Redhill Marina/Scarboreugh
Monday. Last week we’d forgotten to come away from Oleanna with the correct dimensions of the diesel cap so that we could get the correctly sized version. A message was sent to Tom which also enquired as to when he thought Oleanna would be being launched. Correct dimensions were received, and news that all was going according to plan, the last of the painting was nearing completion, and Bertie was busy polishing. Tom would give us a call on Tuesday to chat about the plan for the rest of the week.
Ah! We really needed to know which day, as we didn’t want to miss out on hire vans this week, and we’d be needing to hire it from the day before the launch so that we’d be able to arrive before her bottom got wet. The answer came back, ‘Let’s go for a Thursday launch either way’. We did a quick plan in our heads regarding trips to Redhill, 1 for launch, back to Scarborough, 1 to move Tilly, return hire van. A Thursday launch would mean a longer hire, but more leeway should we need it.

The van was booked straight away, a Sainsburys click and collect booked in Loughborough, then I did a happy dance!
Mick checked the diesel cap lock. The place we’d bought one from only does one size. We looked round for alternatives and think we’ve found something neater and of the correct size. However, the time of us having a handy address for it to be delivered to was running out. We’ll put that on the back burner and revisit soon. Anyone fancy the lockable cap we can’t use?

Tuesday lunchtime we got a request from Tom for some D shackles so that the stern fender could be attached. Did we happen to have some with a gap of 17mm minimum? Maybe on the boat, but that would mean hunting through The Shed! No-one should be given that task apart from one of us!
Scarborough used to have two chandlers, both no longer sadly. We looked online, nowhere did 17mm, next size up was 20mm. No local shops had them, maybe if we had to order them then we should go for stainless steel. The hunt continued.


The bow fender went on. Plank and pole rest were located towards the bow. It used to be towards the stern, but we’d soon realised our mistake when centre lines got caught round boat hooks. Some more antislip was added to the roof and the stern doors were sanded and given a coat of yacht varnish for protection.


We were all very excited when Alex, Angie and Polly arrived to stay overnight for the press night of the new Ayckbourn. The barrier between the two houses was put back up for the night to keep woofer and Tilly apart, then we all put on our glad rags to head to see the show.

The Trial of Romeo Oscar is Alan’s first ever courtroom drama, set in 2194 when humanity has been scattered across the universe. Androids are plentiful and seeking to be treated as equals. Romeo Oscar, a military android, is to be put on trial for murder, the first non-human to be tried in a court of law. There are a few laughs, lots to listen to, absorb and think about long after the show. We really enjoyed it along with catching up with people over a drink afterwards. If you happen to be near Bowness or Stoke the show will be touring in October.
Wednesday. A spark of inspiration, would Berriman and Chapman in Scarborough have some D shackles? It was worth a try. I walked down into town for a few bits and had a lengthy chat with the lady behind the hardware shop counter. I bought four of their largest shackles, but suspected they’d not be big enough. Back on line to check the location of S3i, a short detour on our route south and yes we could collect our order in the morning, job done.

The rest of the day was spent packing up the kitchen, work items and just about everything else other than clothes. Once the van arrived it was loaded for a swift getaway in the morning. Anna, our current lodger was surprised at how quickly things were now moving, well we’ve been ready for this move for well over a month now, we just had to repack items we’d unpacked.
Thursday morning. With several plastic bottles filled with water and sandwich supplies we climbed into the van and headed southwards. A turn-off near Doncaster had us arrive at S3i which is just across the way from Howarth Heating where we got our multifuel Bubble stove from when Oleanna was built. Did we need anything for the stove? It was too late to be thinking about a new riddling rod! Once our shiny shackles were picked up, we carried on heading south arriving at the paint shed at just gone 11am.


Shackles handed over, the stern fender could now be fixed on. Unfortunately the new one we’d bought was a few inches shorter than the old one and would not quite protect the rudder. Tom hunted round for an old stubby button, this was cleaned off and added to our new one, much better, thank you guys.



Our items that had been in storage in the shed were brought out and popped on the bed inside Oleanna. It was going to be interesting to see what we’d actually packed weeks ago! At least my walking boots were there! Two fat fenders were pulled out from the shower and hung on the starboard side, the chaps from the boatyard were coming to move her!




A trailer was brought, then a forklift with a long strop which was attached to Oleanna’s bow T stud. She’d been put on wheels all ready for the move. We were asked to stand behind the jolly barrier, the engines that Bertie has been painting. Then the forklift took the strain and Oleanna gradually inched her way out of the shed. Once her bow was well clear of the shutter doors the trailer was backed up to meet her. The frame was lowered to go underneath her, then backed up. She was raised a bit, making sure she’d still clear the shutter doors and pulled further out into the day light. The solar panels started to work. She was lowered onto blocks again and then the trailer reversed more, then she was lifted up off the wheels from the paint shed.
She was pulled out of the shed, then manoeuvred around in front of the cooling towers, how many photos did I take? Just a few!!!




As she came past the Hill another boat was being grit blasted, it would be backed into Oleanna’s space later in the day, just before it started to rain.


Then she was swung round and headed down to the slipway, where she was backed down the ramp. Tom and Bertie holding bow and stern ropes followed her down keeping hold of her. It took a couple of goes at getting her to be free from the trailer, but then she was floating, back in the water after 47 weeks and a day! She was pulled backwards and tied up on the mooring in front of the bar and marina office.
First job, those plastic bottles of water would be coming in handy as the water tank on Oleanna was empty and we wanted to sterilize it first. The hose was set filling the tank. Tom fitted the pramcover which gave us somewhere to eat our very late lunch.



Taps were tried, a trickle from the kitchen sink. Nothing from the bathroom sink! Maybe an airlock, Mick left the taps on for a while and the pressure improved. Tom wanted to check the gas was okay. The hob took a bit of persuading to ignite, two of the burners needed a bit of nozzle cleaning for them to work properly a bit of wire did the trick to clear it.


The fridge was turned on, the light worked , it made a noise, but it didn’t get cold. Bugger! Tom didn’t know anyone who could help, maybe someone in the pub later on would know something to assist us. The suggestion came back that turning it upside down for an hour might help, other suggestions from Canal World Forum were in favour of re-gasing it. Or would we simply have to buy a new one? We looked online, asked advice about chandlers. Since Midland Chandlers has gone online only, it’s much harder just to pick up a new fridge. Thankfully we’d not brought too much from the house that needed to stay chilled. Our pullout freezer can be used as a fridge, the temperature can be adjusted, so that would do for today.

The bathroom tap now seemed to be working, but there was also a lovely stream of water flowing across the bathroom floor. After ten years of good service the tap must have had some water in it which froze despite the boat being fully winterised! New tap or ceramic cartridge required, but for now a tea towel wrapped round it will do. With the water tank now full and sterilizing it was left for an hour, then the water pump worked it’s socks off emptying the tank. Those plastic water bottles keeping us away from using the water in the tank for a while longer.


Next important job was to get the new curtains hung. I started in the bedroom, glad I’d labelled all the curtain rods, they went back up pretty easily. The curtains I’d made at least five years ago went up without a hitch. Next the main cabin curtains, made earlier this year with more tolerance in them than the old ones, this might be a good thing as our new windows are far thicker. Mick was called in to help with a troublesome endcap and screw, the endcap dropped and totally vanished. It was nowhere to be found! At least we’d be able to draw the curtains when it got dark, they might fall off the end of the pole on one side, but hey! It would do for the time being.
Bedding was found. Around the bed hoovered, items put into storage beneath the base, bed made up. Time to try and clear somewhere to sit down!

Items we’d cleared from all the lockers needed to be moved back to where they belonged, cupboards under the dinette hoovered out, floor hoovered again, dust jumping out from everywhere. Thank goodness we’d brought an evening meal with us, beef and beetroot curry which was consumed quite late on when we’d had more than enough of trying to stow things and clean up. A couple of glasses of wine whilst looking at potential fridges, then we collapsed into bed pretty exhausted.

Friday. We’d come without any breakfast. It had been planned that way, as there is the cafe just across the way, it would have been rude not to! So we both opted for a cooked breakfast sat in the morning sunshine overlooking the river and a rather nice shiny boat.

Tom called round this morning to check if things were working as they should. Our sliding galley windows were extremely stiff. These are original windows and even though I’d cleaned them quite well before she came out of the water last year, she’d had a whole winter and spring for green growth to accumulate, add into that grit from the blasting. Tom set to work clearing them out and greasing them so they would move better.
We’d also had difficulty closing the stern doors last night, the rear hatch wasn’t clearing the doors as it should. This turned out to be the two PTFE blocks that normally glide on the runners were missing, thankfully they were sat on the Nicholsons shelf. Tom glued these back in place for us and we locked the hatch so the glue to set undisturbed.


Mick rang round chandlers, no-one had a fridge in stock. If they sell fridges then they have to be able to recycle old ones, so few chandlers stock them. One company was found in Oldbury, but they didn’t answer the phone and then when he tried to place an order it said that it would take 7 days for the fridge to be converted to 12/24 volt. No, we weren’t interested in buying a 240 volt one. Very kindly Tom offered to order one for us from Midland Chandlers using his account, it should arrive Monday or Tuesday, bingo, job done. We just needed to plug the gap left to keep Tilly from exploring behind cupboards, cooker and the floor, those clothes bags can be unpacked later!

More unpacking, stowing, moving things about, I did wonder if it would ever end! Items to be returned to the house were collected together and put in the van. Tom came and helped take the old fridge out then he single-handedly popped it in the back of the van for disposal in Scarborough.
The journey back to Scarborough was a touch slow, Friday late afternoon evening traffic. We opted for a supermarket curry and bottle of wine then headed home to see Tilly and give her the news that her floating home was as ready as it could be for her to move back on board.
0 locks, 0.1 miles on a trailer, 4.79 miles walked around the boat on Thursday, 3 on Friday, 1 van load, 2 many things to stow, 0 new items, just where has it all come from? 1 hire van, 8 shiny shackles for the price of 6, 1 forklift, 1 trailer, 1 new cat landing net needing glue, 1 dead fridge, 1 leaking tap, 1 stubborn cooker, 1 water tank filled, 1 bottle milton, 1 hour, 1 tank empty, 1 tank refilled, 1 wasp sting, 1 hour of PA duties, 1 support network set up, 1 shiny boat in front of 8 cooling towers, 2 cooked breakfasts, 1 with extra bacon instead of gf toast, 2 happy boaters, 2 long days.
