The Sausages Have Gone Fat! 27th May

Riley Green to Bridge 84

We’d already decided on a slower start to the day, then we’d see where we got to on the mooring front as today had been ear marked as a work day for me. Setting off cruising we’d see what a large M on our Waterways Route map was like and if it was deep enough for us to get into the side. If not then we’d carry on to Johnson’s Hillock Locks, do the flight, then find a mooring.

We didn’t manage the earlyish start we’d planned and Mick really didn’t want another long day at the tiller and I really needed to get on with some work. So we had a cooked breakfast.

Not quite vegetarian

Mick had stocked up on suitable ingredients for breakfast including some gluten free black pudding and some sausages. However the pack of sausages, despite saying they’d be best before the 31st had expanded in the fridge and the cellophane lid looked like it was about to explode! The pack was opened, contents sniffed. They didn’t smell bad, but just the fact that they’d been gassing for several days wasn’t appealing, they sadly went in the bin! An almost vegetarian breakfast. A bit like those enjoyed when working at the SJT when a vegetarian breakfast with a portion of bacon were consumed at the Rendez Vous Cafe on a regular basis. It was still very tasty, but the sausages were missed.

Tilly had been allowed shore leave and thankfully hadn’t spotted all the tadpoles that surrounded Oleanna in the shade. Just how many of this mass will survive and grow into frogs? Never seen so many tadpoles in the canal.

Onwards. Mick tried pulling Oleanna into the bank before bridge 84, nowhere near deep enough, but through the bridge where the M was on our map proved better. Here there were no tadpoles just Canadian Geese creches. Mick at one point counted 20 goslings plopping into the water. This could be a noisy night!

Goose creche

With a small shopping list Mick cycled down to the next flight of locks and found a garage with a Spar shop. No newspaper but a few things to keep us going. I set about doing more sketches for panto.

Ideas on paper

I’ve now got six basic ideas of how the whole thing could look. The afternoon was spent scanning the sketches, removing parts of my drawings so that I can add other scenery without having to redraw the basic.

Late afternoon I needed to stretch my legs so headed off for a panto thinking walk. I crossed over the canal at the next bridge and climbed up the hill, hawthorn bushes surrounding me. Along the road I came across a Vegan cafe, diners enjoying the late afternoon sunshine on the terrace with great views across the valley. Then on the main road was a Farm Shop. If only we’d known! It was closed now and won’t open until we want to be on our way tomorrow. Next time!

Returning to the canal I had to walk past a smart houses front door, they obviously have to put up with such things but I could hear I was tripping infra-red alarms. Down the steep path back to the canal. A few more steps were required and a bit more thinking had me head on down into a field, crossing small wooden bridges and wading through tall grass filled with buttercups and Ladies Smock. Then back the even steeper hill back to Oleanna. I’d stretched my legs but not come up with enough solutions for panto.

Yum, click the photo for the recipe

Time to strip the roast chicken and make use of a couple of leeks that were sat at the bottom of the fridge. Chicken and leek macaroni cheese. This was very yummy for a fridge invented meal and will be made again.

Not bad friendly cover!

0 locks, 2.5 miles, 1 aborted mooring, 1 deep mooring, 2 outsides, 1 sausage roll day, 0 rolls, 6 versions, 13568386425 tadpoles, 20 geese.

https://goo.gl/maps/d4GujUDFXXetc1nK8

Take A Deep Breath, It Might Be Your Last! 26th May

Pipe Bridge 116A to Riley Green

Another long day of cruising for us. We’d decided last night that if we woke up earlier than the alarm clock then we’d get up rather than pretend to still be asleep. However we both were very much asleep when the alarm sounded. Breakfast and then we were off.

Windlass locking mechanism

First three swing bridges, all three requiring a handcuff key and windlass. You unlock the spring loaded lock then wind up the leg to release the bridge. It takes quite a bit of time to get everything lined back up to put the leg back down.

No wonder Oleanna wasn’t responsive!

After the second bridge Oleanna had picked up a blade full of urban jellyfish. I held onto Oleanna whilst Mick used the prop mate to clear everything.

I’d not seen these signs before. A chemical works nearby. There was also a sign for towpath users, maybe it says for them to take a deep breath as it might be their last!

Halfway now between Leeds and Liverpool 63 5/8 miles. Originally we’d planned to go from one end to the other this year, spending time in Liverpool again, but plans are there to be changed.

Pylons providing power

Yesterday I’d said the western side of the canal was more industrial, well it is, but you still get great views and plenty of greenery, it is just more inhabited than towards Leeds.

This pound is a long one over 23 miles on the flat. As we got closer to Blackburn buildings increased. Murals near to Calypso brighten up the place, but this considered safe mooring is also filled with Reggae and pigeons. We’ve never paused here, one day we will to have a look round.

Eventually we were at the top of the locks. A boat had just come towards us saying at least half of them would be in our favour as he’d just been down to wind. Shame they all leak and had half emptied themselves. *Last time we came down the flight we’d not noticed a paddle had been left slightly up meaning Oleanna was stuck in one lock whilst we were about to flood the pound below. Today we checked every paddle.

*It has been pointed out to me that this actually happened on NB Lillyanne back in 2016, not Oleanna!

When new bridges were built the locks had to adjust to what space was left

I walked down to the last lock of the flight. Someone was there doing something, one of the local drinkers said the bottom gate was open. Well the booze had definitely affected his eyesight as a chap was stood by a bottom paddle winding it up, the lock was only a few inches away from being full when I arrived. The chap just carried on emptying the lock. I really couldn’t be bothered to argue that the lock was in our favour so therefore he should have waited for us. No comment of ‘Oh sorry I didn’t see you there’! I helped and lifted the other paddle to help things along.

The chap dropped his paddle! The cruiser required both gates to be opened and then closed. We obliged and then headed to the top paddles. There was no sign of him making his way up from his boat, or asking if we’d work the lock for him, or anything. I stood gave him the thumbs up, behind his canopy I couldn’t see him. I was not going to start filling the lock without acknowledgment from him!

Winding hole and services two thirds down the flight

By now I was slightly peeved, so shouted, ‘HELLO! Are you ready?’ ‘Shall I lift the paddle?’ I got a thumbs up and a few stares from a group of walkers who’d stopped to gongoozle. The boat rose up, we opened the gates. Mick stared at the chap until he got a very quiet Thank you.

As we started to work through the lock a small narrowboat arrived, they’d apparently said to the chap in the cruiser to wait for them as they’d easily be able to share. Well if he’d not stolen the lock from us they’d have caught him up and then helped him up the flight.

Twonk!

For the last two days the Wigan Flight, which lays a few days ahead of us, has been unofficially closed due to a couple of pounds having been emptied. We’d been keeping an eye on the Wigan Flight Group on Facebook. This morning one of the local volunteers had posted that the flight was reopen, phew! Someone had made a comment, they were aiming to go down the flight early next week and would post nearer the time. I replied too, we are now teamed up with NB That’s It for the flight next week.

Onwards, checking out each mooring we came to, none looked as good for Tilly as Riley Green would be so we continued onwards. Pulling up after 3pm we were hungry and Tilly was shouting to head off and explore, I didn’t notice the bees nest at the bow! After we’d eaten and with Tilly on board we pulled back giving the bees plenty of comfort space.

6 locks, 15.3 miles, 3 swing bridges, 0 held up, 1 blade full, 1 twonk head, 57 bees, 3 hours shore leave, 1 shorter day tomorrow, hopefully.

https://goo.gl/maps/A6jgQW74PCHGLGNS7

Now Thursday Has Turned Into Sunday! 25th May

Barrowford Visitor Mooring to Pipe Bridge 116A

Yesterday Mick had walked down to see if the Locks were actually locked overnight. There was a padlock on a chain, but it was just resting on the lock beam. This meant no lie in waiting for 10am and that today we’d be on our way at 8am.

The day started off with blue skies and warmth

Barrowford Locks drop you down 67ft 9″, passing Barrowford Reservoir and ducking under the M65 before you arrive at Nelson then Brierfield before cruising through Burnley. There was nobody else about showing intention of using the locks so we’d be on our own.

Looking across at the reservoir

The bywashes ran fast, just about every lock in our favour, the odd one requiring a top up. By the second lock we got views over the reservoir, Barrowford is one that has been drained of for works to be carried out on it, small puddles of water sit surrounded by greenery as diggers moved about on the far banks kicking up dust.

There were plenty of dog walkers out, one black lab lumbered along with a big stick. When it reached a lock bridge, which are quite narrow, it laid down it’s prized piece of tree and walked across, leaving said stick for it’s owner to pick up and move across to the other side where the lab picked it up again and trotted on across the field.

As we rounded the final bend with the last two locks to go we came across contractors about to trim the grass and an uphill boat. As soon as the strimmers started up there was no chance of chatting to anyone, they continued as Oleanna lowered in the chamber, Mick feeling slightly vulnerable with the strimmer above him, kicking grass etc about.

By 9:45am we were on the long pound following the contour. The miles on the mile posts grew to Leeds and lowered to Liverpool. This side of the canal a much more industrial landscape, the backs of mills and far less green hillocks fill the view. Lesser spotted supermarket trolleys show their wheels frequently as the bottom of the canal is quite lumpy. At one bridge a pontoon was set up with a scaff tower on it. Chalked numbers all over the underside of the bridge, it must have been having a survey done, wonder how deep the pitting is?

Our schedule had us mooring just north of Burnley Embankment today, but we’d nudged things along a bit planning on a longer day to reach a favourite mooring. When we first cruised this end of the Leeds Liverpool back in 2014 Bank Hall Dry Dock had just been taken over and there was a flurry of activity. Today sadly it looks very different, maybe even closed the big shutter door firmly closed.

A few more wiggles and then straight ahead of us was Burnley Embankment. The banks over grown, we made comments about how it was one of the Wonders of the Waterways and how you would think it would be more impressive, some tlc to help show it off. We passed the lines of chimney pots and looked down on the streets, maybe one day we’ll see it from below and not just when shopping at Tescos.

On the far side there were flashing lights and several men in workwear orange. Maybe the embankment was getting some tlc. The towpath has been resurfaced and a gang of workers were busy shovelling out top soil along the verges. Another chap brushed off new mortar where the wall had been rebuilt whilst a member of the public sat on a bench dancing aided by music and at least three open cans of larger.

Round the far end came a tug, pushing more than it’s weight in water, the waves it left behind getting on for 18″. This did not please the boats moored at the new (to us) Finsley Gate Wharf. Here there is a new pub, rooms to hire and three moorings to go with it for patrons, each space filled with boats bobbing up and down. It looked rather appealing and would warrant a visit next time.

In stark contrast shutters cover the windows and doors of The Inn on the Wharf. This is where people used to moor to visit Burnley, not one boat outside today.

Strawberries on their way

A pause to top up with water at Rosegrove Services. Volunteers were busy working on some fruit and veg raised beds, signs saying to help yourself. In a week or so there will be strawberries, some gooseberry plants and maybe some salady bits all kept under nets.

From here on we’d be criss crossing under the M65, we’d already been over the top of it, then under it whilst in Gannow Tunnel. Our Waterways Routes map shows where the course of the canal was altered so as to avoid even more bridges. The trough of the canal along these stretches is concrete.

There seems to have been a fashion in this part of the world for astroturf. Five houses side by side each having a slightly different shade of plastic green!

An old life raft overtook us, heading for the next stretch of permanent moorings where it winded and moored. Soon we were back with the view stretching for miles and miles, the Ribble sitting below the hills. Past one redundant swing bridge and then we’d reached our destination for today. Pipe Bridge 116A.

Here you can appreciate the view from inside your boat. The M65 buzzes away above whilst sheep and cattle graze on both sides of the canal. Tilly headed off to explore, it took her a little while to find the friendly cover on the other side of the fence.

Roast chicken, yumm!

We had a late lunch then I set to preparing tonights meal. Back in Skipton we’d bought suitable things for a Sunday roast, but the veg were looking like they wouldn’t last, so we decided to have it tonight instead.

All week I’ve been confused about which day it was, this nearly always happens around Thursdays . Nearly every day this week has felt like a Thursday, now Thursday has turned into Sunday! It’s soo confusing!!

Camera set to auto

After eating we took stools out to watch the sun set. Such a great view, we’ve never known it disappoint. I span the dial on my camera round and discovered that since it went away to be mended it seems to have some new settings. The photo above was taken normally, the one below with one of the new settings, the scene we saw was more like the one below.

Impressive Art setting

7 locks, 14 miles, 1 tunnel, 1 embankment, 3 boats moving, 1 tug causing many furrowed brows, 1 smart towpath, 1 more dead pub, 1 new pub, 1 week of Thursdays ending with a Sunday, 1 roast chicken, 1 confused sheep, 1 misty sunset, 5 new camera settings.

https://goo.gl/maps/8kqwqtRdLFXVREHA6

Borderline. 24th May

Curley Wurleys to Barrowford Visitor Moorings

Off not quite as early as planned, there was the yellow water tank to empty and the view to enjoy for just a short while longer before pushing off. We then got to enjoy the view this way and that for a while before the hawthorn blossom took over.

The Cross Keys

East Marton Double Bridge, The Cross Keys Pub high above sadly closed.

East Marton Double Bridge

Rolling hillocks of fields, all lumpy and bright green. The farmers were busy cutting the grass in the sunshine, up and down.

It took us a while to reach Greenberfield Locks which would take us up onto the summit pound of the Leeds Liverpool Canal. A chap was busy at the bottom lock, he waved us on as he opened the bottom gates for a big widebeam. He’d been helping his mate down the flight a single hander with the use of only one arm, so a true single hander.

The middle lock was emptied for us by a volunteer and then we were urged to catch up another narrowboat who was waiting in the top lock. These guys were out for a week from Skipton, they’d be going as far as Foulridge before returning.

We were now at the highest and wound our way round Barnoldswick, Barlick if you are local. No time today to head into town for a pork pie, we wanted diesel and gas.

Cobweb and Oleanna together

Pulling in at Lower Park Marina, Oleanna was stern to stern with NB Cobweb. We’d been hoping to meet somewhere, maybe share the Wigan flight. NB Cobweb is owned by Vicky and her husband David, years ago Vicky used to work front of house at the SJT in Scarborough. Earlier this year we’d just missed each other at Bramwith Lock, a comment on a post on facebook made me realise we knew each other. Sadly no-one was onboard today, their plans have changed so we won’t be sharing locks with them, maybe another time.

A fill up of diesel and a new bottle of gas and we were on the move again. We paused at Salterforth Bridge to dispose of rubbish and recycling. The Anchor pub here is also closed. Such a shame that these once thriving pubs are no more.

No longer the border

Now we discussed the border between Yorkshire and Lancashire. Two houses in Barlick flew rose flags of different colours. Was the sign further along the canal in the correct place? It was once upon a time, but today according to the OS map, we’d crossed the border below Greenberfield Locks.

Gongoozling on high

Approaching Foulridge memories came back of a conversation I’d had with my brother nine years ago, Jac his wife had just been diagnosed with breast cancer. Thankfully today Jac was busy celebrating her 60th birthday in London, maybe the festivities weren’t quite what they’d had in mind as Andrew tested positive for covid at the weekend. Happy Birthday Jac!

Waiting for the green light

Mick checked the times for Foulridge Tunnel. On the hour to ten past heading westwards, we’d be stopping for lunch then. One boat came through eastbound, then we pushed off as the lights turned green. The mile long tunnel was damp in places, we’re out of practice as I nearly missed the three air shafts or mysterons.

Now most definitely in Lancashire we pootled on to the visitor moorings. Here we settled in and debated whether it would be too breezy for a barbecue again. The asparagus wouldn’t last much longer.

Tilly burrowing her way through the grass

Tilly was a touch miffed with the amount of footfall until she found the wooded area with fantastic friendly cover. Here she kept herself very busy for a couple of hours, which required being called back to the boat. I got to do my mad cat woman performance to a passing crowd.

We decided to brave the breeze and set ourselves up in a line along the mooring for a barbecue. Maybe we should have stopped a touch further on where the bank was flatter. It was still a very pleasing evening sitting out as the sun fell behind the hill opposite our mooring, just a shame the asparagus went black almost as soon as it went on the grill! The pork and veg kebabs were very tasty.

3 locks, 10 miles, 1640 yrds of tunnel, 3 mysterons, 73.6 litres diesel, 13kg gas, 11 fronds of asparagus, 4 veg haloumi kebabs, 2 pork steaks, 1 jolly good wood, 1 near meeting, 60!!!

https://goo.gl/maps/oAyjJZnPzCRjRLQL7

Having A Gander. 23rd May

Skipton to the Curley Wurleys above Bank Newton

After a lovely long weekend of friends, food, theatre, oh and a birthday we needed to be on our way again, the alarm was set.

Brewery Swing Bridge, Skipton

The lovely man from the slow boat was walking his dog and insisted that he should help us through Brewery Swing Bridge where the key of power does the barriers but you have to push the bridge manually. Between us we managed to find a gap in the traffic and school children and ended up holding nobody up.

A line of Silsden maroon boats sat just past a vacant water point, we pulled in and topped up the tank. Then a wave to Robert and Margie (who weren’t looking at the time) and we were soon saying our farewells to Skipton, Gawflat Swing Bridge no longer requiring a C&RT person to operate it.

About three miles on the flat gave us more swing bridges, the last on this side of the summit. Swans sat enjoying the freshly cut grass. Were they making nests? Would a farmer carry on regardless or leave that corner of the field should eggs be laid? Geese preferred the longer grass around the fields, peeking up having a gander at us as we cruised past.

Approaching one swing bridge a hire boat was coming the other way, they’d got to the bottom of the locks and decided to leave them for their second narrowboat holiday, swing bridges would be enough for their first. At Highgate Swing Bridge two boats were getting ready to set off, they’d each found themselves a locking partner.

I walked up to help. One boat was a hire boat and it was their first broad lock, myself and the other lady explained how the locks worked and wound the ground paddles round and round and round. A shame I’d helped so much as we’d be on our own coming up and my arms were already exclaiming about this being the first of several locks today.

Such a photogenic signpost

Once we were up we pootled onwards to Eshton Road Lock, the two boats ahead now rising and what looked like another Silsden boat was pulled up on the lock landing, we might have found ourselves a locking partner.

Cloughs open

This is the first lock with cloughs as ground paddles, I asked the lady we’d be sharing with if she’d used them before. The answer came back that they had done this stretch several times before, we had experienced serial hirers with us. Helen and Joe turned out to be good locking partners.

The two boats ahead pulled in above Highlander Lock for the day leaving the way ahead clear for us. As we walked between locks some Ash trees were having a serious chop back, Mick was a little bit too far away from the bank to stop and collect a few rounds sadly.

The boys chatting

We now met a few boats coming down the locks everyone enjoying the wonderful sunshine. Mick and Joe chatted away at the stern and Helen and I chatted, when we could hear each other, at the locks.

What a wonderful day

So much green, yellow, white and blue. What a beautiful day to be boating and on such a beautiful canal.

Looking up Bank Newton

A lunch break was required by all, so both boats paused before starting our ascent of Bank Newton. Most of the lock flights on the Leeds Liverpool have restricted hours, nothing too restrictive, 10am to 5pm, last boat in at 4pm. This is to help conserve water so that hopefully the canal won’t have to close as it did last year.

Action shot of Helen

At the bottom of Bank Newton a Lockie was cutting the grass, he mentioned that there were two boats on their way down. As soon as Helen and Jo were in sight I started to set the first of the six locks. The newer of the cloughs seem to be the hardest to move, maybe tighter fitting below the water. Us both ladies in their 50’s we’d give the cloughs a go, but should they not want to move we’d leave them for a while before trying again, in some cases a while longer. No point in aggravating my back third week back on the boat!

The friendly volunteer

We made steady progress up the flight, passing a Silsden wide beam in one pound and a narrowboat in another, both gates requiring opening as they cruise with their fenders down! By the time we reached the halfway mark we picked up a friendly volunteer who headed on upwards to set the next locks for us.

So much green and blue

Now on our favourite pound, we followed the contour around the hill, fingers crossed there’d be space for us on the curley wurleys. Bingo one boat there, we pulled in to their stern, Helen and Joe pulled up in front. This is our favourite mooring on the network. A wide towpath, sheep in the fields below, a dry stone wall and fantastic views.

We’d been planning a barbecue but sadly there was just too much of a breeze to have made for a perfect evening. Instead we decided to have a drink sat out to soak up the view and give Tilly an extra hour of shore leave before we all came inside to eat. I so love it here. Next time we’ll try to stay for longer.

Tilly admiring the view

12 locks, 11 shared, 7.6 miles, 5 bridges, 0 held up! 1 pooh sucky lorry, 1 wave to Margie, 1 slightly pink boater, 31st sock for dementia.

https://goo.gl/maps/TrtyHzwgVGumqzY17

A Slowly Birthday. 20th May

Keighley Golf Club to Skipton 3 day Visitor Moorings

Presents

Another early start, but time to have tea in bed along with some birthday surprises. Presents and cards were opened. A new pair of jeans, a Boot Buddy and a limited edition print by Ant Savage. The boot buddy was from Tilly to assist when one treads in woofer deposits. If you haven’t come across Ant Savages work then they are worth a look, lino prints of bendy narrowboats among other subjects.

A bacon butty then we were on our way, pushing off just after a boat that had been moored behind us on the bridge landing for the night. Well that would have been the case except we very quickly made scraping noises, we were stuck on something. Reverse didn’t work, forwards neither, trying to push the stern out, nope! Persevering worked in the end.

The cow bridge

The pound to Skipton keeps you busy, lots of wonderful green views, with plenty of swing bridges. The chap on the boat ahead of us handed over the tiller to his wife and went ahead to open the bridge. Brilliant we’d got a boat to leapfrog the bridges with. Well that’s what we thought!

The bridge opened, the boat ahead gradually made it’s way through. We weren’t sure if the lady on board had seen us. She tried to pull over to the side, but it didn’t really work. The bridge closed behind us and the chap walked along the towpath to where his boat finally touched the bank for a second. We were still behind. Hmm not a leapfrog.

Swing Bridge after swing bridge

At the next bridge the chap hopped off again, but had serious problems moving the bridge, so I joined him, extra bum power required. Both boats came through. He explained that his wife has MS so her balance isn’t so good, possibly also her spacial awareness. This explained why she was finding it hard to pull into the side to let us leapfrog.

We pootled on behind, they clung to the towpath which we thought was a suggestion for us to pass, so Mick cranked Oleanna up a gear as we got closer to Silsden. The back gardens immaculate as ever. Here hire boats waited for the next set of guests to arrive, this is where we’d hired our first boat from together, the start of our journey to living afloat.

Not upgraded yet

Paul from Waterways Routes had asked us to make note if the towpath here had had an upgrade. His maps not only show moorings and services but also what type of towpath runs alongside the navigation. The next stretch had not been upgraded to cyclable, rough and bumpy, it would remain purple on the Waterway Routes maps, also no new moorings to report.

Birthday Boy

The next few swing bridges were opened, either by myself walking between them or we were now starting to meet other boats coming the other way and one heading towards Skipton. Maybe we’d now got a three boat leapfrog, even if one boat couldn’t leap over the others.

It’s getting busy now!

It turned out that the other boat we’d caught up with was a hire boat from Skipton and their handling skills were still being developed. Warehouse Swing Bridge was operated stopping and starting for us, then I hopped off to swing the little footbridge after I’d taken a photo of Oleanna going through Parson’s Bridge 186 to add to our collection.

Oleanna going through

Milking Hill Swing Bridge was being held open by a day boat. Just how many passengers are these little boats allowed? We counted fifteen!

A very pretty stretch

The woods here would have been spectacular a few weeks ago with a sea of bluebells. Shame we missed it.

How many to operate a swing bridge?!

At Bradley Swing Bridge we managed to become lead boat, others dropping behind or pulling in for lunch. The day boats from Skipton were now coming thick and fast along with the trip boats. Assistance was required at Snaygill Swing Bridge to get it moving. Maybe I’ve lost some umph, or have the bridges just become harder to move?

Now the uninterrupted length in to Skipton. We pulled in on the water point and filled up the tank very quickly as the pressure was so good. Where to moor up? Along this stretch where a high wall and a carpark are the view? Round past the Springs Branch where the footfall is heavy? Or further on? We opted for the more central position as it would be handier for a visitor to find us.

A late lunch was followed by Birthday Cake. Maybe the omitted milk would have made it slightly more moist, we’ll see the next time I make it. A message was sent of out location to Frank. This was soon followed by him calling. When were we meeting up? Today? NOt Thursday?!!! Blimey, good job I’d sent him the message when I did as he had a two hour drive from Scarborough on busy roads.

A few items were needed, mallet and spikes mostly, so we headed out to see what we could find. Boyes came up trumps with a mallet and Pennine Cruisers sold us two new shiny spikes. No suitable container for sawdust though or high ball glasses. We’ll carry on looking.

At 6pm Frank arrived, a hunt for a free parking space was successful and then we headed over to Bizzie Lizzie’s for fish and chips, followed by a drink in one of the many pubs.

Ooo! Skipton, why can’t we skip it!?!

0 locks, 8.9 miles, 12 bridges, 1 left open, 6 maybe held up, 1 brother positive, 1 very slow boat to Skipton, 2 boaters who’d forgotten how busy it can get, 5o many day boats, 2 many sailors hats, 1 rejected mooring, 1 Frank stirred into action, 1 full cooler box, 2 spikes, 1 mallet, 3 of each, 3 beers, 1 boy turned 65.

https://goo.gl/maps/5AL7wZDEyG7YMRKH8

In The Footsteps Of Barry. 19th May

Hirst Lock to Keighley Golf Club

Pitter patter on the roof this morning, rain! No choice but to get moving though as we wanted to ascend Bingley this morning. Passages up and down the five and three rise happen twice a day with the assistance of Lock Keepers so arriving before 10am would be a good thing.

The first arched bridge

First we had Hirst Lock. These locks are a lot kinder when shared, but nobody else was on the move. The woods round these parts must have been spectacular a couple of weeks ago, a haze of bluebells, sadly now past their best. Maybe next time we’ll cruise the L&L in early May to catch them.

Dowley Gap Two Rise

A cat sat watching us as we arrived at Dowley Gap Two Rise. The top chamber required topping up and the bottom emptying. There was a lot of walking round to be done.

Now the weather was drying up and we pootled along to the bottom of Bingley. We wondered what this stretch looked like before the A650 and railway were hemmed in by the 1980’s looking stone walls and before the railway existed. Just after we’d pulled up joining three other boats a steam train came past, shooting it’s smoke high above the walls (from Carnforth, heading to York).

One boat was descending as I popped up to say Good Morning to the Lock Keeper. He was pleased we’d be making a second pair, pairs are easier in the locks. A chap from the hire boat we’d be sharing with asked if we’d be going up straight after the two lead boats, because theoretically they could have three pairs in the Three Rise at once. Well no you couldn’t as the following boat would have to steal the water from the boat ahead. So you need to leave a chamber in between uphill boats.

Leaking gates

It took Oleanna 22 minutes to rise up the Three Rise. The Lock Keeper setting ahead and a jolly volunteer keeping an eye on paddle winding. At Bingley you need to take note of what the Lock Keepers say, conserving water is one thing, but keeping your boat safe is another. It took a while for the chap from the hire boat to understand that you shouldn’t just open paddles, a close eye on bows and sterns were required before another two turns could be made.

The Five

The pound between the Three and Five seemed low, but there was just enough water to get us in line below the Five. The bottom lock was emptied for the lead boats then the Lock Keepers headed up the flight to get the upper chambers ready, each one filled ready to be emptied into the next one.

Sitting at the bottom of the five

Tilly sat in the window to admire the view, well the sideways view was of rather good looking trees!

I headed up to reset the bottom chamber, getting to walk up the side Barry (the renowned Lock Keeper) used to inhabit. The bywash at the bottom having moments of gushing water as chambers filled and over spilled above us. The lead boat was assisted up the staircase by the Lock Keeper whilst the lady volunteer assisted us. A pause at one point as the gates into the second chamber ahead hadn’t quite closed for us to empty the one in between. Water cascaded over the top of gates, the Lock Keeper ran round, the bywash below gushed again. We paused a while to let them get ahead of us.

Thankfully we’d recalled a Lockie a few years ago suggesting to have our cratch cover closed due to leaky gates, helping to deflect the water away from the welldeck. We know of one boat this year that has turned around due to so much water spraying over their tug deck, this was before they got to the Three and Five Rises.

Water gushing from their roof

Oleanna and the hire boat would enter each chamber far enough for the bottom gates to be closed and then nestle back towards the bottom gates. Despite this the roof of the hire boat was a third wet and water rushed down along the sides of the grab rail, nowhere for the water to drain other than right down to the stern, causing two waterfalls one each side of the stern bulkhead.

At Bingley there are four seasonal Lock Keepers (2 of which share a job). The Lockie chatted about the seasonal staff in Leeds and the difficulties they were having recruiting this year. From last year one chap has retired, another hasn’t returned due to ill health, the third one, well lets just say there are still people out there who don’t respect Lock Keepers as they should.

Out the top

As we reached the top chamber it was time to put waterproofs back on as the sky turned black, thankfully we didn’t get too wet before the swing bridge was swung for us to leave the top of the Five, fifty minutes after entering the bottom.

On the same contour as Skipton

We’d thought about filling with water, but the tap by the café was being used and the hire boat wanted to top up, we’d last til Skipton. Now to find a mooring, suitable for Tilly and in time for Mick to have another important phone call.

New improved bridge

Micklethwait Swing Bridge has had an upgrade since we last came through and had to call for assistance. A raised platform with a small pedestal with Open and Close buttons. Other bridges didn’t have such good sight lines so a quick walk from checking the road to the pedestal was needed before more traffic came.

The good views start

Cygnets, new houses, the views across to Keighley. A splash of serious colour from two rhododendron bushes in a garden made us hope that we’d timed our arrival along this stretch to perfection. Sadly we’re at least two weeks too early for the masses of rhododendrons to be in full flower. Maybe next time we come this way we’ll have to do it in early June!

More swing bridges, one operated by a hire boat, another by C&RT as they were in the middle of replacing the post it gets secured to.

The Piano Boat more a raft really

We passed the Piano Boat, a raft comprising of all sorts that the owner bow hauls along the L&L. A peek in through one of the bay windows revealed a drum kit.

So much lush green

We’d thought of mooring near Riddlesdon, but that was too close to roads for Tilly. Onwards to where we thought we’d moored before, but sadly we were too deep to pull in close enough to the bank. Onwards pulling in to try time after time, Mick’s arranged phone call getting closer and closer all the time.

JUMP!

Booths Swing Bridge has always been hard to secure in position. Today it had been left a few feet from where it should be, no chance of securing it. I tried to give it a push. Nothing! Was this the bridge our locking partners out from Leeds had mentioned that you needed to jump on the opposite corner to help get it moving. I jumped and tried again. Nothing! I enlisted Mick to come and do the jumping and sure enough this helped greatly to get it going, phew!

A short distance onwards we tried pulling in again. The depth not our friend, but this would do for the time being, for lunch and Mick’s phone call. Mick hopped off to bang spikes in.

Where were the bow spikes? I normally leave them sticking out from a spare pooh bucket. They weren’t there. Ohh! We both realised what must have happened. This morning I’d untied the bow and thrown the rope to Mick as the bow was quite a way from the bank. I’d then headed off to set the lock and Mick had been more occupied with the position of the bow rope so I wouldn’t have to stoop to get it, he’d forgotten to pick up the spikes and the good hammer. So if you are now the new owner of two spikes and a yellow hammer may they serve you well. Luckily we have spares, but will need to get replacement ones for when this happens again. Maybe a visit to a chandlers for Mick’s birthday is needed!

Tilly headed off to check on the golfers below as we had lunch and then Mick’s phone rang bang on time. Tomorrow is Mick’s birthday, he will now be of an age where he will receive his private pension. A small one he’d been getting for a few years had suddenly had a boost, he checked this with the person on the phone, the new amount was correct, what a lovely birthday bonus.

During the afternoon I watched Encanto, a Disney film set in Columbia. The settings pretty much spot on with my reference photos I’d collected. The music was very catchy, even Mick was tapping his toes.

Shhhh!

Then a spot of secret baking. A new recipe for a chocolate fudge cake from a book I got at Christmas. I omitted to add the 70ml of milk, and when I realised my mistake it was already starting to rise, so I let it be. Within ten minutes I could smell that it was cooking well and needed to be covered in foil as the top had caught! Was it the amount of sugar in it? Was it that our oven has decided to be a touch too hot? I’m sure it’ll be edible though, fingers crossed!

11 locks, 3 staircases, 11 bridges, 1 left open, 25 held up, 1 wet start, 2 shallow, 2 boaters jumping on bridges, 2 late for bluebells, 2 early for rhododendrons, -2 spikes, -1 mallet, 1 very dark chocolate cake!

https://goo.gl/maps/NCsXFmiFCfAZnzud9

First Floor, No Thanks! 18th May

Calveley Lodge Swing Bridge to Hirst Lock.

Alarm required today as we’d need to be making another early start, however today we allowed ourselves to have breakfast before pushing off.

What a lovely bridge!

The road was busy at Millman Swing Bridge, but I think it always is. I put the key of power into the pedestal, waited for a gap in traffic then pressed and held the ‘Open’ button. Once Oleanna was through I pressed and held the ‘Close’ button, we were through in a jiffy. What a good design of bridge unlike Moss Swing Bridge yesterday!

Pretty and solid!

I walked on to Dobson Two Rise locks and started to set it for us, the towpath pawl on the bottom gate paddle wasn’t making any contact with the cog so I had to let it close so that I could check the upper chamber, the offside one worked, emptying the chamber. As I was walking back down a group of volunteers in blue arrived from litter picking. I was asked if I’d like some help, I then asked which side of the lock was best to use, the near side was the answer as the ground paddles on the other side are VERY stiff.

Conversation with the volunteers obviously turned to Moss Swing Bridge. Just about everyone has complained about it. Apparently C&RT are collecting together the complaints to hand over to the company who own it to try to get things improved. We’ll be adding our complaint to the many, hopefully something will happen.

With one volunteer watching, Oleanna gently rose up the staircase of two, we then paused to fill with water and dispose of our rubbish, the skip having just been emptied. The water tap was slow so we gave up when we were three quarters full, we’ll finish it above Bingley.

Next Mitchell Swing Bridge which had a problem a few days ago being stuck half open. C&RT had been out and got it moving again, however it was soo stiff I had to enlist Mick to give it a push from the towpath side, thankfully that worked.

I held a Yorkshire Water van up at the next bridge having just let one van through. The chap didn’t seem too bothered.

A little bit stiff today

We’d been told back at Dobson Two that there would be volunteers on at Field Three Rise and sure enough there was. Three volunteers who were trimming edges and cutting the grass, then there was an employee who was jet washing the stonework and lock beams. This lock has always felt a little bit left out to me. Being close to the sewage works, not the picturesque Dobson Two or close to Saltaire. Admittedly it’s normally raining when we come through so that won’t help with appearances. Once the jetwashing is done it will look lovely.

Field Three Rise getting some TLC

Three more swing bridges to go today. Dock Swing Bridge used to have to be wound round, I enlisted Mick to do that for us in 2014. Now it all operates by pushing two buttons.

Flying high

As we passed the boat yard by the junction where the Bradford Canal used to join the L&L a narrowboat was in mid flight about to be put back in the water. The chap giving instructions to the crane driver asked if we’d like a first floor adding to our boat. We declined as we’d not make it through bridge holes further on.

There was nowhere to stop in Shipley, all moorings taken.

Saltaire

Then through Saltaire. The obligatory photo taken.

Would the mooring above Hirst Lock be free? Or should we join a few other boats moored alongside the sport fields? I walked up to check, there was a boat. Maybe we could get in behind it and bang spikes in, but I remembered the earth to be minimum and stone blocks lurking beneath. We opted to reverse to a short length of armco where we got in, just about.

Looking back

Time for a quick lunch before Mick had an important phone call to answer and another to make. I got on with collating reference photos for panto before I had a zoom meeting with John the Director and Gemma the Production Manager.

Cricket is a mystery to me!

Unfortunately the internet in Saltaire isn’t too brilliant, so I kept dropping out. But ideas were exchanged, logistics talked about, future meetings set, hopefully for when we’ll be passing near by. Maybe we’ll be setting the alarm clock most days and try to moor up for lunch so that I can work the afternoons and Tilly can head of into the undergrowth to explore. Another early start tomorrow so we can arrive at Bingley in good time.

5 locks, 7 miles, 7 bridges, 29 held up at least, 6 volunteers, 0.75 filled with water, 0 rubbish, 3 decisions made, 1.5 hours of panto chat, 5 hours shore leave, 200ml of double cream, chocolate ganache can now be made.

https://goo.gl/maps/prXAmiFWeE4QgCTQ6

Our Verdict. Absolutely Ridiculous! 17th May

Granary Wharf to Calverley Lodge Swing Bridge 215

Pulling away

The alarm wasn’t needed today as we’d been woken by glass bottles being showered into a recycling wagon. Up, dressed, cup of tea drunk whilst rolling up the covers. At 6am we could see that our locking partners were awake, then someone came and untied the bow rope. We sprung into action, well as much action as you can muster at that time in the morning! Their crew had already set Office Lock, I hopped off to lend a hand. Between the two boats we had six crew.

Locking partners

Libby and Karl have hired numerous times before and had been joined for the week by novices Mark and Sarah. It turned out that we had quite a bit in common, such as Scarborough, Windermere and boats of course.

The morning started off chilly, fleeces and jumpers required, but working the locks the layers gradually were removed. As we worked our way uphill numerous runners pounded the towpath. Ground paddles were stiff requiring repositioning of windlasses. Gates over grown with greenery and stiff. Oddy Two Rise the gates wouldn’t open fully, I think I remember that from last time. But with four people to work the locks we had most things covered and worked efficiently.

Cereal!

After Spring Garden Lock we had the a long pound to cruise, time for breakfast on the move. Tilly below deck was excited to be moving. They kept moving all those fantastic looking trees. Don’t they realise I’ve not had a challenging tree to climb for months! She shouted and shouted at me, so keeping hold of her I opened the stern doors so she could see that we were moving the outside! Tom was very busy!

We don’t have a key for that!

Then at Kirkstall Little Lock we ground to a halt. Here the locks are padlocked shut before 08:00 and after 15:00 daily. We’d arrived at 08:10 and the padlocks were still very much locked. From past experience one Lock Keeper has the job of unlocking this and the next two staircase locks, so they obviously start at one and work their way down. We waited, we could have had a more extensive breakfast, we waited.

At 9:00 Mick called C&RT and was on the phone to someone just as a blue van arrived. C&RT usually have seasonal Lock Keepers, but none had returned this year, so interviews are on going to find new people, leaving a couple of chaps to pick up the van and then unlock locks, then deal with work boats on the move and other things. The chap unlocked everything for us and said he’d try to get the other Lockie to set the staircases ahead for us.

Climbing up in the staircase

Forge Three Rise needed the bottom emptying and the top chamber topping up. The stonework on these locks is just wonderful. Curves between chambers. Spillways all engineered in. Bywashes, thankfully all running today, flowing with clean water. We worked our way up. Bottom gates leaking and spraying over the bows of both boats. Once the bottom gates were closed Mick and Karl moved the boats back to avoid the worst of the torrents.

Under my Bridge, the first P just starting to fade a touch now. The Lockie met us part way, there had been something jammed in a gate paddle on Newlay Three Rise, he’d managed to sort it but didn’t want us to use that paddle as we rose. The last of the locks for us today.

First swing

Now the start of the swing bridges. Rose Mill Swing Bridge was nice and easy doing just what it should. NB Burnsall headed onwards to Bridge 218, Moss Swing Bridge! We have history with this bridge, back in 2014 it had expanded in the heat and wouldn’t open, a tractor was sent to assist. Today a tractor wouldn’t be needed as the bridge has been replaced and is causing somewhat of a consternation on the Leeds Liverpool Canal and the local area. It also seems to have had a name change to Aire Dale Mills Swing Bridge! However everyone is still calling it Moss Swing Bridge.

Here’s a list of articles if you fancy reading them

Article in West Leeds Dispatch

More a week later

Yorkshire Evening Post

Yorkshire Post

Not owned by C&RT, it is privately owned by Rodley Bridge Company (Emergency phone number 08000114074 you may need this number one day!)

Here we go!

Mick had had to pause to clear the prop, but as he arrived Mark and Sarah were at the bridge along with a chap who has been employed to assist boaters in the correct operation of the bridge. Sarah filmed and I took photos.

Instructions

There is a large sign with instructions, the first four stages you need to follow are on the control console. First you unlock the cabinet, not unusual for those of us used to the Stainforth and Keadby Canal swing bridges. Inside you follow the steps to set the barriers in motion by pushing buttons. Once they are lowered you then have to remove the bridge key and insert it into the Bridge Wedge release handle lock rotating it clockwise. Then you move the locking lever to release the bridge, this is a 90degree bent metal rod. I’m not sure how you Ensure the handle is fully retracted and pins fully withdrawn.

It seems that you have to keep hold of the lever for a while as you start to turn the wheel which removed the wedges. You then keep turning the wheel for around about 70 turns until it will move no more.

Walk across the bridge to the other side. Here you lift the tail lock catch (because we all know what one of those is!) and rotate clockwise to sit on the holding bracket. This is another 90degree bent bit of rod.

Then you turn the wheel at this end of the bridge to swing it. I don’t know how many turns this takes. Some people say 100. Mark looked relieved when it was finally open and he could have a rest before reversing the whole procedure. If you forget to return the tail lock catch to where it had been at the start then you won’t be going anywhere, neither will be the vehicles wanting to cross the bridge.

Once you’ve wound the wheel back to relocate the wedges you then return the big fat key to the control console, press buttons and hope that they don’t flash at you.

The chap employed to assist boaters seems to be well known by the locals. He is there from 8am to 3pm when he takes the protruding handles away with him. He will only be on site for a few more weeks when apparently some new handles will be attached, or you’ll have to turn the wheels as you do on the River Nene locks!

Mark was keen to operate the bridge today even though he’d had a go yesterday. From putting his C&RT key into the lock and removing it it was just over 10 minutes. I was very relieved it wasn’t me trying to work out what the instructions meant and turning and turning the wheels. It will be just about impossible for single handers to operate the bridge, the instructions say that the bridge operator to remain in position throughout navigation movements, so you can’t move your boat anyway!

Not all the bridges on the Leeds Liverpool are easy, some are buggers, but this bridge (designed to withstand lorries going to a building site) is plain ridiculous! During morning hours when the bridge is most likely to be operated by boaters heading into Leeds the home owners will be wanting to head to work. Whether it’s 67 or 72 properties in the new development that is a lot of potential cars wanting to cross the bridge. I see horns being sounded. Should an ambulance or fire engine be required in the development it takes time to turn those wheels. The cardiovascular exercise to operate it is well breath taking. I think it is likely to put some people off cruising the Leeds Liverpool.

Verdict. Ridiculous!

Rodley Swing Bridge opened with smiles

Anyway. Mark and Sarah went ahead to open the lovely Rodley Swing Bridge then I took my turn at Owl Swing Bridge. Here we parted ways as we were looking for a mooring and they were wanting to get close to Saltaire to have a look round tomorrow. Thank you for your company this morning and especially to Mark for working the stupid bridge.

Happy boaters

We carried on to where the green fields stretch out below Calverley. It took a while for us to be happy not being quite into the side.

Out into the countryside

A sausage roll day!!! 6 hours!!! Brilliant!!! I made sure I did my rolling on the towpath so it knew it was mine, all mine. We didn’t see her for ages at a time, but the Dreamie container will require a refill soon.

Don’t you come home until you’ve had a bath!

Bolognaise sauce is bubbling away on the stove and I suspect we won’t be late to bed this evening. Another earlyish start tomorrow.

12 locks, 3 staircases, 6.8 miles, 4 swing bridges, 5 held up, 6am push off, 2 more Scarborians, 2 more lodgers booked, the most stupidest bridge ever, 6 hours, 1 dusty grey pooped cat.

https://goo.gl/maps/oxiReejirFzVsVTa8

One Bridge After Another. 7th February

Keadby Visitor Moorings to Bramwith Junction

Vazon Sliding Bridge ahead

Another early start or us today. We pushed off at 8:50, Vazon Sliding Bridge has two slots a day when it can be opened, one being 9am. As we approached Mick knocked the throttle back into tick over thinking we’d have to wait a while for a train coming from Scunthorpe to pass. But then the bridge started to slide open, time to push up the revs, we’d need to be out of the way before the train arrived. We were through safe and sound. Time to start operating bridges ourselves.

In between the Vazon Bridges

Each of the bridges on the Stainforth and Keadby Canal are different to each other. The first one Vazon Bridge is quite simple. Turn your key of power in the box, you hear a clunk, lift the handle and push the bridge to open it. It moved like a dream, no twinges from my back either, marvellous.

Looking back to Keadby

A hazy morning, lots of dog walkers chatting to each other. Wind turbines every way you looked. We’re back in the flat lands with masses of bright blue sky. It felt so still, it’s a wonder the turbines were turning at all.

Godnow Swing Bridge next. Here there used to be a big panel with 1970’s calculator instructions on a screen that was really hard to read. This was interlinked with the railway crossing which is manned. The chap came out of his little hut and swung the level crossing gates closed to road traffic which would allow me to operate the swing bridge. A modern panel with Open and Close buttons has replaced the old huge box. Push and hold is all you have to do to close barriers and swing the bridge. Not one vehicle held up today, not even one visible on the long straight stretch of road.

Medge Hall Swing Bridge is not that much further on. I think this is my favourite with the signal box, level crossing gates (which always seem to be closed to road traffic) and then the red post box. Here one manual barrier needs closing before lifting the handle and pushing the bridge open.

The border between Yorkshire and Lincolnshire isn’t a big affair. A group of trees and a dyke heading off on both sides of the canal. We think it should have a sign to mark it. Ahead of us was blue sky, behind vapour trails heading off to the east.

Next Maud’s Bridge. As expected it was left open to boat traffic, bollards and signs on either side stopping road traffic. The dints in the handrails suggest it has been hit with quite a bit of force, the main upright at the end is at quite an unusual angle. There was also no sign of the box you use to unlock the mechanism.

Chuntering cyclists

As we pulled through the opening a group of road cyclists arrived. They seemed to be puzzled that we were continuing on our way without closing the bridge behind us. We said the bridge was broken, by a car not us! They conferred and then cycled back the way they’d come, soon to be seen heading down the road to the next bridge, Moores Bridge.

Pulling in to make a cuppa

Here we had to wait, a planned stoppage at this bridge is ongoing. Eight people in high vis could be counted, four having a cuppa by the welfare van. A chap walked towards us, if we could give them twenty minutes they’d open the bridge for us. Time to pop the kettle on.

Lots of activity

Moore’s Bridge used to have a big control panel, manual barriers, but the bridge moved with the press of a button. Now there are wigwag lights, automatic barriers that drop down and a new modern two button pedestal was spotted. Chaps were busy bending hydraulic piping, trays for it to lay in were in position below where the bridge deck swivels. Here the road was also closed, barriers part way down the lane, hopefully the cyclists managed to get through.

A delivery of new cabinets arrived, it was driven over the bridge and they were about to start unloading it when they changed their minds. Five chaps put their shoulders to the bridge and gave it a big heave, thank goodness it was relatively easy to move. We thanked them as we passed through but they were far too busy looking at the new cabinets.

Not far to the Wykewell Bridge, a lift bridge. Key of power operated this one. Well except we didn’t need to open it as it was already lifted with a couple of chaps inspecting the underside from a cherry picker! We were asked to wait a couple of minutes which was fine. The inspectors retracted themselves and asked for the bridge to be lowered. Someone suggested we should be let through first, we were waved on. So that was the third bridge in a row on the east side of Thorne closed to road traffic.

Blue Water Marina, Oleanna’s winter mooring last year

Past Blue Water Marina, we tried to work out where Oleanna had been moored last winter and who was in her space.

Princess Royal Swing Bridge was next, how would it be today?! I hopped off crossed the bridge and opened the panel. A clunk could be heard as the gates either side were released ready to be closed to pedestrians. I headed across closed one gate, click. Closed the other one, waggled it as suggested in the instructions, did so again! Nothing. Walked back across, closed the near side gates both clicking. Pressed the open button, nothing.

Bloomin Bridge!

Mick came up to try to assist. He waggled the problematic gate until it wouldn’t move. Button pressed, nothing! By now we both had locals offering advice which actually wasn’t helping any. ‘It won’t have been closed properly’ ‘The gates aren’t closed’ ‘Try pressing open and close at the same time’ etc. Nothing was working and now I couldn’t even reverse the process and open the gates to try again, or at least let those waiting across. Time to make a phone call.

The lady at the council apologised, she’d send someone down. I expected to be doing crowd management for a good half hour maybe longer before anyone arrived, but thankfully a chap turned up within five minutes. He waggled gates, leaped over them, checked the panel and wondered if it had done what it did yesterday!

We will do

With his Key of all Council Power he opened a big cabinet across the way brought out a remote and proceeded to open the bridge a bit, then close it again. Then he swung the bridge open for us to get through. As we headed off he could be seen closing the bridge, opening one set of gates but the normally cooperative side were stuck! Oh well that was an SEP.

A very new charity boat

Thorne Lock, a volunteer was on duty and a boat was about to come down. This was Pearl a new boat for the Ethel Trust a hybrid that the crew were being trained on. Walkie talkies were everywhere guiding them into the lock. They’ve only had the boat a couple of months and it will soon head up to Sheffield where it will be officially launched by Princess Anne.

The volunteer helped us up the lock with great care. He let me step back on board and he’d work the barriers and the swing bridge just above the lock. Thank you!

Cruising with the back doors open, a novelty

Now we had quite a distance to travel before the next bridge. Time to have lunch on the move. As we came through Stainforth I sent a message ahead, we’d be about half an hour. Approaching Bramwith Swing Bridge we could see a car crossing and then the barriers were lowered and the bridge started to swing. We sailed straight through, perfectly timed and pulled up on the bridge landing to pick up our friend David.

Teaming up with NB Bob we shared the lock, David and I assisted with the gates and paddles whilst having a bit of a catch up. The owners of Bob were heading up towards Sheffield and asked about mooring there. Four years ago you could moor outside the basin for 2 days, any longer you paid in the basin.

Bramwith Lock with Bob

We headed for our favourite mooring at the junction. Stepping off the bow with a rope jarred my back again, even though today I’d been doing really well, all the ropes and mooring was left to Mick to sort.

This afternoon we’ve had a really good catch up with David. Last time we saw him was in Newark last April. The last year has had it’s ups and downs for him but he has turned a corner and things are far far better. He is content with life, wakes up looking forward to what the day has in store for him. We even got to see a broad smile across his face. It was so good to see him well again.

2 locks, 14.9 miles, 9 swing bridges, 1 slid open, 1 open, 1 obstinate, 3 swung for us, 1 lift bridge, 2 cars held up, 0.25 tank of diesel since filling up in Newark, 1 lunch on the go, 1 more sunny sunny day, 1 happy smiling David.

https://goo.gl/maps/BE6eREnpNEv3jvvXA