Uuuuppppp. 25th September. With photos!

Green Park to Sydney Wharf Bridge 188

Oleanna was rocking around a touch this morning due to loosened ropes, but the river looked like it had behaved itself overnight. A damp start to the morning, so we had tea in bed and hoped it would brighten up before we got to the locks. We didn’t want to be too early anyway hopping that we’d get some assistance from volunteers on our way up.

Approaching the lock landing on the river

At 10:15 we pushed off and headed for the bottom of the flight. With walkie talkies in hand I walked up to the bottom lock. A breasted up pair were just about to enter the lock to come down, masses of crew.

Hotel boats breasted up

It turned out to be the Bywater Hotel boat and butty, they were heading with their full compliment of guests to Bristol hoping to stop for the night on route. They may be lucky and time their arrival at Keynsham to grab the space on the pontoon that would be vacated by a hire boat today.

No need to radio to Mick there was plenty of time to signal to him what was happening. They were soon down and the lock was all ours and we’d timed it just right to have both volunteers lend us a hand. One chap stayed with us whilst the other walked up to Bath Deep Lock to open the gates and then head up to the next lock to let some water down so that we wouldn’t empty the pound in between.

A couple of bike riders came and asked lots of questions about how the locks worked etc. They then decided to follow us up to the Deep Lock.

Going in

The gates had been wound open enough for a narrowboat to enter, but no more. Each gate takes 120 turns to open it fully. I was grateful as I did the closing. From the instructions I’d been given the other day I knew using a rope wouldn’t be a good idea, but Mick had already passed the centre line round a riser. The Lockies joined us and explained how the lock would work, which I then conveyed to Mick via the radio. All well and good being told not to use a rope but then having a paddle lifted before you could get it back from the riser was a touch annoying. As Oleanna rose Mick flicked the rope upwards on the riser and then had to fight to get it loose at the top.

Water coming in at the side

The effect of the paddles was as they had suggested. Using the paddle on the opposite side of the lock to your boat has the effect of holding it to the side, the water comes out from four points along the side of the chamber. Then as the level rises the stern starts to cross over, this is when the other paddle is lifted to compensate.

Get out of the WAY!!!

I was hoping to get some good photos but our friendly cyclists had come along to watch also, standing right in front of me! As nice as their cycle helmets were I’d rather have got a few photos of Oleanna.

Just about there

The Lockies helped us up the rest of the flight. The off side paddle in the forth lock up however refused to shut. No matter what the Lockie did it wanted to stay up by a good foot. In the end we closed the gates and could see what the problem was. The rod that leads from the paddle gear to the actual paddle should run through a bracket which is fixed to the gate. This bracket is made up of two pieces shaped so that the rod passes in between them. The outer part of the bracket was lost and the rod had slipped behind the one still attached to the gate, here it was jamming.

It should be like this
But was missing a bit, at least like this it wasn’t jammed

Mick used a boat hook to nudge it over and it was free again, but still not in front of the bracket. It would work for us, but how long before it would jam again? The Lockie said he would pass it on to the local team. A quick stop off to dispose of rubbish in the next pound. It is so nice having a full compliment of recycling bins. Just a shame boaters still just leave bags for someone else to put in the right bin!

We’d chanced coming this far as we hoped there would be space for us before the next bridge. No spaces were immediately obvious, so we loitered on the lock landing hoping. Tilly peered out the windows willing someone to move! Right at the far end there was a space so we took it. The lure of the steps to the road meant Tilly was still locked inside, she stared some more.

Wall and trees!

Feline power eventually worked and the boat behind us moved off, we pulled back knowing that the trees alongside would be more appealing than the steps now. Freedom!!! At long last!!! Trees, smells, walls, friendly cover and ‘Thank you for coming home’ Dreamies again. All was right with the world. I even got a fresh pooh box too!

A contented tip

Time to dig out my scenic brushes. Check them over and see if I needed anything else before we left Bath. This meant lifting the rear steps off thier brackets to access the cupboard below the Alde boiler. The wine cellar hadn’t been restocked yesterday with this job in mind. Blimey there must have been a whole Tilly’s worth of fur down there along with three mice, 1 fish and a bedoingy ball (all cat toys).

Brushes

The advantage of getting my brush bag out was being able to see the back of the boiler and check things over. Something was leaking a touch, water not gas, a damp patch around a hose going through a shelf. Mick was called in and he tightened things up hoping that this would do the job.

Steps back in position the cellar could be stocked with wine and cat food again. After hearing of two people falling from the back deck whilst their steps have been out this year it was nice to get them back in and safe. I made a list of things that would be handy to have when painting Panto and headed into town.

Regency facebook being checked

Parts of town were blocked off, a regency drama was being filmed. A chap sat at the front of a carriage looking at his mobile waiting for his queue to move, the horse patiently waiting too. Looking in from further round it looked like market stalls had been set up with a lot of fabric everywhere. It all looked a touch cheap to me, but maybe film cameras alter things, or maybe it’s just a cheap production.

Oh well!

I managed to time my shopping well, everything bought that I needed and the rather nice looking wool shop having closed before I got there.

6 locks, 2nd deepest, 1.23 miles, 2 volunteers, 1 river left, 1 clean pooh box, 1 clean pooh bucket, £1.53 card, 0 wool, 500 grams brown rice flour, 5 new brushes, 1 cheap compass, 1 film crew, 1 location lock down, 1 clean and tidy cellar, 1 happy cat.

https://goo.gl/maps/dKTQgL1MZF68cxF76

River’s Rising. 24th September

Ferris Railway Bridge to Green Park Visitor Moorings, Bath

Not wanting to get stuck on a rising river for days we needed to move. As we had breakfast the rain hammered it down outside, even more reason to get moving! We don’t know how the Avon reacts to rainfall, is it a quick rise in level or a slow one that can sneak up on you, or does it just about stay constant unless there is a lot of rain.

Off we go

Mick checked Gauge map, the levels had gone up a bit but it looked okay for us to leave the pontoon. With full waterproofs on we rolled back the covers and got going, the rain starting to ease.

Swineford Lock the weir on the left behind the lock landing

At Swineford Lock the weir was gushing, it had been a bit like this on Saturday, just a bit more so today. I looked around below the lock for a levels board to see if we were in the green/amber/red. But there was no board to be seen. The river level above the lock looked like it was up by a couple of inches as I could see where the usual line was below the surface. On most rivers a rise of this much would bring it into amber, but hopefully not red.

Blue skies!

The rain started to come and go, bright sunshine lulled us into removing our coats and waterproof trousers.

Hardly a trickle on Saturday over this weir

The weir at Kelston Lock on Saturday had hardly been flowing, today it was matching the others lower down stream.

One of two spotted today

Weston Lock took forever to fill due to there being only one paddle working, the other wrapped in a plastic bag. The weir was running fast and it looked like the flood gate was slightly lifted too.

Slowly

Once we’d got to within a couple of feet from the top of the lock we both got distracted by our phones. Two boats headed towards us but winded through the next bridge, then the bow of a hire boat appeared, I’d be able to leave the gates for them.

Dark clouds gathering behind

It was lunchtime. Should we take advantage of the sunnier weather and work up the locks. Should we pull in near to Sainsburys and have lunch, Mick needing some bread. The decision was made for us as the rain clouds burst again over head. Coats quickly back on and we made our way to the 48hr mooring nearest to Sainsburys.

No need to water the plants today

No rings or bollards to tie to here, just a fence which is just at the right height to give you a soggy crutch. Mick headed off for a few supplies and returned with vouchers we would have to use. 3 x nectar points and if we spent £100 we’d get an extra 2000 points, we decided to stay put for the day and go and do a big shop that we needed to do anyway.

My new sour dough loaf was mixed and left to rise for an hour and a half then baked. The smell from the oven so yummy. Once it was out of the oven cooling and the news had finished we headed to stock up with shopping. Four boxes of wine brought the bill to over £100, but the check out didn’t want to accept the voucher, assistance was needed. The chap tried several times but failed, he just gave us the points manually in the end.

Oat and Chestnut bread and chocolate chip cookies. Who says gluten free is dull

As we ate our evening meal a batch of chocolate chip cookies went in the oven. I’d made the mixture a few days ago in case we had any visitors, now it was needing to be cooked. The smell through the boat meant we just had to have one each for pudding. Yummy!

4 locks, 6.77 miles, 2 Houdini questions, 2 kingfishers, 4 busy weirs, 3 downpours, 0 prorogation, 4 boxes wine, 1 box Tilly food, 0 shore leave AGAIN!!! 1 oat and chestnut loaf, 6 choc chip cookies, 2 full boaters.

https://goo.gl/maps/fAwcLybVC9xmFcmt9

Eastward Bound. 23rd September

Brunels Quay to Ferris Railway Bridge 211

Oleanna with the SS Great Britain

This morning I noticed a natty little thing on the ferry that crosses from our mooring to the SS Great Britain. On the bow of the boat is a metal hoop which pivots, controlled by a cable from the helm. As the ferry is brought in and lined up to the jetty the metal hoop is lowered over a post. The driver then walks to the bow flips down the ramp which covers the watery gap, passengers get off or on, she then flips the ramp back up returns to the helm and lifts the hoop off the post and away they go. This means that the ferry can be a one person operation as nobody is needed to tie ropes. Here’s a link to a video I took of it this morning (warning it’s 35MB!).

A close up of the bridge

Two more loads of washing were put through the machine, hoping to use up some more electric before we left. This helped pass the time whilst I composed a long email to the theatre in Vienna with photos of the model for A Regular Little Houdini. With the final rinses happening we headed to the nearby Tesco for a few supplies and then we were ready for the off.

About to cast off

Once the ropes were carefully untied from the wobbliest wobblesome pontoon, the wind helping to push Oleanna away from it, we winded and set off for a little tour of the harbour before we left.

Still westward bound

Down towards the Underfall Yard where we turned, mow eastward bound.

Rigging on the SS Great Britain

We headed back past the SS Great Britain, we then cruised down past the electric cranes and turned into Bordeaux Quay and The Waterfront winding at the far end before then passing under Prince Street Bridge, leaving the harbour.

A concrete boat having a house built on top

We would have liked to stay for longer but sadly time is limited before I start work and the cost of mooring here is a little off putting. A week would cost us around £160, cheaper than a hotel and we’d get all our washing done, but still a touch costly.

Straight through Netham Lock

As we cruised our way out of town storm clouds gathered behind us. Waterproofs were gathered from inside. Straight through Netham Lock and we were back onto the river. Gradually more trees surrounded us, gradually the sky became darker. The forecast originally had been for rain at 4, then 2, but it got started at midday. We hoped for a mooring as soon as we got back onto C&RT waters.

Starting to rain

Hanham Lock was in our favour so we rose the 15 inches or so. There was a space on the pontoon at The Chequers Pub, but we’d have had to shrink a touch to fit. Onwards in the rain, waterproof trousers were now required. Mick valiantly stood at the helm whilst I made tea and lunch to have on the go, but his sandwich stayed inside for fear it would get too soggy.

Keynsham Lock and some kind sole had left the top paddles open, so this very slow lock took even longer in the rain than it needed to. Mick hung back away from the lock whilst I emptied it, the flow from the lock would have necessitated mooring up fully on the lock landing. Then we rose slowly, very slowly. The last 2 foot taking a life time !

?

It still rained. Not even an inch spare on the pontoon here. Onwards to Ferris Railway Bridge where thank goodness there was space for two next to the one that had taken up residency. We settled down and started to dry off.

There was just enough phone signal for me to have a chat through the props list for Panto with Jo the prop maker. Good job I don’t really use my phone much as it took us a good hour and a half to work our way through the show. Jo will start work on collecting materials in the next week then she’ll start by making the prop car and mod scooters.

This morning I received photos from Australia of the knitting project I was busy with earlier in the year.

Billie at 1 week old

This is Billie at a week old with the blanket I knitted for her. Billie is the great niece of my bestest friend Emma. Nellie, Billies Mum, was very pleased with it, so was Chief their woofer.

Dad and Chief look on

3 locks, 1 straight through, 11.41 miles, 2 more loads washing, £3 left on the post, 1 tour of the harbour, 2 misleading forecasts, 2 soggy boaters, 3rd mooring lucky, 1.5 hours talking smash, pub stools and mod scooters, 0 shore leave for Tilly again! 1 sour dough woken, 1wk old Billie all wrapped up.

Stretched out on my blanket
https://goo.gl/maps/H1mmsAZdNCCfG7Ho8

Like Giggling Teenagers. 22nd September

Bristol Floating Harbour

Torrential rain woke me at 3am hammering on the roof trying to get in. I checked all the windows were closed and climbed back into bed. By 3:30 the outside world had calmed down so sleeping could continue.

Saturday paper on a Sunday

No alarm clock, we had a lie in and enjoyed a cuppa and the Saturday newspaper in bed. It’s been a while.

A quick tidy and brush up, another load of washing and we were ready.

Two giggling 52 year old teenagers walked down the side of the boat. I knew exactly who they were.

Rachael, Charlotte and Pip

Charlotte and Rachael two of my old school friends from York. Charlotte is a teacher and lives in Bristol and Rachael runs a plant nursery near Malvern. These two ladies were Goths back in the 80’s. They wore black head to toe and had spiky hair, where as I wore all red and occasionally crimped my hair.

They had a good look round Oleanna and met Tilly, although she’d rather have gone out! Then we headed to Wetherspoons for some lunch and a drink. There was lots to catch up on, poor Mick coped very well.

Old friends

I last saw Charlotte at my 40.5 birthday party. We used to keep in touch until we moved onto the boat, then Charlotte moved house several times around Bristol and we lost touch. I luckily found her on Whatsap a couple of weeks ago. Rachael on the other hand I hadn’t seen since we left school. She went off to train as a Stage Manager, performed in a circus act and lived on a coach in Sheffield for a while. She then worked at Askam Bryan, an agricultural college near York, and now designs gardens for people.

Several life times have passed, we caught up on gossip of friends all across the globe. It was a very lovely afternoon with them. We hope to all meet up again when we reach Birmingham at the beginning of next year.

THE Green boat that’s made the headlines recently

There was still enough daylight to go for a walk and help wear off the lunchtime drinking. So Mick and I decided to walk round the harbour to see what else there was to see.

Some of the harbour

By the 1760’s Bristol had become such a popular port for cargo ships it was struggling to accommodate all the ships. In 1765 the idea of a floating none tidal harbour was put forward by engineer John Smeaton. But no progress was made until 1790 and by 1802 William Jessop was engaged to come up a scheme. He put together various ideas from earlier proposals.

Colourful

The River Avon was dammed at Rownham and at the bottom of Totterdown Hill, near Temple Meads, impounding all the water of the Avon and Frome between these points. A weir at Netham controlled the level of the Harbour water, channelling water along a Feeder Canal and allowing excess to spill back into the tidal river Avon. A half tide basin was constructed with locks to the river and the harbour.

Curved lock gates

We walked down to the River Avon past Junction Lock, Cumberland Basin (the half tide basin) to Entrance Lock which takes vessels down onto the tidal river.

Blimey it’s high up

Standing between the lock and the weir we could look down the valley towards the River Severn, Clifton Suspension Bridge sitting high above everything. Lines of coloured houses brightened up the greying skies.

Spot the ball

A pool under the Plimsole Swing Bridge was playing host to teams playing Canoe Polo, highly energetic and wet.

Mick controlling the harbour level

At Underfall Yard there is a museum where models demonstrate how the level of the floating harbour is kept constant and how they scour out the silt that collects. Notice boards around the harbour warn you of days and times that this process takes place.

4 fingers and a thumb
Pretty boat

Plenty of boats are moored up, some with all the services and other with little other than a ladder to gain access to your boat. Past the Harbour Masters building and along the south side of the harbour.

The sun managed to come out

A clock tower on a 1920’s building glowed in the late sunshine against the bright blue sky. Down the side of the building at the end of an alleyway an alarm box had been put to artistic purpose.

A Banksy

Banksy in 2014 painted his version of Vermeer’s Girl with a Pearl Earing. This is called the Girl with a Pierced Ear. The spatters and dribbles make this piece, we did wonder if the central heating flue had been added after the girl was painted or before.

Broken down sign
No sign of Wallace

Signs of the Bristol Old Vic Scenic Workshop and Aardman Animation. Theatre and Wallace and Gromit close neighbours.

Peeking over the fence

We’d considered visiting the SS Great Britain, now it was too late in the day and the £17 entrance fee put us off. Instead we looked at the stern through the fence for free, not quite the same as going round, but considerably cheaper!

There is a bit of road in there somewhere

From here railway lines criss and cross what was the docks.

Electric cranes all lined up

Four electric cranes still stand at the waters edge, the only remainers of the 40 that had existed in the 1950s. What a different place this would have been 70 years ago. No museums cafes and bars then.

Mirror ball

We crossed back over to the north bank on Prince Street Bridge then over Peros Bridge and towards Millenium Square. Here cascading water sculptures reminded us of Sheffield station.

The biggest mirror ball gave me opportunities to take our photos before we looked at the electric generating tree. Below this you can charge your phone whilst enjoying the aroma of the rosemary bushes as a statue of Cary Grant watches you. Millenium Parade brought us back to the boat for some play time with Tilly.

Energy tree
Rosemary phone charger

The cruiser that had been moored near us had left, so we decided to give the other boat left on the moorings a bit more space. We pushed over to the next pontoon, which was one of the wobbliest I’ve ever tried walking on, more like a fairground ride than somewhere safe to tie up to. The wind blew Oleanna away as I clung onto the centre line, Mick waiting for me to pass it back to tie us up. I stayed put trying to keep my balance until we were tied up, reducing the number of sides I could fall off to one.

Cary Grant apparently

0 locks, 0 miles, 2 old friends, 2 much to catch up on, 3 burgers, 1 quinoa salad, 1 portion of halloumi fries, 1 Punk IPA, 1 Swift 1, 1 wine, 1 coffee, 5 mile walk, 4 cranes, £17!! 1 tide out, 1 more day without friends, 1 boat almost blown away, 40ft of wobbliest wobblyness.

Reached Our Destination. 21st September

Sydney Wharf Bridge 188 to Brunel Quay Visitor Moorings

First things first a newspaper! At the bridge behind us there was a Tesco so that was an easy find. Breakfasted and ready to go just gone 8:30am. We had quite a few hours cruising to do today, so no languishing in bed with the paper.

Sharing with plenty of crew

As we rolled back the covers a Sally Hire boat came past with a crew of far too many chaps to ignore. If we could share with them it should make our trip down to the river a lot easier. I checked they were happy to share and we pulled in alongside them.

Chin wagging at the back

We were joining a group of chaps from Margate Rotary Club who’d come out for the weekend. They had missed winding further back this morning and were in two minds as whether to carry on down the locks to the river or find a suitable place to wind. They had to do the first two locks no matter what. As we progressed down the locks more and more people kept coming out of their boat, just how many of them were there?! Eight and someone else was joining them today.

Following another hire boat down we all had to pause when it came to Bath Deep Lock. This is the second deepest lock on the network and has only a short pound above it. By now a couple of volunteer Lockies had arrived and with local knowledge they suggested that the boat in front of us should wait until the Deep Lock had finished filling before leaving the lock above, this would save them grounding.

Winding and winding

I’ve been finding the low geared paddles a pain, so have started to stand in front of the gate to wind them away from myself, I find this a lot easier. The volunteer wasn’t happy with this and told me off. I understood his concerns that I might step back and off the side of the lock, but I was very much aware of this and was just avoiding giving myself numerous bruises.

They’re such a long way down

A single hander was coming up, so the volunteer was kept busy. Locks were swapped, then we helped the single hander up the lock in front of us. A do-si-do of boats and we were in the lock waiting to go down, pausing whilst a boat came into the Deep Lock to come up, therefore they could use our water.

Winding winding winding the gates open

Another do-si-do and we were in the Deep Lock ready to go down. I know we are more than likely to come back up on our own so let the chaps from the hire boat do all the winding of the paddles followed by the winding of the bottom gates. Meanwhile I chatted with the Lockie to get tips on how to ascend the lock should there not be anyone around to assist. We’ll see if his method works when we come back.

Last lock with the chaps

120 turns of a windlass later the bottom gates were open and there was only one more lock. We said our goodbyes to the chaps as we’d be heading downstream, the chaps still had to make their minds up as to what they were doing. Hope the rest of their weekend was good and that they don’t get too wet tomorrow.

Our locking partners to the right

Down on the river, back in a wide watery world. Here boats were moored where ever they could cling to the bank. We still had several locks to pass through and quite a few miles to cover, so on we pressed. A little wooden boat with a one cylinder petrol engine joined us for a few locks. A hire boat with helpful crew wound the paddles up to empty the lock before even looking to see if the boats were ready. The helpful chap really wanted me to climb down the ladder to get back on board, but I don’t do ladders unless I really have to, due to my grip. He kept insisting, but he was never going to win, our boats could just swap over below the lock, far easier than fishing me out of the water.

A good vantage point

Our tiny locking partners moored up by a pub they’d not tried before and left us on our own. The next lock Keynsham was being emptied by a group of lads, they were bringing two cruisers up. Blimey the lock took forever to fill, we seemed to be there for an absolute age before the top gates could be forced open.

The last lock of the K&A

A few more meanders and occasional views and we’d reached Lock 1 of the Kennet and Avon, Hanham Lock. Here you leave C&RT waters and enter Bristol City Docks water. The next stretch to Netham Lock is tidal water, but currently the tides are not high enough to come over the weir. Mick called ahead so that the Lockie at Netham knew we were on our way.

Inflatables and swimmers

There is no mooring along this stretch, but plenty of people were out enjoying the water, paddle boarders and swimmers. We passed a slow widebeam as we gradually left the greenery behind and more urban surroundings took over.

The Lock Keepers house

At Netham Lock we pulled in, as instructed to do by the big sign, and walked to the office. Two nights please. We handed over our money and in return were handed a sticker for our window and given a map showing us where we could moor in the floating harbour.

Netham Lock 1000 miles this year

A quick check of mileage today and as we came through Netham Lock, we had achieved our thousandth mile this year!

Oleanna smiling

Forty Five more minutes of cruising to reach the harbour. Big boats, small boats, boats that might bite, boats with sails.

Wiggly Bridge

Bridges, winding, high and low.

People, loads and loads of people all out enjoying the sunshine, possibly the last we’ll see for a while.

Matthew

Our first option to moor after Prince Street Bridge had space but the number of people sat on walls, dangling their feet in the water put us off. Here is known to be noisy on weekends so we pressed on to Brunel Quay. Here there is no security gate, but finger pontoons. The area was very busy still, but we decided to pull in and make use of the electric hook up and water point at each mooring.

Not a bad view, of people sitting round the pump out machine

Once tied up we checked the credit on the post 22p, 15p went on the first load of washing, good job we’d bought some more credit. We settled in, Tilly was shown that the outside was not for her, but she didn’t take ‘NO’ for an answer and tried to clamber out through the side hatch! There’s only so much sleeping a cat can do!

BRISTOL!!!!

Mick popped to the nearby Tescos and spotted a sign saying that the bar we were moored in front of would be closing at 4pm for a wedding party. Maybe we’d made a mistake in our choice of mooring.

At around 6pm there was a lot of singing.. A LOT! A trip boat pulled in to the moorings close to us and the singing got even louder. This was the wedding party! Damn, we’d just added £5 to the electric post.

Noisy

The singing stopped for about half an hour, then for the remainder of the evening a chap with a guitar led them all singing Britpop hits, maybe it was Noel Gallagher. We thought about going out to enjoy the warm evening and get away from the singing, but we were both a touch pooped after the last couple of days and a long day on the river. Noel turned his mic off shortly after 10:30 and the general party noise gradually subsided.

13 locks, 1 sailed straight through, 17.86 miles, 1002.83 miles so far this year, 8 extra crew, 0 darlings, 2 locking partners, 8 hours cruising, 1 canal finished, 2 loads washing, £5 to get through, 50 grams short, 2 nights, £59, 2 high for painting, 1990’s relived.

https://goo.gl/maps/d5g4CuhQpnMamS8X9

Views Across Bath. 20th September

Bath

Another day on the trains for Mick, heading to York for our friend Mickle’s funeral. Tilly and I stayed put, two train fares would have been too much or hiring a car too far to drive there and back in a day. Mick left suitably attired in a baseball cap, apparently there were lots of remarks that everyone should have worn one. It was a very rare sight, Mickle without his cap on.

Can I really go out?

Tilly’s mornings for the last couple of months have consisted of sleeping whilst we move the outside, so it wasn’t until Mick was about to leave that she realised that the back door was open for her. At two hour intervals she returned as requested.

Puss in Boots needed some attention this morning, lists, contacting the set builders and prop maker. I’ll be heading off to do a weeks painting soon so needed to check that supplies were on order and how my accommodation would work.

Then I revisited my Houdini model. Various ideas had been chatted about yesterday and extra details like the blue doughnuts needed to be added. Monday is the first deadline for the design, I need to send photos to Vienna and hopefully get the thumbs up from them.

Sneaky peek of the model

Mid afternoon I needed to leave some glue to dry, so instead of sitting watching it I decided to go for an explore. Tilly returned home so was left in charge. Friday is obviously a day when most hire boats are returning to base as the moorings here were just about empty and not that many boats passed all day.

I walked down to the lock, crossed the bridge and headed up to the road above. Straight on was a footpath, so I followed it up the hill. A kissing gate and National Trust sign invited me into Bathwick Fields, I’d stumbled onto the Bath Skyline walk without knowing it.

Pretty good views from up here

Within minutes of leaving the boat I was high above Bath with fantastic views across the city. The curve of the railway, the spires of the churches and the Bath stone rows of houses lined up along the hills.

Bath

I dipped down to an orchard where you could pick the fruit, but sadly I didn’t have long enough arms to be able to reach the top most branches, everything else had long since been picked.

Community Nuttery

Across more fields alongside Jacob Sheep and many squirrels busy collecting nuts. Maybe they had emptied the nuttery I came across. A road that led to Smallcombe Garden Cemetery. For £3 a decent burial could be afford by artisans as well as rich Victorians, over 7000 of them until the plot was full. In 2014 the Heritage Lottery Fund gave support to preserve the cemetery and you are invited to look round the grave stones for locals who left their mark on Bath.

One of two chapels

Up through another field, I seemed to be walking in the opposite direction to every one else, but then I didn’t know I was on a recognised walk. The path led further up hill and by now my glue would be dry and I wanted to return home. Eventually there was a gate not marked as PRIVATE and I started my steep descent back down to Bath, then back up the locks to the boat.

Cemetery

An evening of worked followed which actually finished ten minutes before Mick stepped back on the boat at around 11:30pm. A Regular Little Houdini is now ready to see what the producers in Vienna think on Monday, fingers crossed.

Lines of Bath stone

0 locks, 0 miles, 4 miles walked, 4 trains, 3 tubes, 1 bus, 1 final farewell, 1 cap and guitar, 1 weeks work sorted, 3rd props list, 1 sad gits tea, 1 plant pot headed statue, 1 not 2 bottles of wine, 7 hours shore leave, 1 long day for everyone.

The Natural Theatre Company

Flying Over the Usk. 19th September

Walcot Visitor Moorings to Sydney Wharf Bridge 188

The moorings in Bath are either 24hrs or 48hrs, very little space to moor for 14 days anywhere other than down on the river. We needed another couple of days, so our current mooring wouldn’t cover us, we needed to move. Yesterday we’d walked down the locks and didn’t really want to start on them today, they’d take too long. So after breakfast we chanced moving to the 48hr moorings just before them that had been filled with hirers.

Just enough room to get by

At least one boat had come past us, we just hoped that they hadn’t been early risers and ascended the locks this morning. In front of the first of the two short tunnels was a pair of C&RT workboats, breasted up. From where we were it looked like the two widebeams were taking up all the width of the cut, but a chap walked towards us and waved us through. He was waiting for a delivery of stone for the towpath works ahead. Lucky we weren’t a widebeam and managed to squeeze past.

Pretty bridge

First glance at the moorings wasn’t hopeful, even the water point was occupied. But then as we neared there was one space and it was long enough, Phew!

Bath station

With model and sketch book in my bag we walked down towards the station, pausing at M&S to get a sandwich. I then waved Mick goodbye and climbed on a train to Newport, South Wales. I had glimpses of the river on the way to Bristol and then the train dipped down into a tunnel to cross the River Severn.

A metal dome each side of the line and a squiggle inbetween

I had a wait at Newport station as I’d caught an earlier train than planned, but it gave me time to look at the curvy station before Dan arrived. Dan is the writer and actor for A Regular Little Houdini and today we’d arranged a production meeting with Fez the videographer. Sadly Josh the director couldn’t join us today as his shooting schedule for Emmerdale is all out the window since a young actor was sacked.

Model on a Bara Bin, Fez and Dan

Dan arrived in his old camper van and he identified me by my blue Ikea bag containing the model. Three hours were spent discussing the show in depth. We maybe could have saved an hour of this if Fez had read the script before the meeting. There were long discussions regarding the water torture cabinet and my large model proved to be most useful.

Tall and thin

Dan had planned on doing a reading of the play for us, but Fez had another meeting. So until he was free again Dan and I headed down to the River Usk and Newport Transporter Bridge where a large portion of the play is based.

A stone base
A blue doughnut

I’ve spent days trying to fathom out just what parts of the bridge look like and now I was able to see first hand. £1.50 one way or £2 return, the camper van could go for free, but we decided to leave it behind, leaving the bridge uncluttered. We handed over our coins like excited kids.

Seaside

With the blue skies around us, wrought iron benches down each side and the control pergola it felt like we were at the seaside. I took so many photos, now able to see how the structure held together.

The dolly that crosses the Usk

Four large hinges on the stone bases anchor the legs. High above us a large dolly slides back and forth above the Usk with the platform that we stood on suspended by cables below. These are held firm by big blue doughnuts a detail I’ll use in the model.

The control, East or West
The pin that holds the bridge when it’s stopped

The two chaps on the bridge were very chatty and after our return journey one of them offered to take photos from the pergola for me. From there he could get better detail of the structure and he also took a few of inside the control room.

Crossing the Usk

What a wonderful elegant bridge, 113 years old. One of only six still operational world wide.

Great mud

The tide had gone out leaving the mud banks below very visible. The valleys eroded by the receding water needed photos taking and the old wharves rotten and broken with the obligatory shopping trolley were fascinating. Plenty of material for me to use.

Old wharves

We caught up with Fez at the university and Dan did a reading for us. I liked the play when I first read it and now with Dan’s voice and an authentic Newport accent it’s even better.

It had been a long day, but very worth while, especially to be able to go on the bridge.

Another of the bridge

Meanwhile back in Bath. Tilly had some shore leave, the railway is further away from the canal now and Mick managed to force the freezer drawer open. Since we defrosted it months ago, something had happened which meant the drawer had stuck, but with some persuasion using the mallet he got it moving again. Just a shame the drawer is still not coming out all the way, I really want my freezer back working before winter arrives.

0 locks, 0.5 miles, 2 trains, 1 camper, 3 hour meeting, 1 pear and beetroot salad, 1 flying bridge, 4 legs, 1 pin to hold it steady, 2 minutes there, 2 minutes back, 50 minutes each half, 1 very good play, 1 more in the pipe line, 2 adjustments, 1 freezer openable, 4 hours shore leave, 40 ft of mud, 1 happy writer/actor, 1 very good day.

https://goo.gl/maps/HiUsDAdRobpUWEhA8

Terraced Houses, Bath Style. 18th September

Dundas Aqueduct to Walcot Visitor Moorings

Sun

Before we set off I rinsed down the gunnel, today looked like the weather would be good, so if there happened to be a suitable mooring in Bath then I’d be one step ahead. Tilly got fresh litter and we emptied the yellow water, then we were ready to cruise. Straight across the aqueduct.

Dundas Aqueduct

Out from the shade of the trees and into the bight sunshine. It’s a shame that the walls on the aqueduct are so high as it restricts your view down the valley. A few photographers were milling about, was there a steam train due?

Fresh Produce for sale

We turned right and continued on our way towards Bath. The views across the valley stunning with bright blue sky, that cyclist yesterday had been right, it is the best bit. At Millbrook Swingbridge there is a little hut where you can buy jams, eggs, apples and tomatoes. We don’t eat that much jam so I refrained from any purchase, but I’ll see what’s available on the way back.

A hire boat had just come through Bathampton Swing Bridge and closed it behind them, we could see there was another following it. Their crew got off and cross to open the bridge so we waited to see if we’d be waved through, we were and continued on our way.

An interesting 1hr mooring not long enough for a very long boat

The canal starts now to become more urban, but in a very stony way. More and more Bath stone. We paused at Bathampton Bridge to dispose of rubbish, discovering there was glass recycling here meant another trip to the boat. Then we were on our way again.

Cat Health and Safety
says NO

By 11:45 we approached the first stretch of 48hr moorings. There were a couple of gaps so we chose the one nearest the city. We pulled in then checked our surroundings. A wall bordered the towpath, over it a 25ft drop to the railway. Tilly would have no difficulty getting onto the wall, but we felt that the buddleia bushes would tempt her to climb them. If she fell, there would be noway she’d be able to climb back up. Health and Safety verdict, NO shore leave today, we’d see what places were like further on.

Cleveland House Tunnel

Tilly being locked in meant we’d be able to go out exploring instead. A walk down the canal had us walk through two short tunnels each reminiscent in shape of the Macclesfield Canal bridges. Beckford Road and Cleveland House Tunnels, each has a head carved on them. A lady and man trying to look at each other round a slight bend and through a couple of footbridges. The next stretch of towpath is under major work. The bank is being reinforced with armco, back filled , then the raised towpath will be improved with a 6ft wide path.

Relaxing by the locks

We walked down the locks, several hire boats negotiating their way with the help of some volunteers and one lock was having a fresh coat of paint. A group had made themselves comfy on the grass by a lock, with chairs and an ice cream each.

That’s much better

Where was the chilled medication? It was in a hut a little further on, so we treated our selves to a salted caramel each which we enjoyed on our walk to the river.

Bath

Bath Weir is only as Bath could make it, curved steps with the water flowing over in ordered lines. Above the lock a trip boat takes you up to Bathampton, we watched as one of them winded in what space there was between the wall and weir, good job there wasn’t much fresh on the river today.

I’ve not been inside, maybe one day
Bricks!!!

Meandering around the streets we came across the New Theatre Royal, I’ve not been but my shows have. Street signs painted or carved into the walls worn with time. A chap sat in a doorway asked if we were from Canada, Ontario in particular. Mick stopped to chat, I walked on, both of us seeing an opportunist wanting a hefty tip. He soon realised he wouldn’t be getting anything from two Brits who live on a boat.

The Royal Crescent

We walked up through the Georgian Garden and onto Georgian Avenue, then on up to The Royal Crescent. I was last here in 1975 at the age of 8.

My Dad’s photo of somewhere in Bath
My photo

I remembered the crescent, the uniformity and going into a house that was laid out how it would have been in Georgian times. The only thing is I’d remembered it being at the other end of the crescent from where it is today.

Yellow door
Green beard

What a gorgeous day to take the view in. Neither of us felt the need to pay to go round No 1, we just walked from one end to the other. Each terraced house almost identical. One had a cream door, one a pale yellow door, another scaffolding (which spoilt the curve somewhat) and another had a very bushy beard. If this is the only sight seeing we get to do in Bath that is fine.

Chicken in a basket, now those were the days!

I don’t need to relive the chicken in a basket and my Dad getting covered in pigeon poo.

Over the railway

Sydney Gardens gave us a break from the traffic at standstill around the city. Ornate bridges stretching across the railway brought us back to the boat. We were back in time for me to do a bit more prepping on the gunnels, but after yesterdays exertions with the starboard side my body rebelled, preferring to sit down instead.

Same holiday, in Wells. A rare photo of the Leckenby’s all together. Andrew, Me with Fincks on my knee, Mum and Dad.

0 locks, 2 swing bridges, 4.44 miles, 25ft to sure death, 0 shore leave, 2nd space available, 5 miles walked, 1 tub, 1 cone, 30 terraced houses, 1kg porridge, 1 brick house, 1 git gap pulled back into and removed, 4 turkey schnitzels , 1 too many, 4 aching limbs, 1 blue ikea bag packed, 7 years.

https://goo.gl/maps/8n3n9AupmtWN45vh6

The S L O W Boat To Dundas. 17th September

Bradford Lock to Dundas Aqueduct

Chilly start. My gloves had to be found from the depths of the back cupboard before we pushed off. The hire boat that had moored on the water point last night was still there, a lady looked nervously at everyone who came past, they’d already been breasted up to once.

Busy above the lock this morning

A C&RT work boat winded above the lock and picked up loads of volunteers, they were having a day litter picking. Have to say the last few days the canal has been decidedly clean, very few floating plastic bottles. Maybe their pick up plastic campaign is working, or maybe it’s the volunteers going out on days like today.

Sculpture hanging from a tree

At the lock two American gents stood and watched as I filled the 11 ft deep lock then offered to open a gate for me. They were on a boat and had walked down to to see what was what. They were helpful and even offered to lower one of the low geared paddles for me, ‘It doesn’t seem to be doing anything’ ‘It is, just slowly.’

As I left a C&RT volunteer was arriving, windlass in hand, they could get more instruction from him. This was our 100th lock of the month and the only one for today. All we had to do now was pootle and look at the scenery around us. Plenty of moored boats again. Most boats on the visitor moorings were hire boats, everyone else was clinging to the banks where they could.

Rotting away in the cut

A wooden boat was wrapped in plastic, trying to keep the water out from it’s rotting hull. Two large solar panels powered a bilge pump that looked like it worked hard. Alongside on the towpath orange net fencing had been put up either side of the path and possessions filled the grass. On one side it looked like the chap had a workshop set up, possibly working on the boat, bet he’s been there longer than 14 days.

Look there’s Pete

On we pootled behind a couple of hire boats, a Sally boat in front of an ABC. The ABC kept slowing down and just before the right hand bend onto Avoncliff aqueduct they both pulled over. The reason for this was a bright green wide beam coming round the bend full of C&RT volunteers. Standing in the bow was Pete who’d helped us down Caen Hill, there was time to say hello as they passed.

The railway and Avoncliff Station
A nice looking pub, they do Gluten free fish and chips in cider batter.

Once the hire boats had gone round the bend we followed finding a water point not on our Waterway Routes map, something to report to Paul. We pulled in and checked it worked, which it did so we filled up the tank. This gave us the opportunity to have a look at Avoncliff Aqueduct on foot. Here there is a small gathering of buildings, one a nice looking pub the Cross Guns. The aqueduct spans over the River Avon then another arch over the railway line with access down to each platform at Avoncliff Station. When trains stop here only one door opens as it’s such a small station.

Crossing Avoncliff Aqueduct

Once the tank was topped up we rounded the bend onto the aqueduct, the sun warming now we were out of the trees. A cyclist asked if we’d been this way before, then said it was the best bit of the canal.

Going into reverse to achieve their speed

We soon caught up with the Sally hire boat, a young couple who last night had looked petrified above Bradford Lock. The chap was at the helm and concentrating very hard, looking down each side of the boat in turn, checking his rudder, throttle, concentrating. Hang on, where was the ABC boat? It had vanished, nowhere to be seen and it had been between us and the Sally boat.

They were going so slowly, we wondered if he’d be able to slow down anymore to pass moored boats. Yes he could, blimey! No wash from them, hardly a ripple from the prop. We did our best not to sit on his tail and reverse became our friend. It took us an hour and a half to cover the next two and a half miles, nice as the scenery was we’d rather have been going a touch faster.

Could this be our chance?

A long wide bend required a couple of beeps from his horn to warm oncoming boats of his arrival, in half an hour! Moored boats, narrow sections meant we couldn’t get past. Then a bridge hole and an inflatable coming the other way meant the Sally boat slowed even more. After it there was a gap, our chance. Mick moved in closer, the chap was almost standing in our well deck, but this gave us the opportunity to ask if we could come past. If only the inflatable would get out the b***dy way!

A funny little boat with a great view

As soon as they were clear we pounced! Well just engaged the engine and we cruised past with ease. Of course now we didn’t have much further to go anyway, but at least we’d get there this week.

Bye bye Sally Boat

Round the final bend to Dundas Aqueduct and the first mooring was free, this side being away from the railway we pulled in, it would be far more suitable for Tilly here. Sometime later the Sally boat beeped it’s horn and we knew they’d go past in another ten minutes

Suitable! It is great!! Big trees to climb, some friendly cover, a grassy bank down to the river to run around in and some big wall thing to climb. All of it just a couple of paces away. I was given six hours, but then when I came back to check on them the doors were closed behind me.

It’s all very well Tilly being allowed out to explore once we’ve finished moving the outside, but we wanted an explore too. So we nabbed our chance after we’d had lunch. She was allowed back out later.

Dundas Aqueduct

Dundas Aqueduct was built in 1810 and designed by John Rennie. It was the first canal structure to be made a Scheduled Ancient Monument in 1951. Named after Charles Dundas the first chairman of the Kennet and Avon Canal Company, it stands where the canal crosses the River Avon and meets the Somerset Coal Canal.

The narrow entrance to the Somerset Coal Canal

There is now only a short length of the Coal Canal in water. The narrow entrance behind a lift bridge cuts through someones garden now. We had a pleasant walk down to Brassknocker Basin where the canal now terminates. Plenty of moored boats, a cafe and an information centre. The crew from the Sally boat were enjoying a well earned burger in the sunshine.

4 inches long, an Elephant Hawk Moth Caterpillar (we think)

There is a footpath that takes you below the aqueduct, giving you a good view of it.

The north side, not quite so pretty

At one time GWR made repairs to the structure with blue bricks, some of these are still visible on the Western most arch. But when the canal was reopened much of the brickwork was replaced with Bath stone, back to how it should be. The south face shone in the sunshine, the northern face darker and more patchworked. You can see numerous stone mason marks in the blocks and even some 1815 carved graffiti.

Quite fancy up there

Back at Oleanna the lowish hard edge made me think of gunnels. I set too with a scrapper, some sandpaper on the port side, followed by a rinse down and then fertan where it was needed. There was quite a lot needed, I don’t think this side has been painted since we were on the Llangollen! At least it will all be ready for some primer, then paint when the next suitable mooring shows itself. I had had the intention to sand everything back and do a very nice job, but time is running out. There’s only so much time before I head off to work on Panto and the days that are suitable for painting are getting fewer. So a touch up will have to do, it doesn’t have to look pretty.

W Warren 1815 Bridge graffiti

1 lock, 100 this month, 4.12 miles, 1 aqueduct crossed by boat, 1 aqueduct crossed by foot,1.5 mph, 1 exceedingly slow boat, 6 4.5 hours, 1 coal canal, 1 big pizza, 2 sore knees, 1 gunnel prepped, 0 towpath on the right side again for ages, 1 rust converted Mrs Tilly stamp of approval, 1 cat man handled, 1 white paw washed by human hand.

https://goo.gl/maps/kMTU68uy661EHXRL6

Not A Brick In Sight. 16th September

Bradford on Avon

Mick was up and off early this morning to catch numerous trains north. Tilly and I stayed in bed for a while longer, until the local ducks decided to clean the water line of Oleanna for us!

A work day for me. After breakfast I walked up the towpath to Sainsburys for a top up shop to keep us going to get to Bath. Mick wouldn’t be back until late so the biggest decision was what to eat tonight. I returned with some sad gits salmon which I’d have with some pasta, but I managed to forget to get some milk.

Tilly checking things through and giving me notes on my model

As I worked through a few alterations on my Houdini model several hire boats were returned to the hire base opposite. A very smelly black smoking narrowboat was reversed back to the pump out then all went quiet. The day was grey and occasionally drizzly, Tilly wound herself up into a circle on her day bed and slept away all the morning and quite a chunk of the afternoon leaving me in peace.

My phone built into a large scale model

I woke my sour dough starter up, giving it a feed so that I could make some pizza dough for tomorrow. Finished off some sausages in a butty and made a 1:8.5 version of the water torture cabinet for Houdini. This is so that I can put my mobile phone inside it to represent a TV screen, so that we can try out an effect before the real one gets built.

They’d soon be doing the splits

All the hire bases had sent out the next batch of boats and they all seemed to be arriving at the lock here at the same time. The Americans we’d encountered at Foxhangers slowly approached taking ten minutes to pass us and then breasted up with the boat infront of us. At one time it looked like two of their crew, who were trying to hold their boat against the other, were about to do the splits and end up in the cut. Someone came to their aid and ropes were used instead of humans.

Stumpy was coping fairly well after it’s knock the other day. It’s amazing how much you rest your hand on your little finger as you draw and paint things. Once I’d completed building the cabinet I decided to give my fingers a rest and go out for an explore.

Busy at the lock, another two were waiting further back

I walked down the canal past the lock where at 5pm three volunteers were trying to sort out the masses of hire boats still arriving. Two breasted up on the services mooring and two on the lock landing with two just leaving the lock below. I think the volunteers were hoping to make their exit, but were checking if everyone was alright before doing so.

Tithe Barn

A wiggle around various buildings to get back onto the towpath. Shh! don’t tell Tilly, but down here would have been very good for her. No road, a park not of the car variety, trees, walls, and a 14th Century Tithe Barn to explore. Because I’d left it so late the Tithe Barn which was part of Barton Grange Farm was all locked up, but from out side it is quite a building, possibly the largest and finest example of a medieval barn in England.

Trains
Bradford on Avon Station

I walked across the park, checked both ways on the railway line and headed up an alleyway, Barton Orchard an old packhorse way which ran from the farm to Bath. Here there are weavers dwellings with workrooms at the top, No 3 was the clothiers house and below the road you can hear Ladywell spring. In the 17th Century Bradford on Avon had it’s most successful period in the textile industry, many of the properties date from this time.

Teasel House

All made from Bath stone, Jurassic Limestone there is not a single brick in view. Houses were built up the steep hill with narrow alleyways connecting each level. Each big house doing it’s best to better the last.

Work rooms at the top

During the Industrial Revolution the textile workers moved to purpose built mills by the river where they harnessed the power from water and steam to power the looms. Thirty mills prospered along the river until the 19th Century when the centre of the English woolen industry moved to Yorkshire. The last mill here closed in 1905.

Whats up there?
or down there?

I had a wander around, alleyways appealing would lead me to another road and more stone buildings. Very dark clouds had been hanging over the town since I left Oleanna and finally they decided to dump their rain. A dash into a Co-op for the milk I’d forgotten got me out of the worst of it.

Very posh

There was plenty more to explore, but my model was calling me in from the rain. Back at the lock two boats had just gone down and another two hire boats were arriving above, crew looking a touch like rabbits in headlights, their first lock.

Catholic Church

I toyed with helping, but didn’t want to get any wetter and I still had more work to do. The last two boats came by at around 7pm, the last one pulling up on the services mooring, leaving the lock till morning.

The Shambles

Mick came home after I’d enjoyed my salmon and pasta, I finally finished painting my giant model cabinet just before 10pm. A good days work and exploring whilst Mick spent hours on trains.

Is he on the phone?

0 locks, 0 miles, 1 loaf of bread, 1 forgotten 2 pints milk, 5 cables not 6, 1 new proscenium, 1:8.5 cabinet, 1 feline assistant checking things over, 14 hire boats, 2 splits, 1 bruised stumpy, 6 trains, 1 sad gits salmon steak, 1 very bored cat, 1 box of paints, 3 head but bites, 1 tithe barn, 1 wealthy town, 0 bricks.