Cassiobury Park to Turnover Bridge 182
Our cruising schedule has allowed for a little time off, but today we’d not be able to sit still in front of the TV, we needed to keep moving. So we were up and on the move a little later than of late.
The towpath was quite busy and we had people watch us as we dropped down Ironbridge Lock. We pulled into the water point above Cassiobridge Lock and quenched Oleanna’s thirst, the tank was really quite low.
We worked our way through the locks all set apart by half a mile or a mile, all with leaky bottom gates. As we cruised between locks we watched the thousands of soldiers in London marching, guns reversed, drums with black surrounds. Had they all had segs hammered into the soles of their boots? Or was it just that there were SO many of them creating such an incredible noise?
Down through Common Moor and Lock Mead Locks, tube trains still running, people taking the advantage of a day off to work on their boat roofs, we passed at least six, all as past Prime Ministers arrived for the service and the gun carriage rumbled around West Minster.
Just above Batchworth Lock we passed the car/boat on a permanent mooring, car seats in the bow protected by perspex. Two lads of about 7 helped me with the bottom gates of the lock chatting away, smiles on their faces at being asked to help.
We paused below the lock to empty the yellow water tank and then were on our way again, slowly passing the many moored boats as the two minutes silence took place.
At Stokers Lock there was a large family ready to watch and ask questions, I enlisted another seven year olds assistance with the gates. Mum asked if we had to book the locks, a Dad asked if we needed a licence to drive the boat. I was asked what I used to do before the boat.
There were more boats on the move than we’d expected today and plenty out on the towpath. We watched the pallbearers move the coffin back to the gun carriage and the procession past Buckingham Palace. Up above us the monkey and the bear hung from the old building having no idea what was going on elsewhere today.
Near the waterworks a Jules Fuels boat was doing an odd manoeuvre, he was heading up onto the River Colne where a cruiser seemed to have got stuck. At Coppermill Lock we joined a downhill boat with a crew of South Africans, not the chattiest of people but it was still nice to share the next few locks having had a pause to help fill the bins.
Towards Wide Water Lock the amount of Pennywort was quite something, huge mounds of it gradually taking over the canal. There has obviously been some clearing of it going on as by the lock there were huge piles of the stuff.
Another leaking lock, would it ever equalise. Two old fellas stood and watched as Mick and I tried to open the top gates. In the end I enlisted them to help, their inner 7 year olds gleaming with joy at being asked to push and pull a lock gate. Today we’d made five young/old boys days.
Here we lost our partners as they headed into the marina and we continued onwards. Approaching HS2 there were priority signs for boats coming the other way. A roadway has been added around the construction site keeping a right of way open, a car timed it’s arrival very well to demonstrate the floating roadway.
We pulled in just after Bridge 182 just before 3pm. Tilly went out whilst we sat down to a late lunch and to watch the hearse drive up the Long Walk in Windsor. If ever a road was made for such a moment!
Time to get the lights outs and see how we could decorate Oleanna for next Saturday’s flotilla. With magnets and magnetic pole we hoped we’d got everything we’d needed now.
It soon became obvious that we’d need more height on the pole to act as a mast, the broom handle was perfect cable tied to it. Then just which lights to use for what? The cabin sides were measured, 14 meters in length, magnets deployed at regular intervals along the side. One set of lights reached the mast and came back down again, another had a lot of spare, but not enough to go round the hole cabin, these ended up going round the stern deck. The newest set of lights 80 meters long ended up going round the boat twice and heading up to the mast twice.
With some of the lights in position, it starting to rain and the light fading we switched everything on to see what we thought. Repositioning of magnets got the lights in a better position and tension will be the key to it looking good. We could really do with a few more magnets, but there’s unlikely to be enough time to get them delivered now, so we’ll have to make do with what we’ve got.
The biggest decision will be when to put all our lights up. Before we head out onto the Thames, possibility of lumpy water disturbing our display. Or whilst we’re moored awaiting the flotilla to muster out on the Thames, possibly not sufficient time to get them looking good whilst balancing on gunnels! At lest there won’t be any tide as the barrier will be shut.
10 locks, 8.93 miles, 1 funeral watched from on deck, 5 lock helpers, 1 mountain of pennywort, 1 floating roadway, 1000 white lights, 1 Thames barrier closing, 1 plan starting to be formulated, 1 feline assistant.