Doncaster Visitor Moorings to Bramwith Junction

A few little gaps in our larder needed filling, we moved Oleanna up to the water point and I left Mick topping up with water as I walked into town. A few stalls were open in the fish market along with a couple of fruit and veg stalls outside. I toyed with trying to buy everything at the market, but I still would need a supermarket for a few bits and another visit to Boyes was required.

Back at Oleanna the development next door was having some piles driven about 2ft away from the gate to the moorings and more importantly 2 ft away from the piling holding the bank back. Mick just wanted to make sure CRT knew about this, so gave them call.
Yesterday a small black narrowboat had arrived towing a small cruiser. The chaps had chatted to Mick asking if he had a guide to the area. They were planning on towing the cruiser and a second one down to Keadby and out onto the Trent and up stream to Nottingham, their main concern was would they be able to breast up one cruiser and still get through the locks. This morning they were manoeuvring themselves round to the other side of the pontoons to collect the second cruiser, neither of which have working engines.

We pushed off wishing them well and headed back down stream. Todays mooring should be one suitable for Tilly to have some shore leave and hopefully one where we’d be able to do some jobs. As we approached Long Sandall Lock we clocked the boat that had been at Bramwith Junction, maybe our mooring would be available?

The amber light at the lock turned red. Ah, the VHF radio had been coming to life on and off and news that Eastwood Lock up at Rotherham was now open suggested to us that maybe Exol Pride was on its way, maybe we were to meet it here? The top gates opened and the light turned green. A chat with a chap in blue, they were here to clear bywashes etc, then up to Doncaster to check things out there too along with the development site. No news of Exol on the move.

Below the lock there was more activity at the pontoon for the flood defences. Numerous chaps in orange were gesticulating to a crane operator. A short distance further on another band of orange people were on the river bank erecting fencing and measuring things out.

At Barnby Dun Lift Bridge I had another prat go through on the red wigwag lights necessitating me lifting my finger to stop everything. Once through I counted the cars, 21 including a funeral cortege, I hope I didn’t slow them down too much.

I now opted to walk to the junction whilst Mick took Oleanna on ahead. Our favourite space available, thankfully the wind that is always present here helped to hold Oleanna to the bank today. Tilly when shown the outside wasn’t too enamoured due to the breeze, so the front door outside was checked, it was slightly better!
After lunch it was time for jobs. I dug out the drill for Mick whilst he dug out buckets for me. Mick would be having a more concerted effort with the stern light today. Our passage through Keadby next week is at 7am, there may be fog on the river and with so many boats in convoy it would be handy to show a white stern light.


I got the boat washing things out. Goole for five months leaves it’s mark on boats, a greening and general layer of dust, time to give Oleanna a scrub up for the Fund Britain’s Waterways Campaign Cruise. I decided to split the job into four, starboard side today, both roof and cabin side. The covers will have to wait!
Tilly came out claimed the towpath as hers, ran around like a loon for a while then sat on the gunnels, chewed the tasty bits of grass alongside the boat then went on duck duty, Can’t have ducks making nests on Oleanna, the outside needs to keep changing! Just keep away from the wet side of the boat please!

Ten more minutes of walking were required so I decided to walk round the ‘block’ as it were. From the opposite bank I got a few nice shots of Oleanna and Mick looked like he was nearing completion of the stern light wiring. Along to the Don Doors, a boat just approaching from the last bridge of the New Junction. Across to Bramwith Lock, people from the permanent moorings were sitting out enjoying the early evening sunshine. By the lock there is a cupboard for fresh eggs. Not just chicken eggs, but if you are lucky you can get Turkey and Guinea Fowl eggs too. I’ll look again when we come through, see if we’re lucky enough to try a Turkey egg.

On returning to Oleanna some wiring was happening in the electrics cupboard. After a short while there was a cheer, the stern light was working! Brilliant.

A while after dark we paused what we were watching on the TV, lights and voices could be heard on the canal. It was the black narrowboat breasted up to one of the cruisers, thankfully they weren’t towing as well! Will they have got through Bramwith Lock breasted up? Hopefully where ever they got to they got there safely, we just wonder how much research they’ve done for the Tidal Trent?
1 lock, 5.7 miles, 1 lift bridge, 21 held up, 1 prat, 4.43 miles walked, 52 minutes briskly, 1/4 washed boat, 1 stern light working, 1 loony cat who’s forgotten about the trees over there! Where?!

