Over the last couple of mornings Mick has been in the engine bay trying to solve our power problem. This morning he succeeded in getting things working again. Hooray!!! The lap top now has 100% power.
We’ve been able to keep moving so there is plenty to write about, well most of it is written in long hand so I didn’t forget it. Plus there are hundreds of photos to sort through so it will take some time to catch up with ourselves whilst still moving!
In other news however there has been a breach on the Leeds Liverpool Canal. Yesterday afternoon the following C&RT notice came through
A closure to navigation and towpath is required between Bridges 109 (New Barn Bridge) and 110 (Aspen Bridge) on the Leeds & Liverpool Canal in Rishton, while our engineers investigate significant leakage through the bed of the canal.
Due to the volume of water loss, please be advised that water levels between Barrowford Bottom Lock (No.51) and Blackburn Top Lock (No.52) may be affected and lower than normal. We advise against unneccesary travel through this area until repairs have been completed.
Then this morning it was followed with this
Our teams have been working throughout the night to try and stabilise the significant leak between Bridge 109, New Barn Bridge and Bridge 110, Aspen Bridge, Rishton on the Leeds & Liverpool Canal, unfortunately, during the early hours of this morning the canal bank has breached.
Dams are currently being installed onsite and our teams are organising a method of repair, including pumps to be able to pump water over the affected area to maintain a feed to the lower section of the canal.
To help conserve water in the surrounding areas, the following Lock Flights are closed:
Barrowford Locks
Blackburn Locks
Johnsons Hillocks
Wigan Flight
Another update will be put out tomorrow. This all seems very familiar to us. We obviously really feel for those affected and hope there is a speedier solution than there was on the Aire and Calder. We’re also glad we decided against going that way just over a week ago.
Due to the need to conserve what power we have on board, the Oleanna blog may be silent for a little while until our current situation is rectified. We are fine, but may need a good wash in a few days!
Wool Road Winding Hole toDiggle, the summit of the Huddersfield Narrow Canal
It looks good over there!
As we got ready to leave this morning the chap from the boat in front appeared with a billy can full of coal which he proceeded to give to me. He’d taken his stove out several months ago, so had no need of it.
Good Luck with Gypsy
He bought his boat in May as a project boat and was due to have a new stove fitted before now, but for one reason or another it hasn’t happened. I suggested he might want to hold onto the coal to help keep warm, but he still wanted to give it to us. I suspect it was in his way. He grew up around Tunnel End in Marsden, before the tunnel was reopened he and his mates used to play in it, he says there is graffiti from the original navies who cut the tunnel. We wished him good luck with the work on his boat, his next aim is to get to Marsden, then who knows!
Time to climb the last few locks. The last nine locks to the summit are all relatively close together, infact today we only moved a mile horizontally but 94ft 6″ vertically.
Lifting the paddles
The angled paddle gear wasn’t as bad as I thought it would be, several of them having had hydraulic mechanisms added to them. Six years ago we had enlisted crew to assist due to me not being able to use my right hand at the time. Using a windlass wrong handed was a challenge as I tried to do my bit. Today my long reach windlass was only needed some of the time.
Will that be enough water?
Our main problem today would be the low pound between locks 26W and 27W. As I arrived to open the gates into 26W above looked really rather low, would there be sufficient water left after filling the lock to get Oleanna over the cill? The bottom gates leaked, she rose, we pushed the gate open, it was touch and go from my reckoning that there’d be enough water.
Gradually making her way forward
I walked up to 27W, the level above much healthier, in fact the bywash was running. I lifted the paddles on the bottom gates and then the top gates and let water run down through the lock. I made note of where I thought I could drop the level above to for us still to be able to get over the cill of this lock.
Will she get over the cill?
Below Mick had closed the gate again, hoping to stop the pound from draining as much as I was filling it. He then refilled the lock, opened the gate and gradually inched his way out of the lock and over the cill. A big thumbs up was given and I could now drop the paddles at the top end of my lock.
There was now the pound to cross which took quite sometime! As Oleanna approached the bottom cill of the lock Mick gave her quite a few revs before cutting them and thankfully gliding into the lock at a slow pace. Now to see if I’d let too much water down to be able to get over the top cill of this lock. There was just enough! Phew!
Nearly there!
Onwards and upwards we worked, the single bottom gates meaning less walking round, but heavier to move. The last pound between 31W and 32W was also a touch low, but thankfully passable, no need to draw on the 3 plus miles of the summit pound.
As the top gate opened of Lock 32W Oleanna had reached the highest point on the Canal Network, tomorrow she will bag her next wonder of the waterways, but getting this far is a wonder in itself.
We pulled up in front of NB Idleness a tug who will also be going through the tunnel tomorrow, Kim and I had been in touch through facebook over the last week. So there was plenty to chat about on our arrival. They are longer than us at around 60ft and had been asking how easy or hard it would be to go down the Huddersfield Broad Canal.
Good hunting friendly cover here
Tilly came out for an explore as we chatted, but after a lady walking by mentioned she’d just seen a couple of Mink I decided that maybe Tilly should return indoors. After seeing how quickly a mink grabbed and dragged a pigeon down a tree earlier this summer I thought it would be safer.
BUSY!
After lunch we walked down hill slightly to Grandpa Greens for some celebratory chilled medication. Signs all around the building suggest that they have had queues round the block, but today we only had to wait for one other person to be served. Sadly no gluten free cones so I had to make do with a tub instead.
What a choice!
Mick had Belgium chocolate and Salted Caramel whilst I had Raspberry Ripple and Nutella. Both very nice and a fitting celebration for reaching the summit of summits.
Yay! Summit medication!!!
The Huddersfield Canal is the highest canal on the network at 645ft above sea level. Next is the Rochdale at 600ft, followed by the Macclesfield and Peak Forest at 518ft, Titford Canal BCN at 511ft, Leeds Liverpool at 487ft the last two surprising us not to be the other way round.
Taking down her smile
The afternoon was spent preparing ourselves for tomorrow. The highest point on Oleanna we know to be the horns at the front, the chimney used to be similar until we had some cut off. Mick undid the supports that the horns sit on and tucked them under the bracket that normally holds them off the cratch cover. This will have gained us at least another 3 inches clearance, which we might be glad of if someone else drives Oleanna through the tunnel.
One day I’ll repaint that bracket
Another job today was sussing out whether we’ve been charging enough for our house. We’ve already had an enquiry for a few weeks next year. Now that we have been paying the bills for a full year we know what it costs to run the house.
A Summit Robin
I made up a chicken and roast carrot risotto with the last of our Sunday roast and popped it in the oven before I got together with my Scarborough chums for our weekly catch up. It was good to see those who could make it and today was the first time we’ve had two people on boats, me and Sue who is currently on holiday in Greece sailing.
9 locks, 94ft 6″ climbed, 1 mile, 32 locks up, 645ft, 1 summit pound, 1 billy can of coal, 1 dodgy pound, 1 foot of water, 2 boats waiting for the tunnel, 3 by the end of the day, 2 scoops each, 2 horns lowered, 2 hours shore leave, 2 mink! 5 chums, 1 pot of oven risotto, yummy!
The yarn shop I’ve just spotted on the map at Warth Mill has been added to the ‘next time’ list!
The chaps on the other boat were out and about this morning as we pushed off. One chap was measuring their cabin, he wasn’t sure they’d fit through Standedge Tunnel. There are strict maximum dimensions that your boat must fit due to the dimensions of the tunnel, yes it does get tight in places. Maximum height above the water 6ft 2″, maximum draught 3ft 3″, width 6ft 10″, length 70ft.
Roach Lock moorings
Then there is the height of your cabin corners above the water compared with the width across the top. There is a handy chart here. When we were on the River Wey we measured Oleanna at a bridge where we knew the height. Oleanna measured 1.87m or there abouts to the top of her horns, so just under the maximum height for Standedge, we can always remove the horns if we need to.
Blue skies and hills!
The chap with the tape measure said they had discovered that their booking wasn’t until a week on Friday, not this Friday. They are heading back to their mooring and with the Rochdale and Leeds Liverpool both closed it was the Narrow or the Trent to get home and there is a matter of flying away on holiday in a couple of weeks time too.
We left them to it and turned to face the hills ahead.
What a sky
What a stunning day!
Beautiful
I could just leave it at that, because it really was glorious. The sun shone, bright blue skies, views across the valley, trees on the cusp of autumn. Yesterdays dampness just evaporated away. Wonderful.
Bridge 85 is called Division Bridge. This used to mark the boundary between Yorkshire and Lancashire, the name suggesting the counties rivalry with each other in times gone by. Oleanna crossed the old boundary, the next lock in Old Yorkshire was the first to not have locks on the paddle gear! This of course didn’t last long as they were reintroduced at the next lock.
And breath
Views through the trees across the valley, the peaty water and the sunshine. I soon had to make a change to my leg attire and layers came off from walking and paddle winding.
Royal George Mills sits by Lock 19W which shares it’s name. Built in 1786, by 1870 it specialised in the production of felt and the manufacture of flags. During the 20th C they specialised in two forms of felt, Technical felt used in machinery and Taper Hammer Felt used on the hammers on pianos, the mill was renowned for it throughout the world.
A couple of community raised beds sit alongside the lock, it looks like strawberries, tomatoes and mint were the main crops. Only green tomatoes today, all the strawberries long gone.
Spire and mast
The spire of Christchurch Friezland reminded Mick of a wedding he’d once attended there.
Frenches Wharf
Next Frenches Wharf Marina. Here six years ago we’d wondered if the grey box was a pump out machine, it turned out not to be. We also wanted a Saturday newspaper so paused to head to Tescos behind, there being no rings handy Mick was left holding Lillian whilst the shopping was done.
Hmm! No chimneys
Beside the marina there is a big new development, houses and flats all built/clad with stone that has been given a black tint presumably to meld in with other buildings in the area. I wonder whether this coating weathers in time and will be self cleaning returning to a natural stone look rather than the grimy mill look?
We now started to get gongoozlers, the area around Uppermill and Dobcross a magnet for tourists. Oleanna ducked under the new High Street Bridge and I walked up to open the lock, the off side gate windlass operated as there’s not enough space for a full length beam.
Only one boat on the visitor moorings here which was a bit of a surprise, but then the road is close by and there is a lot of tree coverage for solar to be any good. One day we will stop and have a bit more of an explore, the Saddleworth Museum going on the ‘next time’ list.
A couple sat with their two dogs and watched us come up Dungebooth Lock. As Oleanna started to appear from below the side of the lock one of the dogs was not happy! He barked and barked at this growing thing from the deep. When the chap decided to tap Oleanna’s gunnel I suggested he should watch out as Tilly might make an appearance!
Saddleworth Viaduct
Then Lime Kiln Lock, the sun being out gave me plenty of photo opportunities. Saddleworth Viaduct towers high above the canal. The arch that spans the cut adjusted to make everything work. The pillars are all square on until you get to the canal, here the down hill face is narrower and angles towards the lock, the curved arch above set on a skew.
15th August 2015
This is where I took my favourite photo of our last trip up here with Kath (Mick’s sister) and Sean walking up to the lock. Mick says he’s glad we don’t have a 70ft boat as it was hard enough to line Oleanna up to get in the lock.
Think this is my favourite photo from today
Here I met my first angled paddle gear, there is most probably a better name for them but angled will do for me. Normally paddles are lifted straight up. The deeper the water the more pressure on them. These paddles lift at an angle. This increases the water pressure on them, making them that bit harder to lift (my theory). Repositioning the windlass was needed to get more purchase, but with patience you can avoid getting a hernia.
Will the tunnel be able to stop this tag?
Gongoozlers stood and watched, asked questions, but no-one had that glint in their eye wanting to open the gate for me. Ah well! A chap warned us that a boat was coming down the locks above. Time to claim a mooring.
There was one boat moored by the car park opposite Wool Road Service Block, we pulled in behind doing our best not to annoy a fisherman. This would do us for the day, the last nine locks reserved for tomorrow. Sadly being almost part of a car park Tilly had to just sit and look at the sideways trees.
A downhill boat
As we had lunch the downhill boat came past, the only boat through the tunnel, east to west today and Shire Cruiser Hire boat, the first on coming boat we’ve seen since being on the narrow. After lunch we headed off for a walk, well we couldn’t waste the sunshine! We walked up Standedge Road then veered off onto Huddersfield Road taking the lower route through Diggle. Diggle Chippy looked inviting, but as there was no mention of gluten free fish we refrained.
Warth Mill was built in 1919 and in 1929 it started to produce tyre fabric for the growing automotive industry. In it’s heyday it was producing nearly 50 tons a week. Thankfully when production ceased the Mill was made available for a collection of small businesses which still use it today.
We walked up to the tunnel entrance where the railway thunders alongside. All calm on our side of the fence.
Mick peeked through the gate and said ‘Hello!’ Either nobody was at the other end to respond or we didn’t wait long enough for their greeting to come back to us.
Space in front for us
Returning to the boat we followed the canal and locks downhill. Plenty of room for us to moor up away from the tunnel entrance. Then Grandpa Greens Chilled Medication Emporium, we’ll be visiting there tomorrow!
Summit pound
We took note of any low pounds, the same as they were six years ago between 27W and 26W. Maybe overnight the levels would improve, maybe they’d get worse, we’ll see. A quick measure of our cabin corners from the water level just incase. 5ft 3″ then 5ft across the cabin top, well within the limits. Phew!
What a day
9 locks, 97ft 3″ climbed, 2.66 miles, 1 downhill boat, 1 shadow boat, 0 shore leave, 1 glorious day boating, now you don’t get views like that on the Ashby
It’s not often we push off in the rain, but with a tunnel booked we want to keep moving, anyway the forecast had been for rain in the afternoon not morning!
7W with all the railings around it
Up 7W already a little bit damp at the seams. This is surrounded by apartment’s that were built after the reopening of the canal in 2001, good views over the canal. Photos of the lock being built. The new stretch through town could really do with someone adopting it and giving it a good weed, maybe the council used to do this but it’s been cut back on financially.
Narrowing
The canal now follows the River Tame. Power lines head off in all directions from a substation. When the canal was being restored one pylon had been built over the cut. Instead of going round it the canal narrows to the width of a narrow lock and goes right underneath it.
Pylon selfie, yes that’s my hood
Up 8W and we pulled in at the service block. Here there is water, toilets, elsan, shower and bins with what must be a C&RT yard behind it. Not the most romantic of locations with the razor wire along the top of the walls!
Service block
We topped up on water, put a load of washing on, Tilly got a fresh pooh box, the yellow water was disposed off and we got damper.
Canal, Bywash, River
Constant rain turned into proper Pennine Autumn Half Term rain, the sort where your Mum says ‘It’s character building’! No it’s just WET. All we wished was that Tilly was busy inside relighting the stove that had gone out during the night, the heat ripple from the chimney would have given us something to look forward to. Oh well!
9W
Not willing to jump to the bank from the stern, it was better to access the towpath from the bow as the canal wasn’t really built for stopping, so the sides can be rather shallow. Locks 9W and 10W are close together. In the past leaking gates and not enough water in the pound between have caused problems with boats getting stuck on the cill with water lowering in the lock. Today filling 9W certainly stopped the bywash and dropped the level in the pound, I dropped the water from 10W, that along with a flow of water from elsewhere kept Oleanna off the cill and safe.
The bridge at Lock 10W
I’m sure there used to be a levels board at one of the locks here that warned you if the levels were too low, but today it wasn’t to be found. The problems must have been solved.
Next Scout Tunnel, or Dave’s Tunnel to us. Remedial work was needed here, much of it similar to that done in Standedge. Parts of the tunnel are lined in brick others are bare rock where rock bolts were used to stabilize it. There is a towpath that runs through the 188m tunnel, if you walk you need to take care not to bump your head.
A Mandarin Spring Roll Duck
Ducks were hanging out enjoying the rain. We’d already spotted a drenched Mandarin Spring Roll Duck, but the one here looked all preened and ready to impress. They are such tarts of ducks!
At Lock 13 we could see up the hillsides a spire poking up into the sky. Not sure which church this is as I can’t find one on the map with a suitable spire.
Woodend Lock 14W sits round a slight bend, alongside Woodend Mill. The mill was built around 1830-40 and was an integrated cotton mill, meaning that weaving and spinning processes both took place here. Now it looks like the mill is used by different people for different things, workshops, upholstery, a dog stood gazing out across the valley. Up on the top floor someone has installed what looks like white French windows with railings across them.
Woodend Mill
Not far now. Below Roaches Lock is where we moored six years ago. We had a feeling it was hard to get into the side then and fairly soon we were reminded of it. There was one boat already moored up, the gap ahead of them had something big below the water. Then a stretch of stone bank has fallen in, but in the end we got close enough to the side to be happy. With plenty of friendly cover before the river Tilly was allowed shore leave, although she spent a lot of time coming and going making the most of ‘Thank you for coming home’ Dreamies!
Another soggy boat
The stove was lit and we dried out during the afternoon as wind and rain came down outside. A couple of hours after we’d settled another boat arrived, it was the same boat that had turned up yesterday afternoon in Stalybridge. Mick had chatted with them yesterday, they are also booked for the tunnel on Friday but had been hoping to get through tomorrow! We suspect they are not totally aware of Standedge Tunnel and how much it differs from Harecastle or Blisworth and that C&RT are quite unlikely to be able to add you to the list of boats who’d already booked. Their rush however towards the summit has slowed as they stayed put for the night.
Two years ago we crossed the Pennines from east to west via the Rochdale Canal with Clare and Graeme on NB Mr Blue Sky. Last year we crossed via the Leeds Liverpool visiting friends and family in Skipton and Leeds. Earlier this year we dodged the hills by taking the route south via the River Trent. There is one other route which we have only done once before, six years ago, the Huddersfield Narrow and Broad Canals.
Snake bridge
Recently all routes have had their problems. Lock floors, stuck boats, lack of water etc etc. The Huddersfield Narrow has problems with water levels towards Huddersfield on a good year, but this year those problems have been greater. Then over the last month the bottom end of the Huddersfield Broad Canal has been found to be empty on several occasions.
And another
The C&RT stoppage notices that come from this area are far more informative than you normally get, they explain what has happened and what measures are being taken to rectify the situation. However what we wanted to know was, was the situation going to improve or would Oleanna be stuck in Huddersfield all winter if we went that way.
I think we’re going to see a lot of the chap on the right
The amount of work needed to reach the summit, the tunnel passage and then working down the other side is more for those who like a challenge than those who prefer a life on the flat with a glass of wine in hand. Before we committed to this route we wanted to talk to someone on the ground with local knowledge. For the last week Mick has been trying to call Standedge Tunnel Control to speak to someone, but with no luck. Today however was different he got through.
This year the canal has suffered more from the lack of water as one of the reservoirs has been drawn down for inspection and maintenance (several others on the system have also been lowered). But the rain we are having has been doing a good job of filling the canal up. The chap sounded positive, which is what we wanted to hear. Decision made before we’d even got out of bed this morning. Huddersfield Narrow it is!
We’ll be going right please!
About a month ago we’d booked our passage through Standedge Tunnel and our cruising has been planned for us to reach Diggle portal the day before. We have also booked a ranger to assist for a day on our descent from Marsden, then you also have to book for Lock 1E to be unlocked to let you out the bottom and into Huddersfield.
Time to get moving!
A boat came past, possibly the boat that had followed us down Marple yesterday, at speed. They then met a Black Prince hire boat at the next bridge, we just waited for both boats to pass before untying. The Black Prince boat might just arrive in time to start the flight before midday.
They’ll need warp drive to reach the locks in time!
Soon after pushing off ourselves we were approaching a big bend when the bow of another Black Prince boat came charging round it. Thankfully it seemed that the person at the helm had some experience as we narrowly avoided a collision. If they could keep their speed up we reckoned they would miss the locks by about ten minutes! Not good if you are trying to the Cheshire ring in a week!
We pootled along at a reasonable speed through the long winding wooded valley. A chap was blowing leaves off his astro turf. Maybe it’s best to keep on top of such things, but what a never ending job!
M67
Under the M67. Was this the face of a local graffiti artist on the wall here? Was this going to be the local ‘Ghost’? It was, we were to see plenty more pupilless faces today.
We caught the boat ahead of us up at Duckingfield Lift Bridge. Here you need an anti-vandal key, or handcuff key to get the lock off the mechanism and they hadn’t got one. The chap was tinkering with the lock as the lady knocked on a boat to see if they could help. We pulled in for me to hop off just as they got the lock unlocked. At least it saved me doing all the winding, but I did make sure it was locked back up once it was down again.
Mick asked them which way they were going. ‘To Ancotes’ was the reply. He pointed out that they would need a handcuff key for the locks. But the lady said they wouldn’t be doing the locks today. They’d still need a handcuff key no matter what day they were doing them.
Dukinfield Junction
They turned left at the junction, we turned right onto new waters for Oleanna and Tilly. Under the Asda Tunnel and out passing moored boats and three flying ducks.
Then on towards Bridge 111, the first of the Huddersfield Narrow Canal, just below 1W Ashton Lock, the first lock of the canal.
Broken even with the price tag still on it!
Now six years ago we’d just bought ourselves a long reach aluminium windlass. I was nursing my lack of little finger so was at the helm, off went Mick to set the lock. He soon returned with the brand new windlass in two pieces! The advantage of the longer reach no longer available he struggled with a standard windlass. A while later we replaced the broken aluminium windlass with a long reach one made from steel, now my best friend.
Lock 1W finally open!
Today it would be me working the locks and 1W made itself known quickly. The lock was full so I went to empty it. The towpath side paddle being extremely stiff took some work. A couple of clicks, then adjusting the position of the windlass to give me more umph! Eventually it raised. I then tried the off side, this just slipped every half turn, so I left it closed. The gates were stubborn too, one side with a cranked beam. If this was to be the case at every lock we were going to be working hard for the next few days!
Plantation and Tame Lock were much easier. Hills just in view ahead and old mills alongside the canal.
River Tame
The River Tame aqueduct took me by surprise, I nearly had to do a Giles as I’m not too keen on having nothing on one side of the boat!
Now we cruised through overgrownness on both sides approaching Stalybridge. Railings and lamp posts hide in amongst the sideways trees. At one time someone thought the canal would be a popular place to walk, it is but only on one side, the other left to grow over and collect rubbish.
Salt shaker vent
The canal was built over 17 years, originally opening in 1811 Standedge Tunnel being the last stretch to open. For a while the canal was profitable being a shorter route connecting Manchester to Leeds than the Rochdale, but bottlenecks were created at the tunnel where it took four hours to leg a boat through! In 1845 the canal was bought by the Huddersfield and Manchester Railway Company who’s route was to follow the canal up the Tame and Colne Valleys. Standedge Tunnel was used to remove the spoil when they built the railway tunnel. Once the railway was open there was no need for the canal which fell into decline and ended up closing in 1944.
In 1974 the Huddersfield Canal Society was formed with the aim of re-opening the canal. Whole sections of the cut had been filled in, built over and several bridges had been removed. Volunteers with the support of local councils worked hard and by the 1990’s all sections that had not been filled in were restored. The Huddersfield Canal Company was set up to co-ordinate the reopening of the remaining sections, one of them being a half mile through Stalybridge which had been filled in and partly built over. But in May 2001 the canal was reopened. Plenty photos of the building work here.
4W mossy but new
Lock 4W is more or less where the major works in Stalybridge started. A whole new lock was built with it’s approach under a road. I’d remembered this and the railings which meant dropping crew off to work the lock had to be done at the start of the tunnel/bridge.
The bottom gates were problematical to close. In fact after pushing and bumping the gates there was still a six inch gap between them. We tried adding water pressure to the equation, but all that was going to do was deplete the pound above. The paddles were closed, gates reopened, Mick tried prodding around with a boat hook but the water was too deep. The gates closed a touch better and water pressure did the rest of the job for us, up the 11ft 1″ Oleanna rose, the pound above looking a bit short on water.
Looking back to 4W
I walked ahead and dropped the water from 5W which aided our need to get over the cill. Mick decided to leave the ground paddles open until Oleanna was safely across the cill, this would help water move around her should I have needed to let more water down. Once clear of the gate he then dropped the paddles. As on quite a few of the Huddersfield Canal Locks both ground paddle mechanisms are on the same side as the gate beam, handy as there are no walkways over the top gates.
Stalybridge Civic Hall and hills
We had a similar problem at 5W with the gates closing. An extra nudge and water help again. Now we could see the Civic Hall and the hills behind as we made our way through the new cut to 6W.
Nice trees, a shame about the weeds
Up at lock level there is masses of paving everywhere, a municipal feel to the town centre, all revamped when the canal came back through town. Once exciting I’m sure, but now it feels just a touch soulless. An art installation sits near the lock, Holy Trinity and Christ Church a little behind it. Then once up through Lock 6W Tescos takes over, car park on both sides of the canal. We pulled in where another boat was moored right opposite the checkouts. The chap on NB Texas Star had a very pretty dog and he was trying his best to get a coat of paint on the back of his cabin just as it started to really rain.
Two paddles and Tescos ahead
After a late lunch we put together a big shopping list, enough supplies to get us into Yorkshire. This must be the closest we’ve ever moored to somewhere you can leave your trolley and get your £ coin back. The only problem is the railings between the car park and boat. I passed the shopping through and Mick popped them on the boat. It was then either a walk round for me or a scramble through the railings.
Look what they’ve just bought!
This afternoon we’ve had the following through from C&RT
Huddersfield Narrow Canal – Water management information Starts At: Lock 1 East, Stanley Dawson Lock Ends At: Standedge Tunnel
Monday 4 October 2021 14:30 until further notice
With the support of the EA, during the 2021 boating season we installed a temporary river pump at Britannia bridge, in Milnsbridge, abstracting water from the River Colne into the Huddersfield Narrow canal to aid continued navigation on the canal. We have unfortunately been unsuccessful in gaining an extension on this abstraction from the EA which we had hoped would continue until the end of the 2021 boating season, so as of 30th Sept 2021 we have ceased abstraction for this year.
The canal is currently looking healthy and we are relying on supply from our reservoirs, natural feeds and of course wet weather to maintain water supply, with the recent rainfall proving beneficial. The local team will continue to do their best to manage water levels in order to support safe navigation and if we are faced with the need to implement restrictions or closures, we will update the notice accordingly.
At least the rain is doing some good to the east of the Pennines, here it has stopped us from heading out for an explore, instead we stayed by the stove keeping dry and warm. Outside it was someone’s birthday, maybe they were having a car park party! Thankfully they quietened down after a while leaving us with the car park lights and the very raucous Canada Geese!
Today we have learnt something that we’ll never forget. Did you know that a Moorhens skin type is fur ?! No we didn’t either until we were checking what juvenile Moorhens looked like. Check this link if you don’t believe me!
6 locks, 61ft 3″ climbed, 5.89 miles, 1 lift bridge, 1 boat held up, 1 right, 2 canals, 1 Asda tunnel, 6 furry Moorhens, 1 pretty woofer, 6437 giant spiders, 1 car park mooring, 1 box, 2 bottles wine, 1 trolley almost to the boat, 1 very damp evening, 0 shore leave.
So our route today
Murrys Winding Hole to opposite Tescos, Stalybumbridge, Huddersfield Narrow Canal
A chilly morning, mainly due to letting the stove go out so that Morag could sleep on the sofabed last night. The stove is a touch too close for duvets in the middle of the night! The central heating soon took the edge off.
School pals
After breakfast it was time to say goodbye to Morag, she was heading off to see her son who is studying at Manchester University and it’s his birthday tomorrow. It was so lovely to have her to stay and have a proper time for a catch up.
Goodbye Macclesfield Canal
The covers were rolled back, waterproof trousers put on, we were ready. Two volunteers were by the top of the Marple flight. One chap, Rob, had been there at 8:30 to unlock the locks, he’d had a long wait for his first boat, us, at just gone 11.
Hello Peak Forest Canal and Rob
The other chap, who’s name I didn’t catch, walked on down the flight, topping up locks where needed and opening the top gates. This meant my steps for the day wouldn’t include going backwards and forwards between locks.
One down, 15 more to go
We soon got into a rhythm. Rob closed the gate behind Oleanna, I walked to the offside and lifted a paddle, then Rob would lift the towpath side. Occasionally we swapped sides.
The locks are quite deep
Many of the bottom gates overhang the narrow bridge below, so the gates tend to be easier to push from down there, but only if you are tall enough! I thankfully am just within the useful height range.
There was plenty of water coming round the bywashes, most probably because most of the locks were already full, so any water we were adding went straight round.
Heading to Lock 13
Rain came and went, sunshine did the same but for shorter periods. The weather hadn’t discouraged walkers up the flight. By Lock 13 two lads were eating snacks on the steps, then they rushed through the boatman’s tunnel to the bottom of the lock as Oleanna came out. I took the more convoluted route down steps to the horse tunnel under the main road.
New wall
The lock that was rebuilt a few years ago is now weathering in, the new dry stone wall alongside the towpath now the only clue to the works that went on to rebuild the bulging lock sides.
Gongoozling
With Lock 9 being open ready and waiting for us we dropped lock 10, the level in the intermediate pound rising almost to the top of the lower lock. Rob spotted that the overflow there was blocked, not helping on a pound that can easily overfill. Here we were surrounded by numerous eager gongoozlers all over hanging the lock sides and keen to help push gates.
At Lock 8 Rob headed off down the flight, it was 11:50 and time to go and lock the gates on the bottom lock at midday. So we were left to work the next few locks on our own, no hardship.
Nearly there
A young lad ran up to see what was happening, obviously wanting to help but a touch too shy to ask. He was very quickly recruited and despite his height disadvantage he was able to open and close the gate from the lock top, with me reminding him to keep an eye on where he was putting his feet as the edge of the stonework got closer and closer.
Lock 7’s top gate was closed but had a paddle raised for us. The level looked equal, but obviously not quite! No matter how much I pushed and bumped and pushed it just wasn’t going to shift. Where were all those keen helpers now!! Nowhere to be seen. I tried to be patient, but it simply wasn’t going to help, the lock had reached a point where the same amount of water was leaking out through the bottom gates as was coming in at the top. Eventually a dog walker was recruited to help, that extra bit of force making all the difference.
That’s a pisser
Rob and the other volunteer reappeared at Lock 5. They’d had a ping on the whatsap group for the locks and another boat had just started down the flight ten minutes before it was due to be locked. Rob stayed with us as the other fella walked back towards the top.
Open sesame
Rob was a very chatty chap. You could tell he’d not been volunteering long as he’s not fully realised just how loud you have to shout across a lock as it empties or fills. He started in May, his enthusiasm for gaining knowledge about the locks is commendable. Originally from Whitley Bay he used to walk the beaches there, but recently he’d found himself in Manchester walking the canals, so he managed to volunteer and here he is. Apparently last year there were four volunteers on the flight on Sundays, but this year it started off with just one, him, the old volunteers having gone elsewhere.
Bye and Thank you Rob
At Lock 1 he suggested I climb onboard and he’d work the lock, the gates needing to be unlocked and locked again. We thanked him as Oleanna dropped in the lock, the noise from the pissers from the lock walls taking over.
Now across the aqueduct, no chance of doing a Giles today, there were photos needing to be taken especially as the sun had come out, now we’d finished the locks!
Waiting for them to come through
Up ahead a boat was coming towards us, they’d missed the locks, but turned out to only be a day boat anyway. They were soon followed by a second day boat near Hyde Bank Tunnel where we pulled into the side to let a third boat through. This was a charity boat that would also wind once it had crossed the aqueduct.
This is when we realised that we’d forgotten something! Today at the top of the flight we were going to make our minds up as to which route we’d be taking across the Pennines. With lock closures and lack of water around the north our choices have been fluctuating almost daily and we’d obviously rather not get stuck. Maybe we’d allow ourselves another day before our final decision had to be made!
We carried on, pulling in on a length of armco before Bridge 9, the rain starting in earnest again, just as Tilly went off to explore. In one lull between showers Mick made use of the new chimney brush. The wire handle a touch shorter than the old one. Maybe we can fix the two handles together adding another 9 inches to it’s length. Once the chimney was swept the stove was lit. The temperature inside also rose with the assistance of the oven being on for a roast chicken.
But it’s raining!
16 locks, 208ft 9″, 4.33 miles, 2 tunnels, 1 left, 1 wave goodbye, 1 enthusiastic Rob, 1 very wet flight, 3 boats on the move, 4 hours shore leave, 1 happy cat, 9 more inches needed, 1 cheesy wotsit on the cratch.
A few weeks ago we’d received some alternative sausages with our Sainbsury’s order, they should have been pork and apple but instead we got chicken. We’ve not had chicken sausages before, turkey yes, but not chicken. Last night I’d taken half the packet out of the freezer to defrost. They were a little bit stubborn to get any colour and weren’t the same as a good pork sausage, but were okay in a buttie with ketchup.
First boat to come past us this morning was NB Ellis. We opened the hatch and Mick said hello, but as we’ve never met Mark properly and he was lining up for Bridge 1 he was otherwise engaged. Ellis is a Hotel Boat, but more relaxed and informal than most hotel boats, it’s more of a ‘live-aboard narrowboat experience‘. This mornings topics on the Geraghty Zoom included Bingo songs, Years and Years and sling backs in Hull.
Fish not filters now
Despite the wet weather Mick headed off on the bike to find Harrods. Harrods is a motor factors shop in Marple and is a good place to stock up on oil, filters and anti freeze. It used to be just down the hill from Church Lane Bridge 2, but thankfully we’d checked before he headed that way as the old shop is now a fish restaurant.
They are now situated in an industrial unit behind Goyt Mill, where they have more space. Mick picked up oil for the next engine service and some antifreeze.
An old Godber show on in a couple of weeks
During a dry spell we walked down to the Co-op for a few bits, enough supplies to get us happily to the next big supermarket. We think the Co-op is new, quite well stocked, but there were a few things missing off our list so we then headed to Asda where the gaps were filled.
The cake shop’s still going, no Superman today though
Across the way from Asda is Hollins an independent DIY shop. I wondered if they might have a pump action spray bottle to use on the boat covers, not that we’ll have two dry days together before the end of the year now! Mick also suggested looking to see if they had a new chimney sweep brush.
Aladdins cave and a new brush
I had a good look round, the shop is reminiscent of Clock Handyman in Scarborough and Turtles in Croydon, just about everything you might want for house, garden, kitchen all under one roof. It took me a while to walk round.
They had spray bottles and big 5 litre pump action bottles. Sadly we have nowhere to store such a big bottle and as it will only be used once a year it seemed a touch excessive. I’ll keep looking. They did however have a new sweeping brush and at £4 cheaper than Midland Chandlers a bargain. SOLD.
Why is there always one thing that gets missed when packing away my work stuff!
Back on board Oleanna we had a tidy around. Tilly seemed a touch unimpressed by the Great Wall of Marple, maybe it was too wet for the bird feeder at the top to be enticing to both her and birdies!
I chopped up onions, mushrooms and butternut squash and added tomatoes to make a veggie goulash and popped it ontop of the multifuel stove to slowly simmer away during the afternoon.
Unimpressed Tilly, back in bed.
On Thursday I’d received a message from my old school friend Morag. She was planning a visit to York and wondered if she could invite herself to stay the night in Scarborough with us. She fortunately then went on to mention that she would then be heading to Manchester on Sunday. Of course we couldn’t put her up in the house, but we could on the boat. Early evening she arrived having walked up the hill and a little bit around the houses from the station to find us. She was a little bit soggy around the edges from also walking miles around York visiting old haunts and exploring parts of the University campus where she grew up.
An evening of catching up on the last two and a bit years. News of friends both near and far. Her job which two years ago she thought she’d not stick with, it’s improved with the help of remote working, although some of the people she works for leave a lot to be desired. Morag was one of the people I’d hoped to have been able to see when we were in London this summer, but we ran out of time after seeing family and cruising through London on the Thames. Thank goodness she’d mentioned her trip to Manchester.
0 locks, 0 miles, 1 very wet day, 1 unimpressed cat, 10 litres oil, 5 antifreeze, 4 croissants, 4 crumpets, 1 sweeping brush, 1 best friend from school, 2.5 years to catch up on, 1 wonderful coincidence, 1 touch 2 much wine.
This morning at 09:59 the following notice dropped into our inbox from C&RT, not much notice of the start of works!
Aire & Calder Navigation Main Line Location: Low water levels at Goole Starts At: New Goole Caisson Ends At: New Goole Caisson
Monday 4 October 2021 10:00 until Wednesday 6 October 2021 09:00
Type: Advice Reason: Information
Original message:
British Ports are undertaking emergency repair works to their lock gates.
We will have a reduced water level of 300mm for today and potentially tomorrow as the levels need to be dropped to allow the repair works to be carried out.
Last year there were rumours that the lock gates out onto the River Ouse leaked quite badly, which didn’t help retain levels in the docks when the Caisson was closed. Well they leaked too until stop planks were put in behind them.
Presumably the stop planks have been dropped back in as the caisson gates open the wrong way to maintain levels upstream on the canal, or has the whole pound back to Pollington and Sykehouse Locks been dropped?
I’m hoping that people living on their boats in the marinas at Goole have had prior warning as the levels dropping by 300mm might feel a little bit like deja vu!
Updated Update
Update on 04/10/2021 at 15:30:
Associated British Ports have advised us that they have completed the emergency repair works and water levels are returning to normal.
Further works will be required in the future and we will advise of these works when we have more information.
Bancroft Bridge 8 to Marple Junction, well just about
Not far to go today, but would there be space. The traffic on the Macc may be a lot less than that on the Staff and Worcester and the Trent and Mersey at the moment but mooring spots can be full, especially when the weather isn’t too good.
Not many bridges left
We’d slept in, so we didn’t push off until gone 11am. A rather unpleasant aroma was wafting over the fields so we were glad to be moving on. Not quite a mile and a half to reach our destination.
Goyt Mill
A boat was just pulling into the first gap before Church Lane Bridge. We pulled into the other space, being very careful of our footing as we stepped off. These moorings became known to us as Dog Shit Alley as locals didn’t seem to tidy up after their hounds and autumn leaves tend to disguise the locations!
Dog Pooh Alley
With the wind still being quite strong the other boat decided to see if there was a mooring through the bridge, there was along with another. We followed avoiding being under trees for the rest of the day and pulled in alongside Tilly’s Great Wall of Marple. Well today is her 6th birthday, so she needed a treat.
Our mooring with the wall Tilly scaled when she was a whippersnapper
This afternoon we left Tilly in charge, sunning herself in one of the windows. We walked down the locks which were locked. Opening times of the locks are the same as last year to help conserve levels on the summit, so the padlock had been on for a couple of hours already. When we reached lock 9 we veered away from the canal down the steep hill towards Marple Station.
Top Lock locked
Here two gate posts stand alongside a slightly wonky tall house. They looked like they should lead to a big house, but there seemed to be no sign of it. Brabyns Hall was actually set quite a distance from the road here, on the other side of the railway. Map link. I wondered about it as we walked down to the station, we bought a duo ticket into Manchester and walked over the bridge to the other platform.
Gate posts and the gardeners cottage
There was a board telling us all about Miss Fanny Hudson a lady who helped shape Marple. On the day WW1 broke out Fanny announced that she would offer her home as a hospital, this was Brabyns Hall. Wounded soldiers returning from the Western Front were brought on hospital trains straight to Marple. By 1918 the number of wounded returning was escalating so Fanny Hudson arranged for Rose Hill House to open as an annex to the hospital.
Brabyns Military Hospital
In the 1940’s the house was passed onto the local authority, they had hoped to open it as a community centre but by 1952 it had deteriorated so much that it was demolished. Now it looks like the site of the house is just a car park, the gardeners cottage by the gates one of the last buildings to survive.
Piccadilly in the sunshine
We took the train into Piccadilly, then got the free bus 2 over to Shudehill. Across the way is where we met the London Leckenbys who were in Manchester for a few days having a look round as a possible University City for Josh in years to come. They had had difficulty booking hotel rooms, we now know due to the Tory Party Conference, so had ended up with a serviced apartment for a couple of nights.
Slightly worse for wine
Manchester was humming as if there hadn’t been a pandemic so we decided on staying in for the evening. A big red fish Reg had been bought from the fish counter under the Arndale Centre which was accompanied by salads and roast potatoes. Then followed by my very chocolatey pudding with ice cream and raspberries, very rich and very nice. There was enough left over for us to bring back to the boat for tomorrow.
The return train journey was busy, a full train and only two people other than the guard wearing masks, us. The walk back up the hill to the boat earnt us another glass of wine, well we did have to celebrate Tilly’s birthday somehow. Just a shame we’d forgotten to feed her before we went out! The other day we’d stocked up with a box of her current favourite food, only to discover that it was actually old gits food, 7+! Well it turns out that she is really rather partial to senior food a year early! We keep trying to alternate between 1+ and 7+, the whippersnapper food gets ignored, but the old gits gets devoured, even the same flavours. Old before her time!
Birthday Girl, home alone
Happy Birthday my little thug xxx
0 locks, 1.32 miles, 2 moorings, 1 bit of creative mooring, 2 trains, 2 free buses, 3 London Leckenbys, 3 bottles wine, 1 re fish, 1 slab of chocolatiness, 1 hungry birthday girl, 1 very annoying barking woofer at midnight! 6 years going on 40.