My last Sunday morning on board before panto, so I had requested a cooked breakfast. Very yummy it was too.
A few last things to pack and then I was ready. Time to push off to load the car.
Late yesterday afternoon I’d heard a boat pulling in a boat behind us. This morning as we started to untie a chap on the narrowboat was doing the same. Without assistance he was taking his time, so we waited patiently before undoing our ropes.
I looked at his boat. Hang on! Could this be a boat I’d been keeping my eyes open for since we reached Wakefield? It had the right configuration at the bow, but I just couldn’t see it’s name. The chap reversed out from the mooring and proceeded to wind, heading back towards the flood lock. As he did so we both spotted each others boat names at the same time. NB Honky Tonk is another Finesse boat, we follow each other on Instagram. We waved and had chance for a little bit of a chat, but the distance between us was a touch too much for him to hear properly, he at least got the jist that we wouldn’t be following him to Lemonroyd Lock, a shame really as we could have met properly.
Once he’d cleared we followed suit, pushing out and winding. We headed up towards the flood lock, all of 0.4 of a mile. The lock landing was full of fishermen, so we couldn’t pull in there and get the car alongside to load it.
Instead we pulled up behind the boat moored on the water point and whilst I popped the last few things into bags Mick ferried things to the car.
Once I was off loaded we winded again and returned to where we’d come from, mooring up well in case any of the gravel barges were on the move. Now it was time to say goodbye.
Well I knew what was happening, but a little unsure to what extent. She’d been putting things in bags, lots of them! Last time She did this we all moved to Scarboreugh, to a house! But this time it didn’t look like I was going anywhere. She gave me a big head nudge and asked me to look after the boat and Tom, I also got some Webbox too! Then they were gone, leaving me in charge. Thankfully She’d left me my evening dingdingand extra biscuits!
Normally it takes 50 minutes to reach Chippy by bus, today it would take about three hours by car. The last stretch gave us great views over the Cotswolds. We dipped down through Over Norton and into Chipping Norton.
I’m staying with Suzanne again where I’ve been for the previous pantos. She was away for the weekend so had left me a key. We off loaded the car and had a cuppa, then it was time for Mick to head back to Oleanna. He could have stayed the night, but would have been under time pressure to get back with the hire car. Heading back today meant he could do a few chores in the morning, return the car and then hopefully get down the broken lock whilst it is being manned, the day after it will be closed for divers to hopefully fix the problem.
So I am now in Chipping Norton for the next few weeks, working hard, doing my best to avoid catching any lurgy. Mick and Tilly will still be cruising and taking photos for me. For the next few weeks it will be Panto Postcard Posts only on the blog. See you at the weekend.
0 locks, 0.8 miles, 2 winds, 2 Finesse boats, 2 many bags, 1 full car, 1 very early dingding, at least we remembered this time, 3 hours there, 3 hours back, 1 Chippy home again, 0 Pepper the cat :(, 1 post a week for a while.
After the Geraghty zoom this morning Mick headed off to pick up a hire car. He’d shopped around to find the cheapest option. Enterprise just pipped Thrifty to the post as Thrifty have a maximum mileage after which you are charged quite a bit per mile.
Whilst Mick was out Tilly got to come and go as she liked whilst I first wrote a long list and then started collecting items together. Next week I start work on this years Chippy Panto. On the two previous times we have been on the South Oxford Canal, an easy weekly commute for me to get back to the boat for weekends. This time being a lot further north, I will only be getting one trip back to see Mick and Tilly, plus I’ll be there for five weeks. So my packing needed to be more comprehensive than in the past.
Living on a boat means things are beavered away all over the place. The steps at the stern had to be removed to access the lower cupboard where I keep my Scenic paint brush bag. Then the winter bag of clothes needed to come out from under the bed. This has normally already happened to get our warmer clothing out of storage, but so far this year we’ve not felt the need for thermals. But I strongly suspect I’ll be needing my long johns before too long.
As everything was gathered together and packed into bags I was staring to run out of places to put everything. The bed became piled high. The sewing machine came out from under the dinette seats and sat on top of them in the corner. It really is amazing just how much stuff can be tucked away.
A pork stew was put on the stove to have with jacket potatoes later in the day. I carried on packing. The Bourbon tin came out, still full with drawing tools from two years ago. The big pencils got a good sharpen whilst I watched boats arriving to be penned down the broken lock. Mick had a walk up to chat the lock keeper as he was hoping to be able to get the car a touch closer to the boat to load all my stuff. The road to the lock has a barrier and if it’s not open you have to reverse for quite a distance before you can turn round. The lockie suggested returning to the flood lock where you can get a car right by the north bank. We’d leave moving until tomorrow.
A batch of apple crumble flapjack was made and once cool it was cut up and shared between two tuperwares. One to stay on Oleanna, the other added to yet another bag to head to Chippy.
When it came time to go to bed everything was lifted off the bed and put on the floor under the flap of our cross bed, at least now it wasn’t in the way anymore.
The generator has been chuntering away again tonight, still going as we turned the light off at gone midnight!
0 locks, 0 miles, 1 car for 2 days, 0 space nearby, 3 sharp pencils, 9 hours, 2 ikea bags, 1 large hold all (obviously it didn’t hold everything), 1 paint brush rucksack, 1 rucksack, 1 food bag, 2 crochet blanket to finish, 1 food bag, 1 sewing machine, 1 pooped cat, 1 designer all packed up, 1am!
No need to rush today, we are on schedule and having pushed on a touch yesterday to get somewhere suitable for Tilly, we were a touch ahead of ourselves.
As we had breakfast a tug came past pushing a skip piled high with brand new lock gates. Stanley Ferry is one of two places in the UK where lock gates are manufactured and refurbished. In an average year around 100 gates are made here, that is a lot of oak! Between November and the end of March sections of the network will close for maintenance, an extensive stoppage list is put together every year with chance to make comments before it is finally published in August. Cruising in winter can take some planning.
Soon followed a crane boat, most probably heading to the same site to off load the gates. We pondered where they were heading and if the skip boat was short enough with the tug to go up the Calder Hebble Locks together, we suspected not, there’ll be some bow hauling out of locks.
The sun was out, clear blue skies and plenty of them now that we are out of the hills. We pushed off pausing for me to work Ramsdens Swing Bridge, I only managed to hold up one cyclist! A chimney sweep sat having a fag break on a roof sunning himself.
Then on over Stanley Ferry Aqueduct and past the workshop.
The big doors were open so we could see inside. Hoists were about to move more gates about inside. Out side piles of gates lay on the concrete, one pile had a constant stream of water running over it, the oak all dark. Presumably this is to keep gates from shrinking as during their working life they will hold back tonnes of water on a daily basis. New baulks of oak sat close by.
No squeezing into locks today, no need for handcuff keys or windlasses. The Aire and Calder requires the Key of Power. Birkwood Lock however never looks like it should be key operated as it’s gate beams of oak have relaxed through the years, it looks like they’d need a good old shove, but no the Key works wonders.
On the lock landing below there were pots of flowers that were past their best, then hand scrawled signs that could have been painted in blood were a big contrast.
Sky sky sky. 180 degrees of it. Chilly but so very sunny.
A short distance above Kings Road Lock is where the proposed route of HS2 crosses on our map, I’m no longer sure if the northern sections of HS2 will happen. Thankfully today there were no huge mounds of earth to spoil the views.
We pulled into the lock landing to empty the yellow water into a container for disposal later. This meant the lock was emptied by a wide beam heading up. We were ready before the lady moved to the top gates to start filling the lock, so I offered to use my key at that end, the console traps your key until the gates are closed. She was quite happy for me to press the button for two seconds to commence the filling, so was I!
Down we dropped in the huge lock, it’s as if those short locks were a figment of our imagination now!
Pink Panther keeps an eye on where Foxholes Lock used to drop down onto the River Calder. Ahead we could see that traffic on the M62 was stationary on the eastbound carriage way, we however were cruising along quite happily in the deep wide water.
A top up of water above Woodnook Lock before we pulled in to descend. This was to be my last lock for a while, the last before I head off to Panto land.
Now back on the river we passed familiar sights Woodnook Viaduct, Fairies Hill Lock, no yellow wide beam moored below it today. At Methley Bridge Boat Yard the boats were still three deep. Welding going on and a great named tug, Chugger-lugs-the-tug.
Towards Castleford Junction, where the Aire and Calder Wakefield Branch meets the Aire and Calder from Leeds and Goole, there is a housing estate going up. I’m fairly sure we’ve been past and seen the Marvin the paranoid android houses before, but now there are even more going up.
Each and everyone of them has the sad furrowed brow, what a sad estate. Did the architect never see how sad they looked?
Left to Leeds, Right to a weir, or straight on to Castleford and Goole.
Straight on for us and through the flood lock. Now where to moor? We need to be here for three days, so longer than the 48hr moorings. We carried on towards Bulholme Lock and pulled in on the south bank just before the edge becomes high.
Was that a ‘Red’ light at the lock? A cruiser pottered about in front of the light. Yes it looked red. Normally the lights on the Aire and Calder are on Amber, self operation. Maybe a gravel barge was on it’s way up? Once we’d moored up the reason arrived in our Inbox.
One of the lower sluices has an object jammed in the gate preventing the sluice paddle from fully closing. This impacts lower lock operation. The upper lock is operational but only operates via the desk in the lock tower and not via the lock side customer operated pedestals which only operate the lower lock.
Actions to investigate and make repairs are in hand but the lock will not be operational via the customer operated lock side pedestals until these are undertaken and completed. To facilitate lockage’s and until repairs have been completed the lock will be operated by a lock keeper on the following dates and during the time periods indicated below. Outside these times the lock will be closed:
Saturday 16th, Sunday 17th and Monday 18th October 2021: lock open from 10am, last lockage 3pm
The lock will be closed on Tuesday 19th October to allow access for divers to investigate and undertake repairs.
Bulholme Lock is big, but it also has, like many others around here, an extra section to make it even longer. These stem back to when Tom Puddings transported coal around the area. So even though the bottom gates of the lock cannot be made water tight, the middle gates (in normal operation the top gates) are, so they can be used as the bottom gates instead. The extra gates which are rarely used can only be operated by a lock keeper in the tower, hence reduced working hours.
Tilly was given four hours! There was a bit of coming and going at first, but then she vanished out of sight for a couple of hours.That’s more like it!
As the sunset, planes flew over and boats lit their stoves, sending up plumes of smoke. Just a shame someone had got their genny going. Even more so when it didn’t stop until around midnight!
3 locks, 1 flood lock, 6.21 miles, 1 straight on, 1 swing bridge, 1 cyclist, 1 boat helped up, M62 stationary, 14 day mooring, 0.5 half broken lock, 2 many sad houses, 1 happy cat, 1 annoying boater somewhere over the other side who needs new batteries!
Wheatley Bridge to Stanley Ferry Water Point, Aire and Calder, Wakefield Section
Today we needed to be moored up in time for me to join a zoom Production Meeting for panto, Tilly’s hope was that we’d be somewhere she could go out for the rest of the afternoon. We already knew that wouldn’t be possible. The travel time on our maps didn’t really give us a suitably cat friendly mooring for 2, 2:30pm, we’d see how we did.
So no time to sit around in bed, we’d got more short locks to descend and some miles to cover. This must be the first time on passing through Mirfield that there have been no visiting boats moored up, we could have carried on just that bit further yesterday, but Tilly wouldn’t have had any bracken or friendly cover to seek out friends in as the link fencing is right on the towpath here.
The boat that is being worked on is still covered in a tarpaulin by the water point and it looked like the charity boats were gearing up for a day of visitors. Just by the lock, no I’ll rephrase that, on the lock landing was a cruiser! Big signs say that it is the lock landing but the owner must be blind. Any single hander would have had to reverse past the permanent moorings to be able to tie up to use Shepley Bridge Lock. I however went through Oleanna to the bow (I don’t walk the gunnels due to my bad grip) and hopped off the front, luckily the lock was just about full.
No need to get the Calder Hebble spike out and risk dropping it into the hole below the ground paddle gear. The hard wood that the spikes are made from does not float! I’ve seen one disappear here before and on the same day met a second crew who’d lost theirs at a lower lock.
The paddle gear seems to be getting stiffer with every lock we work, at least it means you can’t whip up a paddle in the short locks too quickly. Once down the lock Mick turned left and pulled into the lock landing we were now on the River Calder, deep, wide, so different from the bottom end of the Huddersfield Narrow. With water under Oleanna she smiled a broader smile than she’s smiled before, nothing to do with a slight reposition of her twin horns after the tunnel. She also sounds more confident too!
Swans and geese blocked our way into Greenwood Cut, but luckily they all moved out of the way leaving just one cygnet to our port side. It didn’t complain too much at it’s enforced separation.
Greenwood Lock gave us plenty of room to breath in, the stern doors needed closing to avoid the torrent of water coming from under the top gates. Then Thornhill Flood Lock took us back onto a cut, a long cut. This is where we started to play Bridge Bingo.
Some bridges just have names, others numbers as well. However the numbers seem to be mixed up as if two waterways have been melded into one. 31, 8, 33, 34, 35, 22, 39, a few with names and then 26!
A moving boat came towards us, NB Little One, an Aintree Beetle, below the high up Railway Bridge 35. Great the Double Locks should be with us.
This is where Lillian had an incident the pound between the two locks which knocked her tiller out of it’s cut, meaning we had no steering. Since then we do our best to be very careful at these two locks. The top one was full, but the bottom empty, I went down to lift a paddle as Mick brought Oleanna in to the top.
With no means of crossing the bottom gates of these locks I started to walk back up to the top lock on the off side, but Mick had stepped off Oleanna on that side as the gate had opened. This meant running back down and around to get to the towpath side to close that gate, oh well my steps for the day had a boost!
These two locks are the last of the shortest locks, so we took care and nudged our way past the closed bottom gate. The intermediate pound was still at a good level, I’d opened the off side gate on the lower lock for Mick to be able to go straight in. However the two locks are on a bend and Oleanna really wanted to go through the other gate. Mick did his best to manoeuvre her round, but she clipped the port side bow on the walkway, smudging off some paint I’d touched up from a previous moment!
One day we will go down the Dewsbury Arm just to have a look, ‘Next Time’.
Approaching Millbank Lock I could see movements, another boat just leaving below. I filled the lock only using the gate paddles, getting the spike into use wasn’t necessary. As I went to lift the first bottom paddle another boat was pulling up below. The first paddle was just about impossible to lift so I moved over to the other side where I hoped that one would be easier. Have to say I’d rather be stood over the bow of the boat in a short lock to keep an eye on it catching on stonework.
A lady came up to help, I asked her to wait until we knew we were past the cill as we were over long. She understood and waited until Mick was happy with our position. We nudged past the closed gate and were set free onto the river again.
Next the Figure of Three Locks. Two locks very close together, the lower one was seriously damaged by flood water, the bywash being more or less totally washed away. I posted about it earlier this year as it was being rebuilt.
Today the locks are reopen, reconnecting the Rochdale and Huddersfield Canals to the eastern side of the network. Both Locks look pretty much as they would have before the flood damage. A new area of stonework on the towpath connects the two where the flood water pushed through from the river. Now sunflowers fill where the gap had been. Here’s a link to what it looked like after the flood and during the work to put it back together.
The lower of the two locks has a new bywash. The sides of it very high and built of sturdy stone, this had all but been washed away. The off side bank looks to have been replanted and today a farmer was out in his tractor. A very fine job done.
I wonder if the one new solitary stone below the lock will have something carved on it, it’s shouting out for it.
More moving boats and then moored boats below Broad Cut Top Lock, the locks were getting quite roomy now. Time was ticking on. We knew we wouldn’t make it to Stanley Ferry in time for my meeting so decided to pull in after the next river stretch through Thornes Flood Lock. Just as well we’d given ourselves a bit of leeway as Broad Cut Low lock took forever to fill and then with only one paddle working at the bottom end it took forever to empty!
We pulled up into the lock cut with half an hour before my meeting and had a late lunch listening to Tilly demanding to be let out. Too close to the railway for comfort she could protest all she liked, but we’d be moving on for her after my meeting anyway.
A couple of new faces at the meeting today. Late last week a site was found for me to do a weeks painting near Chippy and set pieces will arrive for me next Monday. I have a clean bare space to take over for a week, I just need a chair, a table and a ladder and I’ll be painting away for hours. Every department was checked on, lists drawn up and the first day of rehearsals discussed, along with the obvious Covid protocol. I’m hoping my panto face masks are waiting for me when I get to Chippy as I think I’ll be wearing them a lot.
With the meeting over we’d pushed off within five minutes to reach a Tilly friendly mooring. Thornes Lock was our last short lock of the Calder and Hebble.
This required a hand spike to empty it as the other paddles were out of order. We squeezed in and dropped down. A chap walked up saying they couldn’t get through the lock without a Hebble Spike. I thought he was about to ask me to lock them through. But now the lock was empty they’d be able to fill it just using a windlass as I had. They took their time to move off the lock landing, the reason soon becoming obvious as they’d lost steering and were wanting to tie up above the lock to fix things.
On we pootled back on the river now, passing Double Two where I used to paint sets for the John Godber Theatre Company before I started living on a boat. Straight ahead the dangling sculptural man above the moorings near the Hepworth Museum still dangles. We turned right through Wakefield Flood Lock.
No visitors to Wakefield on the moorings today, but we did spot a very very tall telephone pole.
At Fall Ing Lock we could now breath out, we were leaving the Calder and Hebble, all the short locks behind us now and big Yorkshire locks ahead. It takes quite a bit of filling, longer when it’s a touch breezy and Mick had decided to hover and wait.
Eventually the lock was full and we could descend onto the Aire and Calder, each hydraulic paddle taking over thirty turns to lift. My arms were tired before I started!
Not long now Tilly! We sped down the river and through Broadreach Flood Lock and on towards Stanley Ferry. We’d made it with an hour before cat curfew!
11 locks, 4 flood locks all open, 11.94 miles, 0 short locks left, 0 manual locks left, 1windlass back in the locker, 4000 engine hours, 1 hour, 11 panto zoomers, 1 painter starting on Monday, 5 chum zoomers, 24th October Tankards Bridge on the Selby Canal open to all craft after 13 months.
This morning I packed up my model for #unit21 and walked up to Queen Street in town to the offices of Dark Horse for a production meeting. The show doesn’t happen for another four months but there was much to discuss.
The budget was the main thing. Next February will be a showing of the show, six scenes to wet the appetite for funders, possible tour venues. The original brief I’d been given was that the set and costumes should have full production values. Normally this would be a tight squeeze on their budget, but right now I was needing more than a shoe horn and magic fairy dust to sprinkle on everything to try to keep the costs down, materials have rocketed in price. When I’d last talked to Amy the director I’d planted some seeds, thankfully they had started to take root.
With Penny the Lighting Designer/digital editor joining us via zoom we had a very productive meeting fuelled by gf Chocolate Hobnobs. Lynda was recovering from the cold that is doing the rounds, I kept my distance and hope that she’s past the stage of passing it on as I’ve got five weeks of hard work coming up.
Several things had arrived for me, UV fabric paint, which I need to try out on off cuts of costume. A very large box which contained two 1inch brushes that I’ve treated myself to for panto. I just needed to walk to B&Q now to pick up some neon green paint for the set, then after doing a couple of samples I can forget about the show for a while.
Meanwhile back on board, Mick topped up the diesel tank, our stern being moored right next to the pump it made sense. Topped up to the top. There is a small chandlers here where he managed to get a few more poppers for our cratch cover as spares. £10 a night including electric was paid so that we’d be ready to go in the morning. The washing machine has been working hard.
Then it was time for him to climb back into the engine bay. A service was needed, but first it was time to trace and reconnect all the wires that had got chewed up when the belt went.
Red, a voltage sensitive relay, which provided power from the ignition to the bow thruster battery.
Orange, the engine temperature gauge.
Green. Green! What is the green one for? There had been a length of green cable wrapped round the pulley that Mick had dug out, but what had it been connecting? And to what? He’s had no luck finding any other green cabling in the engine bay. So far it can’t have been anything critical, but it would be nice to know what it was.
Next followed the oil change. One less job to do today was changing the alternator fan belt! Just after Mick had pumped all the old oil out I got a message from Kim on NB Idleness saying they were about to come down Lock 3 and Lock 1 was going to be unlocked for them.
We would be breasting up with Yan and Kim and because of their old dog we’d suggested that we should pull out to let them have the bank side mooring to help with his arthritic legs. Of course shortly before they arrived another boat pulled up onto the water point opposite and when they were just pushing off NB Idleness was just pulling through the bridge slowly. Instead of a two way do-si-do it was to be a three way one. Idleness through first, then the blue boat into the bridge hole (pausing to remove their bikes), we pulled out, Idleness pulled in and we tied up on the outside, job done.
I walked the mile to B&Q a very large one on Leeds Road. Mick had also made a request for a new fuse for the bowthruster. So that was another 0.75 of a mile to Halfords for one, then back to the boat via Sainsburys picking up a bag of cat litter and some pizzas for tonight. The rest of the shopping we did on line to collect in the morning before we pushed off. So despite doing no locks today I still walked 5 miles, but I have pretty things to show for it.
0 locks, 0 miles, 5 miles walked, 1 meeting, 2 alterations, 1 budget to be fine tuned, 2 wires reconnected, 1 green mystery, 9 litres oil, 1 filter, 1 fuse, 1 bow thruster able to charge again, 3 boat do-ci-do, 1 full tank of diesel, 2 pots UV, 2 pots Neon, 2 x 1″brushes, 1 key to be left, 1 producer, 2 pizzas.
The other day She was complaining that a fly had flown at speed into her mouth. Then a day or two later as She drank her cup of tea she suddenly spat it out, a large spider was lurking in the depths of her mug! So far I’ve not noticed any birds being consumed, but they may have chicken tonight. I’m keeping my distance, just in case.
If you don’t hear from me again I’ll have been sent in to sort things out!
Slow progress at times along the summit pound today. The levels have been down up here, but this morning it only looked to be an inch lower than the overflow at the aqueduct. At one point we were passing another boat to find both of us were sat on the bottom!
We pootled our way through Macclesfield, familiar local boats from our winter up here five years ago. Bridge 43 is another roving bridge with a high wall concealing an accommodation bridge nestled up alongside it.
The off side vegetation was getting a strim as we crossed above the houses. Then we hunkered down under the big wall that holds the top part of Macclesfield away from the canal.
The site where a culvert had problems a few months ago is only obvious now by the new mortar in amongst the stones of the canal bank, a new top to the dry stone wall and a large pile of aggregate hiding behind. The canal was closed for sometime earlier this year.
At least it hasn’t taken as long as the wall by Black Road Bridge. This used to hold someone’s garden up off the towpath and has gradually disintegrated through the years. At least this towpath closure is sturdier than the one in Wolverhampton that people just ignored.
Passed the Hovis Mill the 1 day moorings were just about full, we’ve very rarely seen boats moored here as it’s been hard to pull in and you are requested not to run your engine. The pontoon moorings were full, the end boat being NB Rosie out for a cruise from Teapot Hall.
As we pootled along we discussed a topic that people often ask. Which is your favourite canal? Well our favourite mooring is above Bank Newton Locks, the curley wurlys on the Leeds Liverpool. But is our favourite canal the Macc? A lovely flight of locks, little industry, great hills and views, a reliable coal boat to look after you, the beautiful bridges. It might just be our favourite.
A strange noise could be heard as we reached the far side of Macclesfield. Raaaag aaaandd Boooooonnne! As we moved round the tone of the call changed, Rag and Bone through a loud hailer was echoing around the streets.
Then Clark Lane Bridge curls the towpath back to the otherside, at Kerridge someone has built themselves a little porch.
Then as it started to rain a little bit more heavily we came round under Greens Bridge to the sight of the Adelphi Mill. Today lots of room on the visitor moorings, but we were after pulling in at Bollington Wharf, their service mooring empty.
A chap was having a couple of containers filled with red diesel and chatted to Ann Marie. Then it was our turn to fill up Oleanna’s tank, the price higher than we’d paid at Hawne Basin a few weeks ago, but that’s hardly surprising. This morning Bollington Wharf had had a delivery, the price per litre having risen by 8p. Last Saturday they’d had a bit of a rush on with four boats queued up for a top up. Brian arrived and sorted out five bags of coal for us, positioning them on our roof mats as low as he could get them. If you are ever on the Macc this is where to come for a top up of diesel or bits of work that need doing. Last year they mended a gas locker hinge for us whilst we waited. There is also NB Alton that does a fortnightly run along the summit pound, so they will come to you. They certainly looked after us the winter we were here.
The bright colours of the diesel pump and day boats cheered up a thoroughly wet day. Nice to have a catch up too.
We pushed off and now hoped for a space on the embankment by the aqueduct. This was chocka block, not even a nudge around would have made enough space for us. But luckily round the bend in the shadow of Clarence Mill the newish bollards were empty. We pulled up and claimed them.
Whilst finishing battening down the hatches for the day, an alarm sounded. Not the sound of Mick pressing the button to stop the engine, it was a different pitch. ‘That’s not meant to happen is it?’ ‘No’ The engine was over heating, just as well Mick was about to turn it off. This first happened on the Thames a couple of years ago, a loose pipe connecting the calorifier to the engine. It had come loose again , therefore there wasn’t enough water in the cooling system.
We managed a shopping trip down to the Co-op to stock up on chocolate between showers and then just left Tilly to explore the wet outside for the remainder of the afternoon. She did her best to get really quite soggy. I revisited the budget for #unit21, still need an updated price on a couple of things. News came through from Chippy that sight lines had been checked with a mock up of a tower made from cardboard and that my paint order had been placed. So at least I’ll have lots of lovely colours to play with.
Later in the afternoon Mick lifted the engine boards and sure enough the pipe was loose again. He checks this and tightens it on every service. The next service is due in 40 hours. So maybe an in between services check is required.
It turns out that there is at least one train driver who keeps a note of passing boaters in Stoke. Thank you Michael for your email. We’ll keep a beady eye open for you when we’re next on your patch and wave until you see us. Michael’s boat was one of those stuck in Goole this year, hope the move up the Ouse wasn’t too wet and windy for you today.
0 locks, 4.58 miles, 88 litres, 0 panic buying, 1 feline visitor twice, 2nd time being very nosy, 100kg coal, 530grams dark chocolate, 500grams granulated sugar, 1 rag and bone, 1 alarm, 1 loose pipe, 1 wet day.
With no other boats having arrived last night we didn’t feel under pressure to be at the locks waiting for them to open at 8:30 this morning. The alarm was set for 7 but then we had a fairly normal start to the day. This did however mean that we wouldn’t be first up the locks. Three boats came past, two before 8:30 and vanished up the bottom lock.
Yesterday afternoon Mick had walked up the flight and closed quite a few gates that had either blown open or been left, so we already knew the locks would be set against us.
Old trainers came out of the cupboard as rain and mud were a high possibility this morning. With the temperature being low we also risked our padded waterproof trousers, an intermediate waterproof covering for legs needs to be found for such days.
Last year we climbed the locks in a group. A single hander in front a boat mover single hander behind, all done in the sunshine a well oiled machine by the time we reached the top of the twelve locks. Today we were on our own with constant drizzle, but thankfully we still got the wonderful views.
Every now and then I could see someone ahead, were they coming down or going up? They were going up. The pounds between locks 10 and 12 were both very low, but with umph from the engine then neutral Mick managed to get Oleanna over the bottom cills. After about five locks we did encounter our first downhill boat, a single hander with a volunteer helping, apparently there were two more boats making their way down.
At lock 6 you get the great view to the Cloud, no pretty flowers today.
Looking up ahead to Lock 5 the lock seemed to be being emptied. Next time I looked I thought I could see the stern doors of a boat. Eer Hang on! How could that be? Mick gave me one of those looks! Next look up there was a boat heading towards us.
I zoomed in on my camera. I had been right that a boat was coming down and one was going up. The road bridge masking the fact that I was seeing two locks and not just one.
After all the rain yesterday and drizzle this morning I’d been expecting a muddy towpath. This must be where the aggregate is being used as a new surface covers part of the towpath. Quite a relief as in the past parts of it have been quite a boggy mess, today it was all dry underfoot.
We picked up a volunteer at Lock 3, he set the lock above and then waited for the next boat coming downhill, Lock 1 sat waiting for us with it’s gates open.
Plenty of volunteers on hand at the top, although they were all having a good chat. We disposed of rubbish as the last couple of feet filled the lock, then left it open for the fourth boat of the day to head down the flight.
Now on bridge duty with the key of power in hand I pushed the buttons at Royal Oak Swing Bridge.
Turned the key in the lock of Broadhurst Swing Bridge. Returned it. Then gradually turned it trying to lift the white handle to release the bridge with each fraction of a turn. Eventually I found the position it worked, the handle lifting easily, the bridge swinging effortlessly. When I pushed it back there was no need to turn the key to release it, it just came straight out.
Where to moor for the day, hopefully before the rain started in earnest. After Leek New Road Bridge the world opens out, hills as far as the eye can see. Even today in the drizzle they looked wonderful.
It was slow going, shallow in parts, especially where you didn’t expect it. At Gurnett Aqueduct we pulled in towards a space, but grounded as another boat came past also looking to moor up. It took quite a bit to push us off and then reverse with major umph. A second gap looked more appealing despite the mooring rings being in very unsuitable positions. Extra rope was required and a mooring spike driven in as far as the concrete trough would allow. This would do us for the day.
By the time we’d done all the chores Tilly was not impressed with the very VERY wet outside we’d managed to tie up today. The stove was stocked up with coal and this became a more attractive place to spend much of the afternoon.
Panto has most definitely woken up today. Emails zooming between Macclesfield, Bristol, Kent and Chipping Norton. Working speakers, cinema screens, sight lines, cloths which hopefully have finally been ordered today. Tilly of course decided that the outside wasn’t too bad after all, but returned frequently for ‘thank you for coming home’ Dreamies just as I’d got all my plans out on the table. Tracing paper isn’t too keen on muddy dripping wet cats!
12 locks, 5.05 miles, 1st in line, 4th up, 4 coming down, 2 hot legs, 2 low pounds, 2 swing bridges, 0 held up, 1 boat up near the hills, 1 damp day, 1 excessively wet afternoon, 2 crinkly paw prints, 1 flying cat.
No rush this morning, mainly because it was raining! We laid in bed with our Saturday newspaper as the temperature outside dropped, it was cold. Other boaters were out and about. We heard the click click click of the lock paddle gear being wound a few times. On one occasion this was soon followed by shouting, the sound of an engine that got closer far too quickly to be passing moored boats and the approach to a lock! We peeked out of the window to see a boat very close to us. Then the name came past as the chap at the helm carried on shouting to the boat that was leaving the lock to leave the gates open. It was the ramming boat from the Staffs and Worcester the other day. Inside Oleanna we both used the same expletive.
We pulled back and filled the water tank as the rain eased off and eventually the sun came out. Hooray! We have a schedule to keep to and need to do around 4 hours a day, come rain or shine, so it was better that it was shining.
Today we pootled onwards, the long pound all nine miles of it heading towards Bosley Locks. Currently there are time restrictions on the locks to help conserve water on the summit pound so we’d not be able to pass up the locks today. Our aim however was to moor on the River Dane Aqueduct so as to be ready for the flight in the morning.
With a zoom meeting arranged with the Production Manager of panto we needed to keep going and not stop for lunch, which suited Tilly better.
Soon we were going under the first of the lovely bridges. Oh those curves!
A first glimpse of Mow Cop, maybe next time we’ll actually walk up there if we can find enough puff.
Bridge 87 not only has the lovely curves, it also is built on a skew and for some reason the stonework seems to be more eroded than on other bridges. Maybe the stone came from a softer layer.
Ramsdell Hall and Tilly’s railings. We’d thought of carrying on to moor here yesterday, but chances were that it would have been full when we got here. Of course today it was far too early to stop at such a nice mooring.
The curvy bridges come thick and fast, all lined up, framing the view up the canal and themselves.
Billy Tights Bridge still makes us wonder how it got it’s name. He sounds like he should have been part of Mr Kites performing troop on Sergeant Peppers Lonely Heart Club Band. PS this used to be a swing bridge.
Lamberts Lane Bridge 77 is the first snake/roving bridge. Not quite as pleasing as those in Macclesfield and Marple but a good preview of what’s to come. The great white wall of Congleton then shows it’s face opposite the visitor moorings.
Today a large bough of tree lay across the towpath and into the canal. Last nights wind must have brought this down. Already parts of it had been sawn up and stowed on the bows of surrounding boats. Thankfully it doesn’t look like anyone had been moored beneath it.
Over the aqueduct to bridge 76 another snake bridge, followed by a busy stretch of moorings below the pub. Bridges after bridges follow, criss crossing road and rail high above us.
A long straight stretches out in front. In the distance we could see a boat heading away from us, then one coming towards. The water point had a couple of work boats tied at the end, a large pile of dark aggregate looked like it was going to be loaded for towpath works.
We passed a boat with a snoozing cat in the cratch, could that have been Betty or Olga? Shame not to have seen Ben to say hello.
At Crossley Hall Farm, where the painted cow used to sit, I was glad to see NB Blanche on it’s mooring. Boatwif’s blog of a few days ago had suggested the boat no longer moored there, but they must have been out and about. A great shame the cow has gone though.
Coming towards us had been several boats over the last hour or so and we half expected there to be a few moored below the Bosley Flight. One boat faced away from the locks at the end of the moorings, the rest was empty. Just where to pull up? I suggested we should sit at the end nearest the locks, claiming pole position for the morning. The views still pretty good.
A while after we arrived the hire boat we’d followed through the tunnel yesterday arrived, shouting to make themselves heard over their engine. They were getting ready to climb the flight. Mick popped out to give them the bad news that the locks were closed. ‘WHAT!’ was the reply. He then mentioned it was to do with saving water and the lady calmed down a touch. They’d been wanting to reach Macclesfield before winding to return to Stone, if they waited till the morning for the locks they wouldn’t have enough time to get back to base. After a while they ascended the first lock winded and headed back towards Congleton a pint at the pub to console themselves.
Time to get ready for my zoom meeting, which got postponed by an hour. Mick made himself scarce as had Tilly so that there were no distractions. Finally I had a meeting that could/should have happened at least a month ago. Details of the set finally being discussed. Currently there is nowhere for me to do a weeks painting booked. One possible in a village nearer Banbury than Chipping Norton, ideal if the boat was on the South Oxford this year, but not so good when she’ll be much much further north.
If anyone knows of a dry, reasonably warm space with lights and water near Chipping Norton that I could use for a weeks painting from the 18th October, please shout out. I’m clean and tidy and would make you some sausage rolls as a thank you!
PS The C word today was Curve
0 locks, 8.78 miles, 44 bridges, 1 wet start, 1 dry day, 1 full water tank, 220 curves, 3.5 hours! 2 pounds low, 5 sets of gates closed, 4m or 4.15m? 4 or 5 D rings? 1 problematic sight line, 1st in line for the morning, 1st top bought, 0 other boats.
We had to wait to pull out this morning, boats coming in both directions, there had already been about eight boats go past heading northwards, most now familiar as we keep leapfrogging them. Eventually we pushed off and arrived behind NB First Dawn a BCBM share boat at Deptmore Lock. We helped lock them down then bring another up before it was our turn.
The morning was lovely, sun with a touch of cloud, the boat ahead had similar ideas to us, if there was space at Tixall Wide we’d stop for the day, if not we’d continue to the Trent and Mersey.
Passing Stafford Boat Club, NB Festina Lente was moored online, we’ve never met them but said hello as we passed, nobody heard us. Then the odd pram cover on NB Malakarti came into view, this was one of the last Steve Hudson boats to be built and the original owners discovered that their Huskies got seasick, so it was sold on fairly quickly. It is one of the boats that we got to see a lot of during Lockdown 1 as it was moored on Nantwich Aqueduct all the time.
Once past Radford Bridge I was onto slightly unfamiliar water. Our first cruise along here on NB Winding Down I’d had to jump ship for a day to head to Hull Truck for a read through, leaving Mick and his sister Kath to carry on to Stone. Another occasion I’d just broken my ankle, so was confined to quarters with Tilly, Mick single handing above. This is also a stretch where I seem to get busy below as it’s a good break between locks. On one occasion Mick remembers wafts of stew coming from below at 9:30am as I popped things in a slow cooker. Another time he thinks I was doing some work below. So maybe today is the first time I’ve actually been up top.
The sign to RCR was familiar but not the Stafford Riverway Link, the lock down to it currently being worked on.
I’d never seen the homemade train by NB Abba.
Milford Bridge is a roving bridge, with almost full curving lines, but still not as pretty as the Macc bridges. Across the River Sow Aqueduct I did a Gyles (Gyles Brandreth on Great Canal Journeys), ducking my head to avoid the view.
Soon we arrived at Tixall Lock, the cream paint of the lock cottage glowing in the sunshine. We helped NB First Dawn down, as the weather was so nice they had decided to carry on to the T&M, we’d also leap frogged several other boats that had passed us this morning, maybe there might be space for us at Tixall Wide?!
Our approach to the wide summed up what the stretch of popular moorings would be like. Some boats moored nose to tail, others having gaps both in front and behind. On such a popular mooring if we pulled into a big gap we’d certainly have pulled up to the next boat and not plonked ourselves in the middle. We’d also nudge up if we found ourselves left with git gaps after other boats had moved on.
There were two possible gaps we might have squeezed into, but it all felt like a giant car park for boats, did we really want to squeeze in, we know that the view is lovely, but! It didn’t take us long to decide to continue onwards leaving the masses.
There was space just after Swivel Bridge so we pulled in mooring at the end of a piece of armco leaving space between us and the bridge. Tilly was given 4.5 hours shore leave. We think she liked it as she didn’t return for two hours, then missed dingding time!
The whirligig was put to good use with two loads of washing drying and I sat down to get my head around what paint I needed to order for panto. Quite a long list and one I need to try to prune a touch before emailing it onwards. One thing that I discovered is that you can at last get Bio Glitter from a well known theatrical chandlers. I’ve avoided using glitter as it is so bad for the environment, but this year I’ll be adding a little bit of sparkle to the walk down set.
2 locks,6.15 miles, 1 train, 1 Gyles, 1 car park, 7 git gaps, 2 tight squeezes, 1 mooring on our own, until late afternoon, 2 loads washing, 4.5 hours which turned into 6! 1 grounded Tilly, 2 many colours, £8.83 glitter, 5 chums, 1 Mrs Tilly stamp of approval, 1 failed rugby tackle.
We’re getting slower at getting up in the mornings. Today fishermen were coming past with their kit as we had our cuppa in bed. A match was being set up around us, comments from a passing boater to one of them suggested that they’d be starting at 10:15am. With this in mind we made ready, pushed away and had passed the last chap shortly before the call went along the line to start.
The canal had been busyish and at Filance Lock we met our first uphill boat, a single hander who’d managed to gain assistance from a dog walker. Filance isn’t friendly to single handers, there’s nowhere to tie up to below so this chap was grateful for the assistance. Oleanna however quite fancied being in the lock before he left, no matter what Mick did she wasn’t having any of it. Oleanna gave NB Arden Tilly a little kiss as she went by.
Penkridge Lock had a boat coming up, they’d been hoping to be able to wind and use the lock for their return. However we were there waiting to make use of the water. The locks are far deeper than the Wolverhampton 21, between 8 to 10ft deep compared to around 6ft 4″. The water certainly rushes out of them at speed.
Below the lock we pulled in and moored up. A few bits of shopping needed and we’d heard that Wednesday was market day in Penkridge. We’ve not stopped here for ages, the walk into town felt a touch like that of Market Drayton, only shorter. Some lovely houses.
Market Square was just a car park, the market must be elsewhere. We carried on walking through town, all the cars heading in one direction. Just off Stafford Road near the River Penk the traffic was backed up, they were all going to the market.
The market has it’s own site and car park, we were glad we’d walked and wouldn’t have to sit in a jam in a car to find a space. The market is big with a one way system, a little like Ikea, we were trapped until we’d walked all the way round. There was the usual fare of tat, but also good stalls that caught our eye.
Hardware, pies, crafts, plants, fish (smelly), socks (not so smelly), veg, dog trests (none for cats!), towels, cat statues one of which had the same expression Tilly has when she visits her pooh box! A pretty good market, but very busy. Have to say we did walk past the Covid test and jab centre quite quickly, I really hope no-one with symptoms comes for a test in such a crowded place.
With a black pudding pork pie and a spare hose attachment we left the market behind and headed to the Co-op for other bits of shopping.
After lunch we set off again, still some distance to cover to keep up with the schedule. At Longford Lock we pulled in behind a boat that had sped past us a while earlier.
With only one top paddle working the lock took forever to fill. Extra weight was needed on the gate beam to get it open whilst comments were made about the state of the locks. I walked round to go and lower the working paddle whilst the chap brought their boat into the lock and the lady waited to close the gate behind. He then hopped off and proceeded to drop the one working paddle, which hit the bottom with a metal thud! Then he ran to get back on his near full length boat that was still very much in gear. He didn’t make it in time as the bare bow hit the bottom gates not once, but twice!
After all his complaints about the locks, he most certainly wasn’t doing anything to help. The general rush the two of them seemed to be in wouldn’t help them any, in fact they were likely to end up braking something that may slow them down quite considerably!
The bottom gates opened as the chap at the tiller opened another can of Carlsberg.
Under the M6 bridge another fishing match sat. I wonder how much fishing they actually get done with so many boats about. But they all seemed quite happy and most returned a hello.
At Park Gate Lock we’d caught the speeding boat up, doubt they slowed for the fishermen, well they’ve the Four Counties ring to do in a week, they were hoping to reach Stone by the end of the day!
The basin here is now full of boats, Bourne Boats now builds their boats here. The old Midland Chandlers closed last year, but in the last three months a new chandlers has opened, Park Gate Leisure. The chap said they were gradually getting on their feet. A peer inside the door and I could see all the basics, plus life jackets. They also sell 13kg gas bottles. Sadly we didn’t want anything today.
Running around the locks and biffing gates certainly wasn’t making the boat ahead go any faster as we caught them up again. Comments here as to there only being two working paddles, one at each end, were made as their boat entered the lock in their usual style. I have to say I did take note of their number.
Now it was time to find a mooring hopefully away from the motorway noise. At lunchtime I’d received a message from the panto production manager saying that the company who were going to print up the cloths hadn’t received the artwork, had I sent it? Well yes and it had been signed for on delivery a month ago. My heart sank, yes I have scanned copies but nowhere near the quality needed to enlarge them to 25 times the model! Just before we moored I got confirmation from my agent, who happens to also work for the printing company, saying that my art work was safe and sound. Thank goodness!! Finally now it looks like the cloths will be ordered!
Tilly had a fun few hours outside whilst I made some apple crumble flapjack and then got on with hunting down neon tops for #unit21 again. After an hour and a half I’d had enough of looking at young ladies in scanty tops on vinted, here’s hoping some of them offer to drop their prices and nothing else!
5 locks (thankfully still in one piece), 4.46 miles, 1 vast market, 1 hose connector, 1 smallpork pie, 2 boaters in a quandary, 1 shop, 1 contract copied (house or boat?), 1 trip on Winding Down, but which 1? 0 help from blog! 35 fishermen, 1 big rush, 1 number taken, 1 tray too big, 2 much flapjack, 0 well what a shame!