Over the last few days there has been plenty going on at the Leeds Liverpool Canal breach. A dam has been put across one bridge hole and I think stop planks have gone in on the other side of the breach. There is a lot of footage available on Youtube. Here’s a link to some drone footage.
A group of lads also went down to where the dam has been put in. Their theory, before they got there, was that the water was going down into a disused coal mine. Bare with the swearing, they get quite a bit of information about the collapsed wooden culvert that has caused the breach. They then go to explore the breach site and below it. I do not condone their actions, but it is quite interesting to see below the canal.
Several boats have been affected including NB Mr Blue Sky, the boat we shared locks into Manchester with a couple of years ago. I so hope the boat is safe along with others that have been caught up. Sections of the canal are now getting water back in them and boats are being re-floated. Other sections will take a while longer as water needs to be pumped round the breach site to reach them. is now cut off. Refloating those boats will take longer.
The Leeds Liverpool isn’t the only canal with problems.
Down on the Grand Union Canal the levels dropped between Copper Mill Lock and Cowley, a C&RT notice was put out yesterday with an emergency navigation restriction. On Tuesday night Widewater and Denham Deep Locks were closed due to low water levels. Several boats have sunk because of this in the marina there.
15W ten days ago
Then on the Huddersfield Narrow Canal yesterday a significant leak had been discovered between locks 14W and 15W, where we had been moored last Tuesday. Today a method of repair has been established and repair works will happen over the weekend.
On this side of the Narrow someone has left a paddle up at Lock 14E. This doesn’t sound too bad, half emptying a the pound above. The eastern side of the Huddersfield Narrow has limited water resources and the refilling of this pound will have a knock effect to the lower end of the canal.
The alarm was set to make sure we were up and about in time for the arrival of our CRT Ranger this morning. Richard arrived just before 9 with his wife, sorry we didn’t get your name, she’d come for the walk up and down the locks. Today we’d start our descent from the highest pound on the network.
Leaving the highest point
Richard set the top lock, and we all had a brief chat about how to work the locks. Basically to save as much water as possible the lock below should be set to fill before the one above emptied. This is what we tend to do on a flight anyway.
Filling up with a view
Mick and I had both imagined that either Richard or I would walk ahead lifting paddles on the lower lock and opening them up. However it didn’t quite start off that way. After lifting paddles I was sent down to open the gates on the next lock. But at that lock both bottom paddles were up, the pound below looking like it needed a refill. I lifted a top paddle to aid the refill, quite a lot of water was already going round the bywash. But how long should I leave it for? I tried phoning back uphill, ‘Yep close it and fill it’.
The pound looked to be improved but was still shallow. As we dropped the next lock Kim arrived walking their dog, could I let her know of any problems down the flight when they come to it on Monday, the next pound was an obvious one!
Richard running back to let more water down
Mick brought Oleanna across the low pound, when he reached lock 40 the depth simply wasn’t enough to get Oleanna over the cill. Richard ran back to let water down and Mick put Oleanna into reverse to get her away from the cill and aid the level in the lock to rise.
Just floating back in
As Oleanna reversed there was a sudden screaming coming from the engine bay. A fan belt had gone! Mick lifted the engine board, Yep a belt had gone and taken some cabling with it. The influx of water from above was pushing Oleanna now into the lock, Richards wife and I took the centrelines and pulled her into the lock.
Both centre lines
We dropped the lock keeping an eye on her position. Mick checked below, he felt he could start the engine and run it for a short time. This next pound looked to be a better level and we managed to get Oleanna into the side, just putting spikes in was a problem but we got there in the end.
Time to investigate
Mick inspected the engine bay further. The Domestic alternator belt had gone and as it did so it had taken out quite a lot of cables. We have spare belts and in fact at the next service Mick was going to change them. A call to RCR was made to see if they could help. It took a while before they rang back suggesting it might be 3 or 4 this afternoon before someone could get to us.
Dates inside the locks
This wasn’t going to be a quick fix, so we thanked Richard and his wife for their help, he gave us his notes on the locks, so we’d know where we might have problems. Richard is normally a ranger for the Broad Canal, he very kindly offered to return should we get moving again, or maybe be able to help us tomorrow.
Off to enjoy the Jazz
Our mooring was okay for Tilly to go out and we got to hear several of the stages placed around Marsden for the Jazz Festival taking place this weekend. I dropped in to say hello on the Geraghty zoom as I couldn’t be much help in the engine bay or hunting for friends.
Ends of cables
Mick got down in the engine bay to clear the wires. Orange, Red and Green has been severed, but what did they all do? That didn’t matter really as one of the cables had managed to wrap itself around the alternator in such a way that he couldn’t get it off.
That lot shouldn’t be there!
Time for lunch, well that’s what Tilly thought as she returned on board with a friend. She and her friend were very quickly lifted back outside where she and I discovered that her friend had been playing dead, it scurried off ending up in our well deck! I hunted round for it, Tilly did too with her head down between the boat and the bank, right in the crush zone. After she was put inside I found the mouse which ended up running back the way it had come. This could mean it was either back on the bank, in the canal or in the starboard side locker, possibly having gone down the vent pipe to get cosy around the water tank. Here’s hoping it wasn’t the latter.
Ooo dear!
Kim and Yan came to see if they could help, then the chap from RCR arrived, a local mechanic from the other side of the tunnel. Mick and he descended into the engine bay. Phone calls were made, discussions had, it wasn’t sounding good.
In the end the chap couldn’t help, the alternator would need to be removed then the pulley as the cable had got itself round and under it. This needed a puller to remove it which the chap didn’t have. The good news was that we could move just our domestic batteries wouldn’t charge without the belt. The engineer suggested getting to Aspley Basin where assistance should be easier to get. Because we were able to move we wouldn’t be covered by our RCR membership. If there was a mooring available in Huddersfield we’d at least be able to plug in and charge the batteries.
On the move again
The boat was put into serious energy conservation. The freezer was turned off. Hopefully the contents, which I’d been depleting anyway, would last us a couple of days as they defrosted. All sockets were switched off, leaving just the one USB socket powered from the batteries so that we could charge our phones. Phones would only be used for essential use and the laptop would remain off unless needed for work.
We decided to move down 8 locks to get closer to Huddersfield today. There wouldn’t be enough daylight left to reach Slaithwaite but hopefully we’d be able to pull in above Lock 31.
We worked our way down the pretty flight, plenty of walkers making comments. The lock below was filling before we emptied the one above, well apart from at 33 where I wound a paddle up and was on my way back quickly, quite a long walk, to let Oleanna out of 34. When we returned 33 was still empty. Grrr! I’d found a none working hydraulic paddle and had walked tall that way three times for nothing!
Sparth Reservoir
Wild swimmers were getting ready for a dip in Sparth Reservoir above the canal, below the canal the other reservoir sat empty, the mud drying out well.
We tried pulling in near another boat but only got stuck on a submerged object almost mid channel. Onwards we continued ending up where we’d had lunch six years ago. Normally we’d not moor in a winding hole, but here the only downhill boat would be NB Idleness and they wouldn’t be coming for a couple of days, uphill boats were unlikely as there were no tunnel passages until Monday, we doubted we’d see another moving boat, if we were in anyone’s way we’d happily move.
Very picturesque
Tilly was given an hour and a half which she took once there was a big enough gap between walkers and woofers to dash to the nearby trees and friendly cover. Inside the fridge was now turned off, we’d rather survive with the water pump working and light than have chilled milk and wine!
Come on Woofers! Don’t you know the clock is ticking!
Tonight we had sticky American Chicken cooked on the hob and stove top, followed by melting Soleros from the freezer, spoons were required. Some sausages were brought out to finish defrosting for a sarnie in the morning.
Couldn’t see chilled medication go to waste
I darned a hole in one of Mick’s jumpers, he read Trevor’s book on the tunnels and we were ready for bed by 10pm, no news for us tonight. Hopefully tomorrow will be sunny to get us as close to Huddersfield as we can. Sadly Richard can’t help, he sent out messages to other volunteers, but nobody has been back in touch. So it looks like we’ll be on our own, 22 locks shouldn’t be too much of a problem, should it?
Hopefully the solar will give us enough reserves for light and water for another day.
Have to say it’s a very beautiful spot to be moored in, which we’d have missed on our original schedule.
11 locks, 1 and a bit miles, 1 trip computer switched off, 1 very helpful Richard, -1 belt, 3 cables, 1 unknown green one, 44% to 42% before bedtime, 2 top outsides, 1 lost friend,1 hand written blog post, 8 pages, 1 jazz festival, 1 early night, 2 Mrs Tilly stamps.
Straight away we had a request from Trevor at the helm to adjust our tunnel lamp, to point it straight ahead. Mick did so, then we didn’t hear another word from Trevor for almost two hours.
Differing bricks and arches
Last time we’d both been on the back, our volunteer/guide gave us a fascinating running commentary as well as guidance to Mick at the helm. So much history and interesting facts was passed onto us. Sitting at the stern meant there was a limited amount you could see though. My photos were pants!
Sooty brickwork from the days of steam trains
This time sat in the bow I had my camera on handheld intelligent night auto mode along with the camera on my phone, both fully charged. Our volunteer Trevor, had turned out to be the author of a book all about The Standedge Tunnels (available from here), he’d become a member of the Huddersfield Canal Society in 1976 so if anyone knew their stuff about the tunnels he did. Just a big big shame there was about 50ft between us all. We did however buy a copy off him which he signed for us before entering the tunnel.
Rocky
There are four tunnels in all through the hill, the canal being the first to be built and it was then used to remove the spoil from the construction of the railway tunnels, two of which are now disused. Each tunnel is connected, walkways cross above the canal, and the support van drives through another alongside.
Rocky and misty
The railway tunnel crosses over the canal twice through the hill and when a train passes mist collects in front of you which then gets dragged away with the motion of the train, quite eerie!
At the western end the tunnel was extended when the last railway tunnel was built, so you start off in a brick arch, then a flat roofed section.
Reflections
All the way through different surfaces surround you, it’s like being in a 1970’s DR Who set at times, except this isn’t made from polystyrene!
Curves
Brick arches.
Bare rock that was blasted away, the drill holes for the dynamite quite visible towards the eastern end.
Arch meets rock
A mixture of rock and brick, sometimes brick above, sometimes below.
Spraycrete and rock
Then the creepier sections where concrete has been sprayed onto the bare rock to help stabilise it. This is very Dr Who or Star Trek, Captain Kirk would have set his phaser to stun! The spraycrete was done during the restoration of the canal.
At times the tunnel twisted in front of us, dug out from the ends and from the bottom of shafts the tunnel went off course several times. There are now several S bends
Rock bolts on the ceiling
Other places big bolts have been drilled into the rock face to hold it all back. The ends painted yellow so you can see them better, or know when one of them is going to scrape down your cabin side! There are numerous places where the sides of the tunnel look to jut out further then the gunnels of your boat!
I believe there are four wide sections, passing places. These tend to have wider brick arches helping to support the roof line. When boats were originally legged through the tunnel, it took four hours, this is where the boats going in different directions could pass. But the boatmen meeting elsewhere in the tunnels would refuse to go backwards to the next passing place, so two way traffic was abandoned. Official leggers were employed with traffic going in one direction for four hours before the direction changed. This then led to queues to get down locks at either end of the tunnel.
NO exit
Numerous gaps go off to the sides, some marked as exits, others marked with no exit.
As you approach each of the four adits a security light can be seen on the tunnel roof. Motion activated, the lights come on, a ticking noise can be heard as we passed. Apparently Tunnel Control would be able to tell that we’d passed each adit because of this. However not calling in would mean we didn’t know if there was a problem up ahead.
Walkways from the old rail tunnel to the new
The tunnel was built with quite a few air shafts. None of these can be seen now, well some are around 500ft deep! But you certainly know when you pass under most of them as this is where the water tends to get in. The further east we got the more water cascaded in. Waterproof coats did a good job, but when a flood hits the locker you are sitting on you also need waterproof trousers or better still a swimming costume! I got soaked twice and stood up for the last one, but still I was soaked through to my knickers!
Changes in height
But how was Tilly faring? I was glad we’d kept her confined to our end of the boat. I could see her most of the time and she could see us too.
But?!
Well who stole the sun?!
I’m kind of used to bridges stealing it, although I do tend to duck when that happens. Tunnels are worse as they usually time their theft of the sun with me requiring to use shore based facilities, very inconsiderate! Yes I know I can see in the dark but I’d rather not have to when visiting my box.
Rock and arches
Apparently Tom moved this tunnel once, before I came to be second mate. He bumped into it two times, She is quite proud of that. But today they were not where they should have been, I could see them, slacking at the front! They’d left it to Hard Head Tom to move the outside today.
BUMP, scrape, BANG!!! I sat on the floor not wanting to see what Hard Head Tom was doing to the outside, well lets face it I was really the only one who could see everything properly. BANG!!! How many more times!
Can anybody hear me!!!
I screamed at She and Tom to go and sort it all out, but they couldn’t hear me. Maybe I could do something? But black stuff was over the emergency bathroom gap, how was I meant to escape if I needed to!
Brick profile changing
BANG BIFF Scrrrrrrapppe!
In the end I decided that there was nothing I could do but to curl up on the bed and pretend everything was okay. Maybe this was going to be it for the rest of our lives! I certainly didn’t sleep. Who’d be able to sleep with no sun to warm your back and all that noise!
Light at the end? Or the trip boat?
As we approached the last adit I could see the lights from the trip boat ahead, quite a distance off.
Hi John
A torch light was flashed from the adit. John, the volunteer who’d driven through in a van was waiting for us. He informed us that the trip boat was in the tunnel, but we should just keep going.
After at least a year of my life Tom came through the bedroom, he had a hard head to put on too. Gradually the sun fought it’s way back into the cabin pushing away the tunnel. I could tell Tom was back moving everything, it got quieter and lighter.
Handing the equipment over
Mick had walked through for the very last part of the tunnel. This was so that the boat could be stopped at the tunnel portal to hand all the safety equipment to shore with ease. A plastic crate of first aid, life jackets and a large fire extinguisher were handed ashore. Just a case of retrieving the light from the bow.
Back in the sunlight
We pulled in to where the little shuttle boat moors, it had just headed to the top of the locks to drop people off near the station.
Trevor
Time to thank Trevor who admitted he’d bumped Oleanna a couple of times! There was nothing to see on the port side, but then he did favour starboard side in the tunnel.
No smile just yet
As we pushed off past the visitor centre a train sped past and into the rail tunnel, the sun shone brightly, as much as the tunnel is fascinating it was good to be back in the light.
We pulled in at the top of the locks, the first stretch a touch shallow for us so we hoped that further towards the lock would be better for NB Idleness. A quick check up and down the starboard cabin side of Oleanna, a couple of lines which when rubbed vanished. Our passage may have been a touch noisy at times, but other than a couple of new scrapes on the gunnels there was not one scratch. Thank you Trevor for looking after Oleanna, maybe I should have repainted the grab rails earlier in the year after all.
Soggy bum!
Time to check on Tilly, get changed and have lunch. All was fine with our little thug, who within half an hour of arriving used her on board facilities. Well I couldn’t hold on any longer and you weren’t letting me out!
This way out!
What a great day. Thank you to all the volunteers who make the passage through the longest, highest, deepest tunnel on the network possible.
0 locks, 3.76 miles, 1 tunnel, 3 miles underground, 1hour 48 minutes, 1 more wonder of the waterways for Oleanna and Tilly, 3 boats, 3 volunteers, 2 crew in the front, 2 soaked boaters, 17 years, 1 screaming cat, 2 nav lights in tact, 2 more scrapes on the gunnels added to the 5678 which were already there.
The alarm was set and we were up and about having breakfast ready to push off in plenty of time. It seemed like it was going to be a rather nice day, not that we’d notice it in the tunnel!
The gates were already open
We moved up to the west or south portal of the tunnel at 9am, the gates already open and waiting. Time to fill the water tank to help Oleanna sit as low as possible in the water for her trip through. Once she was full we pulled her back from the water point (much better pressure than at the slow tap at Wool Road).
Covers removed
This morning there was one boat heading east to west, they most probably set off at 8:30, so there was still plenty of time to get Oleanna ready for her trip, the first boat at our end wouldn’t set off until 11:30.
All naked again
Yesterday evening the boat that has been following us arrived, this morning they had called Tunnel Control and managed to change their passage booking for Monday morning. The rush to return to their mooring is due to a relative being very poorly, they were hoping that the chaps at the tunnel today would be able to add them to todays passages. However no body was here but us. The volunteers wouldn’t turn up until nearer 10:30, so they headed back for breakfast.
Here comes NB Idleness
Yan and Kim soon joined us on NB Idleness pulling in behind.
The cratch cover was removed and stowed inside. Then the pram cover and frame came off and slotted in behind the dinette table. Tilly’s Escape Pod was zipped together ready should it be required. The gap at the bottom of the bathroom door into the main cabin was taped up with gaffa, meaning we’d be able to contain Tilly to one end of the boat. I hoped this would be enough as on the tunnel guidance it suggests all pets should be restrained inside your boat, if they won’t be able to handle the tunnel someone should take them over the top. Tilly’s Escape Pod is a favourite place for her, until the door gets closed! This would freak her out more, so I hoped we’d done enough.
Not so smiley today!
Brushes and hooks were laid in the gutters on the roof. All but the strawberry plants from the well deck were moved inside into the shower to give us more space at the front. Mick decided to wait to see what the volunteers thought before removing our nav lights, not wanting to break the seal between them and the cabin side, helping to keep rust at bay.
The men in blue arrive
At around 10:30 a C&RT van arrived, the chaps from NB Faggle Three went up to chat with them and explain their situation. They then headed off to get their boat to be measured. If it fitted then the volunteers would accommodate them.
What a high cratch board, we’d be fine
Soon a tunnel light appeared at the portal the west bound boat with a well deck full of people, a volunteer and helms person at the stern. They all looked a tad wet!
How high?!
Out came the official measuring stick, a large aluminium L shape. Oleanna had her vital statistics taken. To the top of the bags of coal she was 5ft 10″, across the cabin top 4ft 11″ and draught 2ft 4″. She passed! Mick asked about the nav lights. It was suggested that it was best he removed them rather than the tunnel! NB Idleness was measured, she passed. By now NB Fraggle Three had pulled up. Her vital statistics measured and passed too.
Fraggle Three coming to the front
Yan, Kim, Mick and I had conferred, if the extra boat fitted then we would let them go first as they were hoping to make it as far as Slaithwaite today, this would give them at least another hour and a half, we would be stopping in Marsden for the night.
Off they go
The chaps rushed to take the pram cover off their boat and pulled up to the water point where their volunteer loaded all the safety equipment on board, handed out high vis and hard hats and they were off, into the tunnel.
Byee!
Next a discussion as to who would be at the helm of Oleanna for the trip. Last year the volunteers were not working and only one boat could go through the tunnel in each direction a day, helmed by a C&RT employee, all crew on board had to be sat at the bow. This year the volunteers are back, two boats in each direction, three times a week. It is up to the volunteer whether they can socially distance themselves on your boat. 2m distance had been reduced to 1m in September. If there wasn’t the space they drive. For NB Idleness with it’s trad stern there was no question, but Oleanna being a semi trad?
The volunteer said he would drive her through, but he also quite fancied Mick doing it too. Mick had been quite looking forward to being able to sit in the bow and actually see things rather than concentrating all the way and not getting chance to look round.
Extra light at the front
Decision was made Trevor would be at the helm. This however meant that we wouldn’t be able to do the usual stops at the safety adits to call through to tunnel control. John another volunteer would have shadowed NB Fraggle Three through by van in an old railway tunnel, he would wait for us at the last adit to check on us.
Here we go (thank you Yan for the photos)
Tunnel control were consulted and we were given a time to enter the tunnel. Kim and Yan had another cuppa and a bacon butty, they would have to wait for at least 3/4 of an hour after we’d gone in, maybe more as their volunteer had taken the first boat through and needed to returned by van for them.
Trevor at the helm
Our gas was turned off at the bottles. Extra lights were put on the hatch and gas locker. Mick was given a hard hat and high vis just in case he needed to take over at the helm. We popped our life jackets over our waterproof coats, untied and at 12:20 we pushed off into the dark.
Over the last couple of mornings Mick has been in the engine bay trying to solve our power problem. This morning he succeeded in getting things working again. Hooray!!! The lap top now has 100% power.
We’ve been able to keep moving so there is plenty to write about, well most of it is written in long hand so I didn’t forget it. Plus there are hundreds of photos to sort through so it will take some time to catch up with ourselves whilst still moving!
In other news however there has been a breach on the Leeds Liverpool Canal. Yesterday afternoon the following C&RT notice came through
A closure to navigation and towpath is required between Bridges 109 (New Barn Bridge) and 110 (Aspen Bridge) on the Leeds & Liverpool Canal in Rishton, while our engineers investigate significant leakage through the bed of the canal.
Due to the volume of water loss, please be advised that water levels between Barrowford Bottom Lock (No.51) and Blackburn Top Lock (No.52) may be affected and lower than normal. We advise against unneccesary travel through this area until repairs have been completed.
Then this morning it was followed with this
Our teams have been working throughout the night to try and stabilise the significant leak between Bridge 109, New Barn Bridge and Bridge 110, Aspen Bridge, Rishton on the Leeds & Liverpool Canal, unfortunately, during the early hours of this morning the canal bank has breached.
Dams are currently being installed onsite and our teams are organising a method of repair, including pumps to be able to pump water over the affected area to maintain a feed to the lower section of the canal.
To help conserve water in the surrounding areas, the following Lock Flights are closed:
Barrowford Locks
Blackburn Locks
Johnsons Hillocks
Wigan Flight
Another update will be put out tomorrow. This all seems very familiar to us. We obviously really feel for those affected and hope there is a speedier solution than there was on the Aire and Calder. We’re also glad we decided against going that way just over a week ago.
Due to the need to conserve what power we have on board, the Oleanna blog may be silent for a little while until our current situation is rectified. We are fine, but may need a good wash in a few days!
Wool Road Winding Hole toDiggle, the summit of the Huddersfield Narrow Canal
It looks good over there!
As we got ready to leave this morning the chap from the boat in front appeared with a billy can full of coal which he proceeded to give to me. He’d taken his stove out several months ago, so had no need of it.
Good Luck with Gypsy
He bought his boat in May as a project boat and was due to have a new stove fitted before now, but for one reason or another it hasn’t happened. I suggested he might want to hold onto the coal to help keep warm, but he still wanted to give it to us. I suspect it was in his way. He grew up around Tunnel End in Marsden, before the tunnel was reopened he and his mates used to play in it, he says there is graffiti from the original navies who cut the tunnel. We wished him good luck with the work on his boat, his next aim is to get to Marsden, then who knows!
Time to climb the last few locks. The last nine locks to the summit are all relatively close together, infact today we only moved a mile horizontally but 94ft 6″ vertically.
Lifting the paddles
The angled paddle gear wasn’t as bad as I thought it would be, several of them having had hydraulic mechanisms added to them. Six years ago we had enlisted crew to assist due to me not being able to use my right hand at the time. Using a windlass wrong handed was a challenge as I tried to do my bit. Today my long reach windlass was only needed some of the time.
Will that be enough water?
Our main problem today would be the low pound between locks 26W and 27W. As I arrived to open the gates into 26W above looked really rather low, would there be sufficient water left after filling the lock to get Oleanna over the cill? The bottom gates leaked, she rose, we pushed the gate open, it was touch and go from my reckoning that there’d be enough water.
Gradually making her way forward
I walked up to 27W, the level above much healthier, in fact the bywash was running. I lifted the paddles on the bottom gates and then the top gates and let water run down through the lock. I made note of where I thought I could drop the level above to for us still to be able to get over the cill of this lock.
Will she get over the cill?
Below Mick had closed the gate again, hoping to stop the pound from draining as much as I was filling it. He then refilled the lock, opened the gate and gradually inched his way out of the lock and over the cill. A big thumbs up was given and I could now drop the paddles at the top end of my lock.
There was now the pound to cross which took quite sometime! As Oleanna approached the bottom cill of the lock Mick gave her quite a few revs before cutting them and thankfully gliding into the lock at a slow pace. Now to see if I’d let too much water down to be able to get over the top cill of this lock. There was just enough! Phew!
Nearly there!
Onwards and upwards we worked, the single bottom gates meaning less walking round, but heavier to move. The last pound between 31W and 32W was also a touch low, but thankfully passable, no need to draw on the 3 plus miles of the summit pound.
As the top gate opened of Lock 32W Oleanna had reached the highest point on the Canal Network, tomorrow she will bag her next wonder of the waterways, but getting this far is a wonder in itself.
We pulled up in front of NB Idleness a tug who will also be going through the tunnel tomorrow, Kim and I had been in touch through facebook over the last week. So there was plenty to chat about on our arrival. They are longer than us at around 60ft and had been asking how easy or hard it would be to go down the Huddersfield Broad Canal.
Good hunting friendly cover here
Tilly came out for an explore as we chatted, but after a lady walking by mentioned she’d just seen a couple of Mink I decided that maybe Tilly should return indoors. After seeing how quickly a mink grabbed and dragged a pigeon down a tree earlier this summer I thought it would be safer.
BUSY!
After lunch we walked down hill slightly to Grandpa Greens for some celebratory chilled medication. Signs all around the building suggest that they have had queues round the block, but today we only had to wait for one other person to be served. Sadly no gluten free cones so I had to make do with a tub instead.
What a choice!
Mick had Belgium chocolate and Salted Caramel whilst I had Raspberry Ripple and Nutella. Both very nice and a fitting celebration for reaching the summit of summits.
Yay! Summit medication!!!
The Huddersfield Canal is the highest canal on the network at 645ft above sea level. Next is the Rochdale at 600ft, followed by the Macclesfield and Peak Forest at 518ft, Titford Canal BCN at 511ft, Leeds Liverpool at 487ft the last two surprising us not to be the other way round.
Taking down her smile
The afternoon was spent preparing ourselves for tomorrow. The highest point on Oleanna we know to be the horns at the front, the chimney used to be similar until we had some cut off. Mick undid the supports that the horns sit on and tucked them under the bracket that normally holds them off the cratch cover. This will have gained us at least another 3 inches clearance, which we might be glad of if someone else drives Oleanna through the tunnel.
One day I’ll repaint that bracket
Another job today was sussing out whether we’ve been charging enough for our house. We’ve already had an enquiry for a few weeks next year. Now that we have been paying the bills for a full year we know what it costs to run the house.
A Summit Robin
I made up a chicken and roast carrot risotto with the last of our Sunday roast and popped it in the oven before I got together with my Scarborough chums for our weekly catch up. It was good to see those who could make it and today was the first time we’ve had two people on boats, me and Sue who is currently on holiday in Greece sailing.
9 locks, 94ft 6″ climbed, 1 mile, 32 locks up, 645ft, 1 summit pound, 1 billy can of coal, 1 dodgy pound, 1 foot of water, 2 boats waiting for the tunnel, 3 by the end of the day, 2 scoops each, 2 horns lowered, 2 hours shore leave, 2 mink! 5 chums, 1 pot of oven risotto, yummy!
The yarn shop I’ve just spotted on the map at Warth Mill has been added to the ‘next time’ list!
The chaps on the other boat were out and about this morning as we pushed off. One chap was measuring their cabin, he wasn’t sure they’d fit through Standedge Tunnel. There are strict maximum dimensions that your boat must fit due to the dimensions of the tunnel, yes it does get tight in places. Maximum height above the water 6ft 2″, maximum draught 3ft 3″, width 6ft 10″, length 70ft.
Roach Lock moorings
Then there is the height of your cabin corners above the water compared with the width across the top. There is a handy chart here. When we were on the River Wey we measured Oleanna at a bridge where we knew the height. Oleanna measured 1.87m or there abouts to the top of her horns, so just under the maximum height for Standedge, we can always remove the horns if we need to.
Blue skies and hills!
The chap with the tape measure said they had discovered that their booking wasn’t until a week on Friday, not this Friday. They are heading back to their mooring and with the Rochdale and Leeds Liverpool both closed it was the Narrow or the Trent to get home and there is a matter of flying away on holiday in a couple of weeks time too.
We left them to it and turned to face the hills ahead.
What a sky
What a stunning day!
Beautiful
I could just leave it at that, because it really was glorious. The sun shone, bright blue skies, views across the valley, trees on the cusp of autumn. Yesterdays dampness just evaporated away. Wonderful.
Bridge 85 is called Division Bridge. This used to mark the boundary between Yorkshire and Lancashire, the name suggesting the counties rivalry with each other in times gone by. Oleanna crossed the old boundary, the next lock in Old Yorkshire was the first to not have locks on the paddle gear! This of course didn’t last long as they were reintroduced at the next lock.
And breath
Views through the trees across the valley, the peaty water and the sunshine. I soon had to make a change to my leg attire and layers came off from walking and paddle winding.
Royal George Mills sits by Lock 19W which shares it’s name. Built in 1786, by 1870 it specialised in the production of felt and the manufacture of flags. During the 20th C they specialised in two forms of felt, Technical felt used in machinery and Taper Hammer Felt used on the hammers on pianos, the mill was renowned for it throughout the world.
A couple of community raised beds sit alongside the lock, it looks like strawberries, tomatoes and mint were the main crops. Only green tomatoes today, all the strawberries long gone.
Spire and mast
The spire of Christchurch Friezland reminded Mick of a wedding he’d once attended there.
Frenches Wharf
Next Frenches Wharf Marina. Here six years ago we’d wondered if the grey box was a pump out machine, it turned out not to be. We also wanted a Saturday newspaper so paused to head to Tescos behind, there being no rings handy Mick was left holding Lillian whilst the shopping was done.
Hmm! No chimneys
Beside the marina there is a big new development, houses and flats all built/clad with stone that has been given a black tint presumably to meld in with other buildings in the area. I wonder whether this coating weathers in time and will be self cleaning returning to a natural stone look rather than the grimy mill look?
We now started to get gongoozlers, the area around Uppermill and Dobcross a magnet for tourists. Oleanna ducked under the new High Street Bridge and I walked up to open the lock, the off side gate windlass operated as there’s not enough space for a full length beam.
Only one boat on the visitor moorings here which was a bit of a surprise, but then the road is close by and there is a lot of tree coverage for solar to be any good. One day we will stop and have a bit more of an explore, the Saddleworth Museum going on the ‘next time’ list.
A couple sat with their two dogs and watched us come up Dungebooth Lock. As Oleanna started to appear from below the side of the lock one of the dogs was not happy! He barked and barked at this growing thing from the deep. When the chap decided to tap Oleanna’s gunnel I suggested he should watch out as Tilly might make an appearance!
Saddleworth Viaduct
Then Lime Kiln Lock, the sun being out gave me plenty of photo opportunities. Saddleworth Viaduct towers high above the canal. The arch that spans the cut adjusted to make everything work. The pillars are all square on until you get to the canal, here the down hill face is narrower and angles towards the lock, the curved arch above set on a skew.
15th August 2015
This is where I took my favourite photo of our last trip up here with Kath (Mick’s sister) and Sean walking up to the lock. Mick says he’s glad we don’t have a 70ft boat as it was hard enough to line Oleanna up to get in the lock.
Think this is my favourite photo from today
Here I met my first angled paddle gear, there is most probably a better name for them but angled will do for me. Normally paddles are lifted straight up. The deeper the water the more pressure on them. These paddles lift at an angle. This increases the water pressure on them, making them that bit harder to lift (my theory). Repositioning the windlass was needed to get more purchase, but with patience you can avoid getting a hernia.
Will the tunnel be able to stop this tag?
Gongoozlers stood and watched, asked questions, but no-one had that glint in their eye wanting to open the gate for me. Ah well! A chap warned us that a boat was coming down the locks above. Time to claim a mooring.
There was one boat moored by the car park opposite Wool Road Service Block, we pulled in behind doing our best not to annoy a fisherman. This would do us for the day, the last nine locks reserved for tomorrow. Sadly being almost part of a car park Tilly had to just sit and look at the sideways trees.
A downhill boat
As we had lunch the downhill boat came past, the only boat through the tunnel, east to west today and Shire Cruiser Hire boat, the first on coming boat we’ve seen since being on the narrow. After lunch we headed off for a walk, well we couldn’t waste the sunshine! We walked up Standedge Road then veered off onto Huddersfield Road taking the lower route through Diggle. Diggle Chippy looked inviting, but as there was no mention of gluten free fish we refrained.
Warth Mill was built in 1919 and in 1929 it started to produce tyre fabric for the growing automotive industry. In it’s heyday it was producing nearly 50 tons a week. Thankfully when production ceased the Mill was made available for a collection of small businesses which still use it today.
We walked up to the tunnel entrance where the railway thunders alongside. All calm on our side of the fence.
Mick peeked through the gate and said ‘Hello!’ Either nobody was at the other end to respond or we didn’t wait long enough for their greeting to come back to us.
Space in front for us
Returning to the boat we followed the canal and locks downhill. Plenty of room for us to moor up away from the tunnel entrance. Then Grandpa Greens Chilled Medication Emporium, we’ll be visiting there tomorrow!
Summit pound
We took note of any low pounds, the same as they were six years ago between 27W and 26W. Maybe overnight the levels would improve, maybe they’d get worse, we’ll see. A quick measure of our cabin corners from the water level just incase. 5ft 3″ then 5ft across the cabin top, well within the limits. Phew!
What a day
9 locks, 97ft 3″ climbed, 2.66 miles, 1 downhill boat, 1 shadow boat, 0 shore leave, 1 glorious day boating, now you don’t get views like that on the Ashby
It’s not often we push off in the rain, but with a tunnel booked we want to keep moving, anyway the forecast had been for rain in the afternoon not morning!
7W with all the railings around it
Up 7W already a little bit damp at the seams. This is surrounded by apartment’s that were built after the reopening of the canal in 2001, good views over the canal. Photos of the lock being built. The new stretch through town could really do with someone adopting it and giving it a good weed, maybe the council used to do this but it’s been cut back on financially.
Narrowing
The canal now follows the River Tame. Power lines head off in all directions from a substation. When the canal was being restored one pylon had been built over the cut. Instead of going round it the canal narrows to the width of a narrow lock and goes right underneath it.
Pylon selfie, yes that’s my hood
Up 8W and we pulled in at the service block. Here there is water, toilets, elsan, shower and bins with what must be a C&RT yard behind it. Not the most romantic of locations with the razor wire along the top of the walls!
Service block
We topped up on water, put a load of washing on, Tilly got a fresh pooh box, the yellow water was disposed off and we got damper.
Canal, Bywash, River
Constant rain turned into proper Pennine Autumn Half Term rain, the sort where your Mum says ‘It’s character building’! No it’s just WET. All we wished was that Tilly was busy inside relighting the stove that had gone out during the night, the heat ripple from the chimney would have given us something to look forward to. Oh well!
9W
Not willing to jump to the bank from the stern, it was better to access the towpath from the bow as the canal wasn’t really built for stopping, so the sides can be rather shallow. Locks 9W and 10W are close together. In the past leaking gates and not enough water in the pound between have caused problems with boats getting stuck on the cill with water lowering in the lock. Today filling 9W certainly stopped the bywash and dropped the level in the pound, I dropped the water from 10W, that along with a flow of water from elsewhere kept Oleanna off the cill and safe.
The bridge at Lock 10W
I’m sure there used to be a levels board at one of the locks here that warned you if the levels were too low, but today it wasn’t to be found. The problems must have been solved.
Next Scout Tunnel, or Dave’s Tunnel to us. Remedial work was needed here, much of it similar to that done in Standedge. Parts of the tunnel are lined in brick others are bare rock where rock bolts were used to stabilize it. There is a towpath that runs through the 188m tunnel, if you walk you need to take care not to bump your head.
A Mandarin Spring Roll Duck
Ducks were hanging out enjoying the rain. We’d already spotted a drenched Mandarin Spring Roll Duck, but the one here looked all preened and ready to impress. They are such tarts of ducks!
At Lock 13 we could see up the hillsides a spire poking up into the sky. Not sure which church this is as I can’t find one on the map with a suitable spire.
Woodend Lock 14W sits round a slight bend, alongside Woodend Mill. The mill was built around 1830-40 and was an integrated cotton mill, meaning that weaving and spinning processes both took place here. Now it looks like the mill is used by different people for different things, workshops, upholstery, a dog stood gazing out across the valley. Up on the top floor someone has installed what looks like white French windows with railings across them.
Woodend Mill
Not far now. Below Roaches Lock is where we moored six years ago. We had a feeling it was hard to get into the side then and fairly soon we were reminded of it. There was one boat already moored up, the gap ahead of them had something big below the water. Then a stretch of stone bank has fallen in, but in the end we got close enough to the side to be happy. With plenty of friendly cover before the river Tilly was allowed shore leave, although she spent a lot of time coming and going making the most of ‘Thank you for coming home’ Dreamies!
Another soggy boat
The stove was lit and we dried out during the afternoon as wind and rain came down outside. A couple of hours after we’d settled another boat arrived, it was the same boat that had turned up yesterday afternoon in Stalybridge. Mick had chatted with them yesterday, they are also booked for the tunnel on Friday but had been hoping to get through tomorrow! We suspect they are not totally aware of Standedge Tunnel and how much it differs from Harecastle or Blisworth and that C&RT are quite unlikely to be able to add you to the list of boats who’d already booked. Their rush however towards the summit has slowed as they stayed put for the night.
Two years ago we crossed the Pennines from east to west via the Rochdale Canal with Clare and Graeme on NB Mr Blue Sky. Last year we crossed via the Leeds Liverpool visiting friends and family in Skipton and Leeds. Earlier this year we dodged the hills by taking the route south via the River Trent. There is one other route which we have only done once before, six years ago, the Huddersfield Narrow and Broad Canals.
Snake bridge
Recently all routes have had their problems. Lock floors, stuck boats, lack of water etc etc. The Huddersfield Narrow has problems with water levels towards Huddersfield on a good year, but this year those problems have been greater. Then over the last month the bottom end of the Huddersfield Broad Canal has been found to be empty on several occasions.
And another
The C&RT stoppage notices that come from this area are far more informative than you normally get, they explain what has happened and what measures are being taken to rectify the situation. However what we wanted to know was, was the situation going to improve or would Oleanna be stuck in Huddersfield all winter if we went that way.
I think we’re going to see a lot of the chap on the right
The amount of work needed to reach the summit, the tunnel passage and then working down the other side is more for those who like a challenge than those who prefer a life on the flat with a glass of wine in hand. Before we committed to this route we wanted to talk to someone on the ground with local knowledge. For the last week Mick has been trying to call Standedge Tunnel Control to speak to someone, but with no luck. Today however was different he got through.
This year the canal has suffered more from the lack of water as one of the reservoirs has been drawn down for inspection and maintenance (several others on the system have also been lowered). But the rain we are having has been doing a good job of filling the canal up. The chap sounded positive, which is what we wanted to hear. Decision made before we’d even got out of bed this morning. Huddersfield Narrow it is!
We’ll be going right please!
About a month ago we’d booked our passage through Standedge Tunnel and our cruising has been planned for us to reach Diggle portal the day before. We have also booked a ranger to assist for a day on our descent from Marsden, then you also have to book for Lock 1E to be unlocked to let you out the bottom and into Huddersfield.
Time to get moving!
A boat came past, possibly the boat that had followed us down Marple yesterday, at speed. They then met a Black Prince hire boat at the next bridge, we just waited for both boats to pass before untying. The Black Prince boat might just arrive in time to start the flight before midday.
They’ll need warp drive to reach the locks in time!
Soon after pushing off ourselves we were approaching a big bend when the bow of another Black Prince boat came charging round it. Thankfully it seemed that the person at the helm had some experience as we narrowly avoided a collision. If they could keep their speed up we reckoned they would miss the locks by about ten minutes! Not good if you are trying to the Cheshire ring in a week!
We pootled along at a reasonable speed through the long winding wooded valley. A chap was blowing leaves off his astro turf. Maybe it’s best to keep on top of such things, but what a never ending job!
M67
Under the M67. Was this the face of a local graffiti artist on the wall here? Was this going to be the local ‘Ghost’? It was, we were to see plenty more pupilless faces today.
We caught the boat ahead of us up at Duckingfield Lift Bridge. Here you need an anti-vandal key, or handcuff key to get the lock off the mechanism and they hadn’t got one. The chap was tinkering with the lock as the lady knocked on a boat to see if they could help. We pulled in for me to hop off just as they got the lock unlocked. At least it saved me doing all the winding, but I did make sure it was locked back up once it was down again.
Mick asked them which way they were going. ‘To Ancotes’ was the reply. He pointed out that they would need a handcuff key for the locks. But the lady said they wouldn’t be doing the locks today. They’d still need a handcuff key no matter what day they were doing them.
Dukinfield Junction
They turned left at the junction, we turned right onto new waters for Oleanna and Tilly. Under the Asda Tunnel and out passing moored boats and three flying ducks.
Then on towards Bridge 111, the first of the Huddersfield Narrow Canal, just below 1W Ashton Lock, the first lock of the canal.
Broken even with the price tag still on it!
Now six years ago we’d just bought ourselves a long reach aluminium windlass. I was nursing my lack of little finger so was at the helm, off went Mick to set the lock. He soon returned with the brand new windlass in two pieces! The advantage of the longer reach no longer available he struggled with a standard windlass. A while later we replaced the broken aluminium windlass with a long reach one made from steel, now my best friend.
Lock 1W finally open!
Today it would be me working the locks and 1W made itself known quickly. The lock was full so I went to empty it. The towpath side paddle being extremely stiff took some work. A couple of clicks, then adjusting the position of the windlass to give me more umph! Eventually it raised. I then tried the off side, this just slipped every half turn, so I left it closed. The gates were stubborn too, one side with a cranked beam. If this was to be the case at every lock we were going to be working hard for the next few days!
Plantation and Tame Lock were much easier. Hills just in view ahead and old mills alongside the canal.
River Tame
The River Tame aqueduct took me by surprise, I nearly had to do a Giles as I’m not too keen on having nothing on one side of the boat!
Now we cruised through overgrownness on both sides approaching Stalybridge. Railings and lamp posts hide in amongst the sideways trees. At one time someone thought the canal would be a popular place to walk, it is but only on one side, the other left to grow over and collect rubbish.
Salt shaker vent
The canal was built over 17 years, originally opening in 1811 Standedge Tunnel being the last stretch to open. For a while the canal was profitable being a shorter route connecting Manchester to Leeds than the Rochdale, but bottlenecks were created at the tunnel where it took four hours to leg a boat through! In 1845 the canal was bought by the Huddersfield and Manchester Railway Company who’s route was to follow the canal up the Tame and Colne Valleys. Standedge Tunnel was used to remove the spoil when they built the railway tunnel. Once the railway was open there was no need for the canal which fell into decline and ended up closing in 1944.
In 1974 the Huddersfield Canal Society was formed with the aim of re-opening the canal. Whole sections of the cut had been filled in, built over and several bridges had been removed. Volunteers with the support of local councils worked hard and by the 1990’s all sections that had not been filled in were restored. The Huddersfield Canal Company was set up to co-ordinate the reopening of the remaining sections, one of them being a half mile through Stalybridge which had been filled in and partly built over. But in May 2001 the canal was reopened. Plenty photos of the building work here.
4W mossy but new
Lock 4W is more or less where the major works in Stalybridge started. A whole new lock was built with it’s approach under a road. I’d remembered this and the railings which meant dropping crew off to work the lock had to be done at the start of the tunnel/bridge.
The bottom gates were problematical to close. In fact after pushing and bumping the gates there was still a six inch gap between them. We tried adding water pressure to the equation, but all that was going to do was deplete the pound above. The paddles were closed, gates reopened, Mick tried prodding around with a boat hook but the water was too deep. The gates closed a touch better and water pressure did the rest of the job for us, up the 11ft 1″ Oleanna rose, the pound above looking a bit short on water.
Looking back to 4W
I walked ahead and dropped the water from 5W which aided our need to get over the cill. Mick decided to leave the ground paddles open until Oleanna was safely across the cill, this would help water move around her should I have needed to let more water down. Once clear of the gate he then dropped the paddles. As on quite a few of the Huddersfield Canal Locks both ground paddle mechanisms are on the same side as the gate beam, handy as there are no walkways over the top gates.
Stalybridge Civic Hall and hills
We had a similar problem at 5W with the gates closing. An extra nudge and water help again. Now we could see the Civic Hall and the hills behind as we made our way through the new cut to 6W.
Nice trees, a shame about the weeds
Up at lock level there is masses of paving everywhere, a municipal feel to the town centre, all revamped when the canal came back through town. Once exciting I’m sure, but now it feels just a touch soulless. An art installation sits near the lock, Holy Trinity and Christ Church a little behind it. Then once up through Lock 6W Tescos takes over, car park on both sides of the canal. We pulled in where another boat was moored right opposite the checkouts. The chap on NB Texas Star had a very pretty dog and he was trying his best to get a coat of paint on the back of his cabin just as it started to really rain.
Two paddles and Tescos ahead
After a late lunch we put together a big shopping list, enough supplies to get us into Yorkshire. This must be the closest we’ve ever moored to somewhere you can leave your trolley and get your £ coin back. The only problem is the railings between the car park and boat. I passed the shopping through and Mick popped them on the boat. It was then either a walk round for me or a scramble through the railings.
Look what they’ve just bought!
This afternoon we’ve had the following through from C&RT
Huddersfield Narrow Canal – Water management information Starts At: Lock 1 East, Stanley Dawson Lock Ends At: Standedge Tunnel
Monday 4 October 2021 14:30 until further notice
With the support of the EA, during the 2021 boating season we installed a temporary river pump at Britannia bridge, in Milnsbridge, abstracting water from the River Colne into the Huddersfield Narrow canal to aid continued navigation on the canal. We have unfortunately been unsuccessful in gaining an extension on this abstraction from the EA which we had hoped would continue until the end of the 2021 boating season, so as of 30th Sept 2021 we have ceased abstraction for this year.
The canal is currently looking healthy and we are relying on supply from our reservoirs, natural feeds and of course wet weather to maintain water supply, with the recent rainfall proving beneficial. The local team will continue to do their best to manage water levels in order to support safe navigation and if we are faced with the need to implement restrictions or closures, we will update the notice accordingly.
At least the rain is doing some good to the east of the Pennines, here it has stopped us from heading out for an explore, instead we stayed by the stove keeping dry and warm. Outside it was someone’s birthday, maybe they were having a car park party! Thankfully they quietened down after a while leaving us with the car park lights and the very raucous Canada Geese!
Today we have learnt something that we’ll never forget. Did you know that a Moorhens skin type is fur ?! No we didn’t either until we were checking what juvenile Moorhens looked like. Check this link if you don’t believe me!
6 locks, 61ft 3″ climbed, 5.89 miles, 1 lift bridge, 1 boat held up, 1 right, 2 canals, 1 Asda tunnel, 6 furry Moorhens, 1 pretty woofer, 6437 giant spiders, 1 car park mooring, 1 box, 2 bottles wine, 1 trolley almost to the boat, 1 very damp evening, 0 shore leave.
So our route today
Murrys Winding Hole to opposite Tescos, Stalybumbridge, Huddersfield Narrow Canal