I’m liking these mornings with shore leave, I don’t feel the need to return for my dingding quite so much. However this morning She started to call for me long before my hour was up! Just what was She wanting?! I was busy.

Well it would have been very rude of Tilly not to have shown her face to say goodbye to Karen and Bill before they pushed off, wouldn’t it Tilly! Yes!!!

See you again somewhere sometime

We waited and hoped that the wet air would subside, it did a little. Where we are planning to go has nowhere to fill up with diesel, NB Halsall is currently on her way down the Shroppie. A comment made by Brian on facebook somewhere suggested that the price at Aston Marina would be good. We decided to pull and and see.

Fill her up please!

Aston Marina has two entrances, however one is an entrance, the other an exit. They operate a one way system. We turned in, a family busy feeding ducks and geese from the bow of NB Winding Down, we waved to Paul and Aileen. Round to the service point where a bridge crosses the marina. Gosh Brian had been right, this would be the cheapest diesel we’ve had all year.

Turning back out onto the cut we made our way to Aston Lock. A boat was coming down, Mick helped then it was our turn. The offside bottom gate was obstinate in closing. Mick wiggled it around a bit, still a couple of inches gap, but that was better than it had been. Up Oleanna rose, the half way mile post, garden hut came into view along with the Aston Villa stop planks.

Looking back below Aston Lock

In towards Stone. It’s further than you remember it being, I’ve once walked from Stone Station to Aston Marina and its even longer by foot. The end of the moorings showed. The bank where we’d pulled in back at the end of April is more settled, adding a new length of mooring capability. There was a space just past the footpath, we pulled in and soon discovered why it was empty. Oleanna’s bow came in but not her stern. We tied up anyway, time for lunch.

We checked on the new bins, up a little footpath by the Scout hut, no recycling facilities, at least there are bins again. M&S for fresh food supplies. A chat with a chap who moors on the Caldon about his extended nappy pins, pins with a long hooped handle welded onto them. Then it was time to make a move.

Star Inn and Lock

Star Lock, always gongoozlers here. Loud music came from the garden and two kids in fancy dress ran around in great excitement. Up ahead a boat could be seen leaving Yard Lock, Mick walked ahead. The boat coming towards Oleanna wasn’t making a very good job of avoiding the moored boats. The crew walked past Mick, ‘We’ve emptied it for you’, fairly obvious, he could have left the gates open too especially as the lock bridge is cordoned off at the moment. In his defence he’d not have been able to see us coming, but the person at the helm would have.

I managed to hover, bow close to the gates to avoid being blown about, whilst Mick walked round the lock to open the gates again. Up we rose. The chap had said he’d left the lock empty, he’d also left a paddle up by four inches, that was soon rectified once I’d spotted it.

All under wraps today

The pub was busy, most of the Ginger hire boats were in. The obligatory photo of Joules Brewery had a different look to it today, the building covered in scaffolding and red netting.

A boat was filling with water below Newcastle Road Bridge, not enough room before or after it for Oleanna to pull in to drop Mick off. We backed in and off he hopped. I’ve never noticed how the brickwork to the entrance of lock funnels in to meet the width of the lock.

Newcastle Road Lock

At Lime Kiln Lock a boat was coming down, their crew walked on down past me, asked how far we were going, maybe just to the moorings above today. He said there was room, they’d just pulled out after the first boat. As we cruised past we’d need not have fretted, only two boats moored along the whole stretch. Anyway we carried on that bit further getting away from back gardens and closer to the bottom of Meaford Locks ready for the morning. Tilly was given 45 minutes, she didn’t use them all Too many woofers!

The other day we’d worked out a cruising plan, we knew we’d have enough time on our hands to cruise where we wanted, a calculation of how many hours cruising a day would be required. However we now were getting suggestions for rendez vous with several people. We realised our plan would require fine tuning and adjusting to meet up with transport for various dates. This meant an hour of deep concentration and Canal Plan. Railway stations required on at least four occasions, maybe returning back to join the Trent via the Shroppie hadn’t been such a good idea.

Suddenly our cruising hours had shot up to four hours a day. How come? It had us heading for Derwent Mouth Lock to join the Trent, then returning to Nantwich before heading along the Shroppie. Another session is required for fine tuning. By now we both wanted to watch the final episode of Imposter: The man who came back from the dead. What a terrifying true crime story of a man who woke from a Covid coma in Glasgow accused of being a serial sex offender on the FBI’s most wanted list. We needed to know if he was extradited back to the States.

5 locks, 5.1 miles, 2 outsides, 1 dragon, 1 jaunty mooring, 2 biffa bins, 1 top up shop, 1 huge cauliflower cheese, 0.5 of a sock knitted, 1 painting scanned, 1 box of paints to put away.

https://maps.app.goo.gl/hxmutpmwCGrFTRs3A

Drained But Not Fully, Breach 31. 14th March

The recent storm has stopped Mark from flying his drone recently, but this morning he deemed the wind speed was just about okay to go flying again.

14/3/2021

The cofferdam looks like it has drained by itself again, although maybe not quite as low as it has done before.

The pictures today show where the leek happened that has now been mended.

25/2/2021
25/2/2021

These photos are from 25th February. In the bottom right hand corner where the pipes gently curve away from the bank there is a grassy gap showing where the cofferdam piling meets the existing piling and there is a bridge over the pump pipes.

7/3/2021

Then these from the 7th March. The area is much darker than before, this is because there is a hole there.

7/3/2021

It looks like you can see the back of the bank piling and then another layer of piling is close up to the pipes, you can see the corrugations in this second photo.

14/3/2021

Today the hole has now been filled with aggregate, the chalky surface quite obvious and there may also be more clay than before by the cofferdam piling.

14/3/2021

The second raft for the pumps to extract more water (at the western side) have been plumbed in, but there are no extra pipes at the eastern end.

14/3/2021

The level between the breach and Goole caisson is being kept about a foot lower than normal so that the level doesn’t over top the cofferdam. The removal of the top section of stop planks helps with this, draining any excess water that is pumped round the breach into the docks to help keep the level up there.

At some point this week we will be changing our website hosting. Readers shouldn’t notice anything different and those who get an email each time I post should still get one. I will do my best to inform you of the last post before we move, JUST IN CASE!

Where were we

2020. Betton Wood Bridge, Shropshire Union Canal. LINK

2019. Goole, Aire and Calder Navigation. LINK

2018. Norbury Junction, Shropshire Union Canal. LINK

2017. 13th March, Cracks Hill, Leicester Section, Grand Union Canal. LINK

2016. Cranfleet Cut, River Trent. LINK

2015. Peartree Bridge, Grand Union Canal. LINK

2013. Leek. Caldon Canal. LINK