Kind of handy to have a day without moving before heading off for a white card model meeting for panto. I got the drawing board out again to do a ground plan and section of the set. The section is useful to check sight lines, making sure things you don’t want to be seen until a certain point can be kept well out of view. This is a touch hard at Chippy because they don’t really have a fly tower, so things either have to concertina up on themselves or only be a certain height to start off with. A section is also useful for the lighting designer.
I also had time to run through the model doing all the changes, a kind of dress rehearsal for tomorrow when I do it in front of the creative team. Then I did a few sketches of some big props and puppets, these were only basic but enough to convey the basic idea of them.
All day boats have been heading downstream, quite a few hire boats. I wonder how many don’t know about Banbury Lock being shut. Yes there is a notice on a lock beam, yes there is a notice on line that you can sign up to. But not everybody looks or knows to look. I’m hoping to get to Banbury early tomorrow so that I can check out the mooring situation and see what’s happening at the lock before catching a bus out to Chippy.
On board Oleanna the two working batteries seem to be doing okay, they have charged up on the shore line. So the loose connection on the alternator will have been to blame for their sorry state. The temporary fix to bypass the failed battery needs to be made more permanent until we decide how to proceed. One new battery or three?
We are now down to two thirds of our normal amp hours. This was the original capacity Oleanna was specked with, we then changed our minds and wanted a third battery. This has served us well, but we’d been thinking we might upgrade to twice the capacity now that lithium batteries are more advanced, cheaper and easier to get hold of than they were seven years ago.
However for the time being we need to live within our electrical means. We’ll see how we go, but the first thing that will get switched off will be the freezer as when it’s hot it is working continuously. I’ve not restocked it and meals are currently planned around eating it empty. A big Sainsburys order arrived this morning, the wine cellar is restocked with boxes so that will make up for the freezer being off. Chicken curry new style tonight, lots of spices, but not too hot, yum.
This evening Mick turned the shore power off to see how the two batteries cope overnight on their own. Fingers crossed they survive the night.
0 locks, 0 miles, 4 loads washing, 2 tumble dries, 1 grounded cat, 1 Cr*predy! 1 model ready, 12 sheets of drawings, 2 batteries charging, 6 boxes under the back steps, 1 bag of peas to use up.
Another early start, pushing of at 6:30 with cuppas in hand. The lovely cool breeze was nice and refreshing as we wound our way along the summit pound of the Oxford Canal. Sun cream had been applied as few clouds showed themselves.
This morning our batteries hadn’t been complaining. At the moment we can’t check their state of charge properly, so all we can do is help them to keep topped up. Good job we want to keep on the move at the moment.
Wiggles and winds soon brought us to the contrasting landscape. One minute beautiful green fields, sheep grazing, bird song. Then round the next bend the huge mounds of earth from HS2 sat grey against the horizon. No activity today just earthwork scars across the gentle valley. I’d been at work last year when Mick passed this way so the new temporary bridge was new to me.
A short distance onwards the normally very popular moorings had only two boats on them! Blimey, maybe the HS2 works has put people off, or is it just the lack of view at this time of year with so much greenery about.
Late yesterday afternoon we had a Clifton Cruiser hire boat come past asking where the next winding hole was. Mick checked our map, Fenny Compton another two hours ahead. Their boat needed to be back in Rugby for Monday morning and today the temperature was due to hit 29C! Thankfully we passed them as we approached Fenny, already winded and heading back to base, a long hot day ahead of them.
Next Fenny Compton Tunnel where the roof was removed quite sometime ago. I looked for the towpath, but there was no sign of it amongst the cow parsley and nettles. As we passed through the narrowest part Oleanna had to push past the vegetation on both sides,
No need to stop at the old railway bridge today, no requirement for a festive wreath of ivy for the cratch. Then the first Oxford Canal lift bridge, sitting open to boat traffic.
The first mooring above the Claydon flight looked very nice and shady, sadly a boat was sat there. Strange conversations came from within as we passed, followed by a rendition of ‘Always Look on the bright side of life’. They had some sort of bird onboard, a parrot, a very vocal one.
Spaces were available on the rings before the bridge, we pulled in leaving an Oleanna sized gap between us and the next boat. Tilly was given an hour, knowing full well she’d take far more. The kettle was put on and we could sit down to join the Geraghty zoom only five minutes late and our cruising for the day done.
Topics today, what to do with ripe tomatoes, the deepest loch in Scotland and cheating on school sports days. I wonder how much ketchup Christine’s one tomato would make?
A late breakfast as the sun started to come across and hit the roof and both sides of the boat. Hopefully late afternoon would see us into shade.
Cricket was listened to, Tilly came and went, often opting to lie on the bathroom floor as she was too hot again. I worked my way through my Cinderella model, making sure I’d got everything and taking photos as I went so as to be able to do a new version of the storyboard.
During the afternoon a Carefree Cruising boat pulled up behind us, another foot would be good. Both Mick and a chap from the boat behind went out to see if we could adjust our ropes to accommodate them, this was soon sorted. Their dog took a fancy to Tilly at one point. Her popping out from the sideways trees, she got chased back in through the hatch. I showed her the front door entrance which she used for much of the remainder of the day.
She and Tom gave me an extra way on and off the boat too. Part of the see through sides was removed, just the hammocks left in place. She had to hold them closed at one point as the woofer walked past and all I wanted to do was stick my tongue out at it. She said because the glass wasn’t there I wouldn’t be safe, so not to be so cocky! I tried shouting at me later, but I just moved further down the towpath to get away from the noise.
My model is now complete, just a few bits to do before my meeting. Hoorah! Despite good solar for much of the day Mick felt it necessary to run the engine again at around 7 for half an hour to help charge our batteries, Boo!
Sadly the wind was too strong to sit out and cook our dinner on the barbeque, the defrosted pork was chopped up and made into paprika peppery pork, very tasty.
We ended the day by watching Elton John at Glastonbury. All the lyrics imprinted on our brains. Very evocative of my sixth form days and parties that ended up on the flat roof of my parents house watching the sunrise. Those parties were great parties. Elton still blasting out the tunes in tune unlike one onlooker in the crowd!
0 locks, 9.3 miles, 1 lift bridge lufted, 1 topless tunnel, 5 fields of broad beans, 3.5 hours cruise before breakfast, 1 hot day, 1 model complete, 2 batteries struggling, 1 near miss, 1 more entrance, 0 bbq, 1 pair of braces needed for a gold suit.
Napton visitor moorings to Prior Hardwick Bridge 123
Our lithium batteries had turned themselves off overnight, not a good sign. Good job we planned on setting off early. A cuppa was made and we pushed off at 6:30 and as quietly as we could we made it round the bend to the water point. As the tank filled we had breakfast then we pushed over to the other side to empty the yellow water tank and dispose of rubbish.
Time to enjoy the narrow locks. The bottom one was empty, as we rose up a hire boat came towards us from the moorings in the first pound. The ladies chatted away, it had been their first narrowboat holiday and maybe they’d be doing it again. Because we’d been chatting I’d got out of my usual routine closing paddles and the of side was still up as the gate was opened. I reminded them that it was up, the ladies took note.
I walked up to set the next lock, the first few were obligingly empty for us, the pounds a touch low though. Thankfully the lowest pound could be topped up with a lock full of water from above.
The first down hill boat, a couple exploring the whole network, they’d been at it for 2 years and have no end date as yet. They had come through Banbury and had serious difficulty at the now closed lock. It had taken several people to open the top gate, some having to sit on it, as far as it would open. Then as their boat came out of the lock it rose up over something possibly on the gate.
At the last lock in the flight we met our third downhill boat. I walked over to the lady, she jumped in (not into the water!) asking me to cross over to the other side where I’d be able to open a bottom paddle for them. I replied that I was happy to do that but thought I’d come and say Good Morning first. She was obviously in locking mode, they were hoping to grab a space below the flight left by a hire boat returning to base, hopefully one of at least three spaces would still be free for them. She also warned me to mind where I put my feet at Marston Doles bottom lock.
I opted to walk to the next lock, about a mile. The towpath narrowed as it does on the Oxford Canal. Some sections narrowed even more due to bank erosion. Then I was soon walking through the overgrown towpath. A manchette at times would have been handy. I managed and got to enjoy being surround by butterflies and damselflies galore. Plenty of wild flowers to keep the insects happy. There are plenty of people complaining on the lack of mowing on the towpaths at the moment, this stretch did feel like it had not seen a strimmer this year.
At Marston Doles Bottom Lock I kept my eyes peeled. Then there it was, a 2ft long grass snake on the lock landing, very dead. I wonder how it met it’s demise?
The pound in between the two locks was really quite low and when I reached the top lock a C&RT worker was letting water down. The top lock has had new gates which are successful in holding back the water. The bottom lock however leeks like a sieve, so every morning the pound requires topping up.
Once up we swapped with another downhill boat and carried on our way. When did we last head southwards on the Oxford Canal? We seem to cruise the Oxford most years, because of Panto. We spent a while thinking about it, a check on the blog just now and it turns out it was 2018 when we last headed south. That’s ages ago!
Originally we’d planned on doing a few more miles and getting close to the HS2 crossing, but Mick was after stopping sooner so as to spend some time with our troubled batteries. A length of armco showed itself with a slightly wider area where we’d be able to sit out for a barbecue this evening. We pulled in just gone 10am and soon adjusted our fenders as few boats seemed to be slowing down to pass us.
Mick waited for the engine to cool off, lifting the engine board to assist. Tilly headed off into the friendly cover, but fairly soon returned complaining that This outside is far too hot! Too hot for cats!!!
Mick spent some time down in the engine bay, trying to alter the bus bars that connect our three lithium batteries so as to cut out the one that is failing. He’d found a suitable sized bolt, but not a nut to fit it. We looked in all the obvious places for a nut, boxes of bits and bobs. Nothing. The hunt extended to boxes of things under the dinette. Eventually I looked at a brand new attachment of doom (a handy grinding disc useful for rust removal). In the bag was a bolt, a nut and a washer, would the nut fit?
Well it was the right size but the thread wasn’t the same. How’s about using the bolt from the attachment of doom instead? This worked so long as you remembered that the thread went in the opposite direction to normal. Finally the failing battery was isolated, leaving us with two batteries and 100 amp hours at 24 volts.
The afternoon was spent adding elements to my white card model. These are details that I’d normally add when upgrading the model to a coloured model, but I felt it important to do them now as they’d affect quotes from set builders. So the Town Square went from being 2D to 2.5D.
An early evening engine run was required. Would the two batteries we’re left with work as they should do, or have they been brought down by the faulty one?
Burgers and sausages were popped on the bbq along with a foil package of butternut squash. The squash ended up being cooked for a little bit too long, one side a touch black, but roasted with some oil and thyme it was still nice. Our mooring was ideal for the evening.
Once the temperature had started to drop Tilly headed out again, maybe a little bit late in the day. All the time we were sat out we could tell that she wasn’t far away, her bell giving away her location. Then as we moved inside I called and called. The dingding bell was dinged. No sign of Tilly.
I tried several more times to call her inside, each time I’d hear just enough from the sideways trees to know she was close. So there was nothing for it but to just leave her to finish being busy and come back in her own good time. 10pm, 10PM!!!! Well you are the one’s that tied up the hot outside!
9 locks, 3.5 miles, 4 passed, 2ft of snake, 1 full water tank, 1 empty wee tank, 1 top up, 10 improvements, 2 batteries better than 3 (we hope!), 1 nut short, 1 attachment of doom to the rescue, 2 Mrs Tilly stamps of approval.
Almost Napton water point to Napton Visitor Moorings
An engine at 6:30am! Who , what , where ? One of the boats on the permanent moorings ran it’s engine for half an hour, then thankfully peace returned, well for twenty minutes, then he started his engine up again! We were awake now, so had a cuppa.
Soon the two boats that had been filling the moorings with gaps came past, ah ha! We got dressed, untied and set about reversing back to the now wonderfully large gap they’d left, big enough for three maybe even four boats. Oleanna decided that she’d rather stick close to the moored boats as she went backwards, thankfully there were signs of awakeness in most boats. We pulled in and tied up as close to the boat in front as we could, don’t want to be accused of leaving git gaps! Of course over the next couple of hours other boats moved away and we were left sat in the middle of a very big space, enough for two in front and two behind at least. By late morning all spaces were filled up. Then for the remainder of the day boats came past some forwards others backwards hoping for a mooring, by the evening there were three boats moored at various jaunty angles around the bend where we’d been last night. Napton is a popular place!
Having a morning not really going anywhere we decided to use Mick’s culinary skills for the first time in an age. A very nice breakfast it was too, the sausages, Jolly Hogg tasted very much like sausages used to.
A day at work for me, the drawing board came out and Mick struggled to find somewhere to be as I worked my way to the bottom of the box of model bits. By late afternoon one box was empty the other full. I’ve still ground plans to draw up and a few minor alterations to do on the model if there is time before my meeting next week.
Mick has been monitoring our battery charging current, well he’s been doing this just about all the time we’ve been on Oleanna, but he’s recently noticed that on starting the engine in the morning the initial charging current is about 40 amps. Up until last week it always started off around 65 to 70 amps. Time to investigate.
He disconnected all the batteries and tested the voltage of each in turn. Two of them measured exactly 26.01v but the other one measured between 15 and 20 volts and didn’t remain steady at all. His deduction is that that battery is broken. I’m feeling that BOAT (Bring Out Another Thousand) is rearing it’s head!
An email has been sent to Ricky at Finesse for advice. Does he think the battery will still be under warranty and could be replaced by RELiON? If they did happen to replace it would it be ok to have one new battery in the same bank with two 6 year old batteries? Or does he have any ideas on how to reset the battery and get it working again?
Mick found information on line regarding the warranty, because our battery is between 6 and 10 years old , if it can’t be mended than we would receive a 10% discount off a new one. However Mick would choose different batteries now should we need to replace them, things have moved on in the last six years.
Yesterday a C&RT stoppage notice came through for Banbury Lock. Navigation closed until further notice due to concerns for structural condition of top gate of lock 29.
Today an update, Navigation remains closed until further notice.Following the engineers condition assessment of the gate assisted passage is not a viable option.We are working to deliver the repair of this damaged lock in the shortest possible timeframe.Further updates to follow Wednesday 28/06/2023.
Hmm, our next port of call is Banbury or further south for me to get to Chippy for a meeting, then our destination is further south still. Should we stick to our chosen route and hope that the lock won’t take too long to mend, or should we wind and go down the Grand Union? The latter option isn’t that appealing and would make getting to panto meetings awkward. So we’ll stick to our plan and keep our fingers crossed.
This evening we headed to The Folly, well it would have been rude not to as we are moored at the bottom of their garden! Time to catch up with our friend Lizzie from Crick. Have to say the menu was a touch disappointing for me, only two things marked as gluten free. I chose the gammon horseshoe steak, which should be gluten free, maybe the accompanying chips get fried in the same fryer as their battered fish. However they’d sold out of gammon so I opted for some ham instead, this also wasn’t marked as gf, it must be the chips! Mick and Lizzie opted for burgers which looked great compared to my slices of ham. We were all quite naughty and had a pudding too, only one option for me Chocolate Brownie, which was very tasty.
It was lovely to spend the evening with Lizzie, catching up on news. Sadly she’s not had enough time to do much boating on NB Panda, but she’s hoping for a few days away soon. So a walk down the towpath to say hello to Oleanna and Tilly gave her a bit of a canal fix.
0 locks, 0.1mile in reverse, 1 day at the drawing board, 11.5 sheets of drawings, 1 cat occupied or asleep, 1 out of 3 batteries not well, 1 load washing, 1 lovely evening, 2 options, 2 beers, 2 glasses wine, 2 burgers, 3 slices ham, 2 eggs.
Change around laundry and ironing completed. The Shed reclaimed as a bedroom with organised storage. Upstairs upstairs tidied. Windows washed. A sister-out-law to visit. Food eaten. Outfits remarked on. Who stole the youngest Prince? Beds made up. Clothes and food all packed. One on loan sewing machine returned and the last pair of socks delivered.
It was time to load a van and return to Oleanna.
Tilly’s pooh box and scratch post were the last items to be added to the van. I knew what had been happening, they normally keep me locked inside when they load up everything, but today I was allowed to supervise. I may have been distracted by the elaborate bird feeder though. Maybe I’d be allowed to supervise in the big white box, but no chance of that as I was bundled up into the cat caravan! I know I wouldn’t get under Toms feet, but She says that Tom isn’t so sure. Hopefully the scratches on my chest from the tussle with Tilly will fade without leaving scars. This morning we’d decided not to add any extra stress to her day by trying to give her a travel sickness pill. If only she’d lie down the motion wouldn’t be half as bad!
I’d refrained from saying how well Tilly was doing as we passed our usual stopping place on Staxton Hill, she then showed signs that we’d soon need to stop to refresh the puppy pad in the caravan. Thankfully there were only two stops today then she calmed down, sat with her back to the door of the caravan where I could sort of stroke her.
On our route we somehow got talking about cows. Tilly tried joining in, but her mooing fell short!
On arrival at Viking Marina, Tilly was the first thing off the van and inside. There was time to appreciate the nice clean floor before it was filled with bags and boxes that all needed emptying and places found to stow it all. Tilly checked everywhere over, peeked out the back and then settled down, It’s good to be back home.
Alastair chatted with Mick. Two new engine mounts had been fitted. The stern nav light attached. Leak on the skin tank had required a 46mm spanner to tighten the pipe and all was good.
With everything for the galley, saloon loaded onto Oleanna it was time to make a move. Well just reverse back, wind and come in for the bow to be nearest the bank. This would make filling the water tank easier. The bags of clothes would come straight into the bedroom, plants could go on the bow straight away and Mick would be able to reach to replace a steel cable tie on the bow fender that had broken in Bramwith Lock three months ago.
Whilst knitting socks my back has improved, but sadly moving things around, stoopid stooping has encouraged it to ache again. A few hours sitting down helps. Today though to be able to sit down lots of things needed to be stowed, moved here and there. Yes Mick could have done it all, but it was just easier to get on with it, someone needs to remember where things have been stashed after all! Tilly didn’t help with any of this, she was far more interested in the secret passage and refusing to come back out when I wanted to put the sofa back into sofa mode!
Once we’d remembered we’d put the duvet and pillows in vacuum bags Mick made the bed up whilst I adjusted the Sainsburys delivery for the morning. Diner was some left over gammon we’d shared with Kath (Mick’s sister) and Bill one of our lodgers, with some carrot and parsnip hash. Thank you Mick for being on cooking duty.
0 locks, 180ft, 1 wind, 27 cheese scones, 1 painted wall, 1 van full, 2 puppy pads, 1 proud She, 1 last pair of socks delivered, 1 determined Duncan, 1 more painting hung, 1 slot filling booking, 1 chocka boat, 1 empty water tank, 1 full water tank, 2 new engine mounts, 1 stern light, 1 secret passageway, 1 cat on the shelf, 2 happy boaters, 1 happy cat.
The weather forecast next week looks to be cold. What’s new? Well it’s going to be colder than it already is up on the north east coast. Goole looks like it will have below freezing temperatures. When we left Oleanna we’d left her with everything sorted for such a cold spell, she was plugged in with the thermostat ready to kick the heating on should things get really chilly, the advantage of our Aldi boiler being able to run off electric when hooked up.
However in the last couple of weeks Oleanna has been turned round by Alastair ready for when he has time to do jobs on her. Mick left him with some keys and the camera on board had broadcast movement a few days after his last visit, so we knew she’d been winded. She’d been unplugged from the mains, turned around for easier access, then plugged back in again, Oleanna has two hook up points to make this easy. However inside there is a switch you need to flick to select which end of the boat you are hooked up to, Alastair didn’t know about this. So for a couple of weeks Oleanna has been living off free solar, but should the heating need to come on it wouldn’t work. Someone needed to flick the switch.
Mick caught the train down to Goole a now familiar journey and if you break your ticket in Filey it’s cheaper. Oleanna was given the once over checking she was ready for minus temperatures and the switch was flicked to accept power at the stern. A catch up with Al from NB Summer Wind was had and a chat with Alastair.
The alternator chap he’d had in mind to refurbish our faulty one is no more. Another company said that unless it was something special/historic then it wouldn’t be worth doing! Well they obviously didn’t want the job. We’ll be scouting around in Scarborough to see if anyone here can help us instead.
Topping up the diesel didn’t happen again as Laird had just run out as Mick arrived. Hopefully next time.
The other job today was to meet up with Sean from SPL Covers, who just happened to be at the marina on another job. Our covers are in need of some tlc, too much use. The pram cover front window has had a hole in it for a couple of years and this year it has made a few friends. These happen when it gets folded down for cruising, a crease happening in the same place time and time again has taken it’s toll. The window has also gone quite opaque too, so this will be replaced.
The cratch cover zip that failed early last year will also be replaced. I tacked it together last spring so it was about time it was replaced. Mick checked to see if SPL could clean them too, however that would likely take several weeks to happen and we’d rather the covers were back on Oleanna as soon as they can be to help keep the weather off.
A productive visit.
Meanwhile on land.
Last week was production week for #unit21 in Huddersfield. The upgraded set went in easily but as the temperature of the set increased we found a problem with the fabric it was covered in. When the flattage arrived in the cold it was very baggy saggy. But as it warmed up in the theatre it tightens up making things look wonderfully smooth. However the upgrade to the set involved slitting the fabric to insert LED lights and perspex to create fake neon. In hindsight the original covering of the flats and upgrade should have been done in a warm environment when the fabric was taught, not an easy thing when workshops tend to be chilly places! This is also the first time either Graham or myself have used Ripstop on a set.
So as the set warmed the fabric tightened starting to distort the slots the lights were in. Clamps and cable ties stopped the movement, but the fabric carried on doing it’s thing. Thankfully the atmospheric lighting doesn’t show any of our problems up after a touch of colouring in with a Sharpie was done.
The actors did a couple of run throughs for technical purposes, then a full dress rehearsal where one of our new Led strips decided it didn’t want to do green, the main colour required. So sadly on photos we have a rouge strip and on press night it and it’s partner were unplugged.
The show was very well received and there were plenty of familiar faces in the audience, including Vanessa Brooks who used to be the Artistic Director at Dark Horse, also Pete Massey who used to work at the SJT in Scarborough. It was great to be able to have a catch up with him and Rach his wife after the show.
#unit21 is now on tour for the next few weeks. The Lowry in Salford 3rd 4th March, Chroma-Q in Leeds 10th March, The Junction Goole 15th 16th March, Storyhouse Chester 23rd 24th March.
Decorating of the back bedroom has started. Well the decorating bit hasn’t yet started, it’s more the demolition stage. I’d hoped to be able to remove the cornice and ceiling rose that would never have been in such a bedroom, but they have turned out to be plaster and very well attached. With my back still making me cautious they can stay for a while longer, the last thing I want to do is be patching up a ceiling.
Lots of patching up and some paint stripping to do, interesting how some new Eco friendly paint stripper has and hasn’t worked even with being left overnight to work it’s magic.
A new sewing machine has been invested in along with a cordless drill that matches the sander I got at Christmas, so we now have three batteries between tools.
Estimates for new windows have been coming in, all very expensive. The funding we’d applied for from the council to help insulate the house we were told a few weeks ago had run out, but yesterday we had a phone call suggesting there are now more funds available. We’ll have to see what happens on that front.
Our cruising plans for the year have had to be slightly altered. Two offers of work and an invite from my cousins will see us heading down south rather than staying in the north. It will be good to see family members at something other than a funeral and I think I was 18 when I last spent any time with my cousins kids. Hopefully there will still be enough of the summer to return northwards to accomplish our original plans of cruising the River Weaver. The life jackets have had their annual service, left inflated in a room over night well away from any cat claws.
Pip’s Sockathon 2023 will take place during April this year. A charity has been selected, a conversation with their Community Fundraising Executive has been had, so I’d best get my needles ready. There are still some things to sort for it but there will be more news on that front very very soon.
So for now that is all our news. Stay warm everyone, I can safely say it is far warmer on a boat than in our house!
0 locks, 0 miles, 1 wind captured on camera, 1 boat unhooked, 1 boat rehooked, 1 new sewing machine, 1 drill, 2 batteries makes 3, 1 red strip, 9 ensemble, 2 job offers, 1 workshop, 1 family get together, 1 brown bin, £30 curry for 2, 1 soda bread, 1 bored cat, 4 troublesome doors, 1 job made longer, 1 room stripped back, 36k or 26k? 1 charity, 10 pairs maybe this year, 1 vanity project, 174 x110, 1 blind, 2 covers at the menders.
Ice again this morning. Whilst I attended a zoom production meeting for #unit21 Mick went for a walk along the canal towards Shardlow Lock to assess the ice situation. My meeting went well and Mick’s verdict was that after lunch we should be fine to move as the sun was out melting the ice. He’d phoned Tracy at the farm to arrange a meter reading and a settling up as we’d be moving on today.
Just before midday we unplugged ourselves and walked up to the stables. Here we could say goodbye to our noisy neighbours, two donkeys who were rescues from Blackpool quite a few years ago. In three weeks we’d used 150 units of electric, we’d not run our engine other than to check the alternator and once to warm the engine bay up. The occasional blast of electric heating in the morning, washing machine and dishwasher along with the electric kettle, sewing machine and iron. Yes we have an iron but it comes out very rarely and mostly for work. We thanked Tracy for helping us out at new year and allowing us to stay for three weeks.
Lunch, another C&RT notice! Stoke Lock was still not operational by boaters so needs to be booked 24hrs in advance. A phone call was made straight away, when would we be there? Monday morning. The lady rang back confirming that a volunteer would be at the lock waiting for us.
Time to roll up the covers for the first time this year. The new version of our trip computer spluttered into life, an old phone placed in a window, this will run Nebo and track our route and miles. I turned Nebo on on my phone too to record locks as we go through them. We untied and I walked ahead to open the lock whilst Mick reversed Oleanna back to meet me.
A patch of thicker ice slowed his progress just as he arrived at the three widebeams. A chap on the last boat stuck his head out and complimented Mick for his reversing skills. He also warned him of thick ice below Derwent Mouth Lock.
The top gates needed a couple of attempts to get them open, the ice behind holding firm on the first go.
Reversing in ice seemed to be quite good. Blasts of forwards every now and then sent water backwards breaking up the ice in front of the blunt end of the boat. The odd blast from the bow thruster also helped to steer the stern towards the lock.
Down gently in the lock, the ice there breaking up as the water lowered. The aroma of scampi coming from the pub was soon followed by slightly burnt garlic.
I left Mick to wind whilst I popped to the post box.
Cat ice was about, easy enough to push your way through. Then at the pub bend we came across thicker ice. Would our escape from the Trent and Mersey be thwarted on this bend? It is quite hard to steer in ice. Narrowboats pivot in the middle and sideways force on ice isn’t very productive. Right on the bend it took several forward and backward manoeuvres to help get into a good position to start carving our way through the ice again. We wouldn’t have to moor there over night. Scampi here too! Maybe on Fridays Shardlow has a special for fish Friday on Scampi!
The red traffic lights were both turned off at the EA flood lock, both the rivers Soar and Trent were open to boats.
Now we slowed our pace to pass the line of moored boats by Chapel Farm Marina. Is it better to go slowly? Or does it just eek out the noise of cracking ice? A thick patch by the last line of boats had me at the bow, trying to keep us away from a Dutch barge. My pushing only moved the barge and not us. But eventually we worked our way through.
Up ahead was the widebeam that has been waiting for the river for a couple of weeks. More ice in front of them, we’d had enough and wanted to see what the ice was like below Derwent Mouth Lock before venturing any further. We pulled in. A quick cat H&S meeting was held, too much ice, Sorry Tilly! Harumph urumph!!
Below the lock the river was in the amber, the lock landing all very visible now. However the chap on the widebeam had been correct the ice below the lock looked thick, snow still sitting on it in the shade. We’d done enough ice breaking for the day, we’d be staying put, after all we’d reached our goal. Hopefully tomorrow the ice would have melted some more to make our journey easier.
We settled down for the remainder of the afternoon to listen to Tilly’s complaints. Then a crack and crackle with music came from the cut. A narrowboat with three chaps at the stern came along, we’d broken the ice for them, would they continue. Sure enough they headed for the lock.
A little while later Mick popped his head out of the hatch, the widebeam had also gone. Should we follow too? It was too late now to get much further. A check on the weather forecast. We’d both remembered it as getting warmer at the weekend. The forecast didn’t agree, -3C tonight with fog! Oh bum! Would we end up being iced in now away from water and electric?
To try to keep the engine bay from getting too cold overnight Mick ran the engine again for an hour, hoping that would help the batteries which don’t like charging at low temperatures.
My Mum’s American Sticky Chicken was made up and sat on the stove to bubble away for 90 minutes before we enjoyed it with some rice noodles. It isn’t the healthiest of recipes, but it’s nice.
1 lock, 1.2 miles, 150 units, 1 reasonable mooring, 2 donkeys, 2 scampi pubs, 2 more overalls, 1 hour breaking ice, 1 challenging bend, 0 red lights, 1 frozen river, 1 ice breaker forging ahead, 1 widebeam, 1 Oleanna who maybe should have followed! 2 sticky chicken thighs, 1 box of rosé!!!
This mornings Geraghty Zoom covered subjects such as mobile scooter drum kits and heating the front garden.
Today we had a visit from Tracy who runs the moorings. She wanted to see if we knew what our plans were and check we were aware of how much electricity we were using. Well we’d guessed it would be quite a bit, the washing machine has been working and we’ve not run the engine for two weeks other than to check the alternator. So 100 units wasn’t too much of a surprise and at current costs it works out to £2.50 a day. We’d use a little bit more than that in diesel if we were charging the batteries with the engine every day, just a shame we’re not moving whilst doing it! We’re hoping to move off just as soon as river levels are safe, hopefully later this week.
I found where the extra miles on Canalplan had come from, two Barford Mills I think. One on the Great Ouse, the other on the Avon. I’d also taken Oleanna on a trip down towards Stratford basin via Lapworth Bottom Lock. All sorted now. A third more miles than we did last year, but fewer locks.
Panto now seems a life time ago, but for the acting company they have been playing two shows a day. This afternoon was their last performance, their 97th! Here’s a montage of Instagram posts The Theatre Chipping Norton has put together from the actors accounts. These posts have kept me amused over the last few weeks.
Well done to all the cast and crew. I think only two or three shows had to be cancelled due to actors being ill, the understudies certainly had to earn their money, one having to play three different roles one after the other and two staff members went on with scripts in hand when they ran out of understudies!
This evening the Pippins will have amused everyone with their Pippin Panto. The smallest Pippin getting to wear the biggest costume, the Contessa’s huge pink frock, all four foot of her. I so hope the crew get tomorrow off before the set starts to get dismantled. Within the week there will be little sign panto was ever there and the stage floor will have a nice new fresh coat of black paint.
0 locks, 0 miles, 100 units, 300 miles lost, 100 locks not worked, 1 chicken and feta tray bake, 8 fingers crossed, 2 paws crossed, 4ft nothing in a colossal dress, 50th Chippy Panto behind you, oh yes it is!
A list was made of items I still needed to purchase for #unit21, including a 3m length of plastic pipe! I nearly ordered it along with elbow joints online from Screwfix, but decided to see if there might be a DIY stall in Derby Market. Derby Market Hall is currently undergoing refurbishment, but I was aware of The Eagle Market, the front doors of Derby Playhouse open into the Market. The website suggested a couple of fabric stalls, time to catch the bus.
Mick had made the decision to fit the new alternator this morning and was already down in the engine bay. I required a hack saw so collected one on the way past. The Skylink bus picked me up and whizzed me into town. I made note of a Tool Station next to the big Royal Mail building where there was a handy bus stop, a much better location than Screwfix.
The Eagle Market has seen better days, I’d say only about a third of the units were occupied. I found a couple of fabric stalls and most of what I wanted and ended up having quite a chat with the lady who lives on a boat in Shardlow Marina. Sadly no-one had any navy velcro, that will have to be ordered on line.
No DIY stalls. I had a wander around Derbion the big shopping mall, nothing of use in there, just a sandwich for lunch. Much of Derby Centre stands empty, the bright lights of the shopping centre, being out of the rain has pulled customers and retailers inside. Such a shame. But I believe Derby Council are hoping to rejuvenate the area, refurbishing the market hall being part of the plan to try to pull retailers back into the streets and make it a destination. Well that’s the standard blurb used for such places nowadays!
After a visit to Wilko I walked back to Tool Station taking note of a low wall just by the bus station. Pipe, elbows and cement purchased I headed for the low wall. Here I pulled out the hacksaw and cut the 3m length of pipe in half, no problem getting on the bus now.
At the water point in Shadlow there were three widebeams. WB Lazy Days had moved across from the pub moorings where now sat two C&RT skip boats. Then there were the two widebeams that had been moored above Derwent Mouth Lock, one having a wash, the other on the lock landing. Later on in the evening we could see tunnels lights and hear spikes being hammered in, we presume the widebeams had moved to above the lock, freeing up below.
Back at Oleanna Mick had been working hard to fit the new alternator. Three bolts and three wires, simple! Except things on the old one had settled in nicely, a touch of corrosion on the negative terminal made getting the nut undone a touch troublesome. Time and patience was required. One bolt was in an awkward position and when it came to fitting the new alternator things didn’t seem to marry up as they should do. It turned out there was a bush on one of the holes that needed adjustment. A tap with a hammer sorted this.
All bolted in and connected the engine was fired up, things checked over. Everything working as it should. Hooray!
Time to pack Christmas away, well the lights outside could wait for light tomorrow. The tree was stripped and then given a good soaking in the sink. It will get a day or two inside before being popped in the cratch.
The neon bunny was just about finished off this evening. All limbs sewn on and body stuffed, just a fluffy tail needed. Although I may want to give him longer ears as he’ll be a magicians rabbit. Tilly wasn’t enamoured with it, I may have to hide it away so it doesn’t get beaten up!
More emails were sent regarding flooring for #unit21 this morning. This ended up with a proforma invoice that required payment before 1pm to enable it to be collected early next week. My credit card ended up being stretched that bit more, but thankfully the price hadn’t gone up over Christmas and it will be sat ready for collection.
Our Sainsburys delivery arrived at the end of the towpath. There’s not much space on the road so a bit of nudging out of the way was needed for someone to get past, Mick was there with bags to decant the shopping as quickly as possible so the van could head back off. Everything was stowed away before I got my work things out for the day.
Mick had been getting tracking information regarding our alternator this morning. Would this actually arrive as planned? Through the hedge I could see what looked like a DPD van heading towards the farm. Mick popped his shoes on and walked up to collect the alternator.
Hooray! Just when to fit it now? Should it go on straight way, three bolts and a bit of cabling to do. Should it wait for the existing one to stop working completely? Should it wait to be fitted by a mechanic? How much longer should we stay on the mooring? We won’t be going far for a while with the river in flood. Mick is thinking about it.
I got on with making up the forma for the giant mug. The base dimensions should just fit through the back doors on Oleanna, so I won’t be able to get much further than just the basic shape. Also covering it in the yoga mat has to wait as I’ll be using contact adhesive and there is nowhere near enough space onboard to lay things out to glue, let alone dry and all the fumes.
Sheets were cut to length and then scored so that they would follow the curve. Glued and held in position to dry with masking tape. A second layer was added, laminating two layers would make it stronger.
The actress will stir a giant spoon in the mug so I worked out the maximum depth needed for this. I then made a false base to slot inside, this will help to keep everything together. It’s now ready to have a handle added, just need to get a plastic pipe back from Derby on the bus!
Just where to store the mug until it can be taken to Huddersfield? I’d hoped to make this on land where there would be more space than in a 7ft wide narrowboat. Would it sit in the corner of the dinette? Not quite, but taking out the corner cushions gave it just enough space. Phew we won’t have to move it several times a day just to be able to go about our daily lives.
Tilly thought it was very good especially the new route behind it. Mick thought he’d be able to live with lack of elbow room at the table. ‘It’s funny you making BIG things and not models’.
Mick has spent some of today starting to work on our trip computer. As Water Explorer is no longer, we’re hoping to be able to reconfigure the computer to be able to run Nebo. It may take a bit of doing!