Category Archives: Cats on the Cut

Pig Comes To Mind. 11th Septemeber

Devil’s Garden to Runcorn and Western Canal Junction to Marsh Lock

Tilly awarded the Devil’s Garden a stamp of approval this morning despite it peeing it down for most of her shore leave. A boat we’d passed yesterday came past and pulled in next to the other boat on the field. This is such a lovely mooring, hope we have time to stop here again on our way back.

There’s a devil out there!

A lull in rain gave us the impetus to push off at 11:30am. The chap who’d pulled in asked if we’d got a brolly, well on Sunday we discovered our brolly was destined for the bin! It wouldn’t have helped today as it was very windy plus we were heading into the wind!

There they go

Soon we came across a rowing eight and rescue boat, everyone as soggy as we were. They had soon turned and could be seen gaining on us. Their cox wasn’t altering their course any and they were destined to meet with our stern fender. What to do? Hold our course, they were still gaining on us! Mick decided to pull over to our port and slowed down with the aim of them continuing straight on. This didn’t work as they also slowed right down and looked at one point as if they were about to turn again and head up stream. We carried on returning to the correct side of the river, after a while they came past us to port.

Here they come again

There was a space at the end of the moorings at Sutton Swing Bridge, but we wanted to continue further today despite the rain, maybe we’d stop here on the way back.

Daniel Adamson

On the other side of the bridge sat the Daniel Adamson, were they on the water point? We spotted a pontoon just after them and pulled in to dispose of our rubbish. This is the boats home mooring, hooked up and filling with water. A chap came and asked if we’d like a look round. Silly question! Of course we would. A cruise on the Danny was on the list of possible things to do for Mick’s 60th birthday a few years ago.

The Danny (originally named the Ralph Brocklebank) is a steam tug which was built in 1903 in Birkenhead. She was built to pull long strings of barges laden with goods from Cheshire and the Potteries to Liverpool. She also carried passengers between Ellesmere Port and Liverpool this continued until 1915. During WW1 she had a short stint for the Royal Navy patrolling around the Liverpool coast.

Ropes

She was purchased by the Manchester Ship Canal in 1922 for over £3000, she still towed barges and carried passengers along the Ship Canal including VIPs around the inland docks. In 1936 she was given a radical refit was renamed after the Ship Canals chairman Daniel Adamson. The wheelhouse and bridge were raised, she got an upper deck and two saloons. The interior decor was done by Heaton Tabb and Co who were owned by Harland Wolff Ltd and had worked on the grandest of Atlantic liners. The interior was renovated in the modern Art Deco style.

Curves

Trade on the ship canal and the docks changed through the following decades. With the rise in container ships Manchester docks could not compete and were closed in 1982. The Danny was retired and in 1986 she was towed to Ellesmere Port Boat Museum where she’d started out her life 83 years earlier.

Her upkeep dropped, she fell into disrepair due to funding cuts, she was vandalised and set fire to. By 2004 she was earmarked for the scrap, but word got round, and Mersey Tug Skipper Dan Cross set up the Daniel Adamson Preservation Trust and soon he’d bought her for £1 from the Ship Canal. By 2015 the Heritage Lottery Fund had awarded the trust £3.8 million to restore her to full working order, by which time volunteers had already given over 1000 hours of their time.

Beautiful woodwork

Gordon showed us round, what a treat. The saloons were restored to how they would have been in 1936 with beautiful wood, glowing with warmth, graceful curves and deco steps.

Fancy

The steps up to the bridge have brass fretwork on them. The wheel is the original still with steam powered steering. The love for this boat shone through as Gordon told us the history.

The boiler has three fires

We’d noticed the standard hose pipe to the water point. It takes them three days to fill their tank and tonnes of water is needed as ballast! She has a coal fired boiler and the volunteers are now grateful that the coal arrives in bags as they have ten tonnes to shift at a time and get into the holds.

Steam powered steering

Mick asked how she was to steer. Gordon’s reply was ‘Pig comes to mind!’ From the bridge you can’t see the bow due to the canopy over the deck below, so they use the Jack mast to steer by. Four turns of the wheel, then you wait to see what she’s doing before you have to compensate.

Not only does the water tank take three days to fill, but it also takes that time for her to get up to steam for a trip. If she’s moving two days in a row firemen have to stay on board overnight to keep the fires going.

Thank you Gordon

Thank you so much Gordon for showing us round, what an unexpected treat when only wanting to dispose of our rubbish.

Chemicals

Under the M56 and onwards towards the Ship Canal. Blimey it was getting windier and windier. Now we cruised past the start of Koura Global a massive chemical works, followed by INEOS more chemical works. This continued on right up to Weston Lock where the Weaver navigation meets the Manchester Ship Canal and the River Weaver. We then turned to follow the navigation to the north for about another mile still accompanied all the time by chemical works.

Last lock on the Runcorn and Western Canal

Along here a narrow strip of land keeps the navigation from the ship canal, we couldn’t see it from onboard Oleanna sadly. At the far end the current navigation stops at Weston Point. Here there used to be three sets of locks.

Six inch 1888-1915 map

One towards the Ship Canal to the west. A lock to the north which led to another two locks and then out onto the Ship Canal. Then to the east a lock up onto the Runcorn and Western Canal which finally led to the flight of locks up to Runcorn. The bottom lock gates of the later lock are still visible, today with a heron guarding them.

A rare moment of sunshine after we’d winded

We’d heard that it might be possible to bang spikes in here, but we couldn’t work out where. So instead winded and headed back to Marsh Lock where there is a pontoon. We’d been warned the other day that the pontoon has lost it’s access to the bank. Mick later in the afternoon managed to haul himself up onto the bank and go to have a look at the lock and across to the Ship Canal, the Mersey not far away either.

Marsh Lock looking out onto the Ship Canal

White horses and rain continued for the majority of the day. Tilly resided herself to sitting in front of the stove. I joined her to do some knitting. News came through later today that Hunts Lock on the Weaver has been successfully repaired and is now open for navigation. An adjustment of cruising hours now required to reach the other end too in the time we have.

Our mooring for tonight

0 locks, 6.4 miles, 1 swing bridge, 2 pairs of gloves, 1 guided tour, 1930s deco, 3 days for water, 3 days to get enough steam, 10 tonne coal, 1 stove lit, 1 cosy cat, 1 very wet and blustery day.

Welsh TV not from Manchester

https://maps.app.goo.gl/jDtbx9Af6LvNfL8H6

To Devil’s Garden. 10th September

Moorings above Saltersford Lock to Devils Garden

A wet morning and my back had a twinge, last thing I wanted to do was get down on the floor to do my exercises, they could wait for another day. One thing that couldn’t wait for another day was a cruising plan. A joint effort was required and a touch of maths.

Serious planning

We both opened up Canal Plan. We worked out when we need to be back in Yorkshire, a mooring has already been found for Oleanna. Then specific dates when we need to be elsewhere, the number of days when Oleanna won’t be moving, which stops require a train station, which a marina. The way Canal plan works is that if you add in some stationary days then the end date of your cruise gets added to. We didn’t bother with this, instead we deducted the number of days Oleanna would be stationary from the full trip and kept a tally on how this affected trip days. I understood my method, Mick just had to go along with it and see if it worked. Thankfully it did. Yes we could have adjusted the trip on Canal plan and added in the stationary days but that would then be a touch ridged.

Three possible routes to try out and see if the dates would work.

Firstly the Huddersfield Narrow, the shortest cruise. Plenty of stations to choose from, if we got stuck by flooded rivers it would be the easiest to move the boat at short notice when levels came down. Marinas not so plentiful, but a slight adjustment to cruising hours made it work.

Second choice the Shroppie, the longest cruise. This would mean not doubling back on ourselves too much. Stations not so good, some buses would be needed. Cruising days on the Tidal Trent have some leeway and the tides look favourable to CRT working hours at the locks. Some adjustment required for a marina, but that would be manageable if they have room.

Third choice the T&M, in between the above cruises, retracing the way we’ve just come back to Fradley. The Tidal Trent on the same days as the Shroppie, better stations too.

The final choice is still to be made, but at least we could let friends know the two possible locations we’d be at for a rendez vous. About half an hours drive between them so at least they’d know where abouts to head in the first place.

We checked the radar. More rain due overhead. Two boats moved off, a while later they were replaced with another two. We were going to wait until after lunch, hoping the rain would subside. The two boats that had arrived headed off again in a lull in the showers.

Hello back there!

At 2pm we decided to make a move whether the weather was good or not. Waterproofs on we winded and headed down stream to Saltersford Locks. On arrival there was a boat moored on the lock waiting pontoon, where was the Lockie? We hovered for a while, then Mick rang the Lockie. The lock would be ready in about 15/20 minutes, the boat on the landing moved off and we could pull in to wait. Sure enough the lock took forever to fill, the Lockie set it filling and headed off for a while.

This is the only downstream lock we went through back in 2011, it holds 660,000 gallons of water and I think it was estimated back then that it could hold 27 Winding Downs. It sits alongside a smaller lock, but that hasn’t been used since the 70’s. We passed our ropes around bollards towards the back of the lock. The bow just by a set of disused centre gates. The lock was set emptying, this would take time too.

For sale with some period details!

Just below the lock was a water point we pulled in to fill up the tank. An end of terrace cottage, formerly a Lock Keepers cottage, is for sale. The pressure was pretty good so we were on our way again soon.

Pontoon Mooring?

We didn’t remember the journey to Dutton Locks from 13 years ago. Houses sit close by. Some leading up to Acton Bridge have pontoon moorings sticking out into the river, one of them for sale!

Acton Bridge

The moorings by Acton Bridge were full. We wanted to be further on anyway and the mooring certainly wouldn’t be cat friendly. Mick took the advice of the Lockie back at Saltersford and called ahead to the next lock, it would be set ready for us when we arrived.

Looking towards the weir

Above Dutton Locks the moorings were full. The sunk vessel we’d seen 13 years ago has degraded a lot! Maybe on our way back I’ll get a closer look, today we wanted to head on further. We pulled into the lock, the gates closed behind us and the water started to drain out through sluices in the side of the lock.

Disintegrating

Now on totally new water to all of us. Back in March 2011 the locks had been on winter opening hours meaning they had to be booked, we only had limited time on the river anyway so hadn’t ventured further, today we could carry on.

Dutton Viaduct came into view, dark against the rain laden clouds, sun streaming through where it could. The river has views, next to no flood banks. Open views, then tree lined banks. We had our hopes on a mooring a mile or so further, a little m on our map meaning we’d need spikes.

Dutton Viaduct

As it came into view it had great potential and there was only one boat moored up, space for us. We winded and pulled in a short distance up stream with trees to our bow and stern, our own slot. We’d found the Devil’s Garden mooring, both of us had heard of it before, a favourite for many.

Ducks are forever hopeful

Tilly was allowed out and we all had a little explore, checking signs and fences avoiding stepping in the cowpats. Tilly stayed out and played for a while, but it was blustery, rainy and she was wanting dingding.

They’ve come out to play too!

Mick lit the stove, we’d be needing one for our jacket potatoes to accompany a pie each. Yarn was selected for the next pair of socks, pair 37 I think. Thank you to those who’ve sponsored a pair this week I’ve now only got to find two more sponsors to make 52 pairs for the year and I’ve beaten last years total too! It may be that as the nights start drawing in I may be able to knit a few more pairs, after all why stop at 52, I’ve still got a mountain of yarn to use.

https://www.justgiving.com/page/pip-leckenby-1704636205453?utm_medium=fundraising&utm_content=page%2Fpip-leckenby-1704636205453&utm_source=copyLink&utm_campaign=pfp-share

2 locks, 5.8 miles, 2.2miles of new water, 30 minutes for one lock, 1 full water tank, 1 damp blowy day, 2 pies, 2 jackets, 0 cows, 37 in 4 shades of blue, 1 cosy boat, 1 lovely mooring.

https://www.google.com/maps/embed?pb=!1m17!1m12!1m3!1d7260.5534387613325!2d-2.6748082668054605!3d53.28409690096703!2m3!1f0!2f0!3f0!3m2!1i1024!2i768!4f13.1!3m2!1m1!2zNTPCsDE2JzU3LjUiTiAywrAzOSc1My45Ilc!5e1!3m2!1sen!2suk!4v1726061794294!5m2!1sen!2suk

First Weaver. 9th September

Northwich 2 day Visitor Moorings to above Saltersford Lock

With all the rain yesterday we both were checking the river levels this morning. The Northwich reach had actually gone down, but above and below had risen, obviously there had been someone lifting sluices on weirs to control things.

A little bit of extra time was used to start catching up on the blog. It takes time, usually whilst having breakfast, but on longer more interesting days (well more interesting for me) it can take a while longer. Certainly sifting through photos eats up time. Plus early starts to cruising limits writing time, so I had a lot to catch up today.

Town Bridge

Time to stock up on food for a few days. The nearest supermarket is Waitrose so we went to see what yellow stickers there might be.

Crossing Town Bridge we noticed the different gates at either end. On the west bank is a sliding gate that crosses the road to stop traffic, on the east side there are two gates that hinge closed. Then the bridge would be able to swing to allow taller boats to pass through. The bridge was opened in 1899, designed by J.A.Saner and was the first road swing bridge on floating pontoons and the first electrically operated swing bridge in Britain. In 1924 it was closed for several months for repairs and strengthening during the period known as the Northwich ‘big lift’ when buildings and roads were raised to combat subsidence. In 1998 further works were undertaken, the bridge being lifted off and put in a car park for repair. A crane was brought in which had been used to build the Millenium Dome, but the weight of the Town Bridge at 330 tonnes and was too heavy for the crane.

Winding

Back on board we had lunch before pushing off, we wanted to find a mooring for Tilly. Mick winded Oleanna, a lady watched from the marina and congratulated him on his expertise, then we were heading down stream back towards the boat lift. The new pontoon was even more chock a block than yesterday, NB Lyndsey Jane’s stern sticking out around someone’s bow fender. The pontoon below the boat lift on the other hand had lots of space, but we wanted a better mooring still, no pontoon would suit us, and Tilly better.

Under Town Bridge

Yesterday the flag at the boat lift had hung down, not a breath of wind to go with the rain, today it was dry but blustery. Waterway Routes showed us three possible moorings around a bend downstream of the lift. We passed a weir guarded over by cormorants and under another swing bridge.

The lift looking drier today

The first mooring had potential, we’d have been on our own. The second the bank was a touch higher, more difficult for me. The third was longer and lower, already with two boats moored, but with bollards, grassy field and bunny potential above it, this would do. We winded to face the current and pulled in, positioning ourselves in the middle away from the other boats, but space for two more to pull in either side of us.

Winnington Swing Bridge

Rules given, the doors were opened. Hmmm! It would be good if I didn’t have to share this outside with woofers! I’m not sure Tilly even made it into the field above, at least she had some outside time.

A weir and sluice gate

I managed to get up to date with the blog during the afternoon. Then our attention turned to our cruising plan for the rest of this year. Today a notice regarding the Huddersfield Narrow had looked promising, this route would cut down the miles of our cruise back to Yorkshire, but would our current set up work there? I’ve never had to clear the prop on Oleanna, in fact I’ve never actually cleared a prop on any boat! Would I even be able to reach the prop to clear it? This is one question that needs answering before committing to going over the HNC.

I’m not too sure about it here!

Ease of transport links are important over the next six weeks as appointments and engagements need to be met at different ends of the country. We also want to meet up with good friends and need to give them an estimate of where we might be. Having three possible routes is making this really quite tricksy. I think tomorrow we’ll need to knuckle down and make some decisions.

0 locks, 3.2 miles, 2 winds, 1 straight on, 2 boxes wine, 1 outside rejected, 2 loose ropes, 0.7m, 3 ways, but which one to go for?

https://maps.app.goo.gl/NEjAKuRivbF5VuqY7

An Explosive Night. 7th September

Croxton Aqueduct to Forge Brook Aqueduct

A couple of days ago a new notice had come through from C&RT, Saltersford Lock on the Weaver was now open. Then yesterday a notice regarding Hunts Lock also on the river suggested things were progressing well, an update would be issued on the 11th. It was now worth continuing with our plan to descend the boat lift, fingers crossed the work at Hunts lock does the job.

Tilly got some shore leave in amongst the dog walkers, the field alongside the mooring here was being used by a chap on his bike cycling round it with his two woofers running along behind. He did several laps whilst his little boy trailed behind only managing one.

LOTS of food!

There were things in the fridge that needed eating up, especially the white pudding we’d bought in Leek, so we had a leisurely morning, no need for lunch today!

With my knitting out the back we pootled onwards, quite a few boats heading our way, Bramble Cuttings was empty, was it last night? There were two boats moored opposite which suggested it had been occupied.

NB Huffler back on the main land

As we came past the flashes, we passed bows with NB Huffler. They had crossed the Ribble Link with our friend Chris (The Pink Hat Man) on NB Elektra quite a few weeks ago, then they were caught by the breach on the Lancaster Canal and the broken sea lock on the link. Not a good situation to be in. A few days ago they were lifted out and transported by lorry to Lymm where they were put back in to be able to cruise back to their home mooring for winter.

We then hoped we’d get to see another boat NB Halsall the coal boat, they were due to leave Park Farm Marina today heading for the Anderton Boat Lift. But there was no sign of them, we expected they were a long way ahead of us. However later on in the day we got news that they were actually behind us, maybe they’d catch up with us before Anderton.

Waiting patiently for two to come through

As we reached The Broken Cross Pub we could see a boat coming through the bridge, Mick pulled us over to the side where we trod water opposite the moored boats. A second boat came into view, we waited. As the chap came past he made a comment about the reeds that were encroaching from the offside, ‘if they weren’t there it would be a lot easier! Just what do we pay our licence fees for?!’ Well if that bunch of reeds was removed the only difference would have been that we’d have been able to wait for him to come through the bridge 60ft closer to it. So no difference to us really.

Approaching Tata

Coming through by the Tata Chemical works, cranes were busy on the site of the new power station that is being built. Right by the canal was a new structure which looked like a futuristic Swiss cottage on stilts wearing a very large roller on it’s roof. As we cruised past we could see several very large fans underneath , around 6m across, maybe this is a new version of a cooling tower? More info on the sustainable power station can be found here.

We finally pulled in, half an hours cruise from the Anderton Boat Lift, a little distance away from another boat giving Tilly some extra towpath. Across the fields bells could be heard, most probably from Great Budworth, someone was getting married maybe. However this was soon overtaken by a new large structure being erected on the nearest farm, steel work being hit into submission and then bolted together. This noise continued until dark.

That is when we got the sound of fireworks. Maybe it was the wedding, distant music could also be heard. If it was coming from the wedding the couple must have had a very big budget! Then after maybe 15 minutes we got fireworks again. These went on for quite sometime with a big finale. Another gap, then more. What was going on? Was there a firework convention going on?

It turns out that tonight in several locations across the country there were big firework festivals/competitions. Manufacturers showing off. The one we could hear was most probably coming from Arley Hall, there was also one in Blackpool and one at Catton Hall near Swarkstone at the other end of the T&M, 50 odd miles away. Shame we couldn’t see any of them!

0 locks, 7.5 miles, 3.75 hours shore leave, 3 hours of fireworks, 15 minutes dinging, 5 hours steel fabrication, 1 sock up to the gusset, 1 more pair sponsored.

https://maps.app.goo.gl/LKx3jcsvf28CTPiR9

On A Friday! 6th September

Rookery Railway Bridges to Croxton Aqueduct

Some shore leave before we moved on today, with the rest of the locks through Middlewich to work through we didn’t want to be too late leaving and Tilly obliged by returning in good time.

Bee and clover

Such familiar water this stretch. by the railway bridges there used to be a winding hole just long enough for Carefree Cruising boats to wind in before returning to base by Elton Moss Bridge, but now you’d be lucky to be able to turn a 40fter there, so overgrown.

Nice Lock

Nice Lock 67 had a boat just leaving it, if there was going to be one lock I’d operate on the Cheshire Locks this would be the one. I hopped off with a windlass, Mick closed the top gate and I wound the paddles up at the bottom end. This was quite often the first lock we’d go through on NB Winding Down, hence it’s Nice name, but it also was likely to be the last lock too, then it got named Nasty Lock! But now it’s always Nice.

Knitting as we cruise

Down the Booth Lane Locks meeting a couple of boats heading up. The last of these boats had a hobbling lady walking the towpath, she should have caught a lift as they were only going to have to wait at the next lock for the boat ahead of them to go up.

Statics avoiding looking towards the canal

More new houses going up and some static caravans are also being plumbed in right beside the canal, no canal view though as very few of their windows faced the water.

Mick as blue as the sky

What a glorious day to be boating. Sun blue skies and not too hot. Should we have a mooring today where we could have a bbq what would we eat? There were some sausages or mince, both frozen. Maybe we should see what the new small Morrisons could provide for us.

King’s Lock

We pulled in close to the fish and chip shop, two houses along the way for sale. Well except it was quite hard to pull in. A new length of armco looked appealing, but either there was a sunken vessel there or a ledge, we tried further along, and again. Finally we made it close enough to the bank. The gate to the road leads just that straight onto the road, no pavement just a little gravellyness then the busy road. Morrisons was out of various items, but there were some burgers and a bag of mixed peppers. I checked the free from items. That bread looked nice, ah no wonder it was Rye Bread, first ingredient, Wheat! No wonder they had quite a lot of it!!

We’d originally not planned on stopping in Middlewich, but to carry on straight through, but now we were moored up we had lunch. With one boat just ahead of us when we pushed off again we waited to use King’s Lock. This boat was going onto the water point then up onto the Branch, we had another two possible water points to choose from.

winding a 70fter

Just as I was about to bring Oleanna out from the lock a 70ft hire boat arrived, were they turning up to Wardle Lock and the Branch, no just winding. With a boat on the water point and a CRT work boat the other side of the junction this limited their turning circle. Their wind taking ages, but they managed it in the end. We followed them down to the Middlewich three.

With the opportunity of there being volunteers at each lock I decided I’d like to work the locks as I’d only need to do half the work. However there was a long wait. Another hire boat was under tuition coming up the locks so we and the boat ahead had to wait. The volunteer wasn’t going to let anyone through the lock until the uphill boat had cleared, both boats could have gone down in that time.

I let Mick bring Oleanna round the bend towards the middle lock

The 7/8 chaps on the hire boat in front seemed to know what they were doing and were soon on their way. The volunteer I suspect was a touch deaf as I asked if I could fill the lock. ‘NO!’ He then gestured to wind a paddle up! We were soon on our way down, I checked that there were other volunteers at the locks, ‘Yes’ marvellous! That was until the other two volunteers walked up to the top lock and said the middle lock was filling. Even my walking pole didn’t suggest we’d need assistance, they then vanished into thin air. Oh well the first time I’d been looking forward to having assistance at the locks and it wasn’t going to happen.

Last of the narrow locks for a bit

I opened up the middle lock, the chaps from the boat ahead lifted a paddle to refill the bottom lock for us. I worked us down the middle lock then Mick and I swapped over for the bottom lock, I could do no more.

Yarn bombed posts

We pulled onto the next water point and toped up the tank, emptied the yellow water and then made ready to push onwards. Big Lock had just been emptied, but we were soon on our way down. We’d totally forgotten about Middlewich on an afternoon, especially on a Friday, we’d thought we’d be through by early afternoon, but that pause for lunch! Saturdays it’s shareboat central at the junction, Fridays seemed to be hire boats! Mental note for next time, avoid certain days, avoid afternoons and the volunteers will clock off as soon as either the chippy opens or after the last hire boat is through.

Big Lock

It was getting quite late, we’d thought of heading on to Bramble Cuttings, not that much further, but on a sunny Friday afternoon there was likely to be no room for us. So when we came across Croxton Aqueduct and the towpath widened out and there was plenty of space we pulled in. Tilly was given an hour whilst we got ourselves ready for a bbq. The burgers I’d bought were really quite fatty and sent big flames up from the coals, charring everything. I gave them a few minutes rest away from the fire before finishing them off which seemed to calm them down a touch. A lovely evening sat out none the less watching and eating as the sunset.

Just about ready to start cooking

9 locks, 5.9 miles, 1 straight on, 1 new edge too shallow, 1 nice lock, 1 knee still able to do the T&M hurdles, 3, 2, 1, 0 volunteers, 1 closed council tip, 4 fatty burgers, 4 pepper haloumi kebabs, 1 bowl coleslaw, 1 sunset.

Closed!

https://maps.app.goo.gl/VKxYiedSpayt8Aur6

Why Do We Always Miss It!? 3rd September

Below Engine Lock 4 to Bridge 118, Trent and Mersey

Last night a cow had kept mooing. It moood a long time. Could we help it in any way at midnight? Hopefully what it had been complaining about disappeared not too long after we got to sleep. How would you find out which farmer the cow belonged to?

Twit twoo

No shore leave much to Tillys disappointment this morning. We knew we were already following at least one boat towards the locks back down into Stoke, coats on as it was quite grey we pootled onwards. It’s a long pound to Planet Lock, terraced gardens come down to the canal. Someone had been out to trim the sprigs from their neatly sculpted bushes, we wondered how they reached over to trim the edge nearest the canal. An owl watch us go by, guarding the door at the bottom of it’s tree stump.

Just as we approached Bridge 16A Oleanna started to list, a long scraping noise came from below, Mick knocked Oleanna out of gear. We’re used to scraping the bottom in shallow bits, but this was different. I made note on What3words and got ready to report it to CRT. Twitter used to be handy for reporting such things, but I’ve erased it since it became X. On the CRT website there was a chat function where you can report things. I decided to give it a go.

Lift!!!

Within a minute I got a reply asking if the canal was blocked, partially or fully. We got through, but someone else might not. Could they pass on the information and my details to the local team? Yes, I was kind of hoping you would. Very quick and easy to report and the answers that came didn’t feel like it was a bot replying.

Bride 9, low for some

It was first day at Stoke on Trent College for many, masses surrounded buildings with welcome flags flying, that will be Josh in a few weeks time. So many young people moving on with their lives into new directions.

We passed a couple of boats heading up the canal, thankfully not on big bends. The lift bridge I only caught one car and a pedestrian. We considered stopping for supplies at a handy Lidl, but that could wait for tomorrow, there were other things we needed to buy today.

CND Meow

Planet Lock was almost full thankfully as only one top paddle is working. Then Mick walked ahead to the staircase whilst I brought Oleanna along slowly behind. A lady filmed Oleanna going past out of the window of a restaurant, I waved and she laughed, nice to make someone’s day.

In at the top

The staircase only needed a touch of topping up and was ready with the top gate open for me. The bottom chamber must leak as that was already empty, just how we’d found it on our way up. Downerty Down.

Out the bottom

Was there any room by the Museum? No and not enough room for two boats. Extra space required today. We paused to dispose of yellow water. There were several CRT people busy with items they’d pulled out of the canal, shopping trolleys put onto vans. A lady in blue said hello to us, very jolly. She said a friend of hers had named her daughter Oleanna, an unusual name. This is only the second time someone has made comment on the name knowing of it previously, makes a change from ‘Are you Oli and her Anna?’

This is a rubbish outside, please tie up a different one

Mick told her about the object at bridge 16A. She was surprised at there being something so far along the canal, but they’d take a look. Now reported twice we knew something would happen.

A notice on the services door. Events for Heritage Open Days. Through September there are places that are not often open, that you can visit for free across the country. We’ve been to quite a few over the years. This year it looks like next weekend will be an interesting one at Etruria with all sorts of steaming things going on. Why oh why do we always miss things here?!!

With Oleanna pointed northwards we were now on the hunt for a mooring, one where hopefully there’d be space later on for a second boat. The towpath was empty from the services, but that’s quite busy, we hoped for a little further along. Outside the Toby Carvery was just about full, a couple of rings nearer the bridge, but we’d have been in the way. Just through the next bridge are rings, we’ve paused there for lunch before, no other boats, perfect.

Lunch, an email of our location sent, time to do some shopping. First Mick headed off with the Brompton, over the canal into the retail area near Bet365 for some engine oil. Then the two of us headed to Festival Park which is a bit of a walk away.

New detector

A few evenings ago our CO and smoke detector in the bedroom started to ‘bip’ at us. Mick spent some time with it, gave it a new battery, then tested it. It wasn’t happy, time for a new detector. Having had a couple of these before and they suggest they last for ten years we decided to go for a different brand. Mick came out of B&Q with a FireAngel detector.

She’d better like beef in the 7+ boxes

Then we carried on up the hill, Morrisons for a loaf of bread, further uphill to Pets at Home. Time to restock on wood cat litter. We used to get it delivered with shopping, it only comes in 10 litre bags from supermarkets. Pets at home works out cheaper at 30 litre bags and the pellets are better for our needs. It’s used both by Tilly in her litter tray, and by us in our compost toilet. They also had pink food at a reduced price, Tilly stocked up for a while.

Oleanna and Alchemy

Back at the canal we’d been joined by a very green boat, NB Alchemy. We stowed our shopping then went over to say hello. Alchemy looks very smart after a recent repaint. Mike and Christine invited us onboard for a cuppa and a chat. We’ve only managed to chat in passing in the past, so it was nice to have a good catch up with them whilst not looking over our shoulders in case another boat was approaching.

How did she know I liked Webbox?!

Christine wanted to come and meet Tilly. This very nice She came and gave me an ear rub and then some Webbox! My favourite!!! She is allowed to visit again. Thank you.

Mick, Mike, Christine, Pip

As I got food ready, chicken and leek macaroni cheese, Mick set about fitting the new detector in the bedroom. It’s footprint on the ceiling slightly smaller, but we shouldn’t notice the screw holes. Yarn was selected for the next pair of socks and the first toe cast on in front of the TV.

3 locks, 5.6 miles, 1 lumpy section, 1 report, 1 empty wee tank, 1 right, 0 sign, 1 long mooring, 1 detector, 30 litres wood pellets, 2 blogging boats, 2 good hours catching up, WEBBOX!!! 0 shore leave.

https://maps.app.goo.gl/STzXpn1ENxQPKrV57

Going Downhill. 2nd September

Stoke on Trent Boat Club to below Engine Lock 4

What a dreary morning. Tilly was allowed out whilst it drizzled, we didn’t want to get wet and she wouldn’t mind, too much. Pah!!!

It appeared to dry up after breakfast, boats were moving, time for us to do the same. Except Tilly hadn’t come home yet! Time to be a mad cat woman on the towpath, I waited for two teenage girls to pass before I carried on calling for Tilly, they had enough to giggle about without adding me into the mix. I’m here, I was always just here.

A little moody today

But now it was raining properly. Mick checked the met office. It shouldn’t be raining now, but it was. We decided to have an early lunch and hope that the weather caught up with the forecast by the time we’d finished.

Waterproofs on, we finally set off at 1:30pm, 2.5 hours after we’d originally planned, our nebolink had been sat just waiting for movement.

Keep right

Past the one way sign, those information boards will have to wait until next time.

Mick hopped off at the top of the Stockton Brook flight, most of the locks just about full and thankfully the pounds between them were full too.

Top Stockton Brook Lock

A young lad cycled up just past us to the next lock. He rapidly got out a magnet and started to fish. Once we’d left the lock he tried in there too. Looking back from the third lock I could see the bywash behind us flowing, someone was following us down. Soon there were crew at the lock behind us, running round to work the paddles, we carried on at our pace, if they caught us up so be it, they’d have to slow down then.

Under the road bridge

The number of stone mason marks in the middle lock was quite impressive, triangles, stars, arrows.

More cats

Down the five locks we passed a boat just mooring up. ‘The moorings are like hen’s teeth on here!’ We hoped for a mooring a bit further on, had the canal got very busy now the schools were going back?

Oh the POWER!

I did the honours lifting the bridge, no young assistant to help today, then we were at Engine Lock, the gongoozlers bench occupied by dog walkers. Mick lifted the paddles, opened the gates. Ahh! Two boats moored where we’d been on our way up. Would there be space deep enough for us in between? Thankfully there was and the undergrowth not too overgrown either.

Two and a half hours, brilliant! This outside wasn’t wet either, much better than the one this morning.

Pretzel

Yesterdays chicken was stripped from the bones, what to make with it now? Stir fry. Macaroni cheese. Pie. Curry old style. Hmmm? Stir fry. Pair 35 of my socks were finished off, the trip through the tunnel and washing the roof had put a delay on this pair. I should find the time to up load finished socks to the Sockathon page. Still a few pairs left to sponsor, ideal Christmas presents! Just saying.

Debby’s Jolly socks

Today we had started our descent heading towards the River Weaver. However for the last week Hunt’s Lock has been out of action, the latest CRT notice.

‘Today, divers and our teams were on-site to attempt repairs at Hunts Lock. Unfortunately, both paddles were found to be in a much worse state than anticipated and had to be removed. We are now arranging for them to be taken to the workshop for extensive repairs. As a result, the lock will remain closed. We will provide a further update by Friday 6th September or sooner, by which time we hope to have a better understanding of the repair timescales.’

And earlier in the day there had been this notice.

‘Please be advised that navigation is currently closed at Saltersford Lock on the Weaver Navigation. An obstruction at the bottom of the gate is preventing it from closing fully, which means the lock cannot be operated safely. Our engineers are working on a plan to rectify the problem. We will provide an update on Tuesday, 3rd September 2024.’

At least we’ll get to hear about progress this week, we’ve got a passage booked on the Anderton Boat lift. Maybe we’ll have to change our plans again, another cruise plan to plan as it won’t be worth heading down onto the Weaver and not being able to cruise it’s full length. We’ll carry on and wait to hear.

6 locks, 2.3 miles, 2 lift bridges 1 left open, 1 following boat, they looked fast but came past half an hour after we’d moored up, 2 outsides, 5 hours shore leave, 1 boat heading down, cruise plan 23 on hold, plans 24, 25, and 26 being considered, pair 35 finished.

https://maps.app.goo.gl/gnjnEmdUYwnr5Rbs9

‘Rubbish’ 1st September

Leek Winding Hole to Stoke on Trent Boat Club

Chilling butter for pastry, Hiding the Merlot, Villains and Rhododendrons, Gen X or was it Z were the subjects covered in this morning’s zoom. Not the full compliment of Mick’s siblings present, one off digging up Scotland the other in Paris watching the Paralympics. Tilly arrived back just in time for us all to say goodbye until next week, we could now be on our way again.

The boat from the water point was just arriving, mooring up in front of us. The lady wasn’t impressed with the Caldon, I think her words were ‘It’s rubbish, I’ll be glad when we get off it!’ We have to say we quite like it up here, yes it’s shallow, overgrown in places, the first part from Stoke isn’t all that picturesque, but when the sun is out some stretches are wonderful. But each to their own.

It’s got very busy!

Four fishermen sat along the towpath, yesterday we’d had the day boat at the winding hole, today it was fishermen. Then a boat came through the bridge hole towards us, one fisherman refusing to lift his rod until the very last minute. We were asked if we’d winded further along the arm by the chap at the helm. They must have missed the blue sign saying to wind here if you are over 45ft.

The stone section of the tunnel

Back through the tunnel, the cows joined today by a fishing heron. We gradually made our way along the contour. We’ve been here twice before and remembered more views, these visits were when there was far less foliage on the trees, maybe that’s why we like it up here because we can remember the views.

Popping out the other end

The nice mooring we’d spotted yesterday was empty. We were curious to see if there would have been enough depth for us to pull in there. Mick slowed Oleanna and started to bring her in, we think we’d have made it if we’d been properly trying. But instead Oleanna headed off in a direction unintended and it took a while to get back on course.

The mooring with a view

NB Beatrice the trip boat was passed, then the day boat, another narrowboat, blimey it was busy today! A couple were rapidly trying to get some resin on some fibreglass to hold a wooden grab rail onto their roof, yesterday the chap had been sweltering in direct sun, today they were racing against the resin going off and it starting to rain.

The staircase used to pass down the side of the cottage under the garden chairs

Over the aqueduct, a right hand bend. Here at one time there used to be a staircase that took the canal down towards Froghall. Where it joined the canal below the current set of locks the channel is noticeable as you head towards Stoke. In fact there have been three lots of locks here in the past. These photos were taken yesterday.

Where the channel used to come out on the left

‘The Leek Arm was built in 1801 to bring water from the newly constructed Rudyard Reservoir to a newly lengthened summit level at Denford.  This involved building a new embankment across the valley of the Endon Brook and a new staircase flight of locks at the edge of Hazelhurst Wood to replace three separate locks between there and Endon.’

’40 years later the staircase (having proved to be a bottleneck as John Rennie the Leek Arm engineer had warned) was abandoned and replaced by a flight of 3 new locks at Hollinhurst (the “New Hazelhurst Locks”).  Part of the original 1778 line of the canal was re-used and a new aqueduct built through the Denford Embankment, thus creating one of the six places in the UK where one navigable waterway crosses another.’ Thank you IWA . The route of the old canal and locks is shown in grey.

What a bloomin garden

As we got close to the junction, we could see there was a boat approaching on the other side of the next bridge. We held back, the boat ahead reversed, had they seen us? Or were they just manoeuvring themselves? In the end we approached slowly, they were right at the junction, maybe they were winding, maybe just turning. The two boats managed to get past each other just!

Pulling in at the services, we topped up on water, the washing machine had been on, disposed of rubbish and then carried on for a little while longer. The towpath had been trimmed where we’d tried to get in the other day, the grass now all yellow and flat hanging over the armco. We pulled in a little before the Stoke on Trent Boat Club arm, a late lunch, shore leave for Tilly and time to catch up on blog writing.

Rope swings on the tree at the junction

I had intended to walk over to have a look at the information boards by the old swing bridge, but Tilly was busy outside with a possibility that she would follow, plus it had started to rain. As we got ready to enjoy a roast chicken it rained heavier a rumble of thunder skitting across the sky.

0 locks, 1 aqueduct, 3 siblings, 1 stripy lawn in Surrey, 4.4 miles, 2 many boats, bridge 6 very shallow, 2 outsides, 1 test match, 3 different routes, 1 roast chicken.

https://maps.app.goo.gl/XPQYhMZrPaEkzH5h8

Hazelhurst or Hazlehurst? 31st August

The Boat to Leek Winding Hole

Conkers getting ready

A cuppa in bed, then we were on our way, making sure we’d not be in the way for any boats. The chestnut trees are just starting to turn, conkers spikily hanging on the branches are getting ready for school kids to collect in the coming weeks.

Mick walking up the locks

We worked up the two locks to bring us back up to near the Flint Mill, soon pulling up on the visitor moorings for breakfast, bacon butties and Tilly was given an hours shore leave.

Hazlehust Lock cottage

A lovely day, sunshine and bright blue skies. The wind picked up a touch, surprising me before one of the Hazlehurst Locks, Oleanna’s bow being pushed right over whilst I was sheltered. The lock cottage looked lovely as we rose up the last of the flight, the owner having just returned home with two large containers of red diesel, presumably they have a generator. Now to the left, a tight turn to head onwards to Leek.

For the last few days we’ve been a little bit puzzled. Hazlehurst is written on both the sign post at the junction and on the aqueduct.

Ordnance Survey have it spelt Hazelhurst, there is a village and wood marked.

Then Google can’t make their minds up between the two spellings, adding in a typo to a third! Sorry for poor screenshot.

Historic England have Hazlehurst Aqueduct.

Canalplan Hazelhurst Aqueduct.

IWA Hazelhurst Aqueduct.

Waterway Routes chooses Hazlehurst Aqueduct but follows it in brackets with Hazelhurst

NB Ripple thinks it’s Hazelhurst.

Debby from Chuffed noticed this too the other day. So which should it be?

The other day I changed the spelling on the blog three times and I decided to stick with Hazlehurst as that is what is on the aqueduct and junction sign.

Under the trees to Leek

Oleanna followed the way along past moored boats, crossing Hazlehurst Aqueduct, along the embankment and then along the contour that clings to the hillside all the way to Leek. This was originally built as a feeder for the canal in1801, water coming from the newly constructed Rudyard Reservoir.

By the time we reached Bridge 6 I remembered how slow our progress along the Leek arm had been 7 years ago as we just about ground to a halt. The hour it should take us was likely to be a while longer.

NB Beatrice the trip boat from the Flint Mill came past, luckily not on a slow bit. At one bend Oleanna simply didn’t respond to where Mick was moving the tiller, she just kept going straight on towards the far bank. It took a while to get her back on course.

A hire boat came past, warning us that there was also a day boat up ahead. A distance onwards is a mooring that was quite attractive, great views down into the valley, a bench, a possible mooring for a barbecue. Sadly we needed some shopping so had to continue.

Leek Tunnel, the mended bit

Where the canal widens out just before Leek Tunnel cows were drinking, the other attractive mooring was already taken. The tunnel light was switched on, the way ahead checked and into the tunnel we went. No need to duck here, plenty of height.

At Bridge 9 we came across the day boat, moored just after the bridge, right in the winding hole. Mick was fairly sure we’d have enough room to turn, the ladies on board were having lunch and were very nice, oblivious that their mooring was making it a little bit hard to turn, well there isn’t an actual no mooring sign.

That’s where they are

We then reversed down past one moored boat to as far as we could. A cuppa, some shore leave for Tilly, then it was time to go shopping.

Walking pole in hand, my knee not really my friend after standing on the gunnel yesterday, and the Brompton as sherpa we set off to walk to Morrisons. It’s around about a mile, the first stretch along the canal, then it joins industrial units, some with building work going on. Not the most romantic of walks! A good stock up to keep us going for a few days.

Combination locked

This evening I defrosted the oatcakes I’d made the other day. A light sprinkling of cheddar and then a good spoonful of left over chilli. They were very tasty, I can highly recommend the combination. Mick wondered when we’d be leaving Staffordshire and stop having oatcakes, that will be part way through Harecastle Tunnel. I may have a go at making some batter from scratch, when we’re in Cheshire!

A sticker not painted cat

5 locks, 5.3 miles, 1 left, 1 tunnel, 1 embankment, 2 outsides, 1 toilet, or 1 Tardis, 1 wind, 1 reverse, 1 mile, 3 boxes of wine, 1 very slow section, 6 oatcakes! 2 spellings.

https://maps.app.goo.gl/vWQFsCvgtJvMPdXv5

The Missing End. 30th August

Froghall Basin to The Boat, Cheddleton

There was no point in putting things back on Oleanna’s roof yesterday as we’d be going back through the tunnel today. Well the chimney went on in case it rained overnight. The mooring had been quiet apart from what sounded like a distant dog kennel, one with lots of hounds.

Not CRT bins!

Yesterday we’d wanted to dispose of some rubbish. CRT signs suggested that the bins were theirs, but another sign said there were not and there would be a £600 fine for anyone using them, they belonged to Hetty’s. Mick popped over this morning to check on the situation. Apparently CRT removed the bins a while ago, Hetty’s then took over the contract with Biffa, so they are theirs. The chap at Hetty’s said we’d be okay popping one bag of kitchen waste in them before we left.

A very green lock

Time to make our move. Mick headed off to set the lock, no need to as there was no chance it would have filled up overnight. The chap from the waterpoint yesterday was walking his dog and came for a chat, at least someone other than us had now seen that we’d made it through the tunnel. Blimey the lock was like the Hanging Gardens of Babylon when empty, so much plant life. Up Oleanna rose, we then pulled onto the water point to top up the tank again.

Chatting funding and bins

Not such a powerful tap and I suspect it was connected to Hetty’s as the pressure varied. A CRT fundraiser came over to chat, full of the problems to do with funding. He confirmed the bins were no longer CRT’s, maybe someone should remove the CRT sign.

Nice click photo for details

Opposite the lock is a rather nice building containing several holiday lets. They have their own swimming lake behind them. A lady came out to wave at us as we passed, heading back to the tunnel.

Can we do it in 2 minutes this time?

It took a while to line up with the tunnel again. Then we plunged back into the 75 yards, repeating yesterdays slow progress, only a little bit quicker this time, 7 minutes instead of 10 for Mick’s head to pop back up at the stern.

With all the covers removed it made sense to me to give the roof a much needed wash. Mick wasn’t so keen and busied himself putting nav lights back on and reassembling the horns. I however was determined to finally give Oleanna a wash, sick of the green and grey the cream had become.

Revolting!

With other items removed the roof needed a prewash and rinse to get rid of the worst of the muck. Then followed with a soapy wash and scrubbing brush, rinsed down. Mick ran out of jobs he could get away with, he really hates washing boats, doesn’t see the point in it! So I got him to do the prewash and rinse on the off side. Where the coal lives on the roof both sides got the full works the rest of the offside could wait for us to be moored later on.

So much better

Oh finally the cream was back with us. Unfortunately it did mean that I’d got to see just how bad the grabrail had got close up on the port side. Last year I’d prepped the starboard side for painting, then ran out of time. The port side didn’t get a look in. I’m going to have to find the time this year along with knee stamina to stand on the gunnels to get the job done. Washing the roof was at least a start.

Back under the railway

As we had lunch a boat came past. Where had it come from? It had come from the tunnel, we’d not seen it go past earlier. Mick said he’d spotted it down an arm when he went into Hetty’s. So when we came across a boat heading to Froghall, thankfully not on a narrow section, we could confidently tell the helm that there would be no-one heading towards him as there were no boats behind us. We kept sounding our horn, just in case, but met no other boats.

Just by the water point at Consell Forge there was a For Sale sign. Not much of a river frontage, but hardly surprising as the house was up a track away from the weir and river. If you like a good pint and heritage railways along with a bit of seclusion this is your house.

Back off the river

Back up the river, back onto the canal. No Bob or Rob to help at Wood Lock, but that didn’t matter. We now wanted a mooring. A hire boat and CRT boat occupied the first length. The boat from the water point yesterday sat on the next mooring opposite The Boat pub. We pulled in behind, tucking in as close as we could, with boats moored opposite we didn’t want to be in anyone’s way. It did require some creative mooring, but we got there in the end.

Pheasants? A touch pale though

Time to put Oleanna back together again. I finished off washing the roof, the offside no longer off, whilst Mick put the cratch cover and pram hood back on. Except there was a vital bit missing from the pram hood. An end that connects the end of a piece of frame to attach it to the cabin sides. When we’d taken the frame off it had been stored inside, last night it was put on the roof out of our way, then back inside again today. We hunted high and low, inside and out. Tilly was questioned in case she’d found it interesting and batted it under the sofa for safe keeping. It was not to be found, we needed some means of attaching the frame to the roof.

Boy things kept for what? But that broken thing might just

In amongst the things that have been kept for some reason was a broken bit from the tv aerial pole. A rubber end to it and a broken metal prong. It fitted into the frame leaving the prong which we might be able to clamp into the connector. Mick played around with it for a while, cable ties and for now we have a way to attach the frame when it’s up, it always gets folded down for cruising no matter. A new connector will need ordering next week.

Not the quietest of moorings. Plenty of dog walkers and noisy drinkers at the pub. This was then followed by a lot of cars coming and going. We’d be able to cope with it for a night and before there is any boat traffic in the morning we want to be moving.

4 locks, 4.8 miles, 75 yards of tunnel, £750,000, 0 boats behind us, 1 year of grime, 1 sparkling roof, 2 sides still to do, 15 patches of rust, 1 noisy mooring, 2 dogs to get along, 1 bored cat, 1 missing end, 1 broken bit repurposed.

https://maps.app.goo.gl/WqJVkvPNNTgQgc3X7