Despite the bucketing down rain Mick headed off to catch the bus this morning, thankfully not getting too wet. A fourth elbow joint, a mask and masking tape for my work along with a Saturday newspaper and the eternal hunt for pink cat food in gravy.
With the boat to myself I got the sewing machine out from under the dinette, time to make a pregnancy bump from a cheap calico bag and some stuffing. Rebekah, the actress, is very small so I’m hoping the pad will look like she is nine months pregnant and not about to totally pop! I’ll try it on her next week and see if it needs making smaller or not.
A try out for some competition numbers that will get attached to the actors costumes for one scene. I’ve bought some vinyl that can be cut into shapes and then ironed onto fabric. The instructions on line were for use with high tech cutters and big irons that all cost a fortune. I would be using a scalpel, scissors and the cheap travel iron we have on the boat. I followed instructions, but not correctly, I’ve ended up with numbers back to front! Thankfully this was only a try out and I’ve plenty more materials to get it right next time.
Mick returned with the shopping in sunshine. A quick lunch was then followed by a couple of hours cutting, gluing and sticking. Today the milk pods got two thirds covered before I was loosing the light. My new mask seemed to be doing the job, but fumes seemed to be getting inside the boat instead! Here’s hoping it doesn’t rain too much tomorrow so I can take the sides off the pram cover as well as wear my mask as there is still plenty more stinky sticking to do.
Time to get on with more jobs inside. The panto potato was cut into chips and I made up a couple of card trays for them to be fixed into. Some painting will be added at some point.
Then time to turn attention to the giant mug again. The handle was tried out, then attached inside. The rest of the work now needs to be done either outside or elsewhere. I still haven’t tried it through the back doors! That will all be fun and games tomorrow!
As Mick came back from Derby there was a boat coming up through Shardlow Lock, they had just come off the river. He chatted to them. They had come from the River Soar along stretches that were mostly amber but some were in the red. The river reopened on the 4th January. Sadly for us our route is still closed at Cranfleet Flood Gates. If our original plan had been possible, today we would have been sitting at Keadby waiting for Vazon Sliding Bridge to reopen following the rail strikes.
We watch the levels and watch the weather. We could be here for a while yet.
Talk has turned to what to do should the river remain too high for us to head northwards. A week would be fine, but what if it ends up being several weeks? Maybe our route requires amending. Last year we’d only been interested in stoppages before Christmas holding up our progress, we’d not taken any note of those on the network behind us this year. Would we be able to reach Yorkshire by one of the Pennine routes?
We knew Wigan closed on the 3rd Jan. But what about the Rochdale or Huddersfield Narrow? Mick looked through the stoppages. If we could get Oleanna to Huddersfield for my show that would be brilliant. We knew there was a stoppage stopping us getting there from the east, but what about the west? A long stoppage in Slaithwaite, oh well! The Rochdale has stoppages scattered around too. So no Pennine route open to us. Even if there had been we’d have needed to be through Stenson Lock before next Monday when it closes for new bottom gates.
So it looks like we are here for the foreseeable. Forecast for more rain in a few days. Great!
Time to get to work properly. Most of the jobs involve contact adhesive which is very very smelly, so not a job to be done inside. I set myself up a workshop at the stern under the pram cover for some shelter.
The hatch got a layer of plastic to protect it, aerials moved out of the way. One of the lockers was cleared for a drying area. Time to get sticking yoga mats onto the formas I’ve made. The two sugar lumps were covered before lunchtime. The vapours coming from the glue as soon as you start to spread it out was really quite something, I ended up opening one of the sides of the pram cover, but it didn’t help that much.
I have previous experience of this glue. Frank used to use it to fix edging onto pieces of scenery at the SJT. On one show we used it to add curves of silver laminate to what became known as ‘the doughnut’ which hung from the lighting grid in Scarborough for ‘Making Waves’ a show about the RNLI in Northumberland. None of us were too keen on this particular piece of scenery which when back lit illuminated everything above it, including ducting which normally remains unseen for very good reasons.
My first experience was at college fixing fabric to foam shapes, sitting all day in a workshop with the extractors working hard. When I got home that day I proceeded to empty the fridge of all four of my house mates food hunting for my cheese grater! It is strong stuff.
I decided that I’d only do so much gluing each day to hopefully save my brain cells, so I moved back inside to work on the giant mug. The pipe I’d bought yesterday was measured out with the hope that the hair dryer we have on board would get the pipe hot enough to bend into shape. No chance! I also needed a vice, pieces of wood all sorts which simply were not available on Oleanna. Time to rethink.
I’d bought three 90 degree elbows yesterday, if I had one more I’d be able to make a handle, quite square, but it would do the job. Pipe was cut, holes in the mug to slot things through, yep it would do. Mick was volunteered to head back into town tomorrow to pick it up along with a suitable mask to protect me from the glue fumes.
Mick carried on working on the trip computer. He managed to install the Android Operating System with not too much bother. It just won’t re-boot now! Still work in progress. He then moved on to removing the Christmas lights outside.
During the day a couple of boats have come past, one presumably returning to it’s home mooring and a C&RT tug boat which returned with another skip several hours later. Will these be used for dredging? Or will the new lock gates be loaded into them for Stenson?
0 locks, 0 miles, 1 makeshift workshop, 1 stinky morning, 1 head ache, 2 sugar cubes done, 2 bottoms done, 1 handle rethought, 2 holes, 2 rolls masking tape, 1 elbow missing, 0 response from the trip computer, 1 Friday night roast, 0 way out of here come Monday, 1 pompom.
A list was made of items I still needed to purchase for #unit21, including a 3m length of plastic pipe! I nearly ordered it along with elbow joints online from Screwfix, but decided to see if there might be a DIY stall in Derby Market. Derby Market Hall is currently undergoing refurbishment, but I was aware of The Eagle Market, the front doors of Derby Playhouse open into the Market. The website suggested a couple of fabric stalls, time to catch the bus.
Mick had made the decision to fit the new alternator this morning and was already down in the engine bay. I required a hack saw so collected one on the way past. The Skylink bus picked me up and whizzed me into town. I made note of a Tool Station next to the big Royal Mail building where there was a handy bus stop, a much better location than Screwfix.
The Eagle Market has seen better days, I’d say only about a third of the units were occupied. I found a couple of fabric stalls and most of what I wanted and ended up having quite a chat with the lady who lives on a boat in Shardlow Marina. Sadly no-one had any navy velcro, that will have to be ordered on line.
No DIY stalls. I had a wander around Derbion the big shopping mall, nothing of use in there, just a sandwich for lunch. Much of Derby Centre stands empty, the bright lights of the shopping centre, being out of the rain has pulled customers and retailers inside. Such a shame. But I believe Derby Council are hoping to rejuvenate the area, refurbishing the market hall being part of the plan to try to pull retailers back into the streets and make it a destination. Well that’s the standard blurb used for such places nowadays!
After a visit to Wilko I walked back to Tool Station taking note of a low wall just by the bus station. Pipe, elbows and cement purchased I headed for the low wall. Here I pulled out the hacksaw and cut the 3m length of pipe in half, no problem getting on the bus now.
At the water point in Shadlow there were three widebeams. WB Lazy Days had moved across from the pub moorings where now sat two C&RT skip boats. Then there were the two widebeams that had been moored above Derwent Mouth Lock, one having a wash, the other on the lock landing. Later on in the evening we could see tunnels lights and hear spikes being hammered in, we presume the widebeams had moved to above the lock, freeing up below.
Back at Oleanna Mick had been working hard to fit the new alternator. Three bolts and three wires, simple! Except things on the old one had settled in nicely, a touch of corrosion on the negative terminal made getting the nut undone a touch troublesome. Time and patience was required. One bolt was in an awkward position and when it came to fitting the new alternator things didn’t seem to marry up as they should do. It turned out there was a bush on one of the holes that needed adjustment. A tap with a hammer sorted this.
All bolted in and connected the engine was fired up, things checked over. Everything working as it should. Hooray!
Time to pack Christmas away, well the lights outside could wait for light tomorrow. The tree was stripped and then given a good soaking in the sink. It will get a day or two inside before being popped in the cratch.
The neon bunny was just about finished off this evening. All limbs sewn on and body stuffed, just a fluffy tail needed. Although I may want to give him longer ears as he’ll be a magicians rabbit. Tilly wasn’t enamoured with it, I may have to hide it away so it doesn’t get beaten up!
More emails were sent regarding flooring for #unit21 this morning. This ended up with a proforma invoice that required payment before 1pm to enable it to be collected early next week. My credit card ended up being stretched that bit more, but thankfully the price hadn’t gone up over Christmas and it will be sat ready for collection.
Our Sainsburys delivery arrived at the end of the towpath. There’s not much space on the road so a bit of nudging out of the way was needed for someone to get past, Mick was there with bags to decant the shopping as quickly as possible so the van could head back off. Everything was stowed away before I got my work things out for the day.
Mick had been getting tracking information regarding our alternator this morning. Would this actually arrive as planned? Through the hedge I could see what looked like a DPD van heading towards the farm. Mick popped his shoes on and walked up to collect the alternator.
Hooray! Just when to fit it now? Should it go on straight way, three bolts and a bit of cabling to do. Should it wait for the existing one to stop working completely? Should it wait to be fitted by a mechanic? How much longer should we stay on the mooring? We won’t be going far for a while with the river in flood. Mick is thinking about it.
I got on with making up the forma for the giant mug. The base dimensions should just fit through the back doors on Oleanna, so I won’t be able to get much further than just the basic shape. Also covering it in the yoga mat has to wait as I’ll be using contact adhesive and there is nowhere near enough space onboard to lay things out to glue, let alone dry and all the fumes.
Sheets were cut to length and then scored so that they would follow the curve. Glued and held in position to dry with masking tape. A second layer was added, laminating two layers would make it stronger.
The actress will stir a giant spoon in the mug so I worked out the maximum depth needed for this. I then made a false base to slot inside, this will help to keep everything together. It’s now ready to have a handle added, just need to get a plastic pipe back from Derby on the bus!
Just where to store the mug until it can be taken to Huddersfield? I’d hoped to make this on land where there would be more space than in a 7ft wide narrowboat. Would it sit in the corner of the dinette? Not quite, but taking out the corner cushions gave it just enough space. Phew we won’t have to move it several times a day just to be able to go about our daily lives.
Tilly thought it was very good especially the new route behind it. Mick thought he’d be able to live with lack of elbow room at the table. ‘It’s funny you making BIG things and not models’.
Mick has spent some of today starting to work on our trip computer. As Water Explorer is no longer, we’re hoping to be able to reconfigure the computer to be able to run Nebo. It may take a bit of doing!
If all had gone to plan Oleanna would this evening have been sat above Cromwell Lock waiting for the morning tide to head to Torksey. Working on #unit21 becomes more complicated because we are stuck due to flooding. I need to get the props I’m making to Huddersfield as soon as I can. Finishing their construction would have been so much easier on land rather than on the boat without all my tools. I could really do with a hot air gun to bend some pipe. The pipe could be walked from a shop in Scarborough, but on the boat it requires a bus journey. The pipe is 3m long! Just complicated and more time consuming.
I spent some of the morning sussing out when would be good to head to Huddersfield with the props, this will involve hiring a van and on the same trip we could pick up some new flooring for the show. I also need to do costume fittings with three actors, at the moment they only work three days a week. So logistics, orders and payments. Nearly sorted.
Mick called Beta to order a new alternator. Our engine has a WOC number which means that when ordering anything from Beta they can see how our engine was set up and exactly what part we require. Mick did a slight ouch at the price, he did a bigger one when he realised that hadn’t included vat!
Our alternator has a special pulley on it. To replace the pulley you need a special tool, which we don’t have. The chap on the phone said they would put a special pulley on the new one for us to save moving it from the old alternator to the new one. It should arrive tomorrow, fingers crossed.
Being in Shardlow means there is a good bus service to Derby and Leicester on the Skylink which runs every twenty minutes ferrying people to East Midlands Airport. The bus stops by The Navigation Inn a five minute walk away. Add to this the government putting a £2 cap on single bus fares. Very easy.
Waiting at the bus stop I got chatting to a local lady about the river being in flood. We compared notes on levels of the River Trent and Ouse. My family home over looked the flood plain in York and Dad would give us reports of how high up the five bar gate the flood water had reached. I think if it got up to the fourth bar then driving around York was very tricksy as there would only be one route into the city not under water. The lady I chatted to recounted the floods of 2000 on the Trent. Sand bags were put over the drains in the road and stood at the bus stop you could just pop your hand over the wall and touch the flood water. Thankfully the water isn’t anywhere near that level …. yet!
The bus sped into Derby. Past the train station where strikers stood with placards. Further on the bus passed the lovely houses on Railway Terrace. These were built to accommodate the senior Midland Railway staff in the 1840’s, the first houses built to house railway workers in the country. Jackson and Thompson built a triangular block of streets, North Street, Midland Place and Railway Terrace, NMR. In the 1970’s there was a campaign to stop the houses from being demolished, they are very fine looking houses. However their sight reminds me of a trip we did to Derby a few years ago. We walked down the same streets to Derby Crown Court to hear the sentencing of our original boat builders.
I swapped buses at the bus station and headed out towards Kingsway Retail Park. Here there was a Homebase, no pipe and fittings suitable for what I wanted. I checked the isles for anything suitable to make a giant mug from. A plastic dustbin? Too much to cut off to stop it looking like a dustbin. Kitchen bins were all too narrow.
Over at Hobbycraft I scoured the isles for something that might be useful too. But they had nothing suitable for a giant mug. A couple of months ago I’d spent ages hunting online for anything that might be useful and come up with very little the right size. So back to the foamcor plan. I picked up 8 sheets and some more tape.
My dodgy grip doesn’t like carrying thin things, eight sheets of foamcor isn’t that thin, but still. I’d brought with me three carrying straps from the yoga mats I’ve bought. These have elastic looped ends joined by some webbing. I passed two of them over the corners of the sheets, one each side and then joined them together with a third one, creating a handle on the top. Not the perfect handle but a much easier carry back to the bus for my return journey.
Whilst I was away Mick had changed the fuel filters and the gear box oil. We just need the alternator now.
0 locks, 0 miles, 4 buses, £2 each, 0 pipe, 0 connectors, 0 hot air gun, 8 sheets, 2 pies, 1 sad gits pie, 1 order completed, 1 plan coming together, 1 new filter, 1 cleaned filter, 1.5 litres oil, 2nd bunny leg.
Tilly came and went most of the day. The sun was out and what a lovely day it would have been to cruise. Instead Mick did a couple of loads of washing, introduced himself and Tilly to our bow neighbours. They have quite a few bird feeders and a dog, so it was good to let them know of Tilly’s existance.
Maybe it was the cat nip Dreamies or maybe its the two donkeys in the field next to our moorings, but Tilly rarely ventured further than the gunnel and the hatch. Any suggestion that it might be open was used. Dreamies are rationed now to one each time she comes home! She comes home frequently!!
Mick’s hair was over his ears, time for a trim. A stool was taken outside and the clippers came out. Grade 3 all over and no need to sweep up. Just a shame it’s a little bit early for the birds to collect the hair to line their nests. I always think Mick looks a little younger after a hair cut, even if he turns into a Skin ‘Ed.
Catching up with friends always happens at this time of year. As yesterday had been my college friend Kathy’s birthday it was way past time to have a good chin wag. Good phone signal required being outside so I took my coat with me and stood on the stern. We really did have a lot to catch up on, Kathy has moved back onto her boat on the Thames by Tower Bridge for a while. A shame she hadn’t been there for the flotilla, although I suspect it was a very noisy evening.
I heard about the next Society of British Theatre Designers exhibition, which this year Kathy is curating. There will be 13 regional exhibitions, instead of the usual one, under the collective title ‘Hello Stranger’. The exhibition happens every four years and is normally filled with costumes, model boxes from designers and students. Many of the models are remade specifically to be exhibited costing people a lot of money. This year the designers are being encouraged to only use what already exists for display and there will be more workshops and conversations than before. The work on display will chart what has happened in the performance design world over the last four years, how the pandemic changed the way designers worked and what they produced. Hopefully we’ll be near one of the exhibitions to be able to visit.
After an hour and a half it was time to warm up again in front of the stove. That is when I realised I should have called Kathy via Whatsap. Numpty! But then I’d have missed the mist collecting in the field opposite and Tilly exploring the roof of the boat at our stern!! Rule 4, NO going on other boats! Being flouted in front of my eyes.
My #unit21 knitting came out. Time to stuff the head of the rabbit. Sew on some features and it’s ears. I still need to knit the second leg and both arms. I just hope it’s big enough, otherwise there will be some doubling up of yarn and bigger needles needed.
By the time we went to bed the River Trent had managed to drop by 11cm. There’s still a long way to go and more rain forecast.
0 locks, 0 miles, grade 3, 1st ever Tilly return to the boat using Dreamies packet rustle, 90 minutes catch up, 1 very chilly arm and shoulder, 2 ears, 1 nose, 2 french knot eyes, 1 stuffed head, 11cm.
The levels seemed to have a downwards trend this morning, just a shame the forecasted levels weren’t to continue in that direction! What will be will be, we always knew the River Trent in winter would be interesting, or not as the case may be!
There were a few lulls in the rain so Mick took the opportunity to head off to the Co-op for a Saturday newspaper. Before he left he fired up the engine to top the batteries up.
As I pottered away inside I heard the engine tone change. Nothing like the washing machine or dishwasher were on, but it sounded like one of them had just started a heat mode. That wasn’t all either, there was a sort of rattling sound coming from the engine. Maybe Mick had left a spanner on top of something and it was vibrating? I gave him a call and turned the engine off for further investigation on his return.
The engine board was lifted, things checked over, engine started up. Hmmmm! The batteries weren’t charging as they should. The rattling noise continued. Maybe after five years the alternator had gone. What a handy time for it to fail, New Years Eve with an extra bank holiday on Monday! The invertor was turned off, minimal use of power required.
We put our heads together, we could sit in candle light for the next few days reserving what was in the batteries for the freezer and fridge, or we could find somewhere to plug in. Shardlow Marina wouldn’t be possible as we’d have to go down onto the River Trent. Mick tried calling Chapel Farm Marina. The person he needed to talk to had just left, but hey would try to get him to call us back.
Next Mick tried across the way, JD Narrowboats. A chap answered the phone who wasn’t meant to be at work today. He could give us a mooring, but there wouldn’t be any power. He suggested a few things to Mick but none of them were suitable for our set up sadly.
On our way into Shardlow I’d made a comment about the moorings above the lock, some of them having power. There had been a big sign saying that moorings were available. Mick walked up to have a look and take down the phone number. He called and chatted to Tracy. They don’t normally do short term visitor moorings but they would be able to help us out until we got sorted. If we moved up the lock they would come and see us later to get us hooked up.
After lunch the wet weather gear came out. The trip computer was fired up to run Water Explorer for the last time before the site is taken down. Would we be the last boat to be recorded as moving on the site?
We reversed back to wind outside JD Narrowboats. Two boats had pulled up outside The Clock Warehouse, presumably for the new year. We worked our way back up the lock and pulled into the mooring. Mick then said that the alternator now appeared to be working again! What!!! However it couldn’t be trusted.
Tracy and partner arrived around 4pm, got us plugged in, took a meter reading and took a cash deposit from us, any funds not used when we leave will be returned to us. We were also sent their address should we need it to have a new alternator sent to us.
I got on with cutting out foamcor for the giant mug. Followed by discs of yoga mat and sections for the sides. I thought I’d have a go at taping it all together to make sure it would work. Just as I thought, the softness of the yoga mat was not suitable to stand up on it’s own. I tried fixing the sides to a base piece and all that happened was that it all bent over onto itself! Hmmm, a rethink is required. Maybe if I make the mug out of foamcor first then cover it in the mat? I could get a carpenter to make it out of wood, bending skin ply round a former. This would be far more solid, but what they are wanting to do with the mug requires it to be as light weight as possible and as soft as possible to avoid injury, yet keep it’s shape.
Before resorting to carpenters I’ll see what I can do with foamcor. The mug will only have to last for a few shows, not months. So I’ll see what I can do first.
I also turned my attention to places to stay in Huddersfield for production week. My preferred Premier Inn has shot up in price over the last few weeks, almost doubling. Travelodge was still cheap, but a bit of a walk away from the Theatre. Time to look elsewhere, possible AirB&B apartments were looked at, more research required.
Chicken Tagliatelle this evening with a difference, we didn’t have any tagliatelle! Fuseli did the job though. We watched the film Yesterday whilst the whole of Derby seemed to be setting off fireworks. Thankfully Tilly isn’t too bothered by them. Big Ben bonged the New Year in, we watched the fireworks which went on forever! Derby kept up with the capital, explosions continuing for another hour.
Our hopes for the new year are charging batteries and dropping river levels.
So all of us on Oleanna would like to wish you all a
Happy New Year
1 lock, WE the last cruise 0.37 miles, Pip’s Nebo 0.4 miles, Mick’s Nebo 0.5 miles? 1 wind, 1 unexpected cruise to end the year, 1 failing alternator, 1 Saturday newspaper, 1 boat plugged in, 2 many bird feeders, £450 or £250? 1 very floppy mug, 1 new year facing the wrong way, 1 walrus.
The levels appeared to have peaked this morning and were just starting to come down. We knew we wouldn’t be going anywhere today.
Phone reception is almost none existent inside the boat in Shardlow so it was no surprise when Micks phone received a text message from Adrian at C&RT. He’d tried calling to see if we were still wanting our booking tomorrow to go through Stoke Lock, Cranfleet Flood Gates were still closed. He already knew the answer as did we, Mick texted back confirming that we’d like to cancel our booking. He also asked what would happen from the 3rd of January at Stoke Lock, would we need to book? The answer was that there would be plenty of people about to pen us through when we arrive, hopefully soon afterwards the lock will be back to self operation. Adrian would stand the team down for lunchtime tomorrow.
Mick spent sometime sat out the back making phone calls to cancel all our Trent lock bookings. We’re hoping we may still be able to make the window of good tides next week, but who knows what the river will do and when Cranfleet Flood Gates will reopen. Cromwell Lock said that they’d be able to get us to Keadby one way or another, maybe missing out on a stop at West Stockwith. One slightly worrying thing was that despite us both remembering Mick having talked to Keadby Lock they didn’t seem to have us in the diary! Glad we hadn’t got to the M180 Bridge and radioed ahead with no-one expecting us! Doesn’t matter now, and we’ll double check when we booked it next.
Mick also called Shardlow Marina. Oleanna was due an oil change, the price of oil was a touch more than he was wanting to pay, maybe it would be cheaper to get the bus and buy some from Halfords? He decided to pay the extra and got on the bike and headed off.
Down the towpath at the Shardlow EA flood gates two red lights showed. Both the River Soar and Trent are closed. We’ve stayed this side of the flood gates just in case the river comes up even more!
Tilly did more calculations regarding the wall. She eyed up the wooden signposts again, checked them for claw stability, then decided the call of Dreamies was greater than achieving her goal of getting to the top of the wall.
Inside I took over the dinette table. Foamcor was measured out and cut up to make the base shapes of some giant sugar lumps and milk pods, the sort you get in hotels. I caught up on the Christmas Day radio 4 play which was directed by an acquaintance, The Signalman. All the edges of the shapes were covered in masking tape, this should stop the contact adhesive from eating into the foam when I come to cover them in yoga mats.
Whilst the PVA glue was out I made use of it to re-stick some edging strip that was coming off in the bathroom. An off cut of foamcor proved useful to get the glue in behind the veneer. Masking tape used to hold it in position whilst the glue dries.
Mick got on with the oil change in the engine bay. He’s saved doing the filters until tomorrow, we doubt we’ll be on our way for a few days.
This evenings meal made use of the last ham, ham stock which I’d drained off when I roasted the joint. I made it into a stew with a potato, carrot and peas. The stew bubbled away on the stove top for an hour before I made use of the last of the stuffing, making a sort of topping out of it. It then went inside the oven to finish off. Verdict, tasty maybe a little bit salty, but a good invention to use up the last of the leftovers from Christmas.
Yesterday and today we watched Mayflies, a story of a man diagnosed with cancer and his wish to control the end of his life. What a jolly bit of TV to have between Christmas and the New Year! Some very good performances, but a box of tissues was very much required. To jolly things up we’ve watched episodes of Ghosts, Mick has nearly caught me up.
0 locks, 0 miles, £60 oil, 4 bookings cancelled, 1 oil change, 6 inch sugar lumps, 1ft milk pods, 1 pot of stew, 2 many tears, 1 near death experience, 1 red lever, 20 catnip Dreamies spilled on the sofa, 2 swirling cats eyes!
Henry Knibb Bridge 3A to Shardlow 48hr Visitor Moorings
Both of us had checked the river levels during a conscious moment over night, so neither of us were rushing to get going this morning. As we had our cuppa in bed we checked again, both the Government website and Gaugemap, levels were still going up on the rivers. Cranfleet flood gates would remain shut today.
Time to make use of those nice field mushrooms I’d bought in Alrewas along with the bacon. Once breakfasted we made ready to move into Shardlow, away from the traffic noise and to see if there was space by the pubs to put a supermarket order in for delivery.
A slow pootle to Shardlow Lock past all the moored boats. The lock was full and a grassy island sat just above the top gates waiting to make it’s way down with us. Despite Mick trying to discourage it’s descent it won and entered the lock with Oleanna. A Grandad with pint in hand brought his grandsons over to watch us at the lock, just in time to help close the off side gate.
A top up of water was needed, a load of washing and the dishwasher had been at work already. Tilly’s pooh box got a refresh then we were ready to find a space. As we passed the moorings outside JD Narrowboats I spotted a very shiny NB Hunky Dory, was this THE NB Hunky Dory the owner having got in touch with us years ago at their planning stage. This was to be a boat with not one but two incinerator toilets, high spec kitchen appliances. This was all pre-pandemic, was this their winter mooring, or was the boat only just finished? Both very possible.
Two boats were on the moorings before the bend, we hoped there might be room for us at the far end, but rings hadn’t been used with others in mind. A glance up to the pubs, three boats were nicely spaced out there too, it didn’t look hopeful for a delivery so we reversed back to the first mooring ring. Yes there is a git gap in front of us, but we are on the last ring. Mick walked up to check on the pub moorings, there were four boats, no room for us.
A cuppa and a shopping list were put together then Mick headed over to Leicestershire in the bike, across the River Trent, to pick up a few things to keep us going for the next few days.
Tilly came and went for Dreamies. There are calculations going on with the hope of being able to reach the top of the brick wall alongside our mooring. The C&RT wooden posts may just assist. The mortar between the bricks is too new to get a good grip. Depending on how long we are here, she may discover that she can walk just a few yards along the towpath to an open gate to see what’s on the other side of the wall! There’s no fun in that though!!
An enforced stop means I need to get on with some work. Props for #unit 21 will be needed soon into the New Year and I have quite a lot of materials on board to get started.
I unwrapped a couple of the yoga mats I’d bought. These are cheaper than plastizote, come in a good colour but are a touch softer than I’d thought. Making certain things from them won’t be a problem, but the biggest prop may need extra support. I spent the afternoon measuring the mats and working out how best to cut them up. I’d not taken into account their rounded corners, but as the thicker mats are bigger than advertised this shouldn’t be too much of a problem.
Next I measured all Oleanna’s doors, hatch and windows. I need an opening of at least 60cm for the big prop. Oleanna has a maximum opening of 54cm! If I took the front door frame out then maybe, just maybe there’d be enough room. This would mean making the prop in our bedroom as the bathroom doors are narrower. Hmm, maybe I’ll cut everything out and assemble it in Huddersfield when I get there.
The door openings did make me wonder how deep our washing machine is. It’s not a full depth machine so maybe it would fit through the doors sideways? Was it brought in before the doorframe was fitted? Now what about the cooker? One day we’ll have the joy of finding these things out!
As the day progressed the river levels have risen further. Our bookings on the Trent are looking like we won’t be able to use them.
Last of the Christmas duck was added to some fried rice this evening. That’s the end of the duck and birthday cake, just the ham to finish off tomorrow.
1 lock, WE 0.65 (will this be our last journey recorded on Water Explorer?), Pip’s Nebo 0.8 miles, Mick’s Nebo 0.7 miles, 1 load washing, 1 dishwasher load, 1 clean pooh box, 1 clean pooh bucket, 2 many git gaps, 1 mathematical cat, 2 yoga mats, 1 sheet of calculations, 1 boat going nowhere for a while.
Sutton Road Bridge to King’s Orchard Marina, Coventry Canalto Common Lock 14, Trent and Mersey Canal
Mick headed off with the bike this morning to see if he could find some engine oil no luck. But he did return with one of the B&Q Christmas Trees, possibly the smallest one they had. This morning they had been reduced again to £3! Bargain. It stands at about the same height our old tree had grown to, but has been potted in a very haphazard way. The old tree had one side that was angled in line with Oleanna’s tumblehome (angle of the cabin sides), the new tree has only one face that looks straight, any movement to one side and it has quite a lean. If it copes with life onboard, when it gets repotted I’ll try to straighten it up. But then I don’t want to encourage it to grow too much otherwise it won’t fit inside next year and may have to be retired after one festive season!
All this meant we had a later start than planned, but at least we now had Christmas on board with us. Time to pootle along the long pound towards Fradley.
Very few boats were in Hopwas. We passed where we normally stop, I’m sure Tilly was looking longingly out of the window at all the trees, but stopping here wouldn’t get us to our Christmas bird in time. A lady passed by on her horse. We were surprised to see a boat moored along the length opposite the danger zone. Here a wide concrete edge tends to put most people off mooring, maybe it was intentional. But this boat had taken it’s ropes a good three foot in on the towpath to find somewhere to hammer into.
The clouds cleared and we soon had blue skies, lovely if a touch chilly. Fields are newly ploughed and sewn, some with shoots of a few inches high, obviously enjoying the wet weather.
Approaching Whittington I waited for the weathervane of the Grey Fergie. It has to be one of my favourites and today I got to see how much detail there is on it.
Just before the bend under Whittington Bridge there is a tree half way across the cut. This of course is where we met a boat coming the opposite way, Mick had just enough time to slam on the breaks to let the other boat through. Phew!
Past the Lichfield Canal the sun making the house at the junction look so picturesque. Behind it soon appeared the works for HS2. Red piledriver, Yellow piledriver, not the same as lorries but just as hard to say.
We don’t remember the huge pile of earth that must have been here a while opposite Kings Orchard Marina, it must be more to do with HS2. We pulled in just after the marina entrance and as soon as our ropes were tied I was inside reciting the shore leave rules to Tilly. She didn’t listen or care. JUST OPEN THE DOOR!!!!!
Sadly within two minutes of her paws touching the towpath a chap and his dog came from under the bridge and Tilly was straight back inside the boat. Then a walker too!So not fare! Tilly was good, came and went a few times and was back on board cleaning between her toes a little before 4pm, cat curfew.
It was too late to start putting the Christmas lights on the outside of Oleanna, well that’s the excuse Mick used. However there was plenty of time to bake the Lebkuchen and decorate the Christmas tree.
The Christmas hamper was released from the top shelf of a cupboard. Lights and baubles and silver ribbon hung and wrapped round. A star popped on the top of the tree, Lebkuchen iced. As soon a they were deemed dry enough it was time for a cuppa and biscuit. Christmas has just about arrived on Oleanna.
0 locks, WE 6.63 miles, Pip Nebo 6.6 miles, Mick Nebo 6.6 miles, 1 sad gits Christmas tree, 0 ice, 2 hours! 1 happy cat, 1 disgruntled cat, 250ml evostick,1st tidal stretch booked, 15 biscuits, 2ft decorated.
A grey drab day compared to yesterday. Padded trousers and layers with the top one being waterproof. We pootled our way towards Fradley Junction.
Signs on the towpath suggested there was work going on. Then two sections of fencing lay on the ground suggesting that the towpath had been closed. This was where there had been a closure recently due to a leaking culvert under the canal. The off side field had a muddy track through it and where the leak had been there was even more mud and a new manhole cover on each side of the cut. A couple of chaps were busy putting in new fencing along the towpath.
A short distance further on a group of chaps stood around one of those small tractor hedge cutters with big huge tyres, suitable for most terrain. Well apart from terrain that had recently been dredged to use as back filling behind some new wooden piling. The tractor had sunk on one side up to it’s belly. To get it out the chaps were digging the back filling out and dropping it back into the canal. Wonder how long it took them to get it out?
Now should we stop for water before the junction or after? The tap at the services is extremely slow, the one before not so, but it is a longer walk away from the bins. As we approached the swing bridge was being opened by some paddle boarders, they left it open for us, so we carried on to the junction.
I stepped off, leaving Mick to close the gate and walked up to set Junction Lock. No queues, no boat coming from the next lock up. Mick pulled Oleanna in, a handy post box had caught his eye right by the lock landing, the last Christmas card popped in the post. Then Oleanna dropped down in the lock to the services.
Water, bins, shore based facilities, Santas, Christmas suits, present hunts, onion slicing and frying, bread chopping, plenty of time to get things sorted as the water tank filled.
Mick and I swapped over. Below Keepers Lock a boat was coming into the next lock, Mick waited to empty our lock until they were filling theirs. Our lock emptied quicker than theirs filled and they took their time exiting the lock, pulling in to the landing. Below a moored boat had come adrift and needed pulling back in before we emptied our lock. Mick headed down with the other crew to see what they could do.
The bow rope was still attached, the centre line passed to Mick and then the stern line, the boat pulled in. The mooring pins were thankfully still attached to the ropes (handy those loops on some pins) and somehow they were pushed back into the ground. We don’t think they’ll hold for long.
We dropped down Hunts Lock, our intention had been to do Common Lock too and moor up in the next pound for the night, but the lock landing had a boat length of armco before it, so we pulled in to make use of it rather than cling on with spikes below.
1pm, 3 hours shore leave for Tilly. Pastry rolled out, filling mixed together (I don’t like the new sausage skins Sainsburys are using, they’re like jelly!), rolls rolled and cut to length, then baked. Warm sausage rolls for lunch, yum.
Whilst Mick attached our Christmas lights, I did secret things inside and Tilly made the most of the friendly cover and sideways trees. She also made the most of having very wet paws to trample all over the boat when she came in! Why can’t cat’s learn to wipe their feet! Because they have PAWS!!!
No photo today of the finished lights, I’ll try to get one tomorrow.
3 locks, WE 4.16 miles, Pip Nebo 3.1 miles (operator error), Mick’s Nebo 4.2 miles, 1 swing bridge swung, 3 paddle boarders. 1 all terrain vehicle stuck in the terrain, 1 canal being filled up, 1 water tank full, 8 sausage rolls, 2 more tidal bookings, 1 long line of lights, 5 presents wrapped, episode 2 of season 2 Happy Valley.