Alternative Plans. 8th July

Smallhedge Bridge to Doncaster Visitor Moorings

Sorry Tilly, no shore leave this morning, and none likely later on either. We needed to get moving and had to have a few possible mooring alternatives up our sleeves.

Waiting to leapfrog

At the end of the first bridge landing we came across a wide beam who was waiting for another boat to leapfrog the remaining bridges with. He untied his boat then asked as we pulled in if he could follow us through, yep no problem. I didn’t take note of his tall chimney at the time but thankfully I’d lifted the bridge far enough for it. A boat heading the other way gunned it to come through too, 3 boats with one button press and only 2 cars held up.

Closing up behind us

Of course now we were following a single hander. I was quite happy to hop off and work the last two bridges for us both, but he insisted, or maybe he just didn’t hear! This did mean it took quite a while for him to tie up, work the bridge, then catch us up at the last bridge of the New Junction.

Over and under at the same time

Under the Don doors and on to Bramwith Junction. The wide beam turned left and we were on our own again headed towards Doncaster.

Topping up the tank

A water stop at Barnby Dun lift bridge and a check on bus services for tomorrow. 6 something would get me into Doncaster an hour before my booked train. Not ideal, but an option if we couldn’t get to Doncaster to moor or if the moorings were full.

At Kirk Sandall I checked the trains to Doncaster, I’d also have an hour’s wait for my train whether by bus or train. Another option, but also not ideal.

Bank stabalisation not a sculpture

We pootled on, checking the CRT stoppage notices. A couple of days ago Long Sandall Lock was out of order, the customer pedestal wasn’t working, but engineers had been called the following day. Our question, had they been and mended it and the notice hadn’t been updated? We were willing to give it a go.

Boat people

The people working on the embankment were all heading for lunch. Crammed onto their little boat heading back to base as if they were crossing the channel.

As we approached the light at the lock was amber, the window in the tower was open, people were inside. Surely if the lock was still out of order the light would be red.

Hooray it’s open

The light turned red, just as I was about to step off the stern. The lock started to empty, then the gates opened. The chaps in the tower were on a lunch break from working on the weir so worked us through. We mentioned that the stoppage notice hadn’t been updated, they’d ring it through. A couple of hours later a notice to say it was open arrived.

Passing Strawberry Island we looked out for Cruiser Amourouse, tucked away on the far side of the island. The boats from the flotilla that set out at the end of March have now split. Some are heading back to base, others exploring the Great Ouse and River Cam before returning north.

Doncaster!

Now we had our fingers crossed for some space on the pontoon in Doncaster, this would save having to wake up around 5am tomorrow. As it came into view we sighed with relief, two small cruisers on it and plenty of space for us. We tucked in right on the end as far away from the building site by the gate as possible.

A few bits to do on my model, darken a barrow and add bits to strengthen other pieces of scenery. Mick headed out to get a few bits and was requested to let me know before he stepped back on board as I had a lot of blue lining to do and I didn’t want them to go wobbly!

My hope is to not be returning from Chippy with the model box tomorrow, with that in mind I wanted to take photos of the model. Tilly did her best to assist, getting in the way!

Hmm, you’ve missed the blue lines off the front of the stage!

Music. Fairly loud music, it couldn’t be, could it?! It was Cruiser Orchid, thankfully they continued on towards Doncaster Lock and moored up just about under the railway for the night despite there being plenty of space on the pontoon.

Jobs done. Model packed. Yarn selecting failed, I’ll just have to write this blog post on the train tomorrow instead of knitting socks.

1 lock, 8.8 miles, 4 bridges, 12 held up, 1 water tank full, 1 clean pooh box, 3 alternative plans, plan A achieved, 1 feline note, 176 photos to sort through, 1 model packed, 4 chicken spring rolls, 1 bored cat.

https://what3words.com/hurray.bleat.notes

Leave a reply and don't forget to tell us who you are