No Ducklings Harmed 29th April

Littleborough to Slattocks Top Lock

The voice of Houdini (our emergency phone which acts as an alarm) wasn’t required this morning as both of us were wide awake due to the bickering of the Canadian Geese. Blimey they were noisy. But it did mean that we were up and ready to set off ahead of time along with Clare and Graeme.

Heading out with NB Mr Blue Sky following

The sun was out and the hills glowed around us as we pootled along the long pound towards Rochdale with Oleanna taking the lead. Two swing bridges to negotiate before we reached any locks.

Swing bridges

I hopped off to do the first, Clare who’d been walking came and helped, they would do the second one. A couple of ladies were picking up rubbish and warned that the bridge landing would be too shallow at the next bridge so to carry on before picking crew up. They were doing a good job as once we passed them the rubbish started to build up.

Grand buildings

Views stretched out across the valley. Large red brick buildings with clock towers upstaging the terraced houses. But soon these vanished and barbed wire took over as we came into Rochdale. Graeme and I went on ahead to set the lock, Clare needed a push off from the side once the lock was full the bow having grounded.

Rochdale

Today we would start to get our rhythm at the locks worked out. The next few days we’ll get plenty of practice to hone our method. With the next lock within reach, once the paddles were lifted I walked down to the next lock to set that ready, leaving Graeme to close up.

No ducklings today

When I arrived at Moss Lower Lock there was one chap sat watching, by the time we left there were another three plus one man and his dog. Five years ago we’d had very helpful advice from the chaps drinking cheap lager here, they were most worried that we didn’t harm the ducklings. Today there were none, so the chaps kept quiet and chatted amongst themselves, maybe it takes a few cans to get them to be more vocal.

Going down

Mick left the lock first, Graeme and I closed up behind, I walked over the road bridge to follow the towpath under it. The wide bridge an ideal place to stop and pick up crew. But Mick had headed on, to leave space for NB Mr Blue Sky, he was on the off side some distance away. How on earth did he expect me to get there? There was no obvious means. so it was decided that I’d get a lift over by boat.

Easier said than done, a bywash made positioning that bit harder and submerged obstacles clanked at the prop, but we got there in the end and I stepped back onto Oleanna. Mick all the time stood patiently with a slight look of bewilderment on his face. He’d abandoned me! But then he pointed out the bridge now behind us. The wide bridge was infact two. The modern road bridge with an old canal roving bridge right up against it. Yes, I could so easily have wound my way up and over the bridge to reach him. In my defence this was not evident in the slightest from beneath the bridge.

Ahhh, it’s a roving bridge!

NB Mr BS went on ahead to the next locks. We soon had to stop. At Bridge 62 I hopped off with the centre rope, the engine was turned off and the weed hatch cover was undone. Our first collection of rubbish! Coming the other way five years ago, dealing with low pounds we would have been able to furnish a whole house and have quite a good wardrobe from what came off Lillian’s prop, so we know this won’t be the only time the weedhatch cover has to come off.

At Blue Pits Higher Lock Clare and Graeme were waiting patiently for us. As we descended we discussed only opening one gate to leave, that would be the one in front of NB Mr BS. Graeme would then either head off to set the next lock or get on board, Mick would bring Oleanna out of the open gate and I would then close up behind. This makes less work closing up, that is unless a gate opens itself again!

New houses

New houses sit alongside Lock 52. This is where there used to be a glimmer of a view across to where Mick’s sister Anne lived at Buckley Barn Cottage, known as BBC in the family. Today the trees have grown blocking the view totally. We still waved.

Five years ago, BBC with the blue windows
It’s still there somewhere!

Below the lock a long jolly mural covers the wall. Cats, boats, chilled medication it’s all there.

One last lock before we reached Slattocks. As we pulled in just after the petrol station (handy for a jet wash) there was a really tantalising smell of toast and cheese. A roadside caravan food stall was doing very good business and nearly had our custom too. But we were good and retired indoors for our lunch.

Ducklings

The towpath was at a suitable height for me to have a go at the gunnels. Last year I’d only managed to attack the starboard side before winter hit. This now shows as the scrapes along the gunnel on the port side have allowed water in and rust has done it’s thing, now being chipped off at ease. So I set too with a scraper, followed by sand paper and then a coat of fertan. Clare was also out touching up their gunnels so we managed to have chats to break up the sanding back. Next opportunity I’ll do a coat of primer where needed, this may well not be until we get to the flashes on the Trent and Mersey where the towpath is good and low. But at least the fretan will stop the rust from progressing.

Happy to have company down the locks

5 locks, 6.57 miles, 2 swing bridges, 0 held up, 1st trip down the weedhatch, 0 ducklings harmed, 12 at our mooring, 5 old soaks, M62, 1 wave, 1 huge patch of rust, 1 hour sanding, 1 coat fertan, 1 lasagne, 0 shore leave, 2nd amendment of 4ply sock pattern looking hopeful.

https://goo.gl/maps/peRQpg1ZohbUN4vm8

Queuing! 28th April

Lock 46 to Littleborough

Still to be conquered

With the route into Manchester planned in several chunks, today we had the shortest one to do. Move down three locks and about half a mile, the next few days we’ll be covering more ground. After breakfast we started to make ready for our move and as we did so we joked about waiting for the next boat to come along. The last boat we’d seen pointing in the same direction as us was in Todmorden and before that it had been Hebden Bridge. We’d not seen a moving boat in a couple of days, so we didn’t really expect one to come along, but it did!

Being on the little arm meant we could chat with the chap working the lock whilst his wife hovered in the boat. We’d just decided to empty the yellow water tank before moving down to fill with water in the next pound, so we didn’t rush to join them in the lock.

They are also heading into Manchester and would be stopping in Littleborough for the day, they’d come from the summit this morning and only had a few low pounds, certainly nothing as empty as we’d found. We mentioned that we have a volunteer booked to help us on the way to Piccadilly, if they wanted to join us they’d be welcome.

As we chatted I opened the front door briefly, mistake! After being reluctant to spend any time outside yesterday, today’s sun pulled Tilly out of the door. The geese in the field needed stalking and that tree also needed more thought. No point in trying to get her back and anyway we’d not got far to go so there was no rush.

I just wanted to say hello to the geese

After a while she returned, yellow water emptied and we made our way down the lock. NB Mr Blue Sky was on the water point. No space to pull in by them, so we loitered on the lock landing, we’d not be in anybodies way as a second boat would be very unlikely. But we’d not expected on being in a queue for water today.

A rather nice mooring, might have to come back

We took our turn at the tap and chatted to a chap from the moored boat alongside the services. His boat was the first craned in when the canal reopened, he’d been lucky enough to get planning permission and has a drain and electric hook up right next to a water point. He pointed us in the direction of some skips where he said we could put rubbish, I doubt these are official bins as it is a C&RT maintenance yard, but we made use of them as there are no more bins until Manchester.

Plastic houses with one stone wall

New houses face the canal. Their front walls all built in dressed stone, the natural colours and patterns showing, then all other faces have been built in a cheaper more plastic stone, looking like it’s been clad in sheets. £225k will get you a three bedroomed semi here. Wonder what the thin detached one cost?

Two more locks with plenty of on lookers, one chap eager to help with the gates. Ten we’d reached our destination. A fisherman let us nudge in behind NB Mr Blue Sky. Graeme and Clare came for a chat, a New Zealand couple over for two months. We talked about our plans to go into Manchester. They were interested in sharing the locks but wanted to be at Castlefield Basin to meet a friend a day earlier than we’d planned. We said we’d join them for the last nine big heavy buggers.

Model box just needing steps adding
but they will be matching the show floor, so I’ll make them later

A shopping trip to the Co-op to stock up for the next few days and then back to work for me. An email to the director with dimensions of how things could work and a finished model box. I just need to clear out my cupboard to store it in now, but for the time being it’ll sit in the corner of the dinette.

Late afternoon, as our roast chicken cooked, Graeme and Clare knocked on the roof. They’d been looking at the maps and were going to suggest to their friend to join them at Piccadilly instead of Castlefield. Those extra nine locks after a long day might just be too much and the following day we’d have an extra pair of hands.

So tomorrow we join forces and start to work our way into Manchester. An earlier start than normal for us, but at least we’ll have company and split the work.

3 locks, 0.52 miles, 1 empty wee tank, 1 escapee, 1 queue, 1 full water tank, 0 rubbish, 1 boat going our way, 1 boat going the other way, 1 lady goose watching our every move, 1:25 theatre ready for a set, 1 roast chicken.

https://goo.gl/maps/QsoEbzXFf5KSKVsK9

Fitting A Circle Into A Square Hole? 27th April

Lock 46

A lull in the rain encouraged Mick to head out for a newspaper this morning. He first headed to the Co-op, but apparently they didn’t have juice that I’d like so he just had to head to Sainsburys, handily passing a bakers that sold pork pies. Sainsburys although small had my juice along with Mick’s favourites cheese twists! So I got healthy juice whilst he got an assortment of baked goods.

Rain came and went all day, we were glad not to be out in it. I tried but the wind was a touch too much and kept interrupting my calculations to climb the big branchless tree. On each attempt I would exit via the cratch, decide against it and arrive at the hatch just as She did. Perfectly timed on her part.

Service time

My drawing board was lifted out from it’s slot and I delved under the dinette for my tech drawing equipment and model making box. Time to make a start on Puss in Boots. To make way for me taking over the main cabin Mick headed into the engine bay to give Oleanna a 750hr service. New filters, oil etc.

Sketch elevation and plan

I spent the morning seeing if I could fit a very big circle onto the Chipping Norton stage. Leaving enough room for actors and dancers and it still reading as a circle through the square of the proscenium took a bit of time. A basic groundplan to show how much space there would be for each scene and highlighting things I’d need to solve as I design the show. I can now let John the director know that this version could work.

Mick carried on tinkering after lunch, Tilly carried on checking the outside and returning, helping to keep my steps up for the day! I stowed the drawing board and started to make a model box of the stage. Last year I was loaned a model box, but as they are producing a show in the autumn two will be needed, so I’m making my own.

Model detritus

I double checked the dimensions of my clothes cupboard to make sure I built the model to fit. Every time I finish working on the model it will be put away in the cupboard to stop Tilly from chewing parts of it, or even moving in, it is a box after all!

As the afternoon progressed Tilly learnt that jumping in onto the floor was a much better idea than straight onto the table! Last summers lack of rain helped in me keeping model bits paw print free, I wonder if I’ll succeed this year! I got all the main walls cut, stage and auditorium floor ready to be fixed together tomorrow. Whilst Mick tried to start Oleanna. This went on for a while.

Ratchet in hand

After several attempts where she started but then gradually slowed down till she stopped, Mick could be heard muttering ‘I don’t understand!’ Tilly and I kept quiet for a while, then asked if we could help, knowing that that was unlikely. Another half hour passed and then more attempts to start her up failed. ‘Should I start conserving electricity?’ ‘No not yet’.

A while longer and each time Oleanna was started up she lasted that bit longer before slowing to a stop. Then at last as Mick pumped the thing that bleeds the air from the diesel line she started and kept going. Phew! He’d already done this before starting her up, removed the filter he’d replaced and put the old one back on in case the filter was at fault. So tomorrow he’ll be putting the new filter back on and pumping the bleeding air thing again.

0 locks, 0 miles, 1.2 miles walked back and forth to open and close doors! 1 newspaper, 1 pork pie, 2 cheese twists (they only come in twos apparently), 1 carton juice, 4 soggy paws, 0 on my model yet, 0 on my drawings yet, 1 flat packed model box, 1 elevation, 1 groundplan, 2300 radius, 2 or 3 portals? 10.5 litres oil, 2 filters, 1 swapped out, 7 attempts, 8th successful, 1 very wet day.

Redistributing The Water. 26th April

1st Below West Summit Lock to Bent House Lock 46

Carrying on down

Another morning trying to beat the elements, well the rain had already started and stopped a few times as we got up and had breakfast. The plan was to not go far, but close to Littleborough where we could hop from one mooring to another topping up with water and shopping over the weekend as the weather allowed.

Starting to rain

As I set the first lock a chap walked past in shorts, I bet he’d wished he’d put his long trousers on, it was blustery and starting to drizzle. By the second lock it was time to change my long trousers into waterproof ones!

Disused derelict mill

The next six locks are all close together, so it’s not too far to walk ahead to lift a paddle on the next chamber so that it fills itself as you come down the one above. As Mick brought Oleanna into a lock a passing Postman in his van beeped his horn, ‘How far you going?’ ‘The canal’s empty down there!’ At least we were warned.

Empty

I’d go ahead to lift a paddle and check on the next pound. One persons version of empty is not the same as anothers. But as I reached Lock 43 to lift a paddle I could see that the Postman had used the term ’empty’ as I would have done. Between 43 and 44 you could make out the deep channel very clearly, the bottom of lock 43 along with it’s tyre was also very visible, no danger of getting stuck on the bottom cill here as you’d never get anywhere near it.

Tyre and cill very visible

A phone call back to Mick, I walked down to Lock 44 to check on the paddles. All were down. Mick called C&RT to discuss what to do, we were happy to let water down but the length of pound would almost certainly mean that we’d just be moving the problem up hill, possibly emptying two pounds. We were told to go ahead if we were happy with what we were doing and the local team would be informed. At least we’d be leaving the problem behind us, not taking it with us as you do when going up hill.

With all gates closed we opened a paddle at each end of 43, 42 where Oleanna was sat and 41. Keeping the gates closed as you run water through means that no silt or other larger items will get caught on the cill stopping you from closing the gates, this is what Lockies have told us.

Running water through

The pound between 40 and 41 was quite short, so we lowered this to a couple of feet from being empty, 41 to 42 was left with enough water to navigate through. All the time as we ran water down Oleanna sat in Lock 42, the level here dropped to about halfway, one of us stayed with her all the time whilst the other checked the level either below or above. A large Mink scurried along the bank as I kept an eye on things whilst the rain kept falling. Why do these things always happen when it’s p**ing it down?!

That looks better

Mick called from Lock 43, he thought the level below was now navigable, so had closed the bottom paddle to start to fill the lock. I did the same at 42 to make getting back on board easier, we didn’t want any slipping in the rain.

Lock 44 at last!

Leaving two pounds behind that we hoped would only take a lock or two of water to be deep enough we descended 42, Oleanna crawled along to 43 where the lock was already full. Then down 43 and into the pound that had been empty. Mick had made a note of where the channel had been deep and we avoided using the offside gate to leave as we knew there was a lovely tyre lurking in the depths.

We’d made it through to 44, redistributing the water to aid us and hopefully leaving it in not too bad a state for the next boat.

Earlier I’d walked to the next lock to check on levels there too, this had been fine. I was going to walk it again, but our lock full of water (and possibly more) had brought the level up over the overflow that runs across the towpath. Here there was no raised walkway, but luckily Mick managed to get the stern into the side for me to hop back on board.

Should we stop? We were both hungry, I needed the loo and we were both soaked despite wearing waterproofs. Our chosen mooring was still one lock away, there we’d be nearer shops, the last water point before Manchester and hopefully a nice mooring to while away Storm Hannah, we carried on.

Interesting

Alongside Lock 46 is a short arm, long enough for us and possibly wide enough for two narrowboats. According to Pearsons guide it was an old dock, the stump of a crane still here, which was used for loading stone quarried at Blackstone Edge. That looks like a challenge.

Dough left for 24 hours
Pricked with a folk before cooking
Topped with lots

This evening we have sampled my first go at Gluten Free Sour Dough Pizza. As most things without gluten they behave differently so instead of kneading the dough and shaping it, you push it into shape, then cook it for a while before putting your topping on it. We had tomato, ham, mushroom, olives and mozzarella and cheddar. Verdict tasty, crunchy edge but the centre could have done with a few more minutes baking first.

Cooked, yummy!

8 locks, 1.36 miles, 4 miles walked, 1 very empty pound, 1 hour 20 minutes to fill, 4 low pounds when we finished, 1 mink, 2 drowned boaters, 1 drowned deer, 1 Postman, 80 ft 10 inches down, 258 ft 11 inches above Sowerby,1 branchless tree stump, 1 volunteer booked, 1 very wet morning, 1 drier than expected afternoon!

https://goo.gl/maps/ntRxuFn4RSB2uqqU6

Up And Over. 25th April

Lock 31 to 1st Below West Summit Lock 38

Tilly’s friend with her friend

With the forecast bad for this afternoon and the fact that we’d be crossing over into Lancashire increasing the odds for rain we pushed off a touch earlier than normal. Last night we planned our descent to Manchester into what we hope will be manageable chunks, stopping at sensible places and avoiding the worst of the weather that we know about.

Cut off beams that you have to wind
Very neat and tidy

Lock 31 has had it’s lower gate beams reduced in length so instead of pushing them you wind them with your windlass, quite tedious and repetitive to open the gate then the same all over again to close it! At least whilst recovering I got chance to admire the very neat garden of the house above. You feel as if you are passing through the water feature in their garden.

Rebuilding the bank

We worked our way up the locks. One pound seemingly a touch low which was a bit strange as the one below had been over flowing. But as we rounded a bend slowly we could see the reason. There was a chap wearing waders in the canal, with use of a digger large stones were being positioned building back the canal side. The large stone was lowered carefully into position, then removed to have a bit of a tweak making it fit better. The lock gate was open waiting for us so we wouldn’t have to pull in where they were working.

Yorkshire on the left, border centre, Lancashire right

Warland Upper Lock 35 was to be our last Yorkshire lock, the border is just after it and before the swing bridge.

Crossing
the
border

We’ve been in Yorkshire almost twelve weeks and as Oleanna crossed the line we both were a little bit sad. Yorkshire is still most definitely home. Once up the lock, with the lock gate open I swung the bridge out of the way. We were now in Lancashire.

Last uphill

Longlees Lock 36 was our last uphill lock until we reach the Trent and Mersey. The canal sits in the bottom of the valley as it crosses the summit, the A6033 following on the other side, the trains now rumbling their way under the hills for a couple of miles.

The summit

Nearly three quarters of a mile long the summit pound was full, not what we were expecting as we’ve seen it very shallow in the past.

Starting our descent

West Summit Lock was to be our last of the day and as we dropped down the black clouds arrived and it started to rain. We pulled in on the visitor moorings below just managing to avoid getting wet. We’d dressed for rain this morning, but had been a touch too warm until now.

All quiet on the western front

We pottered away the afternoon, Tilly explored her new surroundings making friends whilst I ordered some yarn for a sock commission. Feed back from my panto sketches came through late afternoon, so tomorrow I will need to get the drawing board out and start with some plans, a few basic measurements are needed before we head down one particular route. I’m hoping to get cracking on the model as Storm Hannah does her worst.

Brown legged cheeky chappy

This evening we walked over to The Summit Inn and met up with Alan from Todmorden for some food a few drinks and a proper catch up. It was good to be able to see him properly, maybe next time will be down south as he may be working on some films later in the year at Pinewood Studios, fingers crossed everything falls into place.

7 locks, 1.86 miles by boat, 2.4 miles walked, 62 ft 7 inches rise, 352 ft 6 inches since Sowerby Bridge, 12 ft 9 inches down, 339 ft 9 inches above Sowerby, 1 swing bridge, 0 held up, 1 border, 2 counties, 0 Look North, 2 odd socks, O version, 2 pies, 1 chicken breast, 2 hours catching up, 1 bowl of sour dough pizza dough ready for tomorrow.

https://goo.gl/maps/6iDDL7evYb1micZs9

Wednesday Roast. 24th April

Lock 31

Time for a tidy up and to put the oven on at 10:30am.

A grey day, but still a lovely mooring

Years and years ago we had invited Mick’s niece Ruth to join us for a Sunday roast in Scarborough. This was to include Mick’s other niece Fran, several dates were muted, but the plan never came together. So far Fran has managed a couple of roasts with us, but Ruth has missed out.

Us with a bottle of Guzzler

Five years ago Ruth and James helped us up through Rochdale, Ruth being local she could sweet talk the locals for us. That day was busy and we ended up being invited round to theirs for food. So as we were in the area we had to invite them over for the long awaited roast.

Ruth managed to squeeze in behind the dinette

This trip over the Pennines we are letting them off assisting, as Ruth is seven months pregnant. It was lovely to see them as we’ve not been together for a couple of years. Plenty of news to catch up on from both sides.

Shame there’s not much left over!

The joint of pork, having sat in the fridge uncovered overnight, almost had good crackling, the nearest I’ve got so far on a boat. I think the LPG keeps the air in the oven a touch too damp. This was followed by the last of our apple and blackberries from the freezer made into a crumble. Very tasty even if I do say so myself.

I took advantage of them having visitors to have a better look around. Today I made a new friend. It’s a shame there was a wall in the way to bring it home and I suspect it might have been too much of a mouthful!

I could play with you for hours!

0 locks, 0 miles, 2 plus 1 bump visitors, 1 shoulder of pork, 20 roast potatoes, 16 carrots and parsnips, 1 head brocolli, 8 garlic cloves, 1 apple and blackberry crumble accompanied by chilled medication, 1 lovely afternoon, 1 swooshy tailed friend.

Back in 2014, during our first summer afloat, we got the news that my sister-in-law had been diagnosed with breast cancer. She has been on quite a journey but is now very well and enjoying life to the full. To celebrate this and also to help other people, she and my brother will be taking part in this year’s London Moonwalk on 11 May. The Moonwalk is a marathon length walk through London at night in aid of breast cancer. It is quite a challenge which they have been training hard for.
If you would like to help them celebrate and help others by making a financial contribution please visit their sponsorship page at https://moonwalklondon2019.everydayhero.com/uk/jac-and-Andrew

A Third But Only A Fifth. 23rd April

Todmorden to Lightbank Lock 31

incredible edible todmorden

Chores first thing. Water, rubbish, yellow water, Tilly’s pooh box and a loaf of bread that we’d forgotten yesterday, then we were ready to push off.

Todmorden or Library Lock 19

Mick untied whilst I went on ahead over the busy road to get the guillotine lock ready for us. Here a key of power is required to power up the bottom gate, but a windlass is also needed to empty the lock. The gate wouldn’t lift so a few turns of the crank on the other side lowered the level, once this was done I could lift the gate. There is a level switch on this gate which played up when we were on a hire boat years ago. This necessitated our first call out to British Waterways, who sent a chap who knew just where to poke and prod to get it to work again. Today it all worked as it should and the ground paddles to fill the chamber were quite restrained compared to most on the Rochdale.

This was Lock 19 and we have so far travelled 10 miles along the canal from Sowerby Bridge. The canal being 32.3 miles long, so we’d just about reached a third of the distance, but there are 92 locks (if you count Tuel Lane as two) so we’d done just over a fifth of the locks. From here on the locks will keep up a steady pace and often it’s not worth getting back on board. When we headed to The Tour de France five years ago, Frank and I joked that we’d walked all the way from Manchester to Hebden Bridge. This was almost true, certainly walking round the locks adds to the steps you do, making up for the distances you ride.

The Great wall of Tod

Round the bend is the expansive wall known as The Great Wall Of Tod, said to contain 4 million brick. This brings the railway out from Lancashire into Todmorden high above the canal.

Gauxholme Railway Bridge with the locks

Soon follows the first batch of locks, five close together, but one just out of view round a bend. The fourth lock was over flowing with water so I suspected a boat was coming down and soon they came into view, this saved me emptying one of the locks as we rose. It’s amazing how much water can come down with a boat, flowing over gates and keeping the bywashes going. I walked up to help them down a small top up of water for the lock to be in their favour. Once in and descending, water was still coming over the top gates and they were concerned that the level would never equalise. So we walked back up and closed the gates they’d left for us on the lock above. I suspect this had little affect as we still needed Mick to help open the bottom gate.

Rising into a low pound

We swapped locks and we started to rise, it’s amazing how much water one lock can take out of a pound. The level dropping by several feet. We could of course have emptied the lock and used it ourselves, filling it with the water coming from the emptying lock above, but they had already started to empty the lock before I got there, so the water was going to waste anyway.

We were soon up and crawling along the next pound to the next lock. Once up Gauxholme Highest Lock we pootled on towards the next lock, where we pulled in for lunch, refueling halfway up todays locks.

Bit of a leak there

Smithylane Lock needed emptying and the level in the pound above did not look good. A very large bubbling up from under the top gates looked like it was causing the problem. We rose up the lock which brought the level in the pound above down by about four inches. I stayed to close the gate instead of leaving it for Mick. Oleanna cleared the top cill, but the water in the pound was bubbling, shallow water which was very obvious to us.

Stuck

With the gate closed I walked to the next lock and emptied it. A phone call from Mick, he was stuck mid channel, I’d need to let water down from above. With the lock gates still closed I lifted both bottom paddles and opened one at the top, hoping not to have to send too much water down as the next pound looked a touch low too. After four inches had gone down Oleanna was moving again, I closed the top paddle.

Oleanna rose in the next chamber, a leaking bottom gate not helping matters as the pound above started to bubble as it got shallower. Mick got off to open the gate, taking his time, I could see the cogs going and chivied him along. The longer it took to get out of the lock the less water we would have in the next pound as the one below was now taking advantage of being topped up.

I closed the gate again and let Mick slowly bring Oleanna up the straight to the next lock. No extra water needed this time, just a bit of a lumpy bottom. The next pound was just below the bywash so there’d be no trouble filling the lock.

Opposite the chippy

Quite a bit has changed around Hollings Lock 27. New houses are being built where a car park for Grandma Pollards was five years ago, a textile mill before that, a lady was watering her new grass at her newly purchased house right by the lock. I nearly asked if the main attraction for buying the house was the canal or Grandma Pollards opposite.

Grandma Pollards is a well renowned fish and chips restaurant, some would say the best fish and chips ever. A double decker bus sits out the back where you can eat and alongside the canal there are benches for walkers and boaters to use. This is our fourth time passing and it still wasn’t the right time of day to stop, only having had lunch a short while before hand. One thought was maybe we could catch a bus or train back in a couple of days to finally sample them.

One more to go

The next couple of locks had flowing bywashes as we approached them, the last lock full to the brim and overflowing, a welcome sight. Our chosen mooring for today was between locks 30 and 31. Here there is a longer pound that curves around a hill. We were surprised at there not being any other boat moored as it is a lovely spot, we could get into the side too! This will do for a couple of days as tomorrow rain is forecast.

Nearly there

I decided to see if I could find the opening times of Grandma Pollards so that we could plan our return. The first things that came up on Google was that after 70 years of frying up the best fish and chips and homemade cheese and onion pies Tony the owner had decided to retire. What!!!! None of his children wanted to take on the business so the shop had closed shortly after Christmas. No more Grandma Pollards and we’d never managed to sample their wares.

12 locks, 2.12 miles, 4 miles walked, 119 ft 9 inches rise today, 289 ft 11 inches up from Sowerby Bridge, 2 lumpy pounds, 1 loaf bread, 1 empty wee tank, 1 full water tank, 1 clean pooh box, 1 guillotine, 23 years of SJT, 0 fish and chips, 2 disappointed boaters.

https://goo.gl/maps/mE3gUaACqkSs4YGD9

To Tod. 22nd April

Lock 15 to Todmorden Services

Sorry Tilly not this morning. Somehow we’d slept in. We wake when we wake and normally that is at a similar time each morning, but today neither of us stirred until an hour later than normal. Maybe it was the six month old halloumi cheese we’d had yesterday on the barbecue. The extra hour in bed meant that the rest of the day was an hour late.

A load of washing did it’s thing whilst we had breakfast, then another load put on as we pushed off, the linen drawer had got quite full and we wanted to make the most of the sun today.

The approach to Lobb Mill Lock

Approaching Lobb Mill Lock we could see where the floods had taken their toll.A large chunk of towpath had been washed away below the lock. A new manhole had been installed and now the towpath needed to be made back up, in some places the gash was three feet deep. A chap sat outside his lock side cottage eating a bowl of cereal.

Nice breakfast location

The cottage had escaped the flooding as they have gates that cut the water out, but with the canal on one side and river the other they must have been a little dry island in amongst a rushing sea. He pointed to how high the water had been against his garden wall, only a couple of inches from the top!

Mill chimneys and sunken boats

Now in the Pennines properly, mill chimneys punctuate the landscape and houses sit high up on top of the steep valley. Before Old Royd Lock we passed where we’d moored up for the day on Lillian, leaving our locking companion Derek to continue on his own. Warning signs decorate the metal fence and it looks like one boat didn’t heed their message.

The Green Route

Gradually we entered Todmorden. The canal towpath bordered with edible plants. Fruit trees, raspberry canes, gooseberry plants and rosemary were all visible. Many of the flower beds in Tod have been given over to the community. Here are grown herbs, fruit and veg. In return for a bit of weeding you are welcome to help yourself.

Tod services on the left, guillotine lock off centre

Up Shop Lock and we could see the moorings by the service block. We’d been warned of an abandoned boat sitting right in the way, it was still there, but there were signs of activity on board. As we pulled up tucking ourselves right at the end furthest away from the pub a chap asked if we’d be going up the lock. No, we planned on doing some shopping at least before continuing. Thank goodness as when he started his engine up the clouds of smoke took us back to the height of the industrial revolution!

by Morrisons

After lunch we walked into town. it being a bank holiday I didn’t expect much to be open, however Mick was more hopeful. No butchers, in fact no shops open at all. Bear Wholefoods shop and cafe has gone after thity years on Rochdale Road, replaced by Yakumama a Latin American cantina. I’m sure it is very nice, but I was looking forward to perusing all the ingredients. Oh well! Morrisons had to do for a stock up shop.

Whilst Mick wandered up the canal to see if there was anywhere else we could moor I got on with some work, trying to catch up with my sketches. I was doing quite well until there was a voice outside ‘Pip are you in there?’ ‘Pip are you asleep?’ I couldn’t really pretend that I wasn’t in as our whirligig was full of washing. It was an old friend from Croydon College who for a time I used to make models with. Alan had been chatting to a mutual friend and had heard that we were in Tod, so he’d come down to say hello.

Local residents

Fortunately he understood about me trying to get work done and we’ve tentatively arranged to meet up sometime over the next few days. Handily we’ll be on his route home from work for the next week.

At 8pm I finally put together my email to send off to Chippy, only a few days later than I’d wanted.

3 locks, 1.48 miles, 30 ft 7 inches risen, 170 ft 2 inches since Sowerby, 1 sunk boat, 2 inches away, 2 loads washing, 3 bickering white geese, 34 illiterate Canadian geese, 0 bear, 2 versions, 21 sketches, 1 old college friend, 1 bored cat, 0.5 worming pill finally eaten.

https://goo.gl/maps/kCsxQRCNZbWhuTC49

Canal Closed. 21st April

Lock 15

It may be Easter Sunday/Monday/Friday, what ever Easter day it is I needed to do some work. Panto may be months off, but my first design deadline is mid May, so a pause in cruising was needed so I could get some sketching done. My hope is that John will return to work on Tuesday after his Easter break to lots of sketches from me, feed back will follow then I’ll be able to get on with a white card model.

It’s too busy! Make them all go away

10 hours! Wowee!! That would be great if only everyone in this outside would just go away! Too many bicycles, woofers, runners, walkers, all busy moving their outside leaving us where we are. All a bit too busy for my liking.

A couple of boats came past late morning heading down the locks, Mick asked about water levels higher up and was told there was plenty of water. He warned them about the levels further down towards Hebden and on they continued. About 3:30pm a C&RT notice came through.


Due to low water levels between Locks 7 and 13 on the Rochdale Canal the navigation is currently closed.
We will continue to monitor the water levels and will update the notice as soon as possible.


Thank goodness we’d got to above Lock 15, it did make us wonder if the two boats going down had got stuck needing assistance from C&RT to get floating again. Weekend and day boats would only come so far up the locks before turning round back to base, therefore gradually diminishing the water in certain pounds. We were surprised that the closure included through Hebden Bridge.

Hot Paw Buns

After watching Mick and Frank devouring their big fat hot cross buns the other day I decided to make some of my own. The recipe I’d found last year had been quite successful and I had everything I needed on board. So whilst I worked on sketches the dough was allowed time to rise, three times before going in the oven with marzipan paw prints on their tops.

Inspiration for Puss in Boots

Mick spent some of the day packing away the spare bedding. This lives under our sofabed and sadly the mechanism has torn through the vacuum bags. We had one bag spare, a giant one. This would hold everything, it’s just that it wouldn’t fit under the sofa with or without air in it. As this was all going on in my studio, it was hard to ignore and I had to take over get involved.

They won’t get very far!

Late afternoon another boat came past heading for the lock, Mick went out to inform them of the stoppage. The couple moor just this side of the summit and were heading to Hebden Bridge for blacking in a weeks time. They are used to lack of water on the Rochdale, they also had plenty of tales to tell of the floods.

New piling to hold the landslip back

In 2015 the river and canal just about became one, in Hebden Bridge where we’d moored the towpath was under 18inches of water and you could only wade through the park where everyone had been sunning them selves on Friday. I’d have been fine up my tree! Up ahead of us there is a stretch where the bank is still washed away and alongside our current mooring is where there was a landslip, now held back by piling. This stretch kept the canal closed for quite sometime.

They decided to continue on down and see where they could get to before they could go no further. Mick helped them through the lock and waved them goodbye.

Everyone on the towpath

As it was such a lovely evening and I’d been cooped up all day trying to work we decided to have a barbecue. We had just enough coals left from last year to cook some veg kebabs and a couple of turkey steaks that I’d marinated. Because we’d had a Hot Paw Bun when they’d come out of the oven we refrained from our usual banana with chocolate for pudding. This meant Tilly had extra time outside which with fewer people about she enjoyed much more.

Yumm!

Will this summer be like last? Will we be having barbecues instead of Sunday roasts until autumn now? I hope so.

Not a bad spot to spend the evening

0 locks, 0 miles, 2 Easter eggs, 12 sketches, 3 boats down, 1 boat up, 6 scanned illustrations, 10 hours of watching, 1 hour of enjoying, 2 holey bags, 1 big bag, 1 squished up sofa, 9 hot paw buns, 2 turkey steaks, 4 kebabs, 1 block of Haloumi left from last year, 1st evening on the towpath.

Gongoozeled. 20th April

Hebden Bridge Wharf to Shawplains Lock 15

Frank had requested a cooked breakfast this morning, Stephen Maskill Butchers had provided the chunky cut smoked back bacon, the freezer on board provided the chipolata sausages left over from Christmas and the Co-op provided everything else. Frank ate his breakfast before I could take it’s photo, so you are saved photos of more food.

A Hebden Scene

With the last Scarborough Athletic match of the season to catch Frank was soon heading off for the station. It’s been a lovely few days with Frank. He has now worked through all the locks on the Rochdale apart from the Rochdale Nine, who knows he may just turn up when we get over that side!

Time to carry on rising up and over the Pennines. First the water tank needed filling, we were almost out. We pushed over to the tap, not the strongest of pressure and with the washing machine going too it took well over an hour to fill. This gave me time to hunt out a bumbag, I’d thought of going to one of the nice independent shops to see what they had, but changed my mind and headed to the nearest charity shop. Here I had two to choose from at £2.50 a bargain. My new camera now has a new cruising home, no longer in trouser pockets, maybe it’ll last me three years this time.

Surrounded
Up the lock

Black Pit Lock had a good crowd of gongoozlers keen to watch us. I felt sorry for the juggler as I think we upstaged him somewhat, but he chose to perform next to the lock. The crowd seem puzzled as I went back to empty the lock, just doing as instructed.

As we made our way towards Stubbing Locks a boat came past saying that the levels up ahead were very low, so much so that they’d turned round. Oh well, we had no choice but to carry on and see for ourselves, we wouldn’t be turning round, we’d be carrying on.

That’s a touch low

They’d been right, the water between the two locks was very low, drawing off another locks worth of course made it worse but there was enough water to get Oleanna over both cills. The next pound looked better to start with but got worse as we continued. Slow progress, the occasional lumpy bit and then a trip boat meaning we grounded for a while.

Not Large Marge, just the Barge

Just before Rawden Mill Lock is a winding hole, the boats on the permanent moorings all sat on the bottom at very jaunty angles. The level was too low to be able to get off Oleanna at the stern so I tried at the front. It was a touch too high and a touch too far away to have enough confidence to jump off from the closest Mick could get her. Luckily a young couple were passing, I asked if I could have a steadying hand to get off. Phew that worked, we were able to get out of the pound before anybody emptied any more water out of it.

Clinging on for dear life

The mooring above Callis Lock looked reasonable, just a shame about the wiff from the sewage works! We carried on, not really wanting to reach Todmorden today. There were plenty more boats sat on the bottom, one chap at an alarming list said he was waiting for a mooring higher up. His dog seemed more alarmed than he was, would he ever get off the bottom?

Scenery

Another couple of locks before we found enough depth to get close enough to the side to moor. The canal, road and railway all follow the valley, so no peaceful moorings, but the scenery is rather good. All Pennine crossings have their difficulties and numerous locks, but what that brings with it is wonderful countryside that you simply wouldn’t get without the effort.

Not a bad view
Mine
All Mine

7 locks, 2.85 miles, 59ft 10inches climbed today, 79ft 9inches day before yesterday, 2 Saturday papers, 1 pair of reading glasses, 8 sausages, 6 rashers, 3 eggs etc, 2 hot cross buns, 1 hour plus filling, 3 knives, 1 ball, 37 gongoozlers, 1 helping hand, 2 big lumps, 3rd mooring lucky, 7 out of 10 OS eggs, 2 hours, 1 wall, 1 field, 1 post claimed, 1 very dusty path, 1 grey cat!

https://goo.gl/maps/QMMetaZLsX49cPeB8