Patience is a virtue, it’s also getting VERY boring now!
Taking the weight off whilst the IT department sort out a problem
Last Sunday we waved goodbye to the Calendar Girls who have been staying with us. Almost as soon as Fenella had pulled away in a car Mick and I got busy moving ourselves from my workroom and The Shed into the back bedroom. This is now my third bedroom in three weeks and Mick’s forth! I had to promise Tilly that this was the last time we’d be moving the inside until we moved back to the inside where the outside moves. We were now left with one lodger, Alex who had headed home for the weekend.
Monday the cleaners arrived to give one side of the house a spruce up. No news or photos from Redhill.
Camenbert and smoked salmon quiche to help use up pastry
Tuesday, a message was sent to Tom to see how things were going. A while ago he’d said he was aiming to be finished this week, we’d taken that to mean the end of the week at the earliest. I’d done a tot up of the jobs still to be done and reckoned it would actually end up being next week.
A message came through from Tom. Next job would be to prepare the grabrail for the red, he’d realised the black he’d been sent was actually gloss and we’d asked for matt, so he was waiting for that to be delivered. The joiner was going to get back to him on timings for his jobs, he’d be in touch later with a better idea. Definitely not this week then.
Mick, some lady and Paul
The day, however, improved with a visitor all the way from Bristol bearing boaty bootie! Paul Balmer from Waterway Routes had decided to have a day out to deliver various boaty items he no longer needs as he has sold his boat NB Waterways Routes sometime ago now. (Note: he has only sold his boat not the Waterway Routes maps business.) Last weeks blog post had landed at just the right time as Paul had spare blue ropes which needed a new home. So early in the morning he’d packed up a bag and set forth to venture northwards. We popped down to the station to meet his train, decanted his boaters bootie into a couple of bags and then walked down to the Cats Pyjamas, we’ve never been to this cafe before, but it is close to southbay so at least Paul would get to see the sea before he headed back southwards.
After inspection by Tilly, the boat hook was put to use to fish things out of the high cupboard in the kitchen. Sadly the custard container was empty.
Thank you very much Paul for the goodies
A very nice hour and a half was spent hearing about his recent trip on the Mon and Brec, us filling him in on the boat repaint and general boaty conversation, all accompanied by butties and cuppas. Then it was time to wave goodbye again, hopefully our paths will cross should we be able to cruise anywhere as he and Christine are itching to help work locks. They may be able to help Mick should we manage to get south for me to go to Panto.
Abandond buckets and spades
Wednesday. A catch up message from Tom. Tomorrow they’d be fitting the windows and then putting black on the gunwales. Other bits would go back on Oleanna, but the red wouldn’t happen until next week.
School holidays will now add to delays, there’s a family festival to attend next week so only a few things will get done on Oleanna. So he’s now looking at the week after for completion. Another disappointing day really. We checked to see how the solar was going, Matt is going away for two weeks from next week. The roof gland had been fitted, where the panels are going marked out and the panels are in transit. Patience!
First thermal break window frame going in
Thursday we got a photo of one of the new windows having gone in, our picture window in the bedroom. The brown paper having been removed from that section. They apparently were going in well. The frames inside will require some joinery. They should slot in around the frames, but then will need wooden plugs putting in over their screws.
Moody skies over Scarbados
Friday, the plan was for Oleanna’s doors to go back on today along with mushroom vents. However, Whatsap was quite quiet.
In the evening we headed to the SJT to watch Handbagged, a political satire which imagines what happened behind the Palace doors when Margaret Thatcher and the Queen met for their weekly meetings over eleven years. Alex our current lodger is playing the older Margaret Thatcher in the play. We’ve been hearing how things have been progressing during the production week and tonight was the first preview. We enjoyed the show, it’s amusing, very different from Calendar Girls and needs a few more shows to bed itself in, but as I say it was the first preview.
Saturday, we decided to unpack some clothes, it’s fine living out of bags for a couple of weeks, but not really for a month. We’ve welcomed in another lodger, Anna who is an Assistant Stage Manager for the new Ayckbourn which starts rehearsals on Monday.
We’ve installed a makeshift barrier on the landing where the two houses connect. This is because next week we will have two visitors, Angie and Polly, Polly is a woofer! So we’re giving Tilly some time to acclimatise, or do calculations to be able to climb it! We’re hoping the off cut of kitchen worktop is not scalable!
Happy Yorkshire Day!
0 locks, 0 miles, 1 date moved again, 2 boaters moving around the house again, 2 lodgers out, 1 new one in, 1 feline/canine barrier built, 1 long distance visitor, 4 x 9m ropes, 1 escape ladder, 1 extendable boat hook, 1 pair pond gloves, 1 set of windows installed, 2 solar panels on their way, but not fitted, 1 family festival, 2 weeks holiday, 1 veg box, 1 GF focaccia, 2 Maggies, 2 Liz’s, 8 diddy quiches, 1 CD to pick up, £? is it Duncan?
Living on land now involves creaky staircases, encouraging Tilly to sleep in a different room, making a list of things that need to be done before leaving Scarborough, starting to tick them off, unpacking boxes to find that thing or bag of sugar you didn’t think you’d need again until returned to the boat. It’s fine, but I’m glad we’re not having to do it for too long though. This weekend we may well have eight people in the house as one company of actors perform their last shows in Scarborough and have family to stay, good job we’ve got four toilets!
Anyhow, Monday morning we hired a van again, cheaper than a car for the day, sadly they didn’t give us a car, but the van did have aircon, so that was a bonus. Should we take a load of things down to the boat? We decided not to. When we do get to move back on board, I suspect even though the boat will have been cleaned through (we hope) there will be places that didn’t get done. All the cupboards that have crockery in will need a clean and tidy etc. Anything that we take down to the boat and put in the stores will need to be onboard before Oleanna goes in the water, so we’ve already got more than enough to move around as we get ourselves sorted. When we do move the next load can stay in the van until we’re ready for it.
Choo Choo
At the paint shed our neighbouring boat had been prepped, blacked, and had it’s high build coats sprayed, the yellow layer quite obvious but nowhere near as yellow as Nb Lillyanne was. Also sat out the front of the workshop were four little engines for a fairground ride. They also had a coat of yellow highbuild waiting to be sanded back.
After spotting things other than Oleanna, our attention was grabbed by her bow flash.
Bow
Now here I now have a dilemma. Do I reveal Oleannas finished bits as they happen, or give you ambiguous photos for a while to then do a big reveal when she’s out of the paintshed? Hmm, not sure. Maybe we’ll stay ambiguous for a while!
Well her bow flash is wonderful, a lovely Mackintosh inspired nod to Oleanna’s previous livery. Claire has done a lovely job. The red sings on the dark blue, we’re very happy.
The sign writing at the stern is lovely, but at the moment under the lights in the shed and no natural daylight hitting her cabin side it looks a touch dark, but this may also be just the way colours sit against each other.
Have to say we’d hoped to see another colour sprayed, but other than the bow she looked pretty much as when Mick had been down last week. I’m aware of drying/curing times of paint and I suspect they also had to fit in with times Claire could work, plus having another boat to work on whilst the paint goes off on Oleanna.
Lots of colours of tape
Tom was busy marking out the long coachlines along the cabin side. Purple, blue and yellow tape were being applied in straight lines. When a cabin side isn’t actually just straight, it curves and kicks up at the rear, you can’t just do a few measurements and join the dots. Sometimes things need adjusting to look right.
Brown paper being added to protect the cream
Did we want the shadow to cut off at an angle, as it should or be square as it had been on her original paint job? We’re all for improvements so chose an angled shadow which would match the sign writing. As the day went on more lines of tape were added for both the blue and red lines on the cabin sides. Then once everything was in place a layer of brown paper was added over the sides to protect it from over spray.
Doors, hatches, and locker lids ready to be painted
Normally when spraying the main cabin colour, Tom would work his way round the sides of the boat and roof. Then have a little break as the paint goes off before following round with a second coat on all sides. However, the high temperatures on the day he was spraying the cream meant that by the time he’d worked his way round both cabin sides back to where he’d started, it was ready for it’s second coat, no time to spray the roof as any overspray would be noticable. So it had been left for another time. By the end of the day the roof was being sanded back ready for the top coats.
Lunchtime view
Lunch at the cafe, a cheese and salad cob and a tuna mayo sandwich with a cuppa each, sat watching the occasional boat on the River Soar. Maybe today was the day NB Bonjour would pass the marina? Maybe they’d already passed this morning? Another near miss with a blogging boat.
New bow and stern protection
We loitered, trying to stay out of the sunshine, waiting to meet with Matt regarding our new solar panels. Our new bow and stern fenders had arrived, now our thoughts turned to new ropes. Oleanna has so far had two sets, we soon replaced the original thin weedy lines she came with, 16mm much better for my reduced grip bought from Tradline in Braunston. These showed their age a bit quicker than we’d expected and we replaced them 2 years later, also with ropes from Tradline. With a new paint job we’d like her to look smart and her current lines are now in need of replacement, not bad after about 7 years. Not being near a chandlery means we may have to purchase without being able to feel them. A choice, should we go for multifilament or polyester? A look back on the blog to see what we’d had previously, this only gave me the lengths not the type of rope. I think our current one’s float.
CRT number with the logo from when she was launched
Matt arrived and chat started about the size of solar panels for Oleanna. We’d originally wanted to up how much solar we can get, but panels need to fit on the roof between mushroom vents. The location of the old ones would be best then we’d not need to either rewire the boat or have numerous wires across the roof. Two manufacturers were looked at, one panel a touch tight, the other would only give us a bit more power. Matt would be in touch tomorrow with a quote. Time is now pressing as he and his colleague go on holiday soon for two weeks, we’d like them fitted before then, plus Tom needs the panels so he knows where to anti-slip the roof, avoiding where the panels will be stuck.
Tuesday. Matt got in touch. The panels we’d opted for were out of stock, but he’d found some others, 290 watts each, which would give us a bit more power and would fit the original spaces. A quote was sent through, we checked it over and approved it. Hopefully now the panels will arrive this week so as not to hold anything up.
Later in the afternoon photos came through from Tom. The roof had been sprayed plus the doors that are going cream along with all the mushroom vents. The mushrooms were originally chrome, in the hope that they’d stay shiny and not require polishing. However within a few months they started to tarnish and we could never get them to be shiny, so just gave up. Hopefully now being painted they will stay looking good far far longer. This now leaves red and blue to be done, followed by the gunnels going matt black, anti-slip, and the base plate getting sprayed, which apparently is the last thing to happen almost as she is wheeled out of the paint shed. However there is now a day to wait before they can cover up the roof with paper to protect it from over spray.
Mushroom coloured mushrooms
Wednesday. An expensive day! Claire sent through photos and an invoice for her work. This was soon followed by Tom asking for his next payment. He also sent ideas for the T studs for the bow. Two options which were okay, but Mick found one that would have a similar feel to the T studs already on Oleanna. The new ones however are stainless steel, so no painting required and will bolt on to the top of the gunnel, meaning should they ever need to be removed it would be an easier job. I doubt we’d ever remove them as they will be useful for river locks and give us an extra option when mooring at oddly spaced rings.
By the end of the day Oleanna was just about ready for the red to go on and money had been moved across from accounts leaving our pockets emptier than they were at the start of the day.
Thursday. Tom seemed to have changed his mind as to which colour should follow. Photos started to come through mid-morning. The mushroom vents were now very much mushroom coloured and waiting to go back on the roof. Then in the afternoon photos of all the doors and hatches came through all shiny and blue. Maybe Tom changed his mind about the red as things like the gas locker lid hinges and dollies will be going red and it’s far easier to spray a big area and then mask out the for the finer details.
In Pantoland I had a go at scanning the cloths. Laptops have changed since I got good results last year and my old laptop has been defaulted. The scans weren’t going quite as large as I need and try as I did, I really couldn’t remember how I’d persuaded the scanner to go large last year. Of course the IT department was busy sitting around in Derby Hospital at the time so he has no recollection as to what I did either! Work in progress. I turned my attention to some visuals for a props maker instead.
Design Assistant Tilly hard at work
Conversations have turned to our cruising plans. Firstly will we be able to go anywhere due to low water levels, CRT are filling up our inbox with lock flight restrictions. Should we move Oleanna back northwards where levels may be better? Or should we carry on with our hoped for destination and a canal we’ve not visited for quite some time?
We have two routes southwards we can choose from, both had restrictions imposed on them last summer. Both would give us somewhere an hours bus ride from Chippy for panto. Stoppage lists were studied, there’s still a few weeks before these are confirmed so they could still change. We also have to take into consideration whether Mick should be single handing this winter or not, this could well steer our cruising plans.
Friday morning, more photos from Tom. Lots more blue had been sprayed, the bow and stern and the cabin coach lines. Next will come the red. We wait for the next photos to arrive, nothing had arrived by the end of the day, so that is likely to happen on Monday now as the blue needs a day to go off before it can be masked out.
0 locks, 0 miles, 1 van hired, 1 bow looking stunning, 2 panels on order, 9 doors and hatches, 4 choochoos, 3 coloured masking, 150 ft brown paper, 1 imp, 8 mushroom mushrooms, 1 visit to Sir and Lady A, 1 solicitor, 2 Eat Me burgers, 7 scans not big enough, 2 alternative plans, 1 Blackbird back to the nest? 1 assistant working hard, only 2 more shows of Calendar Girls, 2 boaters now at least 9 weeks behind the original plan for this year.
We’d been in touch with Tom last week hoping that we’d be able to take a load of things down to the boat, a hire van was booked and first thing Monday morning Mick headed off on a bus to pick up a hire van. We then spent an hour loading it with definite boaty items that had been sat in the boat cupboard or on our dining room floor awaiting their return.
Finishing things off
Unfortunately I had a panto deadline looming so needed to spend the day taking photos of my model box, checking over drawings and making a list of paints I’ll be needing in a few months time. Mick headed off on his own hoping to arrive before Claire the sign writer had finished for the day. His journey down wasn’t too bad and he arrived around lunchtime. Claire was busy giving Oleanna her name back.
Claire busy giving Oleanna her name back
Photos came through from Mick whilst I worked away back in Scarborough. Oleanna’s newly painted cream cabin sides had been marked up with tape where her lines and shadows will be, Tom will mask these out and spray them another day. But their positioning was important to get her name in the right place. My emailed instructions to Claire had requested the shadow on the letters to be towards the stern of Oleanna on both sides. Usually the shadow on lettering is either to the left or the right and is a constant side no matter which side of the boat you are on. However, because I’m me, I want the shadows to be constant as if the sun was in front of Oleanna. When originally sign written nobody had passed this information on to Andy Russell who ended up wiping off the paint thankfully before it had dried. Mick checked and the shadows were in the right place today.
Tom was found elsewhere working on hatch doors. These are taken off the boat and popped in a different room for spraying. Colours were checked for the rear sliding hatch. On my original model this had been red, but it had ended up being painted blue in Sheffield. Today the decision was should it be red, blue or cream? Red would only fade in time. Cream would be boring, so back to blue it would go. Only downside is that it will get hot in the sun.
A top shelf was cleared in the paint shed stores so that our possessions could be unloaded. Mick had taken some dust sheets to lay over them as even in a separate room from the paint shed they may well get dusty. By the end of the day Tom sent a photo of everything covered up, all our bedding ready to go back on board. Mick was back in Scarborough at a reasonable time. Our first load of possessions now back close to the boat, but most importantly, not in the house!
Scarborough Station
Tuesday was a very early start. Mick gave me a lift to catch the 5:44 train to York, model box and technical drawings packed away in my blue Ikea bag. I had time to scour the shelves of Sainsburys at York Station for things I could eat for breakfast/lunch. Some fruit, a nut bar and a quinoa salad.
Next train was direct to Banbury, I was so very glad I had a seat booked all the way, close to the luggage rack and didn’t have to stand like SO many others did. A lift from Helen who worked on props last year over to Chippy where I set up the model, requested a cuppa and was ready for our meeting at 11:30.
Chippy Theatre and Holly Hocks
Helen (Props), Paul (Technician), John (Artistic Director), Caroline (Director) and Gemma (Production Manager were all in attendance. On Monday Gemma and I had met with Jamie the set builder and talked through the builds, we already knew the design was over budget. The build cost came in from Jamie, we’d need to prune some items and simplify others to get the price down. I never like doing this without the Director present as they may have different ideas as to what is really important, especially when a new section of script hadn’t come my way yet.
A good meeting, a few items cut, some discussed to be simpler and thankfully Caroline had the same opinion as me on other cuts that shouldn’t happen. Stocks of paint were checked. Props and staffing were chatted about, quite a full on few hours.
The theatre was full of small people doing a dress rehearsal for an end of term show. Astronauts, pumpkins, superheros and slices of cake amongst others were rounded up through the narrow corridors of backstage, if you wanted to reach front of house it was far Far simpler to walk around the outside of the building.
The River Ouse
A lift back to the station where thankfully I had another reserved seat all the way to York, avoiding having to stand most of the way as so many others had to! Three quarters of an hour wait in York meant I could walk to Scarborough Bridge to count the number of boats on the River Ouse moored at Museum Gardens. The Minster was busy donging, celebrating it being Tuesday, the sixth since Mick and I became Civil Partners. Back to Scarborough for a well earned glass of wine before bed.
Early Wednesday morning we listened to two pixies delivering camp beds to our front door. The rest of the day was spent packing more of our possessions away in the house. The boat cupboard that had almost been emptied on Monday, now became groaningly full. Tilly got totally confused as wardrobes were emptied, spices and herbs packed into boxes, everything rationalised, our existence in the house moved into the room we call the Shed and the boat cupboard. Thursday followed with a visit from our cleaners who made our bedroom look very inviting for our next lodger, Tilly inspected everything before extra covers were added to protect the freshly made bed. Mick and I would now be sleeping in the Shed and my work room. Tilly persevered sitting on our bed overnight, not quite able to relax as for her our move back to Oleanna was imminent, to us it’s still at least a couple of weeks away.
I spent time working on alternative versions for one scene of panto, drawing them up and sending them on to Jamie to price up. A visit to Oleanna was hoped for, but during Friday they would be spraying paint, so it wouldn’t be a good day to visit. Instead we arranged to go down next Monday, hoping we’d be able to catch Claire finishing off the bow. No photos came through from Tom, maybe not much had changed, maybe they were masking things off.
On Saturday and Sunday Scarborough was celebrating Seafest and 400 years of being the first seaside resort. Seafest (an annual event) is normally held on one of the piers, but major works are happening there this year, so celebrations were held at The Spa instead. The community stage was in the Suncourt and the main acts/bands were inside in the Grand Hall. The Ocean Room was taken over with stalls from historical groups and Animated Objects.
A cardboard recreation of the Pump Room had been made, people were invited to colour in paper tiles to help decorate it. Lee gave a very good talk on the history of the spa waters in Scarborough and how their discovery led to the town becoming a tourist destination. Games stickers and a LOT of old work colleagues who turn up to work for Animated Objects at such big events. Lovely to see everyone, hear some of them sing and then enjoy some chilled medication before heading home (well the words on the steps told us we had too!).
Seafest fireworks viewed from the Esplinade
Sunday evening Alex, our third lodger arrived. Alex was one of our original lodgers back in 2021 when we first put our names on the theatre digs list, it’s lovely to have her back and we look forward to her performance as Margaret Thatcher in Handbagged at the SJT in a couple of weeks time.
0 locks, 0 miles, 1 hire van filled, 1 visit, 1 boat with her name again, 1 confused cat, 1 full cupboard, 1 empty wardrobe, 1 pantry reduced, 1 Tom at the very top, 1 She squashed in the Shed, 1 Tilly uncertain where to go! 2 days of Seafest, 1 firework display, 6 in Raven, 20 ? Manhattan Voices, 100kg Lego Spa, 2 many old friends to mention, 1 CD required Duncan with the song about traveling to see someone a long way away please!
We were busy returning from the Dales on Monday, so having no news about Oleanna didn’t bother us.
But when Tuesday arrived we started to jump to look at our phones as photos started to come through from Tom.
All back to bare steel and everything else masked off
All the prep work was complete. She’d been stripped, filled where needed. Anodes, doors, cratch etc were all masked out, they were ready to start spraying on the blacking.
We couldn’t spot the new T studs we’d asked for on the bow, Tom reminded us that these were to be stainless steel and they would be bolted on later. New vents in the gas locker had been cut above the rubbing strake above the old ones. Hannah or BSS examiner said that she’d be happy with this location and that the old lower one (that always sits under water) should be left.
New vent for gas locker
Oleanna was now ready to go black, all over! Yes cabin sides as well as below the gunnels. This is a 2 pack paint which is anti corrosive so should help protect the cabin sides. The base plate would also be sprayed. Oleanna sat on jacks so that she could be raised high enough for them to get underneath on a trolley to spray her bottom.
Three to four hours later she’d turned black.
Wednesday morning Oleanna’s bottom got skirted off with brown paper. We wonder how much brown paper they get through a year?
Areas that obviously needed filling got some attention and then were sanded back. The bedroom porthole being the main area needing this.
Then followed a coat of high build 2 pack, turning her grey. You can see this happening in the photo below. A chap stood in a protective suit with mask providing the wearer with fresh air as they worked their way along the cabin sides.
The bow lockers and well deck got coated too, the stern will have been done too.
Across the way from Oleanna sits the next boat, shot blasted ready to have the remaining paint stripped back around the windows. It’s covered in plastic whilst Oleanna is sprayed.
Thursday we had no photos sent. This was a day when a photo would have been one for the archive as the next coat of high build would be yellow! I wonder how yellow Oleanna went? I doubt she will have matched NB Lillyanne’s Rapeseed Yellow cabin sides.
Why yellow? Well this means that as they sand her back to get a smooth surface for the top coats they can see where they need to stop sanding when they reach grey.
Friday. It had been really good to see the progress being made this week, Oleanna changing colour just about every day. One thing we really needed to know though was when we’d be able to move on board and would Tilly be able to come with us?
Messages went back and forth between Tom and ourselves. We were pretty certain that we’d said when we would become homeless at the house, Tom had remembered a different date! Tilly living on board would add an extra complication to the final stages as we’d want her to be kept inside the boat whilst people would be coming and going all day long, putting Oleanna back together again. I’d also been thinking it would not be fair on Tilly to live in the paint shed, her preferred home the boat, surrounded by odd noises and fumes. She’s quite a jumpy cat normally and turning her home into a scary place would not be good. Tom was fine about us moving on board, but we’d have to find a different solution for Tilly.
Home improvements for panto
We needed to put our thinking caps on. She could go to a cattery. A stressful journey there, then to the boat and we don’t have a completion date for the repaint and the other jobs we’ve asked for. If Tilly could stay in the house that would be the preferred choice. However the house is about to become really quite full and if we’re not about the house would also be a scary place.
Not quite, but nearly finished
Should we be living in the paint shed whilst major works were being carried out? This was another question. Dust, fumes would not be good for us either. Vacating Oleanna every day would be helped if we had a car, but we don’t have one. Mick checked out local to us hotels. Our nearest option (not a choice!) but out of interest was a few hundred pounds more than the Grand which comes with a sea view!
One of us could sleep in the room we call the shed, the other stay with friends. This would mean Tilly at least would have a familiar face in the house. But if that was the case, maybe both of us could stay, we’d just need to find something to sleep on in my work room. As we deliberated solutions two more photos arrived. Oleanna had turned cream! This will be her final colour to hopefully help keep us a little cooler in the summer months than we used to be when she was dark blue.
We checked when Clair is booked to do the sign writing, that will be early next week. With the cream cabin sides done this can go ahead, there will still be the red and blue lines and grab rail to add along with the bow and stern going blue. We’d asked if Clair could paint Oleanna’s CRT number back on the grabrail and do the new bow flash, but I suspect these areas won’t be ready for her.
No quote as yet for our new solar panels from Matt, we hope to hear from him next week.
By the end of the day we’d contacted our next lodger and explained our situation and our solution. Poor Alex has been having to move each week she’s been in Scarborough so far and at the end of next week she’s due to move in with us. There will be a bottle neck in the house for a week, one slightly confused cat not knowing who’s toes to snuggling up to in the night, or why normal doors are closed to her, but we believe this will be the least stressful situation for all concerned. We just need to find something to sleep on and move a lot of our possessions down to Oleanna to make room for a fifth person in the house. At least the house will only be chock a block for a week, then we can spread out a bit again.
0 locks, 0 miles, 4 colours, 120 ft plus of brown paper, 2 boaters thinking out of the boat, 2 boaters thinking about moving without moving, 1 cat oblivious, 1 panto model just about completed, 15 sheets of drawings to update, 1 little Frank faux pas, 1 cool seaside town 2 be stayed in for a while longer, 0 surprises this week.
We’d hoped to be able to head down to see Oleanna on Monday, but we also wanted to coincide with Matt from Onboard Solar and he was busy. I worked the whole day model making for panto which meant I could afford to have a day off on Tuesday to accompany Mick to Redhill.
The temperatures in Scarborough were to remain below 30°C on Tuesday, well, they’ve managed to stay pretty low all week, but Redhill was in the Amber zone, so we opted to hire a car with air conditioning. I made sure I had plenty of knitting to keep me occupied in the car, casting on a second sock just in case I ran out.
The journey down was pretty pleasant, the temperature gradually rising the further south we ventured. An eye was kept out for the brief glimpse of the River Trent from the M1, just in case NB Alchemy had headed that way, but no boat was spotted, green or otherwise. Nb Alchemy had actually set off pretty early to avoid the heat of the day and headed for the River Soar, they were most probably already moored up in Zouch for the day the time we arrived at the marina a little before midday.
There she is
The roller shutters were rolled part way up at the front and back of the paint shed, almost a breeze rolling through past the two boats. One chap was busy sanding away the gunnels of the boat next to Oleanna, the blue paint on its bow a mirror finish. Not much left to do on this boat which is headed to AquaNarrowboats for fit out.
Stood in front of Oleanna we could now see where the blasting had happened and where had been left. The front bulkhead was just about untouched, which had been deceiving in the photos we’d had last week, but stood here in front of her it was now obvious why it had been left, the wooden front doors and hooks would need removing first.
Big rusty patch where the wooden rest for the top of the cratch normally sits
Tom was busy with a scabbler stripping the paint off around Oleanna’s starboard side gally window, the last of the paintwork to be stripped on the cabin sides and gunnels. Apparently under the top coats Oleanna had what I think Tom called a filling coat which was taking time to grind off to get back to the steel. This may have contributed to some of the rust patches we’d been getting as once chipped, water could easily get behind it and make it bubble up, the bond between it and the steel not so good.
Dribblyness
A drain from the galley was dribbling, possibly where a damp trap had been emptied down the kitchen sink when she’d been stood out on the hard. Now Oleanna sits at a different angle, so what was left in the sinnk bend is able to leak out. Tom will put a bung in this and clean up before she is blacked.
Attention was given to the porthole above our crossbed. When Oleanna’s layout was designed we wanted a porthole behind our heads and a picture window at the foot of the bed, so we’d have a nice view to drink our morning cuppa’s infront of. Once the plans had been handed over to Finesse, we remembered that we’d wanted to have the stove chimney on the port side. A quick solution was to flip my tracing paper drawings over and rescan them so that the apertures could be cut in the correct places on the other cabin sides.
You can see the rectangle of what was a hopper window!
In early years I’d often stood looking down at Oleanna in a lock, her (then) shiny paintwork slightly rippling in the sunlight around the bedroom porthole. Then after she’d been sat on the bottom in Goole after the Aire and Calder breach, the sun had started to bleach the paintwork, revealing the reason for the ripples. Where the porthole was had originally had the picture window cut in it. Once the mistake had been spotted the hole was filled back in with steel. Thank goodness it was only one opening.
Enough of the anodes left for a few more years
The chap who does the welding had been to have a look at the couple of jobs we’re wanting doing. He’d walked all the way round Oleanna to check the state of the steel. No signs of any pitting, no dints from collisions and the prop dint free too.
The stick on solar panels had been removed. You hear so much about how the roof can rust underneath them, Tom said the roof wasn’t bad at all.
Checking out the gas locker
Now our attention turned to the bow thruster locker, the main reason for our visit, to try find the cause of all the water in there. First things first, empty the water out of it. A wet dry vac was found, but there was far too much water for that, so instead a bilge pump was set up with an added hose reaching out of the paintshed door. The pump was set going, it carried on for getting on for an hour, the colour of the water checked. If it was clear water, that would suggest it had come from the fresh water tank, but it had a tint of canal colour to it, so it had come from outside. Good in one way, bad in another!
You can see where the water tends to sit in the gas locker
The gas locker was emptied of gas bottles and hoovered out. The vents very visibly below the water line. Oleanna has always sat low in the water, most probably lower than thought when the gas locker floor was welded in. When Tom had been removing the windows and their liners he’d noted that above gunnel height the cabin sides had been lined with 18mm ply. This is usually 9mm. I wonder if my choice to not have any visible grain on the painted cabinsides meant they ended up using 18mm? Anyway all that extra weight will be helping her to sit low.
No obvious hole in the locker floor could be seen. So whilst the bilge pump continued to do its thing, we headed to the cafe for lunch. We managed to find a bench outside the portacabin just about in the shade to have our cuppas and sandwiches. Next we headed to the office to pay the remainder of our dues for sitting out on the hard for eight months. We chatted with Mandy about when we go back in the water and that we might need to be on one of their moorings for a couple of days, this was fine with her, if the boat that had been dumped would only move on, it’s been there for weeks!
Redhill is very much a working boat yard. One old wooden cruiser came past heading to sit out on the hard for a while. Then another narrowboat came past, this was laid off outside Tom’s paintshop. It had been jet washed on the hill and was now due to be blacked.
Whilst we’d been elsewhere Tom had managed to get his phone deep into the bow thruster locker to see if there was any sign of where water might have been coming in. He videoed a pan round, the depth the water had been obvious. Right at the pointy end of the bow, possibly the least accessible part of the hull. A rusty dribble from an inch under the gas locker floor which had then spread. Somehow the water was getting in here. Possibly a failed weld at the pointy end of the gas locker floor which always sits in the water. This leak I suspect has been happening for sometime, but Mick reckons he’d have noticed water on the bowthruster locker floor. When was the last time he’d looked in there? Just how long had the leak been leaking? How had the weld failed if that’s where the water is coming from? Well we just need a solution for it.
That looks like where it’s been coming in!
Can it be welded? Most probably not as this part of the boat is likely to have been made early on in the construction, working from bow to stern and getting in to weld it just about impossible. Tom could do a broad band of PU filler around the edge of the gas locker floor, sealing in the weld. Or maybe some two part epoxy putty could be pushed in where the hole might be. We planned on emailing Ricky at Finesse to see what his thoughts might be on a solution.
Matt from Onboard Solar arrived. Mick chatted away to him about solar panels. I’ll let him chat about those later.
18mm ply cabin sides visible here
The odd wiring, loose connections were chatted about. It looks like the cables from the electric cupboard to the junction on the roof had been cut too short on the original fitout, so short lengths had been chock blocked on the end, these were loose when Tom came to remove the junction. Matt will see if it’s possible to replace the wiring in the roof. We’ve dug out photos of the fitout and the cables should run in a conduit along the edge of the roof, but to access this will mean removing the covers which have been plugged with wooden dowels.
Matt is going to email through a quote for new panels and installation next week sometime
So Oleanna will continue to be prepared this week, it’s all in the preparation, After the preparation is completed she’ll have a good clean inside and out. She’s quite a state inside, so I strongly suspect we’ll be hoovering for a while once we start to move back onboard, maybe we should have removed EVERYTHING to make this easier, but we didn’t as that would have required several more trips in a van and then finding somewhere to store it all.
Just because they are there, demolition due 2029/30
Once Tom gets started with painting, the blacking will go on, the whole boat gets painted. Jacks will lift her so they can paint the base plate too, then below the gunnels will be skirted off with brown paper for them to work on the cabin sides and roof. The next coats will go on the day after so that there is a good bond between coats and no need to sand between them. Then layer on layer and sanding smooth will happen to get a mirror finish.
We reminded Tom of when we’ll be needing to move back on board. Claire the signwriter is booked for the beginning of that week so all the major painting will be done by then.
Will high temperatures affect the painting? Tom said that actually the heat will make the paint more viscus, so they shouldn’t need to thin it down. It’s more about keeping himself hydrated as he paints. He wears a suit and gloves, fresh air is pumped to his face behind his mask, so that is quite pleasant. But when he takes his gloves off they tend to be full of sweat! We wished him well, wanting to provide icelollies to keep moral up, but they’d melt before they got anywhere near the paintshed.
We headed back to Scarborough with a little list of jobs that need doing. New fenders, photos of the electrics to find, an email to Ricky.
Wednesday Mick put together an email with photos for Ricky at Finesse. Maybe he could come up with a solution to the leaking gas locker. On Saturday morning we’ve still not heard anything back.
Pretty carrots from our veg box
Mick also chatted to Hannah our most recent BSS examiner regarding the vents from the gas locker. She’d be happy to leave the existing ones and then add new ones above the next rubbing strake which will be above the water line.
Friday morning an email came from Claire regarding the bow flash design. She has worked up the one we prefer, suggesting keeping lines parallel to each other rather than parallel to the shape of the bow, all of which we are very happy with, so she has been given a big thumbs up from us.
My last mosaic session
Little else to report this week. Hopefully sometime next week we will get info about the solar panels, finalise a solution for the leak and maybe just maybe Oleanna will start to change colour, but that may be the following week.
Christmas!!!
Meanwhile I continue to paint my panto model, being in a snowy world is helping with the heat, although we are very lucky not to have reached silly temperatures. The other evening we used the barbecue to roast a mass of root veg from our veg box, the aim of keeping things cool in the house, we however required jumpers as we watched things cooking. I’ve attended the last mosaic session I think I’ll be able to go to, things are nearing completion, and too many hands are trying to fill gaps now. Hopefully soon we’ll get time to think about starting to pack our belongings ready to move.
0 locks, 0 miles, 1 hire car, 30+C, 1 cool Scarborough, 1 almost naked Oleanna, 1 shiny neighbour, 1 leak! 1 welder with Gogo Gadget arms required, 10cm christmas tree, 18mm! 1 prospective lodger informed, 1 last mosaic, 1 set of bow and stern fenders to find.
An update at the end of a week when the weather showed potential but then turned out to not be on our side!
Oleanna was moved out from her resting place of the last eight months on Tuesday. Yes this is now the longest we’ve been on dry land in twelve years. She was moved round to the hill ready for blasting on the next dry day. Her baseplate was blasted and then she was lowered ready for the cabin and hull to be done. Friday was ear marked as a possible day.
Blue skies in Scarborough
Friday came, Mick headed to watch Yorkshire play cricket and I headed to London for my white card model meeting for panto. Both of us had lovely dry days. Sadly a raft of showers were forecast to cross over Nottingham, Redhill Marina actually, so the blast was postponed till after the weekend.
Blue skies, with clouds in London
Whilst on my train heading south I had a phone call from Tom, our boat painter. He was removing all the fixtures and fittings before the blast could take place. They leave windows in to avoid ingress of the grit, but nav lights, aerials, cratch and pram, plank and pole rack amongst other things, all get removed. He was having severe difficulty in removing the cratch A frame. He could reach inside the gas locker and feel that there were three bolts, but none of these had nuts on them. Did I know anything that might help as they didn’t want to force the A frame and end up breaking it.
I recollected a conversation with Ricky at Finesse, when he told me that the cratch was there to stay, we’d never get it off! Handy when you want to repaint your boat. It appears to have been glued on so well that it will end up staying in situ. The blaster has been advised to give it a wide berth, then Tom will strip the paint right up to it by hand, protecting the woodwork. Oleanna will be given coats of rust-inhibiting paint and Tom will make the join between wood and paint work water tight.
Photos and measurements have been taken for a new hole in the gas locker, so that it actually vents to the outside. This will happen once Oleanna is stripped and moved into the paint shed. Tom said to expect to be inundated with photos early next week. I’m so hoping it’s very early next week as I’ve lots of work to do on Panto and could do with uncrossing my fingers!
The cricket it going well, Yorkshire achieving lots of runs. It’s nice for Mick to be able to make good use of his Scarborough Cricket Club life membership for once.
My model meeting went well, a few notes which I expected, indeed even asked for. A new draft of the script now needs reading to check through in case I don’t know about something that’s been added or removed. Then I can get on with adding colour to the model and finalising the drawings. I just need to find someone in Scarborough with an A3 scanner as the printers and architects I used to use have both closed now.
Tom Tom, please get on with it, they keep taking me to the VETS!!!!
I hope to post again , once Oleanna is stripped and ready to paint. So tata for now.
0 locks, 0 miles, 1 stripped bottom, 1 stubborn A frame, 2 boaters wondering if they’ll ever get their sea legs back, 1 cat whisperer beaten, 1 more notch in my tail! 1 design meeting at the National, 1 thumbs up, 3rd WC alteration, 1 more mention for Duncan, 1.5 pairs of socks knitted, 3 days of cricket in a row.
A bit of an update before we get going on what Oleanna news there is, as I’m conscious that some are missing out on the design of panto this year.
Chippy Panto. The Snow Queen model box has been stripped back. A storyboard was drawn up, ideas swapped with Caroline the Director. Then I’ve worked on the white card model, a couple of versions have been worked on and now I’m starting to work on the sketch working drawings so that quotes for the build can be worked out. I have a white card model meeting in London next week, so fingers crossed everyone likes what they see!
Bridget and Storm have been to stay. It was lovely to spend some time with them and show them around Scarborough. The tide was well and truly in, and they met up with Freddie. Hopefully they’ve had a great time on a hire boat with their grandkids and they’ve had more thoughts of being boat owners once again.
John Godber recently turned 70, so there was a big catch-up with lots of old Hull Truckers at The Little Wold Vineyard near Brough. The dress code was ‘A nod to the 70’s’, so with two charity shop shirts and half a metre of suitable fabrics, I adjusted the collars and made us each a kipper tie. It was great to see so many people from my Hull Truck days to celebrate John’s birthday.
Us
On the hottest day of the year so far we travelled over to York for a night with the London Leckenbys in their top floor flat. Gosh it was hot! Wonderful food as ever, time to catch up with them all, Josh currently in the middle of his second year exams.
At around 10pm we had a walk down to the River Ouse where the air was cooler. A sign on the Blue Bridge, where the Ouse meets the River Foss suggested that work was ongoing at Castle Mill Lock. So we wandered up to take a look in the nighttime gloom. New lock gates were sat on the bank, and the lock had a work boat in it and two cofferdams were doing their best to keep the lock water free for the works. We had been planning to come up to York this year and had hoped to be able to get onto the River Foss. But with the slipping of time on Oleanna’s repaint we’ve run out of time to visit as we want to be in the south by the end of August.
We now have two lodgers living with us, both rehearsing for Calendar Girls at the SJT. So we have a full house which will get fuller in just over a month’s time, so the clock is really ticking now until we become homeless.
Everyone with their heads down, cutting tiles and sticking
Mosaicing is having to take a bit of a back seat whilst panto needs my attention, but I try to go to a session every other week. Things are progressing very well and I suspect all the pieces will be finished soon. Sadly I don’t think I’ll get a chance to help with the installation, but hopefully that will be because we’ll be moving back onto Oleanna then.
I’ve had a break from knitting socks for a few weeks, making a cardie for myself. But now I’m back on with Felicity Edition Sockathon Socks in memory of my friends Mum, Felicity. I have several pairs to knit for children, so I’m concentrating on those before their feet grow too much!
I’ve also been doing some trial baking. Just which is the best GF cup cake recipe? The jury is still deliberating and wondering if a third version would be worth trying, however Spanish Buttercream has been deemed too much work for not enough flavour. Our alpine strawberries are doing very well this year after transplanting some into a urn at the house.
There have also been numerous walks around Scarborough, I’m quite enjoying seeing the town full of visitors and at a time of year I’ve not been here for in over a decade.
Tilly still waits in hope for an imminent return to Oleanna. Whenever a bag is brought out she makes sure she is the first thing to be packed. Well, I can’t have them leaving me here with all these singing Shes and annoying cats can I !!!
0 locks, 0 miles, 2 trips away, 1 confused cat, 70, 2 kippers, 12 cupcakes, 2 ex boaters, 30C, 1 emergency cardie, 1 mosaic coming together, 2 new lock gates, 1 white card model ready, I think!
Well, where do I start? I believe I last signed off saying that hopefully next time I posted I’d be talking about Oleanna’s repaint. Well, I will be, but not in the way I thought I’d be talking about it.
We gave Tom a week after Easter for the dust to settle and kids to have gone back to school. I called him to have a chat and explain that we really could do with an approximate end date to the repaint as we have lodgers booked in, maybe more wanting to book and our thoughts had been turning to where we might end up living if there was a delay in the repaint. We really needed to be back onboard at the end of May. He reassured me that that would be the case, he’d look at the jobs required and let me have a better idea.
You’re not leaving me our of the packing!
With each week passing and no news, canal time was setting in. We started to think of contingency plans for when lodgers arrived. We could stow all our boaty belongings in the room we call the shed and sofa surf, but what would Tilly do? It would be very unfair to leave her with three lodgers, maybe a cattery would have to be the option! What CAT PRISON!!!!! I don’t believe you were even considering that! A better solution was for us to find another bed that we could put in my workroom, I had offers of futons and inflatable mattresses, but so far we’d not had any more enquiries from lodgers, maybe we’d be okay for a few more weeks.
Last Monday I sent an email to Tom. The days of April, our paint slot, were rapidly running out. Would he be starting the repaint later in the week, next week, in two weeks, or would the wait be longer! Would it be worth us popping down to talk over the jobs and colour scheme? We really wanted to know so that we could plan what to do with ourselves!
We got on with jobs. A couple of hours later we received an apologetic email reply from Tom.
‘I’ve had a few delays alongside some other things essentially dropped on me, which has jumbled up my running order. I have a 45ft Narrowboat in the shop which your boat will follow‘.’
It sounds like its not all his fault, but whatever the reason it’s not fair, but what can we do, other than be patient. At least we now have dates which we can work to, he’ll be in touch towards the end of May for us to go to chat things through. He has also said as a goodwill gesture that he will be giving us a discount.
There had been places we wanted to go to by boat, but now they will have disappointingly passed before we are back on board. This means, that to us, it doesn’t matter when Keadby Lock and the leaking culvert is mended, or worry if Vazon Rail bridge goes faulty again, as we won’t be heading northwards anymore. It does mean that Tilly will have the long journey back to life afloat, we’d planned on bringing Oleanna up to Goole before she joined us to make her journey about an hour shorter. I’ll cope, just so long as the outside can move again!
Swarkestone Pavillion painting ready to be hung
We could have decided to have Oleanna put back in the water and postpone her repaint, most probably a wait of another year, but the blacking desperately needs doing before she touches water again. So we may as well sit it out and have her back with all the other jobs done to our satisfaction.
The first of the Felicity Edition Sockathon socks
Now we could plan, we’d not want to sofa surf for a month. I emailed the SJT saying that we would be staying in the house so our third room was no longer available. They thought they were now sorted for the company of the Calendar Girls. However, within 30 minutes I got another enquiry! Over the next few days I’ve had three enquiries from actors from the next company which overlaps. Should you happen to live in Scarborough and have a comfortable spare room there are actors desperately looking for places to stay, get in touch with the theatre. After a bit of jiggery-pokery with a shoehorn we have managed to accommodate someone else, an old friend, with an extra buffer around Oleanna’s repaint. If we’re not back on the boat by then, well!
Anyhow. It’s disappointing, but it does have its advantages. Firstly we won’t be chomping at the bit to get onto the Leeds Liverpool Canal, possibly getting jobs rushed or even put off.
I can carry on helping on the community mosaic for a while longer. I’m really enjoying it and now know quite a handful of new people around Scarborough.
I also have access to my work room at the top of the house. Yes, I’m designing Chippy Panto again this year. The Snow Queen is a very VERY Christmassy panto. So I’m hoping to get as much work done designing it before we get back on Oleanna, meaning we can make the most of boating again when we hit the water.
In 2021 we were in Scarborough until mid May, escaping from Goole after the breach on the Air and Calder Navigation. This year we’ve already had chance to enjoy our bluebells. I’m loving seeing all that goes on at the seaside on sunny days. The spring tides have revealed sand banks that you can almost walk into the harbour. Then when the tide is in the sea covers most of the beach meaning ice cream, wind breaks and deckchairs are all squashed up against the railings. Daleks, Wookies and Storm Troopers took over the Spa for a weekend and there’s a new market once a month to peruse.
We’ve also been along to celebrate the SJT’s 30th Anniversary at the Odeon. The occasion was marked with a rehearsed reading/sing of HONK! which was produced for Christmas 1997. It was lovely to see some old work friends, especially Michael Holt the designer, I used to paint his sets at the theatre and a few years ago I made a model for him whilst we were on the Peak Forest Canal, the last time I saw him.
So with the news our repaint was delayed, Mick made plans to head down to check on Oleanna again. She’s been off shore power for a few weeks, and he wanted to run her engine and check her over as she’ll be sitting still for a few more weeks. He caught an earlyish train to East Midlands Parkway and walked down the long road to the marina, the cooling towers still keeping an eye on everything.
Oleanna was checked over, the engine run, lunch enjoyed at the cafe. Plenty of people were about doing jobs on their boats in the sunshine. I’d like to have a visit too, so that I can clean off the sticky varnish around the dinette before we move back on board and have to do it with ourselves and Tilly about. But that will have to wait a little while, maybe for when we visit to chat to Tom. The dinette cushion covers have been successfully dry-cleaned and forced back onto the cushions and new blinds for the bow doors have been sewn, they just need fitting to the poppers now.
Nearly walking into the harbour
All we can do is wait.
0 locks, 0 miles, 130 miles walked, 1870 brisk minutes walking in April, 1 repaint delayed, 1 hotel required? 1 contingency cottage to be used, 30th anniversary, 2 now 3 lodgers booked overlapping, 2 drafts of panto, 1 storyboard started, 1 very icy mood board, 1 mosaic paisley finished, 4 Felicity Edition pairs of socks, 3 life jackets tested and repacked, 1 painting finished and framed ready to be hung, 2 boaters and 1 cat resigned to life on dry land for a while longer.
A round up of 2025, sit down with your favourite drink and I hope you enjoy.
January started out as December this year would end, us watching from afar the aftermath of a breach. January was the Bridgewater, December the Llangollen. We don’t tend to watch vlogs, preferring to read peoples accounts of their waterway journeys, but updates were watched on youtube from those affected, our personal experience of the Aire and Calder breach back at the end of 2020 had been far less dramatic.
January in the house was spent doing winter maintenance jobs. Three garden benches got a full make over, new slats and paint and a dining room got a colourful lick of paint just in time for the first lodgers of the year arriving. I had a second appointment with a physio about my knee that had given me serious problems last year, the new exercises were working, I ditched my stick by the end of January and started walking around Scarborough every day.
The start of the year it had been wet, but as I strode out the sun would greet me as I reached the beaches of Scarborough. I think this year I’ve visited the seaside more than I’ve done in the last 30 years of considering Scarborough to be my home.
In February Oleanna’s horns got replaced, she now has two tones rather than just one twice. Arrangements were made for future works at the house, carefully planned between lodgers. I joined a community group working on a giant mosaic, sticking glass tiles to brown paper, the final reveal not happening until August which I sadly missed. More walks around Scarborough, longer walks enjoyed on sunny Saturdays taking in both bays. Now I was walking too fast for Mick to keep up.
We visited boat painters, our short list gradually being whittled down. Dates, getting to the painters all had to be weighed up in our decision. One company actually rang to offer us a very early slot, but because of the Bridgewater breach and the end of winter stoppages we’d never have made it in time, plus we’d have ended up being homeless as lodgers were due to arrive at the house. After visiting the last painter we dropped back in to visit Tom at Redhill Marina to see how the boats he’d been painting on our last visit looked. We liked him, his work and a day later called Gibson and Kentwright to book our slot in Spring 2026.
John, the Artistic Director at Chipping Norton got in touch, would I like to do this years panto? This needed some thinking about, last year had been nice without deadlines for designs and we could concentrate on boating, but I’d really missed being part of a team and being a designer. I slept on it then said yes, if the show could be designed earlier in the year then we’d still be able to boat through the summer, hopefully get the best of both worlds. Cruise down to the South Oxford so I could commute to work during rehearsals then we’d make our way back north and arrive at New Year at Redhill to come out of the water and await our repaint. A good plan. But before that, the roof space needed clearing so things didn’t get damaged when we got a new roof on the back of the house. Friends needed meeting and I cracked on with a few paintings of Scarborough.
Mid March came, it was time to give the house a good clean and move back onto Oleanna making way for four lodgers to move in for a month. A new mattress arrived for Oleanna, only just enough headroom for Mick on our cross bed, but a far better sleep than the memory foam mattresses that came before. Back on board, we headed straight out of Goole for the New Junction Canal, pulling in at the first opportunity and letting Tilly have some shore leave once again. She knows where home is and I’m sure she now knows this mooring very well. She was gone for hours, straight back into boat life after a winter of hibernation and inactivity in the house. It felt good for us too.
Some of the team at Level
Doncaster was our first destination for me to head off to do a couple of days work at Level in Matlock with Separate Doors Theatre Company.
Then we gradually made our way to Keadby to wait for the beginning of April, the tide and to meet the Strawberry Fools from Strawberry Island Boat Club who were kicking off the Fund Britains Waterways Campaign Cruises for the year.
Having just left Keadby Lock
Early on the 1st April, the flotilla of Strawberry Fools lined up to go through Keadby Lock onto the Tidal Trent, three boats at a time, turning up stream, southwards. Fog engulfed us for sometime, thankfully clearing as we came close to West Stockwith Lock where more boats were to join the long line all beeping our horns as we approached Gainsborough Road Bridge where TV crews and drones watched us. A great start to the years campaign. The spring tide got us all to Cromwell and off the tidal waters for survivors drinks on the bank.
The following day the boats stormed Newark Castle with a wall of sound before dispersing to several moorings upstream. The morning after we penned the boats up through Hazelford Lock and waved them goodbye and good luck, the majority of boats heading to London to sound their horns outside Parliament. We however turned back, our summers cruising planned to be further north.
Back up the country, down the Tidal Trent, pausing on the Chesterfield canal for a couple of days, across the Stainforth and Keadby, New Junction, Aire and Calder, River Aire, Selby Canal then the River Ouse to York.
Here we met with the London Leckenbys to celebrate what would have been my Dad’s 100th birthday back in his home city. We had a suitable feast, cruised down stream to show Andrew, Jac and Josh the top of our old family home from the river, Josh even had a go at the helm. A curry was also called for along with a visit to a pub which was frequented by our parents as we grew up (we mostly sat in the car with a packet of crisps or a chip butty!).
We were joined for a few hours by old family friend Diana and I got to meet with Philli a boat woman who had sponsored a pair of my Sockathon Socks. It was good to be back in York with our own home and have found somewhere new to moor meaning we could stay longer. We also managed a catch up with Frank over a pint and a pizza.
By now the lack of rain was started to affect the system and our planned cruise. The Leeds Liverpool, I think, was the first of the northern canals to close. The Ripon Canal soon followed. We were wanting somewhere safe to moor for a week or so whilst Mick headed off to oversee building works at the house, our options started to narrow.
We opted to head down stream, the tidal Ouse far more difficult to navigate with the outgoing tide due to the amount of debris in the water. Back onto the Aire and Calder we detoured to Goole to top up on diesel, then headed towards Leeds. A favourite mooring near Lemonroyd would suit us for a while.
A large badger hole proved a bit too interesting for Tilly, so we nudged ourselves up above Woodlesford Lock. Mick headed to Scarborough to wait for roofers, whilst I started to work on Panto and Tilly explored the area. Down south the Strawberry Fools reached their goal on the Thames.
May is full of Birthdays, Mick was allowed some leave from the house to celebrate his with a barbecue. Sketches for panto were revisited, the weather got warmer. Oleanna spent a weekend at Lemonroyd Marina whilst we had a trip to London for another birthday and to see Jane and Kevin who were over from Australia.
Back out on the canal, we opted to stay around Lemonroyd, hopefully far enough away from the badger hole! Mick returned to the house, Tilly sheltered from a touch of rain on her throne under the pram cover, I worked away model making for panto and headed out every day to walk round the nearby nature reserve.
The house roof was finished in time for a new lean to to be installed. My panto white card model was drawn up. New lodgers arrived at the house so all three of us were back on board in time to head into Leeds for me to catch a train to Chipping Norton for a day of meetings.
The weather was hot, along with strong winds in Leeds our plants suffered, above Office Lock on the Leeds Liverpool Canal more locks were being closed. Canal and River Trust were actively discouraging people from cruising up the River Derwent to the Pocklington Canal. The River Hull was closed due to collapsing banks. We’d find somewhere to go, sadly missing out on the main mission of reaching Beverley this year.
However, a return trip to York was on the cards. We opted for a different route and headed back to Goole, topped up again with diesel, then penned down Ocean Lock onto the Tidal Ouse. Back in 2021 we’d headed this way whilst escaping the breach on the Aire and Calder. This time the tide was very strong, we were going to beat our ETA at Selby and had to fight the currents going round bends.
A meet up with my best friend Emma, who was over from Sydney and a chance to meet her new fella was not to be missed. Mooring almost at the bottom of Emma’s old garden in York helped them find us before we had a lovely lunch on the Howardian Hills and a quick visit to Castle Howard for some chilled medication in a thunder storm.
We opted to stay in York. Mick having to find things to do during the day whilst I took over the boat with work. A trip to Headingly for a test match, bumping into his old friend Jeremy and a look at the trains in the Railway Museum. It rained in the Dales, the Ouse came up, we leant Jo and Brian from NB That’s It our Middle Level windlass and key, boats ran away, we checked levels and kept an eye on our ropes, we were fine.
July arrived. Where to head now? A station was needed for another meeting in Chippy. We retraced ourselves back down stream, the Ouse slightly emptier of trees this time, back to Doncaster a good station to head southwards from.
Thankfully there were only a few small aterations to my panto design required, the remainder of the summer could be spent boating, if only the water levels would let us! We headed back towards the River Trent, managing to say hello to our friend David at Bramwith. A few days were spent sheltering under trees of the Stainforth and Keadby, then there was time to explore Thorne more than we’ve done before.
Some Strawberry Fools were arriving back having managed to get through stoppages further south after crossing the Wash and cruising some of the Middle Level and the River Nene. We loitered for Sean from SPL covers to arrive with a new side for our pram hood, the original one had managed to sink into the depths of the Aire and Calder earlier in the year.
Temperatures were high, this wasn’t good. What lay between us and the rest of the summers cruise was Vazon Sliding Rail Bridge, high temperatures meant the bridge could not open for boats. We sat for several days and nights, getting up to chat to the signaller in the middle of the night. One night just as we were about to turn the lights off we got a phone call, the bridge would be opening, we needed to get dressed! A short distance travelled in the dark would mean we’d be able to do some boating again. We were soon cruising for the third time this year on the Tidal Trent, in a down pour of rain!
Surprisingly the Chesterfield Canal was open up to the limit of navigation. Oleanna’s crew had been there before, but Oleanna hadn’t, it was a must. We paused for a few days at the Retford and Worksop Boat Club, our Cutweb membership paying for itself within a few days. I walked whilst Mick headed back to Scarborough to do a turn around and for medical appointments.
A visit to Mr Straws House was enjoyed, locks worked through, towpath walks enjoyed as I sped ahead of Oleanna taking her time in the shallow canal. What a pretty canal, we were glad we’d come back.
The double and triple locks that lead up to the top may take a bit of working, but boy they are worth it. We headed straight to the navigable end before Norwood Tunnel only to find the moorings there full. One chap suggested we’d not have enough depth of water to wind, but thankfully we did and headed back to find another mooring for the night.
On our return journey we had visitors, friends Jane and James on their bikes came and helped us through a few locks. Then the same day Cath and Mark came for a nosy at Oleanna and a meal out in Worksop. Very good to catch up with everyone.
Back at the boat club they found space for us again so we could head back to Scarborough to do another turn around and watch the first night of Noises Off at the SJT. We welcomed new lodgers Liza and Stuart into our house, had a blood test, a dentist visit and headed back to Oleanna and Tilly.
Back out onto the Tidal Trent and onwards to Cromwell. Our timing couldn’t have been better, as we rounded a bend in the river, Cottam Power Station cooling towers came into view. I had just enought time to lift my camera before they came crashing to the ground. A landmark on the Trent now gone. I think we’d already made our minds up not to head towards the Oxford Canal, by now levels were so bad the canal had been closed from the summit to Banbury. We really didn’t want to risk getting stuck somewhere and not being able to get Oleanna to Redhill for her repaint next year. We’d take our time pottering about on the Trent and maybe along the Trent and Mersey Canal. The next day notices came out about further lock closures due to the drought, boats started to turn round, cutting their cruises short so they could beat the closures and return home.
Barbeque at sunset
Newark for a few days, then on to Hazelford Lock one of our favourite moorings, time for a barbecue sat on the big steps watching the sun set. Sounds idylic.
However, that night we got to test out the emergency servies and what3words at 2am. Mick had chest pains, 999 was called, two hours later paramedics arrived, tests were done, followed by an ambulance ride to Mansfield A&E for more tests, lots of waiting, then discharged after twelve hours with what was thought to be pulled muscles. A very lazy day followed.
We continued on to Nottingham, stocked up at Sainsburys and found a mooring near to Beeston. To celebrate Mick not having had a heart attack we treated ourselves to a meal at The Victoria. Always nice, just a shame that things weren’t really quite right with Mick.
Up to Trent Lock, rescuing a boater caught out by shallow water between Beeston and Cranfleet. We turned right, our plan now was to head to Burton on Trent on the Trent and Mersey. An ideal mooring at Shobnal Fields was grabbed so that I could head off to Dawlish to meet the set builder for Panto.
Brian arrived on NB That’s It, able to drop off our windlass he’d borrowed. He’d single handed it from Peterborough on the River Nene managing to beat all the stoppages by doing pretty long days, but now he could relax as rivers would get him back to Strawberry Island again. Coinciding with ‘in steam days’ at industrial museums is a rarety for us, but we managed it at Claymills Victorian Pumping Station, although the volunteers were tryng out some eco fuel rather than coal, they weren’t impressed with the amount of steam it produced.
The water tap at Willington called, the plan was then to wind and cruise up to Alrewas. A mooring was found with better phone signal for Mick to chat with his GP, an appointment already planned. He also wanted to talk to them about some patchy vision he’d been experiencing. Another phone call to an optician, it was suggested he should attend the nearest A&E. That night we made our way back into Burton to be closer to the hospital.
In the morning there was a second visit to A&E this year. A CT scan diagnosed Mick as having had a stroke. I brisk walked my way over to the hospital to find him being put in the back of an ambulance to head to the Royal Derby Hospital. Here there was 24 hours of lying and sitting in various parts of A&E (number 3) before a bed was found on the stroke ward. Thank goodness for a very good bus service between Burton and Derby. They wanted Mick to see an Opthamologist which didn’t happen, the weekend arrived and he was stuck. Then he just needed another ECG and drugs before he could come home, this took another night but thankfully after five nights in hospital he was discharged.
So many people offered help and support, thank you all so much. Thankfully now Mick had no symptoms and felt pretty normal. I kept a close eye on him. Kat on coal boat Bargus stocked us up with coal and diesel and we gradually made our way back to Willington for a moral boosting lunch with the lovely Susie Blake, she even got us tickets to see her show in Derby a few nights later.
Now we found ourselves kicking heels until our lodgers were to move out from the house so we could return, this was more to do with the lack of water in the network than anything else. Bridget and Storm came to check on us, bringing Rolo their new woofer with them. He was very well behaved, Tilly didn’t even mind him being onboard!
We took our time, pausing for a few days whilst storms blew over. I walked to Swarkstone Pavillion, down to the Trent and visited local villages. Next we wanted to check Oleanna could come out of the water earlier than planned, we headed to Redhill Marina to check things out, it would all be fine. We arranged a date to arrive.
We managed only one Heritage Open Day in September at Mills Dock Yard on the Erewash, some beautiful boats and suprising wooden cars on view. Then made our way back to Beeston to be close to a station again.
I had a couple of days at the Seperate Doors Making Tomrrows Theatre conference, watching workshops, listening to discussions and speakers. The mooring in Beeston isn’t so good for Tilly,a brick wall is hardly interesting for anyone! so we winded and headed back to Trent Lock to meet up with an old collegue of mine Jane, from my early days at the SJT.
Kat with Teddy and Bella came to top us up again before we headed back to Nottingham and further on to another favourite mooring above Stoke Lock. Here the mooring by the low wall was available, perfect for Tilly for a few days especially as she was to celebrate her 10th birthday there. However we ended up staying longer than planned, RCR were called out. It was suspected that our drive plate was about to give up. A few days later the engineer returned to replace it with a new one. All good to go!
Back up to moor at County Hall steps, Tilly wasn’t keen. But we wanted to make the most of being in Nottingham, visiting places we’d not been to before.
Our windlasses got used for the final time this year working back up into Nottingham where we took a mooring at Castle Marina for a couple of nights. A trip up to Scarborough to see our lodgers in the latest Alan Ayckbourn play Earth Angel.
Time afloat was now running out, back out to Trent Lock for a few more days before heading to Redhill Marina. Packing up the boat was a little more interesting than usual as we didn’t have the luxury of picking up a van the day before we were to move. Until Mick got to see an opthalmologist he wouldn’t be allowed to drive. So we called on one of those people who’d offered to help when Mick had his stroke.
Mark, Mick’s old friend arrived in a hire van to collect us and all our stuff. The move was done pretty quickly despite having to stop a few times to make Tilly’s journey more comfortable. We’d left Oleanna in the water at the marina, the following day she’d be put on a trailer and moved out onto the hard to await her repaint next Spring.
There were two weeks before I’d head off to work on panto. Phone calls from the set builder came thick and fast. There was time to unpack, see friends, or hybernate, Tilly chose the latter. We managed one trip by train down to find Oleanna out on the hard, she has a fantastic view of the cooling towers, but sadly no electric. We’d need to work on that one.
Mick got the all clear from an Opthalmolgist down in Derby a couple of days before I headed off to Chippy, so he gave me a lift. Whilst I was away working, Mick made up an extra long hook up cable for Oleanna. He had two trips down to attempt to get her hooked up, but for several reasons this wasn’t achieved, thankfully the solar was doing quite a good job of keeping batteries topped up. There was also a trip over to Wigan, where he and Paul Balmer of Waterway Routes helped Chris the Pink Hat Man up the flight along with the help of a CRT volunteer.
Down in Chippy I worked my way through the four weeks of rehearsals up until the show opened. I had chance to catch up with my cousins for Sunday lunch. Met up with Mick at the London Leckenbys for a night and checked on the moorings at Paddington Basin on my way back. I also had a day off in Oxford where I enjoyed a walk along the canal we’d not managed to reach this year, spotting many a familiar boats from previous winters there. My first week in Chippy the canal was reopened to allow people to return to their moorings before winter stoppages kicked in.
Finally on my sixth panto at Chippy it was lovely to have Marion and John (Mick’s sister) and Andrew and Jac (my brother) join us for press night. On his way down to see the show, Mick had fought his way through snow and headed to Oleanna to get her hooked up, unfortunatly the socket available turned out to be faulty!
Back in Scarborough I was pinned to the sofa for a while by Tilly, watching Inspector Morse as is now tradition. Walks along the beach and through the old town were enjoyed. We headed to Filey for a birthday party and unfortunatly ended up in our third ambulance of the year, with another A&E ticked off the list, fortunatly it was only a faint this time.
Mick made another journey down to Redhill, this time Oleanna was plugged in successfully, the electric heating could now be programmed to come on should the temperatures drop enough. He had a chat with Tom who will be doing Oleanna’s repaint, the boat ahead of us is also already on site too. We’re still quietly hoping someone doesn’t manage to get there in time for their slot so we can swap slots and get Oleanna back on the water earlier.
An appointment with a stroke doctor at Scarborough Hospital was had, results and images from an MRI in Derby hadn’t made it to Scarborough so the following week there was an appointment for one here. We now wait to hear what the doctor has to say.
The build up to Christmas kept us busy, our 23rd anniversay celebrated, decorations, cards and presents to make and buy. Hair cuts, the Christmas show to watch. Then a pre Christnmas Christmas with the London Leckenbys in York before returning to Scarborough and coming down with a lurgy which meant most of our festive plans had to alter.
New waterproof trousers, a Victron Smart Shunt and new mugs were all presents for boating. Frank was a lucky man getting his second Christmas dinner in a week. Now that new year is here we need to plan ahead for when Oleanna is going to be painted, windows, new solar and new curtains need thinking about, ordering and making. Hopefully the time will fly by and she’ll be back in the water before we know it.
Us in sunny Scarborough on New Year Eve
Plans for next year, well we know where we want to be in early June, we just hope we can get there by boat. Will we stay up north and be able to cruise the rivers and canals we didn’t manage to do this year? Or will we head southwards to find waters we’ve not cruised yet? We’ll have to wait and see, so will you!
So here are our final statistics for our boating year which ended up being cut short.
According to our Nebo link
Oleanna was underway for 173.53 hours. This is not a real indication of our movements, if we are stationary in a lock it does not count that time
Nebo link was on for 365.48 hours. Sometimes the Nebolink is turned on a bit before we set off, on occasions it is left on at the end of a day incase we decide to carry on, so this is also not a real indication of how long the engine was moving us
End Mileage. 712.725 miles
Distance travelled. 695.6 miles, don’t understand why the two figures are different most days, but I go with the end mileage
Average speed 3.26 miles. We were mostly on rivers this year
Average Maximum Speed 4.78. We were mostly on rivers this year
Total Mileage 719m 3.75f 7 and a bit more miles than Nebolink
Made up of 152 miles 5.75 f of Commercial Waterways, 143 miles 4.5 f of Broad Canals, 61 miles 0.5 f of Narrow Canals, 78 miles 0.5 f of Small Rivers, 66 miles 6 f of Large Rivers, 200 miles 4.75 f of Tidal Rivers, shows how much cruising we did on the Tidal Ouse and Trent this year.
Total Locks 214 fewer than most years as we were mostly on rivers. This figure doesn’t include flood locks
Made up of 51 Large Locks, 98 Narrow Locks, although some of these were broad locks on a narrow canal (Chesterfield), 63 Broad Locks, 2 Locks on Major Waterways
Moveable Bridges 58. 4 were left open, 5 didn’t need to open as we went below them. Although those that didn’t need to open I think should have been 14 to include all those on the River Ouse. 107 vehicles were held up, another 23 when we worked Barnby Dun lift bridge for Mick on Amerouse.
Small Aqueducts 68
Major Aqueducts 6
Tunnels 2, that is 1.4 furlongs underground. I think this is a record for the least amount of time spent underground in a year.
0 Boat Lifts
629.4 litres of diesel. The cheapest £0.89 at Viking Marina, most expensive £1.10 at Kings Marina, total cost £639.26
265kg of smokless coal. This was 12 bags at a total cost of £190.50
2 x 13kg bottles of gas. Cost of £94.87 although we will need to replace a bottle as soon as we get back on board.
Other expenses £144.60. This included 1 starter battery, 1 excess payment for a new drive plate, 2 roller poles, 1 wee tank connector, Cutweb membership
£115.03 Mooring Fees and electricity whilst out cruising
2 Ambulances 3 A&E’s whilst out cruising
1 stroke
0 rain for months
706.85 miles walked whilst on the boat, nearly as far as we cruised! 9504 brisk minutes
Over £3000 raised by knitting socks for Dementia UK (over the last 3 years, 110 pairs) and I’ve still got more to do!
1 Panto design, 3567 pink roses
40 Boxes of Wine
30 Mrs Tilly stamps of approval moorings, she’s not letting onto how many friends!
419.8 engine hours
Us
Phew, that new spread sheet has alsorts on it!
Thank you for joining us on our travels in 2025. We hope you’ll be back for more in 2026 and that the start to our boating year is sooner rather than later.
Monday morning we needed to attempt to catch up on ourselves and finish the technical rehearsal. The actors warmed up away from the stage giving the tech team some time to do more before we had to share the space. Time was taken to tech in two characters and we gradually made our way to the end of the show. Mid afternoon the Pippins arrived we could now tech the end of the show with them.
I took time to sit in the bar and do some flower arranging, well pulling plastic roses from bushes and replacing them with our paper roses. A lovely mixture of shades of pink was achieved before the bushes were handed back to Stage Management to be stashed somewhere on stage. Gemma had worked her way adding roses to other parts of the set so at least we’d get an idea of where more would be needed. The scenery was reset in the wings and behind the backdrop, then we did the first dress rehearsal. Mission achieved, we all retired to the pub for a well earned drink.
First Dress achieved.
Tuesday. An early start as this afternoon photos would be taken during the second dress rehearsal, so more things needed to be finished. Blueprints were added to sliders. Gold lines added to the plainer parts of the set, things were getting finished on the set front. One mannequin had some attention given to it, so at least it wouldn’t look too bare in the photos. A very busy morning.
Photographer starring in my photos
The dress rehearsal was photographed and filmed for use in a trailer. Sadly the mannequin that had started to be dressed ended up being used in a different scene by stage management, so a bare mannequin stood in full view for the photos.
From the circle
The second dress is when the ushers are invited in to watch the show. This gives the actors an audience and the ushers chance to see when and what they will be involved in during the show. During the interval I headed down to find Suzanne in the stalls, she was my previous host in Chippy. Suzanne moved house about a year ago just that bit too far out of Chippy to walk to late at night. We had a very good catch up before the curtain rose for the second half.
A view that is growing familiar
Today, Mick had been up even earlier, catching a train down to East Midlands Parkway with the aim of getting Oleanna plugged in, a second attempt. He’d not left anything on the train this time and headed to see Oleanna. However! Time had been tight this morning and he’d had to hunt round for bike lights before leaving the house in the dark, he’d got all the way to the boat without the keys. This also meant he’d got all the way there having left the house unlocked. Thankfully Tilly had been looking after the house, so all was well back in Scarborough. Mick made use of the shore based facilities at East Midlands Parkway Station and returned home earlier than originally planned, Oleanna still not hooked up and fully winterised with freezing weather already arriving.
The chateau
Wednesday. A morning to work on things, both on stage and in the rehearsal room. Some cuts happening to the script, a schools version of the show omitting a few bits to keep the running time down and make turn arounds easier on two show days.
Tornado!
I’d got a bit carried away with highlights on a signpost, so reduced them to make it easier to read the curly writing. The second set of sliders had their gold lines added, which was a bonus. More props were getting finished, but still quite some work to be done.
Possibly my favourite production photo
A crate was clad on three sides so it could be used in two different scenes, the paint needed some encouragement to dry for the show in the evening. First preview was done and dusted, still a list of notes to be worked through.
Oven gloves what else
Thursday. Mick picked up the hire car a day early as snow fell in Scarborough. Several inches were to fall today, and his possible plan of a day trip by car to Oleanna didn’t happen, he and Tilly stayed inside in the warm instead of venturing out. In Chippy the weather was trying to do the same, but thankfully the snow wasn’t sticking around.
I was in early again to tick off jobs on the list. A mid morning props meeting was had with Gemma and Min to go through notes from the show last night. Priority jobs were set, others not needed, we still had bare mannequins on stage and a touch of shine was needed adding to Les.
First night rose making at the back of the circle
A slower afternoon for me, most of my jobs now crossed off my list and there being limited room in the post room where Min was now having to work meant it would be hard to lend them a hand. Before the show I checked on progress, hmmm?! I checked if Stage Management could live without the Act 2 mannequin until the interval, this was fine, great Min could carry on working on it until then. Well, except they said they were going to watch the show!
In the interval I popped backstage to make sure the mannequin was given to Stage Management. No sign of Min and no sign of any more work having been done on the mannequin, in fact it looked less complete than when I’d last seen it. I wasn’t happy. The jobs that had been high priority hadn’t been achieved during the day, not sure what had! I took myself outside to cool off, after all nothing could be done now. Technical notes after the show, then we worked through a few jobs.
Friday. Mick set off early in the hire car, escaping the snow in Scarborough and headed down to visit Oleanna avoiding the route over the Wolds. The 50m cable was laid out and plugged in. He visited the office to buy an electric card, however the card or card reader didn’t want to work. It was suggested he needed to find one of the chaps on site to sort it, but time was ticking by rapidly. The boiler thermostat was set and left to use LPG rather than electric, the hook up would need to wait for a fourth visit. He then set off to head to Chippy.
Finally finished for Press Night
A few people were at the theatre when I arrived, Gemma heading off back to Bristol, Paul ready to fly in extra bits of scenery for me and Min doing their best painting things for the mannequins in the freezing cold garden. Once I’d finished on stage I leant a hand cutting things out, it would only save a bit of time, but would still be a help. Min worked through the school show early afternoon and we managed to get things on stage just about finished. However, I’d requested that the newest mannequin be painted quite brightly as I wanted it to stand out, but sadly it was now the same colours as the backdrop. I added some dark lines which thankfully did the trick.
Paints were seriously rationalised into a touch up kit. My painting kit packed up ready to be loaded into a car just as Mick arrived around 4pm. Painty Pip was leaving the theatre.
Blue Boar fish and chips are better than those at Checkers
There was time to head back to my digs, change and then head to The Blue Boar. Here we met up with Marion (Mick’s sister) and John, plus Andrew (my brother) and Jac. I’d not managed to have fish and chips at the Blue Boar on the first day of rehearsals so I had to have them today, better than those I’d had at Checkers.
All six of us sat in the balcony. I’m not sure how loud others were shouting during the show as my brother was being very loud indeed. Jac having grown up in Australia was relived that she wasn’t picked out for any audience participation. Family reviews came in quickly after the show. Marion and John said they were considering season tickets and Andrew asked if there were any tickets left for a show tomorrow. I think they enjoyed themselves.
Night Night Chippy Theatre and thank you
The Press Night party followed, a glass of fizz and pizzas all round. Lots of loud conversations and roses were handed over as gifts. A good night all round.
Brunch with bacon I think
Saturday. At my digs my bags were packed and taken down the low steep stairs. Time to say thank you and farewell to Rachel and Geoff. They have been lovely people to stay with. With the car loaded we headed out of town to meet with Andrew and Jac at The Straw Kitchen in Whichford. Mick and I had been there after opening night for Cinderella two years ago and it needed to be revisited as it was such a good brunch. We pulled into the car park in the pouring rain a while before the cafe was due to open. Then several other cars arrived and people rushed in, blimey we needed to get a table so followed suit just missing the table by the log burner by a few seconds.
Very nice, thank you!
Lovely food once again and time to catch up better with Andrew and Jac. Very sadly at the beginning of the week they had to say goodbye to their cat Ziggy. When we’d visited two weeks ago she was looking quite frail and I have to admit that when I said goodbye to her I thought it would be for the last time. Very sad, I hope Finn their other cat is coping okay.
Pip, Mick, Jac and Andrew
A quick look around the pottery next door for us all before we climbed into our cars to drive home in the rain. It had been lovely sharing panto with family for the first time. Thank you all for coming.
Back in the NORF
The rain stayed with us until we crossed the border into Yorkshire, then the sun did it’s best to welcome me back home. Drax Power Station sent out plumes of steam, not quite at full belt. As I opened the house door, Tilly walked into the living room quite nonchalantly, she then slowly allowed herself to be happy about my return. Once a roast dinner was popped in the oven I was pinned to the sofa. Tom is okay to sit on, but She has a far better lap!
Sunday. The usual Geraghty zoom, panto, prescriptions and boilers subjects today. A slow day of washing and pottering, getting the blog up to date. Then in the evening we drove to park outside my old house and walked up to Scarborough Castle in the rain. There was a chap singing with a backing track, a lady fire dancer and an LED dancer and wagons selling refreshements, we opted for hot medication as we were doing a good job of being chilled by the elements.
Hot Medication
The main reason for being there was to watch a drone display to mark the 400th anniversary of Scarborough. Our friend Nick Lane had written the words and another friend Georgie Samuels spoke them whilst the drones danced in the sky telling the story of our town. A great thing to do, but we were very glad to get home to the warm and enjoy a Mac Cheese and sit infront of the fire for the rest of the evening.
Panto is now running through to 18th January. Meanwhile I will be sitting on the sofa watching Inspector Morse episodes for a few days and hopefully very soon we’ll have a more sucessful visit to Oleanna to get her hooked up and finally winterised. Fingers Crossed.
First night roses
0 locks, 0 miles, 2nd and 3rd attempt failed at winterisation, 1 hire car, 4 inches snow, 1 tech finished, 2 dresses, 1 photographer in the way, 2 mannequins finally finished, 1 brother, 1 sister, 1 of each, 1 great brunch, 1 very soggy drive home, 1 cuddly cat, 1 drone show, 1 designer taking it easy for a while.