Empty Horizon. 9th March

Whitley Lock to Castleford Visitor Moorings

Untangling the ropes

The bow and stern ropes got their turn in the washing machine this morning, then we pushed over to the water point below the lock. These big key of power Yorkshire locks have traffic lights, nearly always on amber for self operation. If there is a lockie on duty then you get red and green lights too, but along this stretch this is a rare occurrence.

As we tied up to fill with water Mick pointed out that there was no amber light, in fact there was no light at all! Had a bulb gone, or was there something more serious wrong with the lock? It had been working yesterday as a boat had come down and one gone up. Once the tank was filling I walked up to see what was what.

NO lights!

Key in the panel, I turned it clockwise. No lights, the sluice that keeps the lock full when not in operation was up, normal, but usually on turning the key any open sluices close, then a light illuminates saying the lock is ready. Nothing happened. I pressed a few buttons. At the top there is a fault light, even this wasn’t illuminated but I looked for the ‘instructions below’. Only instructions on how to use the lock in normal situations and the emergency phone number, good job the fault light wasn’t lit! I went to remove my key, a good original BWB key, it was trapped and wouldn’t turn. I called Mick, he’d call C&RT and let them know.

Float and other keys were removed from the one that was now trapped. I walked to check if the light at the other end of the lock was lit. NO, nothing. I returned to Oleanna to discus what to do and await a person in blue. Except as I got nearer to the boat the traffic light came on, amber! There must be power. Back up to the panel, my key would release now. I tried the buttons, the lock would empty and then the gates would open. I called Mick, he then called C&RT to stand them down. It must have been a power cut, thinking about it later the hand dryer in the toilet hadn’t worked either, power cut.

Too big for Oleanna

Up the lock, Mick fishing out one of the biggest fat fenders we’ve come across. The god of the Yorkshire waterways was being a touch too generous. We could think of instances when such a large fender would come in handy, but just where do you keep something SO huge? The roof? We left it on the bank, I suspect the original owner will pick it up when it’s spotted.

Passing under the M62 I waved in case our friend JG was passing overhead. When ever we see him he asks about Whitley Lock, maybe one day we’ll coincide with him there. A mile further on we pulled in at Whitley Bridge, tucking in on the end of the moorings. Our planned cruise still had another three hours and it was just about lunchtime.

A mile down the road there is a shop, a visit was required for a Saturday newspaper and some alternative cat food. Since moving back onboard Tilly has decided that pink poultry food isn’t to her liking and after a week I was getting concerned that she had taken my comments about being an extra 100grams heavier this year to heart. Fortunately the shop also sold pink fishy flavours, our first attempt at getting her to eat before trying blue or any other coloured cat food.

Boats rusting away

The sky line here is very different from when we first cruised these waters no Eggborough Power Station that used to dominate the horizon. The old site of Kellingley Colliery sits abandoned, a few diggers but nothing much happening.

Old big boats take up the offside moorings at Bank Dole Junction. The lock here is closed due to a build up of silt down on the River Aire. We turned left heading to another landmark of my youth, Ferrybridge, all cooling towers now stolen from view.

The visitor moorings were filled with various cruisers that seem to have taken up root with their possessions’, across the way a narrowboat looked like it was settling for the day. I hopped off to operate the lock (a fall of a foot currently), while Mick chatted to the other boat who had just decided that there would be nicer places to moor further on. The two boats sharing the long flood lock.

We’d just left the lock when a lady appeared behind us, key of power in the panel and pressing buttons here there and everywhere. The gates reopened behind us, a boat must be coming down stream. We slowed our progress when we saw it coming at quite a lick under Ferry Bridge. I’m glad we’ve done the tidal Thames as the wake this boat left was nearly on a par with that from an Uber boat.

John Carr’s Ferry Bridge from under the A162 road bridge

With no cooling towers to marvel at the landscape of the River Aire is now bland, brown and bland. No curves to catch the light, maybe one day someone will come up with a new purpose for cooling towers and we’ll start building them again. The last three towers had originally been kept for a future gas-fired power station, but were demolished 17th March 2022.

A queue!

NB Nee Nah was quite a distance ahead, only visible every now and then on the meandering river. Cold was starting to set in, inside the cabin would be nice and toasty, Tilly oblivious to the efforts we go through to find her interesting outsides to tie up. Round the last bend of the river we could see Bulholme Lock, there sat NB Nee Nah and another narrowboat, their crew already emptying the lock. Would all three boats fit? We hung back in case, also not wanting to barge in ahead of the first boat. They waved us in.

The three boats tucked in with room to spare and rose up the lock. Would there be enough room for us all to moor? Mick offered to breast up with the original boat should the need arise. Two spaces were visible, we headed to near the coal shoot, NB Nee Nah opting for the first space near the lock. The last boat came past just after we’d moored. Plenty of git gaps! Hope they found somewhere.

Too late for Tilly shore leave. A batch of shortcrust pastry was made up and left to rest in the fridge for an hour. A leftover roast chicken, tarragon and feta pie (minus the leeks) was made accompanied by jacket potatoes. Very nice it was too.

3 locks, 10.8 miles, 1 wind, 1 left, 1 full tank of water, 4 clean ropes, 12 pouches 1+ fishy pink food, 1 bowl devoured, 1st sock of 10th pair finished, 1 big pie, 2 jackets, 1 big river section done, 15.5 fingers and 4 paws crossed for not too much rain in the coming days, 23:45 when the genny across the way stopped!