Category Archives: Canal and River Trust

The Gates Of Goole. 8th February

Bramwith Junction to Viking Marina, Goole, Aire and Calder Navigation

Good Morning

Sunrise on this mooring is wonderful, the windows needed a touch of decondensationing before we could really appreciate it with a cuppa in bed. It was another chilly morning, a breeze had got going which would help with winding when we set off.

Mick’s Christmas present

The VHF radio was turned on in case we could hear Exol Pride or one of the gravel barges radioing the bridges. It crackled a few times, but nothing was audible we decided that we were unlikely to meet a big barge mid channel today, anyway we’d likely see them miles off as most of the canal we’d cover today have very very long straight stretches.

Left straight on not right straight on

Sadly my back hadn’t improved overnight, so Mick was on duty for anything low down, but I’d see how I did operating the bridges along the New Junction. We winded and headed left. The Don doors open and waiting to let us across the aqueduct.

Don Doors

The step up from Oleanna to work the first bridge was a touch high, but I managed it without too much of a problem. Key of Power in and the bridge turned.

Next Top Lane Lift Bridge nobody held up here. The road surface had big chunks out of it waiting to be resurfaced. Then Kirkhouse Lift Bridge where I managed to hold up two cars, one a C&RT van.

Now the long long length with little to break it up. A zoom in with the camera wasn’t clear enough to make out what colour light there was at Sykehouse Lock. The house that had been for sale last year now has two big barges moored outside it, both in need of a bit of money spending on them, wonderful shapes though.

Sykehouse Lock with Sykehouse Lift Bridge partially open in the background

As we got closer to the lock we could see that the volunteer who must just about live in the control tower had spotted us, the light was green, but the swing bridge was still closed. We pootled on up closer.

A Great Egret

On one of the banks was what looked like a Heron, but it was far too white. When it took off we agreed that it was the size of a heron, held it’s legs and neck like a heron. So it must be a heron. Now I’ve been able to look at the photo closer I believe it to be Great Egret. According to the RSPB website they believe there to be 8 to 12 breading pairs in the country and around 72 birds that winter in the UK.

Lock open but not the swing bridge

The chap came out from the tower with his dogs, crossed the bridge to close the barriers and then pushed the bridge clear for us. Another C&RT chap walked past, a number checker, and asked if we’d seen a big barge moored by the house. We had, along with a second boat. He set off to walk the near 2 km to take down their numbers, then walk back again. That job must keep him fit around these parts.

Thank you

Down the lock we went. We spied people at the next swing bridge who looked like they would operate it for us, which they did. The chap in high-vis was taking photos of the bridge, it was having an inspection.

Up ahead at Sykehouse Lift Bridge there were three C&RT vans and four chaps. The hut by the bridge suddenly sprang into life as we arrived a cloud of black smoke coming from an exhaust in the wall. There must be a generator in there for emergency power. They left us to work the bridge, taking notes of things as it raised and lowered. It’s apparently the time of year when all the bridges are inspected. They all headed over to check a barrier after I closed the bridge and didn’t seem too phased by the huge biff the bridge made when it finally made contact with the ground! It certainly made both Mick and myself jump.

Norf ahead

Straight on to the junction with the Aire and Calder where we turned back towards the east. This stretch, well all of today’s waters are so very familiar, yet things have changed since last March. Drax was churning out power and the breach site still looks in good order.

The giant log cabin by the Alpacas has windows now and an almost completed roof. Then the building nearer to Rawcliffe has new windows and it’s roof is finished, it also has some new render and looks quite smart.

Goole ahead

The last slight bend and we were on the three mile straight to Goole.

Back through the gates of Goole we were back where we’d spent so much of 2020 and 2021, stuck due to the breach and lockdowns. Hopefully the gates won’t close on us this time! The visitor moorings were full, but across on the 14 day moorings there was plenty of space. The big grey boat that has been moored outside the Auction place is now for sale, if you’ve got ÂŁ350,000!

Left by the black and white boat please

Mick swung Oleanna to the left into Viking Marina and we made our way into the corner where we’d moored before. On our pontoon a big cruiser, but to the other side of it a new pontoon. We pulled in, meeting our new neighbour, tied up and headed to the office to check in.

Hello Viking, Hello Lisa!

It was good to see Laird again and Alastair who did some work for us last year. Mick has a short jobs list for Alasdair whilst we’re at Viking. Once we’d paid our mooring fees and got a fob it was time for lunch, do the chores and pack our bags. Due to my bad back we actually left with less than we’d arrived with, Mick carrying everything.

Goole Station

There was just under half an hour before the next train, so we power walked it along Albert Street, through the docks to the station. We had five minutes to spare, unfortunately not enough for us to get Advance tickets. The ticket machine wanted us to pay for the route to Scarborough via York! Thankfully the train guard would allow us to buy tickets from her instead at half the price.

Dusk over the Humber

It was a pleasant journey back to Scarborough, no need to change trains, just sides so that we’d get a view of the Humber Bridge followed by the sea at Bridlington.

As we walked up the steps to the house the new security light was triggered. This also triggered a reaction from Tilly. As soon as she realised it was us there was SO much shouting, the whole street could hear her! Many cuddles and chin rubs later things calmed down to a very loud purr.

About time!

Claire She had been nice, kept offering me Dreamies, but she hadn’t let me out so I wasn’t entitled to any! I felt I had to turn my nose up at them. That’s the longest She and Tom have deserted me for. They should have been back soon after the second flap on the magic food bowl opened! And when they did come back they smelt of Bramwith Junction outside. How dare they!

At least it meant I got lots of head nudges and cuddles.

With our mission accomplished and Oleanna now tucked up in Goole we have our own winter maintenance to do in the house. So blog posts will be as and when we visit Oleanna for the next few weeks. We have cruising plans, but not a definite date to set off yet. So the blog will be tucked up for a while too. See you soon.

1 lock, 11.8 miles, 5 bridges, 4 held up, 2 bridge inspections, 1 volunteer, 2 woofers, 1 mooring, 0 Joan’s Chinese! 1 boat plugged in, 1 train, 1 very VERY pleased cat, 1 hour of cuddles, 1 feline shadow.

https://goo.gl/maps/BHg2XZfd3C1vGBCm7

One Bridge After Another. 7th February

Keadby Visitor Moorings to Bramwith Junction

Vazon Sliding Bridge ahead

Another early start or us today. We pushed off at 8:50, Vazon Sliding Bridge has two slots a day when it can be opened, one being 9am. As we approached Mick knocked the throttle back into tick over thinking we’d have to wait a while for a train coming from Scunthorpe to pass. But then the bridge started to slide open, time to push up the revs, we’d need to be out of the way before the train arrived. We were through safe and sound. Time to start operating bridges ourselves.

In between the Vazon Bridges

Each of the bridges on the Stainforth and Keadby Canal are different to each other. The first one Vazon Bridge is quite simple. Turn your key of power in the box, you hear a clunk, lift the handle and push the bridge to open it. It moved like a dream, no twinges from my back either, marvellous.

Looking back to Keadby

A hazy morning, lots of dog walkers chatting to each other. Wind turbines every way you looked. We’re back in the flat lands with masses of bright blue sky. It felt so still, it’s a wonder the turbines were turning at all.

Godnow Swing Bridge next. Here there used to be a big panel with 1970’s calculator instructions on a screen that was really hard to read. This was interlinked with the railway crossing which is manned. The chap came out of his little hut and swung the level crossing gates closed to road traffic which would allow me to operate the swing bridge. A modern panel with Open and Close buttons has replaced the old huge box. Push and hold is all you have to do to close barriers and swing the bridge. Not one vehicle held up today, not even one visible on the long straight stretch of road.

Medge Hall Swing Bridge is not that much further on. I think this is my favourite with the signal box, level crossing gates (which always seem to be closed to road traffic) and then the red post box. Here one manual barrier needs closing before lifting the handle and pushing the bridge open.

The border between Yorkshire and Lincolnshire isn’t a big affair. A group of trees and a dyke heading off on both sides of the canal. We think it should have a sign to mark it. Ahead of us was blue sky, behind vapour trails heading off to the east.

Next Maud’s Bridge. As expected it was left open to boat traffic, bollards and signs on either side stopping road traffic. The dints in the handrails suggest it has been hit with quite a bit of force, the main upright at the end is at quite an unusual angle. There was also no sign of the box you use to unlock the mechanism.

Chuntering cyclists

As we pulled through the opening a group of road cyclists arrived. They seemed to be puzzled that we were continuing on our way without closing the bridge behind us. We said the bridge was broken, by a car not us! They conferred and then cycled back the way they’d come, soon to be seen heading down the road to the next bridge, Moores Bridge.

Pulling in to make a cuppa

Here we had to wait, a planned stoppage at this bridge is ongoing. Eight people in high vis could be counted, four having a cuppa by the welfare van. A chap walked towards us, if we could give them twenty minutes they’d open the bridge for us. Time to pop the kettle on.

Lots of activity

Moore’s Bridge used to have a big control panel, manual barriers, but the bridge moved with the press of a button. Now there are wigwag lights, automatic barriers that drop down and a new modern two button pedestal was spotted. Chaps were busy bending hydraulic piping, trays for it to lay in were in position below where the bridge deck swivels. Here the road was also closed, barriers part way down the lane, hopefully the cyclists managed to get through.

A delivery of new cabinets arrived, it was driven over the bridge and they were about to start unloading it when they changed their minds. Five chaps put their shoulders to the bridge and gave it a big heave, thank goodness it was relatively easy to move. We thanked them as we passed through but they were far too busy looking at the new cabinets.

Not far to the Wykewell Bridge, a lift bridge. Key of power operated this one. Well except we didn’t need to open it as it was already lifted with a couple of chaps inspecting the underside from a cherry picker! We were asked to wait a couple of minutes which was fine. The inspectors retracted themselves and asked for the bridge to be lowered. Someone suggested we should be let through first, we were waved on. So that was the third bridge in a row on the east side of Thorne closed to road traffic.

Blue Water Marina, Oleanna’s winter mooring last year

Past Blue Water Marina, we tried to work out where Oleanna had been moored last winter and who was in her space.

Princess Royal Swing Bridge was next, how would it be today?! I hopped off crossed the bridge and opened the panel. A clunk could be heard as the gates either side were released ready to be closed to pedestrians. I headed across closed one gate, click. Closed the other one, waggled it as suggested in the instructions, did so again! Nothing. Walked back across, closed the near side gates both clicking. Pressed the open button, nothing.

Bloomin Bridge!

Mick came up to try to assist. He waggled the problematic gate until it wouldn’t move. Button pressed, nothing! By now we both had locals offering advice which actually wasn’t helping any. ‘It won’t have been closed properly’ ‘The gates aren’t closed’ ‘Try pressing open and close at the same time’ etc. Nothing was working and now I couldn’t even reverse the process and open the gates to try again, or at least let those waiting across. Time to make a phone call.

The lady at the council apologised, she’d send someone down. I expected to be doing crowd management for a good half hour maybe longer before anyone arrived, but thankfully a chap turned up within five minutes. He waggled gates, leaped over them, checked the panel and wondered if it had done what it did yesterday!

We will do

With his Key of all Council Power he opened a big cabinet across the way brought out a remote and proceeded to open the bridge a bit, then close it again. Then he swung the bridge open for us to get through. As we headed off he could be seen closing the bridge, opening one set of gates but the normally cooperative side were stuck! Oh well that was an SEP.

A very new charity boat

Thorne Lock, a volunteer was on duty and a boat was about to come down. This was Pearl a new boat for the Ethel Trust a hybrid that the crew were being trained on. Walkie talkies were everywhere guiding them into the lock. They’ve only had the boat a couple of months and it will soon head up to Sheffield where it will be officially launched by Princess Anne.

The volunteer helped us up the lock with great care. He let me step back on board and he’d work the barriers and the swing bridge just above the lock. Thank you!

Cruising with the back doors open, a novelty

Now we had quite a distance to travel before the next bridge. Time to have lunch on the move. As we came through Stainforth I sent a message ahead, we’d be about half an hour. Approaching Bramwith Swing Bridge we could see a car crossing and then the barriers were lowered and the bridge started to swing. We sailed straight through, perfectly timed and pulled up on the bridge landing to pick up our friend David.

Teaming up with NB Bob we shared the lock, David and I assisted with the gates and paddles whilst having a bit of a catch up. The owners of Bob were heading up towards Sheffield and asked about mooring there. Four years ago you could moor outside the basin for 2 days, any longer you paid in the basin.

Bramwith Lock with Bob

We headed for our favourite mooring at the junction. Stepping off the bow with a rope jarred my back again, even though today I’d been doing really well, all the ropes and mooring was left to Mick to sort.

This afternoon we’ve had a really good catch up with David. Last time we saw him was in Newark last April. The last year has had it’s ups and downs for him but he has turned a corner and things are far far better. He is content with life, wakes up looking forward to what the day has in store for him. We even got to see a broad smile across his face. It was so good to see him well again.

2 locks, 14.9 miles, 9 swing bridges, 1 slid open, 1 open, 1 obstinate, 3 swung for us, 1 lift bridge, 2 cars held up, 0.25 tank of diesel since filling up in Newark, 1 lunch on the go, 1 more sunny sunny day, 1 happy smiling David.

https://goo.gl/maps/BE6eREnpNEv3jvvXA

Twinge. 5th February

Cromwell Lock to Torksey Lock

Sunrise at Cromwell

No time for tea in bed this morning, there was the tide to catch. The sun rose opposite our mooring, what a beautiful sight, shame there wasn’t time to enjoy it.

I realised we’d not moved the hose and other bits and bobs out from the cratch, this makes access to the anchor easier should we need to lower it in an emergency. I picked up the hose and brought it into the boat. Then mooring spikes were popped away into a bow locker, as I did this my back gave a slight twinge. Lifting the bucket of other stuff gave me another twinge. The cratch was now a lot clearer but my back was a lot sorer! Stooping under the cratch cover was not a thing I wanted to do, so Mick rolled the covers up as I managed to walk up the ramp from the mooring to see if that would help.

Mick radioed the lock keeper, the lights at the lock turned green, he was ready for us. We untied, winded and headed for the lock. Our plans were checked with the lock keeper, time of departure tomorrow from Torksey. He’d call ahead to let the other locks know we were out on the river.

At 9am the paddles lifted to empty the massive lock, gradually Oleanna descended to the current level of the tidal River Trent. We were off, the fast route north, heading downstream with the tide.

Wiggly river navigation

We’ve done this route several times now. The Boating Association charts are always with us at the stern. The red line well worth following. If you stray from the marked channel you can end up grounding on sand banks. This could mean you having to wait for the next flood to float you again. If the tides are heading towards neap tides you may have to wait several days before you can move again, so it’s well worth following that red line, it’s easy.

Go before you fish!

New red signs stand high on the east bank. The camera zoomed in to take a photo so we could see what they said. Ahhh! Yes! There were rather a lot of fishermen out on the banks!

We joined the Geraghty zoom for a short while. Our reception not quite good enough on a phone to join in properly today. There was an update on sofa covers, sadly we couldn’t see the results as everyone was too small.

Us all wrapped up

What a beautiful day. Blue skies, high clouds of many varieties. But blimey it was chilly!

A runner making the most of a beautiful day

Navigational markers on the sides of the river help you to know where you are. Km markers noting the distance from Nottingham. Red and green markers, although quite a few now have lost their tops.

The charts show you what landmarks to line up to, old mills, pylons and white posts. Submerged islands to avoid. Notes on which span of bridges to pass under noted by the graffiti on them. Someone however does need to refresh the graffiti as on Fledborough Viaduct it is now just about rusted out of view.

Fledborough Viaduct

At around the 64km marker we were following the channel round a steep bend when the one and only other boat we’d see today came towards us. There was just enough time for the chap to warn us of a tree in the channel, somewhere! We’re not sure we got to see the tree, maybe that is something to look out for tomorrow.

A boat!

The cold was starting to penetrate the thermals. Hand warmers required. My back gradually making it harder and harder to move about.

Cottam Power Station, not at work today

Ahead Cottam Power Station could be seen, we were nearly there. A warm up inside might do me good, but we’d be in Torksey soon.

Cormorants

A flight of Cormorants sat in trees. The river side of the trees white, was this from a liberal spraying of cormorant guano?

Torksey Junction ahead

Round the next bend the familiar building just before Torksey Junction, then the large sign announced our arrival at todays destination. We turned into the cut, a boost of power to make the move was needed as the pull from the out going tide was still evident.

Mick pulled us up at the end of the pontoon. We’d not be heading up the lock onto the canal this time as we need to head off early in the morning a little before the tide turns. At least today we wouldn’t be shouted at by Tilly wanting to be out.

Coming in to moor

My back was now causing problems, I had to wait for Mick to moor up and then come to open the back doors, the steps at the stern a touch of a challenge. I really hope this improves as I’ve the #unit21 floor to finish painting at the end of next week!

An early lunch and then nothing much for the remainder of the day. Time spent sat down has been followed by time standing, trying to find comfortable positions to ease my lower back. Fingers crossed this is short lived.

1 lock, 16.3 miles, 1 right, 1 boat, 1 twinge that lasted all day, 5 layers to be increased tomorrow, 1 cosy boat, 1 quiet boat, 1 thumbs up thankfully, 2 boaters ready for 9pm.

https://goo.gl/maps/EdAUXwKN63XNZYYeA

Don’t Let The Cat Out! 4th February

King’s Marina to Cromwell Lock

Tilly keeping an eye out for cats!

Since arriving back in Scarborough it’s taken Tilly a while to settle down. She knows where she is, but the house makes odd noises, different from those on Oleanna. Add into the mix our lodger Claire making noises in the morning and singing in the evening, it all makes for a nervous cat. Over the last couple of days Tilly has ventured outside into the static world the house is surrounded by. She obviously remembers the local cats and is constantly looking out for Alan, Betty and Shoes. I have tried to explain to her that none of them live here anymore! But still she looks. The annoying thing for us humans though is that we thought the runny cat pooh would have ceased since Shoes moved away, however it is still lurking in the grass!

I managed to borrow a sewing machine from my friends Dawn and Lee at Animated Objects, so all the costume alterations have been finished. A few small house jobs have been done and I’ve been baking.

I made some fresh curd cheese and a batch of Yorkshire Curd Tarts to use up the pastry left over from mince pies. The slightly orange pastry was rather nice with the curds. Then yesterday I made a loaf of cheese and spring onion gluten free soda bread using up half the buttermilk I’d been left with from the curd cheese. We had to try a bit with our dinner last night as it smelt so good. Very very tasty. A definite recipe I’ll be doing again, there is still enough buttermilk left (now in the freezer) for another loaf.

Snowdrops everywhere in Scarbados

Now that Maud’s Swing Bridge on the Stainforth and Keadby Canal is left open to boat traffic we needed to identify a window of opportunity to move Oleanna up to Goole. I have work commitments over the next few weeks and we wanted to give Tilly a chance to settle down in the house before we’d be leaving her for several days. We estimated the journey would take us a minimum of four days.

Mick checked the tide times, then the weather. Our first window looked good. A couple of days ago he called Cromwell to check on tide times for Sunday. Then a call to Keadby to check times there too. Both locks were booked.

Time to work out how to get back to Newark. The railway line out of Scarborough has been closed for much of this week due to engineering works, strikes and the poor service on Transpennine Express made us look at the buses to York, The Coastliner. These run every hour and currently a single fare being ÂŁ2, it would be a bargain.

Going over Ouse Bridge in York

So this morning we were up early, breakfasted, a few items packed, soda bread and my work things in case we are held up on route. We caught the 9:10 which was pretty busy already and by the time it arrived in Malton it was chocka, I think we even passed hopeful passengers at a bus stop on our way into York. We hopped off at the station and had a half hour wait for the next train to Newark Northgate arriving a little after midday.

Pontoon B at King’s Marina

We headed straight to the marina as the office would soon be closing. When we’d arrived, we’d imagined Oleanna would be stuck for several weeks, maybe even months, in the end it was only nine nights. Two bags of coal were bought and popped on the roof.

I then headed to buy supplies whilst Mick topped up the water tank and made ready for our departure. I hunted round Waitrose for yellow labels. We’d brought a few days worth of food with us, but needed another couple of days supplies along with milk and cereal. Two heavy bags later, including two boxes of wine, I could drop the gate fob back at the office.

Click photo for recipe

Lunch was had, soda bread, still pretty good even when cold. Then it was time to put our life jackets on and push off, reverse out from the pontoon and say goodbye to King’s Marina. Paula the marina manager came out to wave us goodbye and wish us a good journey. Thank you for accommodating us in your friendly marina.

Goodbye Pretty neighbours

Left. We headed towards Nether Lock where I climbed up a ladder to head to work the lock. The paddles were half raised, it was refilling itself. I turned the key of power and encouraged it to fill quicker, which worked, except the panel still had to work it’s way through all the button presses! It took quite a while before eventually the button moved the gates. Getting my phone out to take a photo of Oleanna coming into the lock, I lost grip and it bounced across the concrete, each time getting closer to the lock edge! Thankfully it stopped a foot short of me having to replace it, a shame the screen is now cracked.

Nether Lock

Back in April last year the levels had taken forEVER to equalise when emptying the lock to come in, I did it twice in one day, so today I was prepared for a long wait again. The lock did not disappoint! I had to press the button several times when it did nothing at all for it to get itself ready to open the gates. But we got there in the end. A helpful couple walking their dogs offered to finish working the lock for me, so that I could get back on. I turned them down, no way would I be climbing down the 12ft or so of lock ladder when below at the lock landing it would only be three foot of ladder.

We passed North Muskham, Muskham Ferry where a group from King’s Marina were enjoying a few pints having come down in ribs. They all waved us on our way.

Fishermen lined the banks. One young lad had caught a fish worthy of a photo, his mate catching one a quarter the size was still eager to have the photographic proof. Then a group of men in waders stood round weighing up the days catch, there must have been a match on by Cromwell Lock.

Muskham Ferry

Mick winded Oleanna to face upstream and bought us into the pontoon. Time to head to the bow to tie up. We don’t often cruise without Tilly on board. When opening a door it is automatic to check to see if she is waiting on the step inside. Don’t let the cat out! She’s never allowed out until we are moored up, yet she is so excited to be somewhere new, she charges to the other door before you can get there. Gentle persuasion is required to keep her away from an opening door, sometimes a ‘Grrrrr!’ is required to keep her eagerness in check, it works quite well. Doors are rarely left open, they always get closed behind you. At times trying to keep Tilly in is a pain, but today there was certainly one big hole without her on board. Hope her magic food bowl has opened up and that she’s cosy on our bed.

1 lock, 4.9 miles, ÂŁ2 coastliner, 1 train, 1 Lincoln Cathedral in view, 0.5 loaf of soda bread gone, 2 boxes wine, 3 yellow stickers, 2 boaters back afloat, 1 feline boater stuck on dry land, 2 pork chops and 2 jacket potatoes.

https://goo.gl/maps/re622ZJ5TsvVKdTq8

Shrunk or Grown. 26th 27th January.

King’s Marina

I was off to catch a train, well three that would get me to Huddersfield mid morning. The current track record of Transpennine Express is really quite poor, trains being cancelled here there and everywhere, so my last leg of the journey couldn’t be guaranteed. Thankfully all went to plan without too long standing on platforms in the cold. I even got to see Lincoln Cathedral from my first train way way off in the distance.

Coming into the marina to fill up

Mick was left to check in with Paula the marina manager at King’s. She was wanting to give us the best deal on mooring, cheaper to pay for three months than on a daily rate. However, as soon as we know that the way ahead is open, the tides are right and I’m not at work we will be moving downstream. So Mick opted to pay weekly.

Borrowing the directors sewing machine meant I could finish sewing one costume. Now all nine actors have overalls they can wear to rehearse in over the next few weeks. We got everyone into their costumes to check them over. Had anything changed? One chaps overall seemed a touch too tight, easy to undo a couple of darts in the back. Sadly someone else was in a situation where the zip wouldn’t do up, a case of shrinking and expanding going on in unison. Notes were taken for expansion, all those off cuts from arms and legs come in handy for waist lines.

Mark, Rebekah, Alice and Meghan

Time to position the numbers I’d made. With everyone stood in a row they looked like mug shots of convicts.

Drawn out and based in

Rehearsals continued elsewhere for the remainder of the day giving me use of the studio floor. Connor came to help roll out the new show flooring, cutting the big roll into three and then marking out the design. Base coats of white were applied, all ready for the green to go next time.

Numbers

I’ve been quite astounded at the price the Premier Inn were wanting to charge me for production week, so on this trip I’d booked an AirBnB to try out for a night. With a bag of alterations to tack I headed to find my room and see if the access codes worked. The front door was easy, the one for my room a little bit more tricksy, but I got there in the end.

I checked around to see what I had, a small kitchen area with cooker fridge and microwave. No sharp knife and slightly heat affected cupboards the laminate edging having come away sometime ago. The cooker and fridge are a bonus, no storing breakfast on a window sill and a heater that actually works without a big fan going constantly.

Chips were only for reference purposes

With some supplies bought along with a portion of chips from the nearby takeaway I set to with alterations sat on my sofa with a huge TV mounted on the wall. TV signal here would certainly get a thumbs down as I couldn’t seem to get any terrestrial channels. I also didn’t want to interact with Alexa as so far I’ve managed to avoid having her in my life. Eventually I did manage to get something to have on in the back ground, early episodes of Silent Witness, the lab used to be next to Kings’ College in Cambridge.

My digs

Digs verdict. Well it would be nice if the gap under the door didn’t let light in constantly. The microwave clock is easily covered up with a sketch book or tea towel. The shower door was easily rehung. The romantic view from behind the blind of buildings three foot away did mean no noise from the ring road next door (quieter than the Premier Inn). The big strip light was useful for sewing, but gave an atmosphere similar to that found in a dentists chair. If I stay again I’ll try to fix the shower so that more water comes out of the head than dribbles down the pipe. Having a fridge and cooker though may outweigh other things and it is two minutes walk from the theatre and ÂŁ200 cheaper than Premier Inn, A bit more cutlery wouldn’t go amiss though.

Back at Dark Horse I finished the alterations on costumes, helped with a mark up of the stage for full rehearsals next week. Then when I was left on my own it was time to don my mask and finish off the giant mug. Getting things lined up and stuck on straight took time. The outside was covered, then the handle. Thankfully my plan for this worked out and two tins of stinky glue later the mug was finished.

Still with time before my booked train, I worked my way through a few props that needed painting. Packed everything away and then removed my mask. Hopefully the aroma on spray paint and any stinky glue will dissipate over the weekend.

My return journey was slightly hampered by late running trains, but this actually meant I still arrived back in Newark on time.

During the day, posts on the Trentlink group had been going about regarding Maud’s Bridge on the Stainforth and Keadby Canal. Then an official C&RT notice was put out.

Update on 27/01/2023:

We have now assessed the works required to the bridge following the damage caused by the road traffic accident and are now preparing for the comprehensive repair to be completed by our contractor.

In advance of this, following advice from our engineers, we will take a team to open the bridge to canal traffic on Tuesday 31st January at 10:30 and then close it at 11:30, allowing all boats currently in the area to pass the bridge.

Following this we will consider further openings as required until a full repair is complete. We will also update this notice with details of the full repair when we have them.

Brilliant! Except we won’t be able to make the hour time slot.

Huddersfield Station

Mick sent an email, to which he got the standard reply that he would get an answer within five working days. So he made a phone call.

The chap seemed fairly hopeful that another bridge swing would be possible for us on another day. He would know more in Monday and call us back. Lets hope we can find a window where everything fits together before too long, so we can move Oleanna up to Yorkshire.

0 locks, 0 miles, 6 trains, 1 rip, 4 inches, 2 tucks untucked, 2 x 9m, 12 white lines, 9 numbers, 36 pieces velcro, 2 tins stinky stink sticky stuff, 1 large mug, 2 caddies, 2 wands, 2 books, 1 giant spoon, 1 shower door, 0 view, 0 noise, 1 hour opening, 2 many commitments 2 make it, 4 meals with sprinkles, 2 pies, 2 jackets.

PS Do you normally receive blog posts by email? Have they stopped coming into your Inbox? Please let us know. Thank you

None Update. 26th January

Kings Marina, Newark

Over the last few days the towpath investigators have been out on the Stainforth and Keadby Canal where Maud’s Swing Bridge has sat closed to boat traffic for two months following a vehicle strike. Footage of the damage has appeared on social media pages.

The general consensus is ‘what’s the problem!?!’ as what is visible is only a bent railing and not a very dramatic one at that. On Oleanna we do our best to take a measured view of such things. The vehicle strike may not look that dramatic on the top but has it affected things below the road surface making the bridge harder to open and close.

Is there an element of the bridge being needed as a diversion route to avoid Moores Bridge whilst the works there have overrun. If you can’t get through one bridge there is no rush to mend the next one as the canal is closed to boats anyway. We know that there is an issue with C&RT claiming against the vehicles insurance and that may take time.

Rumours are that the IWA will be meeting with C&RT to discuss the problems at Mauds Bridge. But will there be an update about this? There has been no update notice since the bridge was first closed two months ago.

Mick decided to send an enquiry to C&RT.

Maud’s Swing Bridge on the Stainforth & Keadby Canal has been closed since 23rd November following a vehicle strike. Now I do understand that the vehicle strike is outside of your control. However since the original stoppage notice over two months ago there has been no further update with regard to the status of this stoppage. We were planning to come through this bridge early in January in order to get back to our booked mooring in Goole. Our plans have been seriously scuppered by this extended closure not helped by the total lack of any updates or information from yourselves. I did ring up to enquire about this closure and was informed that there is no update available and that the bridge might be closed for months. If this is the case why don’t you update the stoppage notice accordingly? If this stoppage is to carry on for much longer would C&RT consider paying for the cost of a pilot to take us round Trent Falls from Keadby to Goole so we can get back to our mooring?

Their reply this morning.

I am really sorry to hear that the closure of this bridge has affected your plans. 

We have refrained from updating the notice further as nothing has changed since we last updated it. I really do understand how frustrating this is but we thought it would be best to wait on concrete news before we update any more, so for now we have left it as it is. We are doing our best to find out more information. However, This is a complicated closure and it was unforeseen, so it is taking a little longer than we’d all like to resolve this one. 

Once we have new information regarding this we will update accordingly via our notices and stoppages.

In terms of paying for you to get back to the winter mooring I don’t think it’s something we can commit to, Which I am sorry to inform you. I can confirm that we will be happy to assist you with any requested over stays whilst you get back to your winter mooring. We’ll be happy to help you with this any time you request or need it.

Not updating the notice because there is no news, just fuels the towpath investigators, conspiracy theories etc. Yes it’s complex but we only know that because we’ve asked about it. It’s a bit like sitting on a train that has stopped in the middle of nowhere, maybe in the middle of a tunnel, and the guard coming on the tanoy to tell you the train has stopped. Then nothing, no reason given, just silence, for hours and hours. All you can do is sit in the dark with no view. Train passengers expect and usually get more information.

No news is not always good news!

We look forward to an update being issued.

Don’t Just Sit There Having A Bath! 24th January

Hazelford Lock

The decision to stay put today had been made last night. C&RT were working on Town Lock in Newark today with possible delays for two hours. That was if we could get there as yesterday we’d had reports that between the lock and the next bridge had been frozen.

Mick made a phone call to King’s Marina, were they iced up? What was their diesel price? There was ice still around the edges of the marina, but the central section had thawed. We’ll do a diesel price comparison with the other two marinas tomorrow.

On the outside

A sausage day for Tilly. Allowed out at breakfast time with two hours. The two hours was extended each time she returned. Something was certainly keeping her busy out there.

Simon from C&RT walked by during the morning, presumably continuing his checks at each lock. Then there was a chap walking his dog, most probably from the Dutch Barge Lily. Other than that island life was quiet, except the noise from the weir. No passing boats today.

Hand sewing still possible

Time for me to collect my thoughts a bits and pieces together for my next visit to Huddersfield this week. Name tags were sewn into the new overalls. A couple of spare chip trays were made in pink and purple. A new batch of felt badges were started, ready to be added to overalls. The large wheelie bag was dug out from under the bed and filled up with things to take. The back steps were taken out to access my paint brush bag and an edited few brushes and chalk line made it into things to take.

Badges in the making

Tilly returned to warm up three quarters of an hour before cat curfew. We tried to convince her that she should make the most of her shore leave as it will be the last for some time. But it fell on deaf pointy ears, Tilly preferring to have a bath in front of the stove instead.

Winter sunset

This evening we enjoyed the last, apart from a butties worth, of roast pork with red peppers and paprika. Yum.

0 locks, 0 miles, 2 chaps, 1 woofer, 2 hours, 2 hours, 2 hours more! 3 overalls, 16 badges, 3 nice brushes, 1 small roller, 1 clean pot, 1 wheelie bag, 2 train journeys booked.

Gunthorpe At High Noon. 23rd January

Stoke Lock to Low side Hazelford Lock

Sitting waiting

The alarm was set this morning, no time for a cuppa in bed either! Breakfast was followed by emptying the yellow water tank, then we walked our rubbish down to the bins by the lock. There was no sign of a volunteer, just a cleaner in the loos and a chap clearing things away from the works that had been happening at the lock.

Stoke Lock very pretty

The lock has had an upgrade this winter, new LED lights and new boat operated pedestals. At the moment the pedestals are not working so someone from C&RT has to come out and work the lock for you from the cabin, booking required with 24hr notice. Cheryl from the Milton Keynes Office called us to say there had been problems at Holme Lock this morning and the person coming was on their way, they’d just be late. We decided to get Oleanna and move her down into the lock cut ready.

Heading inside for a bit of warmth brought the Lock Keeper, Simon, not a volunteer. He’d been trying to clear all the rubbish at Holme Lock this morning as it was stuck behind the gates. He asked us to wait where we were, Stoke Lock needed emptying to check the gates first before we could go in. He then asked us to pull in on the starboard side, he’d only be able to open the bottom gate that side as they were still having problems with the hydraulics.

One gate only

The gates were tested, then we got the green light to go in. As we descended Mick asked if it was possible to do a radio check with Simon, this was the first opportunity to check his Christmas present worked, thankfully it did. Simon was heading to Gunthorpe Lock next, would we like his assistance? Well it would save me having to jump back onto Oleanna from the pontoon below the lock in the full current from the weir. But it would also mean being in the lock, holding a rope round a blue riser! We accepted his offer and arranged to meet downstream in about an hour.

A perfect winters day

Out of the lock we came, blue skies surrounding us. What a beautiful day. We waved to the ladies who rescued Tilly when she was a kitten as we passed Burton Joyce, round the big sweeping bend. Geese flew overhead. Then a flock of birds, not sure what type swooped in murmuration high above the river, switching and changing direction, then settled again only to take off as we passed them by. What a wonderful sight.

The pontoon at Gunthorpe was empty, but we carried on towards the lock cut, pulling in at the water point. We were early for our rendez vous with Simon. Should we wait or operate the lock ourselves? Hmm, that would mean fighting to get back onboard below the lock. We opted to wait.

Gunthorpe Bridge and moorings

Waiting for the lights to change, which side of the lock to pull in on, the blue risers, the V channels behind them, all very familiar from seven years ago. Simon arrived at noon and worked the lock for us. We took it steady, no need to rush in any lock, especially one with blue risers! I took a deep breath, I still hate this lock with a passion.

Simon checked below and gave us information about rubbish that may lay in our way below. He needed to hang around at the lock so wouldn’t see us at Hazelford. The lock gates opened, we thanked him and sped off down stream again. All 9.75 digits still in tact.

This reach is particularly pretty and today it was just stunning. We were glad of our layers, but the blue sky with wispy clouds above was so beautiful. The last two years we’ve missed cruising in the winter. The views (when there’s no fog) are so different. People say there are 2000 miles of the network to explore, true, but there is there and back again and then all four seasons to enjoy. The river was ours and the birds. Wonderful.

Above Hazelford the lock cut was full of C&RT boats, a skip boat, the crane boat and Maid Marion the tug boat. I climbed a ladder on the island and headed to press buttons. It was hard to see Oleanna as the level dropped, but she reappeared on leaving the lock.

There was a Dutch Barge at the far end of the moorings, we pulled in to the lower section, only recently revealed from the flood waters. Tilly was allowed some shore leave and made the most of it once she’d got to the top of the big steps. She returned with a mouth full and was sent away again.

It’s a chunky outside this one!

A tap on our roof mid afternoon, a chap was here to help remove a rope from a prop. Not us, it must have been someone above the lock. An hour or so later we heard a boat engine, the boat from Stoke Lock.

News came through that the stretch above Town Lock in Newark was iced up from a member of the Trentlink facebook group. They had tried to get through yesterday but had no luck. Maybe we’ll have a sausage day tomorrow and hope it thaws.

Hello!

Much of the afternoon was spent sorting out future lodgers for the house. Another favourite actor had been in touch today. We’re now booked up for a third of the year ahead.

3 locks, 2 assisted, 9.6 miles, 1 hour late, 1 deja vous, 9.75, 2 hours shore leave, 1 friend at least, 1 happy cat, 1 glorious day boating, 1 cheeky robin, 1 boat behind us, 1st Look North, 6 lodgers, 1 Mrs Tilly stamp of approval.

https://goo.gl/maps/Hpg99bRANBi17VZR9

Bloomin Maud! 18th January

Shardlow

First there was ice. Then too much water. Now it’s a bridge!

Our plans may have to change. We’d been hoping to reach Yorkshire by now, but obviously the River Trent being in flood hasn’t helped that. All part of boating through the winter especially where rivers are concerned. Now as the river levels are dropping, gradually, we’ve been looking further ahead.

1.5m today down 28cm from yesterday

Vazon Sliding Bridge had problems in the heat last summer, since then the bridge is opened twice a day to boat traffic at 9am and 1pm, apart from when Network Rail are on strike. If the river hadn’t been in flood we’d have had a days wait before we could pass through.

When Mick had phoned to book passage in at Keadby the Lock Keeper mentioned that Maud’s Swing Bridge was also closed. A date for it to open unknown! Hmm. Here’s a link to the stoppage notice LINK. It has been closed since the 23rd November, the notice hasn’t had an update.

Maud’s Bridge 2nd April 2022

Mick rang C&RT and worked his way though to the right part of the country and got to talk to a lady regarding the bridge. Apparently the bridge was struck by a vehicle back in November causing a lot of damage. It has been taking time for the drivers insurance company to sort things out and as yet the engineers haven’t come up with a method of mending the bridge. So at the moment there is no known date for it to open, it could be months! The lady was trying to get someone to do an update.

Poo bar bum!

A re-think is needed. Options.

  • We continue downstream and exit the River Trent at Keadby, then sit and wait for the bridge to open. Not a popular option.
  • We head downstream on the Trent and wait for a suitable day to head round Trent Falls. Not a popular route in the winter months.
  • We continue downstream and find somewhere to moor that isn’t in Yorkshire, but as close as we can get with good transport links. Maybe.
  • We stay put in Shadlow, easy access to transport. Maybe.
  • We turn around and once Stenson Lock reopens, with its new gates, we head up the west side of the country to cross the Pennines over into Yorkshire. A lengthy journey especially in winter, juggling it around work, stoppages and weather. Hmmm.

We’ve got some thinking to do. One option is looking the most likely at the moment.

Today I managed to work through the alterations on another pair of overalls. These were size XS, but still needed the arms and legs shortening. One pair left to do. Mick returned from Scarborough with a few bits I’ll be needing for #unit21 in the next few weeks.

0 locks, 0 miles, 2 trains, 1 bus, 1 broken bridge, 1 river coming down, 5 options, 2 pairs overalls finished, 7.5 inches, 5.5 inches, 1 still to do.

Lock Spotting. 9th January

Shardlow

1.63m up by 8cm from yesterday

The alarm went off early and Mick was up and on his way to the bus stop at 7am. The bus this morning was packed, standing room only, presumably overnight workers from East Midlands Airport. Picking up a van from Enterprise he then called in at Wickes. Here he bought several bags of coal as our stocks are starting to run low.

The parking at the mooring isn’t the easiest. Fulltime moorers have access through a gate, but Mick pulled in as close to the hedge as he could so as not to be in the way. As he off loaded the coal onto the roof he was handed items to head to Huddersfield, all the giant sized props, materials I wouldn’t be needing on the boat etc.

Skips heading to somewhere else by road

As we passed by the Clock Warehouse we could see that the skip boats were being craned out onto lorries in the pub car park. The narrowboat that had been by the pub had moved over to the water point, by the end of the day they had moved back across once the skips had been taken away.

Ergh!

The journey northwards was pretty horrid with almost constant rain and spray on the roads. A quick pull in to get something for lunch and we were soon pulling up close to the Piazza in Huddersfield where Dark Horse rehearse.

4E of the Huddersfield Narrow is just round the corner

I stayed to do costume fittings whilst Mick drove to Sewerby Bridge. Close to Tuel Lane Lock is a company called JC Joel. They provide and make drapes and fabrics for the entertainment industry. Mick was here to pick up a roll of dance floor which is suitable for painting with the right additives in the paint. The existing flooring for #unit21 was cheap vinyl (I had a limited budget) and had already torn before it was laid last year, it certainly wouldn’t survive a tour to five venues.

Lunchtime conversation

Back in Huddersfield I tried overalls on two of the actors. Down Syndrome people tend to have short limbs so there was a lot of pinning up and a few nips and tucks on shoulders to do, the overalls are meant for builders not 4ft actors after all.

After lunch Amy (Director) and I went through the props I’d brought with me and those that had been delivered. The giant mug had it’s handle added and was immediately tried out by Amy for weight. Then Alice was called over to check she could easily lift it on her own to take a swig of tea. All worked well. The remaining covering will get added on another visit in a couple of weeks time.

The Piazza was a shopping centre and has been ear marked for sometime to be redeveloped. The shops have gradually been moving out and the empty units have been used temporarily by art groups like Dark Horse. One large unit runs an art workspace for children, their windows always have something fun to look at. Another window showed off a giant cardboard sculpture of Bob Marley, brilliant.

Temporary Contemporary shop was the Chemists, Dark Horse behind the orange doors on the right

I took a little time to work out which shop had been used for the chemists in Happy Valley. Now a gallery with anaglypta on its walls. As the scene moved away from the shop you can see animal heads in the window of the children’s workspace, I think the scene was filmed around February last year as I have photos of the animal heads.

Last years display

Mick returned with the van and flooring. Two of the actors came out to look after the van whilst Mick and I struggled to move the large roll. A lovely chap offered to assist, then Amy came out to help too. We managed to get it into the unit, I’ll be needing some assistance to move it about when I cut it to length in a few weeks time.

The lower deck of the M1 going over the Sheffield and Tinsley Locks

A pause in Sheffield to visit Hobbycraft for a few bits then we headed for the Co-op in Castle Donnington to see what they had to offer before returning to the boat. Costume returns were organised, parcelled up and labelled for the morning.

Quite a busy day in Yorkshire.

0 locks, 6 locks spotted, 0 miles, 1 van, 191 miles, 2 overalls to shrink, 1 spare pair to make bigger, 3 braces tabs, 1 big swig of tea, 3 ÂŁ1 books, ÂŁ600 worth of floor, 2 near hernias, 1 new sandwich flavour, 1 location, 3 pairs trainers, 1 pair cycling shorts, 1 cat pleased to see us home, 12 sad git sausages, 2 sad git punnets of blueberries, 1 sad git gluten free loaf, 1 emptier boat.