Rangerless. 10th October

Lock 31E to Lock 8E

Beautiful

What a beautiful mooring, even if we were on a list and in a winding hole. We woke up this morning quite late considering we’d gone to bed early last night. After a cuppa in bed Mick pulled us forward onto the lock landing to take advantage of the morning sunshine hitting our solar panels.

Lovely, who needs electric!

This morning the battery bank was down to 34% so any solar we could gain today would help this evening, thank goodness for Lithium. We do have lots of night lights, but we’re too old for candle lit dinners!

Out comes some more

After breakfast, sausage sarnies to help use up the defrosting freezer, Mick decided to have a go at removing more of the cable from the alternator pulley with the aid of a hacksaw. He allowed himself fifteen minutes and came back with a handful of copper wire. There is still more around the pulley!

Time to get moving, think it was about 10:30, hard to know exactly with no trip computer to refer to. We hoped to make up for yesterday and get a good distance in towards Huddersfield and a good number of locks lower. Richard yesterday said he’d send round a message to other volunteers to see if anyone could help, but sadly we’d not heard from anyone, we’d be on our own.

The sun made the day another stunner. Bright blue skies, views just about everywhere you looked. There were plenty of people out for a walk, some sauntering, others far more serious about it. I was out for a walk to get locks filled ahead and then back to let Oleanna free from the locks above. This of course means walking three times the distance. I kept this up going through the closer locks but stopped when they became a touch too far apart, I was going to walk far enough as it was!

Look at that blue!

The bywashes were flowing yet we still managed to have one low pound. Between 28E and 27E there is a line of moorings, the paddles on the lock above have stops on them so you can’t flood the pound below. Mick wound the off side paddle up as I walked back from below, then I lifted the other. When it came to lowering the paddles again this proved almost impossible on the off side, as there wasn’t enough space for me to be able to lift the mechanism to release it from the pawl. I tried everything including hitting it with my windlass, in the end I somehow managed to get it moved and lower the paddle.

Shhh sneeking past

We’d been warned of a vocal local moored above Lock 26E. I’d already set the lock for us in advance so hoped we wouldn’t get abuse. Anyhow I was hoping to cut him off with what a glorious day it was before he got started. His genny was running and washing hung around the trees. Mick brought Oleanna into the lock, lining her up meant being very close to shouty mans boat. But we did okay and didn’t hear a bean from him, I was slightly disappointed!

Shuttle Lock 24E is a guillotine lock, the top gates are operated as normal but the bottom one has a large metal rising door. Within this is a fairly standard paddle, wound by a windlass. The guillotine gate is also windlass operated, the spindle kept safe from nare do wells by a cover opened with a handcuff key. Six years ago the lock was operated by C&RT as there were safety issues with it. Today try as I might I just couldn’t get the handcuff key to open the cover, it had been over tightened. Mick and I swapped over, in the end the mallet was called for to get it shifted.

Mick worked the lock and I descended into the dark chilly lock with numerous gongoozlers peering down at me. The guillotine raised and below I could see a pipe across the top of the opening at an angle restricting the height somewhat. Our fresh bucket from the toilet only just fitted below it.

The pound below seemed slow going to me and sadly there was nowhere for us to pull in by The Handmade Bakery, a must if you visit Slawit. I got to walk back to lock the guillotine, but had no mask or money to buy Mick a lovely loaf of bread and wish I still could eat their wares, they used to do homemade baked beans on toast!

We still waved

At Darmouth Lock we missed the jolly waves from Pete’s (Mikron Producer) Mum and Dad who used to live there, earlier this year they moved away. So all we got today was the silhouette of someone sat at a computer screen.

Now in a new channel the canal is low and very narrow, thankfully our bucket fitted here too. Below Pickle Lock 22E there was the Hippie Boat, they were busy and we’d only stopped for a quick lunch, szechuan pork on toast another defrosting thing eaten up. Salmon came out for our evening meal, not much worth saving now.

At 21E Waterside Lock there is a local celebrity, Tinker. Tinker has taken a fancy to sitting around the lock, C&RT have put up signs saying he lives nearby so not to worry, he’s not lost. I thought Tilly could spare a couple of her Dreamies. Well blow me down, Tinker is the first cat I’ve ever met who turned his nose up at them! Well I hadn’t come home had I, I was still out!

Blackberries past their best now

The narrow channel beyond reminded me of last time, Frank had joined us to help crew and he’d spotted the bank of Blackberries, he and Mick became mountain goats collecting that nights pudding whilst I stood at the next lock all wrong handed.

I gained two very keen crew a few locks on, they both demanded to help with the gates, then ran down to tell their Dad all about it. The next lock I then had six extra crew, their brothers and sisters and Dad now helping. I hardly had to lift a finger. A close eye was needed to keep everyone safe, Mum and the youngest stood and watched. I asked how it was at home with eight of them. She asked if she could run away with us and pleaded with me to take her with us.

Titanic Mill

The big Titanic Mill built in 1911 has been converted into 130 apartments and sits proudly at the bottom of the valley. What a lovely place it would be to moor with such a great view, but I seem to remember it being shallow, we still had quite a way to go

.

Narrow locks, both paddles up to fill locks, overhanging stones locks through Linthwaite.

The pumps have stopped pumping from the river to the canal, the levels are too low

Did you know that in 1931, Bank Bottom Mill in Marsden set a record of 2 hours 10 minutes for making a suit of clothes, direct from sheep to wearer? The cloth industry was big round here.

Dappled sunlight

Back into the woods, my step counter clicking away. There is one pound longer than the others on the eastern side, I could have got a lift, but I’d walked all the way from Marsden so I might as well carry on. This did mean I got to walk over Golcar Aqueduct and see the horseshoe falls on the River Colne.

Horseshoe falls at Golcar

The final three locks of the day, I was pooped and found bottom paddles left up and gates open, not a welcome sight. But they were soon sorted and we were on our way down. Last time empty pounds had held us up here, today the levels were good.

Nearly there

Last lock of the day Isis Lock 9E, one of the locks on the network with poetry on it’s beams.

We pulled in onto the bollards below, almost into the side. This would do us for the day. The sun had boosted our batteries to 49%, so phones could be charged again. Laptop still off and showers on hold until things improved again.

9E last of the day

Salmon pasta and wine tonight, Mick is now 3/4 of the way through the book on the Standedge Tunnels, the most of a book he’s read in years! I wanted to do some crochet, but with Tilly sat on my knee a large blanket would have been too warm for us both.

https://goo.gl/maps/K4WoHm3n8TGpZwAy7

22 locks, 229ft 10″ descended, 4.3 miles (?), 9+ miles walked, 1 more handful of freed wire, 0 rangers, 1 constant stream of walkers, 2nd blog handwritten, 1 more stunning day on the HNC, 1 guillotine, 1 Hippie Boat, 1 Tinker, 3 wasted Dreamies! 2 aching knees, 1 aching back, 1 big sense of achievement, only 8 more locks to go.

No One Can Hear You Scream! 8th October

….. to Marsden Pipe Bridge

On our way in

Straight away we had a request from Trevor at the helm to adjust our tunnel lamp, to point it straight ahead. Mick did so, then we didn’t hear another word from Trevor for almost two hours.

Differing bricks and arches

Last time we’d both been on the back, our volunteer/guide gave us a fascinating running commentary as well as guidance to Mick at the helm. So much history and interesting facts was passed onto us. Sitting at the stern meant there was a limited amount you could see though. My photos were pants!

Sooty brickwork from the days of steam trains

This time sat in the bow I had my camera on handheld intelligent night auto mode along with the camera on my phone, both fully charged. Our volunteer Trevor, had turned out to be the author of a book all about The Standedge Tunnels (available from here), he’d become a member of the Huddersfield Canal Society in 1976 so if anyone knew their stuff about the tunnels he did. Just a big big shame there was about 50ft between us all. We did however buy a copy off him which he signed for us before entering the tunnel.

Rocky

There are four tunnels in all through the hill, the canal being the first to be built and it was then used to remove the spoil from the construction of the railway tunnels, two of which are now disused. Each tunnel is connected, walkways cross above the canal, and the support van drives through another alongside.

Rocky and misty

The railway tunnel crosses over the canal twice through the hill and when a train passes mist collects in front of you which then gets dragged away with the motion of the train, quite eerie!

At the western end the tunnel was extended when the last railway tunnel was built, so you start off in a brick arch, then a flat roofed section.

Reflections

All the way through different surfaces surround you, it’s like being in a 1970’s DR Who set at times, except this isn’t made from polystyrene!

Curves

Brick arches.

Bare rock that was blasted away, the drill holes for the dynamite quite visible towards the eastern end.

Arch meets rock

A mixture of rock and brick, sometimes brick above, sometimes below.

Spraycrete and rock

Then the creepier sections where concrete has been sprayed onto the bare rock to help stabilise it. This is very Dr Who or Star Trek, Captain Kirk would have set his phaser to stun! The spraycrete was done during the restoration of the canal.

At times the tunnel twisted in front of us, dug out from the ends and from the bottom of shafts the tunnel went off course several times. There are now several S bends

Rock bolts on the ceiling

Other places big bolts have been drilled into the rock face to hold it all back. The ends painted yellow so you can see them better, or know when one of them is going to scrape down your cabin side! There are numerous places where the sides of the tunnel look to jut out further then the gunnels of your boat!

I believe there are four wide sections, passing places. These tend to have wider brick arches helping to support the roof line. When boats were originally legged through the tunnel, it took four hours, this is where the boats going in different directions could pass. But the boatmen meeting elsewhere in the tunnels would refuse to go backwards to the next passing place, so two way traffic was abandoned. Official leggers were employed with traffic going in one direction for four hours before the direction changed. This then led to queues to get down locks at either end of the tunnel.

NO exit

Numerous gaps go off to the sides, some marked as exits, others marked with no exit.

As you approach each of the four adits a security light can be seen on the tunnel roof. Motion activated, the lights come on, a ticking noise can be heard as we passed. Apparently Tunnel Control would be able to tell that we’d passed each adit because of this. However not calling in would mean we didn’t know if there was a problem up ahead.

Walkways from the old rail tunnel to the new

The tunnel was built with quite a few air shafts. None of these can be seen now, well some are around 500ft deep! But you certainly know when you pass under most of them as this is where the water tends to get in. The further east we got the more water cascaded in. Waterproof coats did a good job, but when a flood hits the locker you are sitting on you also need waterproof trousers or better still a swimming costume! I got soaked twice and stood up for the last one, but still I was soaked through to my knickers!

Changes in height

But how was Tilly faring? I was glad we’d kept her confined to our end of the boat. I could see her most of the time and she could see us too.

But?!

Well who stole the sun?!

I’m kind of used to bridges stealing it, although I do tend to duck when that happens. Tunnels are worse as they usually time their theft of the sun with me requiring to use shore based facilities, very inconsiderate! Yes I know I can see in the dark but I’d rather not have to when visiting my box.

Rock and arches

Apparently Tom moved this tunnel once, before I came to be second mate. He bumped into it two times, She is quite proud of that. But today they were not where they should have been, I could see them, slacking at the front! They’d left it to Hard Head Tom to move the outside today.

BUMP, scrape, BANG!!! I sat on the floor not wanting to see what Hard Head Tom was doing to the outside, well lets face it I was really the only one who could see everything properly. BANG!!! How many more times!

Can anybody hear me!!!

I screamed at She and Tom to go and sort it all out, but they couldn’t hear me. Maybe I could do something? But black stuff was over the emergency bathroom gap, how was I meant to escape if I needed to!

Brick profile changing

BANG BIFF Scrrrrrrapppe!

In the end I decided that there was nothing I could do but to curl up on the bed and pretend everything was okay. Maybe this was going to be it for the rest of our lives! I certainly didn’t sleep. Who’d be able to sleep with no sun to warm your back and all that noise!

Light at the end? Or the trip boat?

As we approached the last adit I could see the lights from the trip boat ahead, quite a distance off.

Hi John

A torch light was flashed from the adit. John, the volunteer who’d driven through in a van was waiting for us. He informed us that the trip boat was in the tunnel, but we should just keep going.

After at least a year of my life Tom came through the bedroom, he had a hard head to put on too. Gradually the sun fought it’s way back into the cabin pushing away the tunnel. I could tell Tom was back moving everything, it got quieter and lighter.

Handing the equipment over

Mick had walked through for the very last part of the tunnel. This was so that the boat could be stopped at the tunnel portal to hand all the safety equipment to shore with ease. A plastic crate of first aid, life jackets and a large fire extinguisher were handed ashore. Just a case of retrieving the light from the bow.

Back in the sunlight

We pulled in to where the little shuttle boat moors, it had just headed to the top of the locks to drop people off near the station.

Trevor

Time to thank Trevor who admitted he’d bumped Oleanna a couple of times! There was nothing to see on the port side, but then he did favour starboard side in the tunnel.

No smile just yet

As we pushed off past the visitor centre a train sped past and into the rail tunnel, the sun shone brightly, as much as the tunnel is fascinating it was good to be back in the light.

We pulled in at the top of the locks, the first stretch a touch shallow for us so we hoped that further towards the lock would be better for NB Idleness. A quick check up and down the starboard cabin side of Oleanna, a couple of lines which when rubbed vanished. Our passage may have been a touch noisy at times, but other than a couple of new scrapes on the gunnels there was not one scratch. Thank you Trevor for looking after Oleanna, maybe I should have repainted the grab rails earlier in the year after all.

Soggy bum!

Time to check on Tilly, get changed and have lunch. All was fine with our little thug, who within half an hour of arriving used her on board facilities. Well I couldn’t hold on any longer and you weren’t letting me out!

This way out!

What a great day. Thank you to all the volunteers who make the passage through the longest, highest, deepest tunnel on the network possible.

0 locks, 3.76 miles, 1 tunnel, 3 miles underground, 1hour 48 minutes, 1 more wonder of the waterways for Oleanna and Tilly, 3 boats, 3 volunteers, 2 crew in the front, 2 soaked boaters, 17 years, 1 screaming cat, 2 nav lights in tact, 2 more scrapes on the gunnels added to the 5678 which were already there.

https://goo.gl/maps/qbzszmzTKAy1D1p9A