Category Archives: Uncategorized

Fabrics and handles

Visit 9th September

Since our last visit the carpenters have all been on holiday so we weren’t sure how much progress would have been made, but we were pleasantly surprised. Kris had plenty of questions regarding shelves in cupboards, how many, would we like them fixing in place or to be able to adjust their heights etc. As most cupboards I know what will be going into them I made a list of large items to measure which would determine heights of shelves.

The back steps were in place, these are held in position by a big keyhole bracket. This means if you lift them they will become detached from the rear bulk head. One question from Kris was how we wanted the lower doors on the rear cupboards to work. One single door or a bi-folding door with a bolt in the middle. We opted for the bi-folding door. This means we can lift the steps and position them so that they sit vertically against the rear bulk head, the then exposed side of the cupboard door will be able to open giving us access to the lower cupboard. But should we need the whole door to open the steps will need to be removed, the bolt in the middle lifted and the cupboard door will fully open.

Discussions with Louis about the engine bay and positions of the various items going in there brought up that it was all going to be very tight with the boiler and hospital silencer. The lower starboard side cupboard was intended for my work tools, but Oleanna has more storage than our current boat so these could quite happily be relocated elsewhere so that the boiler can be housed in the cupboard. This decision was made as the Boat Safety regulations were complex for the boiler (gas) to be in the engine bay and the instillation would be a lot easier in the cupboard. This also frees up space in the engine bay.


The fridge is now in position and just needs a final adjustment. The bike slot next to it has now a finished drawer below with handle. Not sure what will go in here as yet, maybe shopping bags.

All drawers on the drawer tower have handles and the position of a shelf in the top cupboard was discussed.

The cooker position has been tweaked giving us a bit more space between it and the dishwasher opposite. The wooden surround has been brought forward to cover the sides of the cooker and also help anchor it into position. The granite work top will curve out to meet it.

Samples of worktop were looked at, there was one that was close, but not quite the one we have in mind, so a new sample will be sought for us to look at next weekend.

A stainless steel guard will be put over the woodwork on the cabin side to protect it from the rear burners on the hob.

An adjustable shelf has been added into the triangular cupboard. When this is closed it pulls out on heavy duty drawer runners so that you can access the corner cupboard. This cupboard will have a pan drawer at the bottom so that I can pull it out into the gap and access right into the back corner without having to empty everything out. Above this will be a shelf for things that don’t get used quite so often.


The freezer is now in it’s drawer under the dinette. There is a small amount of space next to it to be able to slot something else in the drawer, not sure yet but I’ll find something.

The broom sits where the corner bubble stove will be positioned.

As the small shelf unit was in position and the trim has been fitted on the underside of the cabin sides I was able to measure up for the sofa and pouffe. The gap under this shelf unit will enable the pouffe to slide into the corner out of the way of the door into the bathroom. It will pull out to either be sat on or lengthen the sofa to make a single bed. We now need to arrange a visit to Bradford to see Michael at Sofa Bed Barn to get the sofa made.

The small box on the bulkhead is for light switches.

Looking down the cabin towards the stern. The ceiling panels are now in, the light surrounds are up waiting for the fittings to go in. Trim on the joins of the panels is mostly up, just a few bits missing.

The windows are on order at Caldwells.

The gap in the floor on the right is where there will be a radiator. The floor will be filled in once the plumbing is sorted.

The towel rail is in position in the bathroom waiting to be plumbed in. The flooring for the bathroom will be ordered shortly.

The sink cupboard is in position and doesn’t need supports on it’s front edge. The position of the sink needed finalising. At the moment the top of the unit is only a mock up and the sink has been centred on the doors. If it wasn’t for the gunnel it would look fine. However as soon as I saw it it looked odd, so it will now be centred on the top, front to cabin side. Just hope it looks more meant than it does now.

The composting toilet is now in situ and the plastic urine tank is under the floor. The toilet only comes with a short length of vent pipe which would reach up under the gunnel, but our pipe needs to reach the roof. A hunt is on for the right diameter pipe to be able to extend it.

This shelf unit will cover the majority of the vent pipe and be handy storage.

The bedroom is all in position now. Wooden handles will be used on cupboard doors. But the two big drawers under the bed will have handles similar to those in the galley to cope with the weight that they will have inside them.

The water pump is in under the steps and cupboard doors are going on. Trim up to the ceiling is also being made to fill the gap above cupboards.

During our visit we got to meet Kim who will be doing the upholstery and curtains for Oleanna. We discussed how I wanted the curtains to work, a choice of three hanging methods. Tab tops, eyelet tops, or just a sleeve in the fabric. The later is what I went for. I like curtains to be functional, cut out the light and keep you warm, both the other options would let an amount of light in even if they are blackout lined.

In the bedroom our front doors have little surround to them, which may cause us a problem as we were wanting to have a blind here. The amount of space for fixing a blind isn’t good. On our current boat we have roller blinds that are quite compact and are spring loaded. If we can make one of them work for Oleanna that would be good. Photos were sent later on to Kim, measurements need to be checked over.

Our bathroom portholes will need some form of covering, spring sunshine can flood a boat at sunrise even through the smallest of windows. Curtains would look wrong though so it was decided to have a couple of bungs made to fill them. These will need rubber backed fabric so some samples have been sent off for.

Blinds in the galley will have to be fire proof so more samples are on their way with a hope that we can get a colour to match the curtains. Hopefully all the samples will have arrived by next weekend when we will next visit as Finesse and Tyler Wilson are having open days.

At the weekend we will hopefully be able to have everyone in the same room at some point to have a final discussion about the batteries, lithium or wet cell?

Bathroom Sink

Visit 18th August

You’ll have noticed a few changes here on our blog. Once we are on board NB Oleanna this will become our cruising blog, leaving NB Lillyanne behind. So every now and then Mick is adding bits and bobs to it.

As two weeks have passed since our last visit and it sounded like there would be quite a bit to see we headed to Sheffield from Goole.

Oleanna has been joined by a shorter boat in the fit out shop which is at the spray foamed stage. Piles of boxes surrounded Oleanna as all the appliances have now arrived. Some have been installed others like the fridge, freezer, toilet and Alde boiler are waiting to go on.


Outside on the port side the water filler and overflow have been added on the gunnel. The stainless steel tank has also been fitted under the well deck. As yet we don’t know what volume this holds, but as we will no longer be flushing the toilet our water needs will be reduced.

The most noticeable change inside the cabin is that all the cabin side panels have now been fitted and the window openings have been cut in them. Although these are currently covered in plastic, to help reduce the amount of dust on board, the amount of light inside is great. We are big fans of natural light.
Where the openings have been cut extra spray foam is being used to fill any cavities left by the window. Hopefully our windows will arrive soon and we won’t have the problem as happens on most house builds, waiting for the glass to arrive which holds everything else up. Luckily on a boat you can crack on with other things.

In the bedroom the ceiling is up although not fully finished on the panel joins yet. One lonely light fitting had been put up to show us what they would look like through the boat. We liked the oak surround. Not having any power on board yet meant there was no point in putting a bulb in.

The wiring is now in for our bedside lights under the overhead cupboards. These lights will have a narrowed angle to their focus so that each will only illuminate one side of the bed. In the corner by the bedside table is the wiring for one of the switches. This will just be a small switch. Next to this on the side of the cupboard we will have a double socket and a usb charger.

Under Mick’s bedside table is our washing machine, snuggly fitted into a cupboard. A few years ago we saw a boat at Crick with the washing machine in the bedroom and thought what a good idea it was. You can put your dirty clothes straight into it out of the way. This is also a condensing drier, which empties through the same pipe as the washing machine does.

A thin cupboard with shelves sits on top.

The bathroom has been mostly lined with blue laminate. The underside of the gunnel has been finished off with oak trim. The gap in the blue is so that pipes can be added from the urine tank (which will be below floor level) up to the gunnel so that we can empty it with a built in or hand operated pump. We will have both should the electric one fail.

The shower is now in position, still with the taps to be added. The cardboard on the floor is protecting the shower tray. Behind the shower and under the gunnel are three shelves for storage. The small switch will work the shower gulper, this pumps the shower water up over the side of the boat as the shower tray is below water level inside so needs a helping hand.

This bathroom door is hung, with it’s door furniture.

The ceiling is still to go up in here. This has been delayed as the only space big enough for our 250 watt solar panel is above the bathroom and saloon. So the cables need to be run in for this. Once they are in the ceiling laminate will be glued in place.

This area is where our sink will be. I chose an oval sink which will go across the corner. Paul the chippy had some questions for me about this. On NB Lillyanne our current boat, our cat has her litter tray in a cupboard under the sink. This is a good place for it as we go to the toilet in the bathroom too, it doesn’t get in the way, it is where it can be cleaned easily and she gets a bit of privacy.

The problem is she is not a standard cat and does not sit down when she goes to the loo, so needs more of a plastic crate than just a tray. Now that they have the sink the cupboard can be made, but fitting a rectangular crate into a triangular cupboard was making it rather big for the space.

Paul had cut out a template for the crate and then drawn out a plan of how he saw the sink working in the space there is.

We scratched our heads for a while and then decided that it may be better to have the whole thing open underneath. So float the sink. All the gubins, pipes etc and underneath of the sink will be hidden behind a cupboard which hopefully will have enough space to give us a shelf too.

If it is possible to just float the sink with it’s cupboard and granite surround that will be great, but should the need arise two chrome poles could be added to help support the front edge. This will leave plenty of space underneath for Tilly’s crate. I hope she likes it!

The TV mantel has been made. The opening on the top right is where the TV will be, mounted on a swivel arm, so that it can come out from the recess to access the slot in it to play DVDs. This unit will also house a digital car radio and a PVR. We should have space left over for DVD and CD storage. All the sockets will be hidden behind the panel on the top left.

The piece of wood next to this is what we call the Houdini Shelf. This will be fixed to the cabin panel above the TV mantel so that our cat can have a great view of all that happens outside. We were asked if the TV mantel would suffice for this, but it is a good 8 inches below the bottom of the window, how is a cat meant to snooze and watch the world at the same time?

The end of the dinette has back boxes for double sockets and a double gang CAT5 socket. The CAT5 is so that when we are moored in areas with numerous WiFi signals we can connect to our router directly, therefore avoiding our devices getting confused as they do currently.

The dinette was in position. The backs are slightly angled for a comfier sitting position. There is a lip which will help hold the cushions in position. Behind the seats is a narrow shelf. We know that we will end up putting things on this, but it serves to cover storage for a drawing board and model making materials. A section of the lid and the side open up for access.

The galley now has most of the cupboard and drawer fronts on. Masking tape handles are in pace to help open them. The corner cupboard behind the dinette is on runners so can pull out to reveal the contents right in the corner.

The dishwasher can be seen here. I think we may have to buy a few more plates to fill it even though it is a compact one.

Corner shelves are on the right, under these is where our cat Tilly will have her food bowls, just out of the way so we don’t kick them.

Opposite the dishwasher is the cooker. This has to sit slightly proud from how it would normally be fitted in a kitchen so that the back rings are a safe distance from the cabin side. The doors of the oven and dishwasher open fine, but a mental note of making sure the opposite one is fully closed will have to be made as there is only just enough space.

The vent at the rear of the cooker will mean that the cabin panel above will need a bit of adapting to reflect heat away from the cabin side. So a section of the oak frame will need to be removed and replaced with stainless steel.

Beyond the cooker is a gap for the fridge, then a slot for one of our folding bikes. Below the slot is a small drawer. This helps nudge the bike up so that it can sit partially over the swim of the boat, meaning it can go further in.

As yet I’m not sure what we’ll put in the drawer, but I know it will be filled very quickly when we move on board.

Opposite the bike slot is the stack of drawers. The fronts of these and the cupboard above them have been made from one sheet of oak, so the grain follows through from ceiling to floor. Between them and the dishwasher is a cupboard which will house a pull out larder.

The starboard side of the galley has a thin MDF work top at the moment, this will actually be the template for the granite tops to be shaped from. The sink and tap positions still need to be marked on them.

The electrics cupboard still has all the wiring coiled up inside. This will eventually have doors over them. The back steps are off the boat at the moment to make access into the back cupboards a lot easier.

One bit of homework will be to find some simple low profile handles for the galley units.

In the engine bay, not much has happened as yet. Until a final decision is made on the type of batteries we are having the engine can’t be ordered. We are still waiting for some information to come back regarding the Victron inverter/charger, the solar panel controller and the domestic alternator before we finally make our minds up on this.

So the engine bay stays dusty for a while, cables and pipes wait to be connected up. The stern gland is visible at the top of the V, this is where the prop shaft goes from being driven inside to revolve the prop on the outside. A gland which is packed with grease stops water from coming into the engine bay

The engine will be one of the last things installed as it gets in the way of everything else being fitted as it is quite a big lump.

Outside on the starboard side cables for tv aerials have been brought through where there will be a socket for us to connect the aerial.

Also here we will have a socket for our 4G internet aerial, which we are likely to fit onto a heavy base to sit on the roof.

Today we broached the subject of a completion date. In the autumn we have to be on the other side of the Pennines, Our hope is that Oleanna will be ready in time for us to move on board in Sheffield, put NB Lillyanne on the market and then head over the Leeds Liverpool Canal to get through a stoppage on the Bridgewater Canal that starts at the end of October. We are mindful that we don’t want anything to be rushed for the sake of it. So hopefully in a few weeks we will know better if this scenario will be possible. Otherwise we will need to find somewhere to launch her and move NB Lillyanne there to meet her.

A very good visit, lots of questions asked and answered on both sides. Things are getting very exciting!

Wiring

Visit 3rd August

Before we cruised away from handy train stations we arranged to visit Sheffield to see how things were progressing and see if there were any questions that it would be easier to answer on site.

The carpenters hadn’t been told that we’d be around but were happy for us to go on board before Ricky and Louis joined us. It looked like virtually all the wiring had been put in and most of the engineered oak flooring was down. Most of the cupboards were off the boat stacked up in the workshop. Most have now had the satin lacquer applied to them where they will be seen. I’m very used to seeing things in this state as it’s far easier to apply finishes when things are in pieces.

All of our bedroom was stacked up with a couple of drawers that will go in the cupboards for socks etc. You can see on the side of the bow steps that the top surface has had lacquer applied but not the sides as these butt up to cupboards.

Holes have been drilled in the cabin at the bow for the navigation lights and cables were showing on the starboard side.

The insides of the hatch have been clad now with oak. The insides of the steel doors have also been painted to match the stripes on the exterior. A nice touch, except the red stripe still needs to be addressed.

The rear cupboard and bike slot were in position inside Oleanna and I checked the measurements of them. Our bikes would fit, but only just at a squeeze. A hiccup in translation, they normally work to overall outside dimensions of cupboards. Luckily we’d spotted this now rather than when all the appliances were in place. Having a very close look at our bikes we can move the saddle slightly which should give us back some tolerance in the rear cupboard. The slot will be altered to give us a bit more height.

Wiring hung from the ceiling everywhere, coiled up ready for back boxes, fittings, switches and sockets. The cabin sides were half in place, some had been removed to start cutting the window openings in them.

The insides of the food drawers can be seen just next to Mick. They still need drawer fronts adding to them.

The ceiling in most of the boat is still unclad, but in the bedroom (sadly didn’t get a photo) it is up with holes for the lights already cut.

All the cables run back to the starboard side rear cupboard which will be the electrics cupboard. Here coils of many colours hung all labelled.

The thick blue cable is the 240 volt ring main and the grey coil is Cat 5 that we will have running to the TV and dinette area. The others well I have no idea!

This is the corner of the saloon by the bathroom. A hole has been cut for a double socket below the gunnel, the blue ring main is looped through it.

A section of the engineered oak floor is visible, most of it is covered for protection with cardboard. There is a section of floor that is just plain ply, this is where the sofa will sit. Most areas where cupboards, beds etc cover are done this way as they will never be seen. However if there is enough of the flooring left over this is an area that may get seen as the sofa is a stand alone sofa bed which may in years to come be replaced, revealing the floor.

In the bathroom the plumber has started. The hole in the floor is for the drain from the shower. A cross member of steelwork has had a section removed to help with this. Pipes for hot and cold water come up from below the floor.

The composting toilet and urine tank are on order along with the sink and taps for the bathroom.

The panel that the shower is fixed to is not in it’s final position in this photo. Fixing it all together whilst the panel is loose makes it a lot easier to reach the back. The two copper pipes protruding will be for the hot and cold water. On our old share boat at one time the tap and temperature control in the shower were very smooth, which made it almost impossible to turn off when you have wet hands. We checked that our tap has some grooves on it.

Discussions about positions of sockets on the dinette were had, as the dinette seating has had to be raised slightly to house the freezer this means there is no space above the cushions for sockets. So all power will go on the end of the dinette along with the Cat 5 sockets.

We have now had a price for Lithium batteries given to us, which we are really interested in as we shouldn’t have to replace them for about ten years, maybe more. Before we go ahead with it we need to know a little more regarding the charging voltage of the alternator and means of connecting the solar panel either via a dedicated MPPT controller or directly into the inverter/charger. We have also asked if space can be left by the battery bank, so that if we discover that we are running out of power in the first few months then we would be able to add an extra battery wired in parallel. We hope this is unlikely, but we’d feel happier to have the option available to us.

Although little was in place we were happy with the progress that is being made.

Carcasses and Electrics

Meeting 21st July

Most of the chaps at the yard had been on a weeks holiday somewhere hot. This either meant that not much progress would have happened since we were last there or a lot would have happened. It was the latter.

First we had a catch up on the battery front, more conversations had been had with the Lithium Battery people and Mick and I had put together a power audit. The audit was based on a winters high usage day. Without running the engine we reckoned we’d use about 82 Amp hours of power. The suggested batteries may be enough as it would be unlikely for us to not run the engine on such a day. Ken and Ricky will put together the prices so that we can decide if we can afford the greater initial outlay.

More fabric samples had arrived and luckily there was one that stood out from the rest for the dinette covers. This and others were taken down to Oleanna to see what they would look like in situ.

A lot had happened since our last visit, although everything was just placed in position for us to see as the floor is still to be laid and the ceiling will go in shortly. It’s most probably best if I talk through photos from the stern.

Carcasses have been made up for the cupboards at the stern. From the furthest back on the starboard side working forwards. The electrics cupboard above a cupboard which is challenged by the swim of the hull, this will be for deep storage. The cupboard door for the electrics cupboard will open above the rear steps.

The next unit will mainly be drawers. Our current boat has drawers that are high enough to hold a bag of flour, so we have two such drawers, a cutlery drawer, T towel drawer then a deeper drawer at the bottom and a cupboard filling what space there is left at the top.

Next will be an undercounter pull out larder unit. Next to that will be a slimline dishwasher.

This is the port side. A long cupboard with hanging space accessible from above the steps. The base of this will be where we keep our second folding bike, which comes out on rare occasions.

The top of this unit will have an open shelf so if/when the heavens open we can pop things there that we want to keep dry. There will be a shelf in the cupboard for the tool kit.

The stern steps are half steps or loft steps. We have these on on NB Lillyanne and really like them as they take up less space but don’t feel as steep as normal treads would. They have however been made with the leading step the opposite way round to our current configuration, so we shall have to be careful for a while. Our standard “Go in backwards, right foot first” will have to change.

Next to the tall cupboard is where there will be a slot left for our other folding bike. This will sit above a cupboard or drawer lifting it as high as possible under the worktop. This is so that the bike can nestle as close to the swim as possible without sticking out too much. We wanted the bike to be in a handy position. Following on from this will be the fridge, then the cooker, then some angled shelves.

Following on from the dishwasher will be the sink unit with the drainer going into the corner. The triangular cupboard will house crockery etc. This will be able to slide along the half bulkhead behind it so that you can get access into the cupboard in the corner.

I’m hoping that the corner cupboard will have a couple of pull out shelves/ drawers to make access even easier.

All these units are on feet and there will be a plinth below.

The cabin sides have been clad with painted birch ply and framed simply with oak. The ceiling has yet to be clad in a similar way. This can only be done when the electrics have been routed to where they need to be.

Between each panel is a joining strip which covers the join, this also allows there to be a small gap for expansion and contraction of the cabin sides. It has a simple detail of a grove down it. Other boats we’d seen in fit out had much more detailed panelling, but I preferred it to be simpler.

Below the painted panels, where visible, it will be clad in plain oak faced ply.

The windows have yet to be cut into the wooden cabin panels. Everywhere apart from the bathroom the liners will be oak. In the bathroom we have gone for metal liners as this will be where the most condensation occurs, which can stain wood.

Here the glazed doors for the side hatch are shown. These sit inside and open inwards, outside the metal outer doors will close to protect these doors when it is raining and for security.

 At the end of the galley the half bulkhead has been made into a 6 inch wide cupboard. This is so that I can store a drawing board and model making equipment. Being here it will be hidden away, but easily accessible when needed. There will be a lid and door on it as my drawing board will need to slide up and out of it’s storage.

The L shaped dinette has mostly been put together.  On the corridor end of the seats is a drawer for a Waeco freezer. Behind the drawer there will be a storage space, only accessible if you remove the cushions.

Below the longer section of the dinette are two doors that open when pushed. This means we can access storage here without having to lift the cushions.

The front facia of the long side pulls out and the back of the seat flattens out to cover the storage below. The back cushion will then become part of the mattress for a double bed. This is such an easy way to make up the bed compared to what we have now.

The table will fold away and be stored under the gunnels opposite the end of the dinette.

At the end of the dinette is a small book case. This originally was going to have open shelves, but now we have a ships cat we need some easy access storage that she can’t access hence the door.

Next to this will be a 2.5 seat sofa with a shelf unit on the other side going into the corner with the bathroom bulkhead. A little bit was lost in translation with this unit as it needs to be open to the floor below to be able to store a pouffe that will extend the sofa into a single bed when pulled out.

In the bathroom some of the blue laminate was in position around the quadrant shower tray.

In the opposite corner there is no floor as yet as this will be where our urine tank for the toilet will be. We did some research into calcification of urine, a steel tank would be fine unless you needed to clear any blockage. The best solution to this is to use some acid, which over time would eat away the steel, so we are having a plastic tank which won’t be affected by acid. Better safe than sorry in a few years time!

The tank would last Mick and myself about four days, although we’d empty it long before then. But it will give us capacity for when we have visitors, so that we won’t have to be emptying it every day.

Then the bedroom. The porthole opening has been cut away above the bed. Carcasses of the cupboards by the bow doors were in position along with cabin steps. These cupboards will mainly be shelved, but one will have some hanging space that goes down below the steps. Not much need these days for hanging long dresses. I suspect most of this cupboard will end up being used for folding chairs etc.

The opening facing away from the bow doors is where our vacuum cleaner will live.

On this side of the bed at floor level will be the washing machine. This is mirrored with a narrower cupboard on the other side of the bed. There is a ledge big enough for a mug and books on both sides too.

Three thin cupboards span the width of the bed above the porthole. These are likely to be used for bed linen.

 All the holes are ventilation under our mattress. This is the cross bed. The open section at the back will be for deep storage, winter clothes and duvets, maybe work things.

Under the holes are two large drawers at floor level, one each side of the bed, his and hers drawers.

The holey bit is two layers, the top one pulls over to span the boat to make a cross over bed. The mattress on this will have a hinged section that we fold over during the day and push the base back in to create a corridor.

 Looking out through the front doors the cratch wood work is complete. The well deck on Oleanna is higher than on NB Lillyanne, so we will have to stoop more when the cover is on out there. I suspect on fine days the cover will get rolled right back so that there is more head height.

Front doors looking rather fine with an inset of darker wood in the bottom panel.

The lock looks good and has two more keys than our current front door has. Although when we returned to the boat later the doors and surround had been removed. I suspect they will stay like this for a while to make it easier to get things in and out of the boat.

The front doors in situ with the cratch in position.

After discussing various things inside we sat down to discuss the electrics.

Two meetings ago I had produced our plan for lights, switches and power sockets. This was our suggestion based on how we live currently. Last time we had visited positions of switches was discussed, but there wasn’t enough time to go through everything. Today it had to be done, otherwise it would start to hold everything up. One or two reductions in the number of light fittings, but mostly it is how I had drawn it. Positions for switches and Cat 5 sockets were discussed. With some hunting on the internet I have since found some chrome Cat 5 covers so they won’t look too out of place.

Confirmation of appliances is needed soon. Very sadly the cooker we were wanting will not be possible. We had chosen a 600 deep cooker with a lid, but forgotten that positioning it on the side of the boat would not work due to the gunnels. So we have a mission to find a cooker without a lid that will fit our needs and position. If this had been pointed out earlier the galley would have been designed differently. A similar cooker to our current one is not on our cards as we haven’t had Yorkshire puddings for two years and I dream of having them again with a Sunday Roast.

Version P

Putting the drawings round the right way and nudging the washing machine should have been an easy thing. But on the originals I hadn’t added any tolerances for appliances, this meant everything was getting very tight. Julia had suggested looking for a narrower washing machine to bring the bedroom/bathroom bulkhead back to where it should be.

Looking through machines took time and then the conclusion that there isn’t a smaller washer/dryer available than the one we’d already chosen. What else could give cupboard wise. Not much as when you come in through the front doors you need to be able to stand somewhere.
In the end we had two choices.
1 only have a washing machine not a washer / dryer.
2  reduce the size of our bed from 5ft to 4ft 6″

We have lived with a 4ft 6inch wide bed for the last two years tucked under the gunnels, so as a cross bed it wouldn’t actually give us more mattress, but more space to one side. Living without the option to be able to dry clothes in the winter wasn’t good. So after chatting it through for a while we were both happy to go for a narrower mattress.

Since doing the original set of drawings we had changed our mind about which fridge we’d want. The new one is that bit narrower than the original, this meant one side of the galley could have more tolerance for our folding bike storage.

We put together a long list of important drawer and cupboard measurements, scanned the drawings and emailed them off before Kris in Sheffield started work on Monday morning. This had taken most of a weekend. Just a shame that we put some measurements of depth in the height column! Ricky raised a question about our galley cupboards which made me realise our mistake. An amended list was put together and resent.

Whilst I was busy drawing, Mick was researching Lithium Batteries. Thank you Adam for your comment.

Panel dimensions and ballast

Meeting 1st July

We were called back to Sheffield earlier than we thought we would be, various questions had arisen since last Thursday and it made sense for us to meet face to face. So we caught the train from Saxilby for a morning meeting.

Ken, Julia and Ricky were on hand to chat things through. Lots of research had been done over the week and one decision was needed asap. We had been wanting to have an Alde 3020 gas boiler along with a Bubble Stove with a back boiler.  Our heating needs tend to be mainly covered by our solid fuel stove in the winter and we were wanting to be able to harness some of this energy to heat our bedroom. The Alde boiler would mainly be used to help take the edge off on spring and autumn evenings, or first thing. Ricky had chatted combining both systems through with the main man at Bubble and several engineers at Alde.

The overall consensus was yes it was possible, but very complicated, much better not to bother. The Bubble chap went into details of a system with gradually rising pipes (these would all have to be hidden behind the cabin sides), thermal storage to help bleed off the heat, pumps as you can’t have the boiler boiling in the stove. The Alde engineers at first were positive, then with more digging and another two conversations with engineers who understood the scenario it got more complicated. A special calorifier would be needed with four coils, one for the Alde boiler, 1 for the back boiler, 1 from the engine and 1 for the radiators, avoiding copper in the system too. All sorts of details were talked about, yes they could do what we’d asked but it would be another extra onto our budget. We needed to talk it over between us and give a decision before the end of the day as this would effect things next week.

Conversations turned to the urine tank below the floor. As space on Oleanna is tight this has to be below the floor, which would make it hard to lift out to empty. Ken a while ago had suggested having a larger tank with a built in pump to empty it which now seems like a good idea. We had asked for a manual back up should the pump fail. They would provide us with a second outlet on the gunnel which we’d be able to lower a hose from a hand pump. This all works for us.

Then the upgrading of the alternator and batteries was discussed instead of having travel power. Ken had been looking into Lithium Ion Batteries which work in a different way to wet cell ones.
Mick here:
In order to save a few thousand pounds we had decided not to have the Electrolux Travel Power system installed but instead spend a few hundred on an upgraded  24v 100 amp leisure alternator. On chatting to Ken about this he suggested looking at having Lithium ion batteries in the leisure bank instead of the usual lead acid bank. On paper this sounds like a good idea. Lithium batteries can be run down to over 80% discharged without causing damage to them unlike to maximum 50% of a lead acid. Lithiums also charge back to full charge much more quickly than lead acid. The other main benefit is that the life of them is up to 10 times longer than a lead acid. Of course the downside is the price, they are MUCH more expensive but because of their longevity they should work out cheaper over an expected 10 year life span. Trouble is we would have to pay now instead of over 10 years!
If we went for these then we would need a different MPPT controller for our solar panels, a much more expensive one, but Ricky was waiting to hear back from Victron to see if their inverter/charger could also double as a solar panel controller. They have also asked Beta whether the 100 amp alternator can be configured to output the slightly higher voltage that the lithiums need to charge.
We need to think about this more. Any comments from blog readers?

The problem with the positioning of the freezer has been overcome and it will be possible to have it in the dinette on runners.

In our galley we will have a stack of drawers. The original thought was to have Shaker fronts to cupboards and doors, but I am not so sure of this now because of the 5 drawers one above the other. A couple of other possibilities were talked about, so some more thought is needed there from us.

In our last meeting we had provided a plan of how we saw the lights and sockets working, we chatted them through with Ricky. We may have over done what we need, so they are going to come back to us with what they would suggest. Although I’m sure not many boaters need extra lighting over their dinette for model making. We’ll see what they come up with. The position of switches was also discussed, a look around the almost finished boat in the yard illustrated where would be good places for them.

We then headed to chat things over on board. The engine bay has been dried out and given a coat of immaculate white paint, not sure how long it’ll stay that way once we get hold of her!

Still in the engine bay water pipes for the heating have been slotted through into the cabin through the tubes. These are just visible in the picture above.

The other side of the bulk head and the pipes run down and into the bilge.


Here they run along a layer of ballast and across the cross members. Joists have now been added to these cross members and another layer of ballast added where needed.

There are gaps in the ballast. The above photo is where the bathroom will be. I think the two dark lines on the side indicate which cross members will need to be altered to accommodate the urine tank. One layer of ballast has been left clear towards the bow as this will be where our cupboards and bed will be, giving this side more weight.
The pipework on the starboard side is for water. One pipe heads to where the water tank will be, the other stopping short at the washing machine. On the port side the four pipes reduce in number once past the solid fuel stove.

Chris the carpenter joined us to discuss the positioning of panels on the cabin sides. These want to look considered, but with the positions of windows not identical on each side the panels will be different slightly. Also as I have more full height cupboards on one side this will also affect the look. But a solution was come up with that should look good.

“How big is the bathroom?” isn’t really the question you want to hear as people are clutching plans in their hands. But as they are still using the plans that I scanned back to front (on purpose) it is no wonder. Our bed which should be 1.5m wide had been read as 1.2m and this made our bathroom vast! It was then discovered that with the end bulk heads, my forgetting to add a bit of tolerance and a side panel to the washing machine the shower cubicle was getting very close to the bathroom porthole. An amendment was needed to rectify this.

I said we’d look at it and possibly a smaller washing machine as I re-drew the plans at the weekend. It had been worrying me that they were still using back to front plans which I could with some time rectify.

On the workshop floor was a large pile of oak slices along with some other darker wood on top. These will be used for the frame work of the panels. When we’d visited back in January we’d been shown a boat that had two different painted panels, oak and birch. The oak shows it’s grain where as the birch is less obvious. I preferred the birch so a sample will be put together for me to have a look at next time.

The plank and pole rack were obvious on the other boat, last time we were here we’d noticed that we had nothing on the roof, but a chrome version will be added to Oleanna at a much later date.

After our meeting we headed to the canal basin for some lunch, a fish finger sandwich and to discuss heating. We were both of the same opinion that spending the extra money and time to get a back boiler to work with the Alde boiler was not going to be worth it. We have survived two winters on board NB Lillyanne without a back boiler and we already know that Oleanna is better insulated. A shame not to be pushing the free heat from the solid fuel stove around, but we still have to think of the pounds. Our decision was emailed through to Julia and Ricky and I suspect the extra pipes for the back boiler were removed that afternoon.

Paintwork and insulation

Shortly after Crick Boat Show I emailed our idea of the paintwork over to Finesse in Sheffield and paint colours were confirmed. Sadly the shade of blue that we’d been wanting couldn’t be mixed as a two pack paint, it is only available as an oil based paint. So the next best blue was chosen. I had asked to be able to chat through what I wanted with the painter as a design on a sheet of A4 is not the same as looking at the side of a hull.

Model
When we’d been trying to find the right colour blue we’d made note of several boats with it, one of these was a boat that Ken and Julia had built at Fernwood several years ago. The lines on the cabin sides were similar but not the same as my design. Somehow my request of a visit was lost in translation and lines were painted on the hull in a similar manner to the Fernwood boat . First we knew of it was when a couple of photographs were sent through. The positioning was good, the size right, but both lines on the cabin sides should have been the same, not a mirror image of each other. So the bottom line has a shadow above it, which is not what I’d wanted and I’d not had chance to explain the design to anyone. 

Model Sign writing
I’m sure they’d been expecting me to say that the paintwork looked wonderful and were surprised at my reaction. Apologies came back and our next meeting was arranged quickly.

Model Galley
Our cruising plans on NB Lillyanne were being disrupted by the River Trent going into flood, so we decided to sit out the high levels in Nottingham. I made use of this time to colour up the 1:25 scale model I’d made. With the exterior completed I then moved on to the interior, until everything had suggestions of colours on them. My hope is that this will help as a visual reference to the builders and ourselves just as a model is used in producing a play.




Meeting 23rd June.
Bathroom finishes
More samples had arrived with Julia, both fabric and laminate for the bathroom. The right shade of blue laminate fitted in nicely with the Kardean sample I’d shortlisted for the bathroom floor, A laminate for the ceiling was chosen too, a warm shade of cream.
The layout of the galley was discussed and notes taken on dimensions of cupboards and drawers that are important to us. My homework is to provide a comprehensive list of dimensions through the boat. My original drawings had quite a lot of information on them, more would have made them hard to read, but now specifics are needed, so the drawing equipment will be taking over the dinette table again.
Oleanna had moved into the fit out workshop and was sitting there on her own, suspect another boat will join her at some point. A look at the paintwork with lots of explanations as to the positioning of lines, the dimensions of them etc. This was all fine, I had no problems with any of this. But sadly my opinion still hadn’t changed on the bottom line, it still had the shadow on the wrong side of it. My design is as if the light source is coming from above the front of the boat, so the shadows are below and to the rear of lines and sign writing. These things matter to me, I can trompe l’oeil intricate architectural details on theatre scenery, so a shadow in the wrong place will just annoy me for years.
Tunnel Bands at the stern in the same cream and red
Grab rail red, roof cream

Bow to stay blue but change to Epiphanes Multiforte at the cratch board for ease of touching up the gunnels
Every layer of paint has a thickness to it so any alteration has to be considered carefully so as not to show up in the shine on the cabin side. The line and shadow need to be in the same position just the other way up, so there is a chance that they can mask off the existing paintwork and repaint it. We are waiting to see what the painter thinks and if there is any other solution.
Roof cross members covered in timber

Everything spray foamed apart from the floor and Mick!
Looking to the stern
Now that Paintgate was dealt with we climbed inside to see what had been happening. The cabin sides and below the well deck were all spray foamed. This is a foam that when sprayed expands and then hardens, you can get it in a spray can for filling holes in walls. The foam is the boats insulation and protects the interior of the steel shell from condensation.
Covered window

Timber had been added to the metal supports on the shell, these are to fix the cabin linings to. All the windows had been covered with panels of wood which were being removed and excess foam was being cut away. The letter box hole at the rear (ventilation) was full of foam and was invisible.
Pipes are for waste water from sinks, washing machine etc
The floor/bilge is left unsprayed, this will soon have paving slab ballast added in between the cross members. Anything that requires extra depth needed to be agreed on today so that any modifications could be made to the structure before the ballast is added. We are going to have a urine tank under the floor for our composting toilet so some modifications to accommodate it’s position may be needed.
Large conduit to run under the floor for water pipes
On top of the cross members on the base, joists will be added for the floor to be laid on. On most boats the water pipes run in boxing along the cabin floor at the sides, we however will have ours running below in a large conduit, which will have access points at any joints in the pipework. This will mean that our floor extends to the cabin sides and as our shell is a Birmingham square no tricky angles will get in the way of cupboards or sofas.
Electrics will go in the black conduit in the corner
Up at ceiling level another conduit has been run in the foam for power cables.
Under the well deck where the water tank will go

What is this?
The space under the well deck is where the water tank will be. On the underside of the well deck was a metal loop, if anyone knows what it is please let us know, Ken didn’t know either. We suspect it is left from the fabrication from the hull and will be ground off when the water tank is fitted.
Water tight engine bay

Climbing up onto the stern we noticed a nice detail in the anti slip. Subtle but still visible. Inside the engine bay we already seem to have water! This will be from when she has been stood outside, good thing is that it hasn’t drained away meaning it is water tight. Next time we visit I’ll have to measure how wide the openings to the stern lockers are to see if a normal bucket will fit.

Stern Locker
Anti slip on the roof
The roof has been anti slipped and the masking is where the mushroom vent holes are in the ceiling. We are not sure where the semi-flexible solar panel is planned to be fixed as yet as there was no obvious space left without anti slip.
Standing on the weed hatch

View from the stern to bow
A sneak look on board a boat that is almost complete to look at the flooring. It was a Kardean tile wood effect, fine if you like that sort of thing, but we’d rather real wood. This boat has been built for a very tall chap and the interior height is vast. The cabin sides have been built deeper to accommodate this.
Back on the engineering side of Oleanna, we were given details and some choices on boilers, alternators etc.
Engine bay with hull identification numbers

Stern locker 
Heating wise our ideal is to have a Bubble corner stove with back boiler, which would heat the boat radiators for much of the winter. Back up would come from an Alde 3020 boiler which runs off LPG. The advantage of this boiler is that it will also work from mains electricity when hooked up. However as the boiler has an aluminium coil you can’t have copper in the system. Mixing the two heating methods to the radiators is also complicated and may end up costing a lot. Finesse would normally fit an Eberspacher boiler as standard which is another option cutting out the copper problem. But it may be that finances dictate that we can’t have a back boiler on the stove. Now that Ricky understands how we see ourselves keeping warm he can chat to an engineer about the options and come back to us.
Domestic alternator upgrades were discussed. The standard one would be 60 amp, but we could upgrade it to 80 amp or go to 100 amp which is over three times as much money extra. Our current boat NB Lillyanne has a shoreline at the stern and bow, which we have found is very useful so the extra money is worth it.
Gas Locker
Different options for the urine tank were discussed and possible adjustments to the cross members in the boats structure to accommodate a larger tank. Currently we are looking at a stainless steel tank under the floor with a built in whale pump so we can empty it into another container for disposal. We would also want a way of manually pumping the tank out should anything go wrong.
The bow thruster has also been priced up. 10 HP Vetus with two batteries fed on a split charge system.
We have become used to sneaking up on fishermen and being able to talk to each other rather than shouting, so a hospital silencer is also on the list.
Looking out onto the well deck
The problem of the freezer and where to put it was discussed. Originally we wanted it under the dinette seating, but the height of the freezer was an issue. We have been trying to think where else it could go, the only other option was under our bed, but I have difficulty sleeping with ticking clocks let alone freezers turning on and off, so this we ruled out. An adjustment of how they build the dinette seating and maybe an extra 10 mm of height should accommodate the freezer.
We left with various decisions to make on the extras, a paint colour to find to match the bathroom ceiling, drawer and cupboard dimensions to collate. 

Crick Boat Show

Crick Boat Show has become a social event for us over the years. We spend most of the first day just saying hello to people we haven’t seen for a while. This year we also wanted to check out various things for Oleanna, having a lot of companies in one place takes a lot of miles travelling out of the equation.

Finesse Boats Limited
Last year we approached Tyler Wilson to build and fit out Oleanna for us. They had recently started fitting out boats, using the skills of Louis and Ricky (son and son in law of Jonathan). On our last meeting in Sheffield we were informed that Louis and Ricky were taking over the fit-out side of things under the name of Finesse Boats. We had a choice whether Oleanna would be one of the last Tyler Wilson Boats or one of the first Finesse Boats. The only difference would be in the boat builder name as the same people would be working on it either way and in the same workshops etc. The contract we’d discussed with Julia would also remain the same.
Quoting from their handbill
A newly formed collaboration of the finest boat builders in the industry. From paint to upholstery, steel to joinery, everything is contained on one site.

Finesse were being launched at the show, so we went along to say hello and see if any progress had happened on our build.

Ricky showed us a couple of photos of Oleanna in the paintshop. A photo can be seen on their facebook page. She was being sanded down after primer and undercoat. Next week they would start on the top coats. Once another boat is complete there will be room for Oleanna to move across and the fitout commence.
During the show we popped back to see them, asking dimensions of a couple of things and pointed them in the direction of a few stands that were relevant to our build.

Toilet Revolution
There were actually three stands at the show with composting toilets. One was purely for the Airhead, another was Ecotoilets (who we spent most of last winter trying to get in touch with to no avail). So we went to chat with Patrick from Toilet Revolution. On his stand was a Sun-Mar which was very impressive as the whole composting process takes place in the toilet. It is just a shame that the unit is so huge, it even needs a step to enable you to sit on the throne. He was very informative and sent us a link for plastic urine tanks which we would need. Oleanna will be a 24volt boat and the Separett Villa only comes as 12 volt. So either we will need to step the voltage down to 12 volts or fit a 24 volt fan.
Ricky popped along to see Patrick as he hasn’t fitted a composting toilet yet. Very handy to get both of them together and Ricky see the real thing.

Sofa Bed Barn
Michael at Sofa Bed Barn made us a sofa bed a couple of years ago for Lillyanne. We have been very happy with it, but sadly it won’t fit onto Oleanna as the layout is different. I had been in touch prior to the show to see if he would be able to make us a sofa that would also work as an occasional single bed with storage underneath.
Last year on his stand he had a new model sofa ‘Dalton’. This is a two seat sofa which pulls out and has a pouffe that adds to the end and would give you a four foot bed across your boat. This year he had brought a new version without arms. We chatted through at length what he’d be able to do for us and it looks like we have a solution. The Dalton without arms can be made to different dimensions as can the pouffe. So we can have a 2.5 seater sofa with a 2 ft square pouffe that can be pushed out of the way most of the time, but is the right size to make the sofa into a single bed when needed. Heights of the storage box below could be altered if we wanted it deeper, as can the overall height of the back. Once the fit out of Oleanna is progessing I’ll be able to get accurate measurements for height and the finished length. Then a decision on upholstery, whether to match the dinette or be different?
In the end we will have a bespoke sofa but based on a standard sofa, so hopefully not costing us an arm and leg.

Cratch and Pram Covers
We saw four companies about covers. Wilsons of Kinver, Kinver Canopies, Titan Boat Canopies and Canvasman. The prices that we were given as estimates ranged from £2000 to nearly £3000 plus vat. Ideally we’d like Dark Blue Acrylic covers with windows, which are backed in a paler colour, so that when all closed up it is still light in there. Some people think that the acrylic goes green in time, where as PVC doesn’t. But as I’ve found a scrub with some techwash gets ride of it and the canvas look is one that we prefer.

Freezers
Our original plan was to have a pull out freezer under the dinette seating as our shareboat did. But  height of the seat would be an issue for most freezers. The height we have to work with is around 1 ft. No-one at the show had one that low, even with the condensor at the back (Waeco) they are still too high. So we may need to rethink where it can go.

Crane or Boat Mover
Tuckey’s was there as they lift all the widebeams into the marina for the show. Mick had been introduced to Barry, so we went to chat with them about the price of transport and cranage to launch Oleanna at Crick.
The harbour master has said that he would find us two moorings side by side for a couple of weeks so that we could move from one boat to the other with ease. Then once Lillyanne was empty and had a thorough clean we’d put her on the market, possibly with ABNB or Rugby Boats.
Another option that we have is that Oleanna is launched in Sheffield, we move on board there and then move Lillyanne by water back south to sell. We could either do this ourselves or hire a boat mover to do it for us, this option is likely to be cheaper than Tuckey’s.

Solar Panels
There were some solar panels that received a good review in Waterways World a few months back. They are sold by Photonic Universe in Kent and they had a stall at the show. We will go for a 250 watt semi-flexible panel which seems to be the most powerful single semi-flexible panel available. We will have a 20 amp MPPT controler. This will enable us to fit another 250 watt panel if we find that one isn’t doing enough battery charging. We checked with the technical bod on the stall that a 20 amp controller can handle 500 watts at 24 volts. He confirmed that Mick’s technical training back in the 1970’s hadn’t been wasted and that W = V x I is still valid 40 years later!

Selling Lillyanne
When the time comes to sell Lillyanne we obviously want the best price for her. We can try selling her privately with an advert on apollo duck or go through a brokerage. Whilst still in Crick after the show we paid ABNB a visit. Lillyanne was bought through ABNB two years ago and they offer a 10% discount to previous customers. Her details were still on the computer from when we purchased her, so a few adjustments to the things that we have done and a new value was worked out. This was a nice surprise as she is worth the same or even more than we paid for her two years ago. Their valuation would of course be dependant on an inspection.
We’ll also be approaching Rugby Boats nearer the time to see what their brokerage fees are compared to ABNB.

A busy show for us. Not many boats looked at, although we did have a walk through a 45ft boat for sale at £49,999.99. Everything was very basic inside and with no heating you would need to spend money straight away on it.

Contract and more research

Whilst we’ve been busy boating on the Thames our contract and schedules have been put together. These were emailed through to us on the 5th May. A couple of small amendments needed to be made so we called Julia and these were very quickly fixed and re-emailed.
The contract has had to be emailed as our address is only a contact one and it could take several weeks for post to be forwarded to us. Next was find someone to witness our signatures. However as soon as we were off the Thames we were wanting our cat to have some freedom when we moored up, this meant being away from other boaters especially dog owners.

But in the end we spotted a boat we’ve been playing leap frog with for several days in Banbury, so we pulled in and asked them and they obliged. Thank you! Now all we need is a post box!

Our first payment has also been made over the weekend, so the hull is now paid for.

Yesterday was a very wet day, so it was time to get our heads down on more research for the boat. There are still a few things to make final decisions on, which alternator, gas versus diesel central heating, how much more will plumbing a back boiler into the system be amongst others.

Some thought today went into where we would want sockets, lights, switches and charging points. The drawing equipment came out and a suggested plan was put together.
10 lighting circuits, 4 usb chargers, double sockets etc. We are also considering installing some CAT 5 cable so that our computers and media devices can be connected to a router on board instead of relying on wifi, which isn’t always good at the other end of the boat from our mifi.

A look through samples for furnishings, I’ve managed to eliminate quite a few, but the main fabric for the dinette isn’t quite what I hoped it would be, so some more samples are needed before we can make our final decision. Who knows they all might still change dependant on the dinette.

Hello!

Yesterday we made the trip up to Sheffield to catch up with the build. NB Oleanna was sitting out in the yard with a 2 part epoxy blacking and then a primer coat to protect her from the elements. The shell is finished with all the little twiddly bits. Inside has been painted too to stop any rust and the next stage is for her to be painted, wooden battens added to the interior and then spray foamed.

It is maybe easiest to talk through the photos.

 Looking from the bow. the rubbing strakes follow round the curve of the bow. The base plate has been cut away to shape around the shape of the hull. Rings are visible where the bow fender will be attached.

There are no front doors as these will be made of hard wood and glazed.

The few scratches on the paint work of the bow are from the hull being moved around the yard on fork lifts and will be touched up.

Side view of the bow. You can see how the bow curves upwards. There is a silver coloured sacrificial anode towards the bottom of the hull. There are four of these in all. 2 either side of the bow and two either side of the stern. Next to the anode is the grill at the end of the bow thruster tube. This is to stop objects from being pulled into the propeller inside the tube and fowling the thruster.

This shows the top of the bow and the lid of the gas locker. These are the only fake rivets on Oleanna. The T stud is where the bow line will attach for mooring.

Below here there is space for two 13kg bottles of LPG which we will use to cook with and we will possibly have a gas central heating boiler too.

The cratch board will sit to the furthest right of the photograph, supported by a cross member to the roof of the boat, this will then have a cratch cover attached, covering the well deck.

Curves and mouldings to the steel work add extra interest. The moulding on the right gives water the chance to run off the roof at these points.

On either side of the well deck there is a locker with metal hinged lid. The ends nearest the bow doors have been scalloped so that the doors can open up fully. The hole seen at the bottom of the scallop is so that if water gets into the well deck it can drain back out into the canal. To the left in this photo you can just see the lid of the bowthruster locker. This will give access down to the motors etc, however the battery will be located in one of the side lockers.
This is looking from inside back through the bow door opening. You can see that the floor and it’s cross members have been sprayed black and that the hull sides have been sprayed grey for protection against rust. The cross members will have wooden battens added to them. Between the cross members on the floor is where the ballast will be positioned. The cabin sides will be sprayed with insulating foam stopping the chance of condensation on the inside of the hull.

The next few photos show the inside of the cabin, first looking back to the stern, then the bow. Holes in the ceiling are for the mushroom vents which help prevent us from suffocating when all the doors are closed. You can make out the inside of the stern doors, these are steel, but will be lined with wood.

Around the porthole closest to the bow extra uprights have been welded to the cabin side. These must be so that there are secure fixing points for the cupboards that will be in here.

The pipes coming out from the side of the cabin are for drains from appliances.

The furthest forward is for the washing machine which will be at Mick’s side of the bed, then the shower followed by the bathroom sink. These are all positioned above water level outside, otherwise they would let water in and we’d sink. The shower will require a gulper/pump to suck the water up and over the side.

Looking at the stern doors. Below them is what looks a bit like a letter box. However this will actually be a vent into the galley from the engine bay, this gives enough ventilation without having to have vents in your back doors. The rear cabin steps will sit here centrally.
The pipe coming through the rear bulk head is for cables, water pipes etc. There is a matching one on the other side too.

The low box/cheese wedge is the swim of the hull, this takes up quite a bit of space at the rear of the cabin and stops you from being able to use these areas for appliances.

Three of these are on the exterior gunnel sides and where you can attach fenders. However from past experience we would be very unlikely to attach them here. The temptation to cruise with your fenders down is too great and lifting them a bit of a phaff. This is also the most likely reason that we have over the last couple of years gained several fenders, around our prop, that have been lost by other boats in locks when their fenders were down.  We are more likely to attach fenders to the grab rail by using wooden hooks. These you can position where you need them and then just lift them out of the way completely. So why still have these? They will be very useful when we moor as we could use them to tie additional lines creating what are known as springs.  Having two lines going in opposite directions from the bow and stern mean that you are less likely to move in strong winds or when speeding boaters pass.

View down the starboard side, another boat in the way.

The port side showing the side hatch that will be opposite our dinette, window in the centre of photo will be the galley. The grill on the side of the boat is for ventilation into the engine.

Below the stern you can see the point where the swim has a hole for the prop shaft to come from inside, this will be where the propeller sits. Behind this is the rudder which pivots in a cup that is attached to the swim.

Above on the stern deck is the weed hatch. This on Tyler Wilson hulls is separate to the engine bay totally, so there is no risk of sinking your boat by not tightening the weed hatch up properly. The grooves on either side let water drain off the back deck. Our current boat doesn’t have these and water drains around the opening to the engine into a channel before being diverted off the boat. 
A loop is visible that the back fender will attach to. Also one of the two rear dollies is visible. This is where you tie your stern line to when mooring. The one in view also acts as ventilation to the diesel tank, having a hole in the top. This will have mesh fitted at some point. 
This is our all important Hull number. This is attached near the weed hatch and is unique to Nb Oleanna. It states who built her, in what year and what number boat she is from that builder. This number will be on our contract.
Finally a view across the stern to the stern doors. There are back doors to the semi trad stern. The hole in the metal work on the left is where the throttle control will be. There is then a locker running full length to the back doors, as there also is on the right hand side out of view in the photograph. On the rear bulk head to the left of the doors is a lockable panel. This is where all the gauges to do with the engine will be and the ignition. Our current boat has this and Mick likes being able to see the dials from the helm, quite often they are just inside the rear doors and not that visible.
The large hole in the floor is the engine bay and you can see the letter box ventilation into the main cabin. 
The back doors will only open to just gone 90 degrees, this was to give us more locker storage space at the rear. The sliding hatch is above these.
After having a good look around our hull we then sat down with Ricky, Louis, Julia and Ken and talked through the contract and stage payments. Then in much more detail we talked through engine, wiring, alternators, travel power, the interior allsorts. We still have to make our minds up about various things. Weighing up the pros and cons versus price on various elements to do with the fit out. Wooden window liners or metal, which bow thruster etc. A lot of things still to sort.
But the most important one is what colour we are going for with the exterior paintwork. This is the next job and paint needs ordering. Sadly the colour we would really like doesn’t seem to have a RAL or BS number, we have a choice between two blues. Despite having a RAL chart to look at this still isn’t the exact colour. So we have been given a little bit of time to think it over and see if we can get a reference to the colour we would really like. But as they use 2 part epoxy paint we may not get an exact match as this may only be available in an oil based paint which is not quite so resilient.
We came away with homework to do and awaiting more details on various things. A very exciting day, we have a boat!