Category Archives: Bridges

Strength And Courage. 5th April

Muskham Ferry to Newark

Waking up in the morning can take some courage. Having the strength to get out of bed to attend a meeting about your mental health is extremely hard, opting to stay hidden under the duvet a much easier option. Add into the mix not having slept properly for weeks along with not eating much for days. We all knew though that the meeting had the potential to be a step forward.

Morning view

The taxi arrived bang on time and on our journey in to Newark I recounted our journey from Keadby to Cromwell. David has been around boats for much of his life and yesterday he’d been imagining where we’d been on the river, which bend, what landmark we’d passed. All this to help keep his mind busy.

A dated building close to Aldi was where we were to meet two chaps who’d come from the Crisis team. David wanted us there with him, to be an extra voice in the room. If things seemed to be going round in circles then hopefully we’d be able to help. Unfortunately the room could only hold three people, fine for the two chaps and David, but that wasn’t going to happen. We split into two, Mick staying with one of the chaps to have a conversation about our concerns, then David, myself and the other fella headed to a more private room.

Kirkgate, Newark

We talked through David’s problems, what support he could access. The chaps had read through his notes thoroughly before coming this morning, he was already known to them. Hopefully he was reassured that he could access their help at anytime. There are certain things that David needs to do for himself, then other support channels will be open to him.

The room was too hot and stuffy, thank goodness the Covid guidelines had dictated only three of us could be in there at any time. But the heat was too much, fresh air was needed. Outside we now could chat to the other chap, his area of support different. The general thought was that if David could get back to Newark on his boat then he’d have so much more access to things that could help, they’d all be within walking distance of his boat, but the move had to come from David.

Now David was exhausted there was no point in continuing with the meeting. Before we left I made sure that they understood that living on a boat can be very isolating, please could someone call him regularly, just for a chat as well as to check on him.

Shame we missed the market

In the taxi on the way back we talked things over that had been said, related them to other people we knew. For me it had been good to hear what the chaps had to say, and now be able to help David remember as I used to when my Dad had hospital appointments.

After a rest David joined us for a sandwich, at last we’d seen him eat something. Could we help him to get his boat started? He was afraid that over the last few weeks his batteries had dropped so much charge that they may never recover. He’d been surviving on what solar power he was getting. Certain things on the boat having stopped working.

With us around he summoned up the strength to pull out his generator. This was started to kick start his engine, but would it work? The generator worked and after a while David tried to start his engines, his boat has two. With lots of dials in the cockpit he could see what charge was going into the batteries, Mick and he consulted over such things. After about fifteen minutes both engines were running, his boat still had life. This alone was a huge achievement and one that brought a smile to everyone’s faces.

Looking ahead

David now asked if he could move the boat with us up into Newark, he had purpose and drive. After a discussion it was decided that we’d move one boat at a time and that we should strike whilst the iron was hot. We would move David first, all three of us onboard, I would work Nether Lock leaving Mick and David in the cockpit.

Sorting the mooring ropes

A bit of rope adjustment was needed before we could set off as both boats were tied together as the mooring cleats on the pontoon were none existent for the centre lines. With this done and the Key of Power in my pocket, all three of us onboard the engines pushed us round into the current to head towards Newark.

East Coast Main Line

Mick and I have never really been on a cruiser before, so being inside in the cockpit felt a bit strange, no wind burn for us today standing outside, but what a treat. All the gauges were checked by David, even the depth sounder was turned on! This was handy when we reached a section of the river where the depth below the keel reduced from 2.5m to 0.5m, no wonder our progress had slowed, the engines were adjusted accordingly.

Mick was given a go at the wheel. The difference between a tiller and wheel instantly showed itself as we started heading towards a bank! Just a different mind set, steer as you would in a car not a narrowboat.

Waiting below Nether Lock

Being able to climb outside and have a wider gunnel to stand on before going ashore was nice. They then took the boat back to hover whilst I emptied Nether Lock.

The newish lock controls here were really frustrating. They gradually allow you to lift the sluices, pressing the Open button when it is constant, but when it flashes nothing will happen. So you press it, wait for it to go constant, press it again. The sluices fully up the water drained out. Below the lock the water stopped being busy, obviously the water was now level, but the light kept flashing and flashing and flashing and fla….. you get the idea!

Blooin thing!

It was decided to close the whole thing down and try again. I still had to wait an absolute age for the sensor to realise that the lock was now empty and that I’d be able to open the gates. In came the boat, Mick using a rope to hold them in to the side and I gradually lifted the sluices when all was calm below. The top gates behaved as you’d expect, thankfully.

Breath in

Back on board we now had to squeeze through a gap between the bank and a skip boat which had been left that bit too close to the bend. David just managed to get through, we wondered if Oleanna would have difficulty being longer.

In Newark we pulled in onto the pontoon. Mooring cruisers is slightly different than for a narrowboat so we followed the skippers lead. Time for David to have a rest.

Pretty colours

We popped into town to pick up a repeat prescription and check in a couple of shops for a new sketch book for Panto. Sadly Hills didn’t have the one I like with a hard cover and suitable paper should I want to use paint, but not so expensive that you wouldn’t want to scrawl notes in it.

A taxi from Castle Station and we were soon on our way back to North Muskham to move Oleanna.

Short short pontoons at the pub

Untying took a bit of thinking about. The centre line wasn’t really doing too much, maybe taking a bit of strain away from the bow line. But as soon as the bow line was undone the stern would be pushed round by the current meaning I’d need to be onboard, Mick would need to whisk Oleanna out from the moorings as quickly as possible before the bow had chance to make contact with the cruiser on the other side of us.

Thank you!

It all went to plan and we waved goodbye to North Muskham. Thank you for helping our friend.

Haven’t we been here before?

Deja vu cruising, just slightly chillier than being on the cruiser. We’d made sure we wrapped up well, winter cruising clothes and wind burnt faces. 3 egrets took off in front of us, don’t think we’ve ever seen three together before.

It all looks familiar

Mick pulled in below Nether Lock to drop me off at a ladder, no just stepping off as I’d done earlier. The large overhang causing concern for our cabin sides, but we managed to keep Oleanna away from harm.

Prepared for the wait at the bottom gates I’d taken gloves with me this time, nothing to do but kick one’s heels for ten minutes before the light turned solid and I could open the gates.

Filling

Up above Mick managed to squeeze Oleanna past the skip boat and pulled in to wait for me to climb back down a ladder. Caution should be taken with some of these ladders on Nether Lock as there is quite often not much room behind the runs for your toes!

David joined us for some food, a plate of chicken pasta, possibly the most he’s eaten in days. Conversations about boating, toilets of course! We got to see a bit of the David we’d met last year today. He’d been strong and brave and achieved much, he was rightly proud of himself. The day however had been exhausting for him.

1 lock twice, 2 boats, 3.4 miles, twice, 3 taxis, 2 chaps, 3 in a room, 1 sandwich, 1 plate of pasta, 1st repeat prescription pick up, 0 sketch books, 2 engines working, 1 day of achievements, 1 email from my cousin in Ukraine, 1 Harry, 1 lobster.

Here are a few links to places where you can find help with mental health

https://www.mind.org.uk/information-support/guides-to-support-and-services/crisis-services/

https://www.mind.org.uk/information-support/guides-to-support-and-services/seeking-help-for-a-mental-health-problem/where-to-start/

https://www.nhs.uk/service-search/mental-health/find-an-urgent-mental-health-helpline

https://www.nottinghamshirehealthcare.nhs.uk/help-in-a-crisis

A Call For Help. 3rd April

From where we were to Keadby Visitor Moorings

This was late afternoon!

Mick got into the bios of the lap top, set various things in motion which were going to take just about all day. We left it to do it’s thing. Thankfully Tilly seemed to be more her normal self and full rations were reinstated.

Yum!

A Sunday morning cooked breakfast was enjoyed before we got going. Time to do the remaining swing bridges.

Sunnier day

Godnow Swing Bridge is interconnected with the railway level crossing, a little building sits between the canal and railway to house the level crossing keeper. There used to be a huge control panel to work the bridge, but this has now been replaced with one of the slim C&RT two button panels.

Once the key is turned the crossing keeper has to close the rail gates to road traffic before you can close the bridge to road traffic. The old manual barriers have been replaced with the drop down kind. A lot better than it used to be as it had it’s moments. We managed to hold one car up.

Power everywhere

Onwards gradually the sky being filled with more and more power generating. The gas power station and wind turbines making the most of the flat landscape.

Vazon Swing Bridge with the slider behind

Vazon Swing Bridge is the most simple to operate on the Stainforth and Keadby, turn the key, lift the latch and push. Once closed we then had a wait before we could proceed further.

Choo choo

We’d actually timed our arrival pretty well. A goods train coming over the Vazon Sliding Bridge in front of us almost immediately. Then the bridge keeper put the bridge into operation for us. Sirens, flashing lights go on for what feels like forever. Then the whole bridge starts to slide back diagonally across the cut to open our route. No dawdling to be done here, I’m sure there was a big gap between trains, otherwise we’d not have been allowed through, but you still feel the pressure and scoot through.

The Keadby Lockie was chatting to a chap on a cruiser when we pulled up, he was most probably called Mark. The flood in the morning would be at 7:10 and Kirsty would be on duty to pen us down. We would be joined by another boat later today who would be joining us for the trip, we could be Trent buddies.

The big crane boat waiting to head to Thorne on Monday

We filled with water and started to make ready for our tidal journey. The well deck was cleared and washed down, the chain bucket brought out from a locker. One end attached to the anchor the other to the T stud on the bow. Mick checked the weed hatch and gave the engine a check through too. Only Tilly’s escape pod to put together in the morning.

Tomorrow the plan had been to make use of the big Spring Tide and make it all the way to Cromwell Lock. A long day at the tiller. But looking at Windy the wind was set to get quite high in the early afternoon the further south we got. Maybe we’d split the journey at Torksey and continue on Tuesday. A phone call had been made to the Cromwell Lock Keeper to book us in for Tuesday, but asking if we made it there on Monday could we pen up then instead. This was fine so long as we arrived before 4pm. All sorted.

A shower full, quite miss the Christmas tree being in there

Then things changed, with just one phone call. Our friend David, whom we escaped Goole with last year has been having a hard time with his mental health. He’d reached out to us just before we moved back onto Oleanna and we’ve talked a couple of times since. He was in a really bad way, could we get to him today, he couldn’t be on his own anymore.

David was near Newark, the way we were heading, but 45 miles away. We certainly couldn’t get there by boat today and no trains were running. What to do? We talked and talked and in the end promised that we would fight against the wind tomorrow to get to Cromwell to be with him.

I then tried ringing an NHS Mental Health helpline, but without knowing who David’s doctor was this was hard. His phone would also soon have run out of battery with little chance of charging it up as his boat batteries were dead. The lady tried to help, suggesting getting him to A&E. I considered dialing 999 but that didn’t feel right. I conferred with Heather from NB Bleasdale who also knows of David’s situation, she also agreed that 999 was not the thing to do.

This has been written with David permission, he wants to try help raise awareness of his situation. For obvious reasons my blog posts may be a touch patchy for a little while.

0 locks, 2 swing bridges, 1 sliding bridge, 1 car held up, 0 trains held up, 5 hrs 35 mins, 1 shower full, 7am start, 1 call for help, 1 promise made that I hope we can keep.

https://goo.gl/maps/tEF8MkBfUH9YtdZd9

Back Where We Started. 1st April

Thorne Services to the big bend between Moores and Maud’s Bridges

Before breakfast we pushed back off the service pontoon to free up space should anyone be passing and want to fill with water. This took quite a bit of doing to keep facing eastwards as there wasn’t much room to manoeuvre the bow round as the wind was doing it’s best to blow the stern that way. But nudging back and forth Mick got Oleanna turned. We then headed backwards to moor up behind a line of wide beams and Dutch barges, tied to railings, not the best place but at least we’d freed up the water point.

First new green Biffa Recycling bin spotted!

Just as we’d finished the boat that had been moored next to us pulled out and headed towards the lock. Oh well we’d stay put.

Breakfast then a trip into town to post the socks and then stock up on supplies for the next week. Everything was stowed away and we were about to untangle our ropes from the undergrowth when the heavens opened again with wintery showers. An early lunch was called for.

Grrrr!

Princess Royal Swing Bridge lived up to its reputation today! I turned the key, opened the panel, no click from the barriers. I walked over to the other side the annoying barrier closed but not the other one, it was locked in place. Keys out try again. Nothing.

Mick tied Oleanna up and came to have a go too. Still nothing, that click on turning the key just was not happening. We tried wiggling the gates, turning the key, pressing buttons that are just lights, anything and everything. Then in unison Mick pushed the troublesome gate back as I turned the key as far as it would go, Bingo! The click! The gates hadn’t registered as being closed by the looks of it, so therefore you couldn’t open them!

Job done and we were on our way again passing the four abreast boats on the other side of the road bridge.

Back where we started Blue Water Marina

We pulled in at Blue Water Marina for a top up of diesel. At the moment they don’t sell to passing boaters, but as we’d moored there over winter Sarah was happy to give us a top up of 37 litres, we wanted a full tank before heading out onto the tidal Trent, however we didn’t really want to spend the £1.50 a litre, but needs must.

Five weeks ago we’d pulled out from Blue Water to move Oleanna to the other side of Thorne Lock before the stoppage started, today we were back where we’d started having just come through the lock yesterday which will at last close on Monday. Today we wanted to get a bit further east towards Keadby.

The bridges between Thorne and Keadby are all that little bit different from each other. Today we passed under Wykewell Lift Bridge (fully automated with the key of power and button pressing) then Moores Swing Bridge (key of power, button pressing, flashing lights, manual barriers). I managed to hold up 8 cars in all.

The railway hugs the canal for much of the 10 miles to Keadby, not a busy line, but quite a lot of freight heading to and from Drax Power Station. We’d identified a couple of bends in the canal that head away from the line so we planned to stop on one of them.

The land around here is so flat which increases the amount of sky. Ahead of us white clouds and blue sky. Behind heavy dark almost black clouds, winter precipitation hanging waiting to fall.

We just got moored up before the next wave of winter weather crossed overhead. The fire was stoked up, Tilly allowed out and a chicken tray bake popped in the oven.

Two skies in one

No knitting this evening, just a request from my cousin for my sock pattern. This is more of an equation than a pattern so I’m not sure she’ll understand it, but I tried my best. Then sewing up a hole in the pocket of Mick’s waterproof padded trousers. We’ll be needing layers when we go out onto the Trent, I may even dig out the balaclavas I made three years ago for a trip in the opposite direction.

This evenings view

0 locks, 1.97 miles, 1 lift bridge, 2 swing bridges, 8 held up, 1 obstinate bridge, 37 litres, 0 boxes of wine, 2 sky day, 1 lovely bend.

https://goo.gl/maps/xzdBEZHVkKD9rkS99

Critical To Fatal. 28th March

Thorne Lock

You may have noticed (unless the problem has been solved when you read this) that there is no blog roll on the right hand side.

This evening Mick came to the blog to have a catch up on fellow bloggers posts only to find the blog was missing, a ‘critical’ error had occured! Oh blimey, what had Tilly been upto whilst we were out earlier?

That sinking feeling

WordPress sent an email to our IT department (Mick) regarding the critical error.

Since WordPress 5.2 there is a built-in feature that detects when a plugin or theme causes a fatal error on your site, and notifies you with this automated email.

In this case, WordPress caught an error with one of your plugins, RSS Feed Checker.

Critical had turned into Fatal in one email!

Not being able to access the ‘dashboard’ to look into the problem Mick was given the option of going into a special ‘recovery mode’. He did this and was able to remove the blog roll plugin. The blog is now visible again. More investigation is required tomorrow.

This fly is far more interesting than the wet outside

They sad it was a Sausage Day, but it turned into a bit of a Frankfurter! She said I had nine hours. Then it rained! Tom said I could still go out. Until he closed the back doors and said he and She were going out instead!

A loaf of bread was required along with a stretch of our legs. So we headed into town to Sainsburys.

Ready and waiting for next Monday

Below Thorne Lock two C&RT boats are sitting waiting for next week, they have small diggers on them, the sort that are used for dredging only a bit cleaner! These will be joined at some point by a big crane boat which was being used at Newark Town Lock until recently.

Thorne Boating Services

With our shopping done we headed to Thorne Boat Services to see if they had any Marine 16, an additive Mick likes to put in the diesel tank to stop diesel bug. We looked round the chandlery, but they had none. Today their diesel was £1.45 a litre.

Closed to pedestrians

To cross over the canal we headed for the troublesome footbridge just as someone was opening it to get their boat through. Good job it wasn’t a windy day as when the chap had taken his boat through he stepped off without a rope. Pedestrians including ourselves were on hand to open the barriers, if we hadn’t been we suspect his boat would have drifted away just that bit too much to be able to jump back on. One of those instances where you just have to wait till it drifts back towards a bank.

Dolly Earl always has washing hanging out

We tried the Chandlery at Staniland Marina too, but the doors were firmly locked. Maybe we’ll try again tomorrow.

Mick called the chap who has our cratch cover, it is ready and he’ll bring it with him one day this week when he’s back in Thorne to do other work, he’s not sure when yet.

Thank you Lisa for the yarn

The afternoon was spent knitting, eighth pair finished and the yarn for the ninth pair wound into two balls ready.

0 locks, 0 miles, 0 winding, 0 bridges, 2 work boats, 3 lodgers, 1 loaf bread, 0 cratch cover, 8th pair finished, 1 Frankfurter day, 1 fatal error thankfully not that fatal!

Boat Conference. 21st March

Bramwith Junction to Pollington Lock, Aire and Calder

A very chilly start

Time to put a plan together. Sitting around waiting for my glasses to arrive doesn’t get the water tank filled or other boat jobs done. So after breakfast and updating the blog we had a boat conference. These are actually quite rare, most discussions of our plans are held as we stand on the back of Oleanna, but today we needed to concentrate.

Our original plan had been to make use of the weeks whilst Thorne Lock was shut. The London Leckenby’s have a few days in York so we’d planned to join them, maybe even a boat trip into our home city as Jac and Josh have never done this and the tour guides on Oleanna know exactly where to stop to see our family home from the river. Various boat jobs to get done and do. Friends to catch up with around the area etc. Also being in the area for a change over of lodgers at the house would be handy. It all had fitted together quite nicely. Then after Easter we would head southwards on the Trent, the quick way south.

The Don Doors again!

But since the dates for the stoppage at Thorne Lock have changed we’ve been in a quandary. Spending time in York is very appealing especially since Andrew and I haven’t been in the city together for at least 6 years and that was for a funeral. Catching up with friends is something we’d wanted to do summer before last, but floods and the pandemic put paid to that as we were rafted up with other boats at Naburn for several days.

Should we stay and do all those things?

Should we leave before the lock closes in a couple of weeks?

We’ve spent a lot of time mulling this over and every day for the last week we’ve discussed it further, but still not come up with a plan. Today we needed a plan.

Our discussion actually was relatively short.

Swing

If the London Leckenby’s hadn’t been coming up to York then we doubt we’d have been considering heading that way at this time of year. We’ve upgraded to a Gold Licence this year and if we stayed on this side of Thorne Lock and then exited via the Pennines it would mean us loosing about a months worth of Goldness. Decision made, we will be heading south on the Trent as soon as the tides look suitable.

A list of things we need to do was drawn up. Approximate dates worked out and ,most importantly a phone call made to Keadby Lock to book our passage. Sadly there was only an answerphone to talk to, but we knew someone would call us back.

With water needed we pushed off along the New Junction Canal again. If my glasses arrive in the next few days we’ll aim to be near a station to get back to Doncaster to collect them.

Lift bridge ahead

We made our way back swinging and lifting bridges. Before Sykehouse Lock three narrowboats that passed us yesterday were moored up, they looked like they were settled for a few days of company, jobs and possibly even a barbeque.

As we came through the last narrowing where a swing bridge used to be the light at the lock changed to red, shortly followed by green. There were plenty of people around. The volunteer who must live there in the tower, another C&RT chap by the bridge and a couple of boaters, so there was plenty of help to move the bridge out of our way and then back once we were below it.

Water water everywhere!

At the end of the New Junction we turned left and headed towards Pollington Lock.

A couple of bank slippages are marked with yellow buoys. These were there when we walked the stretch shortly after the breach happened Christmas 2020. Short red posts and some spray paint mark the worst bits.

Blackthorn blossom

The visitor moorings below Pollington Lock were empty so we pulled up to the space closest to the water point and got the tap going. We very quickly remembered that the pressure is appalling at this tap, no sitting and waiting for the tank to fill, best to get on with other things and forget about it. Thankfully we can check our water gauge every now and then to know when the tank was full, the pressure so low that there’d be no boom from our tank and no major gushing of water coming out of the over flow, just a gentle trickle. It took longer than two hours to fill us up!

Handy picnic bench!

Tilly checked out the picnic table, but wasn’t overly impressed with the mooring. She’s managed to get on the other side of the ditch here before which makes for an interesting rescue. Mick however looked at the picnic table and realised what we’d be doing tomorrow!

1 lock, 7.32 miles, 3 swing bridges, 3 held up, 3 lift bridges, 6 held up, 2 outsides, 6%, 6th pair knitted, 2 plus hours to fill, 2 pairs of odd socks, 1 conference, 1 plan at last, 1 call booked, 1 useful picnic table and tap.

https://goo.gl/maps/CSMReDdA7iSvRyML8

An Inch Short. 16th March

Bramwith Junction

What a grey day! Even Tilly wasn’t impressed, preferring to spend much of the day asleep inside. With rain forecast for 1pm we had a choice of moving off this morning or staying put. The next proper mooring can be quite popular, this time of year especially so as there is parking, water and bins. An hours cruise to find out and if full it would be another hour back again, bringing us into the window of rain opportunity!

Grey

We decided to stay put, we like this mooring even on a grey day. A walk around the junction was on the cards and there was enough time before we’d get wet.

As we walked down to Bramwith Lock we could hear an engine, then see a flag between the trees, coming along the New Junction. It was Pax a kind of cross between a Dutch barge and a trawler that had been in Goole. They turned towards the lock where some friends had already opened the gates for them.

A narrowboat arrived below the lock, pulling into the lock landing, as we walked past we had a chat with the chap. This was to be his first solo lock, the boat new to him, maybe only by a few days. We wished him luck and carried on to where a footpath heads off to the Don Doors.

The side you don’t get to see from the canal

Water was spilling over the edge of the aqueduct, more so than yesterday when we’d crossed it. I was amazed at how little space there is below the trough to the river flowing beneath. The sides of the trough have plenty of extra support to help it withstand sideways pressure when the river is in flood.

We climbed over the top to the other side, sadly no view along the New Junction as the guillotine gates were in the way. But it being so grey the pictures wouldn’t have been too appealing anyway.

Looking up the New Junction

Was that a Chiff Chaff? It was! A sign of spring.

I so love Blackthorn blossom

We crossed back over the Sheffield and South Yorkshire Navigation. The first Blackthorn blossom opening up hunting for the missing sunshine. Bees buzzed round. Was that a Woodpecker we could hear? Spring with all it’s new life.

A small boat in an expanse of water

The single hander came round from Bramwith Lock heading towards Long Sandall. He’d been helped up the lock so still had his first solo lock to come. We wished him well, his next obstacle being Barnby Dun Lift Bridge.

Pootling along

A looooonggg LOUD horn could be heard. Was that someone annoyed to be held up at the lift bridge?

Then another blast. Within a few minutes we could see where it had come from, Exol Pride! I so hope the single hander had been warned about the big blue boat, suspect the Looooonggg blast had been suggesting he got out of their way!

There she goes

We stood and watched as Exol came past, a slight change of engine note before the junction, was that for us or just an adjustment before crossing under the Don Doors? The canal took a good half hour before it returned to calm.

A little after 1pm it started to rain. With whistling wind accompanying it we were glad we’d decided not to move today. Instead I sat in front of the stove and knitted, nearly a whole sock today, just short by an inch or so. Mick pottered on the computer whilst Tilly inspected the insides of her eye lids.

Oleanna

Today we added another option to our escape routes southwards.

  1. Out of Keadby to Cromwell
  2. Head across the Pennines, most probably by the Huddersfield Canals.
  3. Head down the Ouse to Trent Falls and onto the Trent that way.
  4. Cancel a trip to York by boat to meet with family and get through Thorne Lock before it shuts. Have a day trip by train instead.

The jury is still out.

It’s time to add a recipe to the Baking section. Tonight we enjoyed the last slices of my Bakewell Tart.

Click on the photo to get to the recipe

0 locks, 0 miles, 1 walk, 3 waterways crossed, 1 solo boater, 1 Pax, 1 big blue boat, 4 signs of spring, 1 reluctant cat, 1 inch short of a sock.

Five Floating

Sykehouse Junction to Bramwith Junction

She’s not so shiny now

Five years ago today, really quite early, in fact a touch too early, Oleanna was craned into the canal at Finesse and Jonathan Wilson’s boatyard. I say too early as she was the first boat to be moved that day and sadly we missed her being craned in by about twenty minutes! Here are a few photos from the day and a Link to the blog post. At the time I had a broken ankle and couldn’t get on board Oleanna, so a fork lift and a pallet were brought to assist.

Today in 2022 would not be quite so exciting. Today we would head southwards along the New Junction Canal, how far dependant on a new pair of glasses for me.

Yum!

First though was breakfast whilst Tilly had a couple of hours exploring, Exol Pride had moved off, most probably at first light so the way ahead was clear for us. Pushing off at almost midday we pootled past a couple of chaps in high vis who had been looking at a generator that is chained to the Went Aqueduct.

Went Aqueduct

The lift and swing bridges today gave me a few vehicles to hold up including a bin wagon, a car on a trailer. Not the most we’ve stopped along this stretch before but better than a couple of weeks ago.

Open for us

The light at Sykehouse Lock was amber, but as we came through the first bridge it changed to green, someone on duty. Approaching the bottom gates were open, the swing bridge still across the chamber, but this was moved before we got there. Once in the lock we were ushered above the swing bridge so that it could be brought back into position. The Lock Keeper shouted down to us to keep towards the bridge, the currents created by the paddles towards the top gates can have you going all over the shop.

Looking back through the swing bridge

Two C&RT chaps were sorting things on a small digger boat, maybe this would be heading towards Thorne Lock to assist with the works there next month?

On one of the longer stretches between bridges I gave the Opticians a call. My new glasses had been ordered in Scarborough and last Tuesday they rang me to check where I’d like them sending to, they suggested that they should arrive in a day or two, but I’d not heard a thing.

Close but not too close to the bridge

The line just rang and rang as it had done yesterday. No automated lady giving me options, it just rang. Mick suggested we both try calling at the same time, a possible faulty circuit meaning my call would never be heard at the other end. My phone rang, but a lady answered Micks call, an old 1970’s Post Office trick had worked.

Unfortunately my new glasses had not arrived with them, so I tried the Scarborough store, the lady there said she would look into it and to leave it with her.

At the last swing bridge I thought I was about to hold up a couple of C&RT vans, but they pulled in as the barriers lowered. Good job they arrived when they did. One chap was saying that the barrier on their side hadn’t been working earlier on. They removed the cover and peeked inside, Mick brought Oleanna through, then I pressed the close button. The bridge swung shut, returned to be level with the road, the sirens sounded, the chaps stood back from the barrier.

Leaving them to sort the problem

On my side the barrier rose upwards, on their side the barrier tried, rising only a couple of feet before dropping back down. The chaps encouraged it to lift and also had to give it an encouraging final umph back into it’s upright position. If they hadn’t been there to see to it, I’d have had to call them out.

Don Doors

Under the Don Doors and over the River Don we arrived at Bramwith Junction. This would do us for the day. The wind making it hard to moor again. Mick had to cling onto the centre line whilst I wrapped chains round the steel and tied our ropes. My right hand grip really does not like clinging on to ropes in the cold, hopefully as the temperatures rise this will ease.

Those dry mole hills are great for digging in!

The afternoon was spent knitting, towpath exploring and a touch of planning. On the Trent-link group suitable tides have been worked out for those considering heading round Trent Falls. Mick had identified one of them as a possible for us, so at least his calculations are correct.

The fourth pair of socks was completed, then the next two had yarns auditioned and the fifth pair was cast on and knitted up to the gusset before bedtime. Ooo errr!

1 lock, 5.4 miles, 3 swing bridges, 3 lift bridges, 13 held up, 1 dodgy barrier, 3 C&RT chaps, 0 glasses, 1 boat not in a hurry, 1 possible tide, 4 grey paws, 2 glasses of wine to toast Oleanna.

https://goo.gl/maps/6zL4rfHQAP2YAKaq7

Pootling Before Breakfast. 6th March

Opposite Spicers to between M62 Bridge and New Bridge.

Interior view

The sun shone through the boat curtains enticing us out early. After a cuppa in bed we donned our layers and pushed off, winding and headed out through Goole Caisson and onto the straight.

Blue sky cruising, wonderful. Tilly sat in the windows sunbathing all the way, slowly watching the outside move.

Distorting the reflection

We’d just beaten a canoeist to the undisturbed water, leaving it all rippled for him to follow us. Wonderful reflections today.

The new green mesh fence continues along the north side of the canal for quite a distance, presumably to keep people off the railway line. No good for cats. The new or refreshed piles of stones for the animal escapes glowed in the sunshine. Last year there was an increase in the number of dead deer floating in the canal, hopefully these will help them escape now.

Approaching Rawcliffe

At Rawcliffe, the Croda works were giving off fumes and as we worked our way along they increased in pungency. No idea why someone would choose to sit and fish right alongside the works with that smell all day long, it made me want to hold my breath!

Blue blue skies and the M62!

Another mile on we dipped out of the sunlight under the M62. Now to choose where to moor, I’d already checked the fishing facebook group and todays match was happening further up at Pollington, so we had a very long expanse to choose from.

To maximise the solar we chose to moor on the north bank with the hatch to the towpath, our chimney not able to cast a shadow on the panels this way round. The other reason being for ease of access for Tilly to come and go, using the hatch to return.

Watching us go by

By now a breeze had picked up, so it took a while to hammer spikes in and tie off temporarily before replacing with chains. The commercial gravel barges are not running at the moment whilst investigations are on going due to the number of fish deaths in Knottingley, so they wouldn’t be bothering us. Exol Pride was moored facing towards Hull in the docks, so we doubted they would be coming past for a day or two, but chains were preferable to spikes in the softish ground.

Tail held high

As soon as we were settled I entered Oleanna to the VERY excited sounds of Tilly. After four months of being in the house with bully neighbours she now could have her towpath freedom back. Have to say she’s a far more relaxed cat on the boat, some sudden noises are interesting, but not as life threatening as they seem in the house!

A good nosy along the towpath, but with a lack of trees or deep friendly cover she decided it would be better back inside.

An afternoon pedicure

Out of the seven hours shore leave granted today I think I took an hour, the rest will be kept in reserve for another day.

Normal service has resumed

Time for breakfast. Turkey sausages, hash brown, tomatoes, mushrooms and poached eggs on toast. Yummeroonie!!

Exterior view

After all the tidying, cleaning and packing of the last week we deserved a quiet day. Several boats came past on a jaunt out from Goole or Rawcliffe and not a sole walked past us all day. Plenty of sky surrounded us and it was just wonderful to be back onboard.

However we have a mystery which hopefully someone can assist with. Last night on heading to bed I noticed a green dribble from the porthole in the bathroom. Condensation? Well it dribbles like condensation, but then dries out to green crystally stuff. We wiped it up and then this morning it was happening at both bathroom portholes! The starboard side not so much. Has this happened because the boat got so damp a few weeks ago? Where is the green coming from? It’s definitely coming from behind the plastic porthole liner and not running off the window frame. Anyone any suggestions please.

Ahhhh

This evening we’ve enjoyed our usual Sunday roast, a chicken with tarragon butter under it’s skin. Only one thing would have made today better and that would have been to turn the volume down from the motorway a touch. Still a wonderful day to be back afloat.

0 locks, 3.73 miles, 2 winds, 1 blue sky day, 1 out of 7 taken, 1 changed cat, 1 happy relaxed cat, 2 poached eggs, 4 turkey sausages, 2 green dribbley portholes, 1 roast chicken, 1 slow day, 3rd sock finished, 4th toe done, 1 Gold licence in the window at last.

https://goo.gl/maps/oUYS9hE5pGK1cNFe9

Panto Postcard 4, 2021

Apologies, as this will be a short postcard this week, so I’ll stick to last Saturday as that was a very busy day both here and up North.

Mick was up seriously early and on a train at 5 something silly o’clock, he was heading to Goole to try to make the most of what hours of daylight there were. I on the other hand had a little bit of a lie in, well it was going to be a long day for me. Between the two of us we spanned 23 hours.

The curtain going sideways on Act 2

At Chippy Theatre it was time for us to be joined by Will Burgher the Lighting Designer who came in to watch a run of the show. The Pippins were also in and the three teams took it in turns to do scenes. Minimum scene changes happened so it was a little bit hard for me to make notes on what I still needed to work on, but it was good to see the show from start to finish.

I think it was Thursday that I’d received a message from Ann Marie and Dave from NB Legend, they had pulled up in front of Oleanna. We’d hoped our paths would cross earlier this year around Trent Lock, but we were just a bit too quick in passing on our way down to London. Legend has been down the Trent visiting all the off shoots, Boston, up the Chesterfield and when they came off the river at Keadby they had headed on up to Sheffield. We actually thought our paths might have crossed at Bramwith Junction a week or so ago, but due to Oleanna being poorly that hadn’t happened. Instead the boats met in Goole and they helped to keep an eye on Oleanna from the bow whilst Wendy and Martin kept an eye on the stern.

Mick arrived in Goole at 8am and cycled the mile to Oleanna, there was time for a cuppa and a catch up with Ann Marie and Dave before he needed to be on his way.

Heading west

By 9:30 the pram hood had been dropped and Oleanna was winded to face west. Mick waved goodbye to Goole, NB Legend and WB Lullabelle most probably for the last time this year and headed out through the caisson.

The breach site

He motored on along the long straight passing the breach site and on to Sykehouse Junction where we turned left onto the New Junction Canal. This had been planned to happen three weeks earlier and Bridget and Storm had kindly offered to come and operate the bridges for Mick, but today he was going to single hand them.

Some are lift bridges

Now when I operate lift or swing bridges I keep a tally of how many vehicles I hold up. Admittedly I’m not single handing, trying to work the bridges as quickly as possible to hold up as few vehicles as possible, but I was a touch disappointed when Mick told me he held up ‘a few, not many, but a few’! That’s no good for the numbers!

Approaching Sykehouse Lock, is that a green light?

He worked his way along through the first lift bridge. As he approached the second bridge Kirk Lane Road Swing Bridge he thought he could see a green light at Sykehouse Lock. But at distances the lights can be a touch confusing and once he got that bit closer it was most definitely amber, self operation. I’d passed on my knowledge of this lock to him as there is a swing bridge over the centre of it and to be able to operate the panels at either end you need to insert your Key of Power into the panel by the swing bridge and open the bridge to the canal before either of the gate panels will work. However as he approached the amber light turned to green, there is an enthusiastic volunteer who can quite often be found at this lock and today it was Mick’s lucky day. The lock was set and waiting for him, he didn’t have to step off the boat once. Thank you.

By 1pm Oleanna had passed through the last of the six moveable bridges. Ahead lay the Don Doors, two guillotine gates that can be dropped when the River Don goes into flood stopping the river from backing up along the canal from the aqueduct. Earlier in the week I’d seen the River Ouse in flood so there was a possibility that the Don was high, but thankfully not high enough for the doors to be closed.

Don Doors in the distance

In Chippy by now we’d finished the run. The show was running at a half hour too long, some trimming would be needed, there is nothing worse than an over long panto, yet Rapunzel hadn’t felt too long. Dash headed home to work out what could be cut over the weekend.

Notes after the run

Reaching Bramwith Junction Mick battled a touch with the wind to turn the sharp left to Bramwith Lock. Sadly no help on hand here so the ladders were used to get on the boat once she had descended. By 2:30 he’d passed through Bramwith Swing Bridge and was on his way to Thorne.

This left Thorne Lock with it’s swing bridge to do, all operated by the Key of Power, well apart from the road barriers that are manually swung into position. Then it was the renowned Princess Royal Swing Footbridge.

Don’t Look!

Mick moored up and went to operate the bridge, he followed the instructions to the T, but the very particular barriers on the far side got the better of him! Two barriers pull out and lock into position, you then cross back over the bridge and pull out the barriers on the control panel side. This means that unless you are as skinny as a heron you cannot get back across the bridge to wiggle the far side barriers to encourage them to locate properly. Fortunately a local came along and knew what to do. The bridge opened, Mick brought Oleanna through and another local closed the bridge and returned the key to Mick, handy as the bridge landing on that side has deteriorated so much it would have been just about impossible to get off Oleanna safely and tie up.

Oleanna’s home for a few months.

Not much further on they had reached their destination shortly before it got dark. Mick turned Oleanna into Blue Water Marina, her winter home this year. We’d hoped to be able to return to Viking Marina in Goole, but Laird had no room for us, our mooring from last winter now occupied by a go faster cruiser. Mick secured Oleanna to the short pontoon that we’d been allocated, closed her up and headed to the station. Today’s mission was accomplished, winterisation will happen on another visit.

Back on stage the technicians spent the afternoon adding more lights, they were meant to be focusing the lights on stage and then moving to the front of house bars handing over the stage to me to paint. I got myself ready with pots of paint, brushes on sticks and the model to follow. We were all in a position for me to start painting a little later than originally planned, they carried on working in the auditorium until I’d painted too much of the stage for Will to be able to play Hopscotch anymore.

The stage flooring was recently resurfaced which should have made for a nice floor, but somehow the boards were laid rough side up, this made the painting of washes quite a bit harder than it should have been. When Ash left at 11pm I thought it might take me another four hours to finish painting the floor and get two coats of glaze on it, but time just evaporated.

Once the washes were complete I stopped for something to eat, then thankfully enough of it was dry for me to add green hedges, the heating in the auditorium having been put onto it’s highest setting to aid the drying. Next came white and purple for a touch of floweriness. Gavin hunted round for several fans to help with the drying and by 3am I was applying the first coat of glaze. This should have had two hours before the second coat was applied, but by the time I’d finished getting into all the nooks and crannies it felt dry enough to walk on. The second coat went on in 18 minutes, the roller sleeve was left in a bucket of water to be cleaned out properly on Monday and I was out of the door just before 4:30am.

Floor finished

A long day for both of us.

3 locks, 17.6 miles, 9 bridges, ? held up, 3 lefts, 1 lockie, 2 helpful locals, 1 winter mooring reached, 2 weeks late, 1 run, 30 minutes too long, 1 hour late starting, 9 hours of floor painting, 2 coats glaze, 4:30am, 1 pooped Pip.

Panto Postcard 1. 2021

59.5 hours

Monday morning I was in the theatre early. Time to hunt out my paint orders and old paint I would be needing this week. The dressing room that we normally use for a props office (until the Dame takes it over) was piled high with Panto Post. I found most of my things tucked under a pram in the wings of the stage.

I then met up with the new Producer Suzette who gave me a lift out of town to Alfred Groves and Sons in Milton-in-Wychwood where I would be working this week. A while later Gemma arrived with the advance pieces of set for me to paint. These are the pieces that will be needed early on in the fit up or will end up being high up.

Ready to prime

We collected more things from the theatre, like a table chair and ladder. All pieces of scenery were laid out and by the end of the day everything had a prime coat of paint on them. Taxis were booked for the rest of the week to get me back and forth.

Meanwhile up in Yorkshire. Mick did a few things whilst still having use of the car, he’d hoped to be able to buy a new part for the kitchen tap which is dripping again, but one will have to be ordered on line. Once he’d returned the car he and Tilly made ready for the off. Because Bulholme Lock was still being operated by a Lockie he wanted to take advantage of not having to single hand it. He was beaten to it by the gravel barge Farndale, heading back to Hull sitting high in the water. With big beasts of boats now using the waterway it’s wise to find secure moorings as mooring spikes are unlikely to withstand the movement.

Being dismantled

Mick descended the lock and headed downstream towards Ferrybridge. More buildings have been demolished around the power station and the old coal wharf is gradually being dismantled. I’m kind of glad I wasn’t there to see it, although jealous at the same time.

Oak assisted drawing

Tuesday. My taxi arrived and whisked me out to Groves, the driver I would see several more times this week. Despite it being unseasonably warm I had paint that wasn’t drying! So I spent the day drawing everything out. To aid this I hunted around some skips in the yard outside, nearby carpentry workshops supplied me with offcuts I could use as a yard stick. Fixing a pencil to the end means you can draw from a distance and supposedly get better curves. The only sticks I could find had been oak, a touch heavier than I’m used to, along with the lack of practice my curves were not so good, but that could be sorted with paint.

1 kettle and a glass of wine

A short day today as I had a ticket to see The Strange Case of Dr Jekyll and Mr Hyde at the theatre. Blackeyed Theatre are touring the production for which I have several connections. It was adapted and directed by Nick Lane, the Company Stage Manager Jay and one of the actors Zack are all people I have worked with, they are part of my Hull Truck family. It was great to see the show, but better to see Jay and Zack. We headed to the pub where they were staying for a couple of drinks after the show. I of course took a kettle with me, now I could have hot drinks at the paint shop.

Only three towers left at Ferrybridge

Back in Yorkshire. Mick had moored overnight in Knottingley allowing Tilly to have a bit of shore leave. The river level had risen and the flood lock was closed behind him. Good job he’d come through the day before as it’s a very long lock to single hand in.

Next stop was just below Whitley Lock. He’d arrived as someone else had below, the lock got a touch confused so even though it was almost in his favour it was emptied to bring the other boat up which seemed to sort the problem out. The crew from the other boat helped Mick down. He then pulled up on the visitor moorings and let Tilly out.

Wednesday. At last I had dry paint! I could start to add more. I spent a lot of the day either bending over or on my knees laying in and blending the yellow stonework on Rapunzels tower, both inside and out. It took forever and my knees were not my friend by the end of the day. I did treat myself by starting to add some colour to the Cotswold Thunderbolt pieces. Being able to stand up to do this was a joy, I needed to move the other pieces up off the floor and also get some heat as it was starting to get chilly. The weather had been fooling me and I’d not even thought about heating until then.

Gravel barge in Whitley Lock

It was raining at Whitley. Mick decided that he would leave when they moved up to Tilly, so she got busy outside. Just as well he’d managed to tie up to rings as Farndale came past with a full load of gravel. One of our fender hooks broke and sadly a rope fender dropped into the deep Yorkshire water.

A full Fusedale

Half an hour later Fusedale the other gravel barge came past fully laden. I suspect Mick knew they were on their way as he’ll have had the VHF radio on. The gravel barges don’t have to drop crew off with the key of power, there are Lock Keepers on duty for them.

Around about midday Mick and Tilly pushed off although they didn’t go very far, just to Heck Bridge as it started to rain. A strange noise from the domestic water pump made him investigate, it had sprung a small leak. He called Laird at Viking Marine to see if they had a 24 volt one in stock and he did. So later in the afternoon they pushed off again mooring above Pollington Lock.

Up against the walls

Thursday. A chilly start, I was glad I’d taken my thermals with me to work today. I thought I’d be getting a work placement to help me for a couple of days this week and had planned on standing all the set pieces up with their assistance, but because of all the paperwork and regulations they won’t join me until next week.

Cafes, carpenters, bakeries, chilled medication, all sorts at Groves

The big gas heater above my head sadly doesn’t work, so I put in a request back to the theatre for assistance moving things and some heat. The flats are not that heavy and maybe I could have done them on my own, but one wrong twist and I’d be out of action, so not worth it. John the Artistic Director arrived to help move things about, so much easier with two and now my knees could take a break. Another two colours were added to Rapunzel’s tower and I started to base in one of the houses for the town square.

Below Pollington Lock

Mick single handed down Pollington Lock. There is still no mooring along this stretch of water following the breach last December.

Slipping banks

Lengths of the piling holding the bank up slipped when the water level was low and parts of the bank have followed the piling splitting away from the bank.

Buoys on the way to Drax

Buoys mark the areas to give a wide berth of up to the New Junction Canal and around the bend where Drax Power Station comes into view (the only power station in the area still with all it’s cooling towers).

Breach site

Then the right hand bend and past the breach site.

All new

New piling over the big culvert and concrete now have a big rubber strip along the top edge. Two small manholes sit where there were ones before the breach.

Rubber edging

A new wooden fence is in place and grass seed is just starting to take hold around the area.

All the big machines, pipes, generators have long since gone.

New roof for a new life

Past New Bridge 21 you can moor again and further on the almost ruin of a house is in the process of getting a new roof. It’ll be watertight before they remove the bricks and breeze blocks in the windows. Mick carried on past Rawcliffe and through Goole caisson. Both diesel points in Goole had boats moored on them so he winded and returned to moor at the far end. He walked back to Viking Marina to get a water pump. Laird had quite a few and was selling them at a discount price, without a guarantee as several of them had proved to be faulty. If they didn’t work at all he’d either replace it or give you your money back. Mick bought two in case and soon found one didn’t work. Maybe they were a batch lot that dropped off the back of Del Boy’s cruiser!

Not a bad view when I looked up from my work

Friday. A heater was meant to have been left for me to pick up at the theatre this morning, but was annoyingly absent. John would sort it later in the morning. I based in more of the town flat and then started to add extra bits to the ship.

John visited me twice, once with a heater that didn’t work, then with one that did, Hooray!

I then spent the remainder of the day lining in the tower pieces. By the end of the day I had finished several pieces of set, a few just need a few finishing touches which would be better done when they are upright.

I’ll do anything for your kebab!

I requested to the taxi driver to take me to Sainsburys, I’ve been to most supermarkets this week, so that I could get something in stock for tomorrow. But Sainsburys seriously let me down with very few things I could eat without buying a mass of veg, I tried the Co-Op too and gave up, rewarding myself for a good days work with a chicken doner and chips. These I find are best eaten on a bench, they taste better in the open air! The aroma attracted some company from a local beggar who just missed me putting the box in the bin. Even a very big head nudge didn’t work.

Exol Pride’s new home?

Mick returned the none working water pump, got another, but doesn’t hold out much hope. He stocked up with food spotting that Exol Pride seems to have a new mooring near the coal tipper. We wonder if this is because it was all getting a touch too busy with the gravel barges also using the same moorings. He topped up with diesel at Goole Boat House and headed back out of Goole to just before New Bridge. Tilly prefers it out there. The unfortunate thing is that just as he was about to pull in he noticed that the engine temperature was rising, it kept on rising. Mick moored up.

The skin tank wasn’t hot, there was little hot water, but the engine was most certainly hot. Was this a recurrence of what happened on the Thames two years ago? Or had the water pump on the engine gone? A phone call to RCR in the morning when he might be able to get a touch closer to a road.

Finished, Rapunzel’s window when it’s cut out

Saturday. Somehow my taxi this morning had been cancelled, I got it sorted and got out to Groves for a bit after 10. I managed to join the Geraghty zoom for a short time whilst I opened up tins of paint. Lovely to see everyone even if briefly.

Going a bit gingerbread

Time today was precious as it was my last day here and the set pieces would be collected tomorrow. I ended up finishing several other pieces but by the end of the day I had no idea if the roofs for the towers were right or not as I had to leave then drying. Paint was all packed away, my possessions collected together and hopefully I left the place in a reasonable state as I ran hobbled to catch my taxi. My left knee is very much looking forward to doing next to nothing tomorrow.

I could do no more, before my taxi turns up

Mick decided to move to Rawcliffe this morning where there are bollards to moor to and an easier place for an engineer to get to the boat. Oleanna managed to hobble the distance but was getting very hot and bothered as she arrived.

A nice local engineer came out, listened to Oleanna’s woes and history. He doesn’t think it is the pump on the engine, but thinks the system is gunked up again as it did on the Thames. He feels that the system needs a good flush through with a power hose. He thinks that maybe the level of anti-freeze wasn’t correct in Oleanna’s early days and that a flushing out means that we can start from scratch again. We’ll see, Oleanna now has an appointment with a jet wash on Monday, if she can get there!

3 locks, 27.65miles, 1 straight on, 4 winds, 3 water pumps, 1 too hot engine, 11 taxis, 1/3 of the set, 3 heaters, 1 working, 1 lovely space to work in, 3 supermarkets visited, 0 digs cat, 1 scrounging cat, 1 friendly landlady, 2 ex truckers, 1 show, 31 pots of paint, 1 fat knee!