Tea in bed with the Saturday newspaper, just what was needed along with an extra hours sleep.
Tilly
The sun was out warming the lock cut and making it steam. At 8am we got the first rowing boat arrive and sit chatting for ages as we read the papers. Then as the world warmed up more people walked past on the towpath.
Mick spotted a Lock Keeper and was about to say we’d like to stay a while due to our engine overheating, but the Lockie beat him to it saying that the river was back on Red Boards again, so our stay for the time being will be free.
I checked the levels and sure enough this reach isn’t the only one to have gone red overnight. It’s interesting how often they update the conditions, a week ago there were four updates in a day, but today there had only been one in 24hrs.
Sunny day
We had a long discussion this morning, should we eat out at the pub across the way, or should we cook ourselves. The later meant having to go shopping, we chose this option as we knew we’d end up with a much better roast for half the price. Mick headed off on a bike to a big Sainsburys where most of Oxford seemed to be restocking their cupboards.
All very well going downstream
Tilly and I stayed put enjoying the sunshine, watching a chap row by standing up, bet that’s hard work going up stream. What a lovely day for doing just about nothing.
The lock landing on 20th August
After lunch we went for a wander. Coming up the lock was a boat Mick recognised from Goring, the one with the cats on board. We chatted to the chap who moored behind us. They’d come through Abingdon this morning, fighting against the stream believing it to be on yellow boards, when they checked quarter of an hour later, it was on red. They battled their way upstream at about 1mph against the current. Serious hard work. Oleanna won’t be doing any of that!
The lock landing today
We walked down to look at the reach below the lock, it was very high, higher than yesterday, just about to come over the lock landing. Back in mid August there had been at least two foot below the landing visible. The stream from the weir was very strong, I’m surprised the boat had managed to come past it.
Red
A sunny slow quiet day ending with a nice roast chicken before I head back to Chippy tomorrow and paint my arms off for a second week. Here’s hoping the levels improve along with Oleanna’s engine.
My route to work in the morning
0 locks, 0 miles, 1 bike ride, 1 lazy morning, 1 lazy afternoon, 1 lazy evening, 1 roast chicken,1 boat, 2 kids, 3 dogs, 5 cats that’s one very full boat behind us!
Early trains, two of them to get me to Banbury. Then the 488 bus to Chipping Norton, which arrived so I had a good half hour before the meet and greet with the acting company. The van was already being unloaded with the set pieces that had been built in Cornwall.
Pieces coming in through the front doors
There was time to make sure all was well before I’d be needed elsewhere. Unfortunately there were two pieces that wouldn’t fit through the front doors! I had given Ade and Lou what are known as the ‘Get in’ dimensions. The two offending pieces had a very quick straight cut put through them which will be disguised with a lick of paint when I get round to it.
Portals going in
The first day of rehearsals starts with meeting all the actors and other creatives, this is followed by a read through. This was very funny indeed, plenty of jokes for both old and young. Then it was time for Helen (the costume designer) and myself to be centre stage and show off our designs to the company.
Positions on stage
Over lunch time there was a production meeting with Lighting Designer, Sound Designer, Props Maker, everyone involved apart from the actors. My world that normally revolves at about 3mph was suddenly accelerated to ten times that speed and that is the way it has stayed for the rest of the week.
Starting the phone box
Monday saw the portals being put together and fixed in position on stage. By the afternoon a second van arrived with barrows, hanging baskets and the start of a telephone box. Plenty for me to paint.
Pepper being grumpy with me
Late afternoon I walked round the corner to pick up the key for my digs and drop my bags off. I’m staying in the same digs as last year, so no need to be shown round, just a quick hello to Suzanne and Pepper the cat and I was back at work within fifteen minutes.
Yummy!
Late evening we all retired to the pub where on the menu there was gluten free cider battered fish and chips, I obviously had no choice. The portion was huge and I did consider keeping half for the following day, but I did my best and polished it off.
Tuesday more set pieces went up, sliders were suspended. This all took time as the floor of the stage is by no means flat, in fact it dips by getting on for two inches towards centre stage!
Hanging baskets all blobbed and splodged
I took over the front foyer, painting smaller bits of set. Hanging baskets, kitchen counters, the telephone box. By late afternoon it was time to say goodbye to Ade and Lou. They very nicely gave me two bottles of this years apple juice that they’d just pressed.
Glitter tastic scooter
Wednesday was props meetings with John the Director and Jo the Props maker. The scooters Jo has made are wonderful. The huge vault door wasn’t opening quite far enough, so some major chamfering back of the built hinge was needed and I then had to promise not to put too much paint on it all.
Big hinge about 12 inches long
With the crew putting first and second coats of paint on things for me I could concentrate on doing the arty painting. Late on in the day more people headed home, leaving me with Gavin and Ash to carry on.
My pretty walk to work
Thursday the actors started to rehearse on stage. By 4pm the Pippins had joined them. These are local kids who get chance to be in the panto. There are three teams of four, songs are learnt on mass, but stage directions and dance routines all have to be done three times. I’m just about word perfect on some of the songs already!
K6 finished
This also meant that Gavin gave his health and safety chat to the kids. When I realised he’d started I made sure I went into the auditorium to listen. Sadly this year he’s changed the wording somewhat, Death wasn’t mentioned once!
Missed bits
During the evenings the stage is available for painting at the moment, so I’ve made use of Ash and Gavin to get more pleb painting done. This does mean that even though I’m last in the building I also tend to be the first, touching in the bits they’d missed before the actors start rehearsals.
Still things to fly
By the end of Friday night there were just signs and barrow dressing left to do for the market square scene. This scenery possibly has the most work, so on Saturday I treated myself to a sit down in a dressing room doing all the signage. The complicated floor has also been marked out, I just hope it’s still there after all the dancing next week.
Road sign finished
Once these were completed and a few jobs finished on stage I headed to get a Saturday newspaper and a few bits and bobs that Mick had planned to buy when he reached Oxford, but that just hadn’t happened. Leaving the theatre in daylight was a first this week, as I waited for the bus to arrive it went dark. Only the twinkling lights in Woodstock illuminated the journey back to Oxford.
Pub sign completed
I considered on popping in to say hello to our friends, Andy and Irene, who were moored at the end of the canal, but by now I was weary and wanting to get home, still with another bus journey to do. Mick met me from the bus and we walked back to the boat by Sandford Lock. After sausage and mash with a glass or two of wine I had returned to 3mph, Tilly doing her best to keep my lap warm in front of the stove.
Cat cuddles, only because I was nearest to the stove!
2 trains, 3 buses, 1 read through, 7 potatoes more,2 big flats, 3 lots hanging baskets, 1 street sign, 1 nick, 1 kitchen unit, 1 ancient Pepper, 4 free bottles Crabbies, 2 bottles apple juice, 1 wet day, 1 newspaper, 1 purring Tilly, 1 cosy boat, 1 day off.
Theale to Goring Lock to Abingdon to Sandford Lock
This week has been a busy one on board Oleanna.
Yellow line at Theale
Early Monday morning Mick helped me with my bags to Theale Station and on to Reading where I headed off to Panto world and he headed to Screwfix where he bought us a new thermostatic mixer tap for the shower. This was fitted and we now have hot, cold and intermediate water in the shower, no need to look like cooked lobsters anymore.
Tuesday he stocked up on provisions for the dash up the Thames. The levels were dropping and yellow boards were starting to out number the red ones. With friends positioned along the river Mick was getting first hand knowledge from Goring and Abingdon.
Wednesday morning, Mick and Tilly were joined by Paul Balmer who had volunteered to come and crew for Mick whilst I was away. The cruise to get to Oxford would involve two long days. With Paul in charge of the ‘Key of Power’ they passed through Theale Swing Bridge just before 9am holding up a good few cars. Then they dropped down through the remainder of the K&A locks reaching County Lock 106 (the final lock) a little before midday.
Paul working County Lock
We’ve been wondering for a while if the K&A has the highest number of locks on the canal network. Answers on a postcard if you know otherwise.
The traffic light button was pressed and they were on their way through the shopping centre and back onto EA waters. For a jaunt they went round the Jail Loop* in Reading and then down onto the Thames. Oleanna had now escaped the K&A canal.
Blake’s Lock down onto the Thames
The trip heading upstream was a touch harder due to the current which was stronger than we’d had earlier in the year. Lunch was had on the go, helping to tick the miles off quicker.
Paul and Mick coming into view at Goring
As Oleanna passed under Gatehampton Railway Bridge, Mick gave Carol on WB Still Rockin a call. A space was available in front of Still Rockin’ and Carol and George were at the ready to catch ropes and help to moor up. Despite the river now being off Red Boards at Goring the flow was strong, so the extra help was much appreciated.
All moored up. Mick, George and Paul. Photo stolen from Carol
Tea and biscuits on board Still Rockin* was enjoyed by all before Paul headed off to catch a train back home. 18.41 miles and 10 locks. Mick joined Carol and George for some food at The John Barleycorn in the evening. Over the years our bows have crossed and we’ve followed each others blogs, but we’ve never had time to properly meet*, so a couple of hours was spent chatting and getting to know each other.
Tilly getting to know George
The flow on the river had been deemed too strong for shore leave to be allowed for Tilly. So instead on Thursday morning she received visitors at home, Carol and George coming round for a cuppa and a neck tickle!
Oleanna caught foam from the flow over the weir all day, a weeks Thames licence was bought and Mick had a look around Goring* and then was invited over to Still Rockin for some food in the evening. A good day of rest before the next long day up the Thames.
Friday morning and Mick was waiting for Paul’s return with the covers rolled back early. With help from George they ascended Goring Lock and waved goodbye, Still Rockin will now be heading downstream to their winter mooring.
A pause for water above Cleeve Lock and they were on their way again. Lunch on the go, ticking off the miles against the current. The hope was to reach Oxford so that I could return to the boat on Saturday night and Paul would have ease of access to Oxford Station to get home.
Around 1:15pm however an alarm sounded! The engine had been working hard against the flow, the temperature gauge (inside!) was showing how hot the engine was, too hot!
Mick put the engine into tickover, but things didn’t improve. Paul headed to the bow and dropped the anchor*. He was able to hold onto the rope once it had dug in giving Mick the chance to check the engine out.
Below the deck boards things were hot and steamy. Water and coolant were over the engine bilge. Mick topped the system up with water, the engine started again, the alarm stopped sounding and the temperature gauge dropped to about 90, not 80 which is good, but good enough for them to carry on to Abingdon to find a mooring.
Caversham Lock
They pulled in below Abingdon Bridge, the engine still too hot, was it a faulty thermostat? In the end it was decided to call RCR out to have a look. Rusty arrived after about an hour. Once Mick had convinced him that we’ve been on tidal waters going against the flow for far longer without any problem in the past they discovered the thermostat to the skin tank was full of crud. It was cleaned, dropped into boiling water to see if it worked. It did, but Rusty wasn’t convinced it should go back in. Unless this wasn’t the full problem it would be okay to run Oleanna without the thermostat for a while.
Paul had headed home and by now it was too late for Tilly to go climbing trees. A discussion on the phone at gone 10pm (my work finish time) and Mick thought he’d carry on to Oxford in the morning on his own. With rain forecast he didn’t want to now get stranded on the river if the levels came back up.
Troublesome thermostat
Saturday morning I received a message saying he was on his way, the Lock Keeper at Abingdon had said that there should be no problem getting to Oxford. Well except the engine was still being a touch too hot for comfort.
At 12:30 I checked the river levels on line. The rain was having some effect. A couple of reaches above Oxford were increasing again and Osney to Godstow Lock had gone into the red! This is the last reach where you turn off to get onto the canal. it is narrow and there is quite a low bridge too.
One red board
I messaged Mick. I could hear the cogs going from Chippy. Maybe he’d turn back, but then Sandford Lock came into view, this lock closes in a couple of weeks, so would be good to get through it.
He pulled in and opened the lock, the first he’d have to do single handed. Luckily a narrowboat appeared behind and pulled into the lock with him, with spare crew now they operated the lock and left Mick to attend to ropes. They were going to continue on to Oxford and try to get off the river, but Mick didn’t want to risk it with a hot engine. A 24hr mooring above the lock on bolllards was free so he pulled in there to have a think.
Why now?! Why rain now?!!
Being on a lock cut the flow is next to none, so Tilly could go out. Only problem was the amount of rain! This actually put her off for sometime despite having been locked in for days. The weather eased a touch and this outside proved friendly. I decided to bring my new best friend home to meet Tom, but the excitement was obviously too much for it. Tom picked it up and took it outside for safe keeping. He says it’s getting too cold now, so the back doors will be closed when I’m out from now on.
Staying put was the only way forward, Rusty was called and he’ll come back out to flush through the system hopefully in the next couple of days At least if the river goes red again we have a few feet to rise before the river would top the banks here and we’re on bollards. We’re also through the closing lock, so once things improve Oleanna can carry on up to Oxford and off the river, following NB Kamili.
Thank you so much to Paul for his lock wheeling and to Carol and George for keeping Mick company and fed in Goring.
18 locks, 42.63 miles, 1 left turn, 1 thermostatic mixer, 1 cruddy thermostat, 2 days with Paul, 2 evenings with Carol and George, 1 frothy bow, 1 weeks licence, 1 missed evening with Irene and Andy, 1 soggy friend, 2 buses instead of 1 to get home, 5 * things that happened for the first time, that I missed out on due to Panto!
This morning I noticed that our window frames need a good clean out. We seem to have a crop growing in the fluffy surround. Maybe it’ll be something tasty!
Cress or something more substantial?
As we finished off breakfast yesterdays locking partners came past us, then as we were rolling back the covers they came past again, heading in the same direction as us. How nice of them to call for us to do Woolhampton Lock together.
The river joins from the right
They of course were experienced at this lock and the swing bridge that closely follows it, having been through it yesterday. Below the lock the River Kennet joins again at 90 degrees, this is soon followed by the swing bridge. The flow on the river can mean that heading downstream you won’t be able to stop to operate the bridge, so it is recommended to open the bridge before leaving the lock.
Power on
Both safe through the bridge
Crew went ahead to open up, from my side of the lock I couldn’t see that it was opened but the chap on the other side said it was as Mick left the lock. A bit of power was needed to get past the initial force of the current, then enough to keep steerage through the bridge where shortly afterwards the boats pulled in to pick us all up. We’d both safely made the transit.
The culvert work we passed has progressed into a lot of mud
At Aldermaston Lock we waited and helped bring a wide beam up before we both could descend. An off duty volunteer appeared and as there were a few boats he went off to get his windlass and life jacket from the car, a handy extra pair of hands.
That’s what they look like
NB Seraph went on ahead through the lift bridge whilst we turned to the services to fill with water, this will be the last opportunity before going onto the Thames. This meant I got to see what the underside of a lift bridge looks like from the road. At the services we disposed of all our waste and then reversed out winded and waited for the road to be clear to lift the bridge again. I was glad we’d waited as I got 27 cars compared to NB Seraph’s 19.
Hips
As Mick brought Oleanna into Padworth Lock I heard two Kingfishers, soon followed by the two of them darting past in electric blue unison, both banking at the same time to give a flash of orange as they turned just behind Mick’s head and vanished into the trees. It was like the Red Arrows, they just needed a few more mates to make a proper display team. Sadly no photos were possible.
Sticky sticky things
We carried on working our way down through the locks and swinging the bridges now on our own, each chamber needing to be filled. Every now and then the river would join again, one stretch taking us by surprise and speeding our way downstream.
Sulhampstead Swing Bridge and lock were to be my last on the Kennet and Avon. A shame the sun hadn’t been out for my last day of freedom before Panto starts. We pulled in at Theale Visitor Moorings, hoping that the Thames will have dropped enough for Mick to make progress upstream towards Oxford this coming week. Today more yellow boards, stream decreasing are showing, they are almost half way to Oxford now, just a few more needed.
Tilly had a good explore this afternoon as I packed, baked and booked train tickets. Mick spent much of the time searching the internet for a new shower thermostatic mixer bar. Ours has decided to keep a constant temperature, just about too hot! So tomorrow he’ll help me with my bags and then go and see if he can get a new one from Reading Screwfix to plumb in.
My bags are now packed and in the morning I’ll be heading off to Panto. Hopefully when you are reading this Mick will be closer to moving onto the Thames, my navigational and windlass duties will be passed over to Paul from Waterway Routes https://www.waterwayroutes.co.uk to help Mick get off the K&A.
So until I get chance to post a postcard here, this will be the last post for a while. I’ll be keeping an eye on the Thames and other boaters blogs as I eat my cereal each morning before painting my arms off on Puss in Boots. See you all soon.
6 locks, 5.99 miles, 1 wind, 5 swing bridges, 1 lift bridge, 41 held up, 1 boat let through, 1 full water tank, 20 biscuits, 1 oat and chestnut loaf, 1 big bag packed, 1 rucksack, 1 bag of templates, 2 kingfishers, 1 boater signing off for a while.
Hunting round for a printers to do copies of my plans I noticed a group of possibles behind the marina opposite. I chose one to aim for and set off with my tracing paper roll under my arm. After I’d crossed the canal the roll had to be tucked inside my fleece as it had started to rain. They were wrapped in a plastic bag, but all the same I didn’t want to end up with a wrinkly set.
Newbury Salmon ladder
In what seemed to be someones garage I opened the door and enquired if they did A2 copies. No came the answer from a chap hidden behind numerous toner cartridges, but there was a place in Aldermaston. That was no good to me, they’d be closed on Sunday when we might just pass through. They could however do me a couple of copies that covered the whole drawing, that would do me.
Modern printers are like old TV sets they take forever to warm up and get going. A test copy was done, which took forever to appear at the far end of the garage. This was fine and he set about doing my copies for me. once this machine got going it didn’t hang around! They charged a minimum of £7.50, was that okay? Just over 30p a sheet that was great, an A2 would have been around £2 a go!
Ambient! My lasagne the other day was ambient too
Now with a bigger roll I looked like I was hiding a shot gun under my fleece. I met Mick at Sainsburys where we stocked up on perishables. Back at the boat we had lunch and then pushed off.
Dante modelling a new woofer life jacket
Okay so we didn’t go far, just around the corner to wait for the marina service mooring to become free. Then we pushed over doing ‘an Andy’ to get the stern in against the strong wind. Newbury has no C&RT water points, but here you can top up your tank for £2, if you spend enough on other things it’s free. We managed 50 litres diesel and a bag of coal, so we got the H2O for free. I put a load of washing on to make the most of it.
When the new rulings come in for Diesel the chap said they wouldn’t sell to passing boats anymore. How many other places will go the same way?
Impatient locals
This all took time and it was nearly four by the time our tank gave it’s boom to tell us it was full. So we pushed back over, mooring just before Greenham Lock. All was good, with empty and full tanks as required and a clean pooh bucket, happy boaters.
Whilst Tilly explored this stretch of narrow land between canal and river I drew up a template for the pattern in the Boozer for Panto. This recurs on several bits of set, so being able to draw it out quickly will be a great help. With this then cut out I could start putting things away.
Work corner
For months now the corner of our dinette has had a model sitting in it along with boxes of paints and my model making box. It is normally tied away better than in this photo. I’d hoped that the Production Manager for Vienna might manage to pick the model up this weekend, but we are too far off his route, so it will be sent by courier instead, we’ll have to put up with it for a while longer. Everything else though could be packed away again and stowed under the seating until next year.
Mine!
It’s all mine!
Tilly woke up just as I was putting the cushions back and made sure that she claimed them by rolling all over the place and running along the dinette sideways, those poor cushions!
Our forth and final meal from the left over pork this evening. Left over stew, just about anything that I could find went into this in my cast iron pot which was left to bubble for a couple of hours. With a large jacket potato each it was very tasty. The joint may have been large, but it did us five main meals so that’s just over £1 a go. Not bad.
A photo for Frank
Earlier than advertised the Michaelmas Fair firework display started. We tried looking out of the hatch but we were too far away with too many trees in the way to see anything. Oh well, we just listened instead.
0 locks, 0.24 miles, 52.4 litres, 1 bag Glow, 1 full tank water, 1 empty wee tank, 1 clean pooh bucket, 24 copies, 1 chicken, A1 template, 1 corner reclaimed, 1 set loaded ready for Monday, 3 yellow boards, the rest still red, 2 free days hooray!
When you wake up, turn your phone on and before you think it’s even woken up fully you get a text message with a question about panto, you just know it’s going to be one of those days!
Luckily the first email I got was from the actor/writer for A Regular Little Houdini who had just worked his way through the model photos I’d sent out yesterday, he was thrilled, so was Josh the Director when I heard from him later in the day.
Then the Panto emails started, questions left, right and centre. Everyone is gearing up to the start of rehearsals next week. Builders wanting to know if they should use prime mixed with colour. Will we need a pay phone in the telephone box? Will a recoiling hoover cable work? Could they have a hanging plot? My plans don’t quite match plans the technicians now have. Which are correct? Mine have to be. How many 1950’s mics have we got? Black or silver stands? Has portal 3 gone? The repercussions of that. They just kept coming all day!
Pub sign
I enlarged writing for signs on the printer and just had one more thing to do when the black cartridge ran out. I changed the cartridge but somehow it didn’t prime itself. Now the printer thinks it is full of black, but can’t print with it. I stopped what I was doing and handed it over to the technical department to fix. That last job could wait.
The designer of Houdini needed to be shot. Drawing up a cross section can be a challenge at times, one I somehow usually sadistically enjoy. But the bridge structure being set at an angle on the stage and then leaning in both other planes! Blimey!! Okay, so doing drawings on a computer would make this so much easier, but hardly a challenge. The sense of achievement when I finally finished it was great.
I just need a shoe horn now to be able to fit the bridge into the actors camper van to bring it back to England after the run in Vienna.
The technical department tried and tried to get the printer working. The final thing was to leave it off overnight and see if it would sort itself out. Fingers crossed as printer scanners are few and far between now. * Edited Looking at the spec of printers Mick found that most manufacturers of printers don’t boast about scanning as they used to! So if needs be we’ll be buying a new one.
Someone’s hard at work!
Tilly came and went. Even though her time outside here has been short, she is bored of this outside. So much so that she constantly got in the way today, being told off for walking on things she shouldn’t and leaving paw prints on drawings! She then gave up and retired to her shelf. When do cats stop growing? Will she be needing an extension soon.
The pork still keeps giving. Tonight we had roast pork and potato pizza. I’d tried making the sour dough base leaving it to do it’s stuff for 8 hours instead of 24. The verdict was either my sour dough starter has died or it simply wasn’t long enough. The base was a touch chewy!
The photo makes it look a touch too done, but it wasn’t
The Thames is still out of bounds, but looking at the levels on the C&RT site the Kennet should be fine. Hopefully tomorrow we’ll be able to do a bit of boating.
0 locks, 0 miles, 2 days not stepping off the boat, 4 yellow boards the rest red, 1 Still Rockin stuck at Goring, 1 Kamili stuck at Abingdon, 8:20 first question, 2 many questions to get my work done, 1 annoying cat, 3 pawprints that shouldn’t be there, 1 broken printer, 1 expanding camper required, 3rd pork meal, pizza not so good.
The Thames is still high, out of the reaches we’d need to cover five are ‘Caution Stream Increasing’ the rest ‘Caution Strong Stream’, no signs of it decreasing yet. Hopefully after a couple of dry days this will start to change.
A sneaky peek
Yesterday we decided to stay put until all my work is completed for Houdini and the bit of prep work for Panto I need to do. If then we have time to reach somewhere with a station nearer to Reading we’ll move. Getting closer towards the Thames would be a good thing and getting Oleanna through certain obstacles on the K&A would help too. This will give Mick more chance of reaching Abingdon or Oxford for my first weekend trip home from panto, that’s if the Thames goes down.
and another
So today I knuckled down, hoping to finish my model and any amendments to drawings for Houdini. Only one drawing left to do, a cross section. Lots of photos of the model to show the Director, Lighting Designer, Writer/Actor, Videographer. Just annoying that the internet started playing games as everything was uploading!
An Autumnal Mick
Mick cycled off to Halfords for some engine oil. Then he did a biggish shop at Sainsbury’s. They keep giving us really good vouchers so it would be silly not to use them. It’s that thing they do at this time of year, they think they have got you hooked with free nectar points, money off etc. so you’ll do your Christmas food shop with them. For us it tops up the nectar points that we may or may not be able to spend on a Christmas food shop. If all goes according to plan, our bird will come from the butchers in Braunston and our veg from the Post Office at Napton, so our points will wait for another time.
Mick spent the rest of the afternoon sat out the back, keeping out of my way and chaperoning Tilly. It was such a mild afternoon that I had the hatch open for much of it and Tilly could return as often as she liked.The Fish Selection Pocket Pillows have nothing to do with it! They are rather nice, thank you to Joa or Adam for them, although I think I still prefer the Chicken and Cheese ones.
Autumnal catwalk
She’d had enough after a while and returned to sleep leaving her chaperone outside. He eventually came in to carry on working his way through programmes on the channel tunnel, Heathrow and the first series of Star Trek.
Why the title? Today is the first day of Newbury’s Michaelmas Fair which happens in the week where the Thursday is the first Thursday following the 11th of October. It dates back to the 17th Century when Shepherds and Maids turned up to seek work in the town. It is about a mile away, but we could just about make out the words coming across the PA. Neither of us are big fans of fairs, so I doubt we’ll be paying it a visit. Although the fireworks on Friday may be worth it if we are still here.
0 locks, 0 miles, 0 steps of the boat for me,4 hours, 10 litres oil, 4 boxes wine, 1 model finished, 2 groundplans, 6 sheets, 1 cross section still to go, 25 year anniversary, 2,000 robot women, 2nd left over pork meal, teriyaki stir fry.
It’s been a long time since they stayed in bed in the morning this long. I like it, I get to keep toes warm or lie at the longest length I can be. She and Tom checked the outside without even getting out of bed, I chose to check it through the window, it was still raining!
A Marooned view
Apparently the outside we were aiming to tie up means we have to go through one that has gone all red and yellow. This isn’t good, even if it sounds quite bright and jolly. Tom says it would be really quite hard to tie up the right bit as the outside would be moving itself too quickly, faster than he would be moving it. So this doesn’t sound good. Quite confusing really.
The rain started to stop, so they decided to move the outside to somewhere for 14 days rather than just for 1. Another boat arrived so they joined us, tying up the outside to stop it from moving maybe would take two boats. She got her coat choice wrong, silly thing, of course it was going to rain again!
Newbury Lock
Last night there had been loads of people walking past us, it turns out that there had been a fire display on the canal. The messy people had left everything, but had marked it all with yellow balls. This meant one boat at a time, She and the other She had to walk on. Tom speedily followed the other boat managing to avoid the bridges and they both quickly tied up a park with a big round pond in it. This looked quite good. But Tom moved the outside again, this time on our own. Luckily She was there to help tie it up.
Yellow balls everywhere
Big trees, it all looked quite promising out there, but she and Tom stood in a huddle, then came and told be shore leave was cancelled again. They know I can swim, but the river might take me to another outside, so I had to stay inside. Don’t they realise I’m not that stupid! Those trees look so very good.
Instead I tried helping with the poisonous model, but She wasn’t too keen on this.
Now this is fun!
I did find a new game. Be’doingy balls are quite good on their own, but mix one with a slipper! Well now , that is fun.
By the end of the day the River Thames had got even more jolly. She says she can get from here to Chippy, but they don’t want to get stuck on this side of the Thames until Christmas, so we have all our paws and fingers crossed that the rivers go down quickly.
Sandford Lock would be our problem.
1 lock, 0.4 miles, 1 more day of cabin fever, 1 more rainy day, 1 river running by quickly, 1 new cyc, 1st coats of paint,1 ball, 1 slipper, highly recommended.
Yesterday we’d stopped short of our planned destination for the day, today we needed to catch up. So the alarm went off, we had breakfast and were ready to push off into the chilly morning. At least the sun was out and we might be able to see the views that the cloud had shrouded on our way west.
Sun’s out
There are so many boats moored along the Long Pound, progress was very slow but at least Alton Barnes White Horse was in view for much of our way. Then we skirted round the Wiltshire mounds to our north were ancient terracing is very evident.
Mounds
Under Lady’s Bridge and past the wide water where a chap was just coming out of his boat full of the joys of spring!
Terraced Pickle
Just before Pewsey Winding Hole a chap pointed at us from the bow of his boat and then three others waved.
The Rustys
The Rustys had winded this morning and managed to get their boat just about into the side to moor so that they could go for an exploration. our boats were finally pointing different directions and our paths wouldn’t cross again. Hope their trip back to Hilperton is good. There was a bit of banter about meeting up next year, maybe Bingley.
Boat cat keeping an eye on us
We considered stopping to dispose of our yellow water but by the time we realised that the service mooring was actually free it was a touch late, so we carried onwards. The chilled medication emporium wasn’t open anyway!
Birdies
Approaching Wooton Rivers Mick took it very slowly, we didn’t want to get shouted at again. The boat in question seemed to have moved since we’d come the other way a month ago, by a full boat length! Maybe he’d been all the way to Bath and back having returned to the same spot, or maybe not.
At the bottom of the locks we disposed of all our rubbish with the handy recycling bins and then started to make our way up to the summit pound.
A chance photo paid off
Work emails kept me busy when not winding my windlass. Difficulty finding the paint I was after, where’s the drawing for the ladder, would I like an extra painty pair of hands in Chippy. This was all panto stuff, then the emails regarding Houdini started flying back and forth between the writer and production manager. All the time I was aware we would be heading into a black hole of communication once over the top.
Wooton Rivers Lock
Even though I was busy trying to respond to everyone there was still time to buy some eggs at our 2000th lock on Oleanna. I picked out the larger ones from the bottom tray thinking that they would be fresher than those on the top. I’d make use of these in the quinoa quiche I was making for tonight, we were a couple of eggs short before and now we had several very large eggs in hand.
As we pulled out of Brimslade Lock an abc hire boat came from the lock above. We left our gate for them as they closed the gates ahead of us. We all said hello and then we watched them pull into the lock landing to drop off crew, followed by having difficulty getting into the already open lock.
Last lock uphill
Cadley Lock was our last up hill. Sadly the plums by the top gate were now well past their best, most rotting on the floor making it very slippy under foot. But I was surprised at the number of butterflies here. About four fluttered their way around me, one hitching a lift on our roof for a distance. I’d have thought it was way past butterfly time.
Rotting plums
The locks up to the summit and down the other side are still being locked overnight at 3pm. We’d been caught out by the very low pound heading westwards and just made it to the top in time. With two more miles across the top we knew we wouldn’t be down the first set of locks by 3pm, so we’d find somewhere to moor instead. At least we’d caught up some of the time we’d lost yesterday, hopefully tomorrow we’ll get back to where we should be.
Hitching a lift
Through Savernake Tunnel we started to look for a possibility, the railway now very close by but on the off side, so Tilly would be safe. A short distance fro where we’d moored last time we pulled in by another boat. The water deep enough at the stern to get close, but the bow sitting a long way out. Here would do us for the day.
Out of the tunnel into the eastern side
Tilly jumped to the bank with ease and headed off to make friends. I then spent the next three hours trying to catch up on the Houdini emails about Kabouki drops and video footage, finally chipping my ideas into the mix that had been going back and forth all morning. My drawings were scanned and shared. Food put in the oven and after eating I finally got chance to do some model making. Four hours later I had a new version of the proscenium finished, it was now well past bedtime.
4 locks, 2000th on Oleanna, 11.96 miles, 1 final farewell, 1 white horse, 1 must have galloped away, 70 ft in a month, 6 giant eggs, 10 litres paint, 1 ladder, 20 pairs castors, 1 or 2 kabouki drops, 10 scanned drawings, 18 toing and froing emails, 1 prosc, 12 midnight finish., 1 black hole ahead
On Sunday Mick helped me with all my things to Avoncliff Station.
This used to be a request stop
I had quite a lot and a quick change at Westbury Station so he decided to come with me that far to help get me onto the next train. After another change I got a taxi to Admirals Hard where I caught the Cremyll Ferry across to the Rame Peninsula. Only an eight minute crossing but just long enough for those of us sat outside to get sprayed by the waves.
A woofer passenger on the Cremyll Ferry
Lou was there to pick me up, we dropped my work things off at the workshop where Ade was busy and then she gave me a lift down to the village of Kingsand. With keys to my flat I made myself comfortable, stocked up on some things to eat and drink from the shop, possibly getting ripped off and then went for an explore. This was likely to be the only time I’d get in daylight to look round.
The old border
Kingsand and Cawsand are twin villages in Cornwall, however until 1844 Kingsand was in Devon and Cawsand Cornwall. A house still marks the boundary, about 100 ft away from my flat.
Cawsand
Several small beaches link the houses together, all very characterful, smugglers hiding in the corner of your eye. Narrow roads with no parking make for a tranquil place, well until the tide comes in! It did however feel as though nobody actually lives there, it’s just for the tourists now.
My groundfloor bedroom window and the sea!
My flat was about as long as Oleanna but wider. Have to say that our bathroom layout is better designed despite being half the size. Everything was very comfortable, but the kitchen lacked a few basics that would have made cooking a touch more flavoursome.
Last bit left to prime
Monday morning I was picked up from outside one of the pubs and was at work for 8.30. First thing was to lay out the back drop. Normally this would have been stretched on a frame, but as my design needed me to be able to draw lots of circles we laid it out on the floor. By 10am I’d primed the cloth and gained a couple of blisters in the process. Ade and Lou’s workshop has been having a new roof fitted, the central ridge still needed replacing and in parts it was open to the sky. So as the day progressed and the weather outside became damp, buckets were deployed around the place.
Drawn up ready to paint
By the end of the day just about every bit of set that was ready had been primed and my backdrop was marked out. A pencil and string being my compass, I could have done with Frank’s trammel heads (ends of a compass that you can attach to a length of wood), but I managed in the end.
Wednesday the sun came out, only one thing for the canine assistants to do, sunbath
Tuesday and I started to lay blocks of colour onto the backdrop. Three shades of blue paint, a straight edge and a steady hand were needed. Occasionally a helping paw would appear, Bo and Shine two collies spend their days over seeing what happens in the workshop and hoping to be able to gain access to the bins from next door.
Pasty powered painting
The workshop is next door to CornishPod, winner of the World Pasty Championship in 2016. The smells wafting through from them were too much for me, on Monday I’d put in an order for a couple of gluten free pasties. Fresh and warm I enjoyed one for my lunch, keeping the second one for Wednesday. The day was wet again, water flooded in through a hole that had been made for new electrics, a blocked drain was found and sorted by the landlord.
Wednesday thankfully a dry day but water had seeped under the wooden floor where my cloth was pinned out , it had crept up between the sheets and was creating quite a stain. In parts the cloth was wetter than when I’d first painted it. Action was taken and we relaid it on sheets of plastic, a fan heater deployed to drive off the worst of the moisture and I concentrated on painting the portals. The roofers were back in for the day, covering up sections of the ridge.
Tellytubbies
Each morning I woke to wonderful sunrises, some from Tellytubbies,
A new day
others more moody and grown up. Not a bad view to have from your bedroom window. The local sea swimmers would all walk down for their morning dip shortly after dawn. They’d bob away in the swell as the tide came in, Kingsand only seems to have high tide!
Oops I might have bought some cheese!
Thursday was the start of the next storm. We hoped the worst would miss us. The team grew by two, Ade’s nephew Frank and a scenic artist Debs. Debs had come to paint another set they have been building for The Drum in Plymouth. Nothing quite so time consuming as my backdrop and portals, just lots of washes and rust. Lu and Frank lent a hand where needed, basing things in for me and painting black for Debs. As the day progressed the winds got stronger and stronger, necessitating brushing more bits of decaying roof off my backdrop.
The view whilst waiting for my lift
By the time I got back to my flat the tide was being aided by the wind. On other evenings towards high tide the waves had been making it onto the road outside my front door, but the direction of the wind having changed and the tides not being so high the waves just crashed against my bedroom wall instead. Their bumping giving the sofa a slight nudge. I hoped I’d be able to get some sleep, but thankfully things calmed down and I managed to get some shut eye.
Tides
Friday, Debs and I were left to it in the workshop, the others on apple duty back at the house. Ade and Lou have around 250 apple trees from which they press apple juice. This years crop has been plentiful, so whilst painting brushes were working hard at the workshop, Lou and Frank picked up the latest windfalls and Ade worked his way through the first of 40 crates of apples.
Finished!
By the end of the day the other set was finished and Panto had a completed backdrop and two portals. Plenty more for me to do, but at least the main aim of the week was completed. I celebrated by having a halloumi and roasted pepper pasty for lunch, very tasty it was too.
Saturday my last day. A quick tidy up of the flat before I got a lift up to the workshop to see what I could achieve before heading home. I made a good start on two large flats, but I’d hoped to get them almost completed but the paint just wasn’t drying quickly enough. There was also the matter of packing paint and mixing colours so Lou can carry on basing things in,hopefully saving me hours of work.
Mixing grey
The last job was to mix a huge vat of grey. I hate mixing grey, you think you’ve nearly reached the right shade, just a bit more black, a bit more, a bit more, maybe just a touch more. Damn! Now a bit more white!!
Frank and Lou, my cloth was raised and stretched out shortly after this
The other set was loaded onto a wagon. The pieces I’d finished were stacked away and the backdrop was hung to help it continue drying. The water stain is fading but I doubt it will go completely.
Plymouth
Back in my civvies it was time to head for the train. A lift down to the ferry which was just coming in, then an awaiting cab to the station. I had 4 minutes to get to the right platform, my luggage a touch lighter as my brushes will go to Chipping Norton with the set. Two trains and I arrived back in Bradford on Avon where Mick was there to meet me.
A hard weeks work in the company of the lovely Lou and Ade in such a wonderful setting. It’s just a shame I never really got to see the village at low tide in day light.
Meanwhile back on Oleanna.
Mick and Tilly have not been idle. On Sunday afternoon Mick moved the boat a little towards Bradford joining the local boats. On Monday he took the toilet to bits. We have a Separett Villa, the urine gets separated into a tank under the floor from which we can pump it out into another container for disposal. Gradually when rinsing through the system I have noticed it taking longer and longer for the water to drain to the tank, so I’d raised a chitty with the maintenance department.
It was quite sometime ago that Finesse showed us how everything had gone together but Mick managed quite easily to remove the toilet and then the floor above the tank. From the separator one pipe leads to another which then does two 90 degree turns to enter the underfloor tank. Here was where the blockage was gradually getting worse and when Mick poured vinegar into the top it stayed put, the pipe finally having blocked.
Our yellow water tank, the blocked bend on the left
With some drain unblocking cabley thing and more vinegar he eventually managed to shift the blockage. No need to cross our legs, we can go to the loo again. But maybe we need to add more vinegar to the bottle we spray the separator with, or even add it neat every now and again, or maybe we should just drink it so that the pipe doesn’t block again.
On Tuesday morning I made a request that Tom should move the outside. This outside was okay, but another would be better, so he moved it to a Mrs Tilly stamp award winning mooring, Dundas. Here I busied myself outside, returning to check on Tom only to find he’d lost his legs! I found them for him down in the big box at the back of Oleanna. It was quite soggy down there so Tom was trying to get rid of all the Aunty freeze that had leaked there a month or so ago. He was very careful to keep me away from this Aunty, apparently it can be deadly to cats.
Purring paws
Thursday they filled with water winded and headed back towards Avoncliff. All the sink U bends and shower traps were given a good clean and then on Friday they moved up to Bradford and managed to get a spot on the 48hr moorings below the lock. Here was good, plenty to keep me occupied, but then Tom decided to nudge the outside a touch. This touch to the outside meant there were far more woofers, in fact a constant stream of them. It really wasn’t worth stepping off the boat!
0 locks, 7.24 miles by boat, 5 different moorings, 1 calcified lump added to the yellow water tank, 10 litres anti-freeze, 2 winds, 5 trains, 2 taxis, 2 ferries, 13 lifts, 2 pretty villages, 0 beach to be seen, 6m plus high tide, £51!!! 2nd shop at the co-op, 1 flat almost on the beach, 1 thumping sea, 4 bottles wine, 1 bottle oil and some garlic required, 58 hours, 1 fat knee, 1 pastie powered painter, 1 back cloth, 2 portals complete, 1 well used straight edge, 2 woofer assistants, 1 slightly blue ball, all three crew back on board, 1 purring cat.