Category Archives: Aire and Calder Navigation

Mushrooms and Ashley. 20th October

Castleford

Well the generators here at Castleford are a touch quieter than they’ve been in the past. The last one finally went off at 12:30, that’s at night!

Breakfast

We’re in finishing things off mode on board at the moment and with quite a few eggs left that meant we had to have them scrambled for breakfast, this also helped use up some of my nice bread in the freezer.

The Geraghty zoom followed, thankfully no-one caught our colds last weekend, maybe that’s why we still have them! Subjects covered included West Wittering, Corkmen, Tory auras, rotating apples and My First Wedding cards!

There were a few boats on the move today, but were they heading to the lock and on to Ferrybridge? One boat came from the lock, had they come from Ferrybridge or just behind us somewhere? We are seriously thinking that the lock is user operable, but what is the health and safety issue?

It was a touch windy and wet this morning, but nothing spectacular. Was that Ashley over and done with? We were likely to be on the periphery of the storm when it came.

Autumnness

A walk up to the lock to check on the level and just how many leaves were left on the trees. One of the boats that had come past us this morning was moored by it’s centre line in the extension to the lock. We suspected it was a single hander waiting for someone to share locks with rather than have to climb ladders and look after ropes in these big locks. The river level below the lock was just in the amber. Should we move? Or should we stay? We opted to stay and run the risk of the river coming back up overnight.

Back at Oleanna my thoughts turned to jobs that we should have been doing. The sun was out and we could now put the mushroom vent back on the roof. First we needed to find the black tack which seals the join between vent and roof. This took quite some finding, and as always with such things ended up being in the last place we looked, the cat proof cupboard. Then the old black tack needed removing from the vent along with the layer of rusty paint. The vent was then given a clean.

Back when Oleanna was built we’d opted for Chrome fittings so we’d not need to polish any brass. No idea what happened to the chrome but it tarnished pretty quickly on the mushrooms. I think within a year I was trying to find a way to clean them and bring a glint back to them. But this wasn’t to be, as they seem to have had the chrome stripped or stained/worn away somehow. Possibly something to do with the stove as the tarnished sides face the flue, but who knows? I gave up worrying about them ages ago.

Checking it fits

Last year we’d removed another mushroom vent and at dusk tried to fix it back on the roof. We learnt one thing from last year and that was the holes in the base of the vent are not drilled equally. So before adding a layer of black tack it was worth seeing which way round the base should be. Then mark the face that faces the bow with some tape. Maybe if we do more of these we’ll add a permanent mark to the insides so not only we’ll know which way they face for next time, but also which one goes where on the roof, before they are removed!

Better than last time!

Black tack reapplied, fixings pushed through the tack. Tilly agreed we’d managed to do it better than last time, but there was still room for improvement. She wasn’t wrong, as when it came to put the top back on, Mick had just started to tighten the nut from the underside when I realised that it was no longer attached to the top! The two part epoxy glue was needed and a good 24 hours for it to fully cure before we tried again. The big pan would be staying upside down on the roof for another night!

Here’s hoping it’s strong enough!

A big pot of chilli was put together and left to bubble away whilst I designed the next pair of socks. I’m quite happy with the design, I just hope I’ve some suitable colours for it. Yarn selection would have to wait a day or two as I’ve still got the last pair to finish off. At least I’m almost a pair in hand at the moment.

This pair may take a little bit longer

0 locks, 0 miles, 1 storm almost nothing, 1 cat bored of this outside, 1 mushroom base back on, 1 mushroom top broken, 1 threaded bar sticking, 3 meals of chilli ready, 44th pair designed, 0 bags packed, 0 drive south, 1 storm arrived later in the day.

Key Of Power Locks. 19th October

Above Fall Ing Lock to Castleford Moorings, Aire and Calder Navigation

Yesterday Mick had checked the stoppage notices again for our route eastwards. The flood locks were in use on the Aire and Calder, all were user operable apart from Ferrybridge. Ferrybridge is the last lock off of a river section that we need to pass through. We wondered why it wasn’t user operable, he made a call to CRT. The answer came back that due to Health and Safety it wouldn’t be possible for us to use the lock, we’d only be able to go through once the river level was back in the green and the flood lock opened to boats.

Waiting above Fall Ing Lock

Mick walked round to the garage for a newspaper, but none was to be bought, no newspapers at all. So nothing for it but to head onwards. We decided to make a move up to Stanley Ferry sooner rather than later, just in case the river responded to last nights rain, we’d rather be stuck somewhere where we could let Tilly out. Someone else had had a similar idea, NB Perseverance had whizzed past heading up stream in the rain whilst we were still getting up.

Going down

We were on our way before breakfast, topping up the huge Fall Ing Lock. This being our last manual lock for 2024 I was determined to operate it. The bottom gates are heavy, but not too bad if you are patient. I lifted the paddles and watched as the water washed up over the river level board pushing it into the red from amber.

The river seemed pretty normal to us as we made our way towards Stanley Ferry. Here the flood lock was in use, I climbed off with the key of power to operate it. At first it didn’t respond to any buttons being pressed, Mick had a go too, the top sluices needed reminding they existed, now I could open the gates. Unlike at the beginning of the year there was a difference in height, maybe 9 inches.

Key of Power from now on

A boat was coming towards us, I waited to close the gates behind them and retrieve my key. This was NB Ampere an early electric boat that we’d seen at our first Crick boat show. There was time to chat to the crew as the boats swapped positions and the gates closed behind them, they’d been stuck above Lemonroyd when the rivers came up.

NB Ampere dropping off crew

The only space we could find with rings was at one end of the water point, we tucked in, leaving space for another boat. Time for breakfast a bacon butty each. Then as the port side was to the bank we emptied the yellow water tank. The connector that screws into the outlet seems to be loosing it’s thread. Some PTFE tape was wrapped round the connector hoping this would stop any leakage. It was an improvement, but will require a replacement over winter. We moved up to the services to use the elsan, then I swung the bridge open a CRT fundraiser being very jolly saying hello to everyone who came past, but not managing to engage further.

Across

Across the aqueduct and past the Stanley Ferry CRT workshop. Earlier in the year there had only been a couple of new gates awaiting fitting. Today the whole of the area was filled with lock gates. Tried to count how many pairs there were, I think around twenty, that’s a LOT of oak!

New gates, lots of them

The sun was coming out now, anglers lined the banks as we dropped down Birkwood, Kings Road Locks. Under the M62 and on to Woodnook Lock where we’d drop down onto the river again. Big and wide we headed to Castleford Junction and the sad houses.

Mick opted to wind to face upstream to drop me off, just in case the flow from the River Aire wanted to assist us towards the weir. I took my time up the steps, wanting to avoid slipping as I’d done back in March. Here the river level was still just in the amber. I opened the gates and waved to Mick to come round from the lock landing. As he approached I could see how much current there was as the stern of Oleanna was being encouraged towards the weir. The level of the huge lock had to drop by about a foot, so took some time to level out to the cut.

Castleford Junction

Now we had to decide what to do. Should we continue onwards and see if Ferrybridge Flood Lock was actually not useable? If that was the case then we’d have to return to Castleford to be able to moor. Sunday’s weather had looked bad on the forecast and might bring the river back into the red. Being close to a station on Monday was a necessity, both Castleford and Knottingley would work. We opted to not risk having to return and pulled in towards Bulholme Lock. Here we hoped we’d not be plagued by the permanent moorers running their generators well into the night.

Tilly was awarded three hours shore leave. Not her favourite mooring, but far better than being cooped up in Wakefield.

They were here in March

As the afternoon went on several boats came past, one from the lock ahead of us. Had they come from Ferrybridge? Were the other boats headed that way carrying on or mooring up. Surely the light at the lock should be red if Ferrybridge Lock was inoperable! It was amber, and unless you looked at the stoppage notice you’d not know anything about the health and safety issue. Hmmm!

6 locks, 1 of them a flood lock, 7.9 miles, 2 bacon butties, 1 empty wee tank, 0 manual locks left, 1 key of power, 3 hours shore leave, 2 many boats moving for it not to be open.

https://maps.app.goo.gl/GTNwv1MrmtTzx3zr6

First Manual Of The Year. 24th March

Birkwood Lock to Midland Junction Bridge 40

No lazing about in bed today, time to get moving. With more rain in the forecast we wanted to cover as many of the river sections as possible before the levels rise again. Having said that we weren’t about to do an 8 hour day. The sun was out, waterproof padded trousers were donned just in case and to start with they were handy to keep warm.

First Stanley Ferry. Outside the C&RT workshops lay newly cut oak destined for Lock 69 on the Rochdale, it’ll be interesting to see what state the current gates are in as we pass. Then a full set, top and bottom gates were having the water treatment, swelling the oak before they get fitted on site. I couldn’t see any marks to tell me which lock these were destined for.

Stanley Ferry

Over the aqueduct, we’d called ahead yesterday to see if they had diesel. They normally do but their pump is being recalibrated on Friday and anyway they were closed today. This also meant we couldn’t stock up on coal. Through the swing bridge, holding up two ladies, a CRT fundraiser just setting up for the day.

Broadreach Flood Lock in operation

We managed to log on to the Geraghty Zoom on Mick’s phone as we went along the long straight towards Broadreach Flood Lock, although it took us quite some time to get the sound to work. Ahead the flood lock was closed so we waved our goodbyes to the sisters and got on with the task in hand, not that hard as the river was level with the cut, but both sets of gates needed to be operated and the sluices (even though I’d not opened them) closed before I could retrieve my key of power.

Back on the river I logged into zoom again, there was quarter of an hour before reaching Fall Ing Lock, so we listened in for a while before waving goodbye again. Subjects covered seemed to be about Scottish Islands and Ireland.

Fall Ing Lock, our first manual lock this year

Fall Ing Lock is big, deep and a stiff old lock, it would also be our first manual lock this year. Of course both top gates were open, Mick helped wind the hydraulic paddle gear to empty the lock and then I enlisted a Dad and son to help open and close the gate. Winding the top paddle gear I could tell it’s been months since I last did any of this!

I wonder if those jet washes would reach down to the boat?

A quick pause on the 72 hour moorings for Mick to pop to the garage for a couple of bags of coal. We have enough for a week, but wanted some more just in case. EcoCoal was bought, we’ve had it before, it created a LOT of ash, but at least we’ll stay warm.

A long sound of the horn brought us out onto the river again, heading upstream, behind us one of the old warehouse buildings looked like it was having a make over. Ahead Double Two looks to have let out space to an Escape Room. At one time I used to paint scenery for the John Godber Theatre Company in the workshop where shirts had once been sewn.

Thornes Lock, the first where you require a Hebble Spike. A few years ago we created an overlay on our Waterway Routes maps which showed which locks required a Hebble Spike. New phones etc meant we’d lost the useful information. Mick hunted through Canal World Forum to find the info he’d received back then, it’s now been added to our maps so we can be equipped at the correct locks.

A Hebble Spike paddle and spike laid on the beam

Both ends require a spike at Thornes Lock, well I certainly couldn’t get any windlass wound ground paddles to work. A group of cyclists arrived to cross the lock, one chap suggested starting to fill the lock with the other paddle as the one I was about to start with was VERY stiff. Well they were all very stiff! When they had come through earlier in the day there had been a lady trying to work the lock who had never heard of a spike and she managed to break her windlass on one of the ground paddles. I believe they managed to help her through.

Pine to left, hardwood to the right

Our spike is made of hardwood, I found splinters of a soft wood version below one of the mechanisms. Soft wood tends to splinter, hard wood tends to sink if dropped in!

The next flood lock was sat open for us, taking us back out onto the river again. At Broad Cut Low Lock we could see activity, a man in an orange jumper. I walked up to see what was happening and chatted away to the chap and lady who were ascending. He seemed ever so familiar. Mick joined the conversation as their boat slowly rose in the lock. When the chap mentioned they had a house in Wheldrake near York the penny dropped. This was Richard and Heather on NB Isabella, we’d shared the journey between Naburn and Selby back at the end of August in 2020 after we’d been stuck at Naburn when the Ouse was in flood. NB Isabella is their first narrowboat and Naburn was their first ever lock on her. Back then she was grey, today she’s red oxide. I’d been wondering if we’d ever come across them again, today was the day.

Once we were up the lock we pulled over for some lunch, left overs of Szechuan pork and courgette fritters, very nice, the pork seems to improve over a day or two. Heather and Richard had decided to stop for the day, there was only chance for a little bit more chat before I was needed at the next lock.

Hooray a locking partner!

An old Rose Hire Boat pulled out behind Oleanna from the moorings, we waited for her to join us in the lock, the lady very grateful to be able to share with us. She was the lady who’d met the cyclists this morning. Maybe she was now planning on sharing each lock with a different boat. She pulled in a distance ahead and tied her centre line to a fence post across the towpath! Maybe she’d also had a tipple or two at the pub at lunchtime.

We wanted to get that bit further on today despite being warned by the cyclists that we’d not want to be stopping anywhere between Horbury and Mirfield. Up on the hill in Horbury we spied the tower of St Peter’s and St Leonards Church, this is where John Carr the founder of my Dad’s architectural practice is buried. We visited back in 2019

Mick closing up as I set the next lock

We carried on to the Figure of Three Locks. There are only two locks, but their name almost certainly comes from the meanders in the River Calder along side. One of these meanders broke loose after Storm Ciara in February 2020 causing millions of pounds worth of damage to the locks. They were closed for 14 months whilst masses of work was undertaken. Currently the top lock ground paddles are slightly stuck open. Instructions on the notice regarding this were helpful, lift the two gate paddles and let the lock almost empty before opening the ground paddle (this is almost impossible to lift any earlier, but is required to fully empty the lock). Whilst I lifted paddles on the top lock, Mick closed up behind.

The figure of three in the river

A short distance further we came across the mooring we’d got our eye on. Handy bollards to tie to, but also a few motorbikes across the way, riding up and down muddy tracks, obviously a favourite place for youths on a fair Sunday afternoon. Hopefully they would have their fun and then leave us in peace, which is exactly what happened.

Sorry Tilly, this is as close to this outside as you are going to get.

A celebratory leg of lamb went in the oven with all the sides forming a very nice roast. We’ll now have lamb for several days. Yarn was selected for my next pair of socks, a far simpler pattern for these as the last three pairs has taken it’s toll a little, but that’s my own fault. I may not be able to show them at there best until much later in the year as several people will have to get together with their socks for them to make sence.

That’s blown!

7 locks, 9.3 miles, 1 bridge, 2 ladies held up, 1st manual lock of the year, 1 flood lock operated, 20kg of coal, 2 boaters from 2020, 1 lock shared, 2 or 3 tipples, pair 13 cast on, 1 leg of lamb, 3 more lamby meals this week, 2 late for shore leave, 1 disgruntled cat, 1 blown bow thruster fuse!

https://maps.app.goo.gl/FLMhkfcxSxGFkUqdA

Bumpy Crosses. 23rd March

Birkwood Lock

It was obvious that we’d found a good mooring for today, the slight cutting giving us some shelter from the strong wind. On the other side of the cut the trees bent over, here we got moved around but nowhere near as much as if we’d been moored at King’s Road Lock which is very open.

WOOF Away with YOU!

We quickly decided that today would be a sausage day for Tilly, although to start off with she wasn’t that keen on going out. The number of woofers I had to see off from inside and the sudden rain and the blowyness! Maybe the stamp of approval should be removed for this outside!

After a cuppa in bed there was only one thing for it, breakfast! Chewing not that much of a problem now, so we enjoyed the full works.

Over the last few days Mick has been trying to decipher instructions for the voltage sensitive relay he bought from Bimble. He’s wanting to wire it into the Nebolink which tracks our movements. At the moment I have to flick a switch in the cratch to start the nebolink recording, the plan is that when the engine is started up the voltage sensitive relay will spot this automatically and start the nebolink. When the engine is turned off it will do the reverse.

‘If the delay time in P-1 mode has been set, in P-4,the relay will act according to
setting of P-1 when voltage detection exceed the upper limit and lower limit range
(reference to the P-1 mode),when voltage detection between the upper limit and
lower limit range ,set “0N H” relay released, set “0N L” relay closed).’

However Mick needs to program the box so that it reacts at the correct voltage. He’s read the instruction manual, gobbledygook, translated English that still could be a foreign language. Tom from Waiouru has also had a go at finding a different manual, slightly better. Bimble when asked just referred Mick to the manual. By mid afternoon he’d managed to program the switch with voltages. He just wanted to see if he could add a delay to it switching off, so when we pull up at water points it won’t think we’ve ended our journey straight away. Although Nebo would most probably send us a report for each journey, it would also put them all together for the day.

All this was done whilst stood by the electrics cupboard and The Shed. Not a problem, but it meant my chosen activity for the day had to wait as I wanted to be in the galley. But that’s narrowboat life for you.

Ingredients

I’ve been wanting to experiment. Easter being not too far away, I wanted to try out a couple of different Hot Cross Bun recipes. Back in the house I’d made a rather tasty Challah bread, recipe from Loopy Whisk who seems to have some good gluten free recipes. The challah had a good texture and flavour which might lend itself to Hot Cross Buns. I was going to give this recipe a try with amendments to add the fruit I like and of course marzipan.

Unfortunately, the recipe required 1 egg and 2 yolks plus some for an egg wash, I only had 2 eggs! Fortunately Loopy Whisk’s Hot Cross Buns recipe only needed 1 egg plus egg wash. I opted to try that instead and adjust for my fruit.

Mugs were filled rehydrating cranberries and raisins. Another with the yeast and milk mixture. A third with a psyllium husk gel, this is used to add stretch to gluten free bakes and Loopy Whisk seems to like to use a lot of it.

Lots of fruit

Her recipes only need to be left to rise once. This proved a touch difficult as the shelf on Oleanna designed for the purpose is more suitable for bowls or bread tins than a baking tray. So the tray had to perch on the Houdini shelf in the window, close to the stove for some warmth, but maybe with a draft. They didn’t rise as well as I think they should have, maybe the amount of fruit, maybe the marzipan centre.

Chunky bumpy crosses

Hot Paw buns have a marzipan paw print on top, these would have a standard cross. Well except I don’t have a piping bag on the boat, so the flour and water mix was added with a spoon and ended up being quite bulky and bumpy. Baked we waited for them to cool off, a must with gf baking as otherwise the crumb can be very sticky. Then we enjoyed one with a cuppa.

Buttered whilst still warm

Verdict. Nice. Still wonder what a challah version would be like. Not a patch on Hot Paw Buns. Must check I’ve all the ingredients required to make a batch next weekend.

Rain showers came and went, the wind got windier. Here’s hoping it calms down for tomorrow.

0 locks, 0 miles, 7 sausage hours, 2 cooked breakfasts, 12 hot cross buns, pair 12 cast off, 2 many woofers, 0 tapioca starch left, 0 eggs, 1 switch still to be worked on, 1 more flood gate open, 1 to go!

The Brink Of Red. 22nd March

Above Lemonroyd Lock to above Birkwood Lock, Aire and Calder Navigation, Wakefield Branch

The plan started well. Get up have breakfast, sorry Tilly no shore leave. As we made ready to push off we noticed that the light at Lemonroyd Lock was amber, no longer red! Hopefully it had been fixed and we’d be free to head off down stream. We winded and returned to the water point.

What are they doing?

A group of engineers huddled around a cabinet by the off side top gate of the lock. At least three C&RT vans could be seen. We walked down to see what was happening whilst Oleanna’s water tank filled. There was still a problem with the top gate, if we were narrow we’d be okay and we could operate the lock as normal. Phew we’d be able to escape!

Squeezing in through the one gate

When we were ready I walked up to the lock to get it going, Mick not wanting to untie until the top gates were open due to the amount of wind. This amount of wind would normally put us off cruising, but the chance to get moving somewhere, anywhere wasn’t to be missed. I called up to the chaps in the tower, they’d operate the lock for us.

I think it’s the first time I’ve been on a boat through Lemonroyd Lock. Have to say I think it looks much bigger from above than it does from inside it, but maybe that’s different when heading uphill. With the chaps in the tower, they could open the sluices all the way up straight away, from the pedestal it is phased and takes quite a while. It only took 4 minutes before the gates were open and we could be on our way. The river level board just on the brink of red!

By 14:30 a new stoppage notice had been issued for Lemonroyd Lock. It would remain closed until Monday whilst a new part was sourced. Thank you chaps for letting us through, we’d timed our escape well.

Here comes the junction

Sunshine, clouds skidding overhead, we made quick progress heading down stream. It felt good to be moving again.

Skidding round the junction

The sad houses came into view (have a nosy around one of them), time to get ourselves ready to turn into the flow from the River Calder and the wind! Our zooming stopped, Mick cranked Oleanna’s engine up and swung the tiller over, she leant to one side, had our progress just been stopped totally? She then gradually straightened up to face the flow, slowly picking up pace we started to move again.

A boat on the move

A widebeam came towards us, blimey it was blowy out there! Under several bridges each framing views. Past Fairies Hill Lock and on to Woodnook Lock which had been closed until last Friday. Key of power to turn and buttons to press we made our way up off the river, we’d be safe to rising levels for a while now we were back on the cut.

The disused railway bridge

Our blowy journey towards Kings Road Lock was accompanied by a cyclist who rode back and forth back and forth along the track, the head wind not seeming to bother them. Pulling into the lock landing I spotted fishing rods sticking out from behind a widebeam. Frantic activity followed as two young lads fought to reel their lines in. This took quite some doing as they seemed to have caught items on the bed of the canal.

Woodnook Lock

We’d been hoping to stop here for the day, safely off the river, moor on the offside so Tilly could explore safely, but what gaps there were certainly wouldn’t accommodate us, we’d have to continue.

Little boats below Kings Road Lock

At Birkwood Lock there was space on the mooring above. A lady was off loading groceries from her car and carrying them over to her boat on the off side. They’ve moored here for 18 years, loved it, but now it’s time to find somewhere on land to live. They’d been to see a council bungalow and noted their interest, just a shame there had also been over 200 other people interested. Hopefully they’ll find somewhere soon.

Float free little ball, float free!

We pulled in, had a late lunch and let Tilly out to do her own catering!

We may stay put tomorrow as the wind will be stronger still. All the while we’re mindful that the river levels may come up again halting our progress.

On a positive note, I only just took longer than Mick to eat tonight, so my teeth are settling down at last.

3 locks, 8.6 miles, 1 wind, 1 hand brake turn right, £399,995, 1 full water tank, 4 CRT vans, 0 required part, 1 blowy day, 3 hours shore leave, 1 friend at least, 6 courgette bacon and feta fritters, 2 git gaps, 1 hopefully sheltered mooring, 1 Mrs Tilly stamp of approval, I’ll let you have this one.

https://maps.app.goo.gl/yioQNTvdLeBRqH6J8

Will We Ever Escape?! 21st March

Above Lemonroyd, still!

Porridge for breakfast with added diddy fruit. Think it will be a few more days before a Full English is back on the menu. Tooth situation improving, I’m only on paracetamol now.

Diddy fruit

The light behind us was red and flashing this morning, levels on the river deemed too high still. Ahead we waited for news at Bank Newton, would the lock there reopen today? If so our plans would possibly change . From our current mooring if we headed up the River Aire into Leeds it would be 6.4 miles before we got off rivers. If we stick to our original plan of the Rochdale it would be 26.6 miles before no more river sections could scupper our cruise. As the morning progressed we started to get our heads into gear regarding heading into Leeds, currently there are no flood gates or locks closed that stand in our way.

A big blue widebeam came past, we’d seen it last year at the top of Greenberfield. They headed towards the lock, the red light still flashing. A while later Mick walked to the bins, had a chat with Ruth from NB Lily Rose, they are still in the marina awaiting delivery of a new fridge. He said we may be changing our plans and head to Leeds, but River Lock is currently only open three days a week, Tuesday, Wednesday and Thursdays, so we’d have to wait for next week. As he walked back he checked the river level below the lock, almost amber, the widebeam was now below the lock heading downstream, a C&RT van pulled away, the flashing red light no longer flashing, just a steady RED!

Hello!

A stoppage notice came through, Lemonroyd Lock has a ‘mechanical and electrical failure. Engineers will be on site morning of Friday 22nd March to investigate and rectify.’ BOO!!!

Then another regarding Bank Newton, ‘the navigation is now open.’ Hooray!

I wandered up to the shops a few easier items to eat required. On return notices were coming through about the flood locks on the Aire and Calder, all were open or user operable apart from Bank Dole, which is closed due to a silt build up at Beale Lock. We’d now be able to get up to Wakefield.

As usual this was followed by an update on the flood locks and gates on the Calder Hebble. All flood locks and gates were now open apart from Anchor Pit and Ledgard. We’d now be able to reach Mirfield!

Except Lemonroyd our nearest lock has a fault!

We hatched a plan, in the morning we’d wind, fill up with water and then wait for the lock to be mended, fingers crossed!

Today is the 21st March, #WorldDownSyndromeDay. The date for WDSD being the 21st day of the 3rd month, was selected to signify the uniqueness of the triplication (trisomy) of the 21st chromosome which causes Down syndrome and the day has been officially observed by the United Nations since 2012 to raise awareness. The ‘Lots of Socks’ campaign encourages you to wear your boldest, brightest, mismatched socks, so when people ask you about them you can tell them all you know about Down Syndrome. This years campaign is End The Stereotypes.

Four Odd Socks

Not many people got to see our socks today, but that didn’t matter. In the words of Dark Horse Theatre Company, ‘we put a pair of odd socks on & celebrate the individuality and talent of people with Down Syndrome!‘ I certainly know some very talented actors.

0 locks, 0 miles, 1 broken lock, 10 flood locks/gates open, 2 closed ahead, 2 sad git courgettes, 4 odd socks, 1 widebeam, 1 set of unintelligible instructions, 1 favourite lodger booked in, 1 Mrs Tilly’s, NO!

Decisions. 20th March

Above Lemonroyd, still!

Still not a good nights sleep for me sadly. I don’t think my dental problems are over just yet. Things are better, I’m leaving things be for a few days in case it’s just the aftermath of having a wisdom tooth out. Shame I managed to stock up on my cereal whilst in Scarborough, but it’s too munchy to eat right now, porridge it is.

This morning it was raining. The river levels were down, amber light showing at the lock behind us, but it wouldn’t stay that way for long. There was a decision to make.

All that friendly cover being trimmed

We’re wanting to cross the Pennines via the Rochdale canal which is open. Woodnook Lock on the Wakefield Branch of the Aire and Calder reopened last Friday after a stoppage. However the next flood lock, Broadreach has been closed since the 10th March. The Aire and Calder followed by the Calder Hebble both have river stretches, all with flood locks or gates on them, quite a few of these are closed at the moment.

Today we could cruise for about three hours to above Kings Road Lock and moor there. One step closer to the next stretch of river, one ticked off. However, shops are further away than they are here and the only service available is a water point. We could carry on to Stanley Ferry, but it’s not as nice there for Tilly. Here we also have the advantage of transport should we want to go anywhere.

First decision made, it was raining, we’d stay put for the time being.

By the afternoon the light at the lock had turned red! We’d be staying now no choice.

Up ahead of us on the Leeds Liverpool there have been a couple of closures, Greenberfield and Bank Newton. Greenberfield reopened today and the towpath telegraph suggests Bank Newton will open before the weekend. To go this way we’d still have the River Aire to cope with, but once up River Lock into Granary Wharf we’d be free from flood locks and rising levels. We went that way last year, it’s our favourite canal, but we’d really hoped to cross via the Rochdale. This decision has been differed for the time being.

A day of Tilly finally going out, Mick trying to understand the instructions on how to program the voltage sensitive relay switch he’s bought for the Nebolink (still unfathomable) and me knitting. My latest sock frogged back and altered a touch so the secret message would be clearer, it also means the knitting of it and it’s partner should be quicker.

Just who would win the silver?!

Mid afternoon, we couldn’t wait any longer, we had to finish off Traitors Australia Season 2. Not quite the outcome we’d been hoping for, but maybe better than we could have imagined when starting on the first episode. Thank you Adam for helping feed our addiction. We now just have to go cold turkey and start watching all the other things that have been recording on the PVR.

0 locks, 0 miles, 1 load of translated mumbo jumbo, 1 amber turned to flashing red, 1 fair weather cat, 1st chiff chaff, 1 frogged sock, 1 trimmed towpath, 1 heel turned, 1 lazy day, 1 tasty tuna macaroni cheese. No you are not having another Mrs Tilly stamp of approval for here!

Meatball Hide And Seek. 19th March

Near Swillington Pipe Bridges to near Lemonroyd Marina to near Swillington Pipe Bridges

A busy day ahead for all of us.

I was awake with the sunrise in Scarborough. I popped my painty jumper over my pyjamas and started on the gloss surround followed by two coats of emulsion in the bathroom. A bit more tidying up/hiding things was needed, I also needed to track down what had happened to the keys we’d left with Duncan (not that Duncan!). It turned out that he’d added Micks and my instructions together and returned all sets of keys to where they’d started off.

All finished with a sensible mirror and shelf. It’s only taken 14 or so years

Some lovely bird had left it’s calling card all the way down the bay window, so that needed cleaning off as the window cleaners had only just been. All this under time pressure, I really didn’t want to have to return to the house to do a few things.

Meanwhile Mick moved Oleanna back towards the marina. Alongside the road he tied to the last post and banged a spike in. The Sainsbury’s driver called to ask if he could be early, which was fine with me I just hoped Mick was where he said he’d be. A couple of substitutions today, nothing that should be a problem.

A new bit of hospital

Front door was locked, I’d most probably already missed the bus so headed off through the park to walk to the hospital for my appointment. The daffodils are just starting to come out and the sunshine made for quite a warm walk. I was early and possibly jumped the queue at the breast screening clinic. Kind of wished they’d made me wait for another ten minutes as I wouldn’t have been half so clammy to be manipulated onto the scanner. But it did mean that once my boobs had been squished in all directions I left the hospital perfectly timed for the next bus into town.

Goodbye North Sea, see you in a while

An hour before the next train I went to see the sea, the big wheel being put back up, again! for the summer and got myself a gf wrap from M&S for lunch. This took me all the way from Scarborough to York to eat, 50 minutes! Biting and chewing quite a problem at the moment.

!!???!!

Mick stowed our shopping. Had they got confused with a substitution? 1 box of wine had been swapped for three bottles of wine, another seemingly for 12 bottles of alcohol free Corona! Once he’d stowed everything, it was obvious the beers were extra, someone else’s shopping! Two problems with it, it contains gluten and just where to put 12 bottles? Frank do you drink Corona? Would you like it?

The Ouse in York had gone down a touch revealing the amount of silt that will greet moorers at Easter. In Leeds I had chance to check out boats in Granary Wharf, pretty full and four boats moored above Office Lock, are some of these moorings new permanent moorings?

Mick had moved Oleanna back to the last silver birch and Tilly was busy in the friendly cover as I got back to the boat. River levels were down enough, Woodnook Lock now open, should we make a move today? To reach a good mooring it might take us three hours, we decided to wait til tomorrow as it would be getting dark when we arrived.

But you always say I should use the shore based facilities!

Next problem, what to eat this evening? Our shopping didn’t consist of easy none chew food. I goet some meatballs cooking with a tomato sauce to have with rice, I could cut them up very small. Mick took over cooking for the last bit, he counted the meatballs. ‘There’s only 11 meatballs!’ ‘There were 12 when I last looked’ One of them was playing hide and seek!

By the time I’d slowly eaten my meal Mick had finished his, done the washing up and cleaned the hob. I’m normally the first to finish! The leg of lamb we got may have to be liquidized if things don’t improve soon!

Another two episodes of Traitors Australia 2. We’ve started shouting at the absolute stupidity of the Faithful now, thank goodness we moved out of the marina as only the birds and fish can hear us.

0 locks, 0.5 miles, 2 winds, 3 boxes wine, 3 bottles, 12 alcohol free free beers, 1 coat gloss, 2 coats emulsion, 1 clean window, 1 house ready, 4 squishes, 1 bus, 3 trains, 50 minute lunch, 11 no 12 meatballs, 1 Mrs Tilly stamp of approval (does the same place count again Tilly?), 1 pedicure required, 5 left, can they really be SO stupid?!

Confusing The Tooth Fairy. 18th March

Lemonroyd Marina to Above Lemonroyd Lock, Swillington Pipe Bridge

Alarm set, no time for tea, we were off walking round the marina to meet with a taxi. This driver was a little bit dull. He really didn’t get that a bike ride of several miles to reach a bigger supermarket, that only takes a matter of minutes by car, was of no interest, neither was the location of the taxi companies office! I had other things on my mind. He did become slightly less dull when he said he’d be heading to Scarborough for Easter on his scooter.

The receptionist at the dentist sent me back up the fancy stairs to await my appointment, this morning I wasn’t the only person waiting. Eva, the nice Irish dentist, asked questions. I’d been taking note of where the pain started, it had changed a bit since last week and the general conclusion was that this time it had to be my wisdom tooth. She prodded poked, x-rayed. One thing for it, it would need to come out!

Calming fishes

It was quite a relief how little time it took to be extracted. I’d imagined there would be quite a battle, but no. ‘An extraction is £150, I hope that’s alright?’ Well it had to be she’d already pulled it out, or maybe I should have haggled!

I waited for the taxi home biting on the dressing whilst watching pretty fish swimming round and round. I wasn’t really in the mood or capable of a chat on the way back and just gave directions to the driver as we neared the marina.

Mick filled the water tank. The last load of washing finished spinning before we unplugged and made ready to push off. No-one was in the office to return our gate key so we passed it on to Ruth, Simon and Wilfred their dog on NB Lily Rose. The penny suddenly dropped as we chatted away, we’d come across them at Thorne Lock last October when a barrier hadn’t been closed properly on the bridge. They’ve only just set off on their life afloat and will be very glad to put rivers behind them! They’ll be heading a different way to us, depending on how fast they move we may see them again in Lancashire.

Bye bye Lemonroyd Marina. Thank you

We pulled out of the marina and winded, heading back to almost the same mooring we’d left two days ago. Just past the last silver birch, we positioned ourselves better to catch as many sunrays as we could between the trees.

I’d wondered if I would feel a touch rotten this afternoon after my visit to the dentist. I certainly felt hungry. After careful eating I made the decision to head for Woodlesford Station to catch a train back to Scarborough. If I didn’t go today I’d need to be on an early train tomorrow for a routine hospital appointment.

Only a trip boat moving in York today, the moorings under water

Three trains later I arrived in Scarborough, picked up some food on the way to the house and then set to work.

Paper pasted in the bath for ease of cleaning up

We’ve had a bit of work done in a bathroom which now needed a touch of decorating. Some undercoat and a long length of lining paper was applied so that painting could be done in the morning. The kitchen just needed finishing off, a few items put away and the half used tube of white bathroom sealant was found to take back to Oleanna for the shower there.

Yarn yummyness!

In amongst the post was a parcel. Becca from Bluebell Yarns had promised to send me some of her yarn. A wonderful skein of greeny blue, one of purple and some 100% wool mini skeins of bright colours, useful for doing cuffs of socks. What a wonderful surprise. Thank you!

A shame it was cold by the time I’d finished it!

My treat curry and onion bhajis took a long time to eat, the smaller I chopped it up the easier it was to eat. I topped up on pain killers again, wonder how much longer I’ll be taking them for? A single bed in The Shed tonight, all other beds are made up for imminent lodgers. Then I realised I’d not asked for my wisdom tooth so that I could leave it under my pillow for the tooth fairy. Bet she’d not have found me anyway!

0 locks, 0.5 miles, 2 taxis, -1 tooth, 1 key handed over, 1 Mrs Tilly stamp of approval (not sure if an outside can have two stamps, one for each visit?), 1 full water tank, 0 dirty washing, 3 trains, 1 bath used as a pasting table,1 bathroom prepped for top coats, 1 red light turned to amber, 45 minutes to eat my food, £0 for my tooth!

One Keeper. 17th March

Lemonroyd Marina

A top up on pills part way through the night was required. Swilling water around relieved the pain, but also meant I had to remember to swallow it before I dozed back off to sleep! By the end of the day I’d got the pain killers sussed, keeping a note of when pills were taken so as not to OD, all reminiscent of when I lost my little finger.

This mornings Geraghty zoom subjects included Interrupting cows, breasted up houses and it was very nice to see Penelope and Daphne, Mick’s great nieces for the first time in ages.

Hello again

Mid morning there was the sound of a boat engine. We’d been told there was another boat hoping to make it from Castleford when the river levels improved. In turned NB Lily Rose, we’d shared Bulholme Lock with them a week ago. It took a bit for them to wind and reverse into the space next to us. Of course there were several people about offering helpful advice making the job in hand harder than it needed to be. But soon they were all tied up, Mick helping them log onto the app for electric.

Mick’s socks drying

Every so often there is a chattering screech of bird song going over head. At times it feels as if the gossiping birds are hovering over Oleanna. I think they may be Oyster Catchers, not seen them and Mick’s not been able to catch them on his bird song app.

Yarn selection involves covering the bed with woolly colours

I selected the yarn for the next pair of socks. These follow a theme that the last two pairs have been based on. Now I’ve got the pattern sussed I may need to revisit the first pair to make some amendments. Thank you Jennie for your sponsorship of several pairs which will be knitted in time for Christmas presents. I reckon the last four pairs of socks won’t be suitable for Christmas presents, well unless my knitting goes into overdrive and I get ahead of myself. I know it’s not even Easter yet, but if you fancy a pair of socks as a Christmas present for someone, there are only twelve pairs left with guaranteed delivery before the big day!

Definitely a keeper

Mick pottered with jobs. A check on the bow thruster batteries, no need to top them up, all okay. A quick sweep of the well deck. The well deck is on my list of painting jobs, it’ll be soon time to become painty Pip again.

0 locks, 0 miles, 1 new neighbour, 1 red setter, 1 cocodamol, 6 paracetamol, 4 ibuprofen, 1 toe, 36 gossiping catchers, 2 loads washing, 1 load drying, 1 keeper keeping the rain out, 2 batteries okay, 1 dentist appointment made for the morning.