the lock to get Oleanna over the cill? The bottom gates leaked, she rose, we pushed the gate open, it was touch and go from my reckoning that there’d be enough water.

Gradually making her way forward

I walked up to 27W, the level above much healthier, in fact the bywash was running. I lifted the paddles on the bottom gates and then the top gates and let water run down through the lock. I made note of where I thought I could drop the level above to for us still to be able to get over the cill of this lock.

Will she get over the cill?

Below Mick had closed the gate again, hoping to stop the pound from draining as much as I was filling it. He then refilled the lock, opened the gate and gradually inched his way out of the lock and over the cill. A big thumbs up was given and I could now drop the paddles at the top end of my lock.

There was now the pound to cross which took quite sometime! As Oleanna approached the bottom cill of the lock Mick gave her quite a few revs before cutting them and thankfully gliding into the lock at a slow pace. Now to see if I’d let too much water down to be able to get over the top cill of this lock. There was just enough! Phew!

Nearly there!

Onwards and upwards we worked, the single bottom gates meaning less walking round, but heavier to move. The last pound between 31W and 32W was also a touch low, but thankfully passable, no need to draw on the 3 plus miles of the summit pound.

As the top gate opened of Lock 32W Oleanna had reached the highest point on the Canal Network, tomorrow she will bag her next wonder of the waterways, but getting this far is a wonder in itself.

We pulled up in front of NB Idleness a tug who will also be going through the tunnel tomorrow, Kim and I had been in touch through facebook over the last week. So there was plenty to chat about on our arrival. They are longer than us at around 60ft and had been asking how easy or hard it would be to go down the Huddersfield Broad Canal.

Good hunting friendly cover here

Tilly came out for an explore as we chatted, but after a lady walking by mentioned she’d just seen a couple of Mink I decided that maybe Tilly should return indoors. After seeing how quickly a mink grabbed and dragged a pigeon down a tree earlier this summer I thought it would be safer.

BUSY!

After lunch we walked down hill slightly to Grandpa Greens for some celebratory chilled medication. Signs all around the building suggest that they have had queues round the block, but today we only had to wait for one other person to be served. Sadly no gluten free cones so I had to make do with a tub instead.

What a choice!

Mick had Belgium chocolate and Salted Caramel whilst I had Raspberry Ripple and Nutella. Both very nice and a fitting celebration for reaching the summit of summits.

Yay! Summit medication!!!

The Huddersfield Canal is the highest canal on the network at 645ft above sea level. Next is the Rochdale at 600ft, followed by the Macclesfield and Peak Forest at 518ft, Titford Canal BCN at 511ft, Leeds Liverpool at 487ft the last two surprising us not to be the other way round.

Taking down her smile

The afternoon was spent preparing ourselves for tomorrow. The highest point on Oleanna we know to be the horns at the front, the chimney used to be similar until we had some cut off. Mick undid the supports that the horns sit on and tucked them under the bracket that normally holds them off the cratch cover. This will have gained us at least another 3 inches clearance, which we might be glad of if someone else drives Oleanna through the tunnel.

One day I’ll repaint that bracket

Another job today was sussing out whether we’ve been charging enough for our house. We’ve already had an enquiry for a few weeks next year. Now that we have been paying the bills for a full year we know what it costs to run the house.

A Summit Robin

I made up a chicken and roast carrot risotto with the last of our Sunday roast and popped it in the oven before I got together with my Scarborough chums for our weekly catch up. It was good to see those who could make it and today was the first time we’ve had two people on boats, me and Sue who is currently on holiday in Greece sailing.

9 locks, 94ft 6″ climbed, 1 mile, 32 locks up, 645ft, 1 summit pound, 1 billy can of coal, 1 dodgy pound, 1 foot of water, 2 boats waiting for the tunnel, 3 by the end of the day, 2 scoops each, 2 horns lowered, 2 hours shore leave, 2 mink! 5 chums, 1 pot of oven risotto, yummy!

The yarn shop I’ve just spotted on the map at Warth Mill has been added to the ‘next time’ list!

https://goo.gl/maps/Vyq12X4mj5NKCTN36

Old Friends. 26th September

Brook House Winding Hole to Hall Green Footbridge 93, Macclesfield Canal

With Harecastle Tunnel booked for this afternoon we didn’t want to be sat in queues at the locks into Stoke today, the alarm was set and we pushed off with our first cuppas in hand at 7:30am. Slowly and quietly past the other moored boats, a little glimpse of Barlaston Hall, we can still dream, and on past Wedgewood.

Trentham Lock

Trentham Lock was almost in our favour, we helped set it for the first boat soon to come towards us. Then we were on the long pound heading in towards Stoke.

Breakie

I headed below to prepare breakfast, it being Sunday and an early start we deserved bacon butties, with a few mushrooms and ketchup.

The hot dog on legs and Shooting Range are still there. The wood clad boat now has weeds, maybe intentional, growing in it’s gutters (wonder if we’ve had a quote for the gutters in Scarborough yet?) and Shufflebottoms has had the bank side seriously cut back. Owls and Halloween graffiti have been added to the walls along with a lot of scrawl.

Stoke Bottom Lock

Stoke Bottom Lock soon came into view. This huge concrete structure kind of fits it’s surroundings of the A500 Queensway and the house alongside it, today only five vehicles parked in the drive and on the road. This lock and the next four are currently being locked up overnight as vandals have been emptying pounds. We arrived at 9:30 so this wasn’t a problem for us.

No train for us whilst in the lock today

A train sped past over Cockshute’s Lock just before we arrived. Boaters hope to get a photo of their boat in the lock as a train passes, I wonder if train drivers keep a tally of how many narrowboats they get to see here?

A couple of fishermen were set up on the towpath in the next pound, I got my first ‘Ay up Duck’ as I walked ahead to the next lock. Here the lock was half full, or half empty and the first downhill boat was approaching. I was there first so lifted the paddles to empty it. If I’d known that it was a single hander I’d most probably have filled it and helped lock them down. The lady was very chatty and said she was being followed by several boats, the first one being a hire boat that she’d had to go back and help as they were doing their best to adjust water levels with all four paddles open on the top lock.

Waiting to use the next locks

Johnson’s Lock is just round a bend, so the line of sight from it isn’t good, the gates were just opening as I came into view, chance to holler up to leave the gates for us. Above the next boat sat waiting in the short pound, another single hander who’d come to help the hirers whilst he waited. All downhill boats today were heading back to moorings, their summer cruises coming to an end.

Up at the top

We rose as another boat descended Stoke Top Lock, then some do-ci-doing happened to move the three boats round each other and we were on our way up to the summit of the Trent and Mersey. As another boat was waiting to come down we didn’t get a chance to drop off rubbish at Etruria Junction bins and we didn’t fancy turning or backing down to them, so it could wait for the next ones.

New Bridge

The huge wasteland that has laid dormant for as long as we can remember is starting to show signs of redevelopment a new bridge crosses the canal to link it to east.

A group huddled around a large sign where the canal used to have an arm. Burslem Branch Canal used to head off here to the north, a trust was set up in 2011 with an aim of restoring and regenerating the branch.

A new footpath has been opened this year connecting the old port to Middleport and an artwork showing what the area was most probably like just before the branch breached in 1961 which saw it’s closure. So many bottle kilns.

Along the towpath is a long mural, the painters fuelled with oatcakes. It makes for a far jollier scene than the fence used to be.

Middleport Pottery stands bold and proud, showing buildings in the area just what they could become. We still haven’t visited, so it has been added to the ‘next time’ list. Stoke Boats had plenty of boats out on the hard, one looking like it needs quite a bit of tlc, another being jet washed to within an inch of it’s life.

Such a small flag!

Under Bridge 127A. Up ahead we could see a small flag fluttering on the stern of a boat, far smaller than we’d expected from a member of the Flag Bubble! There sat Barry by NB AreandAre and Sandra reading an information board. We’d known they’d be here and shouted out ‘Veg Box delivery!’ Last year in Lockdown 1 they were moored close to us at the bottom of Hurleston Locks, we became a little community on our ‘home’ moorings.

Barry’s waterways cards

We pulled up in the next space, thankfully plenty available at this time of day. Chance for a catch up with them and get to meet one of their grandsons. Barry had his greeting cards on display for sale, so we bought a few and had a go at the raffle, winning another card. It was very good to see them again after their elongated trip to New Zealand last year.

Mick selecting raffle tickets

We’d arrived in plenty of time for our next rendez vous. The well deck contents were stowed in the shower, strawberry plants popped on the roof. Gosh there’s a lot of space in there! Just before 2pm we walked back to say our farewells to NB AreandAre and to await our visitors, Bill and Lisa.

Lisa, Bill and Mick

Lisa used to be a Stage Manager in Scarborough and Bill is an actor who has lived in our house much of this summer. They have recently moved to Stoke so it was an opportunity to meet up not to be missed.

Tunnel bound

We pushed off and headed onwards towards Harecastle Tunnel. At the moment you can just turn up in the morning and join the queue to go through, or you can book passage in the afternoon. We were joined by a hire boat and another behind, neither had booked but were added to our passage. We were given the safety briefing, nothing new from our last trip through, horn and light tested.

Harecastle Tunnel

Life jackets were handed out and because Mick would be at the stern by himself we equipped ourselves with walkie talkies. A few years ago a tragic accident happened in the tunnel when the chap at the helm bumped his head on one of the tunnel profile changes and fell in. His wife was below and didn’t notice anything until the boat started to bump the sides. So it’s best to keep talking to each other to make sure you are there. We acknowledge each other, even when stood close at the stern, every 100m (this is also a bit of a joke between us pointing out the direction of the closest exit).

It’s quite well lit at the front

Bill, Lisa and I sat in the well deck and chatted our way through the tunnel, catching up on all sorts. After the third boat entered the tunnel the doors at the southern end were closed, the fans cranked up and the flow of cold air could be felt coming past us. Harecastle has no ventilation shafts so the air is moved using the fans.

Sitting the bow is a whole different experience from being at the stern. Having your head around about 4ft lower in the tunnel and not looking over the cabin top makes it seem cavernous. I was waiting for it to get really tight, it got a touch smaller, but never tight at the pointy end of Oleanna. Water Explorer has our passage through the tunnel at 45 minutes, not bad as we were following the hire boat, the chap at the helm not having done so for thirty years.

Popping out the northern portal we slowed whilst the hire boat worked out which way they were going. They wanted to go right, the lady kept pointing that way, but to do that you have to go left first. They turned and we followed only to come face to face with a boat wanting to exit the junction. Mick made sure he informed NB Bethany May who were following us from the tunnel as we apologised to the on coming boat.

Past the moored boats

The canal turned over the top of the Trent and Mersey and we managed to find space on the aqueduct for a cuppa. It had been lovely having Bill and Lisa with us for the trip, hopefully we’ll get to see them next time we come through the area.

They were given directions back to Kidsgrove Station via the Trent and Mersey canal. Our trip from Westport Lake had taken an hour and three quarters, journey back would take 15 minutes by rail replacement bus, plus the walk.

We decided to move on a touch further and get onto the Macclesfield Canal properly. On the next stretch of moorings there were a couple of familiar boats from Lockdown 1 and ‘Home’. The Pooh Boat with it’s toys in the windows and ducks on the roof, wonder if their dog still barks as they come in to moor each time? Then a touch further on was NB Plum, Solar Afloat who was one of the Flag Bubble with Barry and Sandra. Next door was The Toastie Boat who turned up to Hurleston at the end of our time there.

Onwards to Hall Green Lock, the stop lock between the Trent and Mersey and Macclesfield canals, all 1ft 3″ of it. We pulled in just past the water point and quickly got our Sunday dinner in the oven, roast chicken, Yum!

Onto the Macc proper now

7 locks, 12.67 miles, 2 canals, 1.5 miles of tunnel, 1 straight, 1 left, 2 go right, 3 lockdown boats, 12 years, 4 cards, 2 SJT friends, 0 shore leave! 1 roast chicken, 1 long day, 1 lovely day.

https://goo.gl/maps/akC4JrQPvgcwJKBL8

Just Like A Car Park. 23rd September

Roseford Bridge 94 to Swivel Bridge 108

Not a bad mooring

We had to wait to pull out this morning, boats coming in both directions, there had already been about eight boats go past heading northwards, most now familiar as we keep leapfrogging them. Eventually we pushed off and arrived behind NB First Dawn a BCBM share boat at Deptmore Lock. We helped lock them down then bring another up before it was our turn.

Hi Dawn

The morning was lovely, sun with a touch of cloud, the boat ahead had similar ideas to us, if there was space at Tixall Wide we’d stop for the day, if not we’d continue to the Trent and Mersey.

Passing Stafford Boat Club, NB Festina Lente was moored online, we’ve never met them but said hello as we passed, nobody heard us. Then the odd pram cover on NB Malakarti came into view, this was one of the last Steve Hudson boats to be built and the original owners discovered that their Huskies got seasick, so it was sold on fairly quickly. It is one of the boats that we got to see a lot of during Lockdown 1 as it was moored on Nantwich Aqueduct all the time.

Once past Radford Bridge I was onto slightly unfamiliar water. Our first cruise along here on NB Winding Down I’d had to jump ship for a day to head to Hull Truck for a read through, leaving Mick and his sister Kath to carry on to Stone. Another occasion I’d just broken my ankle, so was confined to quarters with Tilly, Mick single handing above. This is also a stretch where I seem to get busy below as it’s a good break between locks. On one occasion Mick remembers wafts of stew coming from below at 9:30am as I popped things in a slow cooker. Another time he thinks I was doing some work below. So maybe today is the first time I’ve actually been up top.

The sign to RCR was familiar but not the Stafford Riverway Link, the lock down to it currently being worked on.

Train

I’d never seen the homemade train by NB Abba.

Milford Bridge is a roving bridge, with almost full curving lines, but still not as pretty as the Macc bridges. Across the River Sow Aqueduct I did a Gyles (Gyles Brandreth on Great Canal Journeys), ducking my head to avoid the view.

I suppose

Soon we arrived at Tixall Lock, the cream paint of the lock cottage glowing in the sunshine. We helped NB First Dawn down, as the weather was so nice they had decided to carry on to the T&M, we’d also leap frogged several other boats that had passed us this morning, maybe there might be space for us at Tixall Wide?!

Tixall Lock

Our approach to the wide summed up what the stretch of popular moorings would be like. Some boats moored nose to tail, others having gaps both in front and behind. On such a popular mooring if we pulled into a big gap we’d certainly have pulled up to the next boat and not plonked ourselves in the middle. We’d also nudge up if we found ourselves left with git gaps after other boats had moved on.

Looking back

There were two possible gaps we might have squeezed into, but it all felt like a giant car park for boats, did we really want to squeeze in, we know that the view is lovely, but! It didn’t take us long to decide to continue onwards leaving the masses.

There was space just after Swivel Bridge so we pulled in mooring at the end of a piece of armco leaving space between us and the bridge. Tilly was given 4.5 hours shore leave. We think she liked it as she didn’t return for two hours, then missed dingding time!

Time to be home Tilly!

The whirligig was put to good use with two loads of washing drying and I sat down to get my head around what paint I needed to order for panto. Quite a long list and one I need to try to prune a touch before emailing it onwards. One thing that I discovered is that you can at last get Bio Glitter from a well known theatrical chandlers. I’ve avoided using glitter as it is so bad for the environment, but this year I’ll be adding a little bit of sparkle to the walk down set.

2 locks, 6.15 miles, 1 train, 1 Gyles, 1 car park, 7 git gaps, 2 tight squeezes, 1 mooring on our own, until late afternoon, 2 loads washing, 4.5 hours which turned into 6! 1 grounded Tilly, 2 many colours, £8.83 glitter, 5 chums, 1 Mrs Tilly stamp of approval, 1 failed rugby tackle.

https://goo.gl/maps/bQQGSuUCbDp8gVv16

Obligatory! 21st September

Laches Bridge 73 to Otherton Marina

By the time we’d had a leisurely breakfast we’d been passed by many boats, in fact by the end of the day we’d seen more moving boats than we’ve seen in all the time since turning onto the Grand Union at Napton Junction three weeks ago. We’d taken so much time in getting ready to push off that the next lot of kids had come past in canoes powered by screams.

On closer inspection that might be NB Jubilee behind Bessie Surtees too!

Last night there had been several boats moored along the stretch in front of us, now there was only one. It turned out to be NB Bessie Surtees, fellow Scarborians! We’d last past them at Tyreley in March last year when we had a brief chat and imagined the world would be back to near normal in a matter of a few months. A good gap in passing boats meant we were able to have quite a chat as we trod water. One day I will find out your names! Lovely to have a catch up, hope the weather stays kind for roof painting and see you somewhere next year.

A good Scarborough Smile

At Hatherton Junction we followed the canal to the left.

A right turn one day (hopefully) will take you onto the Hatherton Canal which is proposed for restoration. This will link up with the Wyrley and Essington Canal at Fishley Junction near Pelsall. The canal used to connect with the Cannock Extension via the Churchbridge Branch climbing 16 locks.

Moored boats, fishermen, a bridge and an on coming boat all happen at the same time when the canal is busy as it is. I wonder how much time the fishermen spend moving their lines out of the way at the moment. The two chaps said they’d caught a few, so it must be worth their time.

The ‘No Mooring or Stopping’ signs look to have had a make over alongside the chemical works. Plenty of boats kept on moving, mostly a mixture of hire and share boats. There was space at Gailey for a top up of the water tank, we also pumped out the yellow water for disposal at the elsan here whilst the lock was pretty much in constant use. Our tank finished filling at the same time as a share boat that had pulled up after us, with two more boats coming towards us we both quickly moved up towards the lock.

Gailey Lock

The obligatory photo was taken with the tower, no longer a shop. Two C&RT chaps lifted a manhole and started to turn off what we assumed was the bywash round the lock, it was still flowing at force as we passed below. We pulled in for some lunch before we carried on.

Stop planks in their house

Taking our time was maybe a good idea as we didn’t end up joining the post lunch queue at Brick Kiln Lock, we arrived just in time to help the boat ahead open and close the bottom gates.

Training boat

At Boggs Lock a training boat was coming up, a time to stand back and not help. Their progress was quite slow, but very safe, as the crew worked the lock everything was explained to them.

Just by the M6

With boats coming towards us and one following there always seemed to be crew to help with gates and paddles. A hire boat at Rodbaston Lock were hoping to reach The Anchor pub today but had been told it was too far to reach. I checked my map, suggesting it would be just short of 3 hours, but with this amount of traffic about maybe longer.

Frothy Man!

Along the side of the M6 I walked on to Otherton Lock. This lock is always so frothy! Why this one in particular?

Handy bridges at some locks now

We decided that we’d stop before Penkridge, giving Tilly a while longer to explore, but the number of woofers was a touch off putting so she spent quite a bit of time on the roof instead of in the friendly cover.

A tight squeeze

During the afternoon we regrouped. Our current cruising plan is possibly being thwarted by vandals emptying pounds on the northern waterways which we suspect C&RT are having difficulty refilling due to low water reserves in reservoirs. We consulted canal plan for alternative routes. Some quicker but hard work. Some very familiar. After quite a bit of debate we have decided that for now we will continue with the original plan hoping that things improve ahead of us. Final decision to be made in ten days. We have Plan B, C and D. We also have our fingers and paws crossed.

But if I cross my paws too much I won’t be able to climb trees!

5 locks, 5.72 miles, 2 fellow Scarborians, 1 full water tank, 1 empty wee tank, 2 many boats, M6, 1 frothy lock, 4 possible routes, 1 preferred, 20 fingers and 4 paws crossed.

https://goo.gl/maps/n5vNW4pxmcmqj2ze8

Cutting The Tea Cosy. 7th September

Radford Smelly

An hour of shore leave was permitted whilst I had breakfast this morning and wrote out a shopping list. Tilly came home bang on time, it was my time to head out before it got too hot!

A new route to see new things

A new route into town was called for. I walked along the canal until it ran alongside Radford Road when I dropped down onto it and walked in the shade for a while. At the junction of Willes Road there is a handy Sainsburys Local, it didn’t have the right sort of yoghurt though. I then followed Willes Road over the River Leam, today is the right sort of day to see Leamington shining in the sunshine with bright blue skies.

People enjoying the river

I found scissors and took a chance at a pair meant for crafting, rather than dress making, hopefully they will stay sharp enough for long enough. A hunt for black tissue paper came up trumps in the end, but a plant spray bottle with a pressure pump was nowhere to be found. I want one of these so the pram and cratch covers can have another spray of Wet and Forget before it’s too late, it’ll also mean I don’t get trigger finger! Think I need a garden centre.

As a child I wanted a dress the colour of that sky

Bobbing in and out of air conditioning had been worth the walk as it was now getting really quite hot. I chose to walk back through Jephson Gardens mostly in the shade then followed a path through Welches Meadow where there was no shade. Thankfully back at the boat it was still cool inside.

Mick gave me a whatsapp video tour of the house, before going upstairs upstairs to rummage through my scenic art bags so that I could select any good brushes for painting panto. I really wanted my foot wide roller cage to make basing in and glazing scenery so much quicker, hopefully it will fit the pole Chippy bought for me last time as Mick wasn’t too keen to bring mine back on the train with him. Once my brushes had all been auditioned it was time to re-read panto.

The final draft of the script had landed in my inbox, a few cuts and additions to the props list were needed. I suspect Jo’s Aunt has already knitted the tea cosy for the Dame to wear! This has been cut and replaced with a washing line full of underwear pulled out from beneath the Dames petticoats. Oh well, we’ll just have to take turns in wearing the tea cosy ourselves!

Not as good as true chilled medication

During the afternoon the temperature most probably rose to 29C and chilled medication was called for. As soon as I got a Solero out of the freezer it started to melt, it soon disappeared before I re-read Act 2. Tilly spent quite a bit of time inside this afternoon, but as the temperature dropped in the evening I allowed her to have an extra hour before her dingding. This could have been a mistake, but thankfully she came running before the mad cat woman had to show herself.

Ready for action

The new scissors were tried out and at the moment they are doing very well, a good length of blade and sharpness. Watching the news and Silent Witness got me through at least 600 leaves. Only another 2988 to go!

Another sunset

0 locks, 0 miles, 5 mile walk, 29C, 1 virtual tour of the house, 1 roller cage, 1 long handle, 6 brushes, 1 tray, 3 sets of linen, 1 helpful neighbour, 1 free chilled medication, 2 acts, 3 cuts, 4 additions, 1 sunset, 600 leaves, 0 new blisters, result!

Girls In Charge. 5th September

Radford Smelly

Boats pulled away this morning, but we would be staying put. With a change of lodgers at the house one of us needed to head back to Scarborough to get a few jobs done. We’d looked at hiring a car, but Enterprise prices are no longer cheap, not even for a van. The thought is that last year they sold off lots of their cars and now there are not enough to go around. Train fares for the two of us would waste a weeks worth of money from the house, so with his Old Gits rail card Mick was heading up to Yorkshire on his own leaving the girls on board.

Just two boats

I was given a briefing on how to read the remote console for the batteries and in return Mick was briefed on jobs that need doing at the house. We’re hoping he can meet a builder and a plumber to get a few jobs done and whilst he’s away I’m going to take over the dinette table and do some work. The only job that won’t get done at the house is patching up the damp wall in the kitchen as that is most definitely a Pip job.

Leamington Spa Station is a 1.75 mile walk from Radford Smelly, we both walked into town, me deserting Mick to go to the Co-op. He had a five hour train journey ahead of him and I had a leaf factory to kick start.

Still stunning

The wonderful Mudrock cat is still pristine by the student accommodation. It is my favourite graffiti of all time. Leamington Spa encourages and commissions artists to decorate their walls in parts of the town. Unfortunately earlier in the year a group of tag artists used a lot of silver spray paint over the top of quite a few pieces. But new works keep on being created, some very skilled and beautiful, others that just brighten up a dull wall.

As the temperature gradually rose outside I closed curtains to try to keep Oleanna in some shade as there is no tree cover here, good for the solar though. As Tilly went of to explore I cleared the table and got the felt out.

My panto set has portals which are decorated with leaves. We could get them made by a company who specialise in all sorts of leaves stamped out of fabrics with veins and stalks, but I wasn’t after that sort of detail for my panto world. Hence four shades of green felt. Would my scissors be sufficiently sharp to cut through four layers of felt at a time to speed the job up?

I measured out double thickness strips, cut them from the bolt of fabric. Then marked each one up with points of triangles. These were then cut and put in a big bag. By the end of the afternoon I had used half of the felt and had an Ikea bag with over 1500 triangles in it. These now look like the leaves on my model, they just need refining with scalloped edge which I aim to do in front of the tv.

Same amount to cut tomorrow

Tilly came and went all afternoon, taking the opportunity to enjoy some shade every now and again. Mick arrived in Scarborough to a very clean and tidy house, we knew it would be as Bill and Alex had left the house spotless last time they stayed. They have now headed over to Stoke to The New Vic for two weeks with The Girl Next Door, the new Alan Ayckbourn play. If you are passing it’s most certainly worth going to see.

During the afternoon Oleanna and one other boat were joined by at least five more boats, some summoning up the energy for Hatton others wanting a nice mooring after their exertions.

Mick was too excited to get the photo in focus!

Whilst I ate the left over moussaka from a couple of days ago, Mick tucked into a fully glutenised pizza from Pizza Tempo with accompanying garlic bread. This used to be his favourite, but with me in tow he doesn’t get to enjoy it very often. It will last him two nights.

Ahhh

0 locks, 0 miles, 3 trains, 3 miles walked, 6 hours shore leave, 2 shades green, 1557 triangles, 1 full bag, 1 blister, 1 spotless house, 2 girls left in charge, 1 stunning cat, 1 beautiful Tilly.

If They Go Straight On, We’ll Go Left. 25th August

The hedge to another bit of hedge near Flecknoe Road Bridge 102

A mooring with a view

Most people had moved off before us this morning, one boat just beating us to pushing off heading in the same direction, no worries we were guaranteed to be in a queue today. If we weren’t on a schedule I suspect we’d have just moved up to claim one of the spots with a view for the day, oh well.

HS2 has had a huge mound of earth on the south bank of the canal for years now. Today we could see where the route of the line will be as fresh soil has been laid out just after bridge 128, on the north bank there is a wooden fence which we suspect marks the route across the gentle valley.

Three years ago I did quite a lot of research into the route and what was going to happen in the area, The workers encampment has moved to the south side of the canal and the route now only crosses the cut once, it’s route having been nudged over a touch.

In a couple of places saplings have been planted and a swath of wild flowers sit below one of the mounds of earth.

Surely not HS 2 earth works

In one field away from the canal we could see what looked like wheelbarrows. Surely they are not going to build HS2 with a fleet of wheelbarrows! The top layer of soil has been removed and zooming in I wondered if this is an archaeological dig, there are several buried villages along the canal.

We wrapped our way around the hills, the obligatory photos taken. A couple of chaps were enjoying glamping, an added horse box being used as a kitchen. The narrowboat still sits in the field cut off from the cut, not listing as badly as it was a few years ago.

Cars

The last bend of the summit pound and then we pulled up at the top of Marston Doles. A chap filling with water made sure we knew that his boat would be in front of us once a boat had come up the top lock. We helped boats up and down the lady from the waiting shareboat reminded me of Derek from Alan Ayckbourns Roleplay, Derek has a long monologue regarding his and Dee’s (his wife) drive from Doncaster to their daughters flat in docklands, with minute details of diversions, hold ups and turns. Instead of riga mortice setting in I just had a grin remembering Bob Austin’s wonderful performance.

Turning into the top lock

We took our turn down the two Marston Doles locks, then pootled along the pound to the top of the Napton flight. Some boats were coming up, but not enough to meet at every lock, the trend seemed to be more downhill. Some people we were meeting were heading back to base after being out for a week or three taking their time before returning to their houses.

Busy

Behind we had a Carefree Cruising shareboat, ahead Derek and her husband, although they soon pulled in to check the weedhatch and most probably have lunch. The following boat caught us up at one point but then the boat ahead of us lifted a couple of paddles for us helping to fill the locks ahead speeding up our descent.

The views from the flight are always great and the buffalos were in view today. The new coping stones on lock 9 still have a way to go before they blend in, but are far better than the concrete ones at lock 10.

We paused between locks 8 and 9 to have a late lunch. Two volunteers walked up the flight, one chap stopped to say hello, a reader of the blog. Thank you, sorry we didn’t get your name.

Going down

One last lock, we waited for a boat coming up. They were returning to base, the chap wanting to get home, the two ladies not so keen, wanting to take their time. If they reached the top of Marston Doles before they closed for the day he would insist on getting over the summit so as to descend the Claydon flight in the morning. How could they manage to take 2.5 hours to climb Napton? I suggested they may come across some numpties on the flight who would slow them down.

Numpties at the next lock

A boat came out of the lock ahead of them, the crew closed the gates, then a lady from the following boat started to fill the lock all whilst the chap who was wanting to get home shouted at them for stealing his lock. Another paddle was lifted before the mistake was realised. If this happened at every lock the ladies wishes might come true!

Napton Windmill

Below the locks we aimed to pass Napton Junction before finding a mooring, just about where we should get to today. A boat at the end of the visitor moorings pulled out and carried on at tickover. The journey around Napton Hill is always longer than you think it is going to be, but today it would take us even longer!

Going slowly

‘If they go straight on, we’ll go left at the junction’ a thought we both have whilst driving over the Wolds to Scarborough. ‘And we’ll still get to Braunston before them!’ Blimey they were Soooo slow, we even considered stopping at the bridge where every car hoots their horn!

One boat at home

Napton hire base had only one boat in, plenty must have headed towards Warwick or Braunston this last week. Slowly we followed, going into neutral every now and again.

Quick straight on before they change their minds

At the junction we waited to see what they’d do. Thank goodness they turned right, into Wigrams Marina! We were free once again.

We waved towards Herbie’s new home at Ventnor and tried to catch a glimpse of the campsite and holiday cottage that Dave (Scouts) has suggested as a possible location next summer for a party. Think we’ll have to come back and have a proper look if allowed.

Harvest in full flow

Once the proximity of roads eased we started looking for somewhere to moor. The second stretch had nobody moored on it possibly because the towpath is narrow, but we’d been having complaints from inside for a while so we pulled in and let Tilly out. An hour and a half somehow got extended to nearly 8pm! It was only the threat of no Dreamies for the next week that worked in the end. Tilly does not know how to tell the time!!!

This evening we have watched Act 2 of Home, I’m Darling. An enjoyable play, I suspect better if sat in the theatre watching it, although I wouldn’t have wanted to be the lady sat behind the high backed armchair!

9 locks, 10.92 miles, 4 share boats, 1 Ayckbourn character, 2 paddles lifted, 2 reluctant lock wheelers, 2 too keen lock wheelers, 1 slow boat to Wigrams, 1 straight on, 8 glasses of water, 2 many wee breaks, 2.5 hours! 1 cat avoiding capture, 2 minutes to 0 Dreamies for a week, 1 cat who can tell the time when it counts, obviously!

https://goo.gl/maps/ZyWFDcT2w9h4nsyD6