Happy 8th Baseplate Day! 14th February

Well today marks the 8th anniversary of Oleanna’s baseplate being laid in Tim Tylers workshop in Newcastle under Lyme. It was another year and a bit before we finally moved on board to cruise her down to Crick to meet with Lillian and fully move onboard.

Mick stood at the stern 58ft 6 inches away, 8 years ago

If you want to look back and see Oleanna’s build this is a post from our first visit. Her story starts much earlier so here’s a link to the first Oleanna blog post, 1948 blog posts ago!

Currently we are gradually getting ourselves ready to move back on board, the date still a little bit up in the air.

Sunday in the Park with Mick

Mick went down to check on Oleanna on Monday. A chat with the bully boy batteries went well, the newly oiled floor had cured so the back steps could go back in. I’ve been busy covering new and old dinette cushions and today we should receive new cartridges for our life jackets, which are currently still inflated in a closed room well away from cat claws.

The world of canals and rivers is keeping us on our toes as regards to stoppages at the moment. There is a silt build up on the River Trent which needs dredging between Beeston and Cranfleet locks. The coal boat had serious difficulty passing that way a week ago and was having to wait for levels to rise again before attempting to return to base. Since then the Trent has gone back into flood.

Can we start packing yet?

The Don Doors on the New Junction are having issues with their gearbox so are closed to the canal currently. Even if we got past them Vazon Sliding Bridge is closed to boat traffic until mid March whilst strengthening works are carried out to the north canal wall.

However we’d planned on crossing the Pennines. The Rochdale, Lock 67 is suffering from subsidence which will be worked on next week. Lock 65 is also showing similar signs and will be looked at next week to see what should be done.

Round 1

The Leeds Liverpool has a navigation restriction near Burnley, Embankment 39, so it is still navigable. Works at Wigan have been slowed by the weather so the closure there has been extended by a week so that concrete has more time to go off, the concrete has as yet to be laid. Problems near Foulridge Tunnel seem to have been sorted.

Round 2

Then the Huddersfield Narrow and Broad. There are bridge works and a lock closure on the Broad along with repairs to a wash wall which should be finished mid March. On the Narrow locks on the east side are closed until the end of February, then there is a closure in Stalybridge which should open mid March.

Round 3

So at the moment the Leeds Liverpool is looking the most promising, followed by the Huddersfield canals. Further south there has been a substantial landslip on the North Oxford near Brinklow. We’d planned on heading southwards this way, but we strongly suspect it will take a while for this to be sorted so will have to head southwards through Birmingham. Or do we wait for the Trent to be sorted and out of flood then high tail it south along the Leicester Section?

Who knows! We’ll wait and see what is open when we set off.

Thank you Beth

In Sockathon News I now have sponsors for 29 pairs of socks and have raised £655 for Dementia UK. Pair 7 will soon be finished. I now have a very large box of yarn donations sent in from all over, details of which are on the Yarn Donations page. There are still a few more people who have pledged yarn donations so they will be added as yarn arrives. I think I may be knitting for a few years to use it all up! If you fancy a pair here’s a link to my JustGiving page

  • Thank you Debby for becoming pair 30!
My friend Morag looking across the harbour

0 locks, 0 miles, 8 years old! 4 routes from the north closed, 1 bathroom delayed, 1 best mate visit, 2 lodgers, 1 fair weather cat, 2 opticians appointments, 2 doctors appointments, 1 vets appointment, 1 gathering, 1 leg of lamb, 2 boaters nearly ready.