Category Archives: River Ouse

Preparation Is The Key. 20th April

Goole

We didn’t quite manage to leave the house at 8.30am, but soon after with another boot load of things including a set of steps. Goole Boathouse will be blacking Oleanna for us, but I’m going to be doing above the top rubbing strake on the gunnels and refreshing the tunnel bands whilst she is out of the water.

The chaps had started to abrade patches where the blacking was flaking. We headed into the office for a catch up. Whilst cleaning Oleanna off for blacking they had been surprised at the amount of the previous layer that had been coming off her, certainly the area on the swim looked like it hadn’t been prepared properly.

The big patch

Boats tend to be grit blasted after construction to get rid of mill scale which happens when the steel is rolled at the steel mill. This then gives a good key for the 2 pack blacking to stick to. It looked like either she hadn’t been grit blasted or a layer of grease had been left on her in places.

Yesterday

We talked through solutions. Not everywhere was flaking, some of the original layers had stuck as they should.

Today ground back as best they could

The best course of action would be to get her grit blasted and start again, but they don’t offer that service in Goole. For this we’d have to go elsewhere. We’d thought about using bitumen to give her a coat of something, then finding a boat yard for this time next year to get her sorted. But this was seen as a step backwards, even if we’ll end up getting her grit blasted next time she comes out of the water.

After the first coat of 2 pack

In the end we decided to carry on with the chaps removing as much of the loose layer as possible and then 2 packing over the top. She won’t look as good as she should but will have the best protection she can get right now. We’ll think about when and what to do over the next few months.

Time to get going on the gunnels. Dungarees on, tools at the ready.

Attachment of Doom

We’d brought along our cordless drill and attached what I call the attachment of doom. One of these worked wonders on Lillian’s roof years ago, I was wanting to get back to the steel where rusty patches were. However our drill batteries are seriously on the way out, so after ten minutes the drill didn’t have enough umph anymore.

Angle grinder of Oblivion and my Boaters PPE gloves

I was loaned an angle grinder with an attachment of Oblivion! A disc with a thick wire brush, this worked a treat. I was warned of the dangers by one chap, then the other suggested I should wear gloves. As I’d really rather not loose any more digits Mick hunted round for my Boaters PPE gloves which have leather fingers.

Now power tools are made for male hands, heavy and bulky. So two hands were needed at all times. I worked my way round attacking any rust spots getting them back to shiny steel. The chaps (I’ll try getting their names tomorrow) worked from bow to stern with the first coat of 2 pack. Once the catalyst is added there is an hour and a half in which you can use it before it goes off, so no stopping. I did feel a touch bad as their lovely coat of black then got covered in dust.

A bit dusty down the sides

Then followed a little break, blimey my shoulders were aching. Time for lunch before starting with the orbital sander. The gunnels and tunnel bands got a good sanding back, I was glad I’d overestimated the number of sanding sheets I’d be needing only ending up using half of them.

Ground and sanded ready for fertan

Next a wash down before some fertan was applied to the areas I’d attacked the most. A misting of water back over the top of them to help the fertan do it’s job in killing off any remaining rust. My job list for the day was complete. It may take my hands, arms and shoulders a while to recover though!

Whilst I was busy working and topping up my vitamin D Mick was busy inside. He’s been wondering for a while why the Alde boiler doesn’t show up on any of the Victron statistics. It is of course a gas boiler, but when we’re hooked up it can work off the electric. So far we’ve had to be careful with what else we use at the same time. The electric kettle necessitates the boiler to be off. Mick had a good look round in the electrics cupboard and thinks that if the boiler was wired in a different way he’d be able to keep an eye on things better.

Blacked Bow thruster tube

He checked in the cabin bilges by moving the fridge out. All was lovely and dry down there. The front step where the water pump lives was also checked, also dry. He pumped the accumulator up.

A mission to find a 20 litre container with a lid is on going. Before we head out onto tidal waters, Mick is wanting to check on the anti-freeze problem we had when on the Thames two years ago. A load of clinker/stuff clogged up cooling system and we don’t want this to happen again. If the coolant is okay it would be nice to be able to put it back into the system, saving replacing it and also the problem of disposing of it.

With the freezer having been empty for months the drawer has got stuck. Last time a few biffs on the back of the drawer (accessible from under the dinette seating) got it freed up. But this time it was being stubborn. More time is required for this along with a better solution to the problem of condensation.

New charts

He also had a chat with the chap from Goole Boathouse regarding Trent Falls. Choosing the right day and weather is the key. He would anchor rather than beach a narrowboat as when the flood comes in a wave can build up against your boat if you are beached. If anchored you still need to be ready to lift it and be on your way. A new copy of the Boating Association charts was purchased which means we now have charts from Naburn all the way to Cromwell.

A good day with lots of jobs ticked off the list. Loads more for tomorrow!

With regards to the scrapyard fire, there was still smoke coming off the site today, white and far far less than yesterday. Wonder how long it will be before it is fully out?

Everything ready for the next stage

0 locks, 0 miles, 1st coat, 2 pack, 2 gunnels prepped in 1 day, 1 attachment of doom, 1 attachment of oblivion, 1/3rd sheet sander, 2 numb hands, 2 aching shoulders, 1 pooped Pip, 20 litre container needed, 1 obstinate freezer, 1 lonely Tilly.

PS For those who get the blog by email, are the photos appearing normally? Or only partially and in a line? Please let me know.

High And Drying. 19th April

Goole

Fog or smoke?

The view wasn’t so good this morning. There were two things missing, one the view the other Tilly! Outside it was foggy, or was it smoky?

We both made comments along the lies of being glad we wouldn’t be heading out onto the Tidal Ouse this morning due to the fog, today being the first day leisure boaters could book passage through Ocean Lock. Yesterday we’d pulled out the relevant Nicholsons guide which apparently has good navigation notes about Trent Falls. The other book that was sought out was our Ripon Motor Boat Club “Cruising Guide to the North East Waterways”, this has a wealth of information in it.

Not up to normal standard!

Todays breakfast was a meagre one of just toast and spread, maybe we should have tried one of the jars of jam we threw out yesterday! First job, empty the wee tank, yes we could have used shore based facilities, but that’s not so good in the middle of the night.

Time to untie Oleanna, a slightly simpler job than the last time we’d done this, then we backed away from our mooring, me pushing the bow out to help start the turn. Several people were about, asking if we were heading far.

Our pootle wasn’t a long one, we came out of Viking Marina, turned left, then right at the nesting swan into Goole Boathouse Marina and then right down the last arm towards the slipway.

White smoke today

Looking over the Dutch River we could still see flashing lights of fire engines, one hose and white smoke rising from the scrapyard. There was a slight smell in the air too. I think we’d been lucky last night to miss the smoke.

Oleanna trod water whilst last weeks boat was hitched up to the tractor and gradually pushed backwards towards the slipway. All air vents into the engine bay were covered with tape and then the boat was eased back into the water. Blimey the stern only just staying above the water before she started to float off the trailer.

Once the boat was clear it was our turn. Mick brought Oleanna in towards the slipway. We are quite deep drafted and the level in the docks was quite good, but not as high as it can be, so we soon ground to a bit of a halt.

With us and ropes off of her we pulled her back to allow the trailer to be brought in to meet her. Vents and exhaust taped and bunged up, we then pulled her as far forward as she would go. She was pushed over to meet up with the side guards on the trailer and eventually pulled out. Mick says her back deck did dip under a touch, I’m glad I wasn’t at that end to see it. Just glad we weren’t going flying on a crane, because that is scary!

Stern propped up

Once out and on dry land a prop was popped under the stern as she was overhanging the trailer somewhat. Time for a look round to see what over 4000 miles, 2500 locks since brand new had done to our two pack and how well the anodes were holding up.

Well on first look all seemed good. The anodes still have a couple of years left in them, it was hard to tell how the hull was doing with all the gunge on it. The chaps set to work with the pressure washer and a big scraper, knocking off a few hitchhikers in the process.

Pressure wash

As they worked their way round the verdict was that she was in good nick, a little surface rust in parts. Then on one section of the swim the blacking came off leaving it almost bare steel, Hmmm? They didn’t seem too bothered by it.

We decided that as Oleanna is not likely to come out of the water for another four years it would be worth getting new anodes welded on. Here at Goole Boathouse if you buy them from them they fit them for free, so for just over £100 it’s worth doing them earlier. Cheaper than getting her out of the water just for that job.

The old Waterways Museum

Whilst Mick walked back round to Viking for the car I had a walk up to Goole Caisson. The Waterways Museum that closed a while ago now seems to have been take over by an auction house. Such a shame.

Still no access through the caisson

Up at the caisson the lights are still red, nothing much has changed there. Reports of it going to be opened have not as yet come true.

With Mick back we walked up towards the service block where several boats have been moored since what feels like forever! One of these is owned by David who set up the Goole Escape group on facebook. Time to introduce ourselves.

Visitors or residents now?

It was good to meet up and compare notes. I think David’s calm attitude with ABP has helped a great deal. Tides look good in a few weeks time, which way were we planning to go when the time came.

Bow Thruster tube

David has been round Trent Falls several times so was able to offer us some advice. With ABP penning boats out an hour before high tide this means that if you headed for Trent Falls you’d be pushing the tide for an hour and then have a long wait before the tide comes back in again. So David and Karl plan to actually carry on up stream with the tide to Selby. Then when there is a suitable tide they would leave Selby and head downstream to Trent Falls, have a shorter wait for the tide to come in and then head up the River Trent to Keadby Lock. Doing it this way means doing the trip is likely to be easier and boats wouldn’t be restricted to when ABP let you out. We may well follow suit, plus it means cruising on the part of the River Ouse we’d otherwise not have been on.

Oleanna’s nose, which didn’t go red this year

A few more things went in the car and we headed for home. Driving down the long road alongside the Dutch River we could still see smoke rising from the scrap yard. A fire engine sat close by and a TV camera pointed at a fireman. Sadly our waving wouldn’t make prime time tv as the camera faced away from us.

Mick said we’d have a bit of a bump when we got to the end of the road and he certainly was right. The fire service had been drawing water from the docks last night and this morning. Around ten tenders had attended, and numerous hoses had been joined together to reach the blaze. So our hire car had to hoik itself over the fat hose to get out.

That’s a big snake

Back at home we were told off by Tilly. Her food bowl empty and she was insisting that her new dingding time was midday and we were late! The afternoon filled itself with jobs. Wallpaper was patched up in a bathroom, one colour added to my panto model and the boat dinette cushion covers went in the washing machine. Hopefully these will be okay as the fabric said dry clean only, fingers crossed they still fit the cushions when returned to the boat!

0 locks, 0.19 miles, 1st trip this year! 1 left, 2 rights, 1 trip computer, 2 slices toast, 1 nesting swan, 1 boat out of water, 1 jet wash, 4 anodes, 1 mile walk, 1 full car, 1 escape plan, 1 bathroom ready for paint, 1 mardy cat.

Making Plans. 16th April

Scarborough Harbour

Yesterday news came through from the Goole Escape group that C&RT would be updating their notice regarding passage through Ocean Lock in Goole.

Mick’s inbox was checked frequently yesterday, nothing. But this morning as we were having our cuppa in bed the following appeared.

Update on 16/04/2021:

We have been advised by Associated British Ports they are to open up limited penning for leisure craft from Monday 19th April. 

Bookings will be controlled by the Duty Assistant Dock Master at Ocean lock on Tele: 01405 721128 on a first come / served basis and with a 24 hr confirmation call required.

ABP will offer a penn out at 1hr before HW and a penn in at 1hr after HW on daylight tides only and this will be managed around commercial traffic.

PLEASE NOTE: penning outside of these offered times is not available and that at no times should vessels anchor in the Goole reaches nor any part of the Ouse from the area of Skelton Railway Bridge to the Apex.

We won’t be one of the first boats to leave Goole. But we have been looking at the tide times to see when might be a possible tide to get us round Trent Falls to at least Keadby. Then the next tides to carry on upstream to Torksey and Cromwell. There is a date in mind and research to be done regarding Trent Falls.

The list of jobs at the house has gradually been getting shorter. Builders have been giving the roof and chimney stacks some tlc over the last couple of days and Frank has fitted us a new bath panel. The bathroom just needs to be decorated now.

New panel and a touch up on the plaster

Appointments for all three of us are in the diary. Sadly no news of our second jabs yet.

Press stud replaced, blind ready to go back up in the bedroom on Oleanna

The list of jobs on Oleanna remains long, but work will start on that list soon.

England on the Wold for panto

My panto model, which I’d been hoping to get finished by the end of the month, will have to sit on the back burner for a little while whilst things get sorted.

0 locks, 0 miles, 1 good update, 2 relieved boaters, 1 booking to be made, 2 many jobs to do, 1 press stud sorted, 1 chicken jointing lesson to be given (Frank), 1 quizzical cat, 1 garden catch up to fit in (Duncan), 2 busy but smiling boaters.

Us on the South Bay beach

Two To The North, One To The South. Breach 42 12th April

The first boats to cross between Sykehouse and Pollington Lock happened today. The passage is assisted and pre-bookable with C&RT.

Two Lock Keepers and a volunteer were on hand to see boats through. Apparently ten boats had booked passage, but only two headed northwards from Sykehouse and one southwards from Pollington.

The pound is being kept low, some say to help protect the cofferdam at the breach site. Others that there is another leak between the reservoir and Pollington Lock. But what ever the reason it looks like the low water level over the last three months has affected the banks of the canal in several places. With less water pressure in the pound the piling in places has fallen towards the water. At Christmas I posted photos of areas where this had happened on the Aire and Calder, there are now patches on the New Junction Canal.

Boxing Day 2020 Aire and Calder

Levels at Southfield Reservoir are obviously low too. The sailing club is looking elsewhere for it’s members to sail for the foreseeable future. Luckily the normal depth of the Aire and Calder is around three meters in the main channel so the passage between locks didn’t necessitate any boats scraping the bottom today.

One of the boaters moored at Rawcliffe Bridge visited the breach site today and had a chat with the engineer in charge. According to his post to the Goole Escape group it is looking like the breach will not be repaired until the late summer. C&RT are in talks with ABP regarding Leisure boats using Ocean Lock. Also they are looking at removing the stop planks at the caisson in the next couple of weeks, this will enable boats currently stranded at Rawcliffe Bridge to move to Goole should they want to.

Hopefully the stop planks will remain out which will mean that we’d be able to give Oleanna a bit of a blast up the cut to check everything is running smoothly before heading out onto the Tidal Ouse and Trent. It would also give boaters who don’t plan on escaping Goole the chance to at least get out from the marina for a short pootle.

Elsewhere on the network non liveaboards can now stay overnight on their boats. Some areas of the network will get very busy as they did last year when Lockdown 1 ended. But in other areas there are problems, another culvert is causing problems on the Llangollen. At the Figure of Three Locks on the Calder and Hebble, which has just reopened, a large plastic pedestrian barrier was drawn through the lower ground sluice paddle box this morning, damaging the paddle so the lock can no longer hold water. Hopefully this will be sorted soon.

Could That Be The Hole? Breach 41, 10th April

Thankfully the weather hasn’t stopped Mark from visiting the breach site today, here in Scarborough it is doing it’s best to snow, I suspect drones and the fingers that control them are not too keen on the white stuff.

10/04/2021

The cofferdam is now fully drained.

10/4/2021 Looking westwards

You can see where people have been walking in the silt. Levels to the west of the cofferdam are still low.

10/04/2021

There is a large puddle (bottom left), for want of a better word, very close to where the big hole on the towpath is. My first thought was could this be where the piling or base of the canal has given way.

10/04/2021

But then Mick said , why is it full of water?

10/04/2021

Maybe this is where the breach is but the route out for the water is higher than the hole, so it has acted as a kind of U bend like you get on a toilet. Once the water level is higher than the route outwards the water drains away until it is level with the last thing blocking it’s route out. The footage below was taken on the 30th December.

Certainly when water was draining into the drain below it was rushing under the towpath, over the top of the drain and around the end of the bridge where there are now large boulders. The footage below was taken on the 29th December by Mark. Where the digger on the back of the boat has it’s bucket is where the hole in the towpath is. So the stern of the boat is right over where the big puddle is today.

Hopefully the engineers have been to site to have a look and see what the extent of the damage is.

10/04/2021 Looking down into the drain today

It may well be that most of what was once under the towpath over the drain has been washed away.

10/04/2021

Large blocks have been placed on the bank presumably to stop machinery and vehicles from missing the access ramp into the cofferdam.

The pumps keep going supplying the docks with water. Hopefully a sufficient amount to increase ABP’s confidence which hopefully will then lead to limited passages through the locks for leisure craft.

The Goole Escape group now has 45 members. Most boats are moored in Goole but there are a couple of boats who are stuck at Rawcliffe Bridge which is between the breach and Goole caisson. Currently stop planks block their way to access the docks.

David has called the Lock Keepers at Naburn, Selby, Keadby and Torksey in the last couple of days. All locks off the River Ouse and River Trent are operable. But unfortunately the swing bridge out of Selby Basin is currently unsafe to use, the main bearing on the bridge has weakened, possibly due to heavier than normal road traffic over it. Surveyors have advised C&RT not to use the bridge until the problem is rectified. Then at Tankards Bridge there is a 7ft height restriction. So currently there is no escape route through Selby. The Lockies at Selby are going to keep us updated as things progress.

So escape routes will be to York, Barmby, Keadby, Torksey. Some boats are talking about heading to Hull or even Grimsby.

Thank you Mark once again for letting me use your photos.

Adjusting The Squelch. 7th April

*This post was superseded by A Glimmer Of Hope yesterday*

Panto spiky trees

Whilst waiting for news regarding the breach and possible escape from Goole we’ve not been idle. Well I say we, but in regards to boaty things Mick has been the busy one whilst I’ve been working painting my panto model.

Town Square buildings

On our last visit to Oleanna we brought back the life jackets. These were in need of a service, in fact a year overdue. Last time we paid for them to be checked over to much consternation from readers. This time Mick followed instructions on Youtube.

He checked for any damage, wear and tear. Weighed the gas bottles. Checked the dates on the firing mechanisms. Blew the whistles. Inflated them and left them overnight (well a couple of days) to check they remained inflated.

New firing mechanisms

A couple of the firing mechanisms had a few months left on them and Mick had broken one of the clips that is used to indicate that a firing mechanism has been manually fired. The green clip obviously needed replacing so it was worth getting a couple of new mechanisms.

When they arrived the oldest dated mechanisms were swapped out for the newest and put into the jackets we use the most, these will last us till 2024. The middle aged ones were put in our two spare jackets, these will last till December 2022. The oldest ones we are keeping as spares and run out in February 2022.

All rolled and folded how it should be

The next job was to fold and roll the jackets back up into the covers. This is possibly the hardest part of the servicing. But they are all done and in the crate ready to be returned to Oleanna on our next visit.

Next was the VHF radio. We bought our hand held radio a few years ago and use it to listen in to the big ships around Goole and when we are on tidal waters. You should have your radio licenced and have completed a course to use it. Mick has been meaning to do the course for a number of years but had never got round to it, I suspect like many others. My sister-in-law had looked into it for his birthday last year, but it was going to cost too much.

With the only way out of Goole for the next few months being through the docks to Ocean Lock and down onto the tidal Ouse (when/if ABP allow leisure craft), we have decided the cost of the VHF course and test would be worth doing. ABP normally require leisure boats to have two crew, life jackets and a VHF radio. Should the chance arise to be able to pen down onto the Ouse we’d rather meet all the criteria.

Tilly assisting with panto

The RYA VHF/SRC (Short Range Certificate) Marine Radio Course can be done online for £75. Then the test costs £60 on top. Mick contacted Scarborough Yacht Club to see if they were running the courses and test. This was possible, although the test would have to wait until after April 12th and would be done on a one to one basis at the Yacht Club at Scarborough lighthouse.

Handbook included in the course

Once the course fee was paid a chap popped the handbook through our front door the following day and Mick was ready to do the course. The course takes around 10 hours and Mick has worked his way through doing all the modules in the last week. Before he books for the exam I’m going to look at the course too. Should we be in an emergency situation and Mick not be able to use the radio, I would at least know what to do.

Once the exam is passed Oleanna and her crew will meet all the criteria that ABP require, if this also means that we can cruise as a flotilla with other boats who haven’t got VHF all the better.

*Sadly later in the day Mick received an email saying that as Scarborough Yacht Club building would remain closed until 17th May, exams would not be possible until after that date.

A few days ago marked our 7th anniversary of being boat owners. Today marks our 4th anniversary of the three of us moving onboard Oleanna in Sheffield. So I’d best do a Where Were We

Where were we

2020 Lockdown Mooring 3, Calveley, Shropshire Union Canal. LINK

2019 Above Lemonroyd Lock, Aire and Calder Navigation. LINK

2018 Stourport, Staffordshire and Worcestershire Canal and Beverley. LINK

2017 Victoria Basin, Sheffield and Tinsley Canal and Crick Marina, Leicester Line. LINK

2016 Bulbourne Junction, Grand Union Canal. LINK

2015 Kingswood Junction, Stratford Canal. LINK

2014 Bugbrooke, Grand Union Canal. Sorry no link, we were on too much of a mission to write a blog. But we did get Lillian off the River Nene where her EA licence had run out and up the Northampton Flight, her first narrow locks.

A touch more panto

A Glimmer of Hope. Breach 40, 7th April

Today David has had a more promising response from ABP.

I have had a call through from the Dock Master at ABP this morning. The information that I gathered from the call I have summarised.

The main challenge at the moment is replenishing water used by Ocean Lock. Operating the lock whilst being able to retain functionality of the dock, and enabling contingent use for emergency operation is a somewhat difficult balancing act.

There are some high tides predicted for next week and the port are expecting some particularly deep droughted commercial vessels. With a higher usage, this will hopefully give the opportunity to see how the pumps at the breach site contend with replenishing water levels in the dock.

Depending on how next week goes there will be further assessment regarding lock operations. The situation will be reviewed with the possibility of LIMITED use by Leisure craft. I stress the word limited.

ABP have suggested that the offer to help coordinate this would be well received by them. Hopefully this could at least give the opportunity for boaters who would otherwise be stuck here for a longer period of time, to leave Goole.

We should be mindful of how this message is disseminated. In the first instance, it is probable that a limited number of bookings will be considered, keeping the number of pens to a minimum. The danger is that the message could me misconstrued and assumptions made that operation is back to normal. This is highly unlikely to begin with. ABP have been very clear that this needs managing closely. The last thing they want is craft stranded on the river due to a snow ball affect of people expecting to use the lock as normal.

With the above in mind, I’d like to start to gather info regarding how many people would ideally like to pen through and the destination they would be heading for. If you could let me know by comment or DM that would be great.

I am awaiting a further update from the dock master in due course, and will of course update this page accordingly.

Let’s keep our fingers crossed for a season of cruising waters afar, following these testing times for everyone.

David.

Well done to David. We’re keeping all our fingers and paws crossed. Any further information I get I will pass onwards.

Escape Committee. Breach 38, 2nd April

This morning we had an email from a chap, David, who is also trying to escape from Goole. He’d posted on Canal World Forum this morning after playing ping pong with C&RT and ABP with regards to being allowed out through Ocean Lock onto the Ouse.

C&RT sent him to ABP, they back to C&RT, and back and forth a few more times!

During the day we’ve exchanged emails ourselves and this afternoon a facebook group has been set up with the hope of trying to find other boaters also stuck in Goole who are wanting to make a bid for freedom out onto the tidal River Ouse.

I think I can see David’s boat.

It is hoped to be able to have a meeting with both C&RT and ABP to see if it would be possible to pen a lock full of leisure boats out through Ocean Lock.

If you are stuck boaters wanting to escape please join the facebook group. The Goole Escape Here

If you don’t do facebook, then please leave a comment at the bottom of this post or use Contact at the top of the page to send us a message so that we can keep you in the loop along with seeing how many boats would like to escape.

None of us will be holding our breath, but it’s worth a try. Maybe as a group we will have a bigger voice.

Assisted Passage, Breach 34. 25th March

Well Canal and River Trust have been busy with notices. On the website yesterday they posted the following

Update 24/03/21

The Trust and its contractors are in the final stages of making the cofferdam watertight, to enable the cofferdam to be dewatered. We anticipate that our engineers will be able to carry out the first detailed inspection at the breach site shortly after Easter. Water levels continue to be carefully monitored. While passage through Goole Caission is not possible at present, the Trust is working hard to ensure boaters can once again pass between Pollington and Sykehouse Lock. We intend to operate this on a booking only basis from 12 April (in line with the Government road map).

Certainly the levels in Goole were much better yesterday. But another ten days before engineers carry out a detailed inspection!

Then today notices regarding assisted passage have been coming through.

From the 12th of April access through Whitley Lock will be possible twice daily at 10am and 3pm.

From the 12th April, we shall be permitting a once a day access through Pollington Lock and Sykehouse Lock at 10am daily to allow boats to transit between Pollington Lock to Sykehouse Lock.

Mooring and overnight staying along sections between Pollington and Sykehouse Locks is not currently permitted.

Passage through these locks needs to be booked 48hrs in advance by calling 0303 0404040, Mon to Fri 9am – 5pm

Why assisted passage? Because they need to control the water levels in the pound where the breach is and should two locks full of water be let out at the same time, the wave created would likely overtop the cofferdam.

This is all very exciting. Except we still can’t get out from Goole!

A is Viking Marina B Ocean Lock onto the River Ouse

But should we be able to escape out onto the River Ouse we would be able to turn left and head up stream to Selby.

C Selby Lock

Turn in at Selby lock onto the Selby Canal.

D Tankards Bridge, E Beal Lock

You can only pass under Tankards Bridge, the last on the canal, if you are under 7ft high as currently scaffolding is being used to reinforce the parapet wall which suffered damage last September when a vehicle struck it. From there along the River Aire where a width restriction of 10ft 5″ is in place due to silt build up behind the lock gates. Thankfully neither of these would be a problem for us.

F Whitley Lock

Once up Bank Dole Lock we would re-join the Aire and Calder Navigation and turn left heading eastwards towards Goole. We’d be able to pass down Whitley Lock one morning.

G Pollington Lock, H Sykehouse Junction, I Sykehouse Lock. J The breach site

Then down Pollington Lock the following day, turn right onto the New Junction Canal and up Sykehouse Lock. Then and only then would we have successfully escaped!

According to Canal Plan if we did this route it would be 40 miles 1 furlong and 8 locks, normally taking 13hrs 45 minutes. But with current restrictions it would take us 3 days waiting for locks to open.

A Viking Marina, I Sykehouse Lock

Without the breach in our way Canal Plan has the more direct journey at 8 miles 3/4 furlong, 1 lock, taking us 2hrs 45 minutes.

That’s a bit of a detour!

Handbrake Turn, Breach 30. 9th March

Goole

In my last post I got distracted by the blue tarpaulin at the western end of the cofferdam. I’m still not sure why this is there but a comment from David has confirmed that the leak last week, that filled the cofferdam up was at the eastern end. A void adjacent to the eastern end of the piling, on the south bank, allowed water to fill the dam back up. This was mended, but there seems there must be another leak somewhere as the cofferdam is still quite full, well it was a couple of days ago.

The extra raft at the western end is also most likely to increase the amount of water being pumped round the site, trying to keep up with water that is used at the docks.

It is thought that there are voids and leaks all along the aqueduct on the north bank, so not just one hole. The extent of these won’t be known until the cofferdam is fully drained. At the moment the best case scenario is that the canal will be closed for a couple of months, worst case until the end of the summer. But until the engineers can get a better look they obviously can’t really say.

It’s been two months since we last checked on Oleanna ourselves, others are doing a great job of checking her ropes when the levels alter, but today we paid an essential visit to her. Our Boat safety is booked soon and we knew of a few jobs that needed doing before hand.

Mick picked a hire car up from Beerhouse who are working out cheaper than Enterprise at the moment, £10 cheaper if you call them rather than booking online too. Not a pristine car, bumps and scrapes, but we weren’t bothered.

The trip over the Wolds was lovely, snowdrops filling the verges and reaching up into the woods. Daffodil leaves stretching up towards the sky, hopefully they will be in bloom the next time we do this drive, some of the roundabouts are spectacular.

Spring spinging

The level in the docks still isn’t what it was when we first arrived in September, but today Oleanna was certainly afloat and not sat on the bottom. It was a big step down, no need for the booster block though.

Masked up we went to check in with Laird at the marina. No new news regarding the breach and our only possible escape route would be if we dig a tunnel.

Then it was time to get on with jobs.

A kitchen shelf made to measure, it just needs an extension for the starter battery

The battery terminals needed some form of covering, this is so that you can’t drop any tools on them. A piece of wood would do the job. An unused shelf from a kitchen cupboard had been brought with us. This proved to be the right size for the leisure batteries, but the starter still needs something. We took measurements and will look for either a piece just for the starter, or see if we have a slightly longer shelf that would cover all batteries in one go.

Mick started her up, first time, no grumbling. She was left to run, the leisure batteries already at 100% from the solar, but the bow thruster battery could do with a charge.

I measured up the poppers on the front door blinds. One is broken so needs replacing and I’m wanting to make us two new blinds for when the original ones get too tatty, due to our second mate! The poppers appear to be 12mm diameter, so I’ll need the press stud side and a die to fix them to the cloth. I’m hoping a costume friend may just have what I need to do this.

3003

The red grabrails are all looking very faded, apart from where I touched them up recently. Somehow the red mentioned in the boat bible isn’t the correct colour, but when we were last in Sheffield the painter there gave me a tin of the right colour. I’m wanting to get a new tin to have enough to do all the grabrail, plus this tin reacted strangely when applied.

Cratch rolled up

One place the Boat Safety will need to get to is the gas locker in the bow. Oleanna is on a short pontoon, moored stern in, so not the easiest place to get to. So next job was to wind. We’d chosen today to do this so as to avoid a named storm that is due tomorrow.

Untying all the ropes holding Oleanna to the pontoon took quite some time. The fender eyes on the gunnels are useful in such situations, but really awkward to get to when your boat is lower than the pontoon. Mick had to lie down and then lean over the edge to feed ropes back through the eyes. I could reach the bow rope from the cratch, but this took quite some feeding too.

Reversing

With the cratch cover rolled up both sides and the pram cover lowered we were ready to move her for the first time in six months. No chance of pushing off, she just drifted away from the pontoon and we were off!

Even though all we were doing was winding, just standing at the back felt good. The lady from the Dutch Barge two boats over waved to us as we pulled out of our mooring.

Winding in a marina can be dodgy. Usually the wind will pick up as soon as you want to turn and you end up being pushed towards lines of moored boats. We once got to meet a whole new section of boaters at Crick Marina doing this, everyone trying to give you a push in the right direction away from their boats!

A different view

Marinas have people who watch and the space required to manoeuvre is never luxurious, so the odds are always stacked against you. Mick brought Oleanna out, turned her into the gap almost opposite, then swung the stern round. A touch of bow thruster whist turning meant we kept away from other boats. Reverse, forwards, reverse and then an extra boost of power to finish the turn and we’d finished our handbrake turn and headed back to our mooring.

Only five minutes until we were back tied up, facing the other way. Then the rope tying started again, leaving enough slack we hope for varying levels, but tight enough that she won’t be blown all over the shop in the next storm. The plank that had been positioned to stop us drifting under the pontoon was leaned over a touch. The corner of the pontoon could possibly just catch the gunnel if the levels came back up. A Tilly fender was also added into the equation.

Labelled up, another on the door

After eating our pack up the next job was the fire extinguishers. Oleanna has three. The ones at the stern and bow are both in cupboards. When they were fitted we were warned that we’d need to label the cupboards for the boat safety. So big labels went inside the cupboards and smaller ones on the outside. Each fire extinguisher was turned upside down a few times before going back into position.

The third one has for sometime lived in the gap between the shower and bathroom door. This means it is near the centre of the boat, close to the multi-fuel stove and not in the way. We’d never got round to fixing it to the wall.

A quick check with our Bubble Carpenter Frank as we’d be screwing into laminate. Franks final words were ‘don’t mess it up!’ Small pilot holes were followed by slightly bigger ones then the bracket was screwed into position. Job done and not messed up.

Tilly’s paws absent

The CO alarms and heat sensors have all had their batteries removed whilst we’ve been off the boat, saves some poor neighbour having to live with a dying battery and the beep that accompanies it. Each detector was checked in turn and then the batteries removed again, these will go back in on the day of the test.

We might wash the ropes

After six months of sitting still Oleanna is showing it a touch, both inside and out. All the ropes are turning green, the cratch and pram cover could do with another spray of Wet and Forget. Inside the bathroom windows have been left ajar, the plastic frames now covered in a thick layer of dustyness. These got a good clean, sadly my faithful assistant wasn’t on hand to inspect them from the outside, leaving her stamp of approval on newly cleaned glass!

If only Oleanna 25 times bigger was so quick to clean

A sweep through and a tidy in the galley. The wine cellar emptied of the bottles we’d stocked up on for Christmas, this gives access to the Alde Boiler. Jobs done, just a couple of things to sort on the morning of the inspection.

Hello

Mick had chance to have a chat with Geoff. We’d been hoping to see if anyone else was plotting an escape. Apparently someone had approached either ABP (who run the docks) or C&RT to see if it would be possible to use the lock out onto the Ouse if half a dozen boats got together to share. Sadly this will not be allowed. So currently the only way out of Goole is on the back of a lorry.

Looking back towards the docks

Before heading for the house we turned left out of the marina and drove down to look at the caisson. Lisa had mentioned that the top metal stop plank had been removed the other weekend and that the gates had been opened.

Gates open a bit at the caisson

The area has had a tidy up since we first came to have a look back in December and sure enough the caisson gates are open a bit, red lights indicate that the navigation is closed and you certainly wouldn’t get a boat through the gap.

Across on the southern bank the top stop plank lay. Not just a foot/eighteen inches deep but around three foot. All the pumps and pipes have gone from here, most probably to the breach site.

The water in the docks was slightly lower than that in the cut, causing there to be a flow over the rest of the stop planks. I suspect the remaining planks are being left in to protect both the docks and the cut. Should the level drop on one side, there is still something to hold back the water. So unless a lot more water gets pumped round the breach site, Oleanna is likely to be at her highest right now.

Looking towards the breach 4 miles away

Here’s hoping the cofferdam can be emptied and work of a solution started soon.

No going anywhere

Back at the house Tilly was waiting in a window for us. Her plight of cat food pouches having hit the main stream media after she’d brought the situation to their attention this morning. Apparently the shortage is due to the increase in pet ownership during lockdown and pet food manufacturers are finding it hard to ramp up production to keep up with demand. Don’t worry Tilly you’ve still got another 60 pouches to go before we have a problem!

0 locks, 100 meters, 1 wind, 2 girlie button presses, 3 extinguishers, 5 signs, 1 piece of wood, 1 more needed, 3 down to 2, 1 water tank almost empty, 12mm popper, 3003, 1 plank jauntified, 2 tyre fenders, 2 ham butties, 0 milk, 3ft stop plank, 1 red light, 0 escape, 2 thank yous to David and Stuart, 1 cat staying out of the media hype, 2 months of pouches, 1 blog with all photos again.

Later this month we will be changing our website hosting. Readers shouldn’t notice anything different and those who get an email each time I post should still get one. I will do my best to inform you of the last post before we move, JUST IN CASE!