Monthly Archives: November 2021

Panto Postcard 6, 2021

46.75 hours

Sunday. What a lovely day off spent with family. Finn the feline version of a silver back was first to say good morning to me, I was honoured as he rarely makes his way upstairs. Then Ziggy made sure I had enough feline attention by sitting on me and demanding I leave the crochet blanket alone to give her plenty of chin rubs.

Family!

The day was spent chatting with Andrew and Jac followed by an early lunch. A joint of lamb with plenty of vegetables and masses of cauliflower cheese. All was very very yummy and just what was needed to refuel me for the journey back to Chippy. I even got to take a generous doggy bag back with me!

Google had been good on the way to Hackney with it’s timings, I aimed for an earlier bus than suggested, just missing it. Then with the volume of people at Paddington it was slow going getting up into the station, I was there a minute before my train departed, but there was no mention of which platform, so I missed it! A change of route however got me back to Oxford in time for a bus back to Chippy before they became hourly.

Just a bit of prop veg

Monday. Jo returned with a mass of giant prop veg. Those turnips nearly looked good enough to eat and her leeks made from yoga mats were a triumph! We were joined by Tim for a second day helping to work the way through the remainder of the prop makes.

The Cotswold Thunderbolt

The local BBC reporters came to film us getting ready to open the show. A few interviews were recorded and then Ash and Gav got to wheel the cannons across stage at speed, which of course was the bit that was used.

I know how to live!

The dress rehearsal from Saturday was finished off, followed by a full dress with another set of Pippins. This then left the evening to do work. I decamped into the bar and spent several hours sewing velcro onto ribbons, sadly the bar wasn’t open!

Tuesday. More fairy lights went up in the auditorium and we were joined by the ushers for the final dress rehearsal when photos were taken. There were still notes to work on and the show was running a touch too long for days with two school shows. Whilst cuts were discussed long into the evening glittering happened in the auditorium, adding that bit of eco sparkle to the show.

Drying leaves

Wednesday. I spent all morning in the land of latex glue. The auditorium needed a good leafing. I got into my stride with three plastic bags where leaves could be glued and left to dry as I stuck the driest onto the balcony fronts. The morning soon disappeared and it was time to clear everything away as we had two previews.

Audience!

The first preview was filled with a school and a group of about 30 adults. Sadly after a couple of songs a fault developed with the sound so the show had to be stopped as nobody could hear the music. People ran round to find the fault and ended up replacing a faulty cable which seemed to do the trick. But by the time we were ready to start again there was a very long line of kids waiting for the toilet! The delay of around twenty minutes meant that the schools bus would arrive before the end of the show, so it was decided to get to the song sheet and then say farewell to the kids, the adults then more than made up for the lack of bums on seats whilst the show finished.

Rudi and Rapunzel with the portrait

The second preview went much better, even the cannons did their best to impress and soak! The old Producer Will was in to watch, which was lovely as he put together the team and contracted us all before he left to go freelance.

Still my favourite set

During the show I realised what was missing from one of my sets. The interior of the tower had been bothering me, it was because it didn’t have any panto shadows. So the set was put on stage ready for some attention first thing in the morning.

Almost finished England on the Wold

Thursday, I was just about first in. Shadows painted before the cast arrived to work through the cuts that would be put in today. I had a few more notes to do before having a really good tidy up. Paints were labelled and stored back in the shed. The model was removed from the model box of the theatre, I keep a few bits as mementos but the rest has served its purpose so just ends up in the bin. All my possessions were collected together and piled up in the shower, the only place left in the building with space!

Just a few more leaves were added and the very last one recorded for posterity. I used a few leaves and added strawberries for my first night cards, the remaining ones were all packed up and put in the attic for someone to find in years to come. Out of the 3588 leaves I’d cut for the show I think I had about 900 left and if I’d had one more day I’d have used them all up.

In fact it’s loads of scaf clamps

At bang on 4pm I got a message, Mick had arrived in Chippy! A hire car had been picked up this morning in Scarborough. The car was loaded and the shower made available to the cast again.

Notes

The evenings performance was a socially distanced one, only 65 in the audience, but they all seemed to enjoy it. Maybe it was because there were lots of the team in as it was our last evening. Mick enjoyed the show and I was especially pleased that the Pippin team on tonight included my favourite, she tends to steal the show when she’s on stage.

Time to say Goodbye to panto

After the show I joined the rest of the team in the stalls for notes. This actually was more of a goodbye to many of us who’d be leaving tomorrow. Tiredness and emotion took over a touch for me. After spending almost 18 months talking about the show and the design having been worked on for a year, there it was on the stage in front of an audience. We were all back doing what we love and sharing it with an audience. I’d avoided going to the pub for four weeks and kept my distance, worn my mask for eleven hours a day (sometimes more) but now hugs could not be refused.

Yum!

Time to eat. Only one thing I could eat, and that was fish and chips at the Blue Boar.

Chipping Norton is where Bagpuss resides of course

Friday. No time to sleep in, there was more to pack in the car and time to say goodbye to Suzanne. Thank you once again for my Chippy Panto home.

Festive breakfast/lunch

Then we were on our way heading northwards. We paused to pick up some breakfast at Leicester Forest East Services. Last time we’d stopped here was when we moved NB Winding Down from Elton Moss, on that occasion we’d had three weeks of boat life and were deafened by the chairs in the dining area being scraped on the floor. Sandwiches would do us today.

There she is!

We turned off the M18 at junction 6 and wove our way through Thorne to reach Blue Water Marina. There sat Oleanna tucked in with her new friends, a few with familiar names about the place.

It’s been strange not being able to go home to the boat whilst working on panto this year, my life having developed a north south divide! So it was good to see her in her winter home. Time to collect a few things I would want before it was time to say Toodle Pip to her for the time being.

Drax

The rest of our journey back to the house was filled with autumnal scenes up over the Wolds. Drax the only power station in the area still with it’s full compliment of cooling towers was busy working hard.

Yes it is me, I’m home now!

Sat in the bay window on our return was Tilly. I got a bit of a telling off to start off with but she soon remembered that I give better head nudges than Mick. Well first you’d gone and left me, then Tom did too! He’d even left me with the magic food bowl which had only popped once! I’d got bored of waiting for it to pop again. I was soon pinned down to the sofa by Tilly, Mick gave me a glass of wine and I caught up on Bake Off again.

Pinned down

Three weeks ago on the day we moved Tilly back to Scarborough, we were contacted by the SJT regarding a lodger for 6 weeks next spring, hopefully our first of several. So this year we know when we’ll be back on Oleanna, well hopefully if the plague doesn’t get out of control!

Protecting the bench

This does now mean that unless there is something boaty to write about, the blog will be going into hibernation again, hopefully not for as long as last winter as we’ll be back on board before C&RT’s winter maintenance is finished. In the meantime we’re working on a few new things to be included on the blog.

Now where’s that stoppage list gone?

for now

0 locks, 0 miles, 1 missed train, 1 huge leg of lamb, 2 feline cuddles, 4 last days, 2667 leaves stuck, 21 leaf cards, 6 ribbons, 1 last night visit to the pub, 1 Oleanna visit, 1 ikea bag of stuff, 1 shouting cat, 1 warm lap, 1 designer pinned to the sofa, 1 panto opened, 1 Pip taking it easy for a while.

Panto Postcard 5, 2021

72 hours

Sunday, a day of rest all round. After spending nine hours leaning over painting the floor I needed to check I could still walk. After a bit of a lie in and breakfast I headed out for a walk to get some food. I walked up to Marks and Spencers Food Hall buying a pie and some stir fry vegetables, along with some other bits and bobs to keep me going.

Which one did I buy?

This coming week I would more than likely be trying to paint things with the lights going on and off so I popped into Mountain Warehouse to buy myself a head torch. In past years I’ve ended up borrowing someone’s, but that wouldn’t be possible with covid around. I had quite a choice, narrowed it down to two, then one.

Feet up, baking and crochet

Much of the rest of the day was spent lying on my bed with my feet up. A couple of colours were added to my crochet blanket and two episodes of Great British Bake Off were caught up on. Once I’d watched Dr Who it was very much time to go to bed.

Cinnamon buns

Monday. Ed the sound designer joined us, checking the system and making sure the actors on stage would be able to hear Barney the Musical Director as well as him being able to hear them. Will the Lighting Designer focused lights leaving me with just my head torch behind the backdrop.

Most of the scenery would pass by now, still finishing touches needed, but most of that could now happen in breaks when the lights were on. So I turned to smaller things, the bunch of parsley. The Designer arrived and had changed her mind how this should look! She doesn’t always get in the way, but today she insisted that I start again!

The other major thing that required painting was a portrait of Gothel the witch. I’d been hoping to catch Amy in costume at some stage before now, but had missed her on Saturday. Luckily she had taken some dressing room selfies of herself so I was able to use one of those. I’d been wanting to do a version of the Mona Lisa, it took a while to get her arms not looking stumpy.

Back in Scarborough the roofer returned. The old gutters were replaced and the mass of down pipes moved to nearer the ridge of the roof, hopefully meaning that the water will spread across the roof and not just be a torrent down the corner of the house. The bill for the work turned out to be more than the chap had said, we thought his quote had included scaffolding, but now that was an extra £300!

Still a lot of detail to add

Tuesday. Sound check day, I wondered if Gavin could actually count past two. Barney was moved onto stage. Trying to give him enough space for all his kit, keyboard, headphones, peddles, squeeze box, microphones, cameras, monitors as well as be able to change the scenery in front of him all took time.

Fairy lights going up

Gemma returned and set about adding the fairy lights to the portals, I’d hoped someone would take this on. Due to a lot of previous layers on the portals we wouldn’t be able to push the lights through from the back, this is by far the neatest way. Instead they were cable clipped onto the front, it was quite fortunate that I wanted to cover the surface with thousands of leaves. Once the lights were up Gemma started sticking the greenery up.

Just about finished

Out in the garden Jo was busy with the big cannons. She’d had a brain wave overnight and done some research, I could assist with my boaters knowledge of amp hours and batteries. I got on with the final pieces of scenery, the cucumber sandwich slidders, all the time gradually adding more paint to Gothels portrait.

Wednesday. Mick caught trains down to Thorne, not as easy to get to as Goole was. On Saturday he’d not been able to meet up with any of the marina staff and by the time he arrived it was getting too late to winterise Oleanna. So he introduced himself to Sarah, received the marina rules and handed over some money. The mooring here is a touch more expensive than it was last winter in Goole, but it does include an amount of electricity in the price.

Diddy damp trap

Mick emptied the damp traps, refilled them with new crystals and positioned them around the boat. The water was turned off, the system drained and the shower head laid in the shower. Cupboards were opened up to help with air circulation and the Alde boiler was set to come on when the temperature drops to 3C, a few degrees lower than last winter.

A panto must at Chippy

Time for the technical rehearsals to start in Chippy. The sweet chest had been tracked down, it had been sold off at the last Panto sale by mistake! The new owner will have it replaced with a chest that isn’t so important to panto.

Waiting to start

Last night lighting states and sound levels had been programmed into the boards for the first part of the show, today we’d add the actors, costumes, scenery and props. Teching can be a slow process especially when there is SO much going on. Visual gags and luminous lettuce kept us all amused.

Lettuce!

Thursday, more technical rehearsals. These days I spend watching, taking notes, helping solve any problems. But I’d also decided that baby Rapunzel needed to have a crocheted blanket! Yes we could have gone out and bought one, but it would have been hard to find a good one to match the show. Instead Jo supplied me with some green yarn with gold flecks and I borrowed a lamp so that I could see to crochet in row G whilst I wasn’t needed. In breaks more leaves were added to the portals and Gavin’s feet! He seemed to have a homing instinct to them whilst the latex glue was drying.

Friday. The Cotswold Thunderbolt was erected on stage and we had chance to add the rigging. A chap called Tim joined us to help Jo work on props whilst we continued with the technical. We worked our way through Act 2 until the actors ran out of hours. Then it was time to dry tech the ending of the show.

Wide ribbons had been made up by Valerie a local volunteer, Jo had fibre glassed the giant strawberry which was flown out. With big clamps to temporarily hold ribbons to the balcony fronts we tried out the ribbons and raised the strawberry. This all worked. We then dry teched the end sequence (without actors), it all slotted together as planned! High fives all round.

Saturday. Today we should have been doing the first of three dress rehearsals. Each team of Pippins get to have a dress, but we still hadn’t teched the end of the show with everyone, the five minutes was likely to take about two hours! So in the morning we did a dress rehearsal of Act 1. Imogen my work experience joined us and did her best to cut leaves to decorate the pram whilst sitting in the dark. We then positioned ourselves in the balcony to release the ribbons several times as we finished the technical.

The strawberry, Gemma and Dash

Then followed a busy afternoon, trying to tick jobs off the list, painty jobs that could dry before actors returned in costume. I’d set myself an alarm and at 5:30pm it went off, time to wash brushes, get changed and head to the correct bus stop and leave Chippy for a night away.

Gothel green

This time I was heading to Hackney to see the London Leckenbys. Google suggested a route, S3 bus to Oxford, grab something to eat at the station, a train into Paddington, Bakerloo line then Central line followed by the 388 bus to Hackney Wick. A busy journey but not as alarming as the one to Doncaster had been two weeks ago. Unfortunately I got off the bus a little bit early so arrived about five minutes after I should have, but still before 9:30. Cheese and wine on my arrival with a guided tour of their new improved house, before sinking into bed in what used to be Josh’s room.

0 miles, 0 locks, 5 trains, 2 buses, 2 tubes, 7 tech sessions, 0.5 dress, 6 lateral flow tests, 1 head torch bought, 1 head torch misplaced after 3 hours! 1 boat winterised, 1 portrait, 1 pram, 1 MD squeezed in, 1 backing flat squeezes out, 1 asm, 1 blanket to make, 1 more long week to go.

Panto Postcard 4, 2021

Apologies, as this will be a short postcard this week, so I’ll stick to last Saturday as that was a very busy day both here and up North.

Mick was up seriously early and on a train at 5 something silly o’clock, he was heading to Goole to try to make the most of what hours of daylight there were. I on the other hand had a little bit of a lie in, well it was going to be a long day for me. Between the two of us we spanned 23 hours.

The curtain going sideways on Act 2

At Chippy Theatre it was time for us to be joined by Will Burgher the Lighting Designer who came in to watch a run of the show. The Pippins were also in and the three teams took it in turns to do scenes. Minimum scene changes happened so it was a little bit hard for me to make notes on what I still needed to work on, but it was good to see the show from start to finish.

I think it was Thursday that I’d received a message from Ann Marie and Dave from NB Legend, they had pulled up in front of Oleanna. We’d hoped our paths would cross earlier this year around Trent Lock, but we were just a bit too quick in passing on our way down to London. Legend has been down the Trent visiting all the off shoots, Boston, up the Chesterfield and when they came off the river at Keadby they had headed on up to Sheffield. We actually thought our paths might have crossed at Bramwith Junction a week or so ago, but due to Oleanna being poorly that hadn’t happened. Instead the boats met in Goole and they helped to keep an eye on Oleanna from the bow whilst Wendy and Martin kept an eye on the stern.

Mick arrived in Goole at 8am and cycled the mile to Oleanna, there was time for a cuppa and a catch up with Ann Marie and Dave before he needed to be on his way.

Heading west

By 9:30 the pram hood had been dropped and Oleanna was winded to face west. Mick waved goodbye to Goole, NB Legend and WB Lullabelle most probably for the last time this year and headed out through the caisson.

The breach site

He motored on along the long straight passing the breach site and on to Sykehouse Junction where we turned left onto the New Junction Canal. This had been planned to happen three weeks earlier and Bridget and Storm had kindly offered to come and operate the bridges for Mick, but today he was going to single hand them.

Some are lift bridges

Now when I operate lift or swing bridges I keep a tally of how many vehicles I hold up. Admittedly I’m not single handing, trying to work the bridges as quickly as possible to hold up as few vehicles as possible, but I was a touch disappointed when Mick told me he held up ‘a few, not many, but a few’! That’s no good for the numbers!

Approaching Sykehouse Lock, is that a green light?

He worked his way along through the first lift bridge. As he approached the second bridge Kirk Lane Road Swing Bridge he thought he could see a green light at Sykehouse Lock. But at distances the lights can be a touch confusing and once he got that bit closer it was most definitely amber, self operation. I’d passed on my knowledge of this lock to him as there is a swing bridge over the centre of it and to be able to operate the panels at either end you need to insert your Key of Power into the panel by the swing bridge and open the bridge to the canal before either of the gate panels will work. However as he approached the amber light turned to green, there is an enthusiastic volunteer who can quite often be found at this lock and today it was Mick’s lucky day. The lock was set and waiting for him, he didn’t have to step off the boat once. Thank you.

By 1pm Oleanna had passed through the last of the six moveable bridges. Ahead lay the Don Doors, two guillotine gates that can be dropped when the River Don goes into flood stopping the river from backing up along the canal from the aqueduct. Earlier in the week I’d seen the River Ouse in flood so there was a possibility that the Don was high, but thankfully not high enough for the doors to be closed.

Don Doors in the distance

In Chippy by now we’d finished the run. The show was running at a half hour too long, some trimming would be needed, there is nothing worse than an over long panto, yet Rapunzel hadn’t felt too long. Dash headed home to work out what could be cut over the weekend.

Notes after the run

Reaching Bramwith Junction Mick battled a touch with the wind to turn the sharp left to Bramwith Lock. Sadly no help on hand here so the ladders were used to get on the boat once she had descended. By 2:30 he’d passed through Bramwith Swing Bridge and was on his way to Thorne.

This left Thorne Lock with it’s swing bridge to do, all operated by the Key of Power, well apart from the road barriers that are manually swung into position. Then it was the renowned Princess Royal Swing Footbridge.

Don’t Look!

Mick moored up and went to operate the bridge, he followed the instructions to the T, but the very particular barriers on the far side got the better of him! Two barriers pull out and lock into position, you then cross back over the bridge and pull out the barriers on the control panel side. This means that unless you are as skinny as a heron you cannot get back across the bridge to wiggle the far side barriers to encourage them to locate properly. Fortunately a local came along and knew what to do. The bridge opened, Mick brought Oleanna through and another local closed the bridge and returned the key to Mick, handy as the bridge landing on that side has deteriorated so much it would have been just about impossible to get off Oleanna safely and tie up.

Oleanna’s home for a few months.

Not much further on they had reached their destination shortly before it got dark. Mick turned Oleanna into Blue Water Marina, her winter home this year. We’d hoped to be able to return to Viking Marina in Goole, but Laird had no room for us, our mooring from last winter now occupied by a go faster cruiser. Mick secured Oleanna to the short pontoon that we’d been allocated, closed her up and headed to the station. Today’s mission was accomplished, winterisation will happen on another visit.

Back on stage the technicians spent the afternoon adding more lights, they were meant to be focusing the lights on stage and then moving to the front of house bars handing over the stage to me to paint. I got myself ready with pots of paint, brushes on sticks and the model to follow. We were all in a position for me to start painting a little later than originally planned, they carried on working in the auditorium until I’d painted too much of the stage for Will to be able to play Hopscotch anymore.

The stage flooring was recently resurfaced which should have made for a nice floor, but somehow the boards were laid rough side up, this made the painting of washes quite a bit harder than it should have been. When Ash left at 11pm I thought it might take me another four hours to finish painting the floor and get two coats of glaze on it, but time just evaporated.

Once the washes were complete I stopped for something to eat, then thankfully enough of it was dry for me to add green hedges, the heating in the auditorium having been put onto it’s highest setting to aid the drying. Next came white and purple for a touch of floweriness. Gavin hunted round for several fans to help with the drying and by 3am I was applying the first coat of glaze. This should have had two hours before the second coat was applied, but by the time I’d finished getting into all the nooks and crannies it felt dry enough to walk on. The second coat went on in 18 minutes, the roller sleeve was left in a bucket of water to be cleaned out properly on Monday and I was out of the door just before 4:30am.

Floor finished

A long day for both of us.

3 locks, 17.6 miles, 9 bridges, ? held up, 3 lefts, 1 lockie, 2 helpful locals, 1 winter mooring reached, 2 weeks late, 1 run, 30 minutes too long, 1 hour late starting, 9 hours of floor painting, 2 coats glaze, 4:30am, 1 pooped Pip.

Panto Postcard 3, 2021

61.25 hours

My planned escape back to Oleanna was very nearly thwarted. I left the theatre with ten minutes to reach the bus stop I have used on a Saturday night to get to Banbury in the past. I glanced at the time table only to discover that the last bus to Banbury did not stop at my bus stop, it was a fast bus. Two minutes later I saw it pass the end of the street! I called the taxi company that had ferried me back and forth last week and pleaded with them to help me. Thankfully they had one driver who wasn’t booked up all evening and he’d just returned from a break. I was soon back on track but £25 worse off.

What a journey!

The first train to Birmingham New Street was very pleasant and roomy, however the next train was packed with singing shouting Barnsley football fans. Luckily I had a reserved seat, well three in all for my journey up to Doncaster as I’d bought split tickets. I sat wincing every time the next round of songs was shouted around the carriage. I wore my mask hoping it would keep any possible virus at bay, not just for me but also the whole panto cast on my return. Eventually the carriage emptied out and things became quieter.

Mick was at Doncaster station to pick me up in a hire car and whisk me back to Goole so that I could surprise Tilly. She was so pleased to see me that I wasn’t allowed to stop stroking her until it was time for bed.

Sunday. What a horrible morning! We’d been hoping to move Oleanna today, the alarm had been set, but the sideways rain was so not conducive to seven hours or so out side to get her along the New Junction Canal. So instead Tilly got to come and go, using the hire car as shelter and we had a cooked breakfast. Hooray!

I actually needed a quiet day as I was really rather pooped. Mick headed off to buy some Puppy Training Pads whilst I did very very little. It was so nice to be back at home with my two favourites cosy in front of the stove.

Hello Martin and Wendy!

Yesterday Mick had discovered that the boat moored behind us was Martin and Wendy’s Lullabelle, we’d escaped Goole with them back in May. Lullabelle is part way through having a repaint, Martin had spotted Oleanna though. They have spent the summer months pootling about on the Ouse, up to Oxclose Lock which was closed and down to Naburn. They then headed back to Selby, had a trip round Trent Falls on Sea Maiden ( another Escapee) and Lullabelle was one of the first boats to get through Selby Swing Bridge when it was finally removed to be mended.

Monday. Time to pack things, the main one being Tilly. Our original plan had been to return to the house on Sunday, have a day for Tilly to settle down with me being around before I headed back to pantoland. But there had been a misunderstanding with one of our lodgers who’d decided that she was not leaving until today, she’d also said no to Mick dropping in to pick up Tilly’s Cat Caravan. Her show was moving on to Newcastle so she wanted to avoid any unnecessary contact, we respected that but were a touch miffed that she’d been confused at us wanting to return to the house on the Sunday when that is when she’d booked the house til!

I don’t see why I couldn’t have stayed here!

Anyhow, we packed the hire car. Fleur the Company Stage Manager in Scarborough had lent Tilly a Cat Caravan, which she wasn’t too pleased about. Also what was it with those Puppy Training Pads! I’m not a puppy and I certainly don’t need training! Our drive back to Scarborough involved two stops to refresh the puppy pads and after about half an hour Tilly seemed to be calming down a touch, maybe helped by the Pet Remedy, or just that she was getting more queasy. Poor poor Tilly! It was a relief for us all to reach the house.

Once Tilly had been cleaned up I didn’t bother restricting her to a room at a time, so we both checked round the house, Tilly more vocally than me! She definitely knew where she was, Yes, Scarboreugh! Our lodgers through the summer have ranged from being awarded 11 to 5 out of 10 for how they have left the house. A spare clean sheet for our bed would have been nice, but that was soon sorted.

Shoes from down the road has been making himself known to our lodgers and came peering in through the kitchen window only to find that Tilly had returned and that we would not be a push over. Stupid Cross Eyed Cat!

Having people live in your house means you get left with things, the garlic will get used, but I think we now have a touch too much malt vinegar! The rest of the day was spent doing washing, unpacking and making lists. Followed by fish and chips from Cappleman’s.

Sunny day

Tuesday morning and it was time for me to pack my bag again. Mick gave me a lift to the station, Scarborough was wonderful and sunny, such a shame to spend the day on a train. Mick headed back to Oleanna to pick up more things and check in with Martin and Wendy who would be keeping an eye on her for us for a few days.

My first train was to York where the River Ouse was in flood, right up to the level of the Museum Gardens, so no boats were moored there. I changed trains to a direct one to Banbury which followed parts of the canal network and rivers, the Soar looked really quite full. Back to Chippy on the 488 I stocked up with some food and went straight into the theatre.

The town square almost finished

Final preparations were taking place for publicity photos so we tweaked a few things whilst the Dame tweaked her padding. Lights were focused onto stage and then scenes were run for the photographer. Meanwhile I carried on painting behind the backdrop.

Final adjustments

During the afternoon news came through that one of the Pippins had tested positive on a lateral flow test today. The Pippins had all been in yesterday after school for a couple of hours rehearsing with the adult company. PCR tests were arranged for the company and anyone who’d been in close contact, it looks like I’d chosen a good day to have off!

Things getting nearer to being finished

Wednesday. The theatre was a touch quiet today with the majority of people having gone to Banbury for a test. The test centre where they had been booked into via the NHS had closed three weeks ago! Luckily their appointments were honoured at a drive through test centre not too far away. Doors and windows were kept open and everyone wore a mask all day long.

Socially distanced production meeting

More painting, nearly everything has a coat of paint on it now. Despite rehearsals going on on stage I can beaver away behind the backcloth quite happily. We had a production meeting at lunchtime. We collected in the bar and were joined by other members of the team via zoom. A laptop was pushed around the bar for people to give updates on their progress and bring up any problems. The main problem we have is that The Chipping Norton Theatre sweet chest, which has been in every panto that people can remember has gone missing! If you happen to know of it’s where abouts please let me know in confidence.

Thursday. Back in Scarborough we finally had scaffolders arrive. This is so that a roofer can sort out the roof where we have developed a roof garden which is letting a lot of water into the house and is possibly the reason the kitchen sockets have been tripping for the last few months.

That looks like a good climbing frame!

Mick added two containers worth of our solid deposits into the compost bin in the garden. The garden waste and our deposits from earlier in the year had almost totally composted down, this will be left until next year before it is used somewhere in our garden.

A pouch of plenty!

In Chippy rehearsals continued, the Pippins joined via zoom this evening, Dash (the Director) showing them where he wanted them to be in certain scenes. They also got to meet the Musical Director who joined us, Barney. Some singing was done over zoom too. It’s great that such things can happen keeping everyone involved with the show. By the end of the day everyone’s PCR results were in, only the one Pippin having tested positive, thankfully she hadn’t passed it on to anyone else. We all continue to do daily lateral flow tests.

Second coat of emulsion before the arty stuff goes on

I was called over by Dash for something important, he needed to give me plenty of chocolate to keep me going through the evening. Working for him is a touch like having a fulltime Dame in the room, and today I got most of the sweeties! A fresh coat of paint was added to the floor before we all left for the night.

First frost

Friday. Blimey it was chilly this morning, fitting for it being Bonfire night. Rehearsals continued, eleven out of twelve Pippins returning to the theatre.

I started putting finishing touches to several pieces of scenery and ended up the day drawing out the floor in paint in preparation for painting it over Saturday night into Sunday morning.

In Scarborough the roofer arrived and Mick got chance to see the roof where the problem was. The roofer wanted us to replace the slates with concrete tiles, but that wouldn’t be right for the house. He also wanted to redo the whole of the roof over that part of the house. Mick declined his kind offer, we just needed the roof to be good again and the rest of it seems to still be in good order. Thankfully the timber is just wet and not rotten. The chap will return next week to sort out gutters and reroute down pipes with the hope that the problem will not recur so that everything can dry out. We now need to find a plasterer to redo the kitchen wall, I’m not sure my dabble with plaster last winter makes me qualified enough for the job.

0 locks, 0 miles, 2 windy, 2 wet, 2 nights on board, 1 cat transported to the house, 4 trains, 1 hire car, 0 clean sheets, 5 out of 10, 1 tart, 1 Tilly tree climbed, 3 bottles Sarsons, 1 positive, 2 known neighbours, 1 not too lonely Oleanna.