Panto Postcard 3, 2019. Saturday Escape.

73.75 hours

Hertford College Boat Club to College Cruisers, Oxford Canal

A very long week in Panto land, but a productive one.

Lily working with the Pippins

Two buses got me back to Chippy by 11am on Monday. The cast take over the stage now for much of the day, but lunchtimes and the evenings it is free.

Josh taking set ups

Monday we had a photo shoot for publicity photos for the show. We set up the Square setting as that was the most complete, actors donned their costumes and ‘set up’ photos were taken by Josh Tomalin.

Cutting in the woodwork on the boozer

The set being mainly sliders means that I can pull bits out to paint and then slot them back in whilst another scene is being rehearsed to dry without the possibility of actors getting covered in paint.

All wrapped up, ready to go

On Tuesday I took advantage of not being able to get to much on stage and sorted sending my model box out to Vienna. This took so long to fill out the forms on line. I could quite easily measure the box but weighing it was more problematical. The Front of House money scales came to my rescue, the box weighing 2kg which is £220 in £1 coins!

That’s me driving for the first time in three years!

In the evening Jo (the props maker) and I tried out the Dames car on the front of the stage whilst the technicians and Mark (Lighting Designer) hung lanterns around us. By the end of the day there were working headlights and I’d managed to paint my panto anaglypta in the boozer.

Highlights
Shadows

Wednesday was a filming day. The panto has some sections which are shown on a projection screen. So these were filmed in front of green fabric so that suitable backgrounds can be added. Then footage for the car chase was looked at with the actors in the car. Lots of fun.

Green screen filming

On Thursday I spent quite a bit of time getting dotty in the Bank of England Vault. I ended up getting carried away with the dots so had to paint every third one of them out. It being Halloween the actors had decided to spend the day in fancy dress. We had a strawberry, mustard, The Joker amongst other things.

Dotty vault

Friday was a very messy day. A panto isn’t a panto without a slosh scene. Last year this was tame compared to this year.

Susie mixing the smash
Actors getting covered

A huge bowl of Smash was required, costumes are made with ease of cleaning in mind and a large tarpaulin covered the stage floor. Various consistencies of smash were tried out, thinner worked better and tended not to clog nostrils up quite so much. On the set side of things I am going to need to glaze a lot of it as there is no knowing where the smash will land.

Pepper keeping me company back at my digs

In the evening I worked on the front edge of the stage, one last curve needed marking out. I was back to measuring and scaling up from my model, then joining the dots, followed by painting as good a curve as I could over mouldings. This involved adding a bit, loosing a bit, adding a bit etc whilst Mark and the chaps focused the lights on stage.

Ready to start the stagger through

Saturday morning, time for a stagger through of the whole show for the actors and a chance for everyone else to watch and see what is missing and needed for the technical rehearsals next week.

The boozer, just needing it’s dressing adding

This went well, a couple of scenes scripts were still in hands and we had to stop and start for scene changes, these will be worked out next week.

About to start at 3pm

Once the actors and props were clear of the stage it was time to get to work. Mark had done his best to get most of the lights focused, but still needed a bit of dark time. Jon (Sound Designer) was also around positioning speakers and microphones, a lot of people when you need a clear stage to start painting the floor. But everyone was understanding and accommodating.

Phil finishing the second coat of the base colour

The cavalry arrived in the shape of Phil, a scenic artist from Bristol. She has come to help out for a few days and was thrown in at the deep end helping me with the floor. We soon discovered what a small world it was from Skye to Hull to Bristol.

Base coat on by 4:20
Blues drying waiting for second coats at 5:10

The heating was on full blast to help the paint dry. We gave first, second and to one particularly annoying shade of blue a forth coat of paint before we broke for something to eat at 9:15 leaving the paint to dry on it’s own. Half an hour later we were good to go with a coat of glaze. This was on and drying with twenty minutes to go before the last bus left Chipping Norton for Oxford. Much better than last year when I finished at 2am and couldn’t escape to the boat until 6am.

Glazed by 22:35

Meanwhile

This morning, Saturday, when I’d turned my phone on I received a message from Mick. Yesterday he’d been up to Osney Lock to check on the flow above the lock, any possible moorings and if it would be possible to turn into Sheepwash Channel and then up onto the canal. More rain and strong winds were forecast for this morning, should he push on or stay put. The message said, ‘Just setting off now to beat the wind and rain.’

More Panto

By the time I’d had a shower he’d negotiated his way past numerous rowers on the Thames to Osney Lock. Finishing breakfast he’d single handed Osney Lock. This involves a lot of walking round as the lock landings are on the offside and control panels on the towpath side.

The next stretch would be the hardest. The narrow channel meaning the flow would be strongest. Osney Bridge to negotiate and then the turn onto Sheepwash. Changing from going upstream to downstream with a right hand bend the currents couldn’t be predicted, there was even an Eddie there to confuse matters. Mick made the turn, passed the disused swing railway bridge and then turned onto the lock landing below Isis Lock. This was conveyed just as I reached the front doors of the theatre.

Panto

In the now pouring down rain he worked Oleanna up the narrow lock and at last he’d escaped the Thames. Two weeks later than originally planned, but safe back on the cut. No photos of this expedition as Mick was quite busy and it was raining somewhat.

2 locks, 2.31 miles, 1 right, 1 left, 1 red board, 3 buses, 1 car, almost 2 weeks in 1, 1 scenic cavalry, 1st glaze, 2nd tomorrow, 1 day off, 3 2 1mph, 1 boat escaped, 1 designer escaped, 1 lazy day planned, 1 escape pod to be put away!

On the move again. 31st October

Hello. Mick here. Apologies if this post isn’t up to Pip’s usual  standards but I thought you would like to know how things are here on Oleanna.

On Monday morning Pip headed off on the number 35 bus to Oxford City Centre then changed onto the S3 for the hour long journey to Chipping Norton.

I spoke to the engineer who had been called out to the overheating problem and he agreed to come and have a look at our cooling system on Wednesday (30th October).

The boards were still on red so even if Oleanna hadn’t been poorly I wouldn’t have gone anywhere anyway. So I pottered around for a couple of days, went to Sainsbury’s, went for a walk, that sort of thing. I watched two mad boaters taking their narrowboats through the red boarded Sandford lock, against the advice of the lock keeper, downstream on the way to Abingdon.

The boat moored behind Oleanna had five cats on board. They seemed to be allowed out at all times of the day and night. Tilly was having a quiet little stand off with one of them, Tilly at the stern of Oleanna and the other cat at the bow of its boat. But the stand off soon got more complicated, it was no longer between Tilly and one cat but Tilly and three cats with another one looking on from a distance. I decided I didn’t want any unnecessary vet bills so I called Tilly and persuaded her to come inside. She didn’t need much persuasion.

On Tuesday the lock keeper knocked on the roof and asked if we were ok for water. The boards were still on red with no signs of turning yellow for a while. I said we could do with some (there’s no water point at Sandford) so he suggested that I reverse Oleanna back into the lock and connect the hose up to the outside tap at his house. Marvellous! I put the washing machine on whilst filling the tank.

IMG_20191029_120211888sm

On Wednesday Rusty (Marine Engineer) turned up to have another look at our engine. Last Friday he had removed the thermostat that was full of crud and we thought that had fixed the problem. But Saturday’s events had proved that there was more crud to find. He took the bottom hose off the skin tank and the contents of the tank and the coolant in the engine gushed out at a healthy rate. This was good as it meant the skin tank wasn’t blocked which would have been difficult to clear. He removed the other end of the hose from where it connects to the oil cooler and there was quite a bit of rusty crud in the pipe. Here is some of the rusty flaky crud now in a bucket.

IMG_20191030_122636283sm

Then he took off the housing that the hose attaches to. There was much glee and laughter at this point, “Ah! Found the problem. Yay!” and other words to the same effect! This housing was blocked with more of the same stuff.

BeforeIMG_20191030_130913719sm

So that all got cleaned out. On the engine where the housing is attached is a gauze, presumably to catch this sort of stuff and that was cleaned too.

IMG_20191030_131249675smIMG_20191030_131256572sm

Then it was all put back together again, filled with new coolant, system bled and we were good to go. The engine was started and you could immediately see a much greater flow through the header tank than before. Job’s a good’un. Rusty had brought a wet and dry vac to pump out the old coolant from the bilge. I offered him electricity from our inverter but he’d also brought a generator to power the vac. He poured it all into a container and took it away with him. 

I’m very confident that we have found the immediate issue but the question remains  about where the crud came from in the first place. Oleanna had a change of antifreeze last November. The antifreeze that got put in then was supposed to last five years. Rusty is going to show some of the crud to a friend of his who has been doing boat maintenance for about 60 years (Keith Duffy from RCR, now retired) and see if he can shed any light on where it might have come from. Rusty also suggests doing the same procedure again at the end of next summer and see what is there then. We decided not to put the old thermostat back in but to get a new one. I shall do this in the next few days.

On Thursday the boards at the lock had changed to yellow! Yay! But the lock keeper advised that this was only as far as the next lock (Iffley lock) and beyond that there are still red boards.

IMG_20191031_101412671smIMG_20191031_101523372_HDRsm

The share boat moored two behind us was preparing to move on. They have an appointment with a boat painter in Braunston and need to be above the Claydon flight on the Oxford Canal before they shut for winter maintenance on the 4th November. I asked them if I could join them to save having to work the lock by myself. Of course they were only too happy to do so. Sorry I didn’t get your names nor can I remember your boat name other than it begins with S!

I kept a close eye on the temperature gauge and, with the thermostat out, it didn’t manage to get above 40 to 50 degrees, not enough to heat the domestic hot water! Normally Oleanna runs at about 80 degrees.

When we got to Iffley Lock that was also showing yellow boards so we decided to carry on upwards. There was an off duty lock keeper there who operated the lock for us. However he advised that Osney Lock (the next one) was very definitely red. The share boat decided to carry on towards the centre of Oxford. About half a mile above Iffley lock I spotted a single mooring with bollards to tie to just near to Hertford College Boat Club. There were no “No Mooring” signs in evidence but it looked to good to be true. However I plonked Oleanna onto this mooring and tied up.

IMG_20191031_120143033_HDRsm

I worried a bit about the strong stream and whether to let Tilly out or not. But she’d been pretty much cooped up for quite a few days so I relented to her meows and opened the door for her.

IMG_20191031_122603814sm

After a couple of hours she came home and I went out on the bicycle up to Osney lock to have a look. The current is flowing quite fast through the narrow bit at the East Street moorings. Hopefully in a couple of more days without rain it will ease off and we can gat back onto the benign waters of the Oxford Canal.

 

10 litres of Antifreeze, 1 happy cat, 1 happy boat engineer, two happy boat owners, 1 red board ahead, 1 rainy forecast for Saturday. 1 substitute blog writer who can’t remember how to do the map thing.

 

 

Back In The Red. 27th October

Sandford Lock

Tea in bed with the Saturday newspaper, just what was needed along with an extra hours sleep.

Tilly

The sun was out warming the lock cut and making it steam. At 8am we got the first rowing boat arrive and sit chatting for ages as we read the papers. Then as the world warmed up more people walked past on the towpath.

Mick spotted a Lock Keeper and was about to say we’d like to stay a while due to our engine overheating, but the Lockie beat him to it saying that the river was back on Red Boards again, so our stay for the time being will be free.

I checked the levels and sure enough this reach isn’t the only one to have gone red overnight. It’s interesting how often they update the conditions, a week ago there were four updates in a day, but today there had only been one in 24hrs.

Sunny day

We had a long discussion this morning, should we eat out at the pub across the way, or should we cook ourselves. The later meant having to go shopping, we chose this option as we knew we’d end up with a much better roast for half the price. Mick headed off on a bike to a big Sainsburys where most of Oxford seemed to be restocking their cupboards.

All very well going downstream

Tilly and I stayed put enjoying the sunshine, watching a chap row by standing up, bet that’s hard work going up stream. What a lovely day for doing just about nothing.

The lock landing on 20th August

After lunch we went for a wander. Coming up the lock was a boat Mick recognised from Goring, the one with the cats on board. We chatted to the chap who moored behind us. They’d come through Abingdon this morning, fighting against the stream believing it to be on yellow boards, when they checked quarter of an hour later, it was on red. They battled their way upstream at about 1mph against the current. Serious hard work. Oleanna won’t be doing any of that!

The lock landing today

We walked down to look at the reach below the lock, it was very high, higher than yesterday, just about to come over the lock landing. Back in mid August there had been at least two foot below the landing visible. The stream from the weir was very strong, I’m surprised the boat had managed to come past it.

Red

A sunny slow quiet day ending with a nice roast chicken before I head back to Chippy tomorrow and paint my arms off for a second week. Here’s hoping the levels improve along with Oleanna’s engine.

My route to work in the morning

0 locks, 0 miles, 1 bike ride, 1 lazy morning, 1 lazy afternoon, 1 lazy evening, 1 roast chicken,1 boat, 2 kids, 3 dogs, 5 cats that’s one very full boat behind us!

Panto Postcard 2. 2019

66.75 hours

The yellow line to Panto land

Early trains, two of them to get me to Banbury. Then the 488 bus to Chipping Norton, which arrived so I had a good half hour before the meet and greet with the acting company. The van was already being unloaded with the set pieces that had been built in Cornwall.

Pieces coming in through the front doors

There was time to make sure all was well before I’d be needed elsewhere. Unfortunately there were two pieces that wouldn’t fit through the front doors! I had given Ade and Lou what are known as the ‘Get in’ dimensions. The two offending pieces had a very quick straight cut put through them which will be disguised with a lick of paint when I get round to it.

Portals going in

The first day of rehearsals starts with meeting all the actors and other creatives, this is followed by a read through. This was very funny indeed, plenty of jokes for both old and young. Then it was time for Helen (the costume designer) and myself to be centre stage and show off our designs to the company.

Positions on stage

Over lunch time there was a production meeting with Lighting Designer, Sound Designer, Props Maker, everyone involved apart from the actors. My world that normally revolves at about 3mph was suddenly accelerated to ten times that speed and that is the way it has stayed for the rest of the week.

Starting the phone box

Monday saw the portals being put together and fixed in position on stage. By the afternoon a second van arrived with barrows, hanging baskets and the start of a telephone box. Plenty for me to paint.

Pepper being grumpy with me

Late afternoon I walked round the corner to pick up the key for my digs and drop my bags off. I’m staying in the same digs as last year, so no need to be shown round, just a quick hello to Suzanne and Pepper the cat and I was back at work within fifteen minutes.

Yummy!

Late evening we all retired to the pub where on the menu there was gluten free cider battered fish and chips, I obviously had no choice. The portion was huge and I did consider keeping half for the following day, but I did my best and polished it off.

Tuesday more set pieces went up, sliders were suspended. This all took time as the floor of the stage is by no means flat, in fact it dips by getting on for two inches towards centre stage!

Hanging baskets all blobbed and splodged

I took over the front foyer, painting smaller bits of set. Hanging baskets, kitchen counters, the telephone box. By late afternoon it was time to say goodbye to Ade and Lou. They very nicely gave me two bottles of this years apple juice that they’d just pressed.

Glitter tastic scooter

Wednesday was props meetings with John the Director and Jo the Props maker. The scooters Jo has made are wonderful. The huge vault door wasn’t opening quite far enough, so some major chamfering back of the built hinge was needed and I then had to promise not to put too much paint on it all.

Big hinge about 12 inches long

With the crew putting first and second coats of paint on things for me I could concentrate on doing the arty painting. Late on in the day more people headed home, leaving me with Gavin and Ash to carry on.

My pretty walk to work

Thursday the actors started to rehearse on stage. By 4pm the Pippins had joined them. These are local kids who get chance to be in the panto. There are three teams of four, songs are learnt on mass, but stage directions and dance routines all have to be done three times. I’m just about word perfect on some of the songs already!

K6 finished

This also meant that Gavin gave his health and safety chat to the kids. When I realised he’d started I made sure I went into the auditorium to listen. Sadly this year he’s changed the wording somewhat, Death wasn’t mentioned once!

Missed bits

During the evenings the stage is available for painting at the moment, so I’ve made use of Ash and Gavin to get more pleb painting done. This does mean that even though I’m last in the building I also tend to be the first, touching in the bits they’d missed before the actors start rehearsals.

Still things to fly

By the end of Friday night there were just signs and barrow dressing left to do for the market square scene. This scenery possibly has the most work, so on Saturday I treated myself to a sit down in a dressing room doing all the signage. The complicated floor has also been marked out, I just hope it’s still there after all the dancing next week.

Road sign finished

Once these were completed and a few jobs finished on stage I headed to get a Saturday newspaper and a few bits and bobs that Mick had planned to buy when he reached Oxford, but that just hadn’t happened. Leaving the theatre in daylight was a first this week, as I waited for the bus to arrive it went dark. Only the twinkling lights in Woodstock illuminated the journey back to Oxford.

Pub sign completed

I considered on popping in to say hello to our friends, Andy and Irene, who were moored at the end of the canal, but by now I was weary and wanting to get home, still with another bus journey to do. Mick met me from the bus and we walked back to the boat by Sandford Lock. After sausage and mash with a glass or two of wine I had returned to 3mph, Tilly doing her best to keep my lap warm in front of the stove.

Cat cuddles, only because I was nearest to the stove!

2 trains, 3 buses, 1 read through, 7 potatoes more,2 big flats, 3 lots hanging baskets, 1 street sign, 1 nick, 1 kitchen unit, 1 ancient Pepper, 4 free bottles Crabbies, 2 bottles apple juice, 1 wet day, 1 newspaper, 1 purring Tilly, 1 cosy boat, 1 day off.

Dropping The Anchor. 21st to 26th October

Theale to Goring Lock to Abingdon to Sandford Lock

This week has been a busy one on board Oleanna.

Yellow line at Theale

Early Monday morning Mick helped me with my bags to Theale Station and on to Reading where I headed off to Panto world and he headed to Screwfix where he bought us a new thermostatic mixer tap for the shower. This was fitted and we now have hot, cold and intermediate water in the shower, no need to look like cooked lobsters anymore.

Tuesday he stocked up on provisions for the dash up the Thames. The levels were dropping and yellow boards were starting to out number the red ones. With friends positioned along the river Mick was getting first hand knowledge from Goring and Abingdon.

Wednesday morning, Mick and Tilly were joined by Paul Balmer who had volunteered to come and crew for Mick whilst I was away. The cruise to get to Oxford would involve two long days. With Paul in charge of the ‘Key of Power’ they passed through Theale Swing Bridge just before 9am holding up a good few cars. Then they dropped down through the remainder of the K&A locks reaching County Lock 106 (the final lock) a little before midday.

Paul working County Lock

We’ve been wondering for a while if the K&A has the highest number of locks on the canal network. Answers on a postcard if you know otherwise.

The traffic light button was pressed and they were on their way through the shopping centre and back onto EA waters. For a jaunt they went round the Jail Loop* in Reading and then down onto the Thames. Oleanna had now escaped the K&A canal.

Blake’s Lock down onto the Thames

The trip heading upstream was a touch harder due to the current which was stronger than we’d had earlier in the year. Lunch was had on the go, helping to tick the miles off quicker.

Paul and Mick coming into view at Goring

As Oleanna passed under Gatehampton Railway Bridge, Mick gave Carol on WB Still Rockin a call. A space was available in front of Still Rockin’ and Carol and George were at the ready to catch ropes and help to moor up. Despite the river now being off Red Boards at Goring the flow was strong, so the extra help was much appreciated.

All moored up. Mick, George and Paul. Photo stolen from Carol

Tea and biscuits on board Still Rockin* was enjoyed by all before Paul headed off to catch a train back home. 18.41 miles and 10 locks. Mick joined Carol and George for some food at The John Barleycorn in the evening. Over the years our bows have crossed and we’ve followed each others blogs, but we’ve never had time to properly meet*, so a couple of hours was spent chatting and getting to know each other.

Tilly getting to know George

The flow on the river had been deemed too strong for shore leave to be allowed for Tilly. So instead on Thursday morning she received visitors at home, Carol and George coming round for a cuppa and a neck tickle!

Oleanna caught foam from the flow over the weir all day, a weeks Thames licence was bought and Mick had a look around Goring* and then was invited over to Still Rockin for some food in the evening. A good day of rest before the next long day up the Thames.

Friday morning and Mick was waiting for Paul’s return with the covers rolled back early. With help from George they ascended Goring Lock and waved goodbye, Still Rockin will now be heading downstream to their winter mooring.

A pause for water above Cleeve Lock and they were on their way again. Lunch on the go, ticking off the miles against the current. The hope was to reach Oxford so that I could return to the boat on Saturday night and Paul would have ease of access to Oxford Station to get home.

Around 1:15pm however an alarm sounded! The engine had been working hard against the flow, the temperature gauge (inside!) was showing how hot the engine was, too hot!

Mick put the engine into tickover, but things didn’t improve. Paul headed to the bow and dropped the anchor*. He was able to hold onto the rope once it had dug in giving Mick the chance to check the engine out.

Below the deck boards things were hot and steamy. Water and coolant were over the engine bilge. Mick topped the system up with water, the engine started again, the alarm stopped sounding and the temperature gauge dropped to about 90, not 80 which is good, but good enough for them to carry on to Abingdon to find a mooring.

Caversham Lock

They pulled in below Abingdon Bridge, the engine still too hot, was it a faulty thermostat? In the end it was decided to call RCR out to have a look. Rusty arrived after about an hour. Once Mick had convinced him that we’ve been on tidal waters going against the flow for far longer without any problem in the past they discovered the thermostat to the skin tank was full of crud. It was cleaned, dropped into boiling water to see if it worked. It did, but Rusty wasn’t convinced it should go back in. Unless this wasn’t the full problem it would be okay to run Oleanna without the thermostat for a while.

Paul had headed home and by now it was too late for Tilly to go climbing trees. A discussion on the phone at gone 10pm (my work finish time) and Mick thought he’d carry on to Oxford in the morning on his own. With rain forecast he didn’t want to now get stranded on the river if the levels came back up.

Troublesome thermostat

Saturday morning I received a message saying he was on his way, the Lock Keeper at Abingdon had said that there should be no problem getting to Oxford. Well except the engine was still being a touch too hot for comfort.

At 12:30 I checked the river levels on line. The rain was having some effect. A couple of reaches above Oxford were increasing again and Osney to Godstow Lock had gone into the red! This is the last reach where you turn off to get onto the canal. it is narrow and there is quite a low bridge too.

One red board

I messaged Mick. I could hear the cogs going from Chippy. Maybe he’d turn back, but then Sandford Lock came into view, this lock closes in a couple of weeks, so would be good to get through it.

He pulled in and opened the lock, the first he’d have to do single handed. Luckily a narrowboat appeared behind and pulled into the lock with him, with spare crew now they operated the lock and left Mick to attend to ropes. They were going to continue on to Oxford and try to get off the river, but Mick didn’t want to risk it with a hot engine. A 24hr mooring above the lock on bolllards was free so he pulled in there to have a think.

Why now?! Why rain now?!!

Being on a lock cut the flow is next to none, so Tilly could go out. Only problem was the amount of rain! This actually put her off for sometime despite having been locked in for days. The weather eased a touch and this outside proved friendly. I decided to bring my new best friend home to meet Tom, but the excitement was obviously too much for it. Tom picked it up and took it outside for safe keeping. He says it’s getting too cold now, so the back doors will be closed when I’m out from now on.

Staying put was the only way forward, Rusty was called and he’ll come back out to flush through the system hopefully in the next couple of days At least if the river goes red again we have a few feet to rise before the river would top the banks here and we’re on bollards. We’re also through the closing lock, so once things improve Oleanna can carry on up to Oxford and off the river, following NB Kamili.

Thank you so much to Paul for his lock wheeling and to Carol and George for keeping Mick company and fed in Goring.

18 locks, 42.63 miles, 1 left turn, 1 thermostatic mixer, 1 cruddy thermostat, 2 days with Paul, 2 evenings with Carol and George, 1 frothy bow, 1 weeks licence, 1 missed evening with Irene and Andy, 1 soggy friend, 2 buses instead of 1 to get home, 5 * things that happened for the first time, that I missed out on due to Panto!

https://goo.gl/maps/BqCP1rnuMyLVyVEn6

Oleanna Has Left The K & A. 23rd October

Today Mick, Tilly and Oleanna with the help of Paul successfully moved off the Kennet and Avon Canal and turned upstream onto the Thames.

By mid afternoon all the red boards had gone from the Thames, but the stream was still strong. Thank you Carol and George (WB Still Rockin) for helping them to moor up. Sorry I wasn’t able to be there.

More on this matter and an update on Panto at the weekend.

Kingfisher Formation Flight. 20th October

Woolhampton Lock to Theale Swing Bridge

This morning I noticed that our window frames need a good clean out. We seem to have a crop growing in the fluffy surround. Maybe it’ll be something tasty!

Cress or something more substantial?

As we finished off breakfast yesterdays locking partners came past us, then as we were rolling back the covers they came past again, heading in the same direction as us. How nice of them to call for us to do Woolhampton Lock together.

The river joins from the right

They of course were experienced at this lock and the swing bridge that closely follows it, having been through it yesterday. Below the lock the River Kennet joins again at 90 degrees, this is soon followed by the swing bridge. The flow on the river can mean that heading downstream you won’t be able to stop to operate the bridge, so it is recommended to open the bridge before leaving the lock.

Power on
Both safe through the bridge

Crew went ahead to open up, from my side of the lock I couldn’t see that it was opened but the chap on the other side said it was as Mick left the lock. A bit of power was needed to get past the initial force of the current, then enough to keep steerage through the bridge where shortly afterwards the boats pulled in to pick us all up. We’d both safely made the transit.

The culvert work we passed has progressed into a lot of mud

At Aldermaston Lock we waited and helped bring a wide beam up before we both could descend. An off duty volunteer appeared and as there were a few boats he went off to get his windlass and life jacket from the car, a handy extra pair of hands.

That’s what they look like

NB Seraph went on ahead through the lift bridge whilst we turned to the services to fill with water, this will be the last opportunity before going onto the Thames. This meant I got to see what the underside of a lift bridge looks like from the road. At the services we disposed of all our waste and then reversed out winded and waited for the road to be clear to lift the bridge again. I was glad we’d waited as I got 27 cars compared to NB Seraph’s 19.

Hips

As Mick brought Oleanna into Padworth Lock I heard two Kingfishers, soon followed by the two of them darting past in electric blue unison, both banking at the same time to give a flash of orange as they turned just behind Mick’s head and vanished into the trees. It was like the Red Arrows, they just needed a few more mates to make a proper display team. Sadly no photos were possible.

Sticky sticky things

We carried on working our way down through the locks and swinging the bridges now on our own, each chamber needing to be filled. Every now and then the river would join again, one stretch taking us by surprise and speeding our way downstream.

Sulhampstead Swing Bridge and lock were to be my last on the Kennet and Avon. A shame the sun hadn’t been out for my last day of freedom before Panto starts. We pulled in at Theale Visitor Moorings, hoping that the Thames will have dropped enough for Mick to make progress upstream towards Oxford this coming week. Today more yellow boards, stream decreasing are showing, they are almost half way to Oxford now, just a few more needed.

Tilly had a good explore this afternoon as I packed, baked and booked train tickets. Mick spent much of the time searching the internet for a new shower thermostatic mixer bar. Ours has decided to keep a constant temperature, just about too hot! So tomorrow he’ll help me with my bags and then go and see if he can get a new one from Reading Screwfix to plumb in.

My bags are now packed and in the morning I’ll be heading off to Panto. Hopefully when you are reading this Mick will be closer to moving onto the Thames, my navigational and windlass duties will be passed over to Paul from Waterway Routes https://www.waterwayroutes.co.uk to help Mick get off the K&A.

Image result for puss in boots chipping norton

So until I get chance to post a postcard here, this will be the last post for a while. I’ll be keeping an eye on the Thames and other boaters blogs as I eat my cereal each morning before painting my arms off on Puss in Boots. See you all soon.

6 locks, 5.99 miles, 1 wind, 5 swing bridges, 1 lift bridge, 41 held up, 1 boat let through, 1 full water tank, 20 biscuits, 1 oat and chestnut loaf, 1 big bag packed, 1 rucksack, 1 bag of templates, 2 kingfishers, 1 boater signing off for a while.

https://goo.gl/maps/mUP9KZ6dXqHz11y4A

Monkeying Down. 19th October

Greenham Lock to Woolhampton Lock

Others were on the move before us this morning, so the lock was emptied before we could make use of it, well there was the Saturday newspaper to buy and a bar of chocolate!

A little after 11 we pushed off to the welcome sight of a boat coming up Greenham Lock. It took a little while for the penny to drop why they were taking so much time to fill the lock, of course we are now on the Newbury to Reading stretch where all the locks have a tendency to be fierce as they fill. We swapped with the boat and descended away from Newbury.

Bye Bye Newbury

At Ham Lock Mick made sure the stern rope wouldn’t fall and get wrapped round the prop and our transit through here was much quicker than on our way up!

Now that’s a good stick!

There are some dogs that are not content unless they have a stick to take with them on a walk. Well along the next stretch there was one such dog determined to get a good stick. He found one and tried his best to pull it out from the undergrowth. It came right across the towpath but no further, his owner persuaded him to leave it.

But this one is even better!

But the woofer wasn’t content and still needed a stick, a good stick. So he decided to pick his own, unsuccessfully!

Autumn colour may be slow round here to get going, but the leaves on the ground are starting to build up, it’ll soon be leaf kicking time!

That saves me a job

Our first swing bridge was being held open as we approached. It was hard to see the boats coming as they were round the bend taking their time. Two recently picked up hire boats being very careful leaving the lock so we managed to sneak through the bridge before they’d got anywhere near it, they spotted us in time so left the gates open too.

As I lifted the paddles at a lock two cheery people walked up to say hello. I recognised them straight away and had been hoping our paths might cross, Mick needed a touch of reminding. It was Ann-Marie and Dave from NB Legend. We’d passed their boat a few weeks back just below the summit on our way west, but I hadn’t spotted them on our way back.

Not the nest photo of Ann-Marie and Dave

We met Ann-Marie and Dave about three years ago on quite a fateful day. They are great friends of Alison and Laura who used to own NB Large Marge. There was time for a quick chat, they’d just moved their car and would be following on shortly by boat. Hopefully we’ll get chance to have a better chat as both boats will be waiting for the Thames to go down.

Filling Monkey Marsh up

Monkey Marsh Lock needed filling, so Mick came to lend a hand. The first of the turf sided locks they take an age to fill. I sat on the beam waiting for the last few inches to fill up, this takes about twice as much water as on a standard lock. Mick decided to give his beam a good old heave ho and surprisingly managed to hold it open a touch to help equalise the levels.

Heave Mick heave!

The moorings at Thatcham were still filled with C&RT boats, but two others had managed to sneak on the end, no space for us.

The widebeam reversing to where the narrowboat was

Approaching Midgham Lock we didn’t know what was happening. A wide beam was winding, were they heading for the lock? Were they planning to moor? Which ever there was a narrowboat in the way, one coming up on the lock, the other wanting to pull out from having lunch. Eventually it was obvious they were wanting to moor up so we pulled up and shared the lock with the narrowboat.

Diddy fungi on a lock beam

The crew were jolly companions on NB Seraph, helping to move a friends boat back up towards Napton, they were only out for the weekend. We shared a couple of locks and swung bridges together letting them continue without us when we found a space before the moorings at Woolhampton Lock.

We could get the bow in and tied on the last ring of the moorings, but to be anyway level the stern had to be quite a long way out. This would do us.

This would certainly do me! Trees, friendly cover as far as the eye could see, brilliant! I came home once, but got far too busy to come home when called the first time. She however caught me in a lull of excitement just before the lights went out.

A batch of biscuit dough made and in the fridge for fit-up biscuits, my sour dough starter out of the fridge warming up and a roast chicken in the oven. I could then sit down and sort out my receipts so far for Chippy.

Trying to push us out

We decided that sorting our list out everytime a boat filled the lock was pointless, so waited til after dark when boat movements would stop. The stove was lit and tonight for the first time this year we’d keep it in overnight as the temperature is set to drop to around 4 degrees.

8 locks, 5.94 miles, 4 swing bridges, 1 locking partner, 1 newspaper, 1 big stick, 1 batch of biscuits ready, 1 sponge ready, 1 roast chicken ready and in our tummies, 1 outside contender for a stamp, 2 more hours would have swung it, 1 batch receipts, 1 invoice, 1 cosy boat, 2 yellow decreasing boards!

https://goo.gl/maps/2E16NrA3HWQiepTU6

Moving! 18th October

Newbury to Greenham Lock

Hunting round for a printers to do copies of my plans I noticed a group of possibles behind the marina opposite. I chose one to aim for and set off with my tracing paper roll under my arm. After I’d crossed the canal the roll had to be tucked inside my fleece as it had started to rain. They were wrapped in a plastic bag, but all the same I didn’t want to end up with a wrinkly set.

Newbury Salmon ladder

In what seemed to be someones garage I opened the door and enquired if they did A2 copies. No came the answer from a chap hidden behind numerous toner cartridges, but there was a place in Aldermaston. That was no good to me, they’d be closed on Sunday when we might just pass through. They could however do me a couple of copies that covered the whole drawing, that would do me.

Modern printers are like old TV sets they take forever to warm up and get going. A test copy was done, which took forever to appear at the far end of the garage. This was fine and he set about doing my copies for me. once this machine got going it didn’t hang around! They charged a minimum of £7.50, was that okay? Just over 30p a sheet that was great, an A2 would have been around £2 a go!

Ambient! My lasagne the other day was ambient too

Now with a bigger roll I looked like I was hiding a shot gun under my fleece. I met Mick at Sainsburys where we stocked up on perishables. Back at the boat we had lunch and then pushed off.

Dante modelling a new woofer life jacket

Okay so we didn’t go far, just around the corner to wait for the marina service mooring to become free. Then we pushed over doing ‘an Andy’ to get the stern in against the strong wind. Newbury has no C&RT water points, but here you can top up your tank for £2, if you spend enough on other things it’s free. We managed 50 litres diesel and a bag of coal, so we got the H2O for free. I put a load of washing on to make the most of it.

When the new rulings come in for Diesel the chap said they wouldn’t sell to passing boats anymore. How many other places will go the same way?

Impatient locals

This all took time and it was nearly four by the time our tank gave it’s boom to tell us it was full. So we pushed back over, mooring just before Greenham Lock. All was good, with empty and full tanks as required and a clean pooh bucket, happy boaters.

Whilst Tilly explored this stretch of narrow land between canal and river I drew up a template for the pattern in the Boozer for Panto. This recurs on several bits of set, so being able to draw it out quickly will be a great help. With this then cut out I could start putting things away.

Work corner

For months now the corner of our dinette has had a model sitting in it along with boxes of paints and my model making box. It is normally tied away better than in this photo. I’d hoped that the Production Manager for Vienna might manage to pick the model up this weekend, but we are too far off his route, so it will be sent by courier instead, we’ll have to put up with it for a while longer. Everything else though could be packed away again and stowed under the seating until next year.

Mine!
It’s all mine!

Tilly woke up just as I was putting the cushions back and made sure that she claimed them by rolling all over the place and running along the dinette sideways, those poor cushions!

Our forth and final meal from the left over pork this evening. Left over stew, just about anything that I could find went into this in my cast iron pot which was left to bubble for a couple of hours. With a large jacket potato each it was very tasty. The joint may have been large, but it did us five main meals so that’s just over £1 a go. Not bad.

A photo for Frank

Earlier than advertised the Michaelmas Fair firework display started. We tried looking out of the hatch but we were too far away with too many trees in the way to see anything. Oh well, we just listened instead.

0 locks, 0.24 miles, 52.4 litres, 1 bag Glow, 1 full tank water, 1 empty wee tank, 1 clean pooh bucket, 24 copies, 1 chicken, A1 template, 1 corner reclaimed, 1 set loaded ready for Monday, 3 yellow boards, the rest still red, 2 free days hooray!

https://goo.gl/maps/QFzkg7To1an5yLJp8

Busy Busy Busy. 17th October

Newbury

When you wake up, turn your phone on and before you think it’s even woken up fully you get a text message with a question about panto, you just know it’s going to be one of those days!

Luckily the first email I got was from the actor/writer for A Regular Little Houdini who had just worked his way through the model photos I’d sent out yesterday, he was thrilled, so was Josh the Director when I heard from him later in the day.

Then the Panto emails started, questions left, right and centre. Everyone is gearing up to the start of rehearsals next week. Builders wanting to know if they should use prime mixed with colour. Will we need a pay phone in the telephone box? Will a recoiling hoover cable work? Could they have a hanging plot? My plans don’t quite match plans the technicians now have. Which are correct? Mine have to be. How many 1950’s mics have we got? Black or silver stands? Has portal 3 gone? The repercussions of that. They just kept coming all day!

Pub sign

I enlarged writing for signs on the printer and just had one more thing to do when the black cartridge ran out. I changed the cartridge but somehow it didn’t prime itself. Now the printer thinks it is full of black, but can’t print with it. I stopped what I was doing and handed it over to the technical department to fix. That last job could wait.

The designer of Houdini needed to be shot. Drawing up a cross section can be a challenge at times, one I somehow usually sadistically enjoy. But the bridge structure being set at an angle on the stage and then leaning in both other planes! Blimey!! Okay, so doing drawings on a computer would make this so much easier, but hardly a challenge. The sense of achievement when I finally finished it was great.

I just need a shoe horn now to be able to fit the bridge into the actors camper van to bring it back to England after the run in Vienna.

The technical department tried and tried to get the printer working. The final thing was to leave it off overnight and see if it would sort itself out. Fingers crossed as printer scanners are few and far between now. * Edited Looking at the spec of printers Mick found that most manufacturers of printers don’t boast about scanning as they used to! So if needs be we’ll be buying a new one.

Someone’s hard at work!

Tilly came and went. Even though her time outside here has been short, she is bored of this outside. So much so that she constantly got in the way today, being told off for walking on things she shouldn’t and leaving paw prints on drawings! She then gave up and retired to her shelf. When do cats stop growing? Will she be needing an extension soon.

The pork still keeps giving. Tonight we had roast pork and potato pizza. I’d tried making the sour dough base leaving it to do it’s stuff for 8 hours instead of 24. The verdict was either my sour dough starter has died or it simply wasn’t long enough. The base was a touch chewy!

The photo makes it look a touch too done, but it wasn’t

The Thames is still out of bounds, but looking at the levels on the C&RT site the Kennet should be fine. Hopefully tomorrow we’ll be able to do a bit of boating.

0 locks, 0 miles, 2 days not stepping off the boat, 4 yellow boards the rest red, 1 Still Rockin stuck at Goring, 1 Kamili stuck at Abingdon, 8:20 first question, 2 many questions to get my work done, 1 annoying cat, 3 pawprints that shouldn’t be there, 1 broken printer, 1 expanding camper required, 3rd pork meal, pizza not so good.