Category Archives: Oxford Canal

Panto Postcard 5. Thank You Chippy.

44 hrs

Pen duty

On Saturday night before going to bed I decided that I should check the ropes. Mick normally says he’s doing this, but both Tilly and I know what he is doing! However, Oleanna seemed to be listing a touch, and the spirit level we have on board confirmed this. She normally has a slight list and after not spending much time on board recently, what I was experiencing may have just been normal, but I wanted to be safe so popped outside to check there was slack on the ropes. Luckily there was, so Tilly and I could sleep soundly.

No Mick to cook breakfast on Sunday morning, but he had left a couple of packs of bacon in the fridge. A bacon butty was in order, a deluxe bacon butty. Mushrooms were added to the pan and some thin slices of cheese placed on the bread before the hot bacon. Yummy!!

Whilst Tilly explored outside I caught up on my paperwork for Panto and when she returned I headed into town to pick up some supplies for Sunday dinner. A new pair of jeans made their way into my bag along with a chicken and some suitable veg. Mick arrived home earlier than he’d originally planned which meant I didn’t get chance to breakout the yarn I’d just received until much later in the day.

Crocheted poppies everywhere

Monday morning and I was back on a bus out to Chippy where the town was waiting for 11am to strike for the two minutes silence. Today there was lots to do before the first dress rehearsal, everyone was kept busy. The actors were on stage and everyone from back stage worked around them and through their breaks, which was to be the case for much of the week.

Ready for the dress

The first dress rehearsal went fairly well, although the curse of last years Axe Man struck again, with several flown pieces missing their deads (position in view and out of view) or not appearing at all. We’d been expecting a reasonably early finish to the day but this wasn’t to happen. My evening meal ended up being a packet of crisps, but I was able to imagine sitting in The Anchor on the Staffs and Worcester Canal as I enjoyed a bottle of gluten free 6X.

6X

Tuesday morning I plucked up the courage to climb to the top of my set and repaint the higher panels. I don’t like heights and being stood near the top of a set of Zarges ladders makes me nervous, especially whilst holding onto a pot of paint instead of the ladder. Thankfully the ladder was footed and I was warned of any loud sound effects before they happened. As the day went on my list of jobs got shorter and shorter. I was even starting to work through the notes that would normally fall off the end of the list.

John sorting the curtain call

In the evening we had a second Dress Rehearsal. This went much smoother and I was able to sit in the front of the balcony and take photos. But the show was running too long, by about twenty minutes. A few cuts were talked about and the interval change discussed at length to see if this could be made shorter. After painting the floor into the wings black I’d managed to finish early enough to enjoy a curry with the Sound and Lighting Designers and the Production Manager.

Two pickle trays!

Wednesday. Preview day, an early start to do a few jobs whilst the cast were informed of some cuts to the script. Paint tins were sorted, labelled and put away for any touch ups that might be needed during the run. Then at 1:45 the lights came up on the first performance. The audience were up for a good time, a sixth form college filled the stalls and they had a ball. They should be rented out as a first audience.

All sorted and labelled, whether they ever get used is a different matter!

At 6pm the second show played to a very mixed house who were much quieter but still enjoyed it. The cuts that had been made earlier in the day had improved the running time, but more was needed. Long discussions followed, doubles of everything for the slosh scene would help with laundry between shows. Would just nips and tucks bring down the time enough or would whole routines need to go?

Oops, my third fish and chips!

Thursday morning, I had a lie in, followed by my annual bath. My landlady had left for work early so I could take my time turning pink in the hot water. Living on a boat you miss baths. When you stay at friends they always offer you a bath, but it’s not quite the same. Here in Chippy it’s almost like being back in our house, it was lovely.

I packed all my belongings and popped the key through the door to my digs. Sadly I’d not had chance to say goodbye to Suzanne in person and the card I’d bought her I’d left at the theatre, so i had to say farewell by text.

There were just a couple of little jobs to do at the theatre and then wait to see if the cuts to the show would need anything from me. All that was needed was some props being put into the store as routines had been trimmed.

Boozer

My floor needed a good wash and scrub in places, the crew having been a bit too careful for the last week, so Gemma and I got on our hands and knees making a big difference, still not as lovely as when it was first painted but it would do.

Boo!

Earlier in the day I’d had messages from Mick about the water levels in Oxford. The canal was flowing over the top of Isis Lock and the river was up to the highest we’ve seen it, Isis lock being only 6 to 8 inches deep instead of 2ft 8″. He was nervous of leaving Oleanna for the evening, so I donned my glad rags and enjoyed Press Night on my own.

Just a little bit funny

The evening went very well, lots of booing, clapping, singing and dancing, sweet catching, Oh No! ing and Oh Yes! ing. After the show there were drinks and a very good spread of cheese for us all to enjoy. A photo call on stage for all concerned before people started to make their way home.

Scooters

Without Mick to help me home I got a lift with John the director and Anna who plays Jack the Cat, back to Jericho where Mick loitered to give me a hand with all my bags. After big hugs all round I waved them goodbye, my second Chippy Panto finished. A lot of hard work, a touch easier than last year, with a very good company, may they have a great run.

Panto company, courtesy of Chippy Theatre

0 Locks, 0 miles, 1 bus, 2 dress rehearsals, 2 previews, 3rd portion of gf fish and chips, 1 curry, 1 very tall ladder, 1 very long email from Vienna, 1 long reply, 1 shed full of paint, 1 wooden leg emergency repair, 2 bottle brewdog, 1 panto finished, 1 big sleep needed, 1 Mrs Tilly stamp of approval.

Panto Postcard 4, 2019 Nearly There

68 hours

Our mooring in Jericho

Sunday was meant to be a day off to try to recharge the batteries. It started with forwarding lots of reference to Phil who was working at the theatre painting all the 2D dressing for the Boozer. This I didn’t mind as it was a two minute job whilst enjoying a cuppa in bed with Tilly keeping my toes warm. Then the emails started with questions and requests, easier to do straight away than thinking about them all day. Have to say I did get a touch hacked off when asked a question I’d already answered four days earlier!

Yummy!

But there was still time to enjoy a cooked breakfast and a home cooked Sunday roast of Lamb.

Isis Lock looking autumnal

With the sun out we walked down to Isis Lock, the level below quite a bit higher than normal. At the junction with the Thames the flow was a lot stronger than the day before, Mick said if it had been like this then he wouldn’t have tried to move the boat. We walked up to Port Meadow along the narrow path and crossed over the foot bridge, a lovely stroll for a Sunday afternoon.

Port Meadow

Monday came round a touch too quickly and I was back on the S3 to Chipping Norton, this had to stop and be rebooted as the driver was getting error codes flashing at him. Luckily a five minute break did the trick and we were back on our way.

Rebooting

A new props maker was starting today, Emma, so a hand over was required. Phil was still about for the day finishing off bits which we put in position to see how they looked, which was very good. I did feel my age when I had to explain about pre-decimalisation and £ s d. Poor Phil ended up having to repaint the prices in the boozer twice, the last time with d and not p.

Prices being amended again
Kitchen dressing attached

Tuesday saw the return of Chris the carpenter and Gemma, Production Manager. Chris worked his way through a list of jobs that had been kept for him, someone who could cut a straight line in one go is an asset. The evening sessions had meant to have been for the Lighting Designer Mark to plot the lights, but he’d been held up on a show in London, this meant we could get on with jobs in full light and sound levels could be set.

Chris, Gemma and me with some of the LED woking

Wednesday and it was time for everything to be put together, actors, costumes, lights, set, props, sound, scene changes. The advantage of the actors rehearsing on stage with the set is that most problems had already been ironed out. There were still notes to take, being able to see the set and props under stage lighting meant there were things to add or alter.

Lighting a scene

Two long days sitting in the dark, taking notes and then taking advantage of the actors breaks to get on with jobs. I had become known as Pippippinpippippin, as I was a stand in for Pippins in the scene changes. But on Thursday afternoon we were joined by them. This meant going back to the start of the show and teching each team of four into the show in turn. This does become somewhat tedious, but it’s important that each of the three teams knows what they are doing.

Some of the footage taken last week now added into the show

On Friday we finished teching the show with the main cast and spent the evening with the Pippins again. They are involved in the show much more than last year and have quite a few complicated songs and dances, so it was decided to postpone the dress rehearsal that normally happens on a Saturday morning and use the time cleaning up dances and scene changes instead.

Mark and Jon getting into the feline vibe

Interviews for the local radio were recorded, I may get on air you never know.

A second portrait needed

My lists of jobs are getting shorter. The last couple of evenings I’ve spent trying to sort out the back cloth and portals that suffered so badly with damp in the workshop. Flameproofed sheets of timber are used in the construction of theatre sets, this got damp after I’d finished painting causing the salts to leach through onto the surface, fading colours and leaving a residue. Nothing for it but to repaint large chunks of the main set.

Puss’s boots

The other job that is taking it’s tole on everyone’s patience is installing LED tape around the portals. This takes time, let’s just say that some people are better at this than others. Staring at a lumpy mess you’ve created behind the tape, then disappearing into the toilet for half an hour doesn’t get the job done, but it does mean someone else ends up doing it!

A special brew for Panto

Yesterday afternoon it looked like the lights were nearly there, the final strip just needed connecting before we left for the weekend. But three LED’s decided that they no longer wanted to play the game and stayed pink whilst those around them changed colour. Nothing for it but to start again on that half of the portal.

Glad I got the bus and didn’t catch a ride in the Dames car!

I managed to catch a bus back to Oxford at a reasonable time, the bus having to wade through water. My walk along the towpath back to Oleanna felt very narrow with the water on the mill stream higher than it had been last weekend. I was glad of a touch more land between the canal and the flowing water when I reached the boat.

Someone was hungry!

Tilly was very happy to see me, Mick having left first thing to head up to Liverpool for the weekend. Of course she missed me. But I also missed having my morning Ding Ding that Tom had forgotten!

I encouraged the stove to flame back into life, fed Tilly and then myself. Chicken pasta with a few glasses of wine. Mick had been to London this week to pick up post. So now I have my new passport several months after it was applied for (it arrived three days after I applied for it), a new credit card, new E111 card, a waitrose card we’ve been waiting for since we moored in Newark a few years ago. We also have a new pair of boating shoes each and Mick has a second replacement pair of sheepskin slippers. What a lot of post!

Lots of post, including a shiny new red passport

Tilly chose what we were going to watch, somehow I don’t think she expected The Rock to be about chemical warheads on Alcatraz, a touch disappointing as there was little climbing involved, but I didn’t mind as it had Sean Connery in it. Not quite the girls night in I thought we’d have.

2 buses, 1 chippy, 1 painter, 1 new props maker, 0.5 backdrop repainted, 3 dogless collars, 3rd attempt with the LEDs, 12 Pippins, 2 pairs ears, 1 very dark room, 1 girls night in, 1st pasta in three weeks.

Panto Postcard 3, 2019. Saturday Escape.

73.75 hours

Hertford College Boat Club to College Cruisers, Oxford Canal

A very long week in Panto land, but a productive one.

Lily working with the Pippins

Two buses got me back to Chippy by 11am on Monday. The cast take over the stage now for much of the day, but lunchtimes and the evenings it is free.

Josh taking set ups

Monday we had a photo shoot for publicity photos for the show. We set up the Square setting as that was the most complete, actors donned their costumes and ‘set up’ photos were taken by Josh Tomalin.

Cutting in the woodwork on the boozer

The set being mainly sliders means that I can pull bits out to paint and then slot them back in whilst another scene is being rehearsed to dry without the possibility of actors getting covered in paint.

All wrapped up, ready to go

On Tuesday I took advantage of not being able to get to much on stage and sorted sending my model box out to Vienna. This took so long to fill out the forms on line. I could quite easily measure the box but weighing it was more problematical. The Front of House money scales came to my rescue, the box weighing 2kg which is £220 in £1 coins!

That’s me driving for the first time in three years!

In the evening Jo (the props maker) and I tried out the Dames car on the front of the stage whilst the technicians and Mark (Lighting Designer) hung lanterns around us. By the end of the day there were working headlights and I’d managed to paint my panto anaglypta in the boozer.

Highlights
Shadows

Wednesday was a filming day. The panto has some sections which are shown on a projection screen. So these were filmed in front of green fabric so that suitable backgrounds can be added. Then footage for the car chase was looked at with the actors in the car. Lots of fun.

Green screen filming

On Thursday I spent quite a bit of time getting dotty in the Bank of England Vault. I ended up getting carried away with the dots so had to paint every third one of them out. It being Halloween the actors had decided to spend the day in fancy dress. We had a strawberry, mustard, The Joker amongst other things.

Dotty vault

Friday was a very messy day. A panto isn’t a panto without a slosh scene. Last year this was tame compared to this year.

Susie mixing the smash
Actors getting covered

A huge bowl of Smash was required, costumes are made with ease of cleaning in mind and a large tarpaulin covered the stage floor. Various consistencies of smash were tried out, thinner worked better and tended not to clog nostrils up quite so much. On the set side of things I am going to need to glaze a lot of it as there is no knowing where the smash will land.

Pepper keeping me company back at my digs

In the evening I worked on the front edge of the stage, one last curve needed marking out. I was back to measuring and scaling up from my model, then joining the dots, followed by painting as good a curve as I could over mouldings. This involved adding a bit, loosing a bit, adding a bit etc whilst Mark and the chaps focused the lights on stage.

Ready to start the stagger through

Saturday morning, time for a stagger through of the whole show for the actors and a chance for everyone else to watch and see what is missing and needed for the technical rehearsals next week.

The boozer, just needing it’s dressing adding

This went well, a couple of scenes scripts were still in hands and we had to stop and start for scene changes, these will be worked out next week.

About to start at 3pm

Once the actors and props were clear of the stage it was time to get to work. Mark had done his best to get most of the lights focused, but still needed a bit of dark time. Jon (Sound Designer) was also around positioning speakers and microphones, a lot of people when you need a clear stage to start painting the floor. But everyone was understanding and accommodating.

Phil finishing the second coat of the base colour

The cavalry arrived in the shape of Phil, a scenic artist from Bristol. She has come to help out for a few days and was thrown in at the deep end helping me with the floor. We soon discovered what a small world it was from Skye to Hull to Bristol.

Base coat on by 4:20
Blues drying waiting for second coats at 5:10

The heating was on full blast to help the paint dry. We gave first, second and to one particularly annoying shade of blue a forth coat of paint before we broke for something to eat at 9:15 leaving the paint to dry on it’s own. Half an hour later we were good to go with a coat of glaze. This was on and drying with twenty minutes to go before the last bus left Chipping Norton for Oxford. Much better than last year when I finished at 2am and couldn’t escape to the boat until 6am.

Glazed by 22:35

Meanwhile

This morning, Saturday, when I’d turned my phone on I received a message from Mick. Yesterday he’d been up to Osney Lock to check on the flow above the lock, any possible moorings and if it would be possible to turn into Sheepwash Channel and then up onto the canal. More rain and strong winds were forecast for this morning, should he push on or stay put. The message said, ‘Just setting off now to beat the wind and rain.’

More Panto

By the time I’d had a shower he’d negotiated his way past numerous rowers on the Thames to Osney Lock. Finishing breakfast he’d single handed Osney Lock. This involves a lot of walking round as the lock landings are on the offside and control panels on the towpath side.

The next stretch would be the hardest. The narrow channel meaning the flow would be strongest. Osney Bridge to negotiate and then the turn onto Sheepwash. Changing from going upstream to downstream with a right hand bend the currents couldn’t be predicted, there was even an Eddie there to confuse matters. Mick made the turn, passed the disused swing railway bridge and then turned onto the lock landing below Isis Lock. This was conveyed just as I reached the front doors of the theatre.

Panto

In the now pouring down rain he worked Oleanna up the narrow lock and at last he’d escaped the Thames. Two weeks later than originally planned, but safe back on the cut. No photos of this expedition as Mick was quite busy and it was raining somewhat.

2 locks, 2.31 miles, 1 right, 1 left, 1 red board, 3 buses, 1 car, almost 2 weeks in 1, 1 scenic cavalry, 1st glaze, 2nd tomorrow, 1 day off, 3 2 1mph, 1 boat escaped, 1 designer escaped, 1 lazy day planned, 1 escape pod to be put away!

Seventeen to Twenty. 30th August

End of the Oxford Canal to East Street

With a delivery slot booked for Saturday morning at East Street we needed to time our arrival at the moorings well. Too early and no body would have moved off, afternoon then the spaces would have filled up, lunchtime people would stop for lunch at The Punter. We opted to time our arrival at around 11am.

Our mooring last night was surprisingly quiet, we only just started to hear people passing us as we got up. Or was it that we’d had quite a few glasses of wine and a late night! It’s a shame the road is so close here, meaning no shore leave for Tilly despite there being some very good looking trees.

Do-si-do

The windlass was brought out again and we made our way back towards Isis Lock. A lady was just bringing her boat into the lock to come up off the river. I gave her a hand whilst she clung onto her boat. She was interested in where we’d been moored, so on exiting she moved out of our way and then started to reverse down the arm. With a breeze and no bow thrusters (mechanical or man powered) this was going to be hard. As we were just dropping down to the river she asked how far it was to reach the space at the end. A quarter of a mile. She decided to abort her idea and see if she could find a space up ahead.

Back on the river we turned to head downstream, as we came under Osney Bridge the moorings looked full. But then we were passed by a boat that had been moored towards the other end, there was hope. In fact there was more than hope. Our shopping was booked to be delivered to 17 East Street and there was a long space just there, Bingo! The bollards didn’t work for Oleanna’s length so we nudged up closer to 20 leaving a space not quite big enough for another Oleanna behind. This was soon occupied by a 55fter, perfect. All we needed to do now was alter our delivery instructions from 17 to 20.

With more shopping added to our virtual basket it was time to get some real shopping. Blog reader Steve last year had pointed us in the direction of Osney Food Shed, a fish market and Meat master Cash and Carry. From the moorings on East Street both are very close, we needed something to eat tonight and I fancied getting a lamb joint to roast with plenty left over to try some of the Charlie and Ivy’s Raspberry and Beetroot dressing that is meant to be a perfect accompaniment.

Half a pig

First we headed for the meat. Here there were joints the size my Mum used to get when she bought half of half a cow. Giant gammons that would have strained the sides of my mums biggest catering pans. Amongst the big joints there were more domestic sized joints, we found a suitable lamb joint, some gluten free sausages and some bacon.

Fishy fish

Next the fish. Two sea bass, some smoked mackerel and a few veg bits. We really must get the freezer back on so that we can stock before we head north after Panto. Mick returned to the boat with our food and I carried on to Hobbycraft to pick up some bits for my model. A couple of balls of yarn might just have jumped in my bag too!

Unpacked veg

I called into Waitrose for a few more bits to keep us going until our delivery arrives tomorrow. Here the veg and fruit isles are doing their very best to go plastic free, Unpacked. Large displays of containers greet you as you walk in and crates of pick your own fill the displays. Strawberries and Raspberries in cardboard punnets for you to put lids on yourself. There was still quite a bit in bags, but a lot better than most supermarkets.

Now there’s an idea

Along the back wall was a section of dry essentials, beans, nuts, grains etc that you can purchase loose, an up market version of weigh and save shops, although those had plastic bags. You can also refill your Ecover washing up and clothes liquid bottles. One thing that I did find amusing was that you can also buy wine and beer unpacked. Bring your bottles for a refill. I wonder if they’d refill a wine box?

1 lock, 0.73 miles, 150ft in reverse, 20 not 17, 2 sea bass, 16 pork sausages, 1 joint lamb, 3 fillets, 1 lemon, 0.5kg potatoes, 1 bunch basil, 70grams olives, 1/4inch thick balsa, 1 sheet tracing, 1 blue ball, 1 sheet card, 1 red ball, 4 boxes on order, 1 bored cat, 2 apologies to Kath and Clare, he wasn’t much of an Adonis!

https://goo.gl/maps/oLDPbcabuDzw8W8r9

Waiting Out The Rain. 7th June

Around about Bridge 80 to around about Bridge 87

The forecast was for rain, followed by more rain and then…. yep you’ve guessed it, more rain until about 4pm.

The blog took an annoying amount of time to sort, the internet being so intermittent. Just when you thought it was all sorted and eventually uploaded, I’d put it into preview mode and not only did the photos not appear but half of what I’d written had too! After a lot of frustration I gave up, I didn’t want today just to be about the blog, a rainy day meant I should be getting on with some work.

Dunchurch Pools Marina in the rain

I headed off into the woods. Once the trees had been climbed, I’d done quite a lot of that yesterday, Then some pouncing, I wandered that little bit further. There was a big brick wall. I prefer stone canal walls as they are climbable after some calculations. But this wall had very little claw factor (C) 0.1, Height (H) 1.3 trees high, Friendly cover (FC) 0, Angle (A) 90, Breakfast (B) 15 biscuits, wetness (W) 7.4, Tilly (T) 100%.

Drying off before my next adventure outside

I did my calculations (B x C $} T/W ~ FC x 0.7>A^H+C = :(abort attempt. Back to putting my arms down holes and climbing trees. After an hour or so the wetness rose to 8.2 time to dry off!

I drew out my scenery, everything starting from one point on the whole set means it takes a bit of marking up, but I got there in the end. It will be me painting this part of the scenery, I need to either simplify the floor design or manage to find a very quick way of marking it out.

A mound of scenery

We waited for the rain to ease. NB Chertsey braved the rain as did several hire boats. Every now and then the patter of rain stopped on the roof, Mick would look out of the windows, but by the time he’d stood up the rain had started again. At around 4:30 he decided to move. The annoying internet could not be lived with for any longer and we both knew what happened to Douglas Bader. Getting closer to Braunston would be good for tomorrow and hopefully improve the signal.

Seasonal wool decorations

We cruised only a couple of miles, to be within eye and ear shot of the Banger Spire of Braunston. Internet signal was checked, good, so we pulled in. Tilly went out and explored again, Mick got the stove going and we enjoyed the last of the pancake batter from the freezer.

BANGERS!!! Our mooring for this evening

With only one thing left in the icy box that went into the fridge for tomorrow night and the power was turned off at last. Just how long has it taken to empty the freezer!? But now that mission was accomplished. It will defrost over night have a clean, then be lifted out of the drawer to see if we can improve it’s ventilation anymore. Fingers crossed our combined skills can come up with something.

A rather lovely mooring

0 locks, 1.99 miles, 1 very wet day, 1 very wet cat, she may as well have fallen in! 664 inmates not the 625 it was built for, 2 hours wasted, 3 portals, 1 floor, 1 back cloth started, 2 much grey paint mixed, 2 savoury, 2 sweat pancakes each, 1 instep on its way.

https://goo.gl/maps/xEYdonZdeEMZacuh8

A Good Place For A Conversation. 6th June

Rugby to Dunchurch Pools Marina Bridge 80

Well we had plenty of time

No rush to be on the move this morning, so Tilly was allowed to head off and explore whilst we had breakfast. Next was a shopping trip. We’d opted to moor nearer the station than Tescos so we had a bit of a walk there and back for supplies to keep us going for the next few days.

Lock 4 at Braunston has been shut for 48 hours, opening later today. C&RT have been carrying out repairs to the gates and cil to reduce water loss. Also overnight closures at Watford, Long Buckby etc have come into effect this week so that back pumping can be more effective overnight. Both of these things have put a stop to our plan of popping up to Crick to see our friend Lizzie, instead we hope to catch up with her a bit further south.

So we are in no rush to get to Braunston to join the queue to use the locks, we’d just get a touch closer today. The sun being out helped and despite us being on the flat for a while I decided to have a day off work, well almost.

The new bridge being clad

We pootled along towards Hillmorton. The new road bridge that will lead to Houlton (the new village of 6200 homes, 3 schools etc) has come on somewhat since we last passed. Now the roadway spans the canal and is certainly wide enough to be a duel carriageway. Big bold letters announce the bridges name Houlton Bridge 66A.

Proudly displaying it’s name

Hillmorton water point was empty. This tap is renowned for being one of the slowest on the network, but today that would suit us just fine. With the hose connected we started to fill up, I had a phone call to make about some possible work next year. Now Lynda can talk, but by the time we’d finished our conversation our tank was full, Mick had moved us off the water point closer to the locks and another boat had almost finished filling it’s tank!

Lock beam poetry
Hillmorton Locks

We worked our way up the three paired locks. One boat headed downhill towards us. The top two locks have three paddles out of order, so the chamber we’d chosen took forever to fill. Once they’ve finished at Braunston maybe they should try to get these working a touch better, they are after all the most used locks in the country.

Wild flower borders

Further along the building works are on going, but set back from the canal at the moment. Houlton will be huge, Will it extend down to the canal or will the banks of wild flowers remain?

Giant poppies
Witch in a well

On along Barby Straight, the old ambulance long gone, but giraffes graze the trees and a witch hovers in a well, it gives you something to photograph. The moorings between 78 and 79 were very full so we were surprised at those outside Dunchurch Pools Marina having plenty of space.

Barby Straight

Here Tilly was allowed two hours. Last time we stayed here she was out well past dark. Today Tilly stayed out for three and a half hours, returning for a pit stop only for the doors to remain shut for the night.

3 locks, 5.93 miles, 1 cooked breakfast, 0 boxes wine, 1 chicken, 1 huge bridge, 1 monster development, 1 house up to rent, 1 witch, 1 Mrs Tilly stamp of approval.

https://goo.gl/maps/KQj8yK5PY9GPCCSN7

1 Mooring good for cats but not that much else!

On The Flat to Our Destination. 4th June

Power Station Footbridge to Broughton Road Bridge 59

There are advantages of working whilst we cruise on the flat. Today that advantage was that I stayed dry, well most of the time.

Quite a soggy day really. Mick prepared well with coat and a brolly. Normally on days like today we’d not bother moving, but we needed to be in Rugby by the end of the day. We pushed off a little after 10am then I retired below to get on with work.

Trains with cars!

First the M6 sits along side the canal, then after a few minor wiggles the West Coast Main line joins and sits right along side for several miles. Mick was treated to quite a lot of trains wizzing by. I popped out on deck in case my assistance was needed to get through the swing bridge at Rose Narrowboats. At first it was across the cut, but then it swung out of the way. No need for me to step off.

Swing Bridge ahead

A boat was coming towards us but we were already through the narrow section before they had negotiated the bridge ahead. Mick pulled us into the side and let them and a second hire boat pass before we carried on.

She doesn’t mind the rain, she just keeps on smiling

Down below I decided to start again on my over all paint scheme for panto. So I redrew out a sample piece, based it in and then started a fresh. My design is based on some photos of the underground that took my fancy, yesterday I’d got carried away and possibly veered bit too far away from what I liked about the images. Today I stuck to the bits that I liked the most and adapted them to what I was after.

Mark 2

Of course halfway through the penny dropped and I knew which way I should take the main setting, this was no longer possible on the sample I was doing, but if I’d not done it then the penny wouldn’t have dropped.

There was a space at All Oaks Wood, so we pulled up for lunch. We’ve never seen a space here before and have often carried on a touch further to where there is a view overlooking a farm and a great field to play in for Tilly. But this was only a brief stop and we were on our way again shortly.

Newbold Tunnel

A boat pulled out from Brinklow Marina and took his time weaving back and forth across the cut slowing our progress somewhat. Below deck at Newbold Tunnel Tilly was awake. She really is flummoxed by them. Despite the cabin lights being on for me to work she quickly notices that the outside lights have been turned out. I’m really perturbed that She didn’t seem too bothered by the situation so tried running around to make her aware of the problem. She still took no notice so only one thing for it but to shout to Tom at the back doors! He ignored me too!! Eventually someone turned the lights back on.

Why won’t anybody listen to me!!!

A chap on the towpath asked Mick if he’d seen a boat! He’d popped down to Tescos for some shopping (not on his person) and when he’d come back the boat had gone. Maybe they were on a hire boat, confined spaces and some people just don’t get on, so they’d left him!

We carried on slowly to the water point where the slow boat moored up. Our destination a short distance further on, just as well as just about all the moorings were taken. We found a spot with not too much tree coverage and let Tilly out, lit the stove to help Mick warm up and finally got to eat our barbecue supplies we bought a week ago. All was cooked inside out of the rain and very tasty it was too.

Indoor, but still yummy

0 locks , 12.66 miles, 1 swing bridge swung, 1 rainy day, 2nd go at painting, 3rd idea, 1 slow boat, 1 lost boat, 1 destination reached.

https://goo.gl/maps/VHxugQJkGa132mB38

A Lot Quicker. 3rd June

Whitley Bridge 47 to Power Station Footbridge, Oxford Canal

Better weather today and an earlier start for us than normal, we had water to cover.

Sunnier day

Boats were already going up the locks ahead of us so we pulled out and joined in. NB Piglet was just pulling out of the first lock of the day, NB Trinity waiting below, we pulled up to wait our turn. The pound between this and the next lock is quite short, NB Piglet and NB Trinity ended up both sitting waiting in it, the level slightly low.

Up went Piglet, I waited for Trinity to start emptying the lock before I started to fill the lower one, not wanting to steal the water that was keeping them afloat. We then pulled out and awaited our turn as a single hander came down.

Stuck and not at the cill yet

The pound between locks 8 and 7 was quite low, a couple of boats moored on it were definitely sat on the bottom. NB Trinity was having difficulty getting into the next lock. Pulling on the bow line didn’t help, pushing them over to the other side didn’t either. So some water was let down hoping to lift them off of the bottom and get into the lock. With water coming down and a diagonal pull on the bow they got moving just as two C&RT volunteer Lockies arrived. They set about running more water down to try to return the pound to a better level without starving others above.

Our turn, we suspected our draught was deeper. Oleanna got stuck sooner, Mick reversed her back a touch and tried a different line. Definitely a build up of silt from a bywash, he got her closer to the lock where she stopped again. I got the bow rope, water was let down and bursts of engine got her moving again and over the lump into the lock. Apparently they had had a single hander on the flight who’d been leaving paddles up, not good practice espcially when there isn’t plenty of water about!

Carrying on up

Some boats were pausing for lunch in the longer pound, others stopping to go shopping, but we carried on, too far to go today and the locks were taking that bit longer than normal. More water was let down by the lockies doing their best to get boats floating again. One chap came past enquiring as to when his boat would be off the bottom, just as water was flowing straight through a lock. Have to say if that was us, we’d move our boat at the first opportunity not stay put for a full two weeks and complain about it. But each to their own!

A pretty flight in the sunshine

We carried on up, boats now coming down the flight, most stopping to wait above lock 5 and taking advantage of the water point there. A slight pause below lock 2 for a boat coming downhill and then we were on our way again and at the top of the flight. After half a mile or so we pulled over for some lunch before carrying on.

Bye bye Atherstone

I retired below to work as Mick pootled us through Mancetter, Hartshill, past our favourite mooring near Springwood Haven, slow going through Nuneaton.

Hello NB Cyan!
Turning to the Ashby Canal

At Marston Junction I stuck my hand out of the side hatch to give navigational direction to keep going straight.

Quick glimpse of Charity Wharf

I only just made it out in time to take a photo of the last mannequins at Charity Wharf before they all disappeared behind the willow trees.

Hawkesbury Junction

Approaching Hawkesbury Junction the moorings were full, a couple of git gaps with familiar culprets in the middle of them. Mick carried on would we have arrived in time to get a mooring anywhere?

I hopped off at the Engine House Footbridge and walked across the grass to Sutton Stop Lock. A Kate Hire boat was coming the other way, the lock in their favour. Outside the pub was heaving and a young lady stopped and asked for directions to the Ricoh Arena. I was able to point her in the right direction to follow the canal.

The gate shutting itself behind us

The hire boat were wanting to moor up in front of the pub,I suggested that was maybe not such a good idea as the 180 degree turn from the Coventry Canal for a 70ft boat would necessitate the full amount of space there. They’d be shouted at by the first boat to come through, as soon as they were out of the lock they could see what I meant and rounded the bend to find a mooring.

Conserving my energy for hunting later

Up we went and then started to look for somewhere to pull up. Rather than moor right on a bend we carried on and found space where we’d moored last year very close to the power station. We’d reached our destination with enough time for Tilly to do some hunting and Mick to have a towpath haircut.

Patterns and colour, still some way to go

Today we passed through the pound from Atherstone to Hawkesbury in 5 hours 13 minutes, last year it took us 32 days, 2 hours and 55 minutes!

Best loaf so far

As the evening went on we could hear music from the Arena. Sadly I hadn’t spotted any ticket towts near the Greyhound Inn so we had to make do with the muffled music from the Arena. A shame as Mick had so wanted to see the Spice Girls!

10 locks, 12.96 miles, 2 canals, 1 straight on, 180 degrees left, 2 stuck boats, 15 tissues all day, 1 painting scheme started, 2 friends, 1 quite tasty,  1 sour dough loaf, 4 Spice Girls, 0 tickets.

https://goo.gl/maps/fbTniCBmaKiQt7HJA

2018 Round Up. 2nd January

HOORAY!!! Proper signal again, sorry for the delay. Here at last is a round up of 2018 and our vital statistics, who they are vital to I don’t know!

THAT Aqueduct!

We started off the year up on the Llangollen having spent Christmas up in the basin, if it hadn’t been for me getting some work I think we’d have headed back there this year as we enjoyed it so much. On our return journey we dropped down onto the Montgomery Canal for a few days. Then we gradually worked our way along the canal stoppage hopping, the last bridge holding us up by a few days whilst work over ran, but we were first through and soon back down on the Shroppie  at the end of January.

Ellesmere Port

A pootle up to Chester and then Ellesmere Port where we spent several days looking round the museum, mooring on site made this very easy.

Shuffling with Brian on NB HarnserDry bottom

Oleanna had a day in the dry dock at Chester to check out why our bowthruster had stopped working and gave me chance to do a quick touch up of the blacking.

Jaq from NB Valerie

We then made our way back to Nantwich where we sat out the Beast from the East and at last got chance to meet and spend a bit of time with Jaq from NB Valerie.

The magical Shroppie

Then we climbed the Shroppie to Autherley Junction turned right onto the Staffordshire and Worcester Canal and made our way down to Stourport where the river rose on us over night and left us stranded for far too long. This did mean that Tilly had her annual jabs gaining shore leave for another year. A hire car gave us a few days away from the flashing lights of Stourport, a trip to Beverley and to catch up with the John Godber Company in Bromsgrove along with a recky trip to Droitwich.

Long routeShort routeIn the end we got bored of waiting for the river to drop and decided on going the long way round to Droitwich. Of course about two or three days into ‘the long way round’ the levels dropped and we could have done a quick journey down the River Severn.

TardebiggeLock 40

Oh well we enjoyed all the locks having good weather for the Tardebigge Flight.

Once in Worcester we turned onto the river and made our way down to the Gloucester Sharpness Canal where we pootled down to the end with all the swing bridges being worked for us, met up with Jaye and Duncan (I’d have got into big trouble if I didn’t mention them!), saw the hulks, all sorts of flamingos and got to watch tall ship Kaskelot pass us.

Duncan, Jaye, Mick and meTall Ship

Back up the Severn for Micks 60th birthday weekend where all our siblings joined us to celebrate. We watched cricket at New Road in Worcester, ate in Droitwich, caught steam trains in Kidderminster and ate some more in Bridgenorth, a very good weekend.

Family at the cricketBirthday Boy

About time there was a picture of meYummy

By now the summer had already started with wall to wall sunshine and our Sunday roasts became Sunday barbeques. We made our way back to Worcester and turned back down stream to Tewkesbury (I do like a good Tewkesbury!) and the river Avon. The last rain storm for a while slowed our progress upstream, but we stayed safe.

A lovely Avon mooringThe Avon was a picturesque cruise and we met up with friends from Australia and old work friends of mine in Stratford, taking advantage to see as much theatre as we could.

The Swan, Stratford

Whilst in Stratford I heard that I’d got the job designing Panto in Chipping Norton this year. This would now affect the remainder of the year slowing us down somewhat. We headed back into Birmingham up the Lapworth flight (meeting NB Chuffed) to rendez vous with NB Blackbird and crew.

One last kiss with NB BlackbirdPerry BarHere we planned to explore all the back waters of the BCN, but the sun was now on permanently and the thought of spending weeks surrounded by brick work and concrete reflecting heat at us was not attractive. So we chose a route out of the city that we’d not done before (via Ryders Green and Perry Barr) and headed for the shade of trees.

Sheltering on the Ashby

Work and heat were the feature of the next few months. On days we wanted to cruise we tried to be up early to make the most of the cool hours before the sun got too high in the sky to avoid. We hopped from mooring to mooring hunting out good places with maximum tree cover, not so good for the solar panels but it meant we didn’t cook inside.

Loads of cars in CoventryCoventry BasinWe gradually cruised the Coventry Canal,  the Ashby Canal for the first and second times, all the way into Coventry, down the North Oxford onto the Grand Union and on up to the Leicester Section. All our favourite moorings on the summit pound were visited and the London Leckenbys visited us at Foxton. All this slow cruising was interspersed with Panto meetings in London and Chippy, necessitating being near to stations, but this worked out well with a bit of planning.

The finished model for Aladin

Leamington Spa was a handy station back on the Grand Union for my final  model meeting in mid September, freeing us up until rehearsals started a month later.

Well worth a visitLeamington Spa StationWe made use of the Heritage weekend visiting places in both Warwick and Leamington. Oleanna got to visit the Saltisford Arm where we worked our way through the dirty washing drawer before heading back towards the Oxford Canal crossing bows with NB Tentatrice on the way.

Lift bridges on the Oxford keep Oleanna smilingStunning sunsetsThe South Oxford Canal then became our home for the next three months.

Lunch at the Turf Tavern

First we cruised all the way to Oxford taking our time to return to Banbury. I then spent four weeks working my socks off in Chippy enjoying being creative again on Panto, returning each weekend to wherever Oleanna was with my head full of song lyrics and dance moves.

Final dress rehearsal

Once Aladdin was open and hoards of kids were shouting ‘He’s behind you!’ I could return to my normal life at 3mph, the boat, Tilly’s friends and Mick’s breakfasts.

What a way to spend Christmas Eve

Due to winter stoppages leaving the south Oxford couldn’t happen until near Christmas so we slowly made our way northwards breaking off to have a pre-Christmas in London and then once Napton Lock 9 was open we headed into the middle of nowhere for Christmas. The year ended with us returning to Crick and sadly missing out on the festivities at The Red Lion with friends.

We’ve had a great year travelling, meeting up with old friends and new. We’re looking forward to where 2019 will take us and who we shall meet along the way.

Us

So our final statistics for the year are.

Total distance is 944 miles, 1 ¼ furlongs and 614 locks. There were 170 moveable bridges of which 77 are usually left open (although three of those weren’t); 131 small aqueducts or underbridges; 39 tunnels and 2 major aqueducts.

This is made up of 669 miles, 1 ¼ furlongs of narrow canals; 118 miles of broad canals; 35 miles, 5 furlongs of commercial waterways; 42miles, 7¼ furlongs of small rivers; 78 miles, 3 ¾ furlongs of large rivers; 476 narrow locks; 129 broad locks 9 large locks.

1084.6 engine hours, 7 hire cars, 1,383.63 litres diesel, 10 gas bottles (we do have gas central heating), 54 bags of coal, 2 waterway museums, 3 big houses, 3 versions of tuperware, 60th birthday, 2nd solar panel fitted, 7 overnight guests, 6 packs of Dreamies, 26 friends, 1 snake, 9 Mrs Tilly stamp of approval moorings, 7 pairs socks,  6 pairs gloves, 11 supermarket deliveries, 56 boxes wine delivered!


Turning At The Turn. 26th December

Chambers Bridge 100, Oxford Canal to Butchers Bridge 1, Grand Union Canal

Boxing Day tree

No rush this morning, Tilly got an hour of freedom before we wanted to push off, she most probably just wanted to tidy up the towpath from her Christmas day spree. Boats started coming past early, the crews all wrapped up. By the time we started to move the world had warmed up a touch, so quite so many layers weren’t needed.

Turn straight ahead

We pootled our way under grey skies for just over a mile towards Braunston Turn. Then took the right folk to head into Braunston.

Left or right?Right

There was plenty of space as we came past the pub and under the bridge that we’ve been driving over this last week. We hoped this would bode well for our preferred mooring further along.

Right

Despite our water tank having been filled at Napton we’d used quite a lot of it already so we paused at the Stop House to fill the tank and empty the rubbish. From here we could see there was plenty of space so we passed the entrance to the marina and pulled in just before Butcher’s Bridge. Here there is easier access up into the village, a short reverse back to wind, around half way between the two chandlers, a little bit further away from the road and a slightly wider towpath (admittedly a touch muddy at the moment). Tilly quite likes it here as there are trees to keep her busy despite there only being a narrow strip of land between us and the marina. They think I stay near the boat, but across the bridge there are huge fields to play in for hours! I just have to find the right moment to cross over the bridge without woofers.

Braunston Marina

Living on a boat means space is limited. We’ve been putting up with presents taking over half of the dinette for the last couple of weeks, but now they are all opened homes need to be found for their contents. Father Christmas having visited means that there is now more space in cupboards in the bedroom, so clothes could all now go away. So for much of the afternoon we spent having a good tidy up, the floors even got a wash!

Now there is space for more than two of us on board. Maybe we should have some visitors.

DSCF7114sm0 locks, 1.81 miles, 1 right, 1 hour at morning dingding, 2.5 hours before evening dingding, 12 moving boats, 1 dinette capable of seating 6, 1 tidy boat, 1 clean floor, 1 muddy towpath, 4 muddy paws!

https://goo.gl/maps/dcs7VRyBDT42