Blimey the end of February already! Spring is certainly springing. Here in Scarborough the sun has been out for a few days and flowers are blooming in the woods and along the cliffs to the sea.
With the announcement last Monday regarding the roadmap out of lockdown the world feels a lot more positive. On Monday and Tuesday we allowed ourselves to get a bit boating giddy, planning our escape from Goole. Mick even put our first destination into canal plan to work out how many hours cruising we’d need to do a day.
One escape route would mean we’d be needing to doing just over 2 hours a day, the other just under, although we’d most probably end up doing several days worth in one as there would be nowhere to moor up on the river sections. But this is all easy and would have us reaching our destination towards the end of June. All very exciting, we just have to hope that ABP let us out through the lock onto the Ouse or that the repair on the Aire and Calder is far easier than all the engineering suggests.
We are going to keep our first destination this year a surprise for you until we are on our way. But on Monday and Tuesday this week things started to slot into place quite nicely, we just have to hope that the Governments roadmap, (without dates!) follows the dates Mr Johnson mentioned. We will continue to abide by the rules, just hope everyone else does their part. There is also a long list of jobs to do here along with lots of work.
According to various sources regarding the Aire and Calder Breach the piling forming the cofferdam was finished five days early. The area is virtually dry and decisions on a permanent repair would be made by the end of this week. Equipment has been heading to site all week and initial thoughts are that there is no problem with the culvert under the canal.
Repairs continue on the Calder Hebble at the Figure of Three Locks near Dewsbury. This was just about totally wiped out in floods at the beginning of last year. The repairs have taken into account the possibility of future flooding, the towpath has been reinforced and the spillway should now be capable of carrying flood water away. I’ve come across a couple of videos of the works.
https://fb.watch/3X9yJx9k2o/
This was a route we’d been planning on taking last year as I had a show that would start in Huddersfield and then tour to York. The gap between performances allowed enough time for us to travel between the two theatres, however the damage caused here altered our plans, then the show was cancelled.
Cancelled isn’t really the right word, as this week Dark Horse have been in touch and are wanting to bring the show out of hibernation. It will need designing in the next few months and some costume work before the summer even though it won’t be performed until early next year. Another reason for hoping the roadmap out of lockdown keeps going in the right direction.
Reports from Viking Marina in Goole suggest levels are coming back up. Mid week the caisson gates were seen open, but the metal stop planks were still in place with the pumps running full pelt around them. This weekend we’ve had reports from Lisa and Al that the metal stop planks may now have been removed. With the cofferdam now stopping any more water from escaping I suspect the caisson gates and stop planks are no longer required. Opening them up here means that as the locks in Goole docks are used there will now be another four miles worth of water to draw from. The navigation still remains closed, the red lights still showing at the caisson.
0 locks, 0 miles, 3, 1 set of gates, 1 lot of stop planks, 13 guns, 27 houses, 1 white card approved, 1 white card to be costed, 1 commission finished, 1 plan coming together, 1 roadmap, 0 dates, 1 cat going solo more, 1 new show, 3 more months photoless, 1 long list of jobs, 2 giddy boaters, 1 neighbours cat with cream paws, 1 smug boat cat.