Category Archives: Bridges

A Day Adrift. 6th February

Torksey Pontoon to Keadby Visitor Mooring

Another morning with the alarm clock going off, at least this morning there wasn’t much of a view to miss out on. One side of the cutting looked to be above freezing, our side was all frosted over. Brrrr, an extra layer required today. As I got up and started to move around my back felt remarkably improved from yesterday, thank goodness. I still refrained from leaning down or lifting anything heavy so as not to aggravate the improving situation.

Brrr!

Four years ago yesterday we did exactly the same journey. Then it had also been an early start and a very cold one too. We’d had to wait for the Stainforth and Keadby Canal to thaw and for the entrance to the lock to be dredged. I was ready to pull the balaclavas out today but thankfully even though the day had started off with a good layer of frost on Oleanna we didn’t need to keep our cheeks cosy.

Torksey Viaduct

We needed to push off a while after the tide had started to come in. Yes we were heading down stream, so we’d need to punch the tide for some time, but this was needed for us to reach Keadby when there would still be enough water to get into the lock. At 9am Mick reversed us out onto the main river, an EA rib had just come past us from Torksey Lock but it headed upstream.

The hazy Norf

We winded to face down stream and the tide. Engine revs increased and we were on our way.

Wow

Another wonderful day to be out on the river. Blue blue skies. Trails high above us in the sky, plenty of people jetting of on their holidays. Looking behind us the sun low glinted on the water and our wake. Gorgeous.

Taking off

I checked the charts, our course kept in the channel. This next stretch had been reported as being shallow last year.

Hawks just finishing their loop

A glimpse over Mick’s shoulder, a loop of vapour trail. The Red Arrows must have been out training. The V formation of planes scooped round and out of view. They were at such a distance to us to be silent, you had to scour the sky to hunt them out. One wave of vapour, then another loop the loop. Around this area and along the Fossdyke and Witham you quite often see them practicing. Your own private airshow. Time to concentrate on the charts again.

Busy with something

A man sat in a bright red rib coming towards us. His boat looked to be filled with equipment, maybe he was charting the river bed?

The Chateau at Gate Burton came into view. You can stay here with the Landmark Trust. It makes for a pretty view, I bet the view back towards the river today was a much warmer one. We waved in case anyone was watching as we passed.

Power ahead

West Burton Power Station came in and out of view. The large cooling towers dormant but the gas fired end churning steam out by the bucketful.

The tide had turned by the time we reached Gainsborough. The same revs were now giving us 2 to 3 more miles an hour heading down stream. The sharp bends speed the flow up through Gainsborough, not the fastest we’ve been under the bridge there though.

Earlier this year when we’d planned on doing this journey, we had to cancel our lock bookings due to being stuck in Shardlow as the river was in flood. When Mick called Keadby Lock to cancel our booking, the lock keeper said that we weren’t in the book! Yesterday afternoon Mick had tried calling the lock to check they knew we would be arriving today, he’d got no answer. He then tried calling a couple of times this morning. Thankfully he got through and Tracey was expecting us. Mick checked that the river level would be enough for us to get into the lock. It would be and she was expecting us from around 12:30.

The charts now dispense with the red line for stretches. My back wanted a sit down in the warm so I retired inside for a while, making sure I was watching as we passed West Stockwith Lock. Mick slowed us down and waved to a chap then picked up our pace again.

With a map suggesting we still had 2 hours to go before reaching Keadby we decided to up the revs a touch, it was now getting on towards midday and Tracey was expecting us pretty soon. We really didn’t want to run out of water. As we were now off C&RT waters there are few markers. Instead you rely on landmarks. Will the new build with big windows (still to be fitted) appear on new charts. Owston Ferry with it’s two pubs. Mooring Dolphins where owls are positioned to deter pigeons! Another mill.

The river now wide, sprawling out in front and to our sides. The M180 bridge. Time to call Tracey with our location, she’d expect us in twenty minutes, we were still good to get into the lock.

The span on the right used to open up

Keadby Bridge, under the bascule span. Up ahead Keadby Lock tower with it’s look out. The light was red. Would it be ready for us?

Keadby surrounded by wind turbines

Mick brought us over to the west side of the river as our red line suggested. Then as we were just about level with the lock he started to turn. Not into the lock, that would be foolish with the tide still heading out towards the Humber. He turned Oleanna round to face upstream, this enables you to have more control to enter the lock.

In we go!

On the downstream side of the lock we could see the start of the silt build up above the water. Mick faced Oleanna’s bow towards the upstream side of the lock forcing her against the tide. As we got closer, we both wondered if we’d have enough power to turn the stern away from the silt and enter the lock. An extra bit of umph at the right moment and into the lock Oleanna slid. Phew!! She’d made it. Always a relief.

Leaving the lock

I walked up to the bow to pass a rope around a chain as Tracey closed the lock gates behind us, then the outer lock gates got closed too. The amount of water coming over the top gates started to slowly rise us. Then a touch of a paddle was added, gently does it. Then a bit more which caught the bow a touch before I managed to pull her back in.

Stainforth and Keadby Canal ahead

Once at canal level the top gates opened and we waited for Tracey to open the swing bridge. We pulled in just past a couple of boats on the visitor moorings at the far end. Ahead of us is Vazon Sliding Bridge. This is operated by Network Rail and following the high temperatures last summer it is now only opened to boat traffic twice a day, we’d already missed the second opening. Time for lunch and a well deserved warm up.

1 lock, 27.8 miles, 2 winds, 1 reverse, 2 why nots, 1 cheeky pigeon, 2 ribs, 1 beautiful day on the river, 1 air show, 1 day adrift from 4 years ago, does this mean we’ll have another February heatwave?

https://goo.gl/maps/gFUcoDkNi8wqaaLk7

Twinge. 5th February

Cromwell Lock to Torksey Lock

Sunrise at Cromwell

No time for tea in bed this morning, there was the tide to catch. The sun rose opposite our mooring, what a beautiful sight, shame there wasn’t time to enjoy it.

I realised we’d not moved the hose and other bits and bobs out from the cratch, this makes access to the anchor easier should we need to lower it in an emergency. I picked up the hose and brought it into the boat. Then mooring spikes were popped away into a bow locker, as I did this my back gave a slight twinge. Lifting the bucket of other stuff gave me another twinge. The cratch was now a lot clearer but my back was a lot sorer! Stooping under the cratch cover was not a thing I wanted to do, so Mick rolled the covers up as I managed to walk up the ramp from the mooring to see if that would help.

Mick radioed the lock keeper, the lights at the lock turned green, he was ready for us. We untied, winded and headed for the lock. Our plans were checked with the lock keeper, time of departure tomorrow from Torksey. He’d call ahead to let the other locks know we were out on the river.

At 9am the paddles lifted to empty the massive lock, gradually Oleanna descended to the current level of the tidal River Trent. We were off, the fast route north, heading downstream with the tide.

Wiggly river navigation

We’ve done this route several times now. The Boating Association charts are always with us at the stern. The red line well worth following. If you stray from the marked channel you can end up grounding on sand banks. This could mean you having to wait for the next flood to float you again. If the tides are heading towards neap tides you may have to wait several days before you can move again, so it’s well worth following that red line, it’s easy.

Go before you fish!

New red signs stand high on the east bank. The camera zoomed in to take a photo so we could see what they said. Ahhh! Yes! There were rather a lot of fishermen out on the banks!

We joined the Geraghty zoom for a short while. Our reception not quite good enough on a phone to join in properly today. There was an update on sofa covers, sadly we couldn’t see the results as everyone was too small.

Us all wrapped up

What a beautiful day. Blue skies, high clouds of many varieties. But blimey it was chilly!

A runner making the most of a beautiful day

Navigational markers on the sides of the river help you to know where you are. Km markers noting the distance from Nottingham. Red and green markers, although quite a few now have lost their tops.

The charts show you what landmarks to line up to, old mills, pylons and white posts. Submerged islands to avoid. Notes on which span of bridges to pass under noted by the graffiti on them. Someone however does need to refresh the graffiti as on Fledborough Viaduct it is now just about rusted out of view.

Fledborough Viaduct

At around the 64km marker we were following the channel round a steep bend when the one and only other boat we’d see today came towards us. There was just enough time for the chap to warn us of a tree in the channel, somewhere! We’re not sure we got to see the tree, maybe that is something to look out for tomorrow.

A boat!

The cold was starting to penetrate the thermals. Hand warmers required. My back gradually making it harder and harder to move about.

Cottam Power Station, not at work today

Ahead Cottam Power Station could be seen, we were nearly there. A warm up inside might do me good, but we’d be in Torksey soon.

Cormorants

A flight of Cormorants sat in trees. The river side of the trees white, was this from a liberal spraying of cormorant guano?

Torksey Junction ahead

Round the next bend the familiar building just before Torksey Junction, then the large sign announced our arrival at todays destination. We turned into the cut, a boost of power to make the move was needed as the pull from the out going tide was still evident.

Mick pulled us up at the end of the pontoon. We’d not be heading up the lock onto the canal this time as we need to head off early in the morning a little before the tide turns. At least today we wouldn’t be shouted at by Tilly wanting to be out.

Coming in to moor

My back was now causing problems, I had to wait for Mick to moor up and then come to open the back doors, the steps at the stern a touch of a challenge. I really hope this improves as I’ve the #unit21 floor to finish painting at the end of next week!

An early lunch and then nothing much for the remainder of the day. Time spent sat down has been followed by time standing, trying to find comfortable positions to ease my lower back. Fingers crossed this is short lived.

1 lock, 16.3 miles, 1 right, 1 boat, 1 twinge that lasted all day, 5 layers to be increased tomorrow, 1 cosy boat, 1 quiet boat, 1 thumbs up thankfully, 2 boaters ready for 9pm.

https://goo.gl/maps/EdAUXwKN63XNZYYeA

None Update. 26th January

Kings Marina, Newark

Over the last few days the towpath investigators have been out on the Stainforth and Keadby Canal where Maud’s Swing Bridge has sat closed to boat traffic for two months following a vehicle strike. Footage of the damage has appeared on social media pages.

The general consensus is ‘what’s the problem!?!’ as what is visible is only a bent railing and not a very dramatic one at that. On Oleanna we do our best to take a measured view of such things. The vehicle strike may not look that dramatic on the top but has it affected things below the road surface making the bridge harder to open and close.

Is there an element of the bridge being needed as a diversion route to avoid Moores Bridge whilst the works there have overrun. If you can’t get through one bridge there is no rush to mend the next one as the canal is closed to boats anyway. We know that there is an issue with C&RT claiming against the vehicles insurance and that may take time.

Rumours are that the IWA will be meeting with C&RT to discuss the problems at Mauds Bridge. But will there be an update about this? There has been no update notice since the bridge was first closed two months ago.

Mick decided to send an enquiry to C&RT.

Maud’s Swing Bridge on the Stainforth & Keadby Canal has been closed since 23rd November following a vehicle strike. Now I do understand that the vehicle strike is outside of your control. However since the original stoppage notice over two months ago there has been no further update with regard to the status of this stoppage. We were planning to come through this bridge early in January in order to get back to our booked mooring in Goole. Our plans have been seriously scuppered by this extended closure not helped by the total lack of any updates or information from yourselves. I did ring up to enquire about this closure and was informed that there is no update available and that the bridge might be closed for months. If this is the case why don’t you update the stoppage notice accordingly? If this stoppage is to carry on for much longer would C&RT consider paying for the cost of a pilot to take us round Trent Falls from Keadby to Goole so we can get back to our mooring?

Their reply this morning.

I am really sorry to hear that the closure of this bridge has affected your plans. 

We have refrained from updating the notice further as nothing has changed since we last updated it. I really do understand how frustrating this is but we thought it would be best to wait on concrete news before we update any more, so for now we have left it as it is. We are doing our best to find out more information. However, This is a complicated closure and it was unforeseen, so it is taking a little longer than we’d all like to resolve this one. 

Once we have new information regarding this we will update accordingly via our notices and stoppages.

In terms of paying for you to get back to the winter mooring I don’t think it’s something we can commit to, Which I am sorry to inform you. I can confirm that we will be happy to assist you with any requested over stays whilst you get back to your winter mooring. We’ll be happy to help you with this any time you request or need it.

Not updating the notice because there is no news, just fuels the towpath investigators, conspiracy theories etc. Yes it’s complex but we only know that because we’ve asked about it. It’s a bit like sitting on a train that has stopped in the middle of nowhere, maybe in the middle of a tunnel, and the guard coming on the tanoy to tell you the train has stopped. Then nothing, no reason given, just silence, for hours and hours. All you can do is sit in the dark with no view. Train passengers expect and usually get more information.

No news is not always good news!

We look forward to an update being issued.

Gunthorpe At High Noon. 23rd January

Stoke Lock to Low side Hazelford Lock

Sitting waiting

The alarm was set this morning, no time for a cuppa in bed either! Breakfast was followed by emptying the yellow water tank, then we walked our rubbish down to the bins by the lock. There was no sign of a volunteer, just a cleaner in the loos and a chap clearing things away from the works that had been happening at the lock.

Stoke Lock very pretty

The lock has had an upgrade this winter, new LED lights and new boat operated pedestals. At the moment the pedestals are not working so someone from C&RT has to come out and work the lock for you from the cabin, booking required with 24hr notice. Cheryl from the Milton Keynes Office called us to say there had been problems at Holme Lock this morning and the person coming was on their way, they’d just be late. We decided to get Oleanna and move her down into the lock cut ready.

Heading inside for a bit of warmth brought the Lock Keeper, Simon, not a volunteer. He’d been trying to clear all the rubbish at Holme Lock this morning as it was stuck behind the gates. He asked us to wait where we were, Stoke Lock needed emptying to check the gates first before we could go in. He then asked us to pull in on the starboard side, he’d only be able to open the bottom gate that side as they were still having problems with the hydraulics.

One gate only

The gates were tested, then we got the green light to go in. As we descended Mick asked if it was possible to do a radio check with Simon, this was the first opportunity to check his Christmas present worked, thankfully it did. Simon was heading to Gunthorpe Lock next, would we like his assistance? Well it would save me having to jump back onto Oleanna from the pontoon below the lock in the full current from the weir. But it would also mean being in the lock, holding a rope round a blue riser! We accepted his offer and arranged to meet downstream in about an hour.

A perfect winters day

Out of the lock we came, blue skies surrounding us. What a beautiful day. We waved to the ladies who rescued Tilly when she was a kitten as we passed Burton Joyce, round the big sweeping bend. Geese flew overhead. Then a flock of birds, not sure what type swooped in murmuration high above the river, switching and changing direction, then settled again only to take off as we passed them by. What a wonderful sight.

The pontoon at Gunthorpe was empty, but we carried on towards the lock cut, pulling in at the water point. We were early for our rendez vous with Simon. Should we wait or operate the lock ourselves? Hmm, that would mean fighting to get back onboard below the lock. We opted to wait.

Gunthorpe Bridge and moorings

Waiting for the lights to change, which side of the lock to pull in on, the blue risers, the V channels behind them, all very familiar from seven years ago. Simon arrived at noon and worked the lock for us. We took it steady, no need to rush in any lock, especially one with blue risers! I took a deep breath, I still hate this lock with a passion.

Simon checked below and gave us information about rubbish that may lay in our way below. He needed to hang around at the lock so wouldn’t see us at Hazelford. The lock gates opened, we thanked him and sped off down stream again. All 9.75 digits still in tact.

This reach is particularly pretty and today it was just stunning. We were glad of our layers, but the blue sky with wispy clouds above was so beautiful. The last two years we’ve missed cruising in the winter. The views (when there’s no fog) are so different. People say there are 2000 miles of the network to explore, true, but there is there and back again and then all four seasons to enjoy. The river was ours and the birds. Wonderful.

Above Hazelford the lock cut was full of C&RT boats, a skip boat, the crane boat and Maid Marion the tug boat. I climbed a ladder on the island and headed to press buttons. It was hard to see Oleanna as the level dropped, but she reappeared on leaving the lock.

There was a Dutch Barge at the far end of the moorings, we pulled in to the lower section, only recently revealed from the flood waters. Tilly was allowed some shore leave and made the most of it once she’d got to the top of the big steps. She returned with a mouth full and was sent away again.

It’s a chunky outside this one!

A tap on our roof mid afternoon, a chap was here to help remove a rope from a prop. Not us, it must have been someone above the lock. An hour or so later we heard a boat engine, the boat from Stoke Lock.

News came through that the stretch above Town Lock in Newark was iced up from a member of the Trentlink facebook group. They had tried to get through yesterday but had no luck. Maybe we’ll have a sausage day tomorrow and hope it thaws.

Hello!

Much of the afternoon was spent sorting out future lodgers for the house. Another favourite actor had been in touch today. We’re now booked up for a third of the year ahead.

3 locks, 2 assisted, 9.6 miles, 1 hour late, 1 deja vous, 9.75, 2 hours shore leave, 1 friend at least, 1 happy cat, 1 glorious day boating, 1 cheeky robin, 1 boat behind us, 1st Look North, 6 lodgers, 1 Mrs Tilly stamp of approval.

https://goo.gl/maps/Hpg99bRANBi17VZR9

Bloomin Maud! 18th January

Shardlow

First there was ice. Then too much water. Now it’s a bridge!

Our plans may have to change. We’d been hoping to reach Yorkshire by now, but obviously the River Trent being in flood hasn’t helped that. All part of boating through the winter especially where rivers are concerned. Now as the river levels are dropping, gradually, we’ve been looking further ahead.

1.5m today down 28cm from yesterday

Vazon Sliding Bridge had problems in the heat last summer, since then the bridge is opened twice a day to boat traffic at 9am and 1pm, apart from when Network Rail are on strike. If the river hadn’t been in flood we’d have had a days wait before we could pass through.

When Mick had phoned to book passage in at Keadby the Lock Keeper mentioned that Maud’s Swing Bridge was also closed. A date for it to open unknown! Hmm. Here’s a link to the stoppage notice LINK. It has been closed since the 23rd November, the notice hasn’t had an update.

Maud’s Bridge 2nd April 2022

Mick rang C&RT and worked his way though to the right part of the country and got to talk to a lady regarding the bridge. Apparently the bridge was struck by a vehicle back in November causing a lot of damage. It has been taking time for the drivers insurance company to sort things out and as yet the engineers haven’t come up with a method of mending the bridge. So at the moment there is no known date for it to open, it could be months! The lady was trying to get someone to do an update.

Poo bar bum!

A re-think is needed. Options.

  • We continue downstream and exit the River Trent at Keadby, then sit and wait for the bridge to open. Not a popular option.
  • We head downstream on the Trent and wait for a suitable day to head round Trent Falls. Not a popular route in the winter months.
  • We continue downstream and find somewhere to moor that isn’t in Yorkshire, but as close as we can get with good transport links. Maybe.
  • We stay put in Shadlow, easy access to transport. Maybe.
  • We turn around and once Stenson Lock reopens, with its new gates, we head up the west side of the country to cross the Pennines over into Yorkshire. A lengthy journey especially in winter, juggling it around work, stoppages and weather. Hmmm.

We’ve got some thinking to do. One option is looking the most likely at the moment.

Today I managed to work through the alterations on another pair of overalls. These were size XS, but still needed the arms and legs shortening. One pair left to do. Mick returned from Scarborough with a few bits I’ll be needing for #unit21 in the next few weeks.

0 locks, 0 miles, 2 trains, 1 bus, 1 broken bridge, 1 river coming down, 5 options, 2 pairs overalls finished, 7.5 inches, 5.5 inches, 1 still to do.

Don’t Trust The Locals. 27th December

Branston Water Park to below Stenson Lock 6.

Grey today. We’re keeping an eye on the weather forecasts and river levels. Todays trend was levels are gong down, but with an expected upwards movement due to the coming rain! Not what we want, but we keep moving in the right direction hoping that things will have improved when we get to the River Trent.

Branston Lock

Going down Branston Lock we had a boat on our tail. Might this be a boat that we could share the wide locks with? We’d see.

Shobnall Marina was sadly not open today, their price for 50 or more litres of diesel is now £1.12, the lowest we’ve seen for a very long time. A cluster of boats sat along the next stretch, being close to the marina and shops a good thing at this time of year.

Closed in November

We’ve never really explored Burton-upon-Trent, it’s somewhere we head through in spring or autumn on our way to other places. Next time we’ll do our best to stop and have a look round, but having said that the Bass Museum is sadly no more, having closed it’s doors earlier this year.

At Dallow Lane Lock a boat was just pulling in below, the lock in their favour. I walked up to help with the bottom gates. I asked where they were headed today in the rain. They’d been to fill with water and were returning to a mooring close to the marina. Their plan had been to be in Alrewas for Christmas but the cold weather had put them off.

Dallow Lane Lock

I was then asked where we were headed. My answer was ‘Hopefully Swarkstone today then if the river is behaving, we’ll be heading on to get through Stoke Lock before the new year.’ She responded with ‘Well it’s all shut off up there!’ We talked for a couple of minutes at crossed purposes, me thinking she was meaning flood gates on the river being closed, until she mentioned the Railway Bridge.

Bridge 20A had been closed for maintenance presumably by Network Rail and had been due to reopen on the 23rd December, this is why we didn’t hightail it up the T&M earlier. The lady was quite adamant that it was still closed as it was still on the C&RT website and no notice had come through saying that it was open again. I thanked her, took note and reported back to Mick. He and I were of the same opinion, we’d go and see for ourselves. Of course there was chance that industrial action had slowed down works and it being a third party maybe news hadn’t come through to C&RT.

Goodbye narrow locks

Winter stoppages, in our experience when finished on time do not get an advice notice to say they are open. Notices come through if there is a delay, postponement, over running of works. Or on some occasions when the maintenance work is completed ahead of schedule, even by one day. So because we’d not seen anything regarding the railway bridge we assumed it was now open.

We dropped down Dallow Lane, the boat behind us now right behind us and able to open up a bottom gate for us. They were only heading to Willington today, so lock partner. Waving goodbye to the last narrow lock on the T&M. Our next one, if we stick to the current plan, will be in Middlewich maybe in about six months time.

Pulling her back in

Coming in to Willington there was a boat come a drift at it’s stern. I walked up to the front of Oleanna and pushed it out of the way. We stopped in the bridge hole just ahead, I held onto the centre rope whilst Mick went back with mallet and a boat hook. By now the bow was also adrift. Gradually he pulled her back to the towpath, hammered in the spikes. Her position not the best close to the bridge especially as we’re now back in the land of widebeams.

Talking of widebeams we passed WB Tardis. Wonder how much that pram cover cost them?! Surly it can’t be any bigger inside!

Plenty of walkers on the muddy towpath. We were wet and getting really quite cold by now. Our schedule had us mooring near Swarkstone Lock today, but we wanted to call it a day sooner than then. We pootled onwards.

First one railway bridge, then Bridge 20A. As thought it was open, from our side the only noticeable thing was a fresh coat of paint had been applied. On the other, there had been works done to the embankment and off to the side was a large compound. We’re very glad we go with our instincts and not word on the towpath, as we’d have pulled up in Willington for the night if we had.

Nowhere to moor until Stenson Lock. Here there was one gap, which was two fenders too short for Oleanna. Nothing for it but to go down the lock, at least some activity would warm us up! I took a windlass and walked ahead, I’d find out if my calf could cope with wide lock beams today.

Stenson Lock

It took forever to fill the chamber, at 12ft 6″ it is really quite deep. The ground paddles are strong but the gate paddles almost non existent. In came Oleanna, bottom gate paddles lifted, down she went. Today the sign inviting us to have an ice cream on the cafe wasn’t as enticing as normal!

We pulled in past the lock landing, enough depth for a mooring, pins went in, then second ones as the ground was a touch soft. Too late and too close to the railway line for any cat shore leave today, so we had to put up with complaints from Tilly for several hours.

Leftover bubble and squeak with duck today. We’ve still stuffing, cabbage, duck and ham to finish. What something can I make tomorrow?

3 locks, WE 9.48 miles, Pip’s Nebo 7.7 miles (operator error), Mick’s Nebo 9.5 miles, 1 railway bridge OPEN, 1 boat adrift, 1 calf coping, so far, 1 cat not coping, 4 trains, 2 wet boaters.

https://goo.gl/maps/aBgxGLekMhX8fGeS8

50% of Lorry Drivers. 26th December

Bridge 47 to Branston Water Park

Sandy tapped on the roof this morning to wish us well before we were on our way. Good to meet her, hope she enjoys the rest of the winter and our bows will surely cross sometime in the future. We have a vague plan for next year, she still has yet to decide which waterway to explore.

Goodbye Alrewas, thank you for Christmas

We pulled up at the water point to fill the tank, all the washing up over the last few days meant it would take a while to fill up. Other boats had started moving long before us, in both directions and we were passed by a boat heading towards the lock.

Just in the green today

With windlass in hand I walked down to the lock, the boat ahead of us motoring off into the distance, it’s speed increased with the flow on the river. Plenty of walkers about, one chap stood and watched as I emptied the lock, then he walked round with his dog, I thought I was going to have some assistance, but no.

Left span of the bridge please

A glance back towards the gauge, just in the green. Our speed increased to 6mph as we passed the weir then dropped again to 2.5, no change to the throttle. After Wynchnor Lock we were off the river section and up alongside the A38. When heading south we always wave to the lorries as they pass to see who responds. Today I had to stand looking behind us, straight towards the sun. It being Boxing Day there weren’t so many lorries, but we gave everyone a wave. 50% responded with a honk of their horn and a wave.

Goodies

At Barton Turns we could have stocked up on chutney or jam from an honesty box. This is where I got our strawberry plants from a couple of years ago. The shadows were long at the locks, seeing Mick’s confirmation to wind a paddle up was tricky, a bigger thumbs up required.

Long shadows

A pause by the cafe before the canal turns away from the A38 to dispose of rubbish. Then we were back in the land of narrow bridges, breathing in hoping Oleanna would fit through!

Tatenhill Lock, still as chocolate boxy as it is in the spring and summer. Here we had gongoozlers appear from left and right. It feels odd there being so many walkers after you’ve just cruised past lorries driving back and forth with gravel on one side of the canal and a large builders merchants on the other. But all around are lakes, which today were attracting the Boxing Day walkers.

Tatenhall Lock

Not far now to Branston Water Park where the visitor moorings were empty, we pulled in as soon as we could hoping Tilly would have a less interrupted shore leave. Now either the number of woofer walkers was too much for her or maybe it was the alure of catnip Dreamies that kept bringing her back inside! She did have a good length of time outside just before cat curfew, returning with 5 minutes to spare.

Pretty

Today was far chillier than yesterday and the cloudless sky gave us a rather lovely sunset.

Crescent moon

4 locks, WE 4.98 miles, Pip Nebo 5.5 miles ( I worked the locks today), Mick Nebo 5 miles, 1 none complaining calf, 1 big wave, 1cm of green, 7 boats moving, 5 out of 10, £3 for chutney or jam, 3 jackets in the stove, 2 big slices of ham, 1 lovely sunset.

https://goo.gl/maps/GazxeWNSZb6VLbFA6

Tissue Audit. 30th November

Old Newbold Loop to Ansty Waste Bridge 12 (removed)

Last Sunday as my cold started to wane, Mick was starting to show signs that I had passed it on to him. By this morning a tissue audit was required, we’d be needing more! Before he had breakfast the bike was pulled out from it’s slot and Mick cycled back to Newbold to the Co-op to stock up. By the end of the day tissue usage was in full flow as was his nose!

She’s happy to be moving again

As we had breakfast a number checker came past. Mick wondered when we’d last been spotted? Was it in Rugby, Coventry? Would the records show Oleanna had moved far enough in the last few weeks, or would the records just show her around Rugby? This years sightings would be interesting to see as we’ve spent so much time off C&RT waters.

Pushing away

Last week we had a reminder regarding our gold licence. These are only available from January to the end of December, but there was suggestion that we could trade our gold licence in for any unused months. We weren’t aware that you could do that. Mick filled out the forms for a months refund, mention of a £30 admin fee he thought wouldn’t affect us, but we should get a refund of around £20 once a standard licence for December had been processed, that would pay for our Christmas Ham. Next year we’ll be returning to a Canal and River Licence, we’re not sure where we’ll be cruising yet, but we’re unlikely to be on EA waters for long enough to warrant a Gold licence for a year or two.

Diesel £1.44 today at Armada

Time to move onwards, northwards. Quite often when we are on this stretch I am below making use of the flatness to do work, so the landscape isn’t too familiar to me. Cuttings, wide bends, the railway close by, bridges over the old course of the canal, trees and muddy towpaths. Having been in Chippy for so long I’ve missed the towpath transition from bone dry to muddy.

The autumn colours are falling, blasts of reverse required every now and again to clear the prop. We rounded the big bend passing the farm we often moor opposite where the towpath is very narrow.

There was space at All Oaks Wood, but we wanted to get further today even if it was a good place for Tilly.

Oxford Bridges

Approaching Stretton Stop Mick slowed Oleanna right down as we passed under the railway bridge so that I could step off and walk up to open the bridge for us. I wanted to see how light weight the new bridge was. Amongst the few boats moored before the bridge was one familiar one. NB Chuffed.

Hello Chuffed

Chuffed was sold a year or so ago, Debby, Dave and Meg now owners of NB Bonjour. No-one was on board. This is either where she moors now or she is sitting waiting her turn for a re-paint. Unless she keeps her two tone grey and red livery she’ll become less recognisable. I said hello as I walked past heading towards the bridge that was crossed by a couple of chaps who turned round and gave it a big shove to open it for us. They were happy for me to leave it open, their wobbly bendy pole at hand to pull the bridge back across. I still don’t know from first hand how easily the bridge now moves.

We must be invisible!

I hobbled back onto Oleanna, our slow pace having to reduce even more as a boat that had been on the water point decided to pull out right in front of us! Not even a full boats length in front, they couldn’t say they hadn’t seen us!

We followed behind them past the moored craft on both sides, their speed meaning that they pulled away, our speed meaning we got complimented for it by a moorer.

The new route of the Oxford Canal now avoids all the big loops that it once used to follow coming in towards Ansty. The leaking bridge (14) wasn’t leaking today. Up on the road there were cones, flashing lights, was the problem being sorted? We hope so.

Puzzling

Onwards now just that bit further, would the next mooring be available? Under the M69 round a bend, there was the length of armco we’d been hoping for. We were rather chilly by now, Tilly being the only one being able to enjoy the heat from the stove, it was time for us to swap over.

Our nearest neighbours

Two and a half hours, would I be able to use all the time? Blimey YES!! It went by so quickly despite the number of woofers that came past. She called for me at 4pm, I came running. Sadly the penny dropped that my time was up just as She put her hand around my middle to assist me in through the hatch. No matter how much I protested for the next few hours I would not be allowed to finish off what I’d started, here’s hoping it can wait for the morning.

0 locks, WE 8.18 miles, Pip’s Nebo 8.4 miles, Mick’s Nebo 7.2 miles (started late), MM 8.07 miles, 1 swing bridge swung, 1 box tissues, 1 wave to Chuffed, 1 aching leg, 1 chilly day, 1 extra layer not enough, 4 small spud in the stove, 1 Mrs Tilly stamp of approval.

https://goo.gl/maps/kZf6Rb8DjA1uoGZx5

Another review of Panto https://pippa13.blogspot.com/2022/11/oh-yes-it-was.html

Panto Postcard 5, 2022.

60.75 hours

Coventry Basin, Coventry Canal to Brownsover Services, North Oxford Canal

Following the red lit path

Monday morning a seriously early start to the day, the alarm went off at 5:20. We were both up and out of the door in 20 minutes. I’d opted to walk across Coventry rather than get a bus or taxi. At about a mile to the Station it’s not that far, but my knees and calf muscles were playing up so Mick accompanied me with the bike in case I needed to ride instead. Coventry was dark and misty, very atmospheric.

First tea of the day.

The train got me to Banbury forty minutes before the bus to Chippy, so I sat in the station cafe with a cuppa and ate a sausage sandwich I’d brought with me watching the sun rise through the fog. The bus onwards to Chippy was quite late arriving and by the time it had made it’s way through some road works it was half an hour late. It had taken me 3hrs 15 minutes to get to work!

Abi the Director was back with us, thankfully Covid had been mild for her and her family. Paul was also back with us, there was time to sort a few problems out before the actors came on stage. It was now time to finish off the technical rehearsal. When the Pippins joined us late afternoon we then did a tech/dress. This meant that if there were any problems we’d stop to sort them. We stopped a few times and then afterwards had quite a lengthy notes session, there were still things missing costume, props wise and a few problems with scene changes.

Mick had a morning snooze on the sofa before pushing off, winding and heading back up to Hawkesbury Junction where he turned back onto the North Oxford Canal and pulled up for the day.

Tuesday. An early start for Jo and myself trying to work through the long list of things that needed finishing, making use of time on stage before the actors arrived. Having a key to the theatre was useful as I could open up.

There was one scene that needed finishing off before production photos could be taken. The finishing off consisted of a lot of cross hatching which I knew would take several hours. I chose to finish the funnels today as they would help the scenery look more complete.

A portrait of Whittington

During the afternoon scenes were worked on by the actors and I got chance to finish off the piece that would sit on the proscenium, this was done by torch light. Have to say I was rather pleased with it.

Getting ready for photos

Then late afternoon we settled down for a dress rehearsal with Josh the photographer, Becky the composer joining us by zoom and we were also joined by several members of staff and ushers to give the actors a small audience. Today we got to see the walk down costumes for the first time, still work in progress and several props were now finished. But sadly things were still being worked on, a black curtain got stuck in one scene meaning many of the photos won’t depict the show as intended.

Such a fair weather boater

Mick’s day was totally opposite. It was raining, so he stayed put avoiding getting wet. Apparently Tilly ventured out for a little while.

Wednesday another early start. The side of the ship needed finishing off and as it spans right across the whole stage in three pieces I needed to do this early so as not to be in peoples way. Finishing touches happened to more props and costumes and I did my best to tick painty notes of my list.

The wings full of scenery and props, so much so some flying was needed

Today we were joined by Gemma the Production Manager who’d been off with covid. Having both her and Paul back in the building meant jobs were being crossed off the list. The auditorium needed clearing and Sophie the DSM was moved up into the box from where she’ll operate the shows. Christmas garlands were primed to be flown in and space was cleared in the wings so there’d be room for the actors.

Highgate Hill

The first preview hadn’t sold many tickets, so last week the decision had been made to cancel it, meaning we’d be able to have another dress rehearsal. A good thing as so many of the creatives had been ill. It was actually a dress without costume, enabling wardrobe to continue working on things.

A well earned beer

One problem was found as Paul watched from the wings. The final scene change was tight and to get two large arches into position in time it was felt that some alterations to them were required. Two truck bases would need to be made, but for now he would be an extra pair of hands back stage.

The first preview went well and we rewarded ourselves with a drink next door at Checkers, followed by some chicken and chips from the burger van.

If you look carefully you might just seen the spouting water

The sun was out again on the North Oxford Canal, so Mick carried on retracing his steps of last week. In Ansty a bridge had been spouting water, social media comments had been concerned that it may be closed by C&RT, thankfully Mick got through without any problems. He thinks it’s a water pipe in the bridge that has burst. Here’s hoping it doesn’t get closed before we are back through in a couple of weeks.

Full moorings

As he approached the swing bridge at Rose Boats the canal got busy. The bridge opened and closed and opened again and the narrows approaching it were congested. This meant that when he reached All Oaks Wood where he’d shared the moorings with one other boat last week, he got the last space.

Thursday. Only one show today in the evening, giving time to do acting notes on stage and time for props, costumes and set pieces to be finished off that bit more. Measurements were taken, timber purchased, alterations to the arches would happen after the show this evening.

One of the traditions of Chippy Panto is that Edith, a lady who adorns the proscenium arch is taken down each year and replaced by something to do with the show. This year I’d decided that it should be a portrait of Whittington the cat. Photos had been taken of Nadia in makeup, this was blown up, a simple version traced onto a shield and then painted in. In previous years I have only once witnessed Edith being replaced, handy to know that it is simply done with a D handle and a safety chain. Time and care were taken and Edith was taken to John Terry’s office for her rest.

Getting all Christmasy

Garlands were fluffed up, ribbons added. Piccadilly Circus was finished off including the extra lines on the backing flat. Jobs ticked off at pace.

Jo had been meant to finish on Wednesday, but she’d decided to stay one extra night to be able to finish off one quite elaborate prop. This took her quite sometime, but was well worth the extra hours and that prop got an extra Ooooooo! in the evening from the audience.

The final lines added to Piccadilly Circus

After the show Paul, Gemma and myself got busy with saws, drills, screws, wheels, canvas and paint. Two truck bases were made up and had a coat of paint applied before we left the theatre, the paint would be dry by the morning ready for the arty bits to be added.

Mick avoided the rain as best he could. Tilly kept the stove company as he moved onwards through the autumn colour.

Autumn colour

A pause to top up with diesel was needed at Armada Boats, then he found a space just before the water point at Brownsover. This meant that Oleanna wouldn’t need to move to top up the water tank and the mooring was a good place to pick up a hire car from.

Friday. Over night I’d had cramp in my right calf muscle which has been playing up for the last few weeks. As I stood up out of bed to try to alleviate the pain I heard a bit of a popping noise! Not good, my hobbling walk would be even worse today. After packing my bags for collection later in the day I hobbled slowly in to the theatre where the truck bases were already fixed to the arches. Time to get arty and paint them.

Spring Street with the theatre at the end

Two colour washes were applied and left to dry. They had just about got there by the time the actors arrived for their warm up on stage. New things should always be shown to actors before a show so that they don’t get thrown, the truck bases would be a step up and down that hadn’t existed before so everyone it affected got to have a go.

Then I could finish painting them. The last black line of Chippy Panto went onto a truck base at 11:46, it would be dry before the final scene of the afternoon show. Other little jobs were ticked of, more garlands and ravens added, then it was time to start collecting my possessions together.

Touch up paints were rationalised and put together. Some things are likely to need a freshen up as they are used, other paints are there just in case.

Some straw still to be added

As the afternoons show started I sat down to have some food, listening to the first school show on the show relay. Not so many laughs, but total excited noise at some scenes. The model box was put together to be added to the 50th anniversary exhibition in the gallery. After the interval I sat on the back row to watch the second half, each member of the audience wearing cat or rat masks that they’d made prior to their visit.

A coat of glaze to the truck bases was just about the last thing I could do before press night. My job was done. A couple of things sadly not achievable in what time remained, but an email to Paul next week will hopefully see them get done.

A technical glitch needed sorting

Mick arrived in a hire car, we loaded all my work gear and then headed to my digs to pick up my bags there. A chat with Suzanne and a final goodbye and thank you for letting me stay again. Some cheesy chips were consumed before joining the audience at the theatre for Press Night which seemed to go down very well.

We stayed for some food post show and a drink, but by now my energy levels had run out. It was time to say my goodbyes and thank yous. Time to wish everyone a good run and a Happy Christmas in Chippy. Time to climb in the car and drive back to Rugby, have a few head nudges with Tilly, a glass of wine for the driver and go to sleep.

Dressing rooms

Dick Whittington is open and what a show it is. This year has had many problems come it’s way, covid, family bereavements, people doing their best to plug gaps in the back stage team. We got there in the end with a lot of hard work from everyone and the assistance of zoom. Now I need to rest up and get back to day to day boat life, a far slower pace will be welcome.

Sal

1 lock, 17.92 miles, 1 right, 1 hire car, 1 panto open, 616 hrs work in total, 1 designer hanging up her dungarees, 1 boaters hat being dusted off, but first the sofa calls.

Panto Postcard 4. 2022

75.5 hours

Bridge 68, North Oxford Canal to Coventry Basin, Coventry Canal

Another long week in Panto land and some more cruising for Mick and Tilly.

Monday I arrived in the theatre to find sliders being cut down to size and lots of magnetic catches and door handles having been attached, all good news. But then I soon heard that Abi the Director had tested positive for covid over the weekend whilst at home in London. The cast were given various options, the one they chose was that John the Artistic Director of Chippy Theatre and the writer of panto would stand in for Abi until she returned and Abi would join when she could via zoom. Our Production Manager Gemma was also unwell so she stayed at home an extra day.

Counter getting close to completion

I got on with painting what ever I could without being in the actors way. A list of scenes required for the following days rehearsals is sent out so it takes a little bit of working out what I might be able to paint and when. The wings of the stage were sorted by Stage Management to hopefully help make the technical rehearsals easier.

In the evening we were joined by a couple of chaps to help with setting up the sound equipment and drilling holes in trees for fairy lights. By the end of the evening two out of the four trees had lights and a lot of the sound system was up and running.

The River Avon in Rugby

In Rugby, Mick and Tilly stayed put on the boat. Mick did venture out for his covid booster jab, four weeks after we’d tested positive.

Painting ovens and doors in the wings

Tuesday. More setting up of sound with Matt the Sound Designer about for one day. The aim was for levels to be set for the songs and cues to be programmed into the desk so that only minor adjustments would hopefully be needed. Songs were sung by the company accompanied by the two man band.

Dicks solo being sung in front of the Pippins and Becky the composer

Gemma joined us for a few hours but she was obviously still not well. She did her best to keep her distance, helped get sliders rehung and sorted a few bits out, but mid afternoon she headed to her digs to hopefully get some sleep.

Mark the Lighting Designer had a lighting session in the evening, meaning I was either painting by torch light or had a lot of light. This gave me the chance to get some black lining done to the sliders for Piccadilly Circus. There’s still plenty more to do on them, but at least I made a very good start.

Newbold Tunnel

In Rugby, Mick moved Oleanna up nearer to Tescos, did a good shop. Topped up with water and headed onwards through Newbold Tunnel. Over the weekend we’d discussed where might be easiest for me to get back to the boat next weekend, Rugby was a little bit problematical and quite a bit of a walk to reach the boat. We’d decided that Coventry would be better.

Wednesday. Gemma tested positive for covid this morning. Hopefully she hadn’t passed it on to anyone whilst she’d been in the building, but more importantly she could head home to recover.

Signage

Conversations were had about outstanding jobs. I can lend my hand to quite a few things, but it would all take time. Better to have someone who knew what was needed and free me up to carry on painting and helping where needed.

The Technical rehearsals begin

In the afternoon we started to Tech. This is where all the elements come together on stage. Sound, lighting, costumes, props, actors, musicians and set. Due to many reasons there were gaps in costumes, props and set pieces. Not ideal, but unavoidable. Everyone did as well as they could, one thing became obvious was that we still needed someone to help program the sound.

Loads of room!

Mick carried onwards. In winter months moorings that are normally chocka block can be empty, this was the case at All Oaks Wood. I think we’ve managed to pause there before for lunch once, but today he had a choice of where to pull in. Tilly made the most of a good outside!

Thursday. A long day of technical rehearsals. Days like today I spend mostly sitting in the dark, taking notes, attending to things as they arise. I decided to try to do small jobs whilst sat in the dark like signs, sorting out the new song sheet.

It was not me who emptied the chilled medication fridge leaving only vanilla!

Then when the actors have a break there is some time to get a bit of painting done. Wet things need to be dry before costumes are back on stage, so timing jobs can be a touch tricksy. Following rehearsals there are a couple of hours to get more jobs done. Jo the prop maker was about, so conversations turned to treasure chests and snakes.

Mick carried on moving. The journey from Rugby to Coventry can be done in under eight hours, but with a week to do it in he was pacing himself. Today he moved a touch further than he’d originally planned, through the new swing bridge at Rose Narrowboats, stopping a short distance before Hawksbury Junction, meaning there was space before other boats for Tilly to explore.

The Greyhound busy on a Friday morning

Friday. Mick decided to stay put, having a walk up to the bins at the junction a highlight of the day. The Greyhound was busy even quite early in the morning.

The tight turn at the junction. To head north use the left canal, south the right turning under the bridge.

Another early start to do some jobs before rehearsals started again. My lunch tends to be eaten in the next technical session, making use of as much stage time for jobs as possible. Abi is now very much in the room, joining by zoom, sending messages by Whatsap.

Laptop in the centre of the auditorium so Abi can join us

Today after rehearsals, Dan who’d helped set up the sound equipment and has been helping with programming stayed around to help with various jobs on stage. Some black tabs were not quite in the right place so needed adjusting. A tree needed extending, it’s track moving higher. But the most important job was to get a cloth rigged so that it could be lowered in to view and pulled out of view, it’s been out of view for three weeks.

A Curlywurly in the dark whilst taking notes

Chippy Theatre has a bit of a fly tower, but it is nowhere near tall enough to be able to fly cloths fully in and out. So the cloth has to work like a very big Roman Blind, pulling itself up on itself. We got all the cords in place, but lacked somewhere to tie it off to. So that we don’t now see too much of the cloth it’s been tied off to a cleat for other scenery, a better solution needs to be found.

Nice to see the cloth again after three weeks.

Saturday. A morning of technical rehearsals. There is still more to do on Monday sadly.

Last year I did one of these every day during panto

Also sadly today we were missing Becky, the composer, another case of covid. I am so hoping that I still have some natural immunity left as I spent much of yesterday sat next to Becky. This morning I did a test after spending time with Gemma, I’ll be doing a test before returning to work on Monday.

A nearly finished scene

All the trees were up and fairy lights working giving Mark the opportunity to light the next scene. We mostly worked our way through the scenes that have the Pippins in so as to make the most of their time in the theatre. Having three teams of Pippins means doing everything three times, one team are in costume the others not. We now just have to finish teching the rest of the show on Monday.

Mick moved on again in the morning, turning left at Hawksbury Junction and heading under the bridge decorated with swans. We last came this way about five years ago and today Mick saw a big difference. New houses and just generally better kept, possibly assisted by the City of Culture. Tilly however wasn’t that impressed!

Coventry Basin

After rehearsals I became unpopular asking for the trees that had only just gone up to be taken down. My aim for the day was to get the last two remaining trees painted, having them flat this would take about half the time. It didn’t take too much to get them down thankfully.

Trees finished. Well I might add some glitter if I get chance.

The last couple of hours I was on my own and was glad to not have to climb a ladder. By 18:10 the trees were painted, brushes washed up. By 18:25 the theatre alarm was set and I was heading for the bus stop and Banbury.

Goodbye Chippy, see you Monday

A train then another bus to save me walking across Coventry where Mick met me and we walked up the hill and over the ring road to Oleanna in the basin. Time for head nudges with Tilly, something to eat and slump in front of the tv.

He’s here!

Sunday. A Sainsburys delivery was early, I left Mick to deal with it as it was early early, but it did mean we could have a nice breakfast.

Yumm!

This was followed by the Geraghty zoom where we were all relieved to be joined by Anne who has just had a spell in hospital.

Work in progress

A slow day, much needed, but sadly I still had some work to do. A new song sheet needed designing and the best time to do it was today. Thankfully it didn’t take too long. The day will end with a roast chicken and packing my bags to head back to Chippy tomorrow. Hopefully no more cases of covid this week, fingers crossed.

Had to say hello to James

18.16 miles, 1 lock, 1 left, 1st Christmas tree, 3 positives, 4 trees, 8 pillars, 6 tech sessions, 3 teams, 0 red fabric, 7 safety pins, 2 buses, 1 train, 8 diddy maracas, 1 bored cat.

https://goo.gl/maps/Aa82XVFLWAyiKUXa6