BUMingham to Bridge 68, Worcester and Birmingham Canal, most definitely not BUMingham!
Pushing off
I’d made a promise to Tilly that today we would move the outside just for her, so that is what we did. There was a touch of rain in the air, and the air was still moving quite a lot at times but we kept my promise and moved.
That’s new
An earlyish start for us saw us going right at Old Turn Junction at around 9:30am. Passing under Broad Street Tunnel I noticed a new looking sign, ‘Black Sabbath Bridge’. Last summer a bench was unveiled for the 50th anniversary of Black Sabbath on the bridge/tunnel. We’ll have to have a look at the information board by the canal when we’re back again. As we approached The Mailbox the wind whipped up, blowing a right hoolie it was, we were glad we’d dressed suitably.
Worcester Bar
Edgbaston Tunnel
Onwards we forged along the Worcester and Birmingham Canal. Through Edgbaston Tunnel. Past the hydrogen boat where someone is having a go at developing zero carbon emission propulsion, pedal power.
Pedal power, future proof propulsion
The new footbridge by Selly Oak Sainsburys now has large columns of concrete on either side of the cut, wonder how long before the bridge spans the water?
New bridge coming along nicely
Then the smell of childhood. Cocoa. My childhood in York was filled with the smell of Matchmakers, a slightly minty chocolate smell. Today the air smelt of Flakes, Cadburys Flakes. It soon blew away as we neared the secure moorings on the off side. Plenty of boats here, one jolly chap said hello from the comfort of his pram cover as we passed on by.
Graffiti Tree
Behind the covers of the Toll House at Kings Norton we could hear people at work as we carried on straight past towards Wast Hill Tunnel.
Keeping close to us
We were being followed. Now most Herons you see on the canals get all upperty as you approach them and as you get close they fly off a hundred yards ahead to fish, only having to do the same again and again. Well today we met a Heron who had very different ideas. He obviously knows something that the others don’t as he followed us time and time again, waiting for us to pass and churn up any fish.
What’s going on here?
Approaching the water point there was a lady in a lot of high-vis yellow, she made a phone call and then walked towards us. The Policewoman asked us to pull in as they had a crime scene ahead, a length of police tape closed off the towpath.
Being right by a water point we would quite happily tie up and replenish the water tank as the washing machine had been put into use since we filled up yesterday. She explained that if we carried on we might compromise the crime scene. Mick replied, ‘We watch Vera, we know all about such things!’ She laughed.
Entering the crime scene
She knew what to do with pedestrians but hadn’t thought she’d have any boats coming past. Just as we stepped off to tie up she had a call back, we were good to go. Up ahead on Friday night a man had been assaulted, he had ‘significant facial injuries’ and then had been thrown into the canal where a passerby spotted his body on Saturday morning.
A tent with flood lights
More tape
Another Policewoman stood by a tent a touch further on and by Kings Norton Bridge there was a chap with some apparatus on a tripod, it could have been a 360 degree camera. The towpath slope up over the tunnel was being searched by a team of officers whilst plain clothed police stood by the canal. As we passed we were asked how long the tunnel was, ‘2493m’. I wonder if they were considering if the poor chap might have been pushed in at the other end of the tunnel?
Few boats moving for days and we have to meet one in a tunnel!
Once in the tunnel we pootled along, hang on, someone was coming! Just after half way we pulled right over and just about stopped, their tunnel light quite bright. The chap at the helm asked if we were alright as we’d stopped, we were and carried onwards as soon as they’d passed.
That’s a better view
No Police presence on the other side of the tunnel. We carried on a short distance and pulled in where Mick and Tilly had spent a night whilst I was in Vienna. Just as we were sorting out ropes the heavens opened and gusts of wind sent it sideways at us.
Inside, Tilly had already been surveying the outside and was sat waiting for me in the bathroom, SHOUTING!!!!!!
Four and a half hours!!! Bloomin brilliant!! But hang on. I’m not going out in that! Not for all the Dreamies in the world! The door closed, then opened again. It hadn’t changed! Several more attempts and eventually the outside was dry. See you!
STOP RAINING!!!
Today the C&RT National Council Elections results have been announced. Only one of the people we voted for has been elected, the others came very close, but at least we voted. Out of around 34,000 boats on the network only 2040 people voted in the elections, that is 6%. Congratulations to those who got elected, please report back in some form for those of us who are interested .
0 locks, 8.47 miles, 2 straights, 1 right, 3 tunnels, 12 police, 1 graffiti tree, 1 load washing, 1 keen heron, 4.5 hours spent well, 1 white card finished, 1 set of costume designs finished, 2 panto award nominations, 1 photo from Frank, Thank you.
Checking our vital statistics for a years worth of cruising takes a while. We have a trip computer which records almost all our journeys, sometimes it counts locks twice, sometimes it doesn’t quite catch where we reached before we wind. Before we used this method of recording our journeys I would use canal plan to work out our distances. This method can also miss out parts of our journey but it does give me more statistics. You know how I like numbers! How many bridges, how many narrow locks and what distances we travelled on different types of waterways. So inputting a years worth of cruising takes some time.
Anyhow, here is our round up of the year.
The New Year was seen in at Crick. From here we decided to head to Sheffield to have the last snagging jobs done on Oleanna, we were fortunate that the route north was open with no winter stoppages in our way until we reached Yorkshire. Once in the top chamber at Foxton it was going to be downhill all the way to Keadby.
Going down at Foxton
Sadly our blog started to loose it’s photos, which is a great shame. It was a problem shared by many bloggers who were all doing their best to get things working again. Have to say we ended up jumping ship from blogger to wordpress, but posts still lacked their photos when moved. We hope gradually to rectify this by replacing the missing photos, I miss them when looking back. But this will be a long job.
Waiting at Cromwell
During January we cruised down stream on the River Trent, the weather was getting colder the further north we got. Our route was clear but at Keadby the lock off the river was being dredged, so our journey was held up a touch. Then with February came cold nights and the canal at Keadby froze over. So we waited at Cromwell for things to improve.
First go at Gluten free puff pastry for cruising sausage rolls
Daylight hours and tides meant we split our tidal journey at Torksey. The early morning start from Torksey was very cold, so I was very glad I’d knitted us both balaclavas, we remained cosy cheeked for our journey.
Cosy heads
Our journey up towards Sheffield meant we coincided with the bicentenary of the opening of the canal and a very unseasonably warm weekend. The chaps at Finesse replaced a leaking window, gave us a new one (our choice), sorted out our gas locker lid amongst other bits and bobs. It had been a good decision going to Sheffield, it saved them time coming out to us and it saved us money on the extras we’d asked for.
New galley window going in
200 years old
Next we headed for Goole, the lure of cheap diesel and a night away to see our friends Bridget and Storm on the otherside of the Humber was a bonus. We then hunkered down to sit out storms and rising river levels. Our original plan had been to go to York, but flooding put paid to that, so instead we went by train.
Bridget and Storm with their lovely house
Towards the end of March we decided to give a trip up the Ouse another go, the rivers were at better levels and we still haven’t taken Oleanna there. But first Bank Dole lock wouldn’t fill due to silt, then when we reached Selby the Lock onto the Ouse had a fault which would take too much time to mend for us to wait. This was a relief for Tilly as this was where she’d discovered the difference between grass and duck weed and ended up learning to swim a couple of years ago.
Mark came to meet us from York
At the beginning of April we headed to Leeds. From here we had a day trip to Derby Crown Court for the sentencing of our original boat builder (Stillwater) who had finally pleaded guilty for fraud. I also spent a more pleasurable day in London, having a meeting for Puss in Boots.
Derby Crown Court
With panto in mind we planned our cruising for the remainder of the year. The remainder of April we made our way up the Calder and Hebble and onto the Rochdale Canal.
Being a foot shorter it wasn’t as tight as it had been on Lillian
Our friend Frank joined us to do the stretch from Sowerby Bridge to Hebden Bridge, which included the deepest lock n the network, Tuel Lane. He’d not done this stretch back in 2014 when he and I walked from Manchester locking Lillian over the Pennines to get to the Tour de France.
Tuel Lane the deepest on the network
Frank
Once over the top we picked up a boat to share the locks down into Manchester. Clare and Graeme were over from New Zealand for a few months and proved to be very good company.
Mr Blue Sky and Oleanna
On the 1st of May, with the help of a Canal and River Trust volunteer our passage down into Manchester went well. The following day both boats headed down the Rochdale nine with an extra pair of hands from an old college friend of mine, Doug.
Nearly there!
During May we cruised down the Bridgewater and onto the Trent and Mersey Canal gradually heading southwards. A short detour up the Middlewich Branch to look at where the breach had been before we carried on southwards.
Climbing the Cheshire Locks
A pause in the Cheshire Locks meant we got to meet up with Tom and Jan who were over for a visit. For Micks birthday we moored at Barlaston and had a nosy at the wonderful hall on the hill, our plan still stands if any of our family are interested! https://oleanna.co.uk/2019/05/23/the-plan-20th-may/
Tom and Jan
We saw the end of May out mooring at Tixall Wide before rejoining the Trent and Mersey and heading onto Fradley Junction where we joined the Coventry Canal. With Atherstone Locks out of the way I spent time below working whilst we cruised familiar waters on the flat, it might have rained too!
Tixall Wide
A day trip to London from Rugby for us both, me to a seminar for Separate Doors 3 and Mick to catch up with his friend Siobhan who was over from Australia. Continuing down the North Oxford Canal to Braunston where we joined the Grand Union Canal to head to London.
Busy Braunston Locks
A visit to the Royal Ordnance Depot at Weedon meant I bought some lovely yarn to make a cardie for myself (it’s nearly finished!) and caught up with our friend Heather Bleasdale, who just so happened to be moored there as well.
Yummy yarn
Our route then up and down the Grand Union meant we managed to get to see both Mikron shows this year as well as teaming up with the cast and NB Tyseley to climb the locks up to the summit.
Sharing the locks with Tyseley
Tilly was left in charge for a couple of days whilst we headed to Scarborough to check on our house as we had a change of tenants. This meant we got to stay with Jaye and Duncan and catch up on the news from home.
I’d be in trouble if this photo wasn’t on the blog again!
We now pressed on down to London where we booked a mooring in Paddington Basin for a week in early July. This gave us the opportunity to catch with with friends and family before we headed back out west and down the Hanwell flight. I made the front cover of Canal Boat for July.
Mid July we locked out onto the Thames cruising the Tidal section to Teddington. From here we transited to the River Wey, brand new waters for us.
Up onto the Wey
With my final design for panto delivered to Chipping Norton from Guildford we could enjoy our cruising a bit more, despite the soaring temperatures which had us hiding under trees for a couple of days.
Finished!
On the 26th July we ticked off our third point on the compass, reaching Godalming the furthest south you can get on the connected network. On our way back to the Thames we met up with Adam from NB Briar Rose, both he and Tilly got wet that day.
Furthest South
The original plan had been to cruise the Basingstoke Canal whilst we were there, but sadly the levels were too low and the canal closed before we got there, so we spent a while longer on the Wey.
Hampton Court Palace
Onto the Thames where we managed to get a space outside Hampton Court for a couple of days and I discovered the joys of standing in line for some fresh veg. Gradually we made our way up the Thames. Waking early and getting going worked for us as mostly we managed to get moored where we wanted around lunchtime. Three years ago we did from Teddington to Oxford in a week but with a months licence we took our time.
Waterway Routes
No Problem XL
The further upstream we got the quieter the river got, less hustle and bustle. We met up with Paul and Christine (NB Waterway Routes), missed Carol and George (WB Still Rockin), finally got to have a proper conversation with Sue and Vic (WB No Problem XL) as we headed upstream.
Kelmscott Manor
As the rivers bends got tighter, the banks were harder to get up. A mooring by Kelmscott Manor required a rope from the post to help us get on and off the boat, but it was worth it to visit the house.
At the end of the navigable Thames
On the 26th August we winded at the furthest point we could reach on the Thames on Oleanna and started to head back eastwards. Tilly gave one of our moorings a double stamp of approval and stayed out well after dark!
Isis lock, Oxford
An incident with engine coolant nearly stopped us from reaching Oxford to see War Horse. But a nice man from RCR got us going again so we had a narrow lock fix and headed to the show catching up with Matt and Bill for a drink afterwards.
Lovely chaps
Then at the beginning of September we turned off the Thames onto the Kennet and Avon. For the last five years we’ve been meaning to head this way, but for one reason or another it hadn’t happened.
Gangplank land, the K&A
With tales of lack of mooring we kept to rising early hoping we’d get moorings. This mostly worked and wild moorings were very rarely needed, we did still have to use the gang plank every now and again. We only encountered one pound on our westward journey where even the longest plank wouldn’t have helped which meant we had to carry on up a flight with the clock ticking before locks were locked around us.
Over the summit
At Devizes we met an Instagram friend Frankie who’d been working on the flight over the summer. Despite following another boat down the flight we made good time with the help of the volunteers.
The photo of the year, Devizes
Onwards to Bath and Bristol. Here we moored with HMS GB in the background and met up with two of my old school friends for lunch. A big shame we couldn’t stay longer as there was more we wanted to do and see whilst there, we’ll just have to save up for next time as the mooring fees are quite pricey!
In good company
Old school friends
The section between Bath and Bradford upon Avon was our favourite, with the aqueducts and views along with the second deepest lock on the network.
Cornwall
Mick and Tilly got to enjoy it for a week longer than me whilst I headed off to Cornwall to eat gluten free pasties and start painting my panto set for a week.
Pasty
Once I was back we had two weeks to reach Oxford, but the weather had different ideas. What felt like the monsoon season started. There was rain on most days, luckily not the day we did Devizes. We managed to team up with two couples from Bristol on a hire boat, by the time they reached the top of the flight they could work uphill locks with their eyes closed, we left them to master downhill on their return journey.
Tilly enjoying the big trees
Our second low pound struck as we tried to leave Cobblers Lock, Oleanna was sat firmly on the ground and unable to leave the lock until a good flushing of water set her free. The rain actually did me a favour as whilst we sat in Newbury hoping for the Thames to drop I managed to get my model for A Regular Little Houdini finished.
A Regular Little Houdini
At the end of October I headed off to panto land leaving Mick and Tilly a short distance outside Reading, hoping they would be able to get up the Thames in the following week. Our friend Paul came and helped Mick out onto the Thames reaching Goring on their first day. Here Mick and Tilly got to met Carol and George (WB Still Rockin’) who’d been clinging onto the moorings there before heading downstream.
Photo courtesy of Carol WB Still Rockin
Paul returned later in the week and despite the engine overheating and having to deploy the anchor they succeeded in getting to Abingdon where Oleanna had her second visit from RCR. Mick battled on against quite a downstream flow and reached Sandford Lock before tying up. Here the levels rose and fell, the engineer came for a second visit and found lots of crud in our cooling system.
A calm paws on the Thames at Sandford
With the engine in better fettle, Mick nudged his way up towards Oxford and finally made a dash up Osney Lock and onto the canal despite that section still being on red boards. It turns out he’d chosen his moment well as the river has stayed on red boards since then.
Pantotastic
Once I left all the singing dancing and glitter behind and returned to narrowboat life we had to sit out high levels on the Oxford canal and on the River Cherwell. We loitered in Oxford, but as soon as it looked like things were improving we were on our way.
Lakes not meadows
We paused in Banbury for Christmas haircuts and shopping before pulling in for a few days at Cropredy Marina, from where we headed to London for a Sibling get together at my brothers.
Family
Onwards to the top of the Oxford Canal the day the locks reopened and down the other side continuing onwards to Radford Smelly for Christmas.
Christmas
In Warwick we met up with my family and then picked up crew Mike and Chris to help us up the Hatton and Lapworth flights.
Our final visitors of 2019
The last few locks were done on New Years Eve bring us up to the Birmingham level for the new year.
Narnia Lock our last for the year
Quite a busy year. So our vital statistics for 2019
According to Canalplan
Total distance is 1199 miles, ½ furlong and 886 locks . There are 119 moveable bridges of which 22 are usually left open; 139 small aqueducts or underbridges and 20 tunnels – a total of 8 miles 2 ¼ furlongs underground and 8 major aqueducts.
This is made up of 207 miles, 4 furlongs of narrow canals; 399 miles, 5¾ furlongs of broad canals; 102 miles, 5 ¼ furlongs of commercial waterways; 226 miles, 6 ¼ furlongs of small rivers; 212 miles, 5 furlongs of large rivers; 49 miles, 6 ¼ furlongs of tidal rivers; 150 narrow locks; 626 broad locks; 109 large locks; 1 lock on major waterways.
838.2 engine hours
That is 255 miles and 272 locks more than last year! But 246.4 hours less engine running, just goes to show it’s worth having solar panels.
1336.93 litres diesel, 9 (although we’ve got 2 empty now) gas bottles (used for central heating as well as cooking), 6 overnight guests, 6 packs Dreamies, 1 cover cat, 32 friends, 17 Mrs Tilly stamps of approval, 1 double stamp, 5 pairs socks, 3 pairs gloves, 1 baby blanket, 2 shows designed, 1 cover illustration, 5 lots gluten free puff pastry, 9 supermarket deliveries, 39 boxes of wine delivered, 12 bottles of wine delivered.
Over the last few days I’ve been working my way through the thousands of photos I’ve taken this year, auditioning them for our Christmas card. Short listed photos are copied into a new folder. This year we’ve had no snowy photos and very few misty atmospheric ones, so the short list contained quite a few sunsets and sunny days.
A close contender
Down to 29 Mick and I weedled them down to five last night. Sleeping on it we were now down to just two. The winning photo is one that I’ll never be able to take again. So this morning I set about laying it out into a format to print. This takes a little while, but each year gets a touch easier. I’d just got it sorted when it was time to head out.
To Chippy
The 488 bus to Chippy pulled in at the bus station, much to our relief as it was so chilly out this morning. After 45 minutes of winding through the countryside, pulling over on the narrow roads and climbing steep hills we arrived in Chipping Norton with enough time for some lunch, The Old Mill cafe provided us with a sandwich and jacket potato.
Back on Spring Street
We were a touch early at the theatre, but we certainly weren’t the first to arrive. The place was filled with school kids and quite a few general audience too. Our seats were upstairs away from a large school party who’d taken over downstairs. Upstairs we sat behind a group of grey haired recycled teenagers all with their Santa hats and Christmas jumpers on ready to have a good time at the panto.
Before the Santa hats and flashing lights arrived
Mick had missed out three weeks ago and we’d been trying to work out a time to come on an evening performance. But these only happen at weekends until the schools brake up and would necessitate the hiring of a car as the last bus back is at 6:50pm. So we go to see a school performance which is a slightly edited show to keep the running time down so it fits in with the school day better.
The local electric shop festive window
Mick seemed to be the only one in the audience getting the more adult jokes, but that didn’t matter as the fast pace cracked along on stage. Plenty of shouting, booing and the lady in front of us had a very audible laugh that turned the actors heads at times.
In the interval Will, the producer, came through to say hello whilst we enjoyed some half time chilled medication. I passed on my one note which was already in hand. The show was in good shape, the Smash hit it’s mark, the chocolate mice were thrown, we laughed, joined in and had a good time.
The bus journey back was freezing with the heaters kicking out cold air and the bus driver far too keen on his brake pedal. But we got home in one piece to Tilly sat in the window wondering when we’d be home,Well my evening Ding Ding hadn’t been served had it!
Tilly’s fee for helping on panto
It was worth the wait though as She had finally brought home my Feline Assistant fee. Five foil wrapped mice. They deserved to go on the floor, so that’s just where I put them.
0 locks, 0 miles, 24,970 photos down to 29, 29 photos down to 2, 488 twice, 7 mice, 2 chilled salted caramel medications, 1 panto, 1 hungry cat, 1 Christmasy day out.
Whilst I’ve been away working life of course has continued on Oleanna. Last week Mick had a couple of trips to London. His first excursion was to Ealing, where he grew up. He said it was so that he could go to Morrisons for some peanut butter (their’s is made purely from peanuts and is our favourite) but he also had a look round. The ABC (Old Empire) has been demolished, the front facade left in place, now covered for protection whilst a new development is going on behind. Here there is planned to be 200 new homes an eight screen cinema, shops and restaurants. link
A shop window with it’s own Strowger exchange
He also had a trip over to east London to pick up our post, returning with three shoe boxes. Once the contents were removed Tilly tried the slipper box out for size. Quite a nice fit, I am reserving judgement though until I’ve tried the other two out.
It smells of sheep!
The Liver Building, Liverpool
Last weekend Mick headed up to Liverpool for a night to celebrate John’s (his brother-in-law) 70th birthday.
Quite a view
There were drinks over looking the Mersey from Panoramic 34 followed by a meal at Radison Blu Hotel.
View fro the Mersey
Then a trip on the Mersey Ferry which was followed by drinks at The Philharmonic where Mick would have taken photos of the toilets but they were in use.
The loos
Then an evening at The Philharmonic Hall where the choir numbering 150 were accompanied by the Philharmonic Orchestra playing British Classics, Britten, Vaughan Williams and some Elgar. A very good evening was had by all.
The tour party
In the morning there was a tour of the Williamson Tunnels. Joseph Williamson was an eccentric, who in the early 19th Century refused to give money to the poor but instead employed them to dig holes and tunnels for no known purpose. The tunnels had been filled in with Victorian rubbish which volunteers have cleared out and cleaned up. The extent of the tunnels is unknown.
Lots of Victorian rubbish
On Monday morning the level of the Oxford Canal had dropped since I’d returned home, the small weir by Isis Lock not overflowing as much, perhaps levels were starting to lower. But by Tuesday the water was on it’s way back up. Mick headed down to Isis Lock to fill with water and do some washing, there is a tap there for the permanent moorers and sitting in the lock you can access it, lets face it nobody would be coming up off the river! The sixth brick below the lock was showing.
Sixth brick just in view
On Thursday morning the levels were looking a touch higher, the canal overflowing the lock gates into the river too. Oleanna was rising on the canal and with the amount of rain over the last few days Mick preferred to stay on Oleanna for the evening rather than heading out to Chippy for Press Night. Being on board, should the levels rise anymore he’d be able to do something about it. There was already a plan to nudge up to the hire boats opposite should the mill stream top the towpath. Being tied up to them would mean Oleanna wouldn’t be able to end up sitting on the towpath.
Oleanna sitting high on the canal
Mick had a chat with a fellow from the Environment Agency, the level of the canal was caused by run off in Oxford and not from the river. So the canal should start to lower once the rain stopped. The river would need quite a lot more water to come over the towpath as the whole of Port Meadow was currently being filled with water, a useful flood plain.
The canal almost level with the edge
During the day someone opened the paddles at both ends of Isis Lock to help drain off the excess as the weirs couldn’t keep up with the amount of water. So when Mick came to meet me at midnight he had a windlass in hand to lower a paddle.
Two weeks ago there had been a blue boat moored near Isis Lock on the canal, the following day it had disappeared. A walk over Osney Bridge to get one of our bikes serviced and Mick found the boat. Somehow they had got down the river, were facing upstream and had just managed to tie to the end of the railings there. Maybe they’d headed that way backwards as the flow along East Street at the moment is very strong. I’m so so glad Mick made the move when he did to get off the Thames.
1 lock gone into but not descended, 1 reverse, 2 moorings close together, 1 trip to Liverpool, 2 trips to London, 1 ferry, 0 panto, 1 cat not that impressed, 6 bricks, 2 paddles up, 1 big step up, £91 bike service.
On Saturday night before going to bed I decided that I should check the ropes. Mick normally says he’s doing this, but both Tilly and I know what he is doing! However, Oleanna seemed to be listing a touch, and the spirit level we have on board confirmed this. She normally has a slight list and after not spending much time on board recently, what I was experiencing may have just been normal, but I wanted to be safe so popped outside to check there was slack on the ropes. Luckily there was, so Tilly and I could sleep soundly.
No Mick to cook breakfast on Sunday morning, but he had left a couple of packs of bacon in the fridge. A bacon butty was in order, a deluxe bacon butty. Mushrooms were added to the pan and some thin slices of cheese placed on the bread before the hot bacon. Yummy!!
Whilst Tilly explored outside I caught up on my paperwork for Panto and when she returned I headed into town to pick up some supplies for Sunday dinner. A new pair of jeans made their way into my bag along with a chicken and some suitable veg. Mick arrived home earlier than he’d originally planned which meant I didn’t get chance to breakout the yarn I’d just received until much later in the day.
Crocheted poppies everywhere
Monday morning and I was back on a bus out to Chippy where the town was waiting for 11am to strike for the two minutes silence. Today there was lots to do before the first dress rehearsal, everyone was kept busy. The actors were on stage and everyone from back stage worked around them and through their breaks, which was to be the case for much of the week.
Ready for the dress
The first dress rehearsal went fairly well, although the curse of last years Axe Man struck again, with several flown pieces missing their deads (position in view and out of view) or not appearing at all. We’d been expecting a reasonably early finish to the day but this wasn’t to happen. My evening meal ended up being a packet of crisps, but I was able to imagine sitting in The Anchor on the Staffs and Worcester Canal as I enjoyed a bottle of gluten free 6X.
6X
Tuesday morning I plucked up the courage to climb to the top of my set and repaint the higher panels. I don’t like heights and being stood near the top of a set of Zarges ladders makes me nervous, especially whilst holding onto a pot of paint instead of the ladder. Thankfully the ladder was footed and I was warned of any loud sound effects before they happened. As the day went on my list of jobs got shorter and shorter. I was even starting to work through the notes that would normally fall off the end of the list.
John sorting the curtain call
In the evening we had a second Dress Rehearsal. This went much smoother and I was able to sit in the front of the balcony and take photos. But the show was running too long, by about twenty minutes. A few cuts were talked about and the interval change discussed at length to see if this could be made shorter. After painting the floor into the wings black I’d managed to finish early enough to enjoy a curry with the Sound and Lighting Designers and the Production Manager.
Two pickle trays!
Wednesday. Preview day, an early start to do a few jobs whilst the cast were informed of some cuts to the script. Paint tins were sorted, labelled and put away for any touch ups that might be needed during the run. Then at 1:45 the lights came up on the first performance. The audience were up for a good time, a sixth form college filled the stalls and they had a ball. They should be rented out as a first audience.
All sorted and labelled, whether they ever get used is a different matter!
At 6pm the second show played to a very mixed house who were much quieter but still enjoyed it. The cuts that had been made earlier in the day had improved the running time, but more was needed. Long discussions followed, doubles of everything for the slosh scene would help with laundry between shows. Would just nips and tucks bring down the time enough or would whole routines need to go?
Oops, my third fish and chips!
Thursday morning, I had a lie in, followed by my annual bath. My landlady had left for work early so I could take my time turning pink in the hot water. Living on a boat you miss baths. When you stay at friends they always offer you a bath, but it’s not quite the same. Here in Chippy it’s almost like being back in our house, it was lovely.
I packed all my belongings and popped the key through the door to my digs. Sadly I’d not had chance to say goodbye to Suzanne in person and the card I’d bought her I’d left at the theatre, so i had to say farewell by text.
There were just a couple of little jobs to do at the theatre and then wait to see if the cuts to the show would need anything from me. All that was needed was some props being put into the store as routines had been trimmed.
Boozer
My floor needed a good wash and scrub in places, the crew having been a bit too careful for the last week, so Gemma and I got on our hands and knees making a big difference, still not as lovely as when it was first painted but it would do.
Boo!
Earlier in the day I’d had messages from Mick about the water levels in Oxford. The canal was flowing over the top of Isis Lock and the river was up to the highest we’ve seen it, Isis lock being only 6 to 8 inches deep instead of 2ft 8″. He was nervous of leaving Oleanna for the evening, so I donned my glad rags and enjoyed Press Night on my own.
Just a little bit funny
The evening went very well, lots of booing, clapping, singing and dancing, sweet catching, Oh No! ing and Oh Yes! ing. After the show there were drinks and a very good spread of cheese for us all to enjoy. A photo call on stage for all concerned before people started to make their way home.
Scooters
Without Mick to help me home I got a lift with John the director and Anna who plays Jack the Cat, back to Jericho where Mick loitered to give me a hand with all my bags. After big hugs all round I waved them goodbye, my second Chippy Panto finished. A lot of hard work, a touch easier than last year, with a very good company, may they have a great run.
Panto company, courtesy of Chippy Theatre
0 Locks, 0 miles, 1 bus, 2 dress rehearsals, 2 previews, 3rd portion of gf fish and chips, 1 curry, 1 very tall ladder, 1 very long email from Vienna, 1 long reply, 1 shed full of paint, 1 wooden leg emergency repair, 2 bottle brewdog, 1 panto finished, 1 big sleep needed, 1 Mrs Tilly stamp of approval.
Sunday was meant to be a day off to try to recharge the batteries. It started with forwarding lots of reference to Phil who was working at the theatre painting all the 2D dressing for the Boozer. This I didn’t mind as it was a two minute job whilst enjoying a cuppa in bed with Tilly keeping my toes warm. Then the emails started with questions and requests, easier to do straight away than thinking about them all day. Have to say I did get a touch hacked off when asked a question I’d already answered four days earlier!
Yummy!
But there was still time to enjoy a cooked breakfast and a home cooked Sunday roast of Lamb.
Isis Lock looking autumnal
With the sun out we walked down to Isis Lock, the level below quite a bit higher than normal. At the junction with the Thames the flow was a lot stronger than the day before, Mick said if it had been like this then he wouldn’t have tried to move the boat. We walked up to Port Meadow along the narrow path and crossed over the foot bridge, a lovely stroll for a Sunday afternoon.
Port Meadow
Monday came round a touch too quickly and I was back on the S3 to Chipping Norton, this had to stop and be rebooted as the driver was getting error codes flashing at him. Luckily a five minute break did the trick and we were back on our way.
Rebooting
A new props maker was starting today, Emma, so a hand over was required. Phil was still about for the day finishing off bits which we put in position to see how they looked, which was very good. I did feel my age when I had to explain about pre-decimalisation and £ s d. Poor Phil ended up having to repaint the prices in the boozer twice, the last time with d and not p.
Prices being amended again
Kitchen dressing attached
Tuesday saw the return of Chris the carpenter and Gemma, Production Manager. Chris worked his way through a list of jobs that had been kept for him, someone who could cut a straight line in one go is an asset. The evening sessions had meant to have been for the Lighting Designer Mark to plot the lights, but he’d been held up on a show in London, this meant we could get on with jobs in full light and sound levels could be set.
Chris, Gemma and me with some of the LED woking
Wednesday and it was time for everything to be put together, actors, costumes, lights, set, props, sound, scene changes. The advantage of the actors rehearsing on stage with the set is that most problems had already been ironed out. There were still notes to take, being able to see the set and props under stage lighting meant there were things to add or alter.
Lighting a scene
Two long days sitting in the dark, taking notes and then taking advantage of the actors breaks to get on with jobs. I had become known as Pippippinpippippin, as I was a stand in for Pippins in the scene changes. But on Thursday afternoon we were joined by them. This meant going back to the start of the show and teching each team of four into the show in turn. This does become somewhat tedious, but it’s important that each of the three teams knows what they are doing.
Some of the footage taken last week now added into the show
On Friday we finished teching the show with the main cast and spent the evening with the Pippins again. They are involved in the show much more than last year and have quite a few complicated songs and dances, so it was decided to postpone the dress rehearsal that normally happens on a Saturday morning and use the time cleaning up dances and scene changes instead.
Mark and Jon getting into the feline vibe
Interviews for the local radio were recorded, I may get on air you never know.
A second portrait needed
My lists of jobs are getting shorter. The last couple of evenings I’ve spent trying to sort out the back cloth and portals that suffered so badly with damp in the workshop. Flameproofed sheets of timber are used in the construction of theatre sets, this got damp after I’d finished painting causing the salts to leach through onto the surface, fading colours and leaving a residue. Nothing for it but to repaint large chunks of the main set.
Puss’s boots
The other job that is taking it’s tole on everyone’s patience is installing LED tape around the portals. This takes time, let’s just say that some people are better at this than others. Staring at a lumpy mess you’ve created behind the tape, then disappearing into the toilet for half an hour doesn’t get the job done, but it does mean someone else ends up doing it!
A special brew for Panto
Yesterday afternoon it looked like the lights were nearly there, the final strip just needed connecting before we left for the weekend. But three LED’s decided that they no longer wanted to play the game and stayed pink whilst those around them changed colour. Nothing for it but to start again on that half of the portal.
Glad I got the bus and didn’t catch a ride in the Dames car!
I managed to catch a bus back to Oxford at a reasonable time, the bus having to wade through water. My walk along the towpath back to Oleanna felt very narrow with the water on the mill stream higher than it had been last weekend. I was glad of a touch more land between the canal and the flowing water when I reached the boat.
Someone was hungry!
Tilly was very happy to see me, Mick having left first thing to head up to Liverpool for the weekend. Of course she missed me. But I also missed having my morning Ding Ding that Tom had forgotten!
I encouraged the stove to flame back into life, fed Tilly and then myself. Chicken pasta with a few glasses of wine. Mick had been to London this week to pick up post. So now I have my new passport several months after it was applied for (it arrived three days after I applied for it), a new credit card, new E111 card, a waitrose card we’ve been waiting for since we moored in Newark a few years ago. We also have a new pair of boating shoes each and Mick has a second replacement pair of sheepskin slippers. What a lot of post!
Lots of post, including a shiny new red passport
Tilly chose what we were going to watch, somehow I don’t think she expected The Rock to be about chemical warheads on Alcatraz, a touch disappointing as there was little climbing involved,but I didn’t mind as it had Sean Connery in it. Not quite the girls night in I thought we’d have.
2 buses, 1 chippy, 1 painter, 1 new props maker, 0.5 backdrop repainted, 3 dogless collars, 3rd attempt with the LEDs, 12 Pippins, 2 pairs ears, 1 very dark room, 1 girls night in, 1st pasta in three weeks.
Hertford College Boat Club to College Cruisers, Oxford Canal
A very long week in Panto land, but a productive one.
Lily working with the Pippins
Two buses got me back to Chippy by 11am on Monday. The cast take over the stage now for much of the day, but lunchtimes and the evenings it is free.
Josh taking set ups
Monday we had a photo shoot for publicity photos for the show. We set up the Square setting as that was the most complete, actors donned their costumes and ‘set up’ photos were taken by Josh Tomalin.
Cutting in the woodwork on the boozer
The set being mainly sliders means that I can pull bits out to paint and then slot them back in whilst another scene is being rehearsed to dry without the possibility of actors getting covered in paint.
All wrapped up, ready to go
On Tuesday I took advantage of not being able to get to much on stage and sorted sending my model box out to Vienna. This took so long to fill out the forms on line. I could quite easily measure the box but weighing it was more problematical. The Front of House money scales came to my rescue, the box weighing 2kg which is £220 in £1 coins!
That’s me driving for the first time in three years!
In the evening Jo (the props maker) and I tried out the Dames car on the front of the stage whilst the technicians and Mark (Lighting Designer) hung lanterns around us. By the end of the day there were working headlights and I’d managed to paint my panto anaglypta in the boozer.
Highlights
Shadows
Wednesday was a filming day. The panto has some sections which are shown on a projection screen. So these were filmed in front of green fabric so that suitable backgrounds can be added. Then footage for the car chase was looked at with the actors in the car. Lots of fun.
Green screen filming
On Thursday I spent quite a bit of time getting dotty in the Bank of England Vault. I ended up getting carried away with the dots so had to paint every third one of them out. It being Halloween the actors had decided to spend the day in fancy dress. We had a strawberry, mustard, The Joker amongst other things.
Dotty vault
Friday was a very messy day. A panto isn’t a panto without a slosh scene. Last year this was tame compared to this year.
Susie mixing the smash
Actors getting covered
A huge bowl of Smash was required, costumes are made with ease of cleaning in mind and a large tarpaulin covered the stage floor. Various consistencies of smash were tried out, thinner worked better and tended not to clog nostrils up quite so much. On the set side of things I am going to need to glaze a lot of it as there is no knowing where the smash will land.
Pepper keeping me company back at my digs
In the evening I worked on the front edge of the stage, one last curve needed marking out. I was back to measuring and scaling up from my model, then joining the dots, followed by painting as good a curve as I could over mouldings. This involved adding a bit, loosing a bit, adding a bit etc whilst Mark and the chaps focused the lights on stage.
Ready to start the stagger through
Saturday morning, time for a stagger through of the whole show for the actors and a chance for everyone else to watch and see what is missing and needed for the technical rehearsals next week.
The boozer, just needing it’s dressing adding
This went well, a couple of scenes scripts were still in hands and we had to stop and start for scene changes, these will be worked out next week.
About to start at 3pm
Once the actors and props were clear of the stage it was time to get to work. Mark had done his best to get most of the lights focused, but still needed a bit of dark time. Jon (Sound Designer) was also around positioning speakers and microphones, a lot of people when you need a clear stage to start painting the floor. But everyone was understanding and accommodating.
Phil finishing the second coat of the base colour
The cavalry arrived in the shape of Phil, a scenic artist from Bristol. She has come to help out for a few days and was thrown in at the deep end helping me with the floor. We soon discovered what a small world it was from Skye to Hull to Bristol.
Base coat on by 4:20
Blues drying waiting for second coats at 5:10
The heating was on full blast to help the paint dry. We gave first, second and to one particularly annoying shade of blue a forth coat of paint before we broke for something to eat at 9:15 leaving the paint to dry on it’s own. Half an hour later we were good to go with a coat of glaze. This was on and drying with twenty minutes to go before the last bus left Chipping Norton for Oxford. Much better than last year when I finished at 2am and couldn’t escape to the boat until 6am.
Glazed by 22:35
Meanwhile
This morning, Saturday, when I’d turned my phone on I received a message from Mick. Yesterday he’d been up to Osney Lock to check on the flow above the lock, any possible moorings and if it would be possible to turn into Sheepwash Channel and then up onto the canal. More rain and strong winds were forecast for this morning, should he push on or stay put. The message said, ‘Just setting off now to beat the wind and rain.’
More Panto
By the time I’d had a shower he’d negotiated his way past numerous rowers on the Thames to Osney Lock. Finishing breakfast he’d single handed Osney Lock. This involves a lot of walking round as the lock landings are on the offside and control panels on the towpath side.
The next stretch would be the hardest. The narrow channel meaning the flow would be strongest. Osney Bridge to negotiate and then the turn onto Sheepwash. Changing from going upstream to downstream with a right hand bend the currents couldn’t be predicted, there was even an Eddie there to confuse matters. Mick made the turn, passed the disused swing railway bridge and then turned onto the lock landing below Isis Lock. This was conveyed just as I reached the front doors of the theatre.
Panto
In the now pouring down rain he worked Oleanna up the narrow lock and at last he’d escaped the Thames. Two weeks later than originally planned, but safe back on the cut. No photos of this expedition as Mick was quite busy and it was raining somewhat.
2 locks, 2.31 miles, 1 right, 1 left, 1 red board, 3 buses, 1 car, almost 2 weeks in 1, 1 scenic cavalry, 1st glaze, 2nd tomorrow, 1 day off, 3 2 1mph, 1 boat escaped, 1 designer escaped, 1 lazy day planned, 1 escape pod to be put away!
Tea in bed with the Saturday newspaper, just what was needed along with an extra hours sleep.
Tilly
The sun was out warming the lock cut and making it steam. At 8am we got the first rowing boat arrive and sit chatting for ages as we read the papers. Then as the world warmed up more people walked past on the towpath.
Mick spotted a Lock Keeper and was about to say we’d like to stay a while due to our engine overheating, but the Lockie beat him to it saying that the river was back on Red Boards again, so our stay for the time being will be free.
I checked the levels and sure enough this reach isn’t the only one to have gone red overnight. It’s interesting how often they update the conditions, a week ago there were four updates in a day, but today there had only been one in 24hrs.
Sunny day
We had a long discussion this morning, should we eat out at the pub across the way, or should we cook ourselves. The later meant having to go shopping, we chose this option as we knew we’d end up with a much better roast for half the price. Mick headed off on a bike to a big Sainsburys where most of Oxford seemed to be restocking their cupboards.
All very well going downstream
Tilly and I stayed put enjoying the sunshine, watching a chap row by standing up, bet that’s hard work going up stream. What a lovely day for doing just about nothing.
The lock landing on 20th August
After lunch we went for a wander. Coming up the lock was a boat Mick recognised from Goring, the one with the cats on board. We chatted to the chap who moored behind us. They’d come through Abingdon this morning, fighting against the stream believing it to be on yellow boards, when they checked quarter of an hour later, it was on red. They battled their way upstream at about 1mph against the current. Serious hard work. Oleanna won’t be doing any of that!
The lock landing today
We walked down to look at the reach below the lock, it was very high, higher than yesterday, just about to come over the lock landing. Back in mid August there had been at least two foot below the landing visible. The stream from the weir was very strong, I’m surprised the boat had managed to come past it.
Red
A sunny slow quiet day ending with a nice roast chicken before I head back to Chippy tomorrow and paint my arms off for a second week. Here’s hoping the levels improve along with Oleanna’s engine.
My route to work in the morning
0 locks, 0 miles, 1 bike ride, 1 lazy morning, 1 lazy afternoon, 1 lazy evening, 1 roast chicken,1 boat, 2 kids, 3 dogs, 5 cats that’s one very full boat behind us!
Early trains, two of them to get me to Banbury. Then the 488 bus to Chipping Norton, which arrived so I had a good half hour before the meet and greet with the acting company. The van was already being unloaded with the set pieces that had been built in Cornwall.
Pieces coming in through the front doors
There was time to make sure all was well before I’d be needed elsewhere. Unfortunately there were two pieces that wouldn’t fit through the front doors! I had given Ade and Lou what are known as the ‘Get in’ dimensions. The two offending pieces had a very quick straight cut put through them which will be disguised with a lick of paint when I get round to it.
Portals going in
The first day of rehearsals starts with meeting all the actors and other creatives, this is followed by a read through. This was very funny indeed, plenty of jokes for both old and young. Then it was time for Helen (the costume designer) and myself to be centre stage and show off our designs to the company.
Positions on stage
Over lunch time there was a production meeting with Lighting Designer, Sound Designer, Props Maker, everyone involved apart from the actors. My world that normally revolves at about 3mph was suddenly accelerated to ten times that speed and that is the way it has stayed for the rest of the week.
Starting the phone box
Monday saw the portals being put together and fixed in position on stage. By the afternoon a second van arrived with barrows, hanging baskets and the start of a telephone box. Plenty for me to paint.
Pepper being grumpy with me
Late afternoon I walked round the corner to pick up the key for my digs and drop my bags off. I’m staying in the same digs as last year, so no need to be shown round, just a quick hello to Suzanne and Pepper the cat and I was back at work within fifteen minutes.
Yummy!
Late evening we all retired to the pub where on the menu there was gluten free cider battered fish and chips, I obviously had no choice. The portion was huge and I did consider keeping half for the following day, but I did my best and polished it off.
Tuesday more set pieces went up, sliders were suspended. This all took time as the floor of the stage is by no means flat, in fact it dips by getting on for two inches towards centre stage!
Hanging baskets all blobbed and splodged
I took over the front foyer, painting smaller bits of set. Hanging baskets, kitchen counters, the telephone box. By late afternoon it was time to say goodbye to Ade and Lou. They very nicely gave me two bottles of this years apple juice that they’d just pressed.
Glitter tastic scooter
Wednesday was props meetings with John the Director and Jo the Props maker. The scooters Jo has made are wonderful. The huge vault door wasn’t opening quite far enough, so some major chamfering back of the built hinge was needed and I then had to promise not to put too much paint on it all.
Big hinge about 12 inches long
With the crew putting first and second coats of paint on things for me I could concentrate on doing the arty painting. Late on in the day more people headed home, leaving me with Gavin and Ash to carry on.
My pretty walk to work
Thursday the actors started to rehearse on stage. By 4pm the Pippins had joined them. These are local kids who get chance to be in the panto. There are three teams of four, songs are learnt on mass, but stage directions and dance routines all have to be done three times. I’m just about word perfect on some of the songs already!
K6 finished
This also meant that Gavin gave his health and safety chat to the kids. When I realised he’d started I made sure I went into the auditorium to listen. Sadly this year he’s changed the wording somewhat, Death wasn’t mentioned once!
Missed bits
During the evenings the stage is available for painting at the moment, so I’ve made use of Ash and Gavin to get more pleb painting done. This does mean that even though I’m last in the building I also tend to be the first, touching in the bits they’d missed before the actors start rehearsals.
Still things to fly
By the end of Friday night there were just signs and barrow dressing left to do for the market square scene. This scenery possibly has the most work, so on Saturday I treated myself to a sit down in a dressing room doing all the signage. The complicated floor has also been marked out, I just hope it’s still there after all the dancing next week.
Road sign finished
Once these were completed and a few jobs finished on stage I headed to get a Saturday newspaper and a few bits and bobs that Mick had planned to buy when he reached Oxford, but that just hadn’t happened. Leaving the theatre in daylight was a first this week, as I waited for the bus to arrive it went dark. Only the twinkling lights in Woodstock illuminated the journey back to Oxford.
Pub sign completed
I considered on popping in to say hello to our friends, Andy and Irene, who were moored at the end of the canal, but by now I was weary and wanting to get home, still with another bus journey to do. Mick met me from the bus and we walked back to the boat by Sandford Lock. After sausage and mash with a glass or two of wine I had returned to 3mph, Tilly doing her best to keep my lap warm in front of the stove.
Cat cuddles, only because I was nearest to the stove!
2 trains, 3 buses, 1 read through, 7 potatoes more,2 big flats, 3 lots hanging baskets, 1 street sign, 1 nick, 1 kitchen unit, 1 ancient Pepper, 4 free bottles Crabbies, 2 bottles apple juice, 1 wet day, 1 newspaper, 1 purring Tilly, 1 cosy boat, 1 day off.
Theale to Goring Lock to Abingdon to Sandford Lock
This week has been a busy one on board Oleanna.
Yellow line at Theale
Early Monday morning Mick helped me with my bags to Theale Station and on to Reading where I headed off to Panto world and he headed to Screwfix where he bought us a new thermostatic mixer tap for the shower. This was fitted and we now have hot, cold and intermediate water in the shower, no need to look like cooked lobsters anymore.
Tuesday he stocked up on provisions for the dash up the Thames. The levels were dropping and yellow boards were starting to out number the red ones. With friends positioned along the river Mick was getting first hand knowledge from Goring and Abingdon.
Wednesday morning, Mick and Tilly were joined by Paul Balmer who had volunteered to come and crew for Mick whilst I was away. The cruise to get to Oxford would involve two long days. With Paul in charge of the ‘Key of Power’ they passed through Theale Swing Bridge just before 9am holding up a good few cars. Then they dropped down through the remainder of the K&A locks reaching County Lock 106 (the final lock) a little before midday.
Paul working County Lock
We’ve been wondering for a while if the K&A has the highest number of locks on the canal network. Answers on a postcard if you know otherwise.
The traffic light button was pressed and they were on their way through the shopping centre and back onto EA waters. For a jaunt they went round the Jail Loop* in Reading and then down onto the Thames. Oleanna had now escaped the K&A canal.
Blake’s Lock down onto the Thames
The trip heading upstream was a touch harder due to the current which was stronger than we’d had earlier in the year. Lunch was had on the go, helping to tick the miles off quicker.
Paul and Mick coming into view at Goring
As Oleanna passed under Gatehampton Railway Bridge, Mick gave Carol on WB Still Rockin a call. A space was available in front of Still Rockin’ and Carol and George were at the ready to catch ropes and help to moor up. Despite the river now being off Red Boards at Goring the flow was strong, so the extra help was much appreciated.
All moored up. Mick, George and Paul. Photo stolen from Carol
Tea and biscuits on board Still Rockin* was enjoyed by all before Paul headed off to catch a train back home. 18.41 miles and 10 locks. Mick joined Carol and George for some food at The John Barleycorn in the evening. Over the years our bows have crossed and we’ve followed each others blogs, but we’ve never had time to properly meet*, so a couple of hours was spent chatting and getting to know each other.
Tilly getting to know George
The flow on the river had been deemed too strong for shore leave to be allowed for Tilly. So instead on Thursday morning she received visitors at home, Carol and George coming round for a cuppa and a neck tickle!
Oleanna caught foam from the flow over the weir all day, a weeks Thames licence was bought and Mick had a look around Goring* and then was invited over to Still Rockin for some food in the evening. A good day of rest before the next long day up the Thames.
Friday morning and Mick was waiting for Paul’s return with the covers rolled back early. With help from George they ascended Goring Lock and waved goodbye, Still Rockin will now be heading downstream to their winter mooring.
A pause for water above Cleeve Lock and they were on their way again. Lunch on the go, ticking off the miles against the current. The hope was to reach Oxford so that I could return to the boat on Saturday night and Paul would have ease of access to Oxford Station to get home.
Around 1:15pm however an alarm sounded! The engine had been working hard against the flow, the temperature gauge (inside!) was showing how hot the engine was, too hot!
Mick put the engine into tickover, but things didn’t improve. Paul headed to the bow and dropped the anchor*. He was able to hold onto the rope once it had dug in giving Mick the chance to check the engine out.
Below the deck boards things were hot and steamy. Water and coolant were over the engine bilge. Mick topped the system up with water, the engine started again, the alarm stopped sounding and the temperature gauge dropped to about 90, not 80 which is good, but good enough for them to carry on to Abingdon to find a mooring.
Caversham Lock
They pulled in below Abingdon Bridge, the engine still too hot, was it a faulty thermostat? In the end it was decided to call RCR out to have a look. Rusty arrived after about an hour. Once Mick had convinced him that we’ve been on tidal waters going against the flow for far longer without any problem in the past they discovered the thermostat to the skin tank was full of crud. It was cleaned, dropped into boiling water to see if it worked. It did, but Rusty wasn’t convinced it should go back in. Unless this wasn’t the full problem it would be okay to run Oleanna without the thermostat for a while.
Paul had headed home and by now it was too late for Tilly to go climbing trees. A discussion on the phone at gone 10pm (my work finish time) and Mick thought he’d carry on to Oxford in the morning on his own. With rain forecast he didn’t want to now get stranded on the river if the levels came back up.
Troublesome thermostat
Saturday morning I received a message saying he was on his way, the Lock Keeper at Abingdon had said that there should be no problem getting to Oxford. Well except the engine was still being a touch too hot for comfort.
At 12:30 I checked the river levels on line. The rain was having some effect. A couple of reaches above Oxford were increasing again and Osney to Godstow Lock had gone into the red! This is the last reach where you turn off to get onto the canal. it is narrow and there is quite a low bridge too.
One red board
I messaged Mick. I could hear the cogs going from Chippy. Maybe he’d turn back, but then Sandford Lock came into view, this lock closes in a couple of weeks, so would be good to get through it.
He pulled in and opened the lock, the first he’d have to do single handed. Luckily a narrowboat appeared behind and pulled into the lock with him, with spare crew now they operated the lock and left Mick to attend to ropes. They were going to continue on to Oxford and try to get off the river, but Mick didn’t want to risk it with a hot engine. A 24hr mooring above the lock on bolllards was free so he pulled in there to have a think.
Why now?! Why rain now?!!
Being on a lock cut the flow is next to none, so Tilly could go out. Only problem was the amount of rain! This actually put her off for sometime despite having been locked in for days. The weather eased a touch and this outside proved friendly. I decided to bring my new best friend home to meet Tom, but the excitement was obviously too much for it. Tom picked it up and took it outside for safe keeping. He says it’s getting too cold now, so the back doors will be closed when I’m out from now on.
Staying put was the only way forward, Rusty was called and he’ll come back out to flush through the system hopefully in the next couple of days At least if the river goes red again we have a few feet to rise before the river would top the banks here and we’re on bollards. We’re also through the closing lock, so once things improve Oleanna can carry on up to Oxford and off the river, following NB Kamili.
Thank you so much to Paul for his lock wheeling and to Carol and George for keeping Mick company and fed in Goring.
18 locks, 42.63 miles, 1 left turn, 1 thermostatic mixer, 1 cruddy thermostat, 2 days with Paul, 2 evenings with Carol and George, 1 frothy bow, 1 weeks licence, 1 missed evening with Irene and Andy, 1 soggy friend, 2 buses instead of 1 to get home, 5 * things that happened for the first time, that I missed out on due to Panto!