Category Archives: Narrowboat Life

Paddles Up! 27th June

Cow Roast Marina to Pixes Farm Bridge 146

Final load of washing on whilst we had breakfast, most of this got a turn or two in the tumble dryer. By the time it had all finished the post still had £8.03 on it. Not bad.

Fresh blacking

The bow post hadn’t fully cured but the fenders had to go on, it’s not often you can get this close to the pointy end without having to hang over the gas locker and that doesn’t appeal to either of us. The button was put back on and then Mick tried to work out how to attach the new fender underneath.

New fender below

It seems to want to hang a touch more vertically than horizontally. Mick tried shackling it in a different place but this seemed to be looser, so we’ll see how this arrangement works, we just want to stop biffing as we go up in locks.

Whilst this was happening outside I was unpacking the summer clothing bag, with temperatures expected of around 30 degrees on Saturday I wanted my shorts out. Bulky winter jumpers were popped in the vacuum bag ready to be compacted and hidden away for the next few months.

Wayne

Wayne in his Lemon van arrived a good twenty minutes early for our delivery slot, one substitution and unfortunately a hole in the bag of rice flour. I’ve asked for a refund and popped the bag in another bag. With gluten free ingredients replenished I can make bread again.

Full complement of flours again

Once the water tank was topped back up, rubbish taken to the bin and the marina gate fob returned to the office we were ready. Mick gently nudged us backwards, instead of fending off at the front I pulled us in towards the boat next door trying to get as much turn as we could before the stern met the concrete edge behind. Finally we were free and back out on the canal.

That’s a big one

Cow Roast Lock was being emptied so we pulled in to wait our turn. Walking up to the lock I could see that it was a huge widebeam going down, taking their time not to hit the bridge with their wheelhouse canopy. They got back onboard, leaving the gates, was someone waiting to come up? Or are we now south enough for southern cruising ways?!

Studs

Two boats were waiting, phew we’d not spend the next few hours closing gates at every lock. The gates at Cow Roast have been replaced, somehow new huge baulks of oak catch your eye more than old painted ones. Here the usual roofing felt anti slip strip isn’t present, instead they have added studs to do the job. Apparently the roofing felt holds moisture underneath it helping the beam to rot quicker. The studs are a good idea, but according to a C&RT chap a bit further along as the oak dries out the studs become loose and you can just lift them out.

At Dudswell Top Lock, two chaps were letting water down. Thier boats were sat in the next pound and as boats came down they refloated, but then as they left the pound they were going aground again. I’m fairly sure there used to be a note in the Nicholsons guide suggesting not to moor there. If it was us, we’d move to the next pound.

Chained up gate
Almost totally wrotten through

At Dudswell Bottom Lock a C&RT chap was sat waiting for someone to turn up with things to fix a hole in the towpath. He’d come out to unlock the offside top gate for the wide beam. He showed me where the gate was rotten and badly needed some TLC. The bottom gates are also bad, two big holes constantly letting water through. The two boats in the pound above really should move down, they were fighting a loosing battle trying to keep their boats afloat.

North Church Lock needed refilling, the widebeam having just gone down. We’d now gradually catch them up. By the time we both reached Gas Locks coming into Berko we both sat in line waiting for the lock to fill.

Obligatory photo. Looks like it needs a touch up

Here the two locks are close together, so I offered to go and set the second one ready for them to go straight into, knowing that Mick would reset the top one for us. However the bottom lock was empty and below there was a coal boat across the cut. I walked down to see if he wanted the lock or if it was alright to reset it for the widebeam. He was with a customer but was heading up the way to wind and come back, so he’d top up the diesel later.

Pretty archway by people who build tree houses

Just as we were starting to fill the lock a Wyvern Hire boat appeared, so we emptied the chamber again to open the bottom gates. The widebeam above came down, the lady not having spotted boats coming up was closing gates and about to help lift a paddle for us. Luckily Mick had spotted what was happening below. Having such a big boat the crew had walkie talkies, she would help guide the boat in by standing at the bottom gates and then give the chap at the helm a distance to the bottom gates constantly. I wonder if they enjoy cruising on canals, or just can’t wait to get onto the Thames.

We followed them down and found a space on the moorings in Berko. By now we were ravenous and after lunch I popped over to Waitrose for a couple of bits and to pick up an order from John Lewis. The decision was made to move on further today, we want to be within the M25 and find shade before the heat hits on Saturday.

Chairs piled high, the show takes place right next to the lock
Today a rest station for walkers.

At The Rising Sun pub the aftermath of two nights of Mikron shows was visible, large piles of plastic chairs still lock side. Today it seemed to have converted into a resting place for walkers. They were apparently walking a circular route from Goring to Goring. Most of the people we’d seen on the towpath with numbers on them were walking carefully, it was only the first chap we’d seen a few hours earlier who didn’t seem to be limping.

Okay then

Down a few more locks to below Sewer Lock. Most of the locks today we’ve had to leave empty, necessitating leaving a paddle up when you leave. This is great when you arrive going up hill, but a touch more work to do when going down.

Trees

Here we had a couple of attempts to moor up where our 2014 Christmas card photo was taken. In the end we decided that being a couple of foot away from the bank would be good practice for when we get to the Kennet and Avon. It was now 7pm, but Tilly was allowed special dispensation and given an hour of towpath frolicks. We introduced ourselves to the boat behind, they are heading the same way as us, if we manage to push off at the same time tomorrow then we’ll share the locks into Hemel with them.

13 locks, 7 following, 4.77 miles, 1 coal boat, 1 late lunch, 2 parcels, 1 red onion, 1 very sunny day, 2 obligatory photos, 4 pairs of shorts dug out, 1 offer, 1 script.

https://goo.gl/maps/Ev8hCDn8dgKRBLtF6

£11.09, Wash Day. 26th June

Cowroast Marina

Mick was up and off early again this morning to return the car. On his journey he picked up a red pepper so that we could have a pasta salad tonight as we hadn’t quite made up our minds what to do today.

Morning view

We could carry on towards London only having used two of our three nights in the marina, meaning we’d arrived that bit sooner.

Or we could stay another night and do our best to use up the £11.09 that had been left on the electric by washing and drying as much as possible. This would also mean I’d be able to do some work.

Drawn by my Dad in 1941 when he was 16

An advantage of being moored bow end in, was that it would give us the ideal opportunity to fix the second bow fender in position. Doing this without touching up the blacking on the (for want of the proper term) bow post first would just be silly. So I risked having the grumpiest of grumpy men for a second day in a row, I delegated the prep to Mick!

In the future this may prove to have been an unwise thing to do, preparation being the most important thing. Scrapping off any loose paint, giving it a sand and then applying some Fertan, how hard can that be?! I learnt in our early days together that decorating and Mick do not mix. He’d been feeling guilty at me decorating our bedroom so had offered to lend a hand. I got him sanding the skirting boards. This was either a total mistake on my part or his plan all along, so as never to be given such a job again!

That just
needs to be

I worked on technical drawings for panto as Mick sanded etc. Tilly was either lending a hand behind my drawing board or shouting at the back door to go out. Here there are too many unexpected cars and far too many places to hunt for her should she fall in, but she doesn’t see it that way.

on the
floor!

An Ocado shop was put in action, they seem to sell most of the gluten free flours that I use and have been running low on, so it made sense to shop with them. We’ll have to stop for a few things on our way though. Sainsburys sells the only odour control cat litter that isn’t obnoxious to our noses, we should be able to moor close enough to stock up with some and a few boxes of wine in a day or twos time.

Portal drawings one on top of the other

With the weather being warmer I risked washing off the Fertan and once it was dry I applied a coat of blacking to the bow post. This should be dry by morning so that the fenders can go on.

One load of washing is left for the morning and the washing drawer will then be empty. Just about everything will be dry having used the tumble drier as much as we could, you’re not allowed to hang washing out in the marina! Will we run out of electric? Tune in tomorrow to find out.

0 locks, 0 miles, 4 sheets drawings, 1 stomping She, 3 pens retrieved from the floor, 1 near grumpy boy, 5 loads washing, 4 loads tumble dried, 6pm day boat, 1 model arrived in Bristol, 1 red pepper, 1 bow ready.

All Of North London. 23rd June

Wendover Arm to Cow Roast

Mick thought it best for us to move today to be closer to Cow Roast for tomorrow morning. This would save us an hour or so cruise time before checking into the marina for a couple of nights.

Winding at the end

After breakfast we winded only disturbing three fisherpeople and made our way back to Bulbourne Junction. A day boat was already out and about, not going quite so speedy as the one yesterday thank goodness. However meeting another boat on such a shallow stretch meant we had to pull right over the bottom of Oleanna scrapping on the bottom and us listing until she found enough water again.

I stayed below to get on with some work. The date for my next meeting has been set and there’s is quite a bit to do along with cruising down to London with constant locks. I’ve also had a request from the Production Manager to send her the model so that she can show it to some builders for quotes.

Tilly!!!!

So today I made sure I put everything together, made notes of what still needs doing, took photos, checked my sketch drawings making note of any changes so that I can work on these whilst the model is away. Then anything I could scan was scanned. If the postal service lets us down I need to have enough information to be able to recreate the model. Maybe it would just be easier to take the model myself to the meeting, but this week has got busy and the meeting is in Bristol.

Mick turned us back onto the main canal at the junction and then cruised us along the summit pound. To me there seemed to be more boats moored up, some breasted up, but maybe that was just a distorted view from below.

A shaded cruise

For a summit pound there isn’t much to look at as the majority of it is along a cutting. Trees blocking out much of the light for most of the way. Mick hoped for a space as close to the marina as possible, but he overshot and ended up having to reverse back for a space.

The towpath is narrow and quite busy here, a vast contrast to the Wendover Arm. This afternoon we must have had every single north London child under the age of eleven come past, there was a constant stream for over an hour. Most were very polite, but we did get a tap on the windows and one lad shouting in at us. Not bad going really.

A cuff for me

0 locks, 4.23 miles, 1 right, 1 shady summit, 1 overshot mooring, 1 shoe box full of panto, 1 feline assistant overstepping the mark, 1 very hot and humid grey day.

https://goo.gl/maps/X2p5V5YbpCBMWMeV7

With the aerial on top of the pram cover

Terns Taking Turns. 22nd June

Grand Junction Inn to Little Tring Bridge, Wendover Arm, Grand Union Canal

Bye bye Tyseley, see you down the way

A load of washing was set going before we pushed off today. Still heading southwards we cruised through Bulbourne Bridge and pulled up at the water point. Here we filled the tank as the washing machine did it’s thing. Then we winded at the handy ‘Winding Area’ (as they are now known on new blue signs) and headed northwards.

All ready for redevelopment

The old Bulbourne BW yard is fenced off, along the canalside from the road and surrounding area. Here lock gates uses to be made until 2003 when modern mechanised methods and bad vehicle access meant that production moved to Stanley Ferry and Bradley. The yard and it’s surrounding buildings since then have been used by a metal worker, who’s creations used to add interest, large horses and benches filling the canal side of the yard. But now everywhere is boarded up, it looks like some developers are about to move in.

A C&RT document about the future of Bulbourne is here. I’m not sure when it was written but it details the site. H2O Urban has details of a development on the site here. Four buildings will be converted into 25 new homes, a new footbridge and a new yard for C&RT. Works were meant to start last month on site and a website for the development is being set up here.

Left please

We pootled back to the junction where we turned to the left just above the locks. Here the Wendover Arm heads off in a south westerly direction. Back in February 2015 we came down here on Lillian. The navigable section is only around a mile and a half long with a winding hole and 48hr mooring at the end. The going is slow, very slow, most probably slower than it was on Lillian.

Toot Toot
Perfect timing

Originally the arm was built as a feeder for the summit pound, this was then widened to make it navigable. This however leaked and was shut off with stop planks. A hundred years later Phase 1 of the restoration plan was finished giving us what is navigable today. Phase 2 is ongoing with the aim of linking Wendover to the main network.

About to dive

Along the slow mile we were followed closely by Terns. They took it in turns to hover behind us waited to catch a glimpse of a silvery fish in the water. Dropping from the sky to the water they hoped to catch a tasty morsal. Each turned their backs on us, so we couldn’t see if they had been successful of not. Quite a sight.

Hovering
Going down

We pulled in just before the last bend where several fishermen had taken up residency, a day boat having just winded and was heading back waited for us to tie up. There was another boat before the bridge and one right at the end of navigation, but here it felt like we were on our own, all be it with a noisy mower going back and forth in the garden next door.

Which one?

The sun was out, our windows and hatches all open. Tilly spent seven hours exploring and wondering why we weren’t out playing. Well that’s because we’d come down here for some peace and quiet away from the main canal so that I could get some work done over the next couple of days.

Late afternoon Oleanna bumped the side, someone was coming. Ten minutes later a day boat filled with chaps zoomed past us, bumping us into the side, thankfully Tilly wasn’t peering in through the hatch at the time! Very soon afterwards they zoomed back , not quite as fast as before, they hadn’t had long enough since doing a hand break turn to get up to speed again!

0 locks, 1.85 miles, 1 wind, 1 left, 1 load washing dried and put away, 3 terns, 1 heron, 1 canal being topped up, 1 traction engine, 2 more boats, 5 fishermen, K2 or K6? 4 pieces of car, 7 hours, 1 friend rescued, 1 very sunny day, 1st cuff knitted.

https://goo.gl/maps/Cucv4xBeN4cGysNF6

To The Summit. 21st June

Lock 35 to Grand Junction Inn, Tring Summit

The lock ahead had remained empty overnight, the chink of light through the gates inviting us in. Someone else got there before us as we ate our breakfast. I had a few email bits and bobs to sort for panto, so whilst I worked through these Mick rolled back the covers in readiness. Another boat came past heading uphill followed by two coming down. It was now set in our favour.

Waiting for the lock

We were all ready, suncream applied by 11:30, all we needed now was a boat to share with. There was one on it’s way, all the way from The Globe at Linslade. They left at 8am so their ETA was midday, a message came through that they’d just come up lock 33, half an hour away, bang on schedule. We waited. At 11:50 we decided to pull up onto the lock landing, but as soon as the decision had been made a boat appeared above and started to fill the lock. Oh well.

Just before midday two crew members appeared along the towpath. Our locking partners were arriving. The lock took ages to fill and the single hander coming down took his time to enter the lock and to exit it. Mick waved our partner into the lock, the sound of her Russell Newbury DM2 engine getting closer. Marianne stepped off with their centre line to pull her into the side so that Mick could bring Oleanna in next to Tyseley.

Tyseley in first

Last night we’d realised we’d be covering some of the same locks as Tyseley today so I’d sent a message to ask if we could share with them up to the summit. ‘Always happy to share’ was Marianne’s answer. With five crew on Tyseley and the two of us the locking was easy.

Up we go

It just took a bit of time to get Tyseley into the locks. At 71ft 10″ she has a bit of room to spare in the locks, no bow thruster just hard work on the tiller, push push pushing to get her to turn. At the age of 84 she’s allowed to take her time as 2 year old Oleanna came gliding into locks next to her.

Oleanna happy with her new friends

The crew on Tyseley are the four actors, Josh, Chris, Liz, Rachel along with Marianne the Artistic Director of Mikron. 18 years ago Marianne toured as an actor with the company, she now runs it along with Pete Toon the Producer, also her husband. This is Chris’s second tour, the others have only been boating for a matter of weeks, since leaving Welford.

Waiting for the next lock

Marianne or Pete will stay with them as they move Tyseley until everyone is happy. We’d wondered why this period was so long, now we know. Leaving a narrowboat with new crew is one thing, leaving an historic narrowboat with her peculiarities is another. They are all capable at the helm, it’s just when there are problems.

The house the Margees built

We worked our way up the top two Seabrook Locks, Josh going ahead to swing the swing bridge. As we came round the bend after the railway bridge we were glad we’d not continued to there yesterday. No space opposite the Margees old house (Alison and Laura from NB Large Marge). The house next door is up for sale, from the canal you can hardly see it, but the estate agents blurb shows it to be a huge house.

Low pound

The next two locks have a short pound between them, this is nearly always low, today it was even lower. We were joined here by Steve a Mikron volunteer who’d moved the van this morning up to the next venue for them and then walked down the flight to lend a hand. I walked up to the second lock, closed the top gates and emptied it. When Tyseley came to exit the lock she grounded on the cill, more water required. Steve and I lifted paddles and waited to see her move. It took a few minutes but then there was progress. However she ground to a halt again just before the top lock.

Just enough water to get her into the lock

Another wash down of water got her afloat enough to get over the bottom cill, but the shallow water made her hard to steer and she just did what she felt like. it took a while for her to actually go forwards and clear the gates.

How many people have wanted to live here?

The lovely thatched cottage in Marsworth is also for sale. This is a much photographed cottage which is deceptively big. Details here.

The new buildings settling in

We carried on to the junction to get the bottom lock of the main flight ready whilst Tyseley paused at the services to empty cassettes. The lock was gradually emptying itself infront, a centre line was tied to a bollard, but no crew evident anywhere. We weren’t in a rush so I waited and waited, eventually a chap came out from below with a coffee in hand.

Still closed

Despite taking our time we still had quite a wait for Tyseley to arrive, luckily nobody had appeared wanting to come down. Composting toilets are so the way forward.

Killers!
Painting this was going to take quite some time

Once we were joined crew were sent on ahead to prepare the next lock. Chris soon returned having not been able to get past a group of killer geese on the towpath, so we all walked up to the next lock the long way round.

Rounding the bend

We made good progress up the locks, crew going on ahead, any time lost at the low pound was more than made up for here. Two boats were coming down and one lock was having it’s beams painted, so caution was needed.

Last Lock to the summit

At 3pm we reached the summit pound on time. There was plenty of mooring space by the pub and as we pulled in behind Tyseley it felt like Oleanna was just sitting in the wings backstage. A good days boating with great company, even if Rachel and Liz are envious of how Oleanna handles.

Locking buddies

11 locks, 3.23 miles, 1 left, 1 Margees house, 2 houses for sale, 8 crew for two boats, 1 wet lock, 1 almost empty pound, 2 sets of new horrid gates, 1 summit reached, 2 boats waiting in the wings, 0 shore leave for Tilly, 1 mooring for Tilly 2 though.

But she lives on our boat with Tilly
https://goo.gl/maps/CP31PmLWr9z4pNDL7

Speeding Through Milton Keynes. 17th June

Great Linford to Dairy Bridge 102

Shame we weren’t moored the other way round

Today is the last day on the flat for a while, so I wanted to try to get as much work done as I could whilst going through Milton Keynes. But things just kept happening!

We pushed off at the same time as our neighbours, leaving the wonderful moorings for some lucky person. As we pootled along to the water point I cleaned out Tillys pooh box and gave her a fresh lot of litter. Unusually she obliged by using it just before I cleaned it out, normally it’s christened just as the new litter goes in!

As we filled with water the first of todays many speeding boaters came past. This was a converted butty. We were only tied by our centre line in amongst other moored boats. The chap at the helm obviously clocked us, so cut his speed as he levelled with us, Oleanna rushing back and forth! As soon as he’d passed us his throttle was pushed forwards again as he passed other moored boats. I wonder if he would have bothered adjusting his speed if a, we weren’t outside or b, we’d been an older boat with piles of possessions on our roof!

Breasted up coal boats with Jules at the helm

A little while later Jules Fuels slowed at the bridge ahead of us, breasted up the butty and slowly came in in front of us. Stopping briefly to fill a couple of containers with water before they carried on towards Wolverton today. Their holds seemed to be predominantly gas bottles today. A shame we’d got coal at Rugby boats, but if the weather hadn’t warmed up in the last couple of days we’d have been needing some more.

Along the next stretch I concentrated on the Bank of England’s vault. Grey/gold/silver? A couple of miles along and Mick opened the hatch and beeped the horn twice. Was I needed? I popped up top.

Pulled pins

Ahead there was a short narrowboat right across the cut blocking our way. I’d be needed to hold Oleanna in the bridge hole if there was nobody on board. No signs of movement came. Mick went to see if he could pull the boat in and hammer it’s spikes. Both bow and stern lines had been pulled, the centre line somewhere on the middle of the boat. He stepped on the back, trying to make his way to get a rope, a dog started to bark, Mick tried to squeeze past drying washing, then retreated to the bank. I spotted someone inside, eventually the chap got dressed and appeared at the back door. Between them they managed to pull the boat to the bank, we left the chap to tie up again and slowly passed him.

New bridge ahead

As there was a space at Campbell Park we made use of it for a lunch break. Just as we were pushing off a chap came up to chat about our chimney, windows etc, both of us clinging onto the ropes. Eventually when the chap paused we pushed off and left him to it.

Y

I stayed up top for a while to see the new marina and Y shaped bridge. Large buildings are going up opposite and the marina looks like it’s about half full already, considering we don’t remember it in the slightest two years ago that’s not bad going. The Y shaped bridge is pleasing to the eye and a nice contrast to most modern canal bridges that are concrete clad in brick. The rusty metal railings depict bullrushes if you look closely enough.

Maybe this is where Boris has been hiding

The amount of moored boats through Milton Keynes seems to have increased greatly. Mick slowed whilst passing them and at times had to reverse to let other boats come past. At one such moment he picked something up on the prop. The next opportunity, a couple of bollards, he pulled over to investigate. As he rummaged around in the mucky water boats sped past, very few slowing. The tool box was required the normal implements wouldn’t do the job today. Wire cutters and molegrips instead. A steel cable was the culpret and was eventually coaxed off the prop.

Todays catch

We both waved at the couple who sit in their living room at Fenny Stratford, but nobody waved back, the garden seemed not quite as neat and tidy. A single hander had just set the lock so we joined him and closed up after us both, swinging the bridge back over the lock when all was done.

Fenny Stratford Lock

Mick pootled us another couple of miles whilst I popped a loaf of bread in the oven and carried on with work. At a reasonable distance from the road we moored up and let Tilly out. I made a pizza, finished off knitting the pair of socks. At 10pm two local boats must have been doing a boat swap. They sped past us at a rate of knots first one then the other, we really hoped they didn’t meet each other at a bridge hole.

Baked and on the way to our tummies!

1 lock, 8.72 miles, 1 swing bridge, 1 Y shaped bridge, 166 grey dots, 1 heavy sleeper, 3m steel cable, 2 many moored boats, 2 many bored boaters, 2 many speeding boats, 1 vault painted, 0 riches, 1 step closer to London, 1 loaf, 1 giant GF sour dough pizza, 2 full tummies, 2 socks knitted.

All Hands On Deck. 16th June

Not quite Pole Position to Pole Position

On Saturdays we buy our newspaper, Sundays we read it in bed with a cuppa in hand. This morning however this was curtailed a touch.

First there was some yapping, then a bit of boat moving noise, no engine audible. I peeked through the front door blinds, the boat in front of us was being clung onto by a chap with the centre line. Time to get dressed, the opportunity to move up 60ft was not to be lost. All Hands On Deck!

QUICK!!!

We were out the doors and untying within minutes. Pulled along we now had THE view up the parkland towards the Nags Head, it was sunny too. We’d now have to stay another night. The bollards not quite spaced right for our length, so Mick tied a spring line then we could settle down for breakfast.

With eggs needing eating it would have been daft not to have a cooked breakfast.

Not bad, not bad

They moved the outside without the big noise. It’s a similar outside to yesterday, but now there are trees that way and this. There’s also a good wall with gaps that I can get my arms down to feel for any possible friends. She came out for a while and we had a game of stick on the big grassy bit. Then She wandered off to see if she could find Houdini’s daffodil.

Mine, all mine

Apparently this outside is one of the places they chose to remember their previous second mate at, they planted some mini daffodils in amongst the trees. She was being silly, no way was she going to be able to see them, yellow time is long gone, even I know that!

See you later

As Tilly and I played the sound of a Russell Newbery engine got closer. The large windows gave it away as NB Tyseley came past, crew sat out the front enjoying the sunshine, still wrapped up in waterproofs. Not much further for them to go today, just around the next big bend is Lionhearts Cruising Club where their next show was this afternoon.

Lillian in Pole Position

At 2pm we picked up our folding chairs and walked up through the park. We paused near the gates for a photo. We’d moored in the same position in March 2015 for the solar eclipse and taken a photo then.

Oleanna in Pole Position

Today the trees are in full leaf and Oleanna’s blue doesn’t sing out in quite the same way as Lillian’s yellow, but it was a photo that had to be taken.

Am afternoon cuppa and a play

Lionhearts Cruising Club had not taken any chance with the weather today, two marquees had been erected, one with a bar and tea and cake, the other the auditorium for the show. We claimed some seats, no need to have brought our own, and then got ourselves a cuppa each. Mick had a scone with his and after a short delay I got a couple of slices of gluten free cake. Very nice it was too.

Our neighbours at the park

Marianne the Artistic Director of Mikron came over for a chat. After a week on board with the cast she was looking forward to a few days back at home near Marsden. The weather, falling trees and reduced opening hours of locks have all been a problem to them this year. The canal tour is planned to within a few hours, so any delays can leave the cast/crew stuck away from a venue. yesterday they had had a show at Bilsworth at 1pm, by the time they’d packed up from it and got through the tunnel they would be at least an hour late to get down the locks. She had had to make numerous phone calls to find the person who was able to give special permission for the locks to be opened for them. With 24 hours between shows, 15 miles, 8 locks, around 7 hours cruising they really had to get through the flight on Saturday. Luckily they were granted permission.

We sat back and enjoyed the show. All Hands On Deck. In true Mikron style with minimal set and props, numerous musical instruments even more costume changes the four actors worked their socks off. Lily and Ginger are two new WRNS, they go through training together and end up one in the engine bay the other deciphering morse code. It is a poignant tale of these two Wrens battling through all that was thrown at them. Songs and a few laughs, a very enjoyable afternoon. We hope to catch Red Coats their other show a bit further down the Grand Union.

Brick kilns just by the cruising club

The afternoon had stayed mostly dry so we walked back through the parks canal side back to Oleanna. Tilly had another hours exploration before a friend of hers caught my eye, so she was picked up and brought inside, her friend scurrying off into the wall.

My sour dough starter has been woken up over the last couple of days. A bowl of pizza dough is sitting overnight and a sponge is now doing it’s thing ready for a loaf tomorrow. Have to admit I put the sponge in the fridge as I was a touch worried that it might have taken over the boat by morning!

The view from Pole Position

This evening we have enjoyed a joint of pork, better crackling but still not quite perfect, a couple of glasses of wine and I am 15 rows away from finishing off my latest commissioned pair of socks. Then I’ll have all the bloomin ends to sew in.

0 locks, 62 ft, 1 pole position, 1 beautiful mooring, 6 hours of cat freedom, 1 friend at least, 1 rescue, 0 daffs visible, 5 on a boat, 2 marquees, 100 plus, 2 redundant chairs, 1 scone, 2 slices cake, 1 great show, 160 grams starter, 200 grams starter, 1 run away sponge, 1 joint pork, 15 rows to go, 1 lovely Sunday, 1 Mrs Tilly stamp of approval.

https://goo.gl/maps/7oVNScpqHTNda84Q6

Replenishing Stocks Just Enough. 15th June

Haines Bridge to almost pole position at Great Linford

Last night we almost ran out of wine! Supplies on board of all sorts have been gradually running low. We’ve not had the chance to have a delivery for a while so we only stock up on items that are needed. Our evening meal last night was created from what I could find in the drawers and fridge, a nice chicken and mushroom risotto (thank you Christine for the dried mushrooms at Christmas), but today we would be down to emergency tuna pasta. We had to go shopping today.

Wide beam just winded

Mick pootled us along as I carried on trying to paint bits of model between being needed. Thrupp Wharf came into view, the bridge over the canal having several cars parked on it, boats here there and everywhere including a wide beam that without warning winded at the entrance to the marina in front of us. Permanent moorers weren’t impressed with the chap at the helm and wished Mick luck following him.

Solomon’s Bridge

I managed some red painting before we reached Solomon’s Bridge where I managed to take it’s photo from the hatch. The wide beam soon pulled in opposite the Barley Mow. Green paint followed before we pulled in at the services. The yellow water needed to be emptied along with disposing of the other contents from our waterless toilet. By the bins was an amount of wood, I helped myself to a length for kindling as we’d run out.

Cosgrove Lock

Cosgrove Lock was sat open waiting for us, either self opening, blown open or a lazy boater having not gone back to close the gate. The gates on the lock looked like they were new this year along with a stretch of high wooden fencing behind the wall. Some trees have gone since we were last here and the fencing means you can no longer watch the Lamas and other beasts behind the wall whilst the lock empties or fills. Maybe they have gone too.

The Ouse looking full below

The white paint came out from my paint box, mixed with some PVA to help solidify some thin bits of card I’d just started to apply it when I noticed flats outside, we’d arrived at Wolverton. There were only a couple of rings left at the end just past NB Carpe Diem. The wind buffeted off the tall buildings pushing Oleanna into the off side as the lady we’d met yesterday came out to say the same had happened to them. Mick did his best to ignore her as keeping Oleanna out of the undergrowth was a bit more important to concentrate on. A boat behind was just pulling out so we reversed to take their spot. The rings here didn’t really work for us, the wind still pushing Oleanna away from the bank. As soon as Carpe Diem moved off we could tie up better and helped another boat moor up.

Trains Planes

With a bike as sherpa we walked down to Tescos with quite a long shopping list. We returned with four heavy bags despite Leighton Buzzard only being a couple of days away (there are moorings right outside Tescos there). The steps down to the towpath necessitated de-bagging the bike but we managed.

After a late lunch we pootled on some more. Mick at the helm, me at work, Tilly asleep. We’d discussed how far we’d go today, Fenny Stratford, Campbell Park, there wouldn’t be any space at Great Linford, not on a Saturday afternoon. How wrong were we! There was space, not the prime position with the view right up to the pub, but there was space. So we pulled in deployed the tyre fenders due to the submerged ledge and let the cat out.

Great Linford, here’s hoping gravity doesn’t get too much for the trees here

1 lock, 6.92 miles, 1 aqueduct, 1 wee tank empty, 1 pooh bucket empty, 1 length of timber, 3 colours paint, 1 almost dry day, 2 boxes wine, 1 pork joint, 1 box of model bits getting more colourful, 3 hours, 1 favourite mooring almost, 5 yappy shitinyourshoe neighbours, 1 cool cat.

https://goo.gl/maps/FSU6sxrgSeXyyAp49

Is It Us? 14th June

Stoke Bruerne to Haines Bridge 62

A bee busy at work

This morning we noticed that NB Tyseley was unable to come through Blisworth Tunnel due to a tree blocking the navigation close to the north portal . A rather big tree too! We seem to be having this effect on trees, luckily for us they fall over behind us. That of course is no good if you are on a schedule, maybe we should let NB Tyseley get ahead of us!

With the knowledge of no boats about to appear from the tunnel we headed for the locks. It was nearly dry outside, but we didn’t trust it so put our waterproofs on. Two boats were coming up the top lock with the help of a Volunteer. They had been told to moor up and wait for news, there was concern that the moorings would soon fill up, would there be enough space for them. There was plenty and I’m sure even by the end of the day there would still have been plenty of room.

Stoke Bruerne Top Lock

One of the boats that had followed us yesterday had already headed down the locks, no locking partner would appear from behind so we started down on our own. The volunteer Lockie soon appeared and went ahead setting locks and by the fourth lock we’d caught NB Carpe Diem up.

Just about full to over flowing

They waited for us after a short pound, our locks worth of water adding to theirs and flooding the sides of the lock. By now the sun was trying to come out, waterproofs came off. We chatted as we descended, they are pootling about until they can get back onto the River Nene once the levels have lowered.

That cloud was catching up with us

As we walked down to the last lock a very dark cloud had caught us up, the boats took their time to deliver our coats, but luckily this was before the rain really got started.

The new collar on the bottom gate was only just noticeable, a new weld giving it away.

2 soggy Micks
A new weld on a slender collar

The level below the lock looked much higher than we remembered. The River Tove joins the navigation here before heading off eastwards, so the current rainfall was swelling the canal.

That looks a touch higher then normal

Pulling in at the services we were pleased to see a recycling bin and one for glass. We made good use of this and deposited our collection that had been taking over the cratch and galley for a while. Then a nudge up to the end where there’s a handy water point. The pressure wasn’t great but that suited us, we could run the washing machine and have lunch as the tank filled. It beat us to it though, but with no other boats arriving we stayed put and topped up the tank before leaving.

Shelving all dressed now

Mick moved us along to find a mooring as I retired below. Models take a lot of painting and I seem to have the same problem as last year, I keep changing my mind! Today some kitchen units were painted three different shades of pink before I liked them. Grrr, designers!!

The sun came out and we had blue skies for much of the remainder of the day.

7 locks, 4 shared, 4.66 miles, 1 downpour, 1 full water tank, 0 rubbish left (except bits of cardboard tucked behind the knife block), 1 load washing, 1 pooh bucket changed, 4 hours, 0 fire, 1st blue sky for ages.

https://goo.gl/maps/Jkgd5icBiqZu4E2z6

Tall Tales. 12th June

Bugbrooke Bridge to Nightingales Bridge 46 ish

Another miserable day in the making. At least it started off dry, for a while. All the boats around us moved off and carried on their journey and it was soon time for us to do the same. With Stoke Bruerne flight closed we decided to move along to before Gayton, mooring up where Tilly could go off and explore.

Get that door open!

I helped push off and then left Mick to it whilst I did some work below. I’d been putting off checking a few things out on my ground plan for panto. So I started the day with the drawing board out. I made a list of potential problems and then worked my way through them. Details of the trap in the stage had only just been confirmed, the size and position having changed a touch since last year! It didn’t matter for Aladdin, but this year it does. A bit of problem solving and I have a couple of options.

Mick moved us on, far less traffic on the cut than in the last few days, most probably due to the broken lock ahead. He pulled us in after almost three miles cruising at the last big M on our map before Gayton Junction. Here there is armco to make it easier to moor, but the trains are quite close. Trains are a feature of the Grand Union Canal that you have to get used to. The line does move away at times but hugs the canal the remainder of the way to London.

I’m busy!

Seven Hours! Blimey! What could I do with all that time?! No need for it to rain as the grass was good and soaking which got me very wet too. Marvellous.

More of my model got painted this afternoon and Mick went for a walk up to the junction to see what he could see and give me a bit more room to work. He returned just after it started to rain again, I made him some room on the table in return for him not nudging it too much as I painted thin lines of turquoise and dark red.

Boozer and The Nick

If you are looking for something to help fill these rather wet times avoiding being outside, can I point you in the direction of a friends blog. Jan is a story teller based in Edinburgh (Link to her blog). She is also a Theatre Designer, textile artist and curator. Last July Jan joined the crew of tall ship Tenacious as a volunteer, hauling sails, climbing the rigging, hearing and telling stories. This year she is aiming to tell tales on ten tall ships and will be joining the crew on board The Lord Nelson sailing up the Norwegian Coast as part of the tall ships race. The first posts on her blog take her to the Falkirk Wheel and the Kelpies, she featured on Ramblings on Radio 4.

Jan on Tenacious last summer

Stay dry. Oh, this afternoon there was an update on Stoke Bruerne (on the website not an email) saying that the locks are open again, so dependant on how much water is falling from the sky I will either be working or we’ll be heading to descend the locks. Fingers crossed.

0 locks, 2.72 miles, 1 dry start, 1 very wet end, 62 trains, 1 tail held high, 6 hours of soggy moggy, 1 hour of exhaustion, 1 set of new tenants, 1 hat (of mine) headed for the high seas this summer, 10 tall ships, many tales, 900mm wide not 700, 1 trap a touch bigger than planned.

https://goo.gl/maps/1MeiiqtN2h4DELau8