Category Archives: Boat cats

The Goole Escape, Cutting The Perimeter Fence. 27th May

Selby Basin to ………….

Heather arrived yesterday afternoon with lots of goodies she’d picked up in Doncaster at Scicluna Deli. One of the slices of cake had to be enjoyed with a cuppa as we discussed our cruising plans for Trent Falls. Not being able to get off the river at Keadby was still a sticking point for us all, who could we call other than another helpful Lock Keeper?

The flood barrier being taken out

We enjoyed a curry from Jinnah, thank you Martin for the suggestion, it was very tasty, and a bottle of wine, then it was early to bed ready for the off this morning.

I have to admit to not having had the best nights sleep as I was not looking forward to mooring up on the pontoon in Gainsborough as the river hurtled past at a rate of knots. Tonight’s high tide would be the highest of the spring tides, 7.84m at Hull, so our plan of doing the trip on a Neap tide hadn’t worked out!

Selby Lock, open ready and waiting

This morning whilst Mick made us bacon butties Heather walked over to chat with the Lock Keeper, it was worth another try. The chap on duty this morning didn’t know Keadby or really our planned cruise, so he couldn’t be of much help, but would call his supervisor. As we finished our butties he came over to chat, today the problem was more to do with the sandbar at Keadby Lock than staffing. They were saying there wouldn’t be enough water to get us over it and into the lock at the state of tide when we arrived. He tried again for us, but the answer was still no.

Even I want to moor at Keadby Lock!

By now two chaps from the Environment Agency had arrived, they had checked the height of the tide and were happy that it wouldn’t over top the lock so then wound back the flood barrier. Life jackets on, Escape pod at the ready, the sun was out, it was time to go.

David, Karl, Martin and Wendy came down to the lock mouth to wave us goodbye and take photos for us, not often I get photos of me on Oleanna. The lock emptied, not much today due to the spring tide.

Then it was time to put the power on, leave the lock and wave goodbye to the rest of the escape committee. Thank you all for your company, knowledge, apps, photos and our united escape. Hopefully our paths will cross later in the year when we come back up north, but for now enjoy York and pottering about until things open up again.

Out into the flow we soon picked up speed. Mick radioed ahead to Selby Bypass Bridge to check for air draught. It was 4m so not a problem even though Mick got his tongue tide saying that our air drought was 2ft!

Soon the flow got going and our speed increased. We needed to make sure we reached Boothferry Bridge before the tide dropped too much as here sand banks start to show themselves at low water.

Heather has travelled this stretch of the river before some years ago. Selby Bypass Bridge looked new to her. We couldn’t spot the bridge keeper in his high up perch to give him a wave.

Drax

Drax Power Station came into view, the steam from the cooling towers heading straight up. The weather forecast and information on the Windy app were holding true.

I’d set Nebo going and could see that our speed was increasing, the sun that we’d left Selby in made us think we were over dressed for the days cruise, but now out on the river we were glad of the extra layer.

Barmby Barrage

Once we reached Barmby Barrage we were now onto new water for Heather.

Passing a wharf close to Drax Power Station there was a high vis rescue boat. Two chaps sat in the rib. You could play spot the difference with these photos, I think one of the chaps spotted us and put his helmet on quick.

A crane sat in a field alongside the wind turbines. Was it a new turbine being put together or had the lid been lifted off? A chap sat high up there working away.

Aire to the right, Ouse to the left

We passed where the River Aire joins the Ouse, then Boothferry Bridge and the M62 lay ahead.

There was no need to radio ahead, although the Bridge Keeper kept a close eye on our progress. So far so good, we wouldn’t run out of water.

Under the M62. This bridge can be seen for miles with it’s gentle curve up and over the Ouse and surrounding area, it always used to be hard to slow down on the slip road off it at Howden. The salt and pepper pots in Goole could just be seen through the uprights meaning we’d soon be back where we started last Friday.

Keep to the right

Round Howden Dyke Island, the sand banks only just starting to show themselves, then straight across to the first wharf surrounded by the green of Wren Kitchens. A right angle to keep to our red line on the charts and keeping towards the eastern bank of the river. Here two large ships were being loaded, a reclining figure kept an eye on things, looking down into the hold.

Last Friday we’d been surprised at the lack of debris on the river. You seem to get a lot of it on the reaches up to York. Today however was different, there was plenty of fire wood floating along keeping us company, some of it at one point needed some encouragement to leave us, we slowed down and let it drift off ahead.

Goole Railway Bridge. Today we took the span to the east of the control tower. Here we could see the earlier wooden protection, now superseded by a steel structure, it’s a good job as it looked like the wood wouldn’t be able to cope with a miscalculation from a passing ship.

Goole

Now the river sat wide in front of us. The view of Goole clearer than last week. We followed the red line on our charts, taking us across the river closer to the docks.

Victoria Lock entrance came into view, a big yellow sign asking us to radio Goole Docks on channel 14. We’d tried a little bit earlier, but gave it another go.

Victoria Lock

‘Goole Docks, Goole Docks, this is Oleanna, over.’

The now familiar voice from Ocean Lock replied and Mick gave our location and informed him that we would soon be passing. We were clear to proceed and there was no traffic on the river. ‘Have a pleasant journey on the river’. Thank you.

Bye bye Ocean Lock

Now we could finally wave goodbye to Goole.

New water for everyone. Even Tilly was shouting about it below!

We kept our eye out for the markers on the banks. White diamonds to line up and cross between. Numbered posts with what look like Ikea guiding lights on top of them, these are of course more elaborate than just a nightlight helping to show ships in towards the docks.

Wide and reedy

Yesterday Mick had spent several hours studying the Humber charts and comparing the depths to the red line on our Boating Association charts. The Humber has sand banks that constantly change so the river is surveyed bimonthly, our charts may have been out of date. However the red line followed the channel, so as long as we didn’t stray we should be fine.

A truncated windmill, a lighthouse that both Heather and I thought had a sign with two arrows on it, one pointing upstream the other down stream. Well now looking at my photos the arrows are actually just bolts holding the board to the lighthouse.

Lighthouse! Hang on, lighthouses tend to be at sea on the coast. The occasional one has been built as a whimsical curiosity along side a canal, but this one looked like the real thing and meant business.

Next Blacktoft Wharf came into view. When we’d visited it a few weeks ago by car we’d not liked the thought of mooring to it to wait for the tide to turn. Today we liked the look of it even less for a narrowboat and were glad we had a different plan for awaiting the tide.

Apex Light

There up ahead was our next landmark the Apex Light.

Straight on the Humber and North Sea, to our right the River Trent. Gulp!

Hull up ahead!

The flow was making our progress so easy, zipping along, so far so easy, so easy. The sun was out, only a slight breeze, wonderful.

The Apex Light got closer. And closer. And closer.

On the Humber now

Some people say to head down onto the Humber to bide some time waiting for the tide to turn. Others turn and beach their boats on the sandbanks on the southern side of the Humber. But our plan was different.

Skidding round

David and others had said that beaching might mean that as the tide comes in a wave would build up alongside your boat, trying to force you round. Until the level had risen enough for you to back off the bank this could mean water getting in through vents etc. Maybe on a neap tide this wouldn’t be so bad, but today was the highest spring. So our plan was to anchor instead.

Trent to the left, Ouse to the right, Humber and North Sea behind!

Mick moved the tiller round and we turned round the Apex Light. Out from one flow of tide that had been pushing us along to head straight into another! Well we slipped along side ways for a bit before Oleanna managed to turn . Within a minute we changed from doing about 7mph over ground to almost being stationary now facing up stream on the river Trent.

Slow progress

1.5mph meant we crawled up the Trent, keeping quite close to the training wall which was very visible at this stage of the tide.

Trent 2

S L O W L Y we passed the two Trent markers on the west bank. We had to keep close to the training wall as here there is a shallow channel, not the main one, that is over the other side towards the eastern bank. David had given us a landmark to look out for, a drain leading into the channel, this was shown on our charts as being between two anchors.

Gradually making headway

Heather and I went up into the bow. The anchor had already been placed on the bow locker at the ready, the bucket of chain and rope beside it. I lifted the anchor, Heather the bucket.

David’s landmark

I tried carefully to lower the anchor into the water, keeping control as it passed the newly painted gunnels. However it proved a touch too heavy to manage this totally. Clinging onto the chain letting the anchor slowly drop was hard work, so once all fingers were well out of the way I let go of the chain.

It’s under the boat

The chain followed by the rope pulled out of the bucket, leaving a couple of meters behind, which I assisted out into the water. Now would it bite on the river bed? Mick moved us gently, the flow on this part of the river much much less than in the main channel.

After a while the rope seemed to be getting some tension in it. However it was caught underneath the lower bow fender. Then we drifted over where the anchor must have been, the rope moving down the side of Oleanna. Then back again. I wasn’t willing to try to get the rope from under the fender as this would mean balancing on the bow, I’d rather loose the fender than fall in. But after a while things settled down and the rope sorted itself.

Tension

We were at anchor at Trent Falls.

The Goole Escape, Danny’s 17th. 24th May

Selby Basin

Today passage had not been possible due to staffing shortages. Nigel was at Naburn this morning to pen a cruiser down onto the river, this would mean there being nobody available to pen us at a suitable time of the tide, so today had not been an option. This did however mean everyone had their radios on to listen in.

Lock cottage for sale

Around about 9am we could hear one side of a conversation on Channel 9, the cruiser was approaching the bridges. We all gathered at the lock hoping to see what we could see.

The amount of trees not only inhibit an advanced view of the lock, but also there are only a couple of places you can stand to be able to see Selby Rail Bridge swing.

Selby Rail Bridge

Air droughts were checked with the bridges. Yes they would need to swing. The cruiser was told to hang back whilst permission was sought for the Rail Bridge to swing. There was a gap in trains so the bridge keeper commenced the procedure. Selby Toll bridge followed suit, the traffic there a lot easier to stop.

Once the bridges were open the cruiser was allowed through, having to turn back round to go with the flow.

Open and ready

The skipper wasn’t aware that there was another bridge coming up, Selby Bypass Bridge, so we could hear conversations on the radio down there. Hope they made it to Grimsby okay.

Yesterday David had sent through a set of charts for Trent Falls, the Lower Ouse and the Lower Trent. Humber Charts. These lay out not only the depths of channel, but also the heights of the sand banks above the lowest tides, it is essential to understand these sections of the rivers. We printed them out, all the figures too small to read, ideally you’d want them on a computer so as to be able to zoom in at any given time. Under cover this would be possible, but we prefer to cruise with our pram hood down, giving better visibility all round, this does however have the drawback of things getting wet should it rain.

Trent Falls

Mick headed off to chat with David about the charts as I set too hoping to make the most a spare day to get some work done. I put together a story board of panto with photographs of my model and emailed it off to keep others informed.

Assistant hard at work

A blue van came past the chink in the curtains, Nigel was here, he pulled up alongside Sea Maiden. Time for the escape committee to convene.

David had been looking again at the weather at Trent Falls for tomorrow. The patches of sun were now replaced by rain and thunder, wind a touch more than we’d had on our journey up to Selby. He wasn’t too keen. The weather for Thursday looked much much better, sunshine and gentle winds. Tides would mean a later start, therefore a later finish. Another option would be to go to Barmby Barrage a day before and set off from there saving an hours cruise, giving us an extra hour in bed.

Selby Lock

Martin and Wendy on Lulabelle are thinking of staying in Selby to wait for the swing bridge at the end of the basin to be mended. A notice a couple of days ago had suggested the bridge would be lifted out mid to late June, opening up the navigation again. At the other end of the Selby Canal there is currently a height restriction at Tankards Bridge. Nigel confirmed that this was set at 7ft, a scaffolding bar flattening off the arch of the bridge. With the current fluctuation of the canal level with water coming off the fields 7ft was a safe height. This of course means Sea Maiden wouldn’t be able to go that way until the bridge is mended. The dredging on the Aire is scheduled for around about now, so the rest of the way back onto the Aire and Calder Navigation should be fine.

Nigel called someone up to enquire if there was any more news of the basin swing bridge, there had been a big meeting last Friday with lots of pointing going on. Permission is still need for a road closure from the council, then works can begin. The official line still being around three weeks.

River level

Maybe in a couple of days time passage up to York would be possible, the fresh water having decreased by then. Time waiting for suitable tides and weather could be done whilst bobbing back and forth between Naburn and York. The next morning tides not for a couple of weeks.

Conversation came back to Thursday. Low tide at Trent Falls would be 16:24. The cruise from there with the incoming tide would be around a couple of hours to reach Keadby Lock. So arrival would be around 18:30 maybe a touch later. All fine until the Keadby Lock Keepers hours were checked. Currently the shift finishes at 20:00, but Thursday 16:30! Oh B***er!!! We’d still be two hours away.

Maybe we could carry on to Gainsborough and moor on the pontoon there overnight and be up early for the next incoming tide? Maybe!

This would be further than David and Karl had planned and the conditions would need to be spot on for them to go, they may stay and pootle up to York for a bit waiting for the next set of suitable tides and lock opening hours.

Nigel would still be here at a suitable time to let us out tomorrow morning if the forecast improved and we decided to go for it.

We chatted through the charts with David. Learnt of another useful app called Anchor Watch. You can set the position of your phone (boat) on the app and should your phone move by more than 20m an alarm will sound. We then all went away to think things over.

Panto technical drawings

I got the drawing board out. Time to update my technical drawings for panto. Not too much has changed so alterations and a tidy up adding title boxes to my plans. I worked through most of them before it was time to pack up for the day.

Mick busied himself in the engine bay. The new bilge pump he’d put in a little while ago hasn’t been working. It makes the right sort of noise, but no water has been pumped over board. Yesterday he’d had a look at it, maybe the bodge job he’d done fitting it had failed!

The new bilge pump has a wider diameter fitting than the old one did. This means that the pipe from the skin fitting is too narrow to fit onto it. Mick has added a short length of narrower pipe which fits inside both pipes. This is taped and jubilee clipped in position as a temporary fix until we can get some pipe of the correct diameter.

Tilly keeping a watch on the weather

Now we watch the weather, river levels, and wind. What else could be added to our escape calculations?

Ah Yes! The Trent Aegir!

0 locks, 0 miles, 0 penning, 2 cruisers zooming by, 1 postponed cruise, 3 charts, 3 weeks, 1 very helpful Lockie, 4:30 clocking off, 3 to 2 to 1 possibly, 8 sheets, 3 pipes become 1, 3rd episode LOD, 1 cat who has given up all hope!

The Goole Escape, Scaling The Wall. 21st May

Goole to ……

Can you see us?

The River Ouse is so vast in Goole you just have to keep looking forwards so as not to be swallowed up by the expanse of water.

That Mick he’s always been a speed merchant!

With a choice of charts, Ripon or the Boating Association, we decided to follow the red line on the later. Popped in a plastic folder the book wouldn’t stay dry if it rained but it would have some protection. We’d rather these got damp than the useful book from Ripon, so that stayed on the Nicholson’s shelf by the back door in case we wanted it for reference.

Tucked away behind the flood bank

However we were close enough to Sea Maiden to see what course to follow, David having produced the Ripon book should know his way along the river.

Goole Railway Swing Bridge

First landmark was Goole Railway Swing Bridge. With wharfs further upstream the bridge swings to let big ships through, no need for that today. David did take a different span of the bridge than our red line suggested, as Sea Maiden is deeper droughted than Oleanna we had no problem following.

The bridge is also known as Hook Bridge,  it is a large viaducted hogback plate girder bridge with a swing span that was built to connect Kingston Upon Hull to South Yorkshire in 1869. There are four fixed spans crossing from the western bank then the two that swing on the east bank. The pivot point is vast.

Lulabelle following

At Howden Dyke large wharfs stand with their bucket cranes ready to off load. We looked out for green markers here, but then realised these were actually quite small and are lights rather than big posts with brushes on the top as they are on the Trent.

The second wharf is where you change course quite dramatically. Straight ahead would seem to make sense, taking the shorter route round Howden Dyke Island.

But this course is shallow and the channel heads off at a right angle to the south of the island. Paul from Waterway Routes had mentioned this in an email a day ago, we stuck to our red line and followed Sea Maiden up ahead.

Here they come

Looking behind us, would Lulabelle see which course to take? They came into view and took the sharp left following at quite a distance now.

Left!

As we finished rounding the island Mick’s phone rang. It was Nigel at Selby asking on our progress. We’d only been out on the river for about half an hour. Maybe he thought we’d been let out earlier from the docks, but he’d hoped we’d be further on and not still south of the M62 bridge.

At Selby there hadn’t been a noticeable change of tide this morning due to the amount of fresh coming down. He was concerned that we’d soon be loosing the effect of the incoming tide and then struggle against tide and fresh water to make headway. The river appeared to be peaking a day earlier than expected. All we could do was continue, we seemed to be doing 6mph which we thought was reasonable.

We messaged up ahead to David, Oleanna could go faster, but could Lulabelle who seemed to be keeping up but a long way behind. Did their engine have enough umph to push on upstream.

M62

Nebo showed us doing between 5 to 10 knots only slowing to below 5 knots when changing direction around Howden Dyke and as we approached the M62 Bridge, well we had to have chance to have a good look.

Wonder if anyone saw us?

Just how many times have we been over this huge spanning bridge which opened in 1976. This is our preferred route south from Scarborough and at times it was too from York. On crossing the bridge we always look out for boats and comment on the state of the tide. Today the tide was still coming in and there were three boats pushing their way upstream.

Boothferry Bridge

Next Boothferry Bridge. A landmark of Micks childhood, long before the M62 bridge was built! Living in London and grandparents living in Hessle near Hull they would make the journey northwards by car. Crossing the bridge was a sign that they were nearly there! Excitement would build on the back seat of the Humber Hawk.

Another for good measure

To the south of the Ouse the River Aire joins shortly before a bend. Now up ahead the cooling towers of Drax Power Station rose, new wind turbines in the foreground. Was there a faint whiff of wood smoke in the air? Drax burns biomass to generate power now, just like wooden cat litter.

New and old power generating

I had wondered if we’d be able to see Eggborough Power Station too along this stretch. The thought of a photo with Drax, Eggborough and the depleted cooling towers of Ferrybridge a goal of mine, but sadly this wasn’t to be.

Lulabelle still there

Next time we cross the Wolds on a clear day we’ll have to stop the car to get all three power stations in one photo.

Is this Barmby?

Round another bend and Barmby Barrage came into view. The River Derwent heads off north east from here. A while ago we’d considered stopping here to save the full journey up to Selby. Maybe our progress was starting to slow now the effect of the incoming tide was waning against the amount of fresh coming down, we’d been on the river now for an hour and a half. Was this where we should be?

It is

Mick called Nigel at Selby to give him an update on our location. Thankfully he was happy with our progress, he wouldn’t be sat at Selby waiting for us until 9pm as he’d once thought.

Next year

Barmby Barrage has to be booked with the Environment Agency 24 hours in advance. Heading up the Derwent and onto the Pocklington Canal is one trip we want to do, but for now it will have to wait for another year, maybe next year.

Drax

The red line on our charts was now becoming intermediate. Keeping to the outside of bends, but not too far over as the flow pushes you even further out as we’d discovered on our first trip up to York seven years ago. As we reached Hemingbrough our speed was certainly dropping, Nebo showing it now under 5 knots.

24 to where?

We’d been wondering where all the debris was that usually accompanies you from Selby up to York. Last year it had been like a log flume. Our first tree came into sight bobbing along, a browning Christmas tree. Was this all there was going to be?

26

Sea Maiden up ahead was slowing. The river getting narrower the flow coming towards us stronger. This is where the floating debris started, no wonder David had slowed down. We’d lost sight of Lulabelle a while earlier, but with each of us on Nebo we could see where each boat was. Martin and Wendy were maybe ten, fifteen minutes behind, but they were still moving.

How now

Red markers on the western bank counted upwards. 26 being called Brown Cow on our charts was surrounded by sheep grazing the river bank. From here it was only 5km to the swing bridges of Selby, channel 9 to contact the bridge keepers, but we’d not need them to swing for us, we’d only one to go under Selby Bypass Swing Bridge.

A large tree lay on the bank, was this the tree we’d seen last year on our way up to York? At Roscarrs the river narrows and we could see the water bubbling away, lumpy water. We pushed hard against the flow here and up to the next bend where things calmed down somewhat.

Lumpy water

As Sea Maiden passed under the Bypass Bridge we heard David contacting the lock keeper on the radio. Nigel asked if all the boats were together, there was no reply from David. We waited for him to answer but none came. So Mick radioed our position as we passed under the bridge. Sea Maiden would be penned up the lock on her own, Nigel would then drop the lock ready for us. Mick reduced our speed, a gradual approach to the lock better than having to tread water nearer it. Martin on Lulabelle then followed on the radio with their position, still about ten minutes behind us.

Selby Bypass Bridge

But where was the lock? If this was your first time on the river you’d need guidance as all you can see is trees along the banks and Selby Rail Swing Bridge up ahead. Sea Maiden carried on ahead, then just disappeared out of view.

Finally the red brick flats came into view, these are just after the lock so we slowed our progress even more. The water could be seen dropping from the lock. I made my way to the bow before any manoeuvring by us was needed.

Nigel at the lock

Nigel stood by the lock mouth, handy hand signals as to our position on our approach. The temptation to turn in as you would on a canal is great, especially as we were facing the flow. But holding our course upstream meant we’d not get swept into the bank or the lock walls. Stay out, stay out, NOW!

Approaching the lock

Mick swung the tiller hard over and Oleanna responded nicely straight into the lock. Phew!

Thank you Karl for the footage.

Safe in the lock

No need for ropes as we’d be on our own in the lock. Nigel opened up paddles bringing us in towards the wall where we stayed as we raised up to the Selby Canal.

Two of us up

Sea Maiden was already moored. We winded and pulled in behind them. The lock already being reset for Lulabelle. More hand signals and Martin and Wendy turned faultlessly into the lock, big grins all round.

Keep coming!

All three boats safely in Selby. In the last twenty minutes it had started to rain, but other than that we’d had a pretty dry cruise. We’d found the gap in the weather, pushed against the fresh water. David’s original calculations had had us arriving at Selby around 16:30. We’d arrived at 17:30 after pushing against the increasing amount of fresh coming down stream. So we’d not done too badly and had a pleasant cruise up the river.

Three of us up

All that’s left to do now is head back the way we’ve come. Turn up the Trent, using the tide to help us upstream. Passage is currently booked for Sunday at 06:30.

Can I go out yet?

2 locks, 15.84 miles, 1 wind, 3 lefts, 1 straight on, 0 ships, 38 litres, 2 fenders, 3 boat flotilla, 12 knots maximum wind speed, 3 hours 10 minutes on the river, 1 worried Lockie, M62 and Boothferry Bridge gone under, 1st stage of the escape achieved, phew!

https://goo.gl/maps/FRk1AbMS5SM9Wuq39

The Goole Escape, Knotted Sheets. 21st May

Viking Marina to…….

Not much impetus to get out of bed this morning due to rain and thinking our escape plans might be postponed, we drank our tea and looked at weather forecasts, river levels after the recent rainfall. Wind looked to be dying down this afternoon, would this give us an opportunity to make our first move in the escape plan?

Oleanna behind the fence

A phone call from Nigel at Selby Lock brought us news that the River Ouse was starting to come up, due to peek on Sunday morning at 3.5 m. Today passage would be possible but not tomorrow as the amount of fresh coming down the river would hinder our progress upstream even with the tide. He also thought that our trip round Trent Falls currently booked for Sunday 06:30 would be unwise as we would likely be fighting our way up the Trent to Keadby too. If we weren’t going to go today he was suggesting waiting until Tuesday to head to Selby and then head back the way we’d come continuing to Trent Falls on Wednesday. The tides would just make it possible to arrive at Keadby within working hours.

Out to meet the flotilla

We needed to chat to the others and see what they thought. Better to do this face to face rather than on Whatsapp. We got dressed and paddled our way round to the moorings past the big work boats to convene the escape committee.

Shower now full leaving the well deck clear

David had also talked to Nigel, he had also spotted the dip in wind speed this afternoon, which hopefully would coincide with a drop in rainfall too. The wind forecast actually showed it changing direction around about the time the tide would change, the important bit about this was that the wind would be going in the same direction as the tide, reducing the possibility of waves.

Goodbye pontoon

Four out of six of us were happy to give the plan a green light, the other two were still in bed, hopefully they would agree. We headed back to Oleanna for breakfast and to prepare for departure.

Mind Lisa’s boat!

Water tank filled, well deck cleared of everything other than the anchor and chain, rubbish in the bins. The trip computer was set, Nebo started. Just as we were untying the chap from a few boats away started telling us of doom and gloom stories of when he’d been through Ocean Lock, his wife nearly being thrown overboard! Blimey, that didn’t sound good! But we have learnt to take such tales with a pinch of salt.

All of a sudden everyone in the marina had come out, the rain having just about stopped along with a boat moving brought people out from beside their stoves, all nicely timed with us reversing off our pontoon and trying our best not to hit Lisa’s boat whilst the wind had other ideas. Other members of our flotilla were at the services on the other side as we pulled out and turned towards the docks, mooring up at the diesel point at Viking Marina. Time to fill up the tank and check out.

Only 38 litres used in 8 months! Mick gave Laird an electric meter reading, handed back our gate key fob. Then we treated ourselves to two new rope fenders a bit chunkier than the one’s we’d found in a skip a few years ago. These were our present to Oleanna for having a quiet winter and to celebrate leaving Goole.

Escape pod at the ready

Time for lunch, last checks, winter waterproof trousers, life jackets on and Tilly’s escape pod zipped up ready just in case. David and Karl came down to tread water alongside us, shortly followed by Martin and Wendy who had finally been convinced that the weather should stay dry for the trip.

David radioed through to Ocean Lock to ask permission to enter the docks. Radio checks were done all round, all working. We pushed out behind Sea Maiden and Lulabelle.

No need for any bridges to swing for us, David had dropped his masts knowing that then he’d fit under. Plenty of head room for the two of us following.

Past the Tom Pudding hoist (footage of it in use). Oleanna wasn’t quite smiling as she normally does, maybe pensive for her entrance onto the River Ouse. A kind word and a slight adjustment of the cable between her horns and she was reassured, smiling back at us again.

No ships to dwarf us

Such a shame the docks were empty of ships today, nothing for us to feel really insignificant alongside.

Sea Maiden pulled into the port side of the lock, followed by Lulabelle. We were directed to the starboard side of the lock. No ropes required to hold us into the side. The huge gates closed behind us.

We all just bobbed there, plenty of space for loads more boats of our size.

Down we go

Then gradually the water emptied from the lock, the tide was a lot lower than we’d expected it to be, 8 maybe 10ft lower than the canal.

The gates opened in front of us. No need for the chap in the control tower to tell us the ‘gates are in the recess’ as he does for the big ships. The chap who was on the lock side just said we could go as the gates were opening.

David and Karl led the way in Sea Maiden, Martin and Wendy next in Lulabelle then we pushed out from the wall and followed on behind.

Ahead a huge expanse of water. Each boat exited the lock and did a sharp turn to the left, the flow of the incoming tide pushing us slightly as we turned. Blimey it’s wide, it’s really wide.

David pushed on ahead, we waited for Lulabelle to pick up speed, but soon we passed Martin and Wendy, Oleanna wanting to go faster to stretch herself with the incoming tide.

Bye bye Goole

Behind us the Salt and Pepper pots along with the spire of St John’s stood tall, Goole was overcast and getting further away by the second. We’ll see them again when we come back in a few days, but for now it was rather nice to be seeing the back of them. The first part of our escape completed, we just had to reach Selby now!

The Big Wash. 18th May

Viking Marina, Goole

Late yesterday a boat transporter arrived, backed into the maintenance area opposite us and stayed parked up overnight. This morning Geoff was busy with the boat lift.

Getting ready to go

The wagon pulled forward, then Geoff followed with the yellow cruiser. The boat suspended over the trailer, inched forward. Pads were moved around, adjusted to fit the shape of the hull, then gradually the boat was lowered. Straps added and eventually the wagon pulled away, turning round the buildings to exit the marina.

This wasn’t where Geoff stopped though. He seemed to spend much of the remainder of the day moving cruisers about. We now have two small cruisers just in front of us, each one taking quite some time to get sorted with wooden supports which had to be brought by forklift.

Onboard Oleanna Mick busied himself with the washing. The washing drawer already getting full after being back on board for a couple of weeks. Being on shore power he was going to make the most of what time we have left. I’m not sure how many loads went through the machine during the day, but it seemed to be going round constantly.

One whirligig full

Mick cycled to Boyes to buy some oil and antifreeze. This meant he could now change the gear box oil, another maintenance job ticked off the list.

Then once the next load of washing was finished Mick put up the whirligig. This is most definitly (am I ‘H’? I can never spell the word!) a blue boy job. Hanging washing out on the whirligig when attached to the tiller is just that bit too high for me to manage. Tippy toes maybe, but over stretching ones back is not a sensible thing to do in my experience. So Mick gets to do the washing.

I busied myself working through my A4 sheet of model notes. A painted archway needed to be lowered, this was my biggest job. I still can’t decide whether to fade my cyc out to the sides with black or not. But by the end of the day the box of finished pieces was full, only a giant strawberry to finish off. This may not look that big, in fact it’s actual size is around about a standard strawberry size. But theatre models are made at 1:25. So this strawberry will end up being half a meter wide and nearly as high as a dining table!

Could it be too big, no it’s panto!

During the afternoon David/Paul and Karl came to top up with diesel. Mick had quite a chat with David. It was decided that they would call ABP to book all three boats in to pen down on Friday. One phone call much better than three. We’re already booked in at Selby with the Lockie there.

Now all we have to do is finish the washing and pray for a calm day. We can cope with rain, hail even, but not wind! Currently the forecast is not on our side especially for when we plan to do Trent Falls. Postponing this leg of the journey though means that the tides get later and higher, which also means lower. All our digits are crossed hoping that all the weather people have got it wrong and that the jet stream will whisk away the on coming front leaving us with a nice calm day.

Panto bits and bobs box

On a brighter note, we decided to book ourselves a meal for tomorrow night. Sometime earlier this year on arriving at the marina we’d noticed a big sign had gone up just outside the marina gates. Joan’s Home Kitchen collection point. What was this?

May be an image of brick wall, outdoors and text that says "JOAN'S HOME KITCHEN COLLECTION POINT Tel: 07402667478"

We had a look round on the internet and found her on facebook Joan’s Home Kitchen. A Chinese takeaway menu is published every couple of weeks with a limited amount of dishes, all of which look tasty. The only problem being that Chinese food isn’t always so good for a gluten free diet, but I really like it.

Sadly she isn’t open on Thursday, but is tomorrow. Mick gave her a call to ask about gluten free options. She was making suggestions of dishes that she could make gf for me, in the end we decided to have a chat in person. Well Joan’s boat is only about 25m away for us. There in the wheelhouse window her 5 star hygiene rating sticker.

A tasty sample to try

We chatted through dishes that I could have without too much extra work for her and placed our order for tomorrow evening. Joan handed over a sample of her seafood dumplings for Mick to try. Blimey four! I have to admit I did try them despite their flour content. Very very nice. We are now very much looking forward to our meal being delivered tomorrow.

0 locks, 0 miles, 3 maybe 4 loads of washing, 10 litres oil, 1 shower brewing, 1 very bored cat, 1 empty box, 1 full box, 1 whacking great big strawberry, 0 digits left uncrossed, 4 dumplings, 1 chef across the way.

Here’s a little bit of footage from my Scarborough theatre roots about their reopening.

https://www.facebook.com/BBCRadioYork/videos/320055276136892

Rules Are There For A Reason! 17th May

New Bridge to Viking Marina

It was left up to Tilly this morning as to when we’d move. Her last morning of freedom for sometime, so she was told to make the most of it. Off she went scouring the long grass for friends.

By about 10am we were the only boat left, David/Paul and Karl had headed off early and WB Lullabelle followed. Did they know when it was due to rain this morning?

Much better versions on the right

At about 11am we were either ready to push off or I’d be settling down to do a couple of hours work. NO sign of the second mate so I set about finishing off the bits for my panto model. My new version of the under sea scenery much better than the original.

When Tilly wants to come in she either comes to the side hatch when it’s open, or jumps on the back of the boat, quite often jumping up onto the roof hatch making the engine board rock to make a noise. Well on her return this morning we heard her land on the stern, but her bell sounded different. Had she managed to change it herself for a quieter version? Or had something happened to it, muffling it slightly?

What happened?

To us we guessed what had happened, this was confirmed when Mick opened up the back doors. One wet cat. Was this down to wet grass and hunting? No, her head was dry! This was almost certainly down to jumping in, or maybe a fall, or maybe some other excuse for not abiding by the rules which are laid out every time she goes out!

That’s not just damp Tilly!

You can be angry. You can laugh. You can chase her round with a towel trying to catch as much of the water as possible before it soaks into the sofa or bed. You can worry every time your cat is out. You can keep them indoors. Or you can let your cat be a cat. Then you can be grateful that she got out from where ever and came back home to share the clean up experience with you.

That’s soaked!

We think where she got wet was most likely to have been in a short section of drain or pond in amongst the trees. But there is a possibility that the number of ducklings was too big a pull towards the canal. If that was the case, thank goodness she managed to find a way out. However the wet paw prints came from the bank and not the stern button.

As much of a towel dry as I was allowed to give her, she then set about drying herself off by having a bath, thankfully for my end of the sofa, whilst sitting on a towel. Mick lit the stove, the boat warmed up to help with the drying off.

What’s happening there?

A small boat kept coming past this morning with a C&RT chap sat in it. In front of him it looked like he had a laptop. Was he doing a survey? He headed all the way up to the cofferdam a couple of times.

A big mound of earth just in front of the digger

After I’d finished my model bits and had lunch it was time to push off and head back into Goole. As we winded I did a last zoom in with my camera towards the cofferdam. There a digger was busy and a mound of earth could be seen. Every now and then this morning we’d been able to hear pile driving. Which part was being dug up? I’ll have to wait for Mark’s next set of photos to see. Next time we are up this way the breach will hopefully be mended and we’ll be cruising through it reminiscing.

Goodbye for now

The four damp miles back to Goole was tracked again on Nebo. I also remembered to have my camera ready to take a photo of the ladybird tile on one of the culvert bridges.

Time to put the panto model together and see if I want to do anything else. A list of notes was written out, nothing major but a couple of hours work. I also took photos so that the costume designer can see what colours I’ve used.

These were also sent off to David the Director for him to have a look at before we have a catch up, so any notes from him can be sorted prior to the finished design meeting with all the creative team and producers.

The Cotswold Thunderbolt

0 locks, 3.92 miles, 1 wind, 1 soggy moggy, 2 hours drying off, 170 model photos, 1 okay Inn, 1 lovely ship, 1 giant anemone, A4 of notes, 1 model nearly finished, 1 glass of wine to celebrate.

Driving. Breach 50. 16th May

New Bridge

I’m sure breakfast photos must be getting boring!

Yesterday afternoon another narrowboat arrived, keeping well over to the other side of the canal, yet pushing quite a bow wave. We then sat and bobbed about in the resulting waves for a good fifteen minutes until calm was restored.

One of two mums and their babies today

Have to say we’re a little surprised that not more boats have come out from the marinas for a touch of freedom. Yes the motorways are not that far away and constantly audible, but the amount of sky beats the view of other boats any day.

Fishermen lining up for todays competition

The fishermen arrived and set themselves up along the northern bank and at 11am a shout from one end to the other could be heard, then the plop of bait followed by rods. Todays catches reached 27lbs 6oz. No idea if this is a really good haul, but it sounds like it to me.

Hawthorne

After a slow morning watching the local baby boom we headed out for a walk. The towpath officially on our side of the canal, although the northern bank is far busier, we followed it up towards New Bridge and the breach site. The grass has recently been mown despite someone having put a fence across the towpath. There being no sign to say keep out we continued. Under the bridge to where proper fencing keeps gongoozlers away from the cofferdam and new CCTV looks down on the site.

A team of high vis chaps stood around the site. Maybe because they now had on lookers they climbed back into the cabs of the diggers and pile drivers and started to work.

Busy

The piles that Mark had photographed from the air a few days ago were now being driven further down. Each one numbered in chalk. The chaps gradually worked their way along the line.

We decided to walk along the flood bank of the Dutch River to have a different view. Someone arrived in a car to check over the generators, all quite busy for a Sunday.

The tide was going out on the Dutch River, Cow parsley stood high on the flood bank and every now and then the remains of some creatures meal sat on the path, muscle shells. Sadly between us and the canal lay a very boggy area, possibly even a drain so the best view I could muster of the level on the western side of the cofferdam was by standing on a stile. No water in view.

Back at the boat Tilly was allowed several more hours of towpath exploration, although the very quick sharp showers that came and went all afternoon brought her dashing home.

Norf

Big bolts of lightening towards Doncaster were followed some 15 seconds later by big booming rumbles of thunder. We felt for the fishermen across the way, some already starting to pack up ready for a swift exit after the weigh in at 5.

Miserable out there

I continued with my model painting. The Inn now thankfully finished and a few more bits and pieces painted. The underwater scene was partly painted when I had a big change of mind about it, a much better idea which shouldn’t take too long tomorrow to make and paint. This will be a Black Light Scene, illuminated in UV with puppets of fish and mermaids swimming to our principles rescue. After that it will be time to put everything back in the model box, take notes, work through them, take photos and then wait to see what the Director thinks.

Bits and bobs

An up date of the technical drawings then hopefully the model can be tucked away for safe keeping in my clothes cupboard until needed and we can concentrate on boating for a while.

Sunday roast

0 locks, 0 miles, 4th boat, 50 breach updates, 9 hours! 20 babies, 6 showers, 1 biblical downpour, 16 drenched fishermen, 1 final alteration, 2 boaters saving their hugs.

Sunday Selfie

Heading Into The Friendly Cover. 15th May

Waiting

Well I’ve been quite quiet on here recently, that’s because She has been hogging the computer and tapperty tipping lots. Then She has been working and Tom has been tapperty tipping lots instead. Just when does a cat get chance to do some writing of her own!?

Life in Scarboreough (where the outside doesn’t change) was boring, yet I had to keep on my toes. So many cats about and not one friend to be found! I had an inside tree to keep me happy, from the top I could gloat at Boggy Face Alan and Fatty Betty. There was LOADS of room inside and several comfy beds to choose from. Well that was until they all got nice clean sheets and the doors got closed.

Dreaming of escaping

Tom thinks I became a junky for a week, Cannabis is what he thinks I had. If that’s the case he was my dealer, sprinkling it onto my food on an evening! Apparently it was meant to make me a touch more laid back, but with all those cats around I couldn’t lounge around.

I found myself being shoved into the cat caravan and then spending far too long getting all hot around the collar and trying to avoid the inevitable. She did try to help, but I was so glad when Tom stopped turning the wheel.

Hooray!!!

What was this I saw before me?! Oleanna!!!!!! Our proper inside.

House collar to boat collar

She locked us in the bathroom, wanting to check I was clean. Then She said, ‘Do you know where we are?‘ Of bloomin course I did! Just let me get through that door for a nice calm sit down and a bath please!

The inside smelt a little bit different to how I remembered it. A couple of sniffs and then I decided to sit on my shelf, keep myself out of the way as She and Tom would be busy. Things went away into cubby holes, I checked them out before they opened them up in case anything had moved in whilst we were away, but all was fine.

Outside there were views again, birdies to watch, water to be aware of. Life was back to normal, I could forget about lockdown in Scarboreough.

Where is it!

But hang on something was missing! I had to send them back to get it, I most certainly wasn’t going to join them. Tom said that they hadn’t forgotten it, but there just wasn’t space for it and anyhow they had to go and see Bill. Off they went leaving me to get settled back in. I checked things over, feed me shelf, my shelf, Houdini’s shelf, the curtains are too clean and the insides of them don’t have enough grip factor yet, but I’ll work on that once my claws have grown back. Just a shame she’d left the lid on my toy box, I’ve missed playing with Transgender Mouse.

Hurry up!

When they came back, the first thing into the boat was my missing item. She hadn’t even got in through the door properly before I was using it. My scratch post! Then she opened up the toy box and there were my friends again and the really good bouncy balls, they are pathetic in a house, but great on a boat.

Get on with it!

After a few days they went outside. It was time to let this outside go, they untied it and pushed it away. I wasn’t sure if they could remember what they were doing so had to sit on the back steps and shout at them through the door. Don’t forget to push the thingy! Put the ropes where you can lasso the outside again. I’m not sure they heard me, although She kept opening the slidey top and asking if I was alright. I was fine, but were they!!!

Nervous snoozing

I decided my nerves couldn’t take it any longer, so I had to go for a snooze and just hope they caught a good outside. After three nervous snoozes they tied one up. The view from the windows looked good. No trees or sideways trees, but plenty of friendly cover. It took them forever tying it up.

What’s out there?

‘You have an hour. NO friends home dead or alive, or putting them on the roof for later. No jumping in. No falling in. No bullying. Go and enjoy yourself.’

She and I had a little walk up the towpath to check it out then I was allowed to go solo. Here there were friends! Tasty friends, oh how I’ve missed them.

Towpath walks

Since then they have repeatedly tied up the marina outside. This means I can’t go out, the close proximity of friends has been used as an excuse.

Please can I go out

But I’ve been fairly happy just watching things and occasionally twanging the bolts on the back doors.

Trees!

They have also changed the outside several times. Sometimes with trees, other times fishermen (who apparently don’t require my assistance), other times some other boats. Apparently if the weather is good, the tide right and when She’s finished her working they will be letting go of this lot of outsides. They will make the outside go up and then it will zoom away and escape. She says I won’t be allowed out for a few days as it will all be tidal outsides, so I have to make the most of things now.

Best clean my paws first

I’d best lend She a paw with her working then they can get back to moving the outside properly again.

Ahhhhh!

It’s purringly good to be back in this inside.

This post also appears on my very own blog Mrs Tilly

A Weekend Away. Breach 49. 13th 14th May

Goole to Newbridge

This morning the marina was busy. A big cruiser was lowered into the water, then backed away from the slings on the lift. It reversed it’s way out of view before an older yellow cruiser came to replace it, ready to be lifted out. Once on dry land Geoff set to jet washing it’s bottom.

Preparing to move the outside is very exciting for our second mate

With no need to be in Goole for the next few days, we decided to have a weekend away. So after doing the chores, filling the water tank, emptying the wee tank, disposing of the rubbish we untied our ropes and pushed off.

Our normal routine of me giving the bow a BIG push did not work today as the wind was coming from the wrong side. So the stern was pushed out past NB Summer Wind into the gap between pontoons. Once we’d got so far the wind then caught the bow and started to push that round enabling us to turn without getting too matey with any neighbours.

Busy today

It was busy out there! A narrowboat heading in to the diesel point at the Boathouse, David/Paul and Karl tucked into the corner and the boat formerly known as Harlequin just pulling out from the water point. We headed past waving to everyone as we left, maybe next time we pull away from Viking Marina it will be for the last time.

Wharf at Rawcliffe Bridge

It being a grey day the four miles back out to Newbridge was a little bit dull. A few fishermen to break up the long straight lengths of the navigation. I wondered what industry had been along this stretch. Two wharfs opposite Rawcliffe Marina and another a bit further on by the Sugar Mill Ponds. Now that name was a clue, but not to the industry that started on the site.

Another wharf outside Croda Chemicals

In 1838 Rawcliffe Brickworks stood on the site, the clay was dug by hand from the adjacent land. In 1873 the works were modernised and a 30m high chimney was added to the site. Rumour has it that the two clay pits filled with water in the 1870’s overnight creating the ponds. 1890 the site was sold and sugar was refined here, made from the local sugar beet. By 1900 the factory was completely modernised, but the bottom had fallen out of the sugar industry, so the factory never opened, although locals were still employed to keep the machines in working order.

By the Sugar Mill Ponds

After WW2 the factory produced glucose, closing in 1963. Then Croda Chemicals who had a plant on the other side of the village used the site for storage. By the 1980’s the site had become redundant and derelict, but since 1996 the ponds have been rejuvenated into a wildlife haven. Further info on the Sugar Mill Ponds.

Cofferdam ahead

We pulled in on the southern side of the cut, a short distance behind WB Lullabelle.

Hopefully at the end of the wooded area we will get some sunlight for our solar panels, Tilly can climb trees and we won’t be in the way of any fishing matches over the weekend (14 orders for Sunday breakfast have already been placed).

Forth time lucky!

A forth attempt at the Inn backdrop was started during the afternoon along with baking Mick a loaf of Country Grain bread and preparing gluten free pizza dough. It had been slightly chilly in the boat so Mick lit the stove, but by the time the bread was cooked followed by two pizzas it felt like we were in the middle east, even Tilly ended up sitting on the bathroom floor!

Tuna pizza

Yesterday Mark visited the breach site, the first opportunity to fly his drone safely for a while.

13/5/21

We’d noticed on our walk the other day that rusty piling had been removed from the bank and some rather long lengths of new piling were sat on the access road. Today we could see what they were being used for.

13/05/21
2/5/21

The hole in the grass has gone and there is now access for machinery on the western side of the drain.

13/5/21

Here the large piling is being put in on the drain side.

13/5/21

The size of it can be appreciated by this photo of three men sitting on one length.

13/5/21
13/5/21 Old piling left standing by the yellow digger
24/4/21

You can also see that some of the concrete (?) behind the old piling has been removed, leaving a narrower stretch of the original concrete above the drain.

13/5/21

Thank you Mark.

In other news a C&RT notice came through this afternoon saying the following regarding Selby Swing Bridge

Update on 14/05/2021:

Contractors and other parties involved in the works have conducted a site assessment and decided on plans to install a passenger footbridge. Assessment have also been made for the safe removal of the Road Bridge and these works are looking to be done as soon as possible.

Once the road bridge has been lifted the navigation will be reopened. Please expect some disruption when the passenger footbridge is installed which we are anticipating maybe for a couple of days. The expected duration of all the works involving the removal and installation of the footbridge will be 3 months.

York is going to be quiet this summer.

0 locks, 3.92 miles, 1 windy wind, 1 escape flotilla met, 6 hours! 4th go, 0 oil for the gear box, 1 loaf, 2 pizzas, 1 extreamly toasty boat.

Cramming. 13th May

Goole and Hull Marina

Cramming on the dinette table

The morning was spent sharing the dinette table. Me at one end with model crates, rowing boats and a cucumber sandwich marquee, Mick the other with the laptop, cramming for his exam this afternoon.

Originally he’d planned on taking the VHF Short Range Certification exam in Scarborough, at the lighthouse. But the building is currently closed due to restrictions, it is the club house for Scarborough Yacht Club and will reopen 17th May. Mick had been offered one of the first exam slots but he’d decided to try closer to the boat and had been pointed towards Hull Marina.

Ships

After lunch we both walked up to the station, me asking simple questions such as ‘If Tilly’s tail was on fire would that be a scenario for a Mayday call?’ No. ‘If Tilly’s flaming tail brushed against the curtains in the boat and set light to them would that be a scenario for a Mayday call?’ Yes! So the boat is more important than me!

How can I not be more important than the boat!?!

Off Mick sped to Hull whilst I bimbled around Goole. Purchase of moisture crystals and some kindling was achieved but other (secret) items I wasn’t so lucky with. But by the time I returned to the marina I was glad I was not carrying anymore weight as all my fingers were about to drop off!

Hull Marina

Mick walked across Hull to the marina, having to make a detour as most of the footpaths were closed alongside the A63. Bars were busy with outdoor seating in the sunshine.

In the preamble to his exam he was asked what an EPIRB was. Well he couldn’t remember what the letters all stood for (Emergency Position Indicating Radio Beacon), but knew that they are used to transmit a distress alert to satellites. On Oleanna we don’t have one of these.

The exam consisted of several written questions and a multiple choice section. The written section was all about distress calls, maydays, none with the scenario we’d talked about earlier. It all took about 45 minutes and out of 28 questions he got one wrong. The question had been which channel to use for Bridge to Bridge communication. Mick had assumed it would be the same as Ship to Ship, but this was wrong. We have since looked in the VHF handbook and it is channel 13, this wasn’t mentioned on the online course.

However getting one question wrong was not a problem, he passed! A rather washed out photo has been sent off to the RYA for him to get his card/certification. We now meet all the criteria for using Ocean Lock that ABP request.

A widebeam

A walk around the marina as the examiner made ready to head off out onto the Humber to do some manoeuvre training. Mick asked if there were any narrowboats moored there. The examiner pointed to a widebeam which was familiar to us, last seen below Pollington Lock in September.

Heading out onto the Humber

Walking back to the station Mick came across a vaccination centre at City Hall, on the off chance he enquired if he’d be able to get his second jab. We’ve heard of some centres offering jabs to people who turn up towards the end of the day as they have surplus vaccine to be used up, but sadly it was appointment only here. Worth a try though, it would have saved another trip next week.

STOP!

Mick’s journey back to Goole was slowed by a ship exiting the docks requiring a bridge swing, closing the road, the tug zooming off to assist somewhere. We celebrated his success with a glass or two of wine and a macaroni cheese with extras in the middle.

PASS

0 locks, 0 miles, 2 trains, 2 crates, 4 hours cramming,1 cat seeking new heights, 2.5kg crystals, 2kg kindling, 0 secret shopping, 1 toucan, 27 out of 28, 0 handbooks allowed, 1 widebeam, 0 attendance on Zoom, 1 bridge swing, 4 glasses of wine, 1 cat’s tail uncharred, 1 year since we got the house back, 1 big Happy Birthday to Frank!