Checking our vital statistics for a years worth of cruising takes a while. We have a trip computer which records almost all our journeys, sometimes it counts locks twice, sometimes it doesn’t quite catch where we reached before we wind. Before we used this method of recording our journeys I would use canal plan to work out our distances. This method can also miss out parts of our journey but it does give me more statistics. You know how I like numbers! How many bridges, how many narrow locks and what distances we travelled on different types of waterways. So inputting a years worth of cruising takes some time.
Anyhow, here is our round up of the year.
The New Year was seen in at Crick. From here we decided to head to Sheffield to have the last snagging jobs done on Oleanna, we were fortunate that the route north was open with no winter stoppages in our way until we reached Yorkshire. Once in the top chamber at Foxton it was going to be downhill all the way to Keadby.
Sadly our blog started to loose it’s photos, which is a great shame. It was a problem shared by many bloggers who were all doing their best to get things working again. Have to say we ended up jumping ship from blogger to wordpress, but posts still lacked their photos when moved. We hope gradually to rectify this by replacing the missing photos, I miss them when looking back. But this will be a long job.
During January we cruised down stream on the River Trent, the weather was getting colder the further north we got. Our route was clear but at Keadby the lock off the river was being dredged, so our journey was held up a touch. Then with February came cold nights and the canal at Keadby froze over. So we waited at Cromwell for things to improve.
Daylight hours and tides meant we split our tidal journey at Torksey. The early morning start from Torksey was very cold, so I was very glad I’d knitted us both balaclavas, we remained cosy cheeked for our journey.
Our journey up towards Sheffield meant we coincided with the bicentenary of the opening of the canal and a very unseasonably warm weekend. The chaps at Finesse replaced a leaking window, gave us a new one (our choice), sorted out our gas locker lid amongst other bits and bobs. It had been a good decision going to Sheffield, it saved them time coming out to us and it saved us money on the extras we’d asked for.
Next we headed for Goole, the lure of cheap diesel and a night away to see our friends Bridget and Storm on the otherside of the Humber was a bonus. We then hunkered down to sit out storms and rising river levels. Our original plan had been to go to York, but flooding put paid to that, so instead we went by train.
Towards the end of March we decided to give a trip up the Ouse another go, the rivers were at better levels and we still haven’t taken Oleanna there. But first Bank Dole lock wouldn’t fill due to silt, then when we reached Selby the Lock onto the Ouse had a fault which would take too much time to mend for us to wait. This was a relief for Tilly as this was where she’d discovered the difference between grass and duck weed and ended up learning to swim a couple of years ago.
At the beginning of April we headed to Leeds. From here we had a day trip to Derby Crown Court for the sentencing of our original boat builder (Stillwater) who had finally pleaded guilty for fraud. I also spent a more pleasurable day in London, having a meeting for Puss in Boots.
With panto in mind we planned our cruising for the remainder of the year. The remainder of April we made our way up the Calder and Hebble and onto the Rochdale Canal.
Our friend Frank joined us to do the stretch from Sowerby Bridge to Hebden Bridge, which included the deepest lock n the network, Tuel Lane. He’d not done this stretch back in 2014 when he and I walked from Manchester locking Lillian over the Pennines to get to the Tour de France.
Once over the top we picked up a boat to share the locks down into Manchester. Clare and Graeme were over from New Zealand for a few months and proved to be very good company.
On the 1st of May, with the help of a Canal and River Trust volunteer our passage down into Manchester went well. The following day both boats headed down the Rochdale nine with an extra pair of hands from an old college friend of mine, Doug.
During May we cruised down the Bridgewater and onto the Trent and Mersey Canal gradually heading southwards. A short detour up the Middlewich Branch to look at where the breach had been before we carried on southwards.
A pause in the Cheshire Locks meant we got to meet up with Tom and Jan who were over for a visit. For Micks birthday we moored at Barlaston and had a nosy at the wonderful hall on the hill, our plan still stands if any of our family are interested! https://oleanna.co.uk/2019/05/23/the-plan-20th-may/
We saw the end of May out mooring at Tixall Wide before rejoining the Trent and Mersey and heading onto Fradley Junction where we joined the Coventry Canal. With Atherstone Locks out of the way I spent time below working whilst we cruised familiar waters on the flat, it might have rained too!
A day trip to London from Rugby for us both, me to a seminar for Separate Doors 3 and Mick to catch up with his friend Siobhan who was over from Australia. Continuing down the North Oxford Canal to Braunston where we joined the Grand Union Canal to head to London.
A visit to the Royal Ordnance Depot at Weedon meant I bought some lovely yarn to make a cardie for myself (it’s nearly finished!) and caught up with our friend Heather Bleasdale, who just so happened to be moored there as well.
Our route then up and down the Grand Union meant we managed to get to see both Mikron shows this year as well as teaming up with the cast and NB Tyseley to climb the locks up to the summit.
Tilly was left in charge for a couple of days whilst we headed to Scarborough to check on our house as we had a change of tenants. This meant we got to stay with Jaye and Duncan and catch up on the news from home.
We now pressed on down to London where we booked a mooring in Paddington Basin for a week in early July. This gave us the opportunity to catch with with friends and family before we headed back out west and down the Hanwell flight. I made the front cover of Canal Boat for July.
Mid July we locked out onto the Thames cruising the Tidal section to Teddington. From here we transited to the River Wey, brand new waters for us.
With my final design for panto delivered to Chipping Norton from Guildford we could enjoy our cruising a bit more, despite the soaring temperatures which had us hiding under trees for a couple of days.
On the 26th July we ticked off our third point on the compass, reaching Godalming the furthest south you can get on the connected network. On our way back to the Thames we met up with Adam from NB Briar Rose, both he and Tilly got wet that day.
The original plan had been to cruise the Basingstoke Canal whilst we were there, but sadly the levels were too low and the canal closed before we got there, so we spent a while longer on the Wey.
Onto the Thames where we managed to get a space outside Hampton Court for a couple of days and I discovered the joys of standing in line for some fresh veg. Gradually we made our way up the Thames. Waking early and getting going worked for us as mostly we managed to get moored where we wanted around lunchtime. Three years ago we did from Teddington to Oxford in a week but with a months licence we took our time.
The further upstream we got the quieter the river got, less hustle and bustle. We met up with Paul and Christine (NB Waterway Routes), missed Carol and George (WB Still Rockin), finally got to have a proper conversation with Sue and Vic (WB No Problem XL) as we headed upstream.
As the rivers bends got tighter, the banks were harder to get up. A mooring by Kelmscott Manor required a rope from the post to help us get on and off the boat, but it was worth it to visit the house.
On the 26th August we winded at the furthest point we could reach on the Thames on Oleanna and started to head back eastwards. Tilly gave one of our moorings a double stamp of approval and stayed out well after dark!
An incident with engine coolant nearly stopped us from reaching Oxford to see War Horse. But a nice man from RCR got us going again so we had a narrow lock fix and headed to the show catching up with Matt and Bill for a drink afterwards.
Then at the beginning of September we turned off the Thames onto the Kennet and Avon. For the last five years we’ve been meaning to head this way, but for one reason or another it hadn’t happened.
With tales of lack of mooring we kept to rising early hoping we’d get moorings. This mostly worked and wild moorings were very rarely needed, we did still have to use the gang plank every now and again. We only encountered one pound on our westward journey where even the longest plank wouldn’t have helped which meant we had to carry on up a flight with the clock ticking before locks were locked around us.
At Devizes we met an Instagram friend Frankie who’d been working on the flight over the summer. Despite following another boat down the flight we made good time with the help of the volunteers.
Onwards to Bath and Bristol. Here we moored with HMS GB in the background and met up with two of my old school friends for lunch. A big shame we couldn’t stay longer as there was more we wanted to do and see whilst there, we’ll just have to save up for next time as the mooring fees are quite pricey!
The section between Bath and Bradford upon Avon was our favourite, with the aqueducts and views along with the second deepest lock on the network.
Mick and Tilly got to enjoy it for a week longer than me whilst I headed off to Cornwall to eat gluten free pasties and start painting my panto set for a week.
Once I was back we had two weeks to reach Oxford, but the weather had different ideas. What felt like the monsoon season started. There was rain on most days, luckily not the day we did Devizes. We managed to team up with two couples from Bristol on a hire boat, by the time they reached the top of the flight they could work uphill locks with their eyes closed, we left them to master downhill on their return journey.
Our second low pound struck as we tried to leave Cobblers Lock, Oleanna was sat firmly on the ground and unable to leave the lock until a good flushing of water set her free. The rain actually did me a favour as whilst we sat in Newbury hoping for the Thames to drop I managed to get my model for A Regular Little Houdini finished.
At the end of October I headed off to panto land leaving Mick and Tilly a short distance outside Reading, hoping they would be able to get up the Thames in the following week. Our friend Paul came and helped Mick out onto the Thames reaching Goring on their first day. Here Mick and Tilly got to met Carol and George (WB Still Rockin’) who’d been clinging onto the moorings there before heading downstream.
Paul returned later in the week and despite the engine overheating and having to deploy the anchor they succeeded in getting to Abingdon where Oleanna had her second visit from RCR. Mick battled on against quite a downstream flow and reached Sandford Lock before tying up. Here the levels rose and fell, the engineer came for a second visit and found lots of crud in our cooling system.
With the engine in better fettle, Mick nudged his way up towards Oxford and finally made a dash up Osney Lock and onto the canal despite that section still being on red boards. It turns out he’d chosen his moment well as the river has stayed on red boards since then.
Once I left all the singing dancing and glitter behind and returned to narrowboat life we had to sit out high levels on the Oxford canal and on the River Cherwell. We loitered in Oxford, but as soon as it looked like things were improving we were on our way.
We paused in Banbury for Christmas haircuts and shopping before pulling in for a few days at Cropredy Marina, from where we headed to London for a Sibling get together at my brothers.
Onwards to the top of the Oxford Canal the day the locks reopened and down the other side continuing onwards to Radford Smelly for Christmas.
In Warwick we met up with my family and then picked up crew Mike and Chris to help us up the Hatton and Lapworth flights.
The last few locks were done on New Years Eve bring us up to the Birmingham level for the new year.
Quite a busy year. So our vital statistics for 2019
According to Canalplan
Total distance is 1199 miles, ½ furlong and 886 locks . There are 119 moveable bridges of which 22 are usually left open; 139 small aqueducts or underbridges and 20 tunnels – a total of 8 miles 2 ¼ furlongs underground and 8 major aqueducts.
This is made up of 207 miles, 4 furlongs of narrow canals; 399 miles, 5¾ furlongs of broad canals; 102 miles, 5 ¼ furlongs of commercial waterways; 226 miles, 6 ¼ furlongs of small rivers; 212 miles, 5 furlongs of large rivers; 49 miles, 6 ¼ furlongs of tidal rivers; 150 narrow locks; 626 broad locks; 109 large locks; 1 lock on major waterways.
838.2 engine hours
That is 255 miles and 272 locks more than last year! But 246.4 hours less engine running, just goes to show it’s worth having solar panels.
1336.93 litres diesel, 9 (although we’ve got 2 empty now) gas bottles (used for central heating as well as cooking), 6 overnight guests, 6 packs Dreamies, 1 cover cat, 32 friends, 17 Mrs Tilly stamps of approval, 1 double stamp, 5 pairs socks, 3 pairs gloves, 1 baby blanket, 2 shows designed, 1 cover illustration, 5 lots gluten free puff pastry, 9 supermarket deliveries, 39 boxes of wine delivered, 12 bottles of wine delivered.
Thank you for sharing our year with us.