Category Archives: Canal and River Trust

Shrunk or Grown. 26th 27th January.

King’s Marina

I was off to catch a train, well three that would get me to Huddersfield mid morning. The current track record of Transpennine Express is really quite poor, trains being cancelled here there and everywhere, so my last leg of the journey couldn’t be guaranteed. Thankfully all went to plan without too long standing on platforms in the cold. I even got to see Lincoln Cathedral from my first train way way off in the distance.

Coming into the marina to fill up

Mick was left to check in with Paula the marina manager at King’s. She was wanting to give us the best deal on mooring, cheaper to pay for three months than on a daily rate. However, as soon as we know that the way ahead is open, the tides are right and I’m not at work we will be moving downstream. So Mick opted to pay weekly.

Borrowing the directors sewing machine meant I could finish sewing one costume. Now all nine actors have overalls they can wear to rehearse in over the next few weeks. We got everyone into their costumes to check them over. Had anything changed? One chaps overall seemed a touch too tight, easy to undo a couple of darts in the back. Sadly someone else was in a situation where the zip wouldn’t do up, a case of shrinking and expanding going on in unison. Notes were taken for expansion, all those off cuts from arms and legs come in handy for waist lines.

Mark, Rebekah, Alice and Meghan

Time to position the numbers I’d made. With everyone stood in a row they looked like mug shots of convicts.

Drawn out and based in

Rehearsals continued elsewhere for the remainder of the day giving me use of the studio floor. Connor came to help roll out the new show flooring, cutting the big roll into three and then marking out the design. Base coats of white were applied, all ready for the green to go next time.

Numbers

I’ve been quite astounded at the price the Premier Inn were wanting to charge me for production week, so on this trip I’d booked an AirBnB to try out for a night. With a bag of alterations to tack I headed to find my room and see if the access codes worked. The front door was easy, the one for my room a little bit more tricksy, but I got there in the end.

I checked around to see what I had, a small kitchen area with cooker fridge and microwave. No sharp knife and slightly heat affected cupboards the laminate edging having come away sometime ago. The cooker and fridge are a bonus, no storing breakfast on a window sill and a heater that actually works without a big fan going constantly.

Chips were only for reference purposes

With some supplies bought along with a portion of chips from the nearby takeaway I set to with alterations sat on my sofa with a huge TV mounted on the wall. TV signal here would certainly get a thumbs down as I couldn’t seem to get any terrestrial channels. I also didn’t want to interact with Alexa as so far I’ve managed to avoid having her in my life. Eventually I did manage to get something to have on in the back ground, early episodes of Silent Witness, the lab used to be next to Kings’ College in Cambridge.

My digs

Digs verdict. Well it would be nice if the gap under the door didn’t let light in constantly. The microwave clock is easily covered up with a sketch book or tea towel. The shower door was easily rehung. The romantic view from behind the blind of buildings three foot away did mean no noise from the ring road next door (quieter than the Premier Inn). The big strip light was useful for sewing, but gave an atmosphere similar to that found in a dentists chair. If I stay again I’ll try to fix the shower so that more water comes out of the head than dribbles down the pipe. Having a fridge and cooker though may outweigh other things and it is two minutes walk from the theatre and £200 cheaper than Premier Inn, A bit more cutlery wouldn’t go amiss though.

Back at Dark Horse I finished the alterations on costumes, helped with a mark up of the stage for full rehearsals next week. Then when I was left on my own it was time to don my mask and finish off the giant mug. Getting things lined up and stuck on straight took time. The outside was covered, then the handle. Thankfully my plan for this worked out and two tins of stinky glue later the mug was finished.

Still with time before my booked train, I worked my way through a few props that needed painting. Packed everything away and then removed my mask. Hopefully the aroma on spray paint and any stinky glue will dissipate over the weekend.

My return journey was slightly hampered by late running trains, but this actually meant I still arrived back in Newark on time.

During the day, posts on the Trentlink group had been going about regarding Maud’s Bridge on the Stainforth and Keadby Canal. Then an official C&RT notice was put out.

Update on 27/01/2023:

We have now assessed the works required to the bridge following the damage caused by the road traffic accident and are now preparing for the comprehensive repair to be completed by our contractor.

In advance of this, following advice from our engineers, we will take a team to open the bridge to canal traffic on Tuesday 31st January at 10:30 and then close it at 11:30, allowing all boats currently in the area to pass the bridge.

Following this we will consider further openings as required until a full repair is complete. We will also update this notice with details of the full repair when we have them.

Brilliant! Except we won’t be able to make the hour time slot.

Huddersfield Station

Mick sent an email, to which he got the standard reply that he would get an answer within five working days. So he made a phone call.

The chap seemed fairly hopeful that another bridge swing would be possible for us on another day. He would know more in Monday and call us back. Lets hope we can find a window where everything fits together before too long, so we can move Oleanna up to Yorkshire.

0 locks, 0 miles, 6 trains, 1 rip, 4 inches, 2 tucks untucked, 2 x 9m, 12 white lines, 9 numbers, 36 pieces velcro, 2 tins stinky stink sticky stuff, 1 large mug, 2 caddies, 2 wands, 2 books, 1 giant spoon, 1 shower door, 0 view, 0 noise, 1 hour opening, 2 many commitments 2 make it, 4 meals with sprinkles, 2 pies, 2 jackets.

PS Do you normally receive blog posts by email? Have they stopped coming into your Inbox? Please let us know. Thank you

None Update. 26th January

Kings Marina, Newark

Over the last few days the towpath investigators have been out on the Stainforth and Keadby Canal where Maud’s Swing Bridge has sat closed to boat traffic for two months following a vehicle strike. Footage of the damage has appeared on social media pages.

The general consensus is ‘what’s the problem!?!’ as what is visible is only a bent railing and not a very dramatic one at that. On Oleanna we do our best to take a measured view of such things. The vehicle strike may not look that dramatic on the top but has it affected things below the road surface making the bridge harder to open and close.

Is there an element of the bridge being needed as a diversion route to avoid Moores Bridge whilst the works there have overrun. If you can’t get through one bridge there is no rush to mend the next one as the canal is closed to boats anyway. We know that there is an issue with C&RT claiming against the vehicles insurance and that may take time.

Rumours are that the IWA will be meeting with C&RT to discuss the problems at Mauds Bridge. But will there be an update about this? There has been no update notice since the bridge was first closed two months ago.

Mick decided to send an enquiry to C&RT.

Maud’s Swing Bridge on the Stainforth & Keadby Canal has been closed since 23rd November following a vehicle strike. Now I do understand that the vehicle strike is outside of your control. However since the original stoppage notice over two months ago there has been no further update with regard to the status of this stoppage. We were planning to come through this bridge early in January in order to get back to our booked mooring in Goole. Our plans have been seriously scuppered by this extended closure not helped by the total lack of any updates or information from yourselves. I did ring up to enquire about this closure and was informed that there is no update available and that the bridge might be closed for months. If this is the case why don’t you update the stoppage notice accordingly? If this stoppage is to carry on for much longer would C&RT consider paying for the cost of a pilot to take us round Trent Falls from Keadby to Goole so we can get back to our mooring?

Their reply this morning.

I am really sorry to hear that the closure of this bridge has affected your plans. 

We have refrained from updating the notice further as nothing has changed since we last updated it. I really do understand how frustrating this is but we thought it would be best to wait on concrete news before we update any more, so for now we have left it as it is. We are doing our best to find out more information. However, This is a complicated closure and it was unforeseen, so it is taking a little longer than we’d all like to resolve this one. 

Once we have new information regarding this we will update accordingly via our notices and stoppages.

In terms of paying for you to get back to the winter mooring I don’t think it’s something we can commit to, Which I am sorry to inform you. I can confirm that we will be happy to assist you with any requested over stays whilst you get back to your winter mooring. We’ll be happy to help you with this any time you request or need it.

Not updating the notice because there is no news, just fuels the towpath investigators, conspiracy theories etc. Yes it’s complex but we only know that because we’ve asked about it. It’s a bit like sitting on a train that has stopped in the middle of nowhere, maybe in the middle of a tunnel, and the guard coming on the tanoy to tell you the train has stopped. Then nothing, no reason given, just silence, for hours and hours. All you can do is sit in the dark with no view. Train passengers expect and usually get more information.

No news is not always good news!

We look forward to an update being issued.

Don’t Just Sit There Having A Bath! 24th January

Hazelford Lock

The decision to stay put today had been made last night. C&RT were working on Town Lock in Newark today with possible delays for two hours. That was if we could get there as yesterday we’d had reports that between the lock and the next bridge had been frozen.

Mick made a phone call to King’s Marina, were they iced up? What was their diesel price? There was ice still around the edges of the marina, but the central section had thawed. We’ll do a diesel price comparison with the other two marinas tomorrow.

On the outside

A sausage day for Tilly. Allowed out at breakfast time with two hours. The two hours was extended each time she returned. Something was certainly keeping her busy out there.

Simon from C&RT walked by during the morning, presumably continuing his checks at each lock. Then there was a chap walking his dog, most probably from the Dutch Barge Lily. Other than that island life was quiet, except the noise from the weir. No passing boats today.

Hand sewing still possible

Time for me to collect my thoughts a bits and pieces together for my next visit to Huddersfield this week. Name tags were sewn into the new overalls. A couple of spare chip trays were made in pink and purple. A new batch of felt badges were started, ready to be added to overalls. The large wheelie bag was dug out from under the bed and filled up with things to take. The back steps were taken out to access my paint brush bag and an edited few brushes and chalk line made it into things to take.

Badges in the making

Tilly returned to warm up three quarters of an hour before cat curfew. We tried to convince her that she should make the most of her shore leave as it will be the last for some time. But it fell on deaf pointy ears, Tilly preferring to have a bath in front of the stove instead.

Winter sunset

This evening we enjoyed the last, apart from a butties worth, of roast pork with red peppers and paprika. Yum.

0 locks, 0 miles, 2 chaps, 1 woofer, 2 hours, 2 hours, 2 hours more! 3 overalls, 16 badges, 3 nice brushes, 1 small roller, 1 clean pot, 1 wheelie bag, 2 train journeys booked.

Gunthorpe At High Noon. 23rd January

Stoke Lock to Low side Hazelford Lock

Sitting waiting

The alarm was set this morning, no time for a cuppa in bed either! Breakfast was followed by emptying the yellow water tank, then we walked our rubbish down to the bins by the lock. There was no sign of a volunteer, just a cleaner in the loos and a chap clearing things away from the works that had been happening at the lock.

Stoke Lock very pretty

The lock has had an upgrade this winter, new LED lights and new boat operated pedestals. At the moment the pedestals are not working so someone from C&RT has to come out and work the lock for you from the cabin, booking required with 24hr notice. Cheryl from the Milton Keynes Office called us to say there had been problems at Holme Lock this morning and the person coming was on their way, they’d just be late. We decided to get Oleanna and move her down into the lock cut ready.

Heading inside for a bit of warmth brought the Lock Keeper, Simon, not a volunteer. He’d been trying to clear all the rubbish at Holme Lock this morning as it was stuck behind the gates. He asked us to wait where we were, Stoke Lock needed emptying to check the gates first before we could go in. He then asked us to pull in on the starboard side, he’d only be able to open the bottom gate that side as they were still having problems with the hydraulics.

One gate only

The gates were tested, then we got the green light to go in. As we descended Mick asked if it was possible to do a radio check with Simon, this was the first opportunity to check his Christmas present worked, thankfully it did. Simon was heading to Gunthorpe Lock next, would we like his assistance? Well it would save me having to jump back onto Oleanna from the pontoon below the lock in the full current from the weir. But it would also mean being in the lock, holding a rope round a blue riser! We accepted his offer and arranged to meet downstream in about an hour.

A perfect winters day

Out of the lock we came, blue skies surrounding us. What a beautiful day. We waved to the ladies who rescued Tilly when she was a kitten as we passed Burton Joyce, round the big sweeping bend. Geese flew overhead. Then a flock of birds, not sure what type swooped in murmuration high above the river, switching and changing direction, then settled again only to take off as we passed them by. What a wonderful sight.

The pontoon at Gunthorpe was empty, but we carried on towards the lock cut, pulling in at the water point. We were early for our rendez vous with Simon. Should we wait or operate the lock ourselves? Hmm, that would mean fighting to get back onboard below the lock. We opted to wait.

Gunthorpe Bridge and moorings

Waiting for the lights to change, which side of the lock to pull in on, the blue risers, the V channels behind them, all very familiar from seven years ago. Simon arrived at noon and worked the lock for us. We took it steady, no need to rush in any lock, especially one with blue risers! I took a deep breath, I still hate this lock with a passion.

Simon checked below and gave us information about rubbish that may lay in our way below. He needed to hang around at the lock so wouldn’t see us at Hazelford. The lock gates opened, we thanked him and sped off down stream again. All 9.75 digits still in tact.

This reach is particularly pretty and today it was just stunning. We were glad of our layers, but the blue sky with wispy clouds above was so beautiful. The last two years we’ve missed cruising in the winter. The views (when there’s no fog) are so different. People say there are 2000 miles of the network to explore, true, but there is there and back again and then all four seasons to enjoy. The river was ours and the birds. Wonderful.

Above Hazelford the lock cut was full of C&RT boats, a skip boat, the crane boat and Maid Marion the tug boat. I climbed a ladder on the island and headed to press buttons. It was hard to see Oleanna as the level dropped, but she reappeared on leaving the lock.

There was a Dutch Barge at the far end of the moorings, we pulled in to the lower section, only recently revealed from the flood waters. Tilly was allowed some shore leave and made the most of it once she’d got to the top of the big steps. She returned with a mouth full and was sent away again.

It’s a chunky outside this one!

A tap on our roof mid afternoon, a chap was here to help remove a rope from a prop. Not us, it must have been someone above the lock. An hour or so later we heard a boat engine, the boat from Stoke Lock.

News came through that the stretch above Town Lock in Newark was iced up from a member of the Trentlink facebook group. They had tried to get through yesterday but had no luck. Maybe we’ll have a sausage day tomorrow and hope it thaws.

Hello!

Much of the afternoon was spent sorting out future lodgers for the house. Another favourite actor had been in touch today. We’re now booked up for a third of the year ahead.

3 locks, 2 assisted, 9.6 miles, 1 hour late, 1 deja vous, 9.75, 2 hours shore leave, 1 friend at least, 1 happy cat, 1 glorious day boating, 1 cheeky robin, 1 boat behind us, 1st Look North, 6 lodgers, 1 Mrs Tilly stamp of approval.

https://goo.gl/maps/Hpg99bRANBi17VZR9

Bloomin Maud! 18th January

Shardlow

First there was ice. Then too much water. Now it’s a bridge!

Our plans may have to change. We’d been hoping to reach Yorkshire by now, but obviously the River Trent being in flood hasn’t helped that. All part of boating through the winter especially where rivers are concerned. Now as the river levels are dropping, gradually, we’ve been looking further ahead.

1.5m today down 28cm from yesterday

Vazon Sliding Bridge had problems in the heat last summer, since then the bridge is opened twice a day to boat traffic at 9am and 1pm, apart from when Network Rail are on strike. If the river hadn’t been in flood we’d have had a days wait before we could pass through.

When Mick had phoned to book passage in at Keadby the Lock Keeper mentioned that Maud’s Swing Bridge was also closed. A date for it to open unknown! Hmm. Here’s a link to the stoppage notice LINK. It has been closed since the 23rd November, the notice hasn’t had an update.

Maud’s Bridge 2nd April 2022

Mick rang C&RT and worked his way though to the right part of the country and got to talk to a lady regarding the bridge. Apparently the bridge was struck by a vehicle back in November causing a lot of damage. It has been taking time for the drivers insurance company to sort things out and as yet the engineers haven’t come up with a method of mending the bridge. So at the moment there is no known date for it to open, it could be months! The lady was trying to get someone to do an update.

Poo bar bum!

A re-think is needed. Options.

  • We continue downstream and exit the River Trent at Keadby, then sit and wait for the bridge to open. Not a popular option.
  • We head downstream on the Trent and wait for a suitable day to head round Trent Falls. Not a popular route in the winter months.
  • We continue downstream and find somewhere to moor that isn’t in Yorkshire, but as close as we can get with good transport links. Maybe.
  • We stay put in Shadlow, easy access to transport. Maybe.
  • We turn around and once Stenson Lock reopens, with its new gates, we head up the west side of the country to cross the Pennines over into Yorkshire. A lengthy journey especially in winter, juggling it around work, stoppages and weather. Hmmm.

We’ve got some thinking to do. One option is looking the most likely at the moment.

Today I managed to work through the alterations on another pair of overalls. These were size XS, but still needed the arms and legs shortening. One pair left to do. Mick returned from Scarborough with a few bits I’ll be needing for #unit21 in the next few weeks.

0 locks, 0 miles, 2 trains, 1 bus, 1 broken bridge, 1 river coming down, 5 options, 2 pairs overalls finished, 7.5 inches, 5.5 inches, 1 still to do.

Lock Spotting. 9th January

Shardlow

1.63m up by 8cm from yesterday

The alarm went off early and Mick was up and on his way to the bus stop at 7am. The bus this morning was packed, standing room only, presumably overnight workers from East Midlands Airport. Picking up a van from Enterprise he then called in at Wickes. Here he bought several bags of coal as our stocks are starting to run low.

The parking at the mooring isn’t the easiest. Fulltime moorers have access through a gate, but Mick pulled in as close to the hedge as he could so as not to be in the way. As he off loaded the coal onto the roof he was handed items to head to Huddersfield, all the giant sized props, materials I wouldn’t be needing on the boat etc.

Skips heading to somewhere else by road

As we passed by the Clock Warehouse we could see that the skip boats were being craned out onto lorries in the pub car park. The narrowboat that had been by the pub had moved over to the water point, by the end of the day they had moved back across once the skips had been taken away.

Ergh!

The journey northwards was pretty horrid with almost constant rain and spray on the roads. A quick pull in to get something for lunch and we were soon pulling up close to the Piazza in Huddersfield where Dark Horse rehearse.

4E of the Huddersfield Narrow is just round the corner

I stayed to do costume fittings whilst Mick drove to Sewerby Bridge. Close to Tuel Lane Lock is a company called JC Joel. They provide and make drapes and fabrics for the entertainment industry. Mick was here to pick up a roll of dance floor which is suitable for painting with the right additives in the paint. The existing flooring for #unit21 was cheap vinyl (I had a limited budget) and had already torn before it was laid last year, it certainly wouldn’t survive a tour to five venues.

Lunchtime conversation

Back in Huddersfield I tried overalls on two of the actors. Down Syndrome people tend to have short limbs so there was a lot of pinning up and a few nips and tucks on shoulders to do, the overalls are meant for builders not 4ft actors after all.

After lunch Amy (Director) and I went through the props I’d brought with me and those that had been delivered. The giant mug had it’s handle added and was immediately tried out by Amy for weight. Then Alice was called over to check she could easily lift it on her own to take a swig of tea. All worked well. The remaining covering will get added on another visit in a couple of weeks time.

The Piazza was a shopping centre and has been ear marked for sometime to be redeveloped. The shops have gradually been moving out and the empty units have been used temporarily by art groups like Dark Horse. One large unit runs an art workspace for children, their windows always have something fun to look at. Another window showed off a giant cardboard sculpture of Bob Marley, brilliant.

Temporary Contemporary shop was the Chemists, Dark Horse behind the orange doors on the right

I took a little time to work out which shop had been used for the chemists in Happy Valley. Now a gallery with anaglypta on its walls. As the scene moved away from the shop you can see animal heads in the window of the children’s workspace, I think the scene was filmed around February last year as I have photos of the animal heads.

Last years display

Mick returned with the van and flooring. Two of the actors came out to look after the van whilst Mick and I struggled to move the large roll. A lovely chap offered to assist, then Amy came out to help too. We managed to get it into the unit, I’ll be needing some assistance to move it about when I cut it to length in a few weeks time.

The lower deck of the M1 going over the Sheffield and Tinsley Locks

A pause in Sheffield to visit Hobbycraft for a few bits then we headed for the Co-op in Castle Donnington to see what they had to offer before returning to the boat. Costume returns were organised, parcelled up and labelled for the morning.

Quite a busy day in Yorkshire.

0 locks, 6 locks spotted, 0 miles, 1 van, 191 miles, 2 overalls to shrink, 1 spare pair to make bigger, 3 braces tabs, 1 big swig of tea, 3 £1 books, £600 worth of floor, 2 near hernias, 1 new sandwich flavour, 1 location, 3 pairs trainers, 1 pair cycling shorts, 1 cat pleased to see us home, 12 sad git sausages, 2 sad git punnets of blueberries, 1 sad git gluten free loaf, 1 emptier boat.

Oleanna Workshop. 6th January

Shardlow

Talk has turned to what to do should the river remain too high for us to head northwards. A week would be fine, but what if it ends up being several weeks? Maybe our route requires amending. Last year we’d only been interested in stoppages before Christmas holding up our progress, we’d not taken any note of those on the network behind us this year. Would we be able to reach Yorkshire by one of the Pennine routes?

1.52 m

We knew Wigan closed on the 3rd Jan. But what about the Rochdale or Huddersfield Narrow? Mick looked through the stoppages. If we could get Oleanna to Huddersfield for my show that would be brilliant. We knew there was a stoppage stopping us getting there from the east, but what about the west? A long stoppage in Slaithwaite, oh well! The Rochdale has stoppages scattered around too. So no Pennine route open to us. Even if there had been we’d have needed to be through Stenson Lock before next Monday when it closes for new bottom gates.

So it looks like we are here for the foreseeable. Forecast for more rain in a few days. Great!

Stern workshop

Time to get to work properly. Most of the jobs involve contact adhesive which is very very smelly, so not a job to be done inside. I set myself up a workshop at the stern under the pram cover for some shelter.

Drying area

The hatch got a layer of plastic to protect it, aerials moved out of the way. One of the lockers was cleared for a drying area. Time to get sticking yoga mats onto the formas I’ve made. The two sugar lumps were covered before lunchtime. The vapours coming from the glue as soon as you start to spread it out was really quite something, I ended up opening one of the sides of the pram cover, but it didn’t help that much.

Not a bad view, two widebeams added last night

I have previous experience of this glue. Frank used to use it to fix edging onto pieces of scenery at the SJT. On one show we used it to add curves of silver laminate to what became known as ‘the doughnut’ which hung from the lighting grid in Scarborough for ‘Making Waves’ a show about the RNLI in Northumberland. None of us were too keen on this particular piece of scenery which when back lit illuminated everything above it, including ducting which normally remains unseen for very good reasons.

All covered

My first experience was at college fixing fabric to foam shapes, sitting all day in a workshop with the extractors working hard. When I got home that day I proceeded to empty the fridge of all four of my house mates food hunting for my cheese grater! It is strong stuff.

Hmmm

I decided that I’d only do so much gluing each day to hopefully save my brain cells, so I moved back inside to work on the giant mug. The pipe I’d bought yesterday was measured out with the hope that the hair dryer we have on board would get the pipe hot enough to bend into shape. No chance! I also needed a vice, pieces of wood all sorts which simply were not available on Oleanna. Time to rethink.

That should work

I’d bought three 90 degree elbows yesterday, if I had one more I’d be able to make a handle, quite square, but it would do the job. Pipe was cut, holes in the mug to slot things through, yep it would do. Mick was volunteered to head back into town tomorrow to pick it up along with a suitable mask to protect me from the glue fumes.

Are you waiting for your Dingding to be served Tilly?

Mick carried on working on the trip computer. He managed to install the Android Operating System with not too much bother. It just won’t re-boot now! Still work in progress. He then moved on to removing the Christmas lights outside.

Work boats

During the day a couple of boats have come past, one presumably returning to it’s home mooring and a C&RT tug boat which returned with another skip several hours later. Will these be used for dredging? Or will the new lock gates be loaded into them for Stenson?

Finished bunny

0 locks, 0 miles, 1 makeshift workshop, 1 stinky morning, 1 head ache, 2 sugar cubes done, 2 bottoms done, 1 handle rethought, 2 holes, 2 rolls masking tape, 1 elbow missing, 0 response from the trip computer, 1 Friday night roast, 0 way out of here come Monday, 1 pompom.

Armed With A Hacksaw. 5th January

Shardlow

1.79 m

A list was made of items I still needed to purchase for #unit21, including a 3m length of plastic pipe! I nearly ordered it along with elbow joints online from Screwfix, but decided to see if there might be a DIY stall in Derby Market. Derby Market Hall is currently undergoing refurbishment, but I was aware of The Eagle Market, the front doors of Derby Playhouse open into the Market. The website suggested a couple of fabric stalls, time to catch the bus.

Mick had made the decision to fit the new alternator this morning and was already down in the engine bay. I required a hack saw so collected one on the way past. The Skylink bus picked me up and whizzed me into town. I made note of a Tool Station next to the big Royal Mail building where there was a handy bus stop, a much better location than Screwfix.

The Eagle Market has seen better days, I’d say only about a third of the units were occupied. I found a couple of fabric stalls and most of what I wanted and ended up having quite a chat with the lady who lives on a boat in Shardlow Marina. Sadly no-one had any navy velcro, that will have to be ordered on line.

We’ve missed Wind in the Willows

No DIY stalls. I had a wander around Derbion the big shopping mall, nothing of use in there, just a sandwich for lunch. Much of Derby Centre stands empty, the bright lights of the shopping centre, being out of the rain has pulled customers and retailers inside. Such a shame. But I believe Derby Council are hoping to rejuvenate the area, refurbishing the market hall being part of the plan to try to pull retailers back into the streets and make it a destination. Well that’s the standard blurb used for such places nowadays!

After a visit to Wilko I walked back to Tool Station taking note of a low wall just by the bus station. Pipe, elbows and cement purchased I headed for the low wall. Here I pulled out the hacksaw and cut the 3m length of pipe in half, no problem getting on the bus now.

Shardlow is getting quite full

At the water point in Shadlow there were three widebeams. WB Lazy Days had moved across from the pub moorings where now sat two C&RT skip boats. Then there were the two widebeams that had been moored above Derwent Mouth Lock, one having a wash, the other on the lock landing. Later on in the evening we could see tunnels lights and hear spikes being hammered in, we presume the widebeams had moved to above the lock, freeing up below.

Back at Oleanna Mick had been working hard to fit the new alternator. Three bolts and three wires, simple! Except things on the old one had settled in nicely, a touch of corrosion on the negative terminal made getting the nut undone a touch troublesome. Time and patience was required. One bolt was in an awkward position and when it came to fitting the new alternator things didn’t seem to marry up as they should do. It turned out there was a bush on one of the holes that needed adjustment. A tap with a hammer sorted this.

Power restored

All bolted in and connected the engine was fired up, things checked over. Everything working as it should. Hooray!

Time to pack Christmas away, well the lights outside could wait for light tomorrow. The tree was stripped and then given a good soaking in the sink. It will get a day or two inside before being popped in the cratch.

The neon bunny was just about finished off this evening. All limbs sewn on and body stuffed, just a fluffy tail needed. Although I may want to give him longer ears as he’ll be a magicians rabbit. Tilly wasn’t enamoured with it, I may have to hide it away so it doesn’t get beaten up!

0 locks, 0 miles, 2 buses, 24volt 120amp alternator fitted, 2m poly cotton, 1m stiff interfacing, 3m cut to 2 x 1.5ish, 3 widebeams, 1 bunny, 1 miffed cat.

Two Reds. 30th December

Shardlow

The levels appeared to have peaked this morning and were just starting to come down. We knew we wouldn’t be going anywhere today.

Phone reception is almost none existent inside the boat in Shardlow so it was no surprise when Micks phone received a text message from Adrian at C&RT. He’d tried calling to see if we were still wanting our booking tomorrow to go through Stoke Lock, Cranfleet Flood Gates were still closed. He already knew the answer as did we, Mick texted back confirming that we’d like to cancel our booking. He also asked what would happen from the 3rd of January at Stoke Lock, would we need to book? The answer was that there would be plenty of people about to pen us through when we arrive, hopefully soon afterwards the lock will be back to self operation. Adrian would stand the team down for lunchtime tomorrow.

Wall? What wall!!

Mick spent sometime sat out the back making phone calls to cancel all our Trent lock bookings. We’re hoping we may still be able to make the window of good tides next week, but who knows what the river will do and when Cranfleet Flood Gates will reopen. Cromwell Lock said that they’d be able to get us to Keadby one way or another, maybe missing out on a stop at West Stockwith. One slightly worrying thing was that despite us both remembering Mick having talked to Keadby Lock they didn’t seem to have us in the diary! Glad we hadn’t got to the M180 Bridge and radioed ahead with no-one expecting us! Doesn’t matter now, and we’ll double check when we booked it next.

Mick also called Shardlow Marina. Oleanna was due an oil change, the price of oil was a touch more than he was wanting to pay, maybe it would be cheaper to get the bus and buy some from Halfords? He decided to pay the extra and got on the bike and headed off.

When red lights shows it is not recommended for craft to proceed beyond this point due to flood conditions

Down the towpath at the Shardlow EA flood gates two red lights showed. Both the River Soar and Trent are closed. We’ve stayed this side of the flood gates just in case the river comes up even more!

Hmph!

Tilly did more calculations regarding the wall. She eyed up the wooden signposts again, checked them for claw stability, then decided the call of Dreamies was greater than achieving her goal of getting to the top of the wall.

Inside I took over the dinette table. Foamcor was measured out and cut up to make the base shapes of some giant sugar lumps and milk pods, the sort you get in hotels. I caught up on the Christmas Day radio 4 play which was directed by an acquaintance, The Signalman. All the edges of the shapes were covered in masking tape, this should stop the contact adhesive from eating into the foam when I come to cover them in yoga mats.

Held in place till it’s dry

Whilst the PVA glue was out I made use of it to re-stick some edging strip that was coming off in the bathroom. An off cut of foamcor proved useful to get the glue in behind the veneer. Masking tape used to hold it in position whilst the glue dries.

Mick got on with the oil change in the engine bay. He’s saved doing the filters until tomorrow, we doubt we’ll be on our way for a few days.

This evenings meal made use of the last ham, ham stock which I’d drained off when I roasted the joint. I made it into a stew with a potato, carrot and peas. The stew bubbled away on the stove top for an hour before I made use of the last of the stuffing, making a sort of topping out of it. It then went inside the oven to finish off. Verdict, tasty maybe a little bit salty, but a good invention to use up the last of the leftovers from Christmas.

Yesterday and today we watched Mayflies, a story of a man diagnosed with cancer and his wish to control the end of his life. What a jolly bit of TV to have between Christmas and the New Year! Some very good performances, but a box of tissues was very much required. To jolly things up we’ve watched episodes of Ghosts, Mick has nearly caught me up.

Glad I can’t make the mug to go with them!

0 locks, 0 miles, £60 oil, 4 bookings cancelled, 1 oil change, 6 inch sugar lumps, 1ft milk pods, 1 pot of stew, 2 many tears, 1 near death experience, 1 red lever, 20 catnip Dreamies spilled on the sofa, 2 swirling cats eyes!

£7 Protection. 28th December

Stenson Lock 6 to Henry Knibb Bridge 3A

Last night we had discussions about our rate of progress. Yesterdays cruise had been cold and bordering on the not so pleasant. Should we slow our progress somewhat to less than 4.5 hours a day? Would we then be able to make our booking at Cromwell? Should we keep up the hours with the hope that we’d still make Stoke Lock for the last bookable passage between Christmas and the New Year? Would todays forecast rain scupper all our plans anyway?

It was decided to continue as planned, river levels were still coming down, slowly. It would be daft not to be in a position to be able to do the next hop on the river to a safe mooring. Our current mooring was also not suitable for Tilly with the occasional train going past only 50 yards away, plus the trees creaking overhead in the wind! So layers of waterproofs were put on, we’d brave todays rain.

£7 protection

Father Christmas had brought me some new knickers in my stocking, little did he know that he was also providing us with means to keep the navigational phone dry at the stern. It rained for much of the morning, but nowhere near as heavy as we’d expected. It was also far warmer than yesterday, although the wind was quite strong at times bringing the temperature down.

Coal settling in for the days cruise

Ragley Boatstop moorings should have been our mooring last night, just as well we’d stopped early as it was full. A chap warned us about the level below Weston Lock as something yesterday had happened to a paddle at Aston meaning the pound between the locks was draining, they had difficulty, but hopefully all had been sorted by C&RT.

Along the stretch where cars are warned not to fall into the canal. We approached Swarkstone Lock. The Winter Moorings above the lock would have had space for us yesterday, but we’d have been really miserable by the time we got there. A couple of familiar boats NB Still Waters whom we’d seen a few times over the summer and the boat with an owl, Solar Afloat and chilled medication.

Waiting for the lock to fill

We dropped down the lock and just as I opened the bottom gates a hire boat arrived to drop their crew off below no need to close the heavy gates.

The next stretch of towpath is in the process of being upgraded. Pristine tarmac, mud no longer stretches out along the side of the canal. This will have some boaters moaning about a speedway for cyclists.

Weston Lock

Weston Lock was next, another line of winter moorings. A quick look over the bridge showed that the water level was fine below. Here the bottom gates can be an absolute b****rd to close, the offside in particular. I worked the lock, avoiding the big steps up onto the beams to help protect my calf muscle and walking round the lock instead. As I lifted the first bottom paddle a boat appeared below. Hooray, I’d not have to close the gate! Result.

Thank you for arriving when you did

Aston Lock, it was now really quite breezy. As Oleanna descended, the wind hitting the sides if the chamber pushed her across the lock. Here I did have to shut the bottom gate.

Aston Lock

We pootled on towards Shardlow deciding to stop short where Tilly might have a better couple of hours shore leave, unfortunately it’s quite noisy from the A50. After a couple of visits to outside it became obvious that Tilly was far more interested in receiving the catnip Dreamies on her return than actually being outside! These Dreamies are now rationed to 2 a time and if she keeps on at this rate they will be reduced to 1 a time! That means they’ll last longer!

With a late lunch out of the way Mick phoned C&RT to make our booking through Stoke Lock for the 31st. The lady who answered the phone had to be talked through where we meant, then she tried calling the local team for us to make the booking. Adrian was already on the phone, she’d get him to call us back.

Another look at river levels, it was now looking like the trend was in the upward direction, some stations predicting a sharp rise. This morning the strong stream section of the C&RT website had said that at Cranfleet flood gates was Amber, proceed with caution. However the stoppage notice of the floodgates being closed had not been rescinded.

We didn’t have long to wait for Adrian to call us back. He asked if we’d be able to get to the lock for the hour window on the 31st, we would as our current plan was to moor above the lock the night before. He booked us in and said someone would call that morning to confirm our passage. Mick asked him about Cranfleet floodgates, the strong stream section of the website wasn’t working now.

Drying gloves

Adrian was the man to talk to. He is the person who decides on the closing of the flood gates in the area and sends out notices accordingly. The gates may have been opened by someone tampering with them, but they should actually be closed. River levels would be checked in the morning to see what effect todays rain had had. If the level was still going down the gates would be opened, we may get a phone call if that is the case.

Next years licence was bought, not a gold one this time as we’re likely to be staying on C&RT waters in 2023.

Ham with jacket potatoes, onion sauce and red cabbage tonight, a replay of Boxing day. The red cabbage is now used up, but there is still some ham left for another day.

3 locks, WE 7.97 miles, Pip’s Nebo 8.3 miles (including walking round locks), Mick’s Nebo 8 miles (static on the boat), 1 wet day, 1 blowy day, 1 more booking made, 4 now booked, 16 Dreamies, 20 the maximum in one day Tilly! 1 noisy mooring, 2 boaters watching the levels, 4 fingers crossed.

https://goo.gl/maps/8wurXtJcPfum8aME6